HomeMy WebLinkAboutResolutions - 1980.03.12 - 12027; Li March 13, 1980 RESOLUTION NO. 9350 RE: AUTHORIZATION TO RECEIVE BIDS FOR PHASE I OF ROYAL OAK MARKET RENOVATIONS. BY: PLANNING AND BUILDING CO=TTEE TO: OAKLAND COUNTY BOARD OF COMMISSIONERS MR. CHAIRPERSON, LADIES AND GENII - WHEREAS, an overall plan has been prepared by the Planning Division for a series of improvements to the Royal Oak Market; and WHEREAS, the implementation of this plan has been recommended by your Planning and Building Committee and the Royal Oak City Commission; and WHEREAS, Phase I of this project calls for the construction of a canopy along the east side of the Market, which will provide additional stalls for use by the Market vendors; and WHEREAS, this phase will also include the construction of an outside plaza to provide seating and rest area for Market shoppers; and WHEREAS, the design of this construction will enhance the overall appearance of the Market; and 77.777TAS, the estimated cost of Phase I is $135,000.00 NOW THEREFORE BE IT RESOLVED that the Department of Central Services be and is hereby authorized to receive bids for Phase I of the Royal Oak Market Renovations, and a report thereon be made to this Board after receipt and tabulation of such bids. The Planning and Building Committee, by Richard R. Wilcox, Chairperson, moves the adoption of the foregoing resolution. PLANNING AND BUILDING COMMITTEE Richard R. Wilcox, Chairperson 'if APPROVE THE • w •NG RES Construction Sub-Total Administrative Engineering Inspection Contingency Total Project Cost 112,700 .00 1,7^.00 8,C --,-) 8,000.00 $135,000.00 OAKLAND COUNTY EXECUTIVE DEPARTMENT OF CENTRAL SERVICES FACILITIES ENGINEERING DIVISION PHASE I OF ROYAL OAK MARKET Project 79-17 March 6, 1980 On February 7, a slide presention was rr ,de by the Planning Divisin illustrating a multi-phase imprc--77t proje the Royal Oak Authorization was given by the Commi-..'-ee to prc,ceed with Phase 1, namely, a covered canopy along the east side of the existing building which would provide additional spaces for vendors. During the interim, -- -reliminary design work was .:one which enabled a preliminary cost estimai to be developed. This is :,.-m ,-;zed as: Demolition $ 3,000.00 Backfill 2,200.00 Concrete 26,500.00 Masonry 9,000.00 Structural 16,000.70 Metal Deck 11,000,fl1 Pre-Cast Concrete 25,000. Exterior Tile 20,000.0 At this time, authorization to complete the design work and receive bids (using the new bid proce ,l-es) is being sought. #9350 March 13, 1980 Moved by Wilcox supported by Patterson the resolution be adopted. AYES: Dunaskiss, Gabler, Gorsline, Hobart, Hoot, Kasper, Kelly, Lewand, McDonald, Moffitt, Montante, Moore, Moxley, Murphy, Page, Patterson, Perinoff, Pernick, Price, Roth, Wilcox, Aaron, Caddell, DiGiovanni, Doyon, (25) NAYS: Fortino, (1) A sufficient majority having voted therefor, the resolution was adopted. STATE OF MICHIGAN) COUNTY OF OAKLAND) I, Lynn D. Allen, Clerk of the County of Oakland and having a seal, do hereby certify that I have compared the annexed copy of t.eji. with the original record thereof now remaining in my office, and that it is a true and correct transcript therefrom, and of the whole thereof. In Testimony Whereof, I have hereunto set my hand and affixed the seal of said County at Pontiac, Michigan 8o Lynn D. Allen......................Clerk