HomeMy WebLinkAboutResolutions - 1982.08.05 - 13894Miscellaneous Resolution # 82225 August 5, 1982
TPF FOREGOING RESOLUTION
BY: PERSONNEL COMMITTEE - John J. McDonald, Chairperson
IN RE: REORGANIZATION OF TRE OFFICE OF THE DRAIN COMMISSIONER
TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS
Mr, Chairperson, Ladies and Gentlemen:
WHEREAS the depressed state of the economy has significantly reduced
the workload of the office of the Drain Commissioner; and
WHEREAS the consolidation of the Drain Engineering Unit and the
Water and Sewer Engineering Unit into one unit entitled Engineering will
enable the unit to function efficiently with a reduced number of supervisory
and support personnel and still meet the reduced volume of work; and
WHEREAS the decreased workload has resulted in a decline in the
receipt of the revenues used to cover the cost of "other source" positions;
and
WHEREAS the Personnel Committee has reviewed the deletion of 26
"other source" funded positions and has determined that such deletions will not
hinder the smooth operation of the department; and
WHEREAS the deletion of one (1) budgeted position of Chief-Drain
Maintenance and the creation of one (1) budgeted position of Civil Engineer III
will result in an increase in the level of engineering services in the Drain
Maintenance Unit while maintaining adequate field supervision;
NOW THEREFORE BE IT RESOLVED that the Drain Engineering Unit and the
Water and Sewer Engineering Unit, as reflected in the attached "current"
organization chart, be combined into one unit entitled Engineering, as reflected
in the attached "recommended" organization chart; and
BE IT FURTHER RESOLVED that one (1) budgeted position of Chief-Drain
Maintenance in the Maintenance Unit be deleted; and
BE IT FURTHER RESOLVED that one (1) budgeted Civil Engineer III
position be created in the Maintenance Unit of the Drain Commissioner budget,
Mr. Chairperson, on behalf of the Personnel Colmaittee, I move the
adoption of the foregoing resolution.
PERSONNEL COMMITTEE
i'v-bleos4d
arA
4 4. Ce")Pc)-sQ6
(We:6r, AcktiAibrl nix positions.
CURRENT OR(ANIZATLON
Cr
t _37 l.(I)
69 . (26)
106 1(27)
DRAIN COMMISSIONER
DRAIN COMMISSIONER
371 Budgeted Positions
43 'Other Sources Positions
BD I Total Positions
BUD 07S REQ REC TOT ADMINISTRATION _
_ 1. Drain Commissioner
-i CILief Deputy Drain Commissioner
I Drain Records & Information_Spec....
1 S-e"cretary II
L__. L_ 4 Total Positions __I
BUT) 0/S REQ REC OT --S.O.C.S.D.S.
_
Civil Engineer III — ---- Chief-50C Pollution Cont. Far.
1 Drain & Poll. Cont. Malt..a Sur/. _ _
_4. Pump Maintenance Mechanic II _ "3 Chemist Assistant
3 Laboratory Technician /I _
1 Laboratory Technician I „ 1 Maintenance Laborer
Typist II
L5 15 Total Positions _
BUD 0/K RE REC TOT RAI NGINEERINGa
1 1 Chief Engineer
I Asst. Chief Engineer
5 Civil En_glneer III
I Drain. Projects Coord.
1 RiAlit of Way Te clinician
1 Staff Asst.-Drain Proj.
1 Sury_ey Party Crew Leader
3 Engineering Technician
5 Ensineering_Aide II
_. I En_gineering_Aide I
3 Typist II
23 23 Total Positions
BUD 0/S RE ,C TO EWER ENGINEERINC a
i f
___.
U Chie Engineer
(1) 0 Assistant ChieF Engineer
5 (2 3 Civil Engineer III _
1 En.gineerin_g_ Technician
2 (2) 0 Typist II
10(6) 4 Total Positions
f
_ 7RFAIA
pso.JS rEe_
--q
ineer III
Maintenance Supervisor I _
Account Clerk II
General MaInt. Mech.-Drain
Maintenance Laborer
Tot al Positions
CONSTRUCTION INSPECTION
v. of Construction Ins-pec. Serv.
Staff Asst.-Drain Pr?lects
Construction Inspector IV -i 4
Construction Ins_pector III
Engineering Aide II - I "11
5I_Construction Inspector II
Construction inspector I
25ITotal Positions
-5
-6o 't
a) Request
h) Request
c) Request
d) Request
e) Request
F) Request
to combine Drain Engineering IA-lit and Water & Sewer Engineering Unit, deletin
to delete one (1) position.
to delete seven (7) positions.
to delete five (5) positions.
to delete six ((1) positions.
one (1) budge fed position.
