HomeMy WebLinkAboutResolutions - 1972.02.03 - 15706presented the following resolution, Mr Lennon
At a regular meeting of the Board of Commissioners of
Oakland County, Michigan, held in the Commissioners' Auditorium
In the County Service Center, in the C4v of Pontiac, Michigan,
on Thursday , the 3rd day of February , 1972,
at 9:30 o'clock A.M., Eastern•Stjandard Time.
Miscellaneous Resolution No. _5910
Recommended by the Board of Public Works
Re: CLINTON-OAKLAND SEWAGE DISPOSAL SYSTEM
CLARKSTON-INDEPENDENCE EXTENSIONS
a copy of which has been sent to each Mpmber of the Board of
COMMi SSi Oner S.
RESOLUTION PROPOSED BY OAKLAND COUNTY BOARD
OF PUBLIC WORKS WITH RESPECT TO CLINTON-OAKLAND
SEWAGE DISPOSAL SYSTEM - CLARKSTON-INDEPENDENCE
EXTENSIONS
WHEREAS, the Oakland County Board of Public Works has
submitted to this Board Second Revised l Exhibits B, B-1, B-2, B-3
and C setting forth the revised estimates of the cost and revised
schedules of payment of the cost of the Clinton-Oakland Sewage
Disposal System - Clarkston-Independence Extensions, which have
been approved by the Board of Public Works; and
WHEREAS, the Oakland County Board of Public Works has
approved said Second Revised Exhibits as revisions of the Contract
dated September 1, 1970, between the County of Oakland and the
Township of Independence and the Village of Clarkston for the
extension of the Clinton-Oakland Sewage Disposal System to be
known as the Clarkston-Independence EXtensions, and did authorize
the Chairman and Secretary of the Board of Public Works to attach
said Second Revised Exhibits to said Contract subject to the
approval of this Board of Commissioners; and
WHEREAS, the aforesaid revisions require revisions to the
Bond Resolution heretofore adopted by this Board which revisions
are set forth in a Second Amended Bond Resolution approved by the
Board of Public Works and submitted to this Board for approval; and
WHEREAS, the said revisions to the Contract will be
approved by each of the said municipalities.
NOW, THEREFORE, BE IT RESOLVED, that the said Second
Revised Exhibits B, B-1, B-2, B-3 and C be approved and the County
Clerk is hereby authorized to endorse :thereon the fact of such
approval and return same to the Board of Public Works.
BE IT FURTHER RESOLVED, that the Chairman and Secretary
of the Board of Public Works be and they are hereby authorized and
directed, on behalf of said County of Oakland, to attach said
Second Revised Exhibits B, B-1, B-2, B-3 and C to the said Contract,
dated September 1, 1970, between the County of Oakland and the
Township of Independence and the Village of Clarkston as revisions
thereto, which Second Revised Exhibits , as follows:
Contract T-1
Contract T-2 •
Contract T-3
Contract T-4
Contract T-5
Contract T-6
$ 521,251.71
858,351.62
1,349,110.20
822,149.00
1,253,697.00
- 760,974.70
ESTIMATE OF TOTAL PROJECT COST
CLINTON-OAKLAND SEWAGE DISPOSAL SYSTEM
CLARKSTON-INDEPENDENCE EXTENSIONS
January 1972
(Second Revised)
KIEFT ENGINEERING, INC. , CONSULTING ENGINEERS,
VILLAGE OF CLARKSTON
Contract V-1 $1,047,310.00
(Bid) Contract V-1 Consiruction Sub--Total $1,047,310.00
JOHNSON & ANDERSON, INC. , CONSULTING ENGINEERS,
TOWNSHIP OF INDEPENDENCE
(Bid) Contracts T.-1 thru T-6 Construction Sub-Total $5,565,534.23
Contract T-7A
Meyers Avenue Pump Station (34-2) $ 45,000.00
Green Lake Pump Station (29-3A) 125,000.00
Park Street Pump Station (34-1) 75,000.00
Pinehurst Pump Station (29-2) 60,000.00
Major Avenue Pump Station (34-2A) 50,000.00
Contract T-7B
Ortonville Pump Station (29-1) $ 250,000.00
(Estimated) Contracts T-7A and T-7B Constniction Sub-Total $ 605,000.00
--EXHIBIT-Y
(Second Revised) -Rage-1-
$1,246,610.00
$1,047,310.00
93,200.00
26,200.00
31,400.00
40,000.00
6,000.00
2,500.00
$1,246,610.00
Construction Sub-Total V-1
Engineering
Administration
Inspection
Easement Acquisition
Soil Test Borings
Investigate Existing System
Sub-Total
William E. McDon(ild, P.E.
