HomeMy WebLinkAboutResolutions - 1978.02.02 - 12668February 2, 1978
RESOLUTION NO.
By: PLANNING AND BUILDING COMMITTEE
IN RE: WEST BLOOMFIELD WATER SUPPLY SYSTEM - SECTION 4
TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS
MR. CHAIRMAN, LADIES AND GENTLEMEN:
WHEREAS, the Township of West Bloomfield, by resolution
adopted by its Township Board on Aa7 6L, 1977, has
indicated that it is in need of certain extensions to the West
Bloomfield Water Supply System and has proposed that such extensions
be acquired and constructed by the county and financed from surplus
bond proceeds on hand; and .
WHEREAS, this Board of Commissioners desires to proceed
with the acquisition, construction and financing of said extensions
as provided in said contract;
THEREFORE, BE IT RESOLVED BY THE BOARD OF COMMISSIONERS
OF OAKLAND COUNTY, MICHIGAN, as follows:
1. The plans, specifications, and estimate of cost
for such extensions as attached as Exhibits HA" and "B to said
resolution of the Township Board of the Township of West Bloomfield
are hereby approved and adopted, and such extensions are designated
"West Bloomfield Water_Supply System - Section 4.
2. That this Board of Commissioners does hereby approve
and authorize the transfer, pursuant to the provisions of the West
Bloomfield Water Supply System Contract, dated as of December 1,
1970, of not less than $142,000 from the surplus funds now remaining aft er
provision for all costs incurred in acquiring-Section. 1, Section 2 and
8323
Section 3 of the system established by said Contract dated December 1
1970, to the payment of the cost of West Bloomfield Water Supply
System - Section 4 (the "system").
3, That the surplus funds herein authorized to be
transferred shall be used by the County of Oakland through its
Department of Public Works for payment of the cost of the system in
accordance with the provisions of and for the purposes described
in said Contract dated as of December 1, 1970.
4. That the Department of Public Works is hereby authorized
to procure detailed specifications, take construction bids and enter
into contracts, take soil borings, and take any other actions
necessary and incidental to acquisition and construction of the
system.
MR_ CHAIRMAN, on behalf of the Planning and Building
Committee, I move the adoption of the foregoing resolution.
PLANNING AND BUILDING COMMITTEE
ADOPTED: YEAS - Hoot, Kasper, Kelly, Lanni, McConnell, McDonald, Moffitt, Montante,
Moxley, Olson, Page, Perinoff, Pernick, Peterson, Price, Sinson,
Wilcox, Aaron, Daly, Doyon, Fortino, Gabler, Gorsl ine. (23)
NAYS - None. (0)
ABSENT - DiGiovanni , Murphy, Patterson, Roth. (4)
STATE OF MICHIGAN )
) SS.
COUNTY OF OAKLAND )
I, the undersigned, the duly qualified and acting
County Clerk of the County of Oakland, do hereby certify . that the
foregoing is a true and complete copy of a resolution adopted at
a reaular meeting of the Oakland County Board of Commissioners,
held on the 2nd day of February , 1978 the original of which
is on file in my office.
IN WITNESS WHEREOF, I have hereunto affixed my official
nd_ signature this 2 day of _February • A.D. 19y8.
Lynn D. Al len - County Clerk
PROPOSED SECTION
WATER WIN WEST
BLOOMFIELD
TOWNSHIP
XISI.16" W.M.
,ze
14 Mile ROA
PROPOSED SECTION :TE
PRESSURE REDUCING VALVE
EXIST. 16' W,M,
WEST_ E__ DAD
SECTION III WATER MAIN
(UNDER ,CONSTRUCTION)
!TY OF FARMINGTON HILL
13 NILE ROAD
SCAL El 1".20.00'
EXTENSION TO
WEST BLOOMFIELD
WATER SUPPLY SYSTEM
SECTION IQ
EXHIBIT ."A"
PREPARED BY
HUBBELL ROTH & CLARK INC.
0 A 4.n
.1
= $100 ,500,00
10,562,55
3,517,50
4,020.00
-0-
2,000.00
750.00
10,000.00
251.25
10,398.70
a BO a 6.
IP
n e.
R
P
Total Construction Cost
Engineering
Administration
Inspection —
Financial —
Legal .
Soil Borings
Easement Acquisition — —
Soil Erosion Permit
Contingency —
TOTAL PROTECT COST $142,000,00
WEST BLOOMFIELD TOWNSHIP
WATER SUPPLY SYSTEM - SECTION IV
ESTIMATE OF COST
2,100 L.F.
1 Ea,
5 Ea,
1 Ea,
16" Watermain
16" Gate & Well
Hydrants
Pressure Reducing Valves &
Chamber
@$ 25.00 = $ 52,500.00
@ 3,000,00 = 3,000.00
@ 1,000,00 = 5,000.00
40,000.00 L.S. 40,000.00 ----
I hereby estimate the period of usefulness of this
facility to be forty (40) years and upwards.
HUBBELL, ROTH & CLARK, INC.
By
Thomas H. Ritchie, Jr.
p.E #15688
EXHIBIT "B"