Loading...
HomeMy WebLinkAboutResolutions - 1973.08.23 - 153796409 Miscellaneous Resolution August 23, 1973 BY: FINANCE COMMITTEE - Fred D. Houghten, Chairman IN RE: AWARDING OF CONTRACT FOR PROJECTS 73-6 AND 73-8 - PAVING OF ADMINISTRATIVE ANNEX II PARKING LOT AND CREDIT UNION DRIVE TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr. Chairman, Ladies and Gentlemen: WHEREAS bids have been received for the paving of Administrative Annex 11 parking lot and Credit Union drive; and WHEREAS the Buildings and Grounds Committee recommends that the low bid of $54,000.00 of Wolverine Asphalt Paving, Inc., Drayton Plains, Michigan, be accepted, said recommendation being concurred in by the Finance Committee; NOW THEREFORE BE IT RESOLVED as follows: 1. That the bid of Wolverine Asphalt Paving, Inc. , Drayton Plains, Michigan, be accepted and the contract awarded in concurrence with the Buildings and Grounds Committee action on August 20, 1973. 2. That the Chairman of the Board be and he is hereby authorized and directed to execute a contract with Wolverine Asphalt Paving, Inc., Drayton Plains, Michigan, on behalf of the County of Oakland. 3. That this award shall not be effectiye until the awardee has been notified in writing by the Oakland County Board of Auditors. 4. That pursuant to Rule 11, C of this Board, the Finance Committee finds the total project funding sum of $60,500.00 available from the Utility Fund as follows: Construction (low bid) $54,000 Landscaping 2,500 Construction Supervision 2,000 Administrative 100 Quality Control & Testing 500 Contingency 1,400 TOTAL FUNDING: $60,500 The Finance Committee, by Fred D. Houghten, Chairman, and with the concurrence of the Buildings and Grounds Committee, moves the adoption of the foregoing resolution. FINANCE COMMITTEE #6409 Moved by Houghten supported by Perinoff the resolution be adopted. AYES: Nowak, Olson -, Perinoff, Pernick Quinn, Richardson, Vogt, Walker, Wilcox, Berman, Brotherton, Burley, Button, Coy, Dearborn, Douglas, Dunleavy, Gabler, Hobert, Houghten, Kasper, Lennon, Mathews, Moffitt, Montante. (25) NAYS:. Hoot. (I.) A sufficient majority having voted therefor, the resolution was adopted. STATE OF MICHIGAN) COUNTY OF OAKLAND) I, Lynn D. Allen, Clerk of the County of Oakland and having.a seal, do hereby certify that I have compared the annexed copy of Resolution #640.9 adopted by the Oakland County Board of Commissioners at their August 23, 1973 meeting ••••••••••••••000 •4 ea•••n,060 eaawag•••••••••••••••••••••••••••••••••••••••••••• with the original record thereof now remaining in my office, and that it is a true and correct transcript therefrom, and of the whole thereof. In Testimony Whereof, I have hereunto set my hand and affixed the seal of said County at Pontiac, Michigan OOOO Lynn D. BY •••80effe08 .0.94.0.0 W0..M.S.wompspeputy Clerk 4rosa.aamtseate e ov q.11 .o pawa.eozaameaserao n aos•ea.s4e.nesaaameaa•e•••n •••••••,•• August 16, 1973 BOARD MEMBERS DANIEL T. MURPHY CHAIRMAN ROBERT E. LILLY VICE CHAIRMAN JAMES M_ BRENNAN N EM N ER MILTON W. HAMOORF, P.E. DIR ECTOR. Wm, G. ATcHisor4 T. D ZURMAN. P.E. DEPUTY DIRECTOR DEPUTY DIRECTOR OPERATIONS ENGINEERING 332-8882 338-9287 OAKLAND COUNTY BOARD OF AUDITORS DEPARTMENT OF FACILITIES AND OPERATION'S ONE PUBLIC WORKS DRIVE OAKLAND COUNTY SERVICE CENTER PONTIAC, MICHIGAN 48054 AREA CODE 313 PHONE: 338-4751 - Oakland County Board of Commissioner's Oakland County Service Center 1200 N. Telegraph Road Pontiac, Michigan 48053 Re: Administrative Annex IT Parking: Lot Campus Drive-North Projects 73-6 & 73-8 Dear Commissioners: On August 9 bids for the