RESOLUTION NO. 9350
RE: AUTHORIZATION TO RECEIVE BIDS FOR PHASE I
OF ROYAL OAK MARKET RENOVATIONS.
BY: PLANNING AND BUILDING CO=TTEE
TO: OAKLAND COUNTY BOARD OF COMMISSIONERS
MR. CHAIRPERSON, LADIES AND GENII -
WHEREAS, an overall plan has been prepared by the Planning Division for a series
of improvements to the Royal Oak Market; and
WHEREAS, the implementation of this plan has been recommended by your Planning
and Building Committee and the Royal Oak City Commission; and
WHEREAS, Phase I of this project calls for the construction of a canopy along
the east side of the Market, which will provide additional stalls for use by the
Market vendors; and
WHEREAS, this phase will also include the construction of an outside plaza to
provide seating and rest area for Market shoppers; and
WHEREAS, the design of this construction will enhance the overall appearance of
the Market; and
77.777TAS, the estimated cost of Phase I is $135,000.00
NOW THEREFORE BE IT RESOLVED that the Department of Central Services be and is
hereby authorized to receive bids for Phase I of the Royal Oak Market Renovations,
and a report thereon be made to this Board after receipt and tabulation of such bids.
The Planning and Building Committee, by Richard R. Wilcox, Chairperson, moves
the adoption of the foregoing resolution.
PLANNING AND BUILDING COMMITTEE
Richard R. Wilcox, Chairperson
'if APPROVE THE • w •NG RES
Construction Sub-Total
Administrative
Engineering
Inspection
Contingency
Total Project Cost
112,700 .00
1,7^.00
8,C --,-)
8,000.00
$135,000.00
OAKLAND COUNTY EXECUTIVE
DEPARTMENT OF CENTRAL SERVICES
FACILITIES ENGINEERING DIVISION
PHASE I OF ROYAL OAK MARKET
Project 79-17 March 6, 1980
On February 7, a slide presention was rr ,de by the Planning Divisin
illustrating a multi-phase imprc--77t proje the Royal Oak
Authorization was given by the Commi-..'-ee to prc,ceed with Phase 1, namely, a
covered canopy along the east side of the existing building which would
provide additional spaces for vendors.
During the interim, -- -reliminary design work was .:one which enabled
a preliminary cost estimai to be developed. This is :,.-m ,-;zed as:
Demolition $ 3,000.00
Backfill 2,200.00
Concrete 26,500.00
Masonry 9,000.00
Structural 16,000.70
Metal Deck 11,000,fl1
Pre-Cast Concrete 25,000.
Exterior Tile 20,000.0
At this time, authorization to complete the design work and receive bids
(using the new bid proce ,l-es) is being sought.
#9350 March 13, 1980
Moved by Wilcox supported by Patterson the resolution be adopted.
AYES: Dunaskiss, Gabler, Gorsline, Hobart, Hoot, Kasper, Kelly, Lewand,
McDonald, Moffitt, Montante, Moore, Moxley, Murphy, Page, Patterson, Perinoff,
Pernick, Price, Roth, Wilcox, Aaron, Caddell, DiGiovanni, Doyon, (25)
NAYS: Fortino, (1)
A sufficient majority having voted therefor, the resolution was adopted.
STATE OF MICHIGAN)
COUNTY OF OAKLAND)
I, Lynn D. Allen, Clerk of the County of Oakland and
having a seal, do hereby certify that I have compared the annexed copy of
t.eji.
with the original record thereof now remaining in my
office, and that it is a true and correct transcript
therefrom, and of the whole thereof.
In Testimony Whereof, I have hereunto set my hand and
affixed the seal of said County at Pontiac, Michigan
8o
Lynn D. Allen......................Clerk