MISCELLANEOUS RESOLUTION # 90103 May 24, 1990
BY: FINANCE COMMITTEE, DR. G. WILLIAM CADDELL, CHAIRPERSON
IN RE: PUBLIC WORKS/FACILITIES ENGINEERING DIVISION - CONTRACT
AWARD FOR WORK RELEASE FACILITY PARKING LOT PAVING
TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS
Mr. Chairperson, Ladies and Gentlemen;
WHEREAS by Miscellaneous Resolution #90080 of Board of Commissioners authorized
the County Executive's Facilities Engineering Division to receive bids for asphalt
surface on the parking lot at the Work Release Facility at an estimated cost of
$33,000; and
WHEREAS in accordance with bidding procedures, bids for the installation of the
above mentioned were received and opened on May 2, 1990; and
WHEREAS the County Executive's Department of Public Works has reviewed all bids
submitted and recommends that the lowest responsible bidder, Al's Asphalt Paving
Company, Inc. be awarded a contract for construction in the amount of $18,308; and
WHEREAS additional costs are estimated to be $2,392; and
WHEREAS the total cost of the above mentioned work is estimated to be
$20,700 as detailed in the attached schedule; and
WHEREAS funding for the above mentioned project is available in the 1990 Capital
Improvement Program - Utilities Fund #40200.
NOW THEREFORE BE IT RESOLVED as follows:
I) The contract proposal of Al's Asphalt Paving Company, Inc. of Taylor,
Michigan in the amount of $18,308 be accepted and the contract awarded in
concurrence with the Planning and Building Committee recommendations,
2) Funds be provided in the amount of $2,392 to cover the remaining project
costs,
3) The Chairperson of the Board of Commissioners is hereby authorized and
directed to execute a contract with Al's Asphalt Paving Company, Inc. of Taylor,
Michigan on behalf of the County of Oakland,
4) The County Executive's Department of Public Works, Facilities Engineering
Division, shall notify the awardee of this award, in writing no later than 10 days
after adoption of this resolution. The award shall not be effective until the
awardee has been notified.
Mr. Chairperson, on behalf of the Finance Committee, I move the adoption of the
foregoing resolution.
3Y APPROVE THE FpREGOING. RESOLUTION
72 •/,
Dan a LL tViu 4ft: God My
FINANCE COMMITTEE
Sub-Total
3. Contingency (10%)
Total Project Cost
$ 18,808.00
$ 20,700.00
1,892.00
OAKLAND COUNTY EXECUTIVE
DEPARTMENT OF PUBLIC WORKS
FACILITIES ENGINEERING DIVISION
AWARD OF CONTRACT
FOR
WORK RELEASE FACILITY
PARKING LOT PAVING
Project No.: 88-27R May 15, 1990
In accordance with authorization received on April 5, 1990, in the
form of Miscellaneous Resolution #90080, drawings and specifications for
the Work Release Facility Parking Lot Paving were prepared. The project
was re-advertised and bids were received at 2:00 p.m., on Wednesday, May
2, 1990. These bids are summarized on the attached Bid Tabulation
Sheet.
The low responsible bidder was Al's Asphalt Paving Company, Inc., of
Taylor, Michigan, with a base bid of $18,308.00. This contractor has not
performed for us before, but he has worked for the County Parks and
Recreation Commission and we have checked his other references and feel
he is qualified to perform on this project.
The project is expected to be completed by July 1, 1990, and the
total cost is estimated to be:
1. Construction $ 18,308.00
2. Administrative Expense 500.00
Funding in the amount of $20,700.00 is available from the Asphalt
Paving Program line item of the Utilities Section of the 1990 Capital
Improvement Program. We are, therefore, recommending that a contract in
the amount of $18,308.00 be awarded to Al's Asphalt Paving Company, Inc.
Further we are recommending that total project funding in the amount of
$20,700.00 be appropriated.
REPORT (Misc. 90103) May 24, 1990
BY: Planning and Building Committee, Larry P. Crake, Chairperson
TO: Finance Committee, Dr. G William Caddell, Chairperson
IN RE: AWARD OF CONTRACT-WORK RELEASE FACILITY PARKING LOT
Mr. Chairperson, Ladies and Gentlemen :
The Planning and Building Committee, having reviewed the
bids for the above-referenced project, reports with the recommendation
that the contract be awarded to Al's Asphalt Paving Company, Inc. , of
Taylor, Michigan in the amount of $18,308.00, for a total project cost of
$20, 700.00.