referenced project were received. Eight firms had taken out Plans and Specifications but only two bids were received as shown on the attached Tabulation of Bids. The low bidder, Wolverine Asphalt Paving, Inc., is a new firm formed within the last few months. The president was formerly involved with another contractor that has done work for the County and had a responsible position with that firm. We have checked out references on the new firm and found them to be satisfactory; and also based on the fact that the firm will be bonded for the work, it is recommended that a Contract be awarded to Wolverine Asphalt Paving, Inc., in the amount of $54,000.00. Total funding to be allocated from the Utility Fund for this project is as follows: Construction (low bid)--------$54,000 Landscaping 2,500 Construction Supervision------ 2,000 Administrative 100 Quality Control & Testing 500 Contingency 1,400 TOTAL FUNDING: $60,500 A total of $111,000 was listed in the County's 1973 Capital Program for this project. Oakland County Board of Commissioners - 2 - August l6, 1973 Representatives from this office will be available at your meetings to answer any further questions. Very truly yours, N. H. Handorf, P.E. Director T. D. Dzilj-rman, P.R. Chief Engineer TDD/dkb At Thursday, August 9, 1973 2 p.m. -OAKLAND COUNTY BOARD OF AUDITORS DEPARTMENT OF FACILITIES AND OPERATIONS FACILITIES ENGINEERING DIVISION - BID TABULATION SHEET - CONSTRUCTION OF ADMINISTRATIVE ANNEX II PARKING LOT AND CAMPUS . DRIVE NORTH PROJECT 7 -3 .-6 and 73-8 CONTRACTOR SIGNED BOND ADD. BASE BID REMARKS 5% #1 A S A Asphalt Paving Co. Ajax Paving Industries Ann Arbor Construction Direct Enterprises, Inc. X X $92,433.00 Harabedian Paving Co. O'Connor-LaLonde Contracting Co. Warren ContraCtors, Inc. Wolverine Asphalt . X X N 54,000.00 Apparent Low Bidder OAKLAND COUNTY BOARD OF AUDITORS DEPARTMENT OF FACILITIES AND OPERATIONS FACILITIES ENGINEERING DIVISION ADMINISTRATIVE ANNEX II PARKING LOT CREDIT UNION DRIVE FINAL COST ESTIMATE Projects 73-6 8 73-8 June 15, 1973 Listed below are the cost estimates for renovating and expanding the existing parking lot to 157 spaces to serve the Administrative 'Annex II and for increasing the width of Credit Union Drive to 20 feet • from the present 13 feet. The .Administrative Annex II Parking Lot construction was listed in the 1973 County Capital Program under Utilities with a total estimated cost shown as *111,000. The final detailed cost estimate for this work is.'considerably less than the amount listed in the Capital Program. The Credit Union Drive project was not listed in the 1973 Capital Program; but because of the safety hazard with the present width and the minor cost involved, approval to bid that work as an alternate with the Administrative Annex IT Parking Lot project is being requested. COST ESTIMATES 1. ADMINISTRATIVE ANNEX II PARKING LOT Removal Bit. Surfacing * 500 Excavation 6,000 Grading 3,000 Curb 8 Gutter 4,500 Agg. Bas. , 6,000 Prime Coat 750 Bit. Agg. Surface , 15,000 Adjust M.H. Covers 400 Inlets 700 Storm Line 2,000 Lighting 5,000 Striping 500 Signs 1,000 Landscaping —20000 TOTAL CONSTRUCTION: CONSTRUCTION SUPERVISION- ADMINISTRATIVE CONTINCENCY TOTAL PROJECT COST: *47,350 2,000 200 *54,000 2 2. CREI'T UNION DRIVE Excavation Agg. Base Course- Bit. Agg. Surface Curb - Storm Line Manhole Miscellaneous---- $ 500 800 300 500 1,000 300 300 TOTAL CONSTRUCTION: $3,700 CONSTRUCTION SUPERVISION 200 CONTINGENCY- 400 TOTAL ESTIMATED PROJECT COST: $4,300 3. - SUMMARY A. Administrative Annex Parking Lot $54,000 B. Credit Union Drive 4,300 TOTAL OF BOTH PROJECTS: $58,300