HomeMy WebLinkAboutResolutions - 1982.09.09 - 13930Miscellaneous Resolution
BY: PLANNING AND BUILDING COMMITTEE
IN RE: AUTHORIZATION TO RECEIVE BIDS - NORTH OFFICE BUILDING ROOF REPAIRS . .
TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS
Mr. Chairperson, Ladies and Gentlemen:
WHEREAS, in late 1980 the Maintenance Division completed the study of County
building roofs to determine the extent of leakage problems and energy loss; and
WHEREAS, three (3) of the County buildings with the most critical roof problems
have been repaired; and
WHEREAS, the next most critical roof problem is at the North Office Building;
and
WHEREAS, the estimated cost of this project is 547,000.00; and
WHEREAS, monies for this project are available From the North Office Buildind
Remodeling line item in the 1982 Capital Improvement Plan.
NOW THEREFORE BE IT RESOLVED that the Department of Central Services be and is
hereby authorized to receive bids for the North Office Building roof repairs and a
report thereon be made to this Board after receipt and tabulation of such bids,
Mr. Chairperson, on behalf of the Planning and Building Committee, I move the
adoption of the foregoing resolution.
PLANNING AND BUILDING COMMITTEE
4,200
800
$47,000
Project 82-5
OAKLAND COUNTY EXECUTIVE
DEPARTMENT OF CENTRAL SERVICES
FACILITIES ENGINEERING DIVISION
NORTH OFFICE BUILDING REROOFING
Presented to Planning &
Building Committee on
September 2, 1982
In late 1980, the Maintenance Division contracted with the Tremco Company
to evaluate the performance of several of our roofs. In October of 1980,
investigations were made using infrared thermal sensing, core samples,
moisture probes, and visual examination techniques. A report was compiled and
presented on November 17, 1980. From the list of recommendations contained in
that report, the Maintenance Division identified the most critical. The West
Wing, Adminstrative Annex II, and Work Release Facility have already been
repaired and reroofed.
What is being proposed for the next most critical facility, the North
Office Building, is removal and replacement of wet insulation and a complete
replacement of the built-up roof system. The parapet wall, which has been a
factor in other roof repair jobs, has been found to be satisfactory in this
case.
The project is estimated to cost:
Reroofing (14,000 sq. ft. @ $3.00/sq. ft.) $42,000
Contingency (10%)
Administrative (advertising,
blueprints, etc.)
TOTAL PROJECT COST
Funding for the project is available from the North Office Building
Remodeling line item in the 1982 Capital Improvement Plan.
At this time, authorization to prepare the necessary drawings and
specifications, advertise, and receive bids is being requested.
this 9th day of September 19 82
ALLEN
1 County Clerk/Register of Deeds
#82257
Moved by Hobart supported by Perinoff the
September 9, 1982
resolution be adopted.
AYES: Geary, Gosling, Hobart, Jackson, Kasper, Lanni, McDonald, Moffitt,
Montante, Moore, Olsen, Page, Patterson, Perinoff, Pernick, Price, Whitlock, Wilcox,
Aaron, Caddell, Cagney, Calandro, DiGiovanni, Doyon, Fortino, Gabler. (26)
NAYS: None. (0)
A sufficient majority having voted therefor, the resolution was adopted.
STATE OF MICHIGAN)
COUNTY OF OAKLAND)
1, Lynn D, Allen, Clerk of the County of Oakland and having a seal,
do hereby certify that I have compared the annexed copy of
Miscellaneous Resolution #82257 adopted by the Oakland County
at their meeting held on September 9, 1982
with the orginial record thereof now remaining in my office, and
that it is a true and correct transcript therefrom, and of the
whole thereof.
In Testimony Whereof, I have hereunto set my hand and affixed the
seal of said County at Pontiac, Michigan
oard of Commissioners