NGINEERS KIEFT ENGINEERING, INC. • CONSULTING
VILLAGE OF CLARKSTON
JOHNSON & ANDERSON, INC. , CONSULTING ENGINEERS
TOWNSHIP OF INDEPENDENCE
Construction Sub-Total T-1 thru T-7A & T-7B
Engineering
Administration
Inspection
Easement Acquisition
Soil Test Borings
Sub-Total
Sub-Total
$6,170,534.23
409,900.00
154,300.00
185,100.00
271,555.77
40,000.00
$7,231,390.00 $7,231,390.00
$8,478,000.00
Contingency
Legal
Financial
Capitalized Interest 7.5% for 24 months for a
Bond Issue of $10,100,000.00
Total Project Cost
Total Project Cost
Less State Grant under WPC-CS-264
Village of Clarkston
Sub-Total
Less State Grant under WPC-CS-268
Township of Independence
Total Bond Issue
Portion of Total Project Cost represented
by plans prepared by Kieft Engineering, Inc.
Portion of Total Project Cost represented
by plans prepared by Johnson & Anderson, lInc.
712,590.00
25,200.00
8,710.00
1,515,000.00
$10,739,500.00
$10,739,500.00
278,000.00
$10,461,500.00
361,500.00
$10,100,000.00
$ 1,577,526.20
$9,161,973.80
I hereby estimate the period of usefulness to be Fifty (50) years and
upwards.
KIEFT ENGINEERING, INQ. ,. ,,
S
-v
:.: / .,;-. ,-,,, By : „7:!= ,IT.1 -,,,/ 7-:/:..•----" ,?',:,f6-',-/- /1
--7-114oward M. Kieft; P. 7'''-' ' "J
JOHNSON & ANDERSON, INC.
_Page-2-
EXHIBIT B
(Second Revised)
ITEM #1
Cont. V-1
Cont. V-1
ITEM d
Cont. V-1
Cont. V-1
Cont. V-1
@ $ 22.00
750.00
= $ 10,912.00
1,500.00
$ 12,412,00
$ 33.00
750.00
1,150.00
$ 96,789.00
8,250.00
2,300.00
= $ 107,339.00
Village of Clarkston, from Holcomb Street
to Ortonvillo Lift Station,
43 ITEM
Cont. V-1
Cont. V-1
• 492 L.F.
2 Ea.
Construction Sub-Total
@ $ 60,00
750.00
29,520.00
1,500.00
31,020.00
15 inch Sewer
Manholes, Standard
ITEM #4A
Cont. V-1
Cont. V-1
@ $ 22.00 =
750.00 =
$ 11,352.00
3,000.00
$ 14,352.00
•B`=-1---
ageond-Revi:s.td)-
ESTIMATE OF COST SECTION 1
CLINTON -OAKLAND SEWAGE DISPOSAL SYSTEM
CLARKSTON-INDEPENDENCE EXTENSIONS
January 1972
(Second Revised )
PLANS PREPARED BY KIEFT ENGINEERING, INC.
Village of Clarkston, West Church Street from
Holcomb Street to West Village Limits.
8 inch Sewer 496, L . F.
Manholes, Standard 2 Ea,
Construction Sub-Total
Village of Clarkston, Holcomb Street from
Depot Street to 60 feet North of Village Limits.
21 inch Sewer 2933 LE.
Manholes, Standard 11 E.
