Loading...
HomeMy WebLinkAboutResolutions - 1990.05.24 - 16773arm cutive nf4/my9030ms POI. H;:iFfI9EGOI May 24, 1990 MISCELLANEOUS RESOLUTION # 90096 BY: FINANCE COMMITTEE, DR. G. WILLIAM CADDELL, CHAIRPERSON IN RE: PUBLIC WORKS/FACILITIES ENGINEERING DIVISION - CONTRACT AWARD FOR VEHICLE IMPOUND YARD AT THE TRUSTY CAMP TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr. Chairperson, Ladies and Gentlemen; WHEREAS by Miscellaneous Resolution #90078 of Board of Commissioners authorized the County Executive's Facilities Engineering Division to receive bids for construction of a vehicle impound yard at an estimated cost of $27,700; and WHEREAS in accordance with bidding procedures, bids for the installation of the above mentioned were received and opened on May 3, 1990; and WHEREAS the County Executive's Department of Public Works has reviewed all bids submitted and recommends that the lowest responsible bidder, Future Fence Company be awarded a contract for construction in the amount of $21,456; and WHEREAS additional costs are estimated to be $2,744; and WHEREAS the total cost of the above mentioned work is estimated to be $24,200 as detailed in the attached schedule; and WHEREAS funding for the above mentioned project is available in the 1990 Capital Improvement Program - Utilities Fund #40200. NOW THEREFORE BE IT RESOLVED as follows: 1) The contract proposal of Future Fence Company of Detroit, Michigan in the amount of $21,456 be accepted and the contract awarded in concurrence with the Planning and Building Committee recommendations, 2) Funds be provided in the amount of $2,744 to cover the remaining project costs, 3) The Chairperson of the Board of Commissioners is hereby authorized and directed to execute a contract with Future Fence Company of Detroit, Michigan on behalf of the County of Oakland, 4) The County Executive's Department of Public Works, Facilities Engineering Division, shall notify the awardee of this award, in writing no later than 10 days after adoption of this resolution. The award shall not be effective until the awardee has been notified. Mr. Chairperson, on behalf of the Finance Committee, I move the adoption of the foregoing resolution. FINANCE COMMITTEE I. Construction 2. Administrative Expense Sub-Total 3. Contingency (10%) Total Project Cost $ 21,456.00 500.00 $ 21,956.00 $ 24,200.00 2,244.00 OAKLAND COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS FACILITIES ENGINEERING DIVISION AWARD OF CONTRACT FOR VEHICLE IMPOUND YARD AT THE TRUSTY CAMP Project No.: 88-25R May 15, 1990 In accordance with authorization received on March 27, 1990, in the form of Miscellaneous Resolution #90078, drawings and specifications for the Vehicle Impound Yard at the Trusty Camp were prepared. The project was re-advertised and bids were received at 2:30 p.m., on Thursday, May 3, 1990. These bids are summarized on the attached Bid Tabulation Sheet. The low responsible bidder was Future Fence Company of Detroit, Michigan, with a base bid of $21,456.00. This contractor has not performed for us before, but has submitted references which we have checked and we feel he can perform satisfactorily on this project. The project is expected to be completed by July 1, 1990, and the total cost is estimated to be: Funding in the amount of $24,200.00 is available from the Impound Yard line item of the Utilities Section of the 1990 Capital Improvement Program. We are, therefore, recommending that a contract in the amount of $21,456.00 be awarded to Future Fence Company. Further we are recommending that total project funding in the amount of $24,200.00 be appropriated. REPORT May 24, 1990 BY: Planning and Building Committee, Larry P. Crake, Chairperson TO: Finance Committee, Dr. G. William Caddell, Chairperson IN RE: AWARD OF CONTRACT-VEHICLE IMPOUND YARD AT TRUSTY CAMP Mr. Chairperson, Ladies and Gentlemen : The Planning and Building Committee, having reviewed the bids received for the above referenced project, reports with the recommendation that the contract be awarded to Future Fence Company of Detroit, Michigan, in the amount of $21,456.00, for a total project cost of $24,200.00 Mr. Chairperson, on behalf of the Planning and Building Committee, I hereby submit the foregoing report. PLANNING AND BUILDING COMMITTEE Carried on roll call vote with S. Kuhn, McConnell & Luxon absent. REPORT May 24, 1990 BY: Planning and Building Committee, Larry P. Crake, Chairperson TO: Finance Committee, Dr. G. William Caddell, Chairperson IN RE: AWARD OF CONTRACT-VEHICLE IMPOUND YARD AT TRUSTY CAMP Mr. Chairperson, Ladies and Gentlemen: The Planning and Building Committee, having reviewed the bids received for the above referenced project, reports with the recommendation that the contract be awarded to Future Fence Company of Detroit, Michigan, in the amount of $21,456.00, for a total project cost of $24,200.00 Mr. Chairperson, on behalf of the Planning and Building Committee, I hereby submit the foregoing report. PLANNING AND BUILDING COMMITTEE Resolution # 90096 May 24, 1990 Moved by Caddell supported by Ferrens the resolution be adopted. AYES: Calandro, Chester, Crake, Ferrens, Gosling, Huntoon, Jensen, JOhnson, R. Kuhn, S. Kuhn, Law, Luxon, McConnell, McPherson, Moffitt, Olsen, Pappageorge, Pernick, Price, Rewold, Skarritt, Wolf, Aaron, Bishop, Caddell. (25) NAYS; None. (0) A sufficient majority having voted therefor, the resolution was adopted. STATE OF MICHIGAN) COUNTY OF OAKLAND I, Lynn D. Allen, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on May 24, 1990 with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County of Oakland at Pontiac, Michigan this 24th May IS 90 • /L./ Lyn7/D. Allen, County Clerk