DRAIN COMIASSIONER
RECiTOT DRAIN COMISSIONER
37 Budgeted Positions
Other Sources Positions
Total Positions
RE COMMENDED ORGANI Z ATI ON
BUD 0/S REG REC ADMINISTRATION
_ 1 Drain,CoMmissioner
Chief DePuty Drain Commissioner
Drain Records & Information Sue.
Secretary II_
4 Total Positions
0/8 TOT S.O.C.S.D.S. I Civ 1 Engineer III
1 Chief-SOC Pollution Coot. Fac.
1 Drain & Poll. Cont. Maint. Snpv.
_ 4 Pump Maintenance Mechanic II
2 Chemist Assistant
3 Laboratory Technician II
_ ,aboratory Technician 1
Maintenance Labotet
1 Typist II
5 15 Total Positions
fp 0/S RE TOT CONSTRUCTION INSPECTION
1 Supv. of Construction Inspec. Serv.
Staff Asst.-Drain Projects
_ _ 7 Construction Inspector IV
7 Construction inspector III _.
5 Construction Inspector If
4 Construction Inspector i
1 24 25 Total Positions
_
BUD 0/S REOLREC TOT ENGINEERING - — Chief Engineer
Assistant ChieUngineer
8 Civil Engineer III
--I Drain Projects Coordi.
1 -Right of Way Technician
-§taff Asst.-Drain Pyojects
_ Survey Party Crew Leader
4 trt_gineerisg Techhician
5 5 Engineering_Aide II
1 Esgineering Aide I
_ 3 3 Ty_p_ist II
2.3 4 21 Total Positions
BUD /S REI ioi[-- MAINTENANCE
1 .Civil Eg_gineer III 1 -Malntenance Supervisor I
- 1 Account Clerk II
3 General Maintenance Mech.-Drain
3 Maintenance Laborer
_ 9 Total Positions
BUD
FISCAL NOTE
BY: FINANCE COMMITTEE, G. WILLIAM CADDELL, CHAIRPERSON
IN RE: REORGANIZATION - DRAIN COMMISSIONER
TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS
Mr. Chairperson, Ladies and Gentlemen:
Pursuant to Rule XI-C of this Board, the Finance Committee has re-
viewed said reorganization and finds the following:
1) That twenty six (26) "Other Source'! positions, six (6) in
the Water & Sewer Engineering Unit and twenty (20) in the
Construction Inspection Unit, be deleted,
2) That one (1) budgeted position, Chief-Drain Maintenance, in
the Maintenance Unit be deleted,
3) That one (I) budgeted position, Civil Engineer III, in the
Maintenance Unit be .created,
4) That said reorganization be effective August 21, 1982 re-
sulting in a salary & fringe savings (consistent with the
attached schedule) and require no additional funding.
FINANCE COMMITTEE
Salary
Serv. Incr.
F. B.
30,461
3,046
11,107
44,614
Per Pay
1,167.09
116.71
425.56
1,709.36
Remainder 1982
(8/21-12/31)
9.5 Pays
11,087.36
1,108.74
4,042.82
16,238.92
Annual
(26,1 Pays)
COST ANALYSIS
DRAIN COMMISSIONER REORGANIZATION
DELETION OF CHIEF- DRAIN MAINT./CREATION OF CIVIL ENGINEER III
Delete:
Chief- Drain Maintenance - 4 yr. step
Add:
Civil Engineer III - 1 Yr. Step
Salary 30,461 1,167.09 : 11,087.36
Serv. Incr.
F. B. 9,224 353_41 3,357.40
39,685 1,520.50 14,444.76
NET SAVINGS/
(COST) $ 4,929 $ 188.86 $ 1,794.16
iuse 5 9 1982
#82225
Moved by McDonald supported by Perinoff the resolution be adopted.
Discussion followed.
AYES: Moore, Olsen, Page, Patterson, Perinoff, Pernick, Peterson, Price,
Whitlock, Wilcox, Aaron, Caddell, Cagney, Calandro, DiGiovanni, Doyon, Fortino, Gosling,
Hobart, Kasper, Lanni, McDonald, Moffitt, (23)
NAYS: None. (0)
A sufficient majority having voted therefor, the resolution was adopted.
STATE OF MICHIGAN)
COUNTY OF OAKLAND)
I, Lynn D. Allen, Clerk of the County of Oakland and hnving a seal.,
do hereby certify that have compared the annexed copy of
Miscellaneous Resolution # 82225 adopted by the Oakland County Do
at their meeting held on August 5, 1982
with the orginial record thereof now remaining in my office, and
that it is a true and correct transcript therefrom, and of the
whole thereof.
In Testimony Whereof, 1 have hereunto set my hand and affixed the
seal of said County at Pontiac, Michigan
this 5th day of ) August 1982
of Commssioncrs
-
ALLEN
County Clerk/Register of Deeds