Mr. Chairperson, on behalf of the Planning and Building
Committee, I hereby submit the foregoing rgport
PLANNING AND BUILDING COMMITTEE
Caplet I Ms ar Number DESCRIPTION
LETTER OF TRANSMITTAL
OAKLAND COUNTY EXECUTIVE - DEPARTMENT OF PUBLIC WORKS - FACILITIES ENGINEERING DIVISION
ONE PUBLIC WORKS DRIVE - OAKLAND COUNTY SERVICE CENTER - PONTIAC. MICHIGAN 48054
Board of Commissioners
TO DATE
May 22, 1990
88-27-A-Work Release Facili PROJECT
Parking Lot Paving LOCATION
Contract REGARDING
Roy Rewold, Chairman
GENTLEMEN:
ATTENTION:
WE ARE SENDING YOU d' HEREWITH I1 DELIVERED BY HAND UNDER SEPARATE COVER
VIA THE FOLLOWING ITEMS:
5/24/90 1 Contract #833
THESE ARE TRANSMITTED AS INDICATED BELOW:
3
,p, FOR YOUR FILE
101. FOR APPROVAL
O AS REQUESTED
O FOR REVIEW AND COMMENT
0
O APPROVED AS NOTED 0 RETURNED CORRECTED PRINTS
O APPROVED 0 SUBMIT COPIES FOR
O CALL ME REGARDING 0 RESUBMIT COPIES FOR
ATTACHMENT 0 FOR BIDS DUE
0 FORWARD BID DEPOSIT IN THE
Please sign and return all copies or IAM6ntra7t—to my
REMARKS:
attention for signing by the contractor. Resolution
Number is #90080.
Facilitiesd Engineering
SIGNED: TITLE:
P. B ger
(If Enclosures Are Not As Indicated. Please Notify Us Al Once.)
WHITE - Addressee YELLOW - File
PROJECT NO.: 88-27A CONTRACT NO.: 833
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the Count Y of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board Of Commissioners, hereinafter called the "OWNER"
and Al's Asphalt Paving Co., Inc., 25500 Brest Rd., Taylor, MI 48180, a
corporation of the State of Michigan, hereinafter called the
"CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
WORK RELEASE FACILITY
PARKING LOT PAVING
WATERFORD TOWNSHIP, MI
COUNTY PROJECT 88-27A
AS PREPARED BY: The Facilities Engineering Division of the Oakland
County Executive's Department of Public Works, all in accordance with
this agreement, the General Conditions of the Contract, the Proposal, the
Specifications, and the Drawings.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receipt of written notice, and shall fully complete the Work within
thirty (30) calendar days from the notice to proceed. The OWNER shall
pay the CONTRACTOR for the performance of the Contract, subject to
additions and deductions provided therein, as follows: Eighteen Thousand
Three Hundred Eight and 00/100 ($18,308.00), which price is the base bid.
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
Title: Chairman
Contract No.: 833
Project No.: 88-27A
Page 2
The following is a list of the Drawings and Specifications all
dated April 9, 1990, which form a part of the Contract:
SPECIFICATIONS: A8-1, IB 1-4, PF 1-3, G 1-3, GC 1-28, 01085 1-3,
01300 1-6, 01500 1-6, 02200 1-2, and 02600-1
DRAWINGS: Cover Sheet & Sheet #1.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
WITNESS: AL'S ASPHALT PAVING CO., INC.,
By:
By:
Title: President
Title: Secretary
PROJECT NO.: 88-27A CONTRACT NO.: 833
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board Of Commissioners, hereinafter called the "OWNER"
and Al's Asphalt Paving Co., Inc., 25500 Brest Rd., Taylor, MI 48160, a
corporation of the State of Michigan, hereinafter called the
"CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other acrPssories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
WORK RELEASE FACILITY
PARKING LOT PAVING
WATERFORD TOWNSHIP, MI
COUNTY PROJECT 88-27A
AS PREPARED BY The Facilities Engineering Division of the Oakland
County Executive's Department of Public Works, all in accordance with
this agreement, the General Conditions of the Contract, the Proposal, the
Specifications, and the Drawings.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receipt of written notice, and shall fully complete the Work within
thirty (30) calandar days from the notice to proceed. The OWNER shall
pay the CONTRACTOR for the performance of the Contract, subject to
additions and deductions provided therein, as follows: Eighteen Thousand
Three Hundred Eight and 00/100 ($18,308.00), which price is the base bid.