Manholes, Drop 2 Ea,
Construction Sub-Total
=
=
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
\T-1
V-1
V-1
V-1 (T-4)
V-1 (T-4)
V-1 (T-4)
24 inch Sewer
Manholes, Standard
Manholes, Drop
24 inch Sewer
Manholes, Standard
Manholes, Drop
Construction
749 L.F.
1 Ea.
2 Ea,
946 L.F.
3 Ea.
I Ea.
Sub-Total
90.00
750,00
1,150.00
68.00
825.00
1,225.00
67,410.00
750.00
2,300.00
64,328.00
2,475.00
1,225.00
138,488.00
ITEM #4 Village of Clarkston, White Lake Road from
Holcomb Street to Southwest
Village of Clarkston, end of Pinehurst
Street at South Village Limits.
8 inch Sewer 516 L.F.
Manholes, Standard 4 Ea.
Construction Sub-Total
SUMMARY OF ITEM COSTS -
F
Village of C
% Participation
ITEM 41 40.000
ITEM t2 1.880
ITEM43 5.100
41-1
ITEM -1-,t4A 3.500
Construction Cost Sub-Totals
*Construction Cost
Multiplier 1.5063
*1,577,526.20 = 1.5063 1,047,310.00
Township
% Participation
60.000
98.120
94.900
100,000 .
96,500
of Independence ..
Construction Cost
$ 7,447.20.
105,321.03
131,425.11
31,020 00
13,84968
$289,063.02
Project Cost
$435,415,63
Page.
arkston
Construction Cost
$4,964.80
2,017.97
7,062.89
-0-
502.32
$14,547.98
Project Cost
$21,913.62
Cant, T-78
Cont. T-4
Cont. T-4
Cont. T-4
Cant -, T-4
Cant, T-4
Cant, T-4
Cant, T-4
Ortonville Pump Station
24 inch Force Main
24 inch Force Main, Jacked
30 inch Sewer
27 inch Sewer
24 inch Sewer
Manholes, Drop Spec. Na.
Manholes, Special Na, 1
1 lEa,
610 L.P.
50 L.F.
18 L.P.
1984 L.F.
10 L.P.
1 Ea,
5 Ea,
Construction Sub-Total
Independence Township from South Village
Limits (MR T 1-1) South to South TownShip
Limits at connection to Clinton-Oakland
Interceptor.
42 inch Sewer
42 inch Sewer, Jacked
30 inch Sewer, Jacked
30 inch Sewer
Manholes, Special No, 1 28 Ea,
Manholes, Drop Special No. 1 9 Ea.
Manholes, Drop, Special No, 1 1 Xa.
30 inch Sewer 6601L.F.
Manholes, Special No. 1 1 'Ea.
Construction Sub-Total
ITEM #7
Cont. T-5
Cont. T -5
Cont. T-5
Cont. T-5
Cont. T-5
Cant, T-5
Cont. T-4
Cont. T-4
Cont. T-4
- 8979 L.P.
580 1_,F,
17 .5 L.P.
776 L.F.
ITEM #5
ITEM #6
ITEM #7
Construction Cost Sub-Totals =
** Construction Cost
Multirlicr 1.4348
3.500
4.425
3.794
$ 3,038.98
15,185.98
28,259.08
96.500
95.575
96.206
$ 83,789,02
328,000.02
716,576.92
$46,484.04 $1,128,365.96
piz2tect Cost
$69,019.50
Project Cost
$1,675,397.78
ITEM. #5
PLANS PREPARED BY JOHNSON 6, ANDERSON, INC.
Independence Township, end of Pinehurpt Street
at South Village Limits, East to Ortonville Road.
