Loading...
HomeMy WebLinkAboutResolutions - 1970.08.20 - 16357H REcOLUTION NO. J458 RE: RED RU AND CLINTON RIVER TMPROVFMENT PROJECT • BY: PUBLIC WORKS COMMITTEE - Mr. Horton TO: OAKLAND COUNTY BOARD OF COMMISSIONERS August 20, 1970 Mr. Chairman, Ladies and Gentlemen: WHEREAS, major floods have occurred within the Red Per and Clinton River Drainage Basin with great frequency and at times have necessitated the evacuation of homes and have disrupted transportation and utility system, and WHEREAS, these flood problems have, in recent years, become intensified b ecause of the urbanized development within the said drainage basin, and WHEREAS, existing flood control facilities are inadequate to relieve these: flooding conditions, and WHEREAS, the improvement of the jRed Run Drain and Clinton River as !proposed by the United States Corps of Engineers will be beneficial to that ortion of the drainage basin located id Oakland County, NOW THEREFORE BE IT RESOLVED that the County Board of Commissioners Hhavinc! reviewed the concept of the proposed improvement of the Red Run Drain and Clinton River presently under study by the t_LS Corps of Engineers concurs in such proposed project which will be Of benefit to the communities within the drainage basin including the County of Oakland, Mr. Chairman, on behalf of the Public Works Committee, I move the coption of the foregoing resolution, 1 PUBLIC WP.KS COMMITTEE #5458 Moved by Horton supported by Richardson the resolution be adopted. A sufficient majority having voted therefor, the resolution was adopted,