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
Contract NO.:
Project No.: 88-27A
Page 2
The following is a list of the Drawings and Specifications all
dated April 9, 1990, which form a part of the Contract:
SPECIFICATIONS: 18-1, IB 1-4, PP 1-3, G 1-3, GC 1-28, 01085 1-3,
01300 1-6, 01500 1-6, 02200 1-2, and 02600-1
DRAWINGS: Cover Sheet & Sheet #I.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
Title: Chairman
WITNESS: AL'S ASPHALT PAVING CO., INC.,
By:
By:
Title: President
Title: Secretary
SIGNED:
P. Barg
(If Enclosures Are Not As Indicated, Please Notify Us At Once.)
Facilities Engineering
TITLE:
WHITE - Addressee YELLOW - File
LETTER OF TRANSMITTAL
OAKLAND COUNTY EXECUTIVE - DEPARTMENT OF PUBLIC WORKS - FACILMES ENGINEERING DIVISION
ONE PUBLIC WORKS DRIVE - OAKLAND COUNTY SERVICE CENTER - PONTIAC, MICHIGAN 48054
Roy Rewold, Chairman
TO DATE
Board of Commissioners
PROJECT
LOCATION
Contract
REGARDING
ATTENTION:
April 10, 1990
87-23 - Materials Management Cente
Oakland Avenue
GENTLEMEN:
WE ARE SENDING YOU n HEREWITH El DELIVERED BY HAND 0 UNDER SEPARATE COVER
VIA THE FOLLOWING ITEMS:
Copies Date or Number
4/26/90
DESCRIPTION
Contract #831
THESE ARE TRANSMITTED AS INDICATED BELOW:
o APPROVED AS NOTED 0 RETURNED CORRECTED PRINTS
O APPROVED 0 SUBMIT COPIES FOR
O CALL ME REGARDING 0 RESUBMIT COPIES FOR
ATTACHMENT 0 FOR BIDS DUE
0 FORWARD BID DEPOSIT IN THE
O FOR YOUR FILE
>E1\( FOR APPROVAL
O AS REQUESTED
O FOR REVIEW AND COMMENT
REMARKS: Please sign and return all copies AMTKre0FdlonLiat..1. to my
attention for signing by the contractor. Resolution Number is #90039.
PROJECT NO.: 88-27A CONTRACT NO.: 833
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board Of Commissioners, hereinafter called the "OWNER"
and Al's Asphalt Paving Co., Inc., 25500 Brest Rd., Taylor, MI 48180, a
corporation of the State of Michigan, hereinafter called the
"CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
WORK RELEASE FACILITY
PARKING LOT PAVING
WATERFORD TOWNSHIP, MI
COUNTY PROJECT 88-27A
AS PREPARED BY: The Facilities Engineering Division of the Oakland
County Executive's Department of Public Works, all in accordance with
this agreement, the General Conditions of the Contract, the Proposal, the
Specifications, and the Drawings.
• The CONTRACTOR hereby agrees to commence Work under this Contract
upon receipt of written notice, and shall fully complete the Work within
thirty (30) calendar days from the notice to proceed. The OWNER shall
pay the CONTRACTOR for the performance of the Contract, subject to
additions and deductions provided therein, as follows: Eighteen Thousand
Three Hundred Eight and 00/100 ($16,306.00), which price is the base bid.
