Resolution No, 7010
be adopted..
with the
March 20, 1975
REPORT
By Mr. Nowak
Miscellaneous Resolution #7010
IN RE: AUTHORIZATION TO RECEIVE BIDS ON PRIMARY ELECTRICAL, PHASE VI
To the Oakland County Board of Commissioners
Mr, Chairman, Ladies and Gentlemen;
Committee,
Chairman, reports Miscellaneous
recommendation that the resolution
PLANNING AND BUILDING COMMITTEE
Patrtck M. Nowak, Chairman
Miscellaneous Resolution 7010 March 6, 1975
BY: PLANNING & BUILDING COMMITTEE - Patrick M. Nowak, Chairman
IN RE: AUTHORIZATION TO RECEIVE BIDS ON
PRIMARY ELECTRICAL, PHASE VI
TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS
Mr. Chairman, Ladies and Gentlemen:
WHEREAS Primary Electrical Service, Phase VI, will change the primary electrical
service to the North Office Building and Substance Abuse Service Building from the
overhead 4,800 volt system to the underground 13,200 volt system; and
WHEREAS the estimated construction cost for this work is $55,000000, with total
project cost estimated at $65,000.00; and
WHEREAS it is necessary to receive bids for said project;
NOW THEREFORE BE IT RESOLVED that the Facilities & Operations Department
be and is hereby authorized to receive construction bids on Primary Electrical Service,
Phase VI.
The Planning and Building Committee, by Patrick M. Nowak, Chairman, moves the
adoption of the foregoing resolution.
PLANNING AND BUILDING COMMITTEE
Patrick M, Nowak, Chairman
OAKLAND COUNTY
DEPARTMENT OF FACILITIES AM OPERATIONS
ENGINEERING DIVISION
PRIMARY ELECTRICAL SERMICE
PRASE VI
PROJECT 66-13(VI) February 14, 1975
• Under this project the primary electrical service to the North
Office Building and Substance Abuse Service Building would be
changed from the overhead 4,800 volt system to the underground
• 13,200 volt system. Also, a portion of the remaining overhead
electrical system would be removed. At the completion of this
project the only building that will still be on the old 4,8n0 volt
system will be the existing hospital which cannot be converted
until future use of the building is decided. The estimated construc-
tion cost for this work is $55,000 with total project cost estimated
at about $65,000. Funds for this project are available from an
existing Work Order and no additional funds will be needed.
#7010 March 20, 1975
Moved by Nowak supported b y Patterson that resolution #7010 be adopted.
AYES: Dearborn, Dou g las, Dunleavy , Fortino, Hoot, Houghten, Kasper, Lennon,
McDonald, Moffitt, Nowak, Olson, Pa ge, Patterson, Perinoff, Pernick. Price, Roth,
Simmons, Wilcox, Wilson, Aaron, Button, Co y , Dal y . 25)
NAYS: None. (0)
A sufficient majorit y having voted therefor, the resolution was adopted.
A
STATE OF MICHIGAN)
COUNTY OF OAKLAND)
I, Lynn D. Allen, Clerk of the Count y of Oakland and
having a seal, do hereb y certify that I have compared the annexed cop y of
res°1utthri.??..01-9."94 . .Oakland cornty Bond
at their meeting held on March 20, 1975
with the orig inal record thereof now remaining in my
office, and that it is a true and correct transcript
therefrom, and of the whole thereof.