Loading...
HomeMy WebLinkAboutResolutions - 1974.01.10 - 15077Miscellaneous Resolution 6534 January 10, 1974 BY BUILDINGS & GROUNDS COMMITTEE - Richard R. Wilcox, Chairman IN RE: CONSTRUCTION OF PROPOSED SKILLED CARE MED ICAL FACILITY TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr, Chairman, Ladies and Gentlemen; WHEREAS the Facilities and Operations Division of the Board of Auditors has presented to the Buildings and Grounds Committee a cost estimate report For the construction of a proposed County skilled care medical facility; and WHEREAS your Committee recommends that the County of Oakland construct a 120-bed skilled care medical facility on County property at an approximated cost of $2.5 mil lion; NOW THEREFORE BE IT RESOLVED that the County of Oakland construct a 120-bed skilled care medical facility on County property at an approximated cost of $2,5 million, The Buildings and Grounds Committee, by Richard R. Wilcox, Chairman, moves the adoption of the foregoing resolution. BUILDINGS AND GROUNDS COMMITTEE Richard R. Wilcox, Chairman OAKLAND COUNTY HOSPIAL PROPOSALS SCHEDULES OF C0f.';PT,R,,\TiVE COSTS Schedule Total Construction Costs (a) Cost per sq. ft. New Const, Only (b) Cost per sq. ft. Total ConsLruction (Inclusive Renovation) (c) Cost per sq. ft. Total Project Operating Costs (a) Annual Patient Days (b.) Average cost per patient day (c) Annual Operating Costs in excess of 130 bed plan for equivalent number of patients ,(120) 71-77 Net Annual Operating Subsidy: (a) Medical & Skilled Care Pa:ients (b) Additional Subsidy presu min g Medicade establishes limitations on Skilled Care reimbursement, similar to Blue Cross 46,00 per day, T.B. Patients 1!f Facility Hospital Beds 80 Skilled Care 3,4 19,000 51,02 51.02 60.19 43,800 65,42 565,891 (1) 166,422 (2) 228,215 (3) 394,637 4-58,3 23 852 ,960 (2 ) New Facility Skilled Care'' 120 aeH5 2,469,000 40,82 40,82 48,69 43,800 60,88 367,044 (1) 221,921 (2) 508,360 (3) 73Bi 281. 458,323 (4) 188,6-04 (3) .Story Addition & Renovation 130 Beds 4,674,000 54,09 33.93 40.57 65,700 52.50 145,294 9,873 155,167 T80,175' 335,342 (c) (4) Annual costs in excess of the 180 bed plan represent the difference in patient day cost multiplied by number Plan 2 $8.38 X 43,800) (2) Annual subsidy presumes that a r0.4 facility will result in additional revenue, based on 100% reimbursement of cos t s bj Medicare, Approximately 78% of the Skilled Care patients will qualify for Medicare. (3) Additieel subsidy necessary if Medicare establishes limits to reicr.ursement of rz...22 ,1e costs, similar to Blue Cross (approximately $46.00 per day) patient days (Plan 1 $12.92 X 43,800) (14): in the New Facility P are recoverable from State Subsidy. posal an average of 16 T.B. Patients would be cared for in outside 'facilities; Of these 287, dicare. The cost of care for the balance was computed at $115,00 per day less $6,00 per day OAKLAND COUNTY HOSPITAL PROPOSALS COMPARISON OF NET OPERATING SUBSIDIES Present Operation 165 Beds 1 Story Addition and Renovation 180 Beds 1 Story Addition & Partial Renov. 126 Beds New Facility 40 Bed Hospital 80 Skilled Care New Facility Skilled Care 120 Bed New Annual Operating Subsidy T. B. Patients Other Patients Total (Present Reimburs. Formula) Net Annual Operating Subsidy with Anticipaed New Revenues T, B. Patients Other Patients Total flt Average Cost Per Patient Day 180,175 382,418 562,593 180,175 382,413 562,593 50.95 180 ,175 544:49 1 724,666 180,175 145,294 325,469 (4) 52.50 180,175 559,747 739,922 180,175 144,408 324,583 (4) 62.09 458,323 (3) 624,376 1,082,699 458,323 (3) 166,422 624,745 (4) 65,42 458,323 (3 1,008,732 1,467,c 458,323 (3 221,921 680,244 (4 60,88 (1) Plans for all facilities are adjusted for the new $22.50 per day reimbursement rate for Skilled Care Patients. (2) if the Building Authority is used, the cost per day will be increased approximately $3.00 per Patient Day. (3) In the New Facility Proposal, an average of 16 T.B. Patients would be cared for in outside facilities; Of these 28% are recoverable from Medicare. The cost of care for the balance was computed at $115.00 per day less $6.00 per day State Subsidy, (4) Improved Facilities will result in new revenues due to the Medicare/Blue Cross Certification of the balance of the beds presently not certified. Approximately 78% of the Skilled Care Patients will qualify for Medicare. (5) All proposals are based on the 1973 Salary Schedule. (6) The quality of care in all proposals is comparable to the present operation. Revised 1/8/74 411,000 295,000 2,134,8m 93,400 90,000 168,500 2,803,275 95,000 1,974,775 95,000 3,908,200 21,712 33.93 3,192,700 25,339 N/A 2,069,775 17,248 40.82 2,898,275 24,152 51,02 25,967 30,579 28,491 20,575 40,57 N/A 60.19 48.69 4,674 cm 3,853,000 40,000 263,000 170,000 15,000 25,000 30,000 222,800 40,000 225,000 150,000 12,000 20,000 25,000 188,300 40,000 175,000 150,000 15,000 20,000 20,000 100,725 3 419 cm 40,000 125,000 120,000 12,000 15,000 17,000 70,225 2,469,000 OAKLAND COUNTY HOSPITAL COMPARATIVE SCHEDULE OF CONSTRUCTION COSTS 1 Story Addition . and Renovation 180 Beds Construction Costs 1 Story Addition & Partial Renov. 126 Beds New Facility 40 Hospital Beds 80 Skilled Care New Facility Skilled Care 120 Beds 1926 Building Renovations 990,000 410,000 2,134,8m 93,400 90,000 190,000 1954 Building Renovations New Construction Site Work & Utilities Other Exterior Renovations Overhead & Profit Construction Total Const. Costs per Bed Const, Costs per Sq. Ft, Other Capital Expenses Landscaping Architect's Fees Equipment & Furniture Administrative Construction Supervision Start Up Expenses Project Contingency Project Total Total Costs per Bed Total Costs per Sq. Ft. 115,200 Sq, Ft. N/A 56,805 Sq. Ft. 50,710 Sq. F (1) costs for the new 120 Bed Facility are based on the presumption that present steam heat facilities would be utilized. 0 HOSPITAL AREAS BASIC CART= NURSING SKILLED CARE NURSING -0- -0- 100 soft. -0- -0- -0- Work Area Storage Waiting 400 sp.ft. 600 sq.ft. 100 sa.ft. 400 so.ft. 100 so.ft. 600 so.ft. . -n- 100 sa.ft. u (75 Prooct- 71-28 OA M'1D COUNTY BOARD OF AUDIT 0-.S DEPARTMENT OF FACILITIES AND OPD-JIONS FACILITIES ENGINEERING DIVISION MEDICAL FACILITIES COMPARISON Revised: December 28, 1973 (.0 E Director's Office Asst. Director's Office Secretarial Conference Room Business Office Accountant Switchboard/Information TOTALS 200 sa.ft. 150 soft. 150 sn.ft. 250 sa.ft, 750 sq.ft. 125 sq.ft. 100 sn.ft. 1,725 sq.ft. 200 sa.ft. 150 sq.ft. 150 sq.ft. 250 soft. 750 so.ft. 125 soft. 100 sn.ft. 175 sq.ft. -0- 100 sn.ft. 250 sa.ft. 500 sa.ft. -0- 100 soft. 1,725 sa.ft. f 1,125 soft.. ; Medical Director Staff Physicians Consultant's Office Medical Records Clerical/Waiting .Employee's Examination 150 soft. 200 so.ft.(2) 100 se.ft. 200 soft. 200 sq.ft. 100 sa.ft. 150 sg.ft. 100 sa.ft. 100 se.ft. 200 sq.ft. 200 sa.ft. 100 so.ft. TOTALS , 950 sa.ft. 850 sp.ft. 10 0 sa.ft, TOTALS 1,100 so.ft. 1,10n so.ft. sa.ft. Admitting Office Patient Services Volunteer Room Waiting 300 so.ft. 100 sa.ft. 100 sq.ft. 100 sq.ft. 300 sa.ft. 100 sq.ft. 100 sq.ft. 100 sq.ft. 1110 sq.ft. -0- -0- -n- TOTALS 600 soft. 600 soft. 100 sq.ft. C") AREAS HOSPITAL BASIC CARE NUPSIN0 SKILLED CARE NURSING -0- -0- -0- -0 - -0- -0- -0- -0- -0- -0- • -... cri 0 • rCE• 250 sa.ft. 75 sq.ft. 100 sa.ft. 75 sq.ft. 50 sq.ft. X-Ray Room Dark Room .Waitina Technician Office Dressing/Toilet _0_ 550 sq.ft. TOTALS TOTALS 3,850 sq.ft. Soiled Linen Holding Soiled Linen Cleanup Clean Linen Issue -.Clean Linen . Storage General Storage 200 so.ft. 400 sa.ft. 300 sq.ft, 400 sq.ft. 1,200 sq.ft. Food Preparation Area Kitchen Office Freezer/Cooler Storage Receiving Area Dishvashing Trash Room Staff Dining 2,000 sa.ft. 100 sq.ft, 400 sg.ft. 400 sq.ft. 100 sq.ft. 300 sq.ft. 150 sq.ft, 400 sq.ft. 1,500 sq.ft. 100 sq.ft. 400 sa.ft. 400 sa.ft. I 100 sq.ft. 300 sg.ft. 150 sg.ft. 300 sq.-ft- 200 sa.ft. 400 sq.ft. 300 sa.ft 400 sg.ft, 1,200 sg.ft. sajt. -0- 40-0'sft 400 sg.ft. 100 sq.ft. 300 sq.ft. 150 sa.ft. 300 sq.ft, 100 so.ft. 200 so.ft. -0- 400 so.ft. 1,200 sg.ft. • 3,250 sg.ft. t. .3,150 saJt. TOTALS A 2,500 sq.ft. I, 3 2,500 sg.ft. j 1,900 sa.ft. ("J U U Vi • • (1) Examination Hydro-Therapy Gymnasium/Treatment Area O. T. Office O. T. Workshop Beauty and Barber Shop Storage TOTALS 100 sq.ft. 350 sq.ft. 650 sg.ft. 150 sq.ft- 1,000 sa.ft. 150 sg.ft. 150 sa,ft. 100 sa.ft. 350 sq.ft. 650 sg.ft. 150 so.ft. 1,000 sa.ft. 150 sa.ft. 150 sq.ft. -n- • -0- 55n soft -0- • 559 scl.ft, 150 sg.ft, 15n - so.ft. 2,550 sa.ft. 2,550 soft. 1 1,500 sa.ft. L>, "rr 1 AREAS I HOSPITAL I CARE CARE 1 1 i 1 I 1 1 SKILLED BASIC CARE CARE MHDCTM12. NURSING NURSING 1 500 sq.ft. ! 200 sq.ft. - Cr ° 3 '75 1 1 Laboratory Storage Nursing Stations •Nedication Storage Area Clean Linen Storage Soiled Linen Storage Bathing Facilities (6) Examination Room Dayrooms 3 0 15(L= 450 sq.ft 0)150 sq.ft 1 (3)300 . sq.ft 1(3)375 soft 1 1,200 sq.ft i 3 100 = 1 300 sq.ft i 3,600 sq.ft - a • • • ("7 n 124,485 sq.ft. TOTALS 500 sq.ft 6,460 sq.ft 10,500 sq.ft 900 sq.ft, 800 sq.ft TOTALS 700 sq.ft. 150 sq.ft. -0- 150 sq.ft. 150 sq.ft. -0- 150 sq.ft. • Director of Nursing 1 150 sq.ft. , , 1 Asst. Director of Nursing i 100 sq.ft. i Classroom 200 sq.ft. Clerical r 200 sq.ft. to A Single Patient Rooms (4) Semi-Private;-Rooms (34) Four-Bed Wards (12) u) 150 sq.ft. 100 sq -,..ft. 150 sq.ft. 200 soft. 500 sq.ft.- 6,460 sq.ft. I 10,500 sq.ft. 2 0 150 = 300 sq.ft. 1(2) 100 sq.ft. 1(2) 300 sq.ft. 1(2 ) 300 sq.ft. i 1,200 soft. 3 2 0 100 = 200 sq.. i 3,600 so.ft. 24,05 0 so.ft. 150 sq.ft, -0- • • -0- 100 so.ft. 500. 6,450 so.ft. 10,500 SO.ft. 2 P 150 = 300 sq.ft. 1(2) 100 sq.ft.: 1(_2) 300 sq.ft.i (z) 300 soft. . 1,200 so.ft, 2 0 100 = - 200 so.ft. 2,400 so.ft.i 22,510 sq.ft.1 I 0 (1.) ro r (7) f..„) ! ! • Staff Locker Rooms Maintenance Lobby 5 .00 sq.ft. 400 sq.ft. 300 sq.ft. 400 sq.ft. 300 sq.ft. 200 sq,ft. 3011 sq.ft1 , , 1 3011 scl.ft.i 200 soft , 1 TOTALS i. 1,200 sq.ft. , , , , . MARY . . -.HOSPITAL A. Gross Area -4-- 1. Administrative 2. Medical 3. Pharmacy 4, Social Services 5. Radiology 6. Food Service 7. Housekeeping 8. Physical Medicine . 9. Laboratory 10. Nursing Units 11. Miscellaneous 1,725 sa.ft. X 1.4 = 950 sq.ft. X 1.4 = 1,100 sg.ft. X 1.2 = 600 sg.ft. X 1.4 - 550 sa.ft. X 1,3 = 3,850 sg.ft. X 1.2 - 2,500 sa.ft. X 1.2 = 2,550 so.ft.. X 1.3 = 700 sg.ft. X 1.2 24,485 sq.ft. X 1.5 = 1,200 soft. X 1.4 = TOTAL GROSS AREA: 2,415 so.ft. 1,330 so..ft. 1 -,320 sa.ft. 840 so.ft. 715 sq.ft. 4,620 sq.'ft. 3,000 sa.ft. 3,315 sg.ft, 840 sa.ft.. 36,730 sq.ft. 1,680 sa.ft. 56,805 sg.ft. Cost Data 1. Administrative 2. Medical .3. Pharmacy 4. Social. Services 5. Radiology 6. Food Service 7. Housekeeping 8. Phy cal Medicine 9. Laboratory 10. Nursina Units 11. Miscellaneous • 2,415 so.ft. 1,330 so.ft, 1,320 sg.ft. 840 soft. 715 soft. 4,620 sg.ft. 3,000 sg.ft. 3,315 sq.ft- 840 sg. L. . 36,730 sq-ft- 1,580 sa.ft. X $45 = X $45 - X $40 = X $45 = X $100 - X $50 = X $35 = X $50 = X $70 = X $50 = X $45 = 108,675 59,850 52,800 37,800 71,500 231,000 105,000 165,750 58,800 1,836,500 75,600 $2,803,275 95,000 $2,898,275 TOTAL BUILDING COST: SITE iORK ALLOVAI'TF: TOTAL ESTIMATED CONSTRUCTION COST: $2,898,275 = 120 Beds $24,153 Per Bed (CONSTRUCTION) $2,898,275 - 56,805 sq .f $51.02 Average Cost Par Snuare Foot 3,900 sa.ft. 3,000 so.ft. 3,31,5 sa.ft. 195 sa.ft. 33,685 so.ft. 1,170 sn.ft. 50,710 so.ft. 2,240 sq .ft. , 1,105 sa.ft. . 1,320 so.ft. 780 sq.ft, SUMMARY - (Cont'd) II. SKILLED CARE NURSING FACILITY A. Gross Area I. Administrative 2. Medical 3, Pharmacy 4. Social Services 5, Radiology 6. Food Service 7. Housekeeping 8. Physical Medicine 9. Laboratory 10. Nursina Units 11, Miscellaneous 1,725 so.ft.. X 1.3 850 sq.ft 'X 1.3 1,100 sq.ft, X 1.2 600 sq.ft. X 1 -3 3,250 tcl,f -L X 1.2 2,500 sq.ft. X 1.2 2,550 s'a.ft. X 1.3 = 150 sq.ft. X 1,3 = 24,060 so„ft: X 1.4 = 900 so.ft. X 1.3 - TOTAL GROSS AREA: B. Cost Data 1. Administrative 2. Medical 3. Pharmacy 4, Social Services 5. Radiology 6. Food Service 7, Housekeeping 8, Physical Medicine 9. Laboratory 10. Nursing Units 11, Miscellaneous 2,240 sci.ft. X $37 -- 1,105 so.ft. X $37 = 1,320 sq.