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
WITNESS:
Title: Chairman
Contract No.: 633
Project No.: 88-27A
Page 2
The following is a list of the Drawings and Specifications all
dated April 9, 1990, which form a part of the Contract:
SPECIFICATIONS: AB-1, IB 1-4, PF 1-3, G 1-3, GC 1-28, 01085 1-3,
01300 1-6, 01500 1-6, 02200 1-2, and 02600-1
DRAWINGS: Cover Sheet & Sheet #1.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: AL'S ASPHALT PAVING CO., INC.,
By:
By:
Title: President
Title: Secretary
PROJECT NO.: 87-23 CONTRACT NO.: 831
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board of Commissioners, hereinafter called the "OWNER"
and Ken Daly Incorporated, 1520 N. Woodward, Suite 107, Bloomfield Hills,
Michigan, 48013, a corporation of the State of Michigan, hereinafter
called the "CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
MATERIALS MANAGEMENT CENTER
PONTIAC, MICHIGAN
COUNTY PROJECT 87-23
AS PREPARED BY: Silberg & Associates, Electrical Consultant, and the
Facilities Engineering Division of the Oakland County Executive's
Department of Public Works, all in accordance with this agreement, the
General Conditions of the Contract, the Proposal, the Specifications, the
Drawings, and Addenda Nos. 1 & 2.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receipt of written notice to proceed, and shall fully complete the
Work within One Hundred Eighty (180) calendar days from the notice to
proceed. The OWNER shall pay the CONTRACTOR for the performance of the
Contract, subject to additions and deductions provided therein, as
follows: Five Hundred Seventy-Three Thousand Three Hundred and 00/100
dollars ($573,300.00), which price includes the Base Bid and Alternate
M-1 (Alternate E-1 not accepted).
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
WITNESS: KEN DALY, INC.
By:
By:
Title: President
Title: Secretary
Contract No.: 831
Project No.: 87-23
Page 2
The following is a list of the Drawings and Specifications all
dated March 5, 1990, which form a part of the Contract:
SPECIFICATIONS: AB 1-2, 18 1-5, PF 1-4, G 1-3, GC 1-28, 01020 1-2,
01030 1-2, 01045 1-5, 01085 1-3, 01300 1-5, 01500 1-5,
01710 1-3, 01750 1, 02050 1-4, 02222 1-2, 02223 1-3,
02225 1-3, 02711 1-4, 03310 1-14, 04050 1-3, 04100 1-4,
04155 1-2, 04270 1-5, 04320 1-7, 04510 1-2, 06100 1-5,
06200 1-3, 07100 1-9, 07213 1-2, 07831 1-2, 07900 1-5,
08100 1-9, 08213 1-4, 08360 1-5, 08710 1-9, 09260 1-5,
09500 1-4, 09660 1-4, 09900 1-5, 10800 1-5, 11410 1-11,
11161 1-3, 11164 1-2, 11165 1-2, 15010 1-10, 15400 1-10,
15500 1-5, 15600 1-7, 15700 1-2, 15800 1-9, 16010 1-4,
16100 1-4, 16400 1-6, 16500 1-2, 16600 1-9, BORING LOGS
& NOTES 1-5, MDOT SPECIFICATIONS FOR BORING BJ 1-5,
UTILITY TRENCH DETAILS 1-3.
DRAWINGS: SP-1, SP-2, SP-3, SP-4, D-1, D-2, D-3, A-1, A-2, A-3,
A-4, A-5, M-1, M-2, M-3, E-1, E-2, E-3, E-4, E-5, R-1,
R-2.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
Title: Chairman
PROJECT NO.: 87-23 CONTRACT NO 831
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board of Commissioners, hereinafter called the "OWNER"
and Yen Daly Incorporated, 1520 N. Woodward, Suite 107, Bloomfield Hills,
Michigan, 48013, a corporation of the State of Michigan, hereinafter
called the 7CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
MATERIALS MANAGEMENT CENTER
PONTIAC, MICHIGAN
COUNTY PROJECT 87-23
AS PREPARED BY: Silberg & Associates, Electrical Consultant, and the
Facilities Engineering Division of the Oakland County Executive's
Department of Public Works, all in accordance with this agreement, the
General Conditions of the Contract, the Proposal, the Specifications, the
Drawings, and Addenda Nos. 1 & 2.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receipt of written notice to proceed, and shall fully complete the
Work within One Hundred Eighty (180) calendar days from the notice to
proceed. The OWNER shall pay the CONTRACTOR for the performance of the
Contract, subject to additions and deductions provided therein, as
follows: Five Hundred Seventy-Three Thousand Three Hundred and 00/100
dollars ($573,300.00), which price includes the Base Bid and Alternate
M-1 (Alternate E-1 not accepted).
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
KEN DALY, INC.
By:
By:
Title: President
Title: Secretary
Title: Chairman
WITNESS:
Project No.: 87-23
Page 2
The following is a list of the Drawings and Specifications all
dated March 5, 1990, which form a part of the Contract:
SPECIFICATIONS: AB 1-2, IB 1-5, PF 1-4, G 1-3, GC 1-28, 01020 1-2,
01030 1-2, 01045 1-5, 01085 1-3, 01300 1-5, 01500 1-5,
01710 1-3, 01750 1, 02050 1-4, 02222 1-2, 02223 1-3,
02225 1-3, 02711 1-4, 03310 1-14, 04050 1-3, 04100 1-4,
04155 1-2, 04270 1-5, 04320 1-7, 04510 1-2, 06100 1-5,
06200 1-3, 07100 1-9, 07213 1-2, 07831 1-2, 07900 1-5,
08100 1-9, 08213 1-4, 08360 1-5, 08710 1-9, 09260 1-5,
09500 1-4, 09660 1-4, 09900 1-5, 10800 1-5, 11410 1-11,
11161 1-3, 11164 1-2, 11165 1-2, 15010 1-10, 15400 1-10,
15500 1-5, 15600 1-7, 15700 1-2, 15800 1-9, 16010 1-4,
16100 1-4, 16400 1-6, 16500 1-2, 16600 1-9, BORING LOGS
& NOTES 1-5, MDOT SPECIFICATIONS FOR BORING BY 1-5,
UTILITY TRENCH DETAILS 1-3.
DRAWINGS; SP-1, SP-2, SP-3, SP-4, D-1, D-2, D-3, A-1, A-2, A-3,
A-4, A-5, M-1, M-2, M-3, E-1, E-2, E-3, E-4, E-5, R-1,
R-2.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
PROJECT NO.: 87-23 CONTRACT NO.: 831
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board of Commissioners, hereinafter called the "OWNER"
and Ken Daly Incorporated, 1520 N. Woodward, Suite 107, Bloomfield Hills,
Michigan, 48013, a corporation of the State of Michigan, hereinafter
called the "CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
MATERIALS MANAGEMENT CENTER
PONTIAC, MICHIGAN
COUNTY PROJECT 87-23
AS PREPARED BY: Silberg & Associates, Electrical Consultant, and the
Facilities Engineering Division of the Oakland County Executive's
Department of Public Works, all in accordance with this agreement, the
General Conditions of the Contract, the Proposal, the Specifications, the
Drawings, and Addenda Nos. 1 & 2.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receipt of written notice to proceed, and shall fully complete the
Work within One Hundred Eighty (180) calendar days from the notice to
proceed. The OWNER shall pay the CONTRACTOR for the performance of the
Contract, subject to additions and deductions provided therein, as
follows: Five Hundred Seventy-Three Thousand Three Hundred and 00/100
dollars ($573,300.00), which price includes the Base Bid and Alternate
M-1 (Alternate E-1 not accepted).
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
' Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
Title: Chairman
WITNESS: KEN DALY, INC.
Project No.: 87-23
Page 2
The following is a list of the Drawings and Specifications all
dated March 5, 1990, which form a part of the Contract:
SPECIFICATIONS: AS 1-2, IB 1-5, PR 1-4, G 1-3, GC 1-28, 01020 1-2,
01030 1-2, 01045 1-5, 01085 1-3, 01300 1-5, 01500 1-5,
01710 1-3, 01750 1, 02050 1-4, 02222 1-2, 02223 1-3,
02225 1-3, 02711 1-4, 03310 1-14, 04050 1-3, 04100 1-4,
04155 1-2, 04270 1-5, 04320 1-7, 04510 1-2, 06100 1-5,
06200 1-3, 07100 1-9, 07213 1-2, 07831 1-2, 07900 1-5,
08100 1-9, 08213 1-4, 08360 1-5, 08710 1-9, 09260 1-5,
09500 1-4, 09660 1-4, 09900 1-5, 10800 1-5, 11410 1-11,
11161 1-3, 11164 1-2, 11165 1-2, 15010 1-10, 15400 1-10,
15500 1-5, 15600 1-7, 15700 1-2, 15800 1-9, 16010 1-4,
16100 1-4, 16400 1-6, 16500 1-2, 16600 1-9, BