Loading...
HomeMy WebLinkAboutResolutions - 1973.11.29 - 15551Miscellaneous Resolution I. November 29, 1973 52nd District Court be and 7:y approved. BY: BUILDINGS & GROUW:S COMMITTEE - Richard R. Wilcox, Chairman IN RE: GROVELAND OFFICE BUILDING - PRELIMINARY RENOVATION COST ESTIMATE TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr, Chairman, Ladies and Gentlemen: WHEREAS the Former Mathews Clinic in Groveland Towr' as purchased frc.',••:• County Parks and Recreation Commission in 1970 for use us a futue County office building serve the northern portion of Oakland County; and 'EAS the Buildings and Grounds 0. ee concurs in the recorrirne,-,!•-',--,., the Public and Judiciary Committee that the 7son a' Court, upon ,s-xpflation of its present leased location in the kdcpendence Towns FJ1i, be relocated in the Groveland Office Building; r(-‘' THEREFORE BE IT RESOLVED that the lemodeling cost estimate in the amount of $112,500, as subr : r the Facilities and Operations Division of the 8°c:id of Auditor s for the remodeling of the Grove land Office Building to relocate the Secor on ' The Ruildings and Gronds Committee, by Richard R. Wilcox„ moves the adoption of er!•••4::::, • o I uti on BUILDINGS AND GROUNDS COMMITTEE ,ichard R. Wilcox, irman #6480 Moved by Wilcox supported by Button the resolution be approved and referred back to the Department of Facilities and Operations for a more concrete cost estimate. Discussion followed. AYES: Hoot, Houghten, Kasper, Lennon, Mathews, Moffitt, Montante, Nowak, Olson, Patnales, Perinoff, Pernick, Richardson, Vogt, Wilcox, Berman, Brotherton, Button, Coy, Dearborn, Dunleavy, Gabler, Hobart. (23) NAYS: Walker, Burley. (2) A sufficient majority having voted therefor, the motion carried. LAND COUNTY BOARD OF AUDI_ .RS DEPARTMENT OF FACILITIES AND OPERATIONS FACILITIES ENGINEERING DIVISION CROVELAND OFFICE BUILDING PRELIMINARY COST ESTIMATE PROJECT 70-11 November 2, 1973 The former Mathews Clinic was purchased from the County Parks and Recreation Commission in 1970 for use as a future office building to serve the northern portion of Oakland County. The facility contains approximately 7,800 square feet of area on two floors and a basement. The building is presently being used on a limited basis by the Sheriff's Department and the Groveland Township Fire Departmen The Second Division of the 52nd District Court is presently housed in leased area at the Independence Township Hall. The Township has requested-_that the County relocate the Court facility as soon as possible, and will not renew the lease which expires on December 31, 1974. The Public Protection and Judiciary Committee after reviewing all aspects accepted the concept of relocating this District Court to the Groveland Office Building. Based on a preliminary engineering investigation the following cost estimate has been compiled for renovating this building for use of the Second Division of the 52nd District Court: COST ESTIMATE Cpreliminary) Site Work: Parking Lot $ 3,000 Septic System 3,500 Well Renovations 2,000 Landscaping 1,500 $1o, ono Architectural Trades (First Floor Demolition: 2,500 sq. ft. 0$9.00 $22,500 Ceiling and Floor Repairs 2,000 PROJECT 70-11 -2- • • November 6,000 1,500 2,500 2,000 5,000 2,000 1,000 $10,000 7,000 $97,,000 Walls: New Partitions $6,000 Painting 3,000 Paneling 2,500 Miscellaneous 900 S12,400 Ceiling 2,500 @$1 .00 2 9 500 Millwork (i.e. bench, witness box, etc.) 4,000 Doors and Hardware 1,600 Architectural Total $45,000 Mechanical Trades Heating Repairs (1st and 2nd Floors) 7,000 -- Air Conditioning (1st Floor) 8,000 Plumbing Renovations (1st Floor and risers for 2nd Floor) Water Softener Miscellaneous Mechanical Total • $25,000 Electrical Trades New Service Panels, etc. New Lighting Fixtures (1st Floor) New Receptacles (1st Floor Miscellaneous Electrical Total Exterior Renovations TOTAL ESTIMATED CONSTRUCTION PROJECT 70-11 -3— November 2, 1973 Engineering $ 3,000 Construction Supervision 2,000 Administrative 500 Equipment and Furniture 5,000 Contingency 5,000 $ 15,500 TOTAL PROJECT COST $112,500