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Cent,
@ $60,000.00
13.00
16.00
95.00
63,00
675000
450.00
T-7A Pinehurst Pump Station
T-4 6 inch Force Main
T-4 8 inch Sewer
T-4 8 inch Sewer, Jacked
T-4 8 inch River Crossing
T-4 Manholes, Standard
T-4 Manholes, Cover "As'
Construction
Ea,
340 L F
513 L F
50 L.F.
100
4 Ea,
1 Ea.
Sub-Total
= $ 60,000,00
4,420.00
8,208,00
4,750,00
6,300.00
2,700.00
450.00
= $ 86,828000
ITEM 46 Independence Township, Ortonville Pump
Station South to South Village Limits (MR T1-1)
@ $ 60.00
128.00
168.00
36,00
@ 1,085,00
@ 1,700.00
@ 2,200.00
39.00
@ 900.00
@ 250,000.00
27.00
150.00
39.00
31.00
31.00
@ 2,200,00
@ 900.00
= $ 250,000.00
16,470.00
7,500.00
702.00
= 61,504.00
310.00
2,200.00
= 4 500.00
= $ 343,186.00
= $ 538.740.00
74,240.00
29,400.00
27,936.00
30,380.00
15,300.00
2,200.00
25,740.00
900.00
= $ 744,836.00
SUMMARY OF ITEM COSTS
Village of Clarkston Township of Independence
% Participation Construction Cost % Participation Construction Cost
* * 9,161,973.80 1.4848
6,170,534.23
E3H-1-13-1 T B-1----
Lascond Revised) - -Page .2,
SUMMARY OF PROJECT COSTS - SECTION 1
Village of Clarkston, ITEMS 41 thru 44A
Village of Clarkston, ITEMS 45 thru 47
Independence Township, ITEMS 41 thru 44A
Independence Township, ITEMS 45 thru 47
Estimated Cost- Section 1
$ 21,913.62
69,019.50
435,415.63
1875,397.78
$2,201,746.53
SUMMARY OF PROJECT COST PERCENTAGES - SECTION 1
Village of Clarkston - $90,933.12
90,933.12
$2,201,746.53 = 4.1300%
Township of Independence - $2,110,813.41
2,110,813.41 = 95.8700% 2,201,746.53
EXHIBIT B-1
(Second Revised) Page 3
ESTIMATE OF COST - SECTION 2
CLINTON-OAKLAND SEWAGE DISPOSAL SYSTEM
CLARKSTON-INDEPENDENCE EXTENSIONS
January 1972
(Second Revised)
1 . Portion of total project cost included
in plans prepared by Kieft Engineering, Inc.
from Exhibit B
2. Deduct portion of project cost included in plans
prepared by Kieft Engineering, Inc, to be
financed by Independence Township from
Exhibit B-1
= $1,577,526,20
435,415.63
Sub-Total = $1,142,110.57
3. Deduct portion of project cost included in plans
prepared by Kieft Engineering, Inc. to be
financed by Village of Clarkston as a portion of
joint financing of Section 1, from Exhibit B-1 21,913.62
Estimated Cost Section 2 = $1,120,196.95
EXHIBIT B-2
(Second Revised)
= $1,675 1 397.78
= $7,417,556.52
ESTIMATE OF COST - SECTION 3
CLINTON-OAKLAND SEWAGE DISPOSAL SYSTEM
CLARKSTON-INDEPENDENCE EXTENSIONS
January 1972
(Second Revised)
1. Portion of total project cost included
in plans, prepared by Johnson & Anderson,
Inc. from Exhibit B, = $9,161,03.80
• 2. Deduct portion of project cost included
in -plans prepared by Johnson & Anderson,
Inc. to be financed by Village of Clarkston
from Exhibit B-1 = 69,019.50
Sub-Total = $9,092,954.30
3. Deduct portion of project cost included
in plans prepared by Johnson & Anderson,
Inc., to be financed by Independence
Township as a portion of joint financing
of Section 1, from Exhibit B-1
Estimated Cost - Section 3
• EXHIBIT B-3
(Second Revised)
SECTION 1 Estimated Cost $2,201,746.53
Allocation of Cost
Village of Clarkston 4.1300% = $ 90,933.12
Township of Independence 95.8700% = 2 j10813.41