-ft. X ==' 780 sa.ft. :t37 = 3,900 sa.ft. X $42 3,000 sa.ft. X S30 3,315 sa.ft. X $40 195 soft. X $40 33,685 sq.ft. X $4 0 1,170 SO.ft. X $35 $ 82,880 40,885 39,600 28,860 163,800 90,000 132,600 7,800 .1,347,400 40,950 $1,974,775 95,9 0.ft $2,059,775 TOTAL BUILDING COST: SITE WORK ALLOWANCE: TOTAL ESTIMATED CONSTRUCTION COST: $2,069,775 120 Beds - $17,248 Per Bed (CONSTRUCTION) _$2,069,775 50,710 sq.ft. = $40.81 Average Cost Per Square Foot SUMMARY - (Cont'd) III. BASIC CARE NURSING UNIT A. Gross Area 1. Administrative 2. Medical 3. Pharmacy 4. Social Services 5. Radiology 6. Food Service 7. Housekeeping 8. Physical Medicine 9. Laboratory 10. Nursing Units 11. Miscellaneous 1,460 sa.ft. 130 sa.ft. 130 sg.ft. 130 sa.ft. 3,780 sq.ft. 3,380 sq.ft. 1,950 sq.ft. 210 sq.ft. 31,515 se.ft. 1,040 sa.ft. X $30 = X $30 - X $30 = X $30 = X $35 = X $25 = X $32 = X $30 = X $32 = X $30: = 43,800 3,900 3,900 3,900 132,300 57,000 62,400 6,300 1,003,480 • .1,200 1,125 sp.ft. X 1.3 100 sq.ft. X 1,3 100 sq.ft. X 1.3 100 sg.ft. X 1,3 3,150 so.ft. X 1.2 = 3,780 sa.ft- 1,900 sq.ft. X 1,2 - 2,280 sa.ft. 1,500 sa.ft. X 1.3 = 1,950 sa.ft. 150 sq.ft- X 1.4 = 210 sa.ft. 22,510 so.ft. x 1.4 = 31,515 so.ft. 800 sq.ft. X 1.3 = 1,040 so.ft. TOTAL GROSS AREA 42,625 so.ft. 1,460 sa.ft. 130 sa.ft, 130 so.ft. 130 so.ft. B. Cost Data 1. Administrative. 2. Medical 3. Pharmacy 4. Social Services 5. Radiology 6, Food Service 7, Housekeepina 8. Physical Medicine 9. Laboratory 10. Nursing Units 11. Miscellaneous TOTAL BUILDING COST: S1,353,180 SITE WORK ALLO ANCE: .40,000 $1,393,180 TOTAL ESTIMATED CONSTRUCTION COST: 1,393,180 - $11,610 Per Bed (CONSTRUCTION) 120 Beds $.1,393,180 42,625 sg.ft, = $32.68 Average Cost Per Square Foot -7 - SUMMARY - (Cont'd) IV. TOTAL PROJECT COSTS A. Hospital Estimated Building Cost Site Work Allowance Landscaping Architect/Engineer Fees Equipment & Furniture Construction Supervision Start-Up Expenses Administrative Contingency $2,803,275 95,000 40,000 175,000 150,000 20,000 20,000 15,000 100,725 TOTAL ESTIMATED PROJECT COST: $3,419,000 B. Skilled Care Nursing Unit Estimated Building Cost Site Work Allowance Landscaping Architect/Engineer Fees Equipment & Furniture Construction Supervision Start-Up Expenses Administrative Contingency edical Care Facility) $1,974,775 95,000 40,000 125,000 120,000 15,000 17,000 12,000 70,225 TOTAL ESTIMATED PROJECT COST: $2,469,000 C. Basic Care Nursing Unit Estimated Building Cost Site Work Allowance Landscaping Architect/Engineer Fees Equipment & Furniture Construction Supervision Start-Up Expenses Administrative Contingency $1,353,180 40,000 10,000 70,000 100,000 10,000 15,000 10,000 50,820 TOTAL ESTIMATED PROJECT COST: $1,659,000 Started 9-70 Cost Per Bed (126 Beds) Started 4-71 Cost Per Bed (48 Beds) $40,587.94 $21,851;16 1970 Cost Per Bed (200 Beds) 1972 Cost Per Bed (325 Beds) 1972 Cost Per Bed (87 Beds) $12,000 1971 Cost Per Bed (100 Beds) $13,500 1973 Cost Per Bed (150 Beds) •$9,240 SUMMARY - .(Cont'd) V. COST ..COMPARISONS A. Hos_p_itals 1. Garden City Hospital (Garden City, Michigan) 2. Scheurer Hospital (Pigeon, Michigan) B. Skilled Care Nursing Unit (Medical Care Facility) 1. Michigan Veteran's Facility Started 11-72 (Grand Rapids, Michigan) Cost Per Bed (343 Beds) $20,606 2. Fairview Medical Care Facility (Centreville, Michigan) Started 1-72 Cost Per Bed (64 Beds) $14,090 C. Basic Care Nu .rsiho Unit 1. Southfield Medicenter (Southfield, Michigan) 2. :Fairlane Nursing (Detroit, Michigan) 3. Longfellow Nursing • (Detroit, Michigan) 4. Olivet Nursing (Detroit, Michigan) Clinton Aire Nursing (Clinton Twp., Michigan $11 ,816 $1 1,8 00 #6534 Moved by Wilcox supported by Dunleevy the resolution be adopted., Discussion followed. Moved by Dearborn supported by Burley the resolution be amended by adding, after 'and' in the first paragraph, "and other medical facilities including a 180-bed renovation of the existing hospital". In the NOW THEREFORE BE IT RESOLVED paragraph, delete 'a 120-bed skilled care medical facility', and insert, "the 180-bed renovation, as presented for consideration by the Buildings and Grounds Committee at a cost of approximately $4.6 million". Discussion followed. The Chairman declared a recess at 11:15 A. M. for discussion of the amendment. The Board reconvened at 11:45 A. M. Discussion followed. Mr. Brotherton moved the previous question. Seconded by Dr. Montante, The Chairman stated that those in favor of calling the question, say Aye and those opposed, say No. The vote was as follows: AYES: Houghten, Kasper, Moffitt, Montante, Patnales, Richardson, Brotherton, Hoot. (8) NAYS: •Lennon, Mathews, Nowak, Olson, Perinoff, Pernick, Vogt, Walker, Wilcox, Berman, Burley, Button, Coy, Dearborn, Dunleavy, Gabler, Hobart. (17) A sufficient majority not having voted therefor, the motion lost. Discussion followed. Mr. Brotherton moved the previous question. Seconded by Dr. Montente. A sufficient majority having voted therefor, the motion carried. The Chairman called for a vote on the amendment. The vote was as follows: AYES: Lennon, Mathews, Olson, Patnales, Perinoff, Pernick, Walker, Berman, Burley, Coy, Dearborn. (11) NAYS: Moffitt, Montante, Nowak, Richardson, Vogt, Wilcox, Brotherton, Button, Dunleavy, Gabler, Hobart, Hoot, Houghten, Kasper. (14) A sufficient majority not having voted therefor, the motion lost. Discussion followed. Vote on resolution: AYES: Mathews, Moffitt, Montante, Olson, PatnaleS, Perinoff, Pernick, Richardson, Welker, Wilcox, Berman, Brotherton, Burley, Button, Coy, Dearborn, Dunleavy, Gabler, Hobart, Hoot, Houghten, Lennon. (22) NAYS: Nowak, Vogt, Kasper. (3). A sufficient majority having voted therefor, the resolution was adopted. STATE OF Miri-ifGA0 COUNTY OF OAKLAND) 1, Lynn IL Alien, Clerk of the County of Oakland and having a seal, do herehy certify that i have compered the annexed copy of Resolution #6534 adopted by the Oakland County Board of Commissioners ea a .v 9999 440444 44046,4“9499 49994595e.eaaemct"s".....w.fiv Soot stOe qpias at their January 10, 1974 meeting 4499499440Br44.00e440f.4909944444444649494-900444 n 499999 ..w ae“peoq.eemsaa with the original record thereof ncm rcp -ainin ,:i in my office, and that it is a true and correct transcript therefrom, and of the whole thereof. In Test imony Wherof, 1 have heir-cunto set my hand and -affixed the seal of said County at Pontiac, Michigan lIth thiSgoie eev w4p...449440490pdaY Of40').”(9-1TOr:Y0904949"114 74 s .,444r Lynn D. 00.01,00ad.A"CICrk By. flepty Clerk