Loading...
HomeMy WebLinkAboutResolutions - 1979.10.18 - 12514HER EO APPROVE THE FOREG September 27, 1979 9 136 RESOLUTION NO. RE: FINAL FUNDING FOR EXECUTIVE OFFICE BUILDING BY: PLANNING AND BUILDING COMMITTEE TO: OAKLAND COUNTY BOARD OF COMMISSIONERS MR. CHAIRPERSON, LADIES AND GENTLEMEN: WHEREAS, after all major construction contracts were authorized for the Executive Office Building, there remained a contingency of $3,292.00; and WHEREAS, the small contingency resulted from the inflationary costs of construction between the time of the project proposal in 1976 and the receipt of construction bids in 1978; and WHEREAS, further demands for space resulted in the development of an additional 16,960 gross square feet of space, in the hollow core area of the quadrangle building, resulting in additional deterioration of the contingency, which would normally have been approximately 10% of construction cost; and WHEREAS, changes in occupancy in areas of unanticipated work were and still are being identified and require additional funding; and WHEREAS, $120,889.08 remains in the proposed 1979 Capital Program for the purpose of completing this project; and WHEREAS, the final cost of this project will total S3,800,000.00, or a construction cost of $34.69 per square foot. NOW THEREFORE BE IT RESOLVED that $120,889.08 be and is hereby allocated to the Department of Central Services to cover the final cost of completing additional work at the Executive Office Building. BE IT FURTHER RESOLVED that the release of these funds for contingency items must be approved on an individual basis by the Planning and Building Committee before such funds are expended. The Planning and Building Committee, by Richard R. Wilcox, chairperson, moves the adoption of the foregoing resolution. PLANNING AND BUILDING COMMITTEE 1 Agbithido c 0 x , Chairperson I" 30. 1979 TI VE OFFI FINAL 76 -8 In V(irsh of 1976, beg a clar: c e I [tie and „ The of this. s 1 wou d have !•:,r L C.M.f-L. Clinic T ot I be , I wasi-:,,-ese.-mteci to the P1 n or: and ci t: 31 Tra 1276 6,1 s ::.:7T1 air -...7.7c ! a.nd aces 7 t woo d (.7:0Viry:L i VI DEPARTJF..N7 FA C. T77 Built in 1925 and 1926, the original County I was a two -story dr ang e with a "hollow core " and a part th ir- Thc.Em 711 dd 1 la e h and suns i g at ::'acflity, 19621., a four Jirg was k. .n z .e,b Ilahni ry:;.! - the exo r: e suhie at d 1 or n d Is stucturr ccuilo on !„orapt ': It Lyo ate and CE.Ci i..III I Ca.re CC I o I se r v 171 t s:cru Si. Ii rmary, gross urced co ncr .. finally det: kled By a t 1 was an ar C some mo(i V 17, 1977, Resolu ,r1zing the selection , initial design work. by the Board of and appropriating a't-Admlnistrative Civil Counsel Library County Exe.::;)tive County rxe.r.siJtive-f !e:t iting 7,0 ot- 1,777 2,1 ,oay bu i an a a t o desigo ar presented 2and was to develop the "hollow core" :7,ion of floor slabs and a new ess soure feet of buildi! the "core" area Committee on i <7. The / I.. ",. On thorized )2r total brject, eslt0oh SI49 ap7roved '1u! schematic plans olutibn paed o.0 w.ls and blaJLe ,.! a ..3,0X,00) limit 1, 1977. o a.:161tional 11 aneou s Common Areas 2,484 9,815 Aud Total 56 ,004 of the working , which required -as .sd. 7 1 De .v sots were tfd ..s contractor, 7CaCT 76-8 -2- AUGUST 30, 1979 On April 2, 1.97 7 , the firm of Tarapata, PJ..ulson (IMP) was hire: Ti additional des gn upprnpr;:_:ion was auth 4e54o utk) 7M. On May 5, 1977, Resolution 7'l)H4 officially chan,:;cd tre ld County Hospital to the Executive Office Building. The Had none tn work immediately and, durifl S :ivelopment of the '.i.chec br,f-.am. increasingly apparent th5t the dr,:Tr.rtd fcr space excee0ed the -7.apply. The reason for this was that oddltlonal had to oc relocated in order to convert the Court Tower and Wl(vi irt,:h a judicial center. By this time, space for the following divisions iit2 requested: arY 3,788 2,314 2..107 A presentation madc. 1..,g the P 1 r cemonstrating the need ..or devclof!.m....r of 9uil cling if thc, :::hurt lnvwo ire judicial cent..ar. On October 11, 1977, Resoluti the tot7fl cost to $3,500,ftfri, aw)Igs was t,r,9un on March 23, 1978; Civil Couns ,i:I's Ol'f ice to remajr, in the as mod'lf'..Ed the Advadde final wrk cn1ract sebara t would PR.CJECT 76-8 AUGUST 30, 19 06. in the I y: erro' in the 8.:7 awarded awards, he tet:31 projez:H.. r.9 tion (31 ContiRAC,,c-A ct's Fees rut & Furniure n',:nry i on .innce-Demclitien rti Res,:±rvr-:d or future bid Contingency s (1 2 & 1 3) Total Appropriation & PiO.Oct Cost installation r ad that a conflicting storm 1.-ain he i • n mule ro lonpe -c rcAe in Circi;it and Wings, it C Probdon :sentati;A wa.F; ,tlinino rot en Iv Aat odd une 13, the D.92, The t w9posed that -der to a to be ;3171'7:,,,AW project comtingw lot ion 095i quest, U In M Phi 1,c1 Cf[tJee for item by i ..116t futur ';"e- .5rouçtA nsidention bv both the Conmittee and nar 4, b. er7i i ngs ConsF.'f'..cLion s.,:-g)n as •-,ka'nded 5e e-y:)(:-E,ssL Demolit'or wEs started firt., Dep&rtures aitoal cr,nditichs from conditions, are consiered normal on remodeling jos, t 2 1.1rsaff, linteiF„ tected and had to bp ('1,7.1-ced, 3, structural supports were reuuired for new -(::pnings in *a], floors, and the roof. floor slabs had to be r:7:-olaced, to existing building were found to be in error, 6, Existing val'vos of piping were found to be leaking when insulei: was removed, *$170,000 was saved on this item, by utilizing in-house staff. The lowest bid received for this package was $240,000. PROJECT 76-8 -4- '2,UOST 30, 1979 would have t roort, total project dollars Using the costruction rose 12.7 $3,800,000: As .9c estima ted to cost of soya :1 1977 arb-J when cJnad $2,917,0)0 indices, ject was ( ert c:ost in n77 tost of d in 1978. . Had the fu71 $300,000 request hear: Brd's, most reci)t action raised tt'•F' 1- prn• fc',-: tor adjustment ilil POt. 112:7%) liticl!al space '460' xoec.ted Cos -t Tr $3,287, 775.242 $4,062,701 directly on die 76, added, $2,802,2 ca ,000 000 tn ar,assu . "eet prigi 5 is a unit rF.r. involve work by several tr..,,or, sod many at ins to be out Ice - mlotps for quotes by te ,..loniect and S. Then, ::::)Lel..1Ho the usial 2uilding COit am n to the ful . all man' ori7PtIon, This is aces ttle cens.trwstion schedule The typical bulletin item can .untractors: is not days or re-pricrip add of a 7,-,re .:,.ertien Commi e mare log the bul -actor and p S in thee, the 1977 pr,:1pLct did not Me current pifliect is unit cost $42.72 includes ::,inst.u:,;t te S4.71 pe- sq-:,:iar foot: ation, thi, cost of L:ecutive Office epected to be: the so-called 16,960 OSS ace in the Detroit terinral fFes would these tcto-s into ding nav;-, been the $300,000 in a:noested last April had all been the project bud at wPuld h:Ive appeiired as: i„onstrortipn ArchitKt':: Equipment Co,r, Maint ure Supervion hance-General rneriahce-Demolition ftive tar future bid pac 4 . 6, -7 ,• ,774- FISCAL NOTE BY: FINANCE COMMITTEE, DENNIS MURPHY, CHAIRPERSON IN RE: FINAL FUNDING FOR EXECUTIVE OFFICE BUILDING - MISCELLANEOUS RESOLUTION #9136 TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr. Chairperson, Ladies and Gentlemen: Pursuant to Rule XI-C of this Board, the Finance Committee has reviewed Miscellaneous Resolution #9136 and finds the $120,889.08 available from the proposed Capital Program Executive Office item. Said $120,889.08 is to be transferred to Capital Project #C-1260 FINANCE COMMITTEE Dennis MurOhyr, Chajrperson #9136 October 18, 1979 Moved by Wilcox supported by Roth the report be accepted and that Resolution #9I36 be adopted. AYES: Hobart, Hoot, Kasper, Kelly, McDonald, Moffitt, Montante, Moxley, Murphy, Patterson, Pernick, Peterson, Price, Roth, Wilcox, Aaron, DiGiovanni, Doyon, Dunaskiss, Gabler, Gorsline. (21) NAYS: Lewand, Moore, Fortino. (3) A sufficient majority having voted therefor, the report was accepted and Resolution #9136 was adopted. STATE OF N1CHICAN) COUNTY OF OAKLAND) I, Lynn D. Allen, Clerk of the County of Oakland and having a seal, do hereby certify that I have .compared the annexed copy of Miscellaneous Resolution #9136 adopted by the Oakland County Board of eesor r .swe e*orr..tow.e..n •••..a n een.....6.a..o•eer n I• • •I•0• • ••0 0 •• 00••••• Commissioners at their meeting held on October 18, 1979 .................... .......... ....... ..... .............. ........ with the original record thereof now remaining in my office, and that it is a true and correct transcript therefrom, and of the whole thereof. In Testimony Whereof, I have hereunto set, my hand and affixed the seal of said County at Pontiac, Michigan this 18th day of October 19 79 Lynn D. Allen ......... ----Clerk By Deputy Clerk