100% = $2,201,746.53
SECTION 2
Estimated Cost $1,120,196.95
Allocation of Cost
Village of Clarkston 100% = $1,120,196.95
Township of Independence
100% = $1,120,196.95
SECTION 3
Estimated Cost $7,417 556.52
Allocation of Cost
Village of Clarkston 0%
Township of Independence 100%
100%
SUMMARY
Village Township
Section 1 $ 90,933.12 $2,110,813.41
Section 2 1,120,196.95 -0-
Section 3 -0- $7,417,556.52•
$1,211,130.07 $9,528,369.93
COMPOSITE PERCENTAGE OF TOTAL PROJECT COST
Village of Clarkston $1,211,130.07 = - 11.27734%
Township of Independence 9_528,369.93 = 88.72266%
Total $10,739,500.00 = 100.00000%
COMPOSITE PERCENTAGES OF BOND ISSUE
0% =-o-
$ -0-
= 7,417,556.52
= $7,417,556.52
Village of Clarkston Total Project Cost
Less State Grant WPC-CS-264
Bond Issue Principal
Township of Independence - Total
Project Cost
Less State Grant WPC-CS-268
Bond Issue Principal •
$1,211,130.07
278,000.00
$ 933,130.07
$9,528,369.93
361,500.00
$9,166,869,93 _
= 9.23891%
90.76109%
TOTAL BOND ISSUE $1 0 ,100,0 0 0.00 • = 10 0.0000 0%
=BIT"
(Second-Revis-ed)- - - -Page-1 -
CLINTON-OAKLAND SEWAGE DISPOSAL SYSTEM
CLARKSTON-INDEPENDENCE EXTENSIONS
Schedule of Annual Principal Maturities
and Schedule of Annual Municipal Principle Payments
$10,100,000 Bond Issue
Principal Payments Village of Clarkston Independence Twp,
Year 9.23891% 90.76109%
1972 -0- -0- -0-
1973 -0- -0- -0--
1974 -0- -0- -0-
1975 -0- -0- -0--
1976 $ 150,000 $ 13,858.37 $ 136,141.63
1977 150,000 13,858.37 136,141.63
1978 175,000 16,168.10 158,831.90
1979 200,000 18,477.82 181,522.18
1980 200,000 18,477.82 181,522.18
1981 225,000 20,787.55 204,212.45
1982 250,000 23,097.28 226,902.72
1983 275,000 25,407.01 249,592.99
1984 300,000 27,716.73 272 283 27 , .
1985 325,000 30,026.46 294,973.54
1986 350,000 32,336.19 317,653.81
1987 375,000 34,645.92 340,35C08
1988 400,000 = 36,955.65 363,044.35
1989 425,000 39,265.37 385,734.63
1990 450,000 41,575.10 408,424.90
1991 500,000 46,194.56 453,805.44
1992 550,000 50,814,01 499,185.99
1993 600,000 55,433.47 544,566.53
1994 600,000 55,433.47 544,566.53
1995 600,000 55 4 433.47 544,566.53
1996 600,000 55,433.47 544,566.53
1997 600,000 55,433.47 544,566.53
1998 600,000 55,433.47 544,566.53
1999 600,000 55,433.47 544,566.53
2000 = 600,000 55,433•47 544,566.53
Total ====$10,100,000 $933,130.07 $9,166,869.93
EXHIBIT C
(Second Revised)
PUBLIC WORKS COMMITTEE
Bernard F. Lennon, Chairman
Mr. Lennon
resolution. The motion was supported by Mr. Richardson
rati—Call "L'I Q.1 ion-was- adopted' Aay - the-loIlow±ng- --t-c.
moved the adoption of the foregoing
Discussion followed.
A sufficient majority having voted therefor, the resolution was adopted.
held on the 3rd_ day of February
STATE OF MICHIGAN )
) ss:
COUNTY OF OAKLAND )
I, the undersigned, the duly clualified,and acting County
Clerk of the County of Oakland, do hereby certify that the fore-
going is a true and complete copy of a!resolution adopted at a
meeting of the Oakland County Board of Commissioners,
, 1972, the original of
which is on file in my officer,
IN WITNESS WHEREOF, I have hereunto affixed my official
signature this 3rd day of February AD. 1972.
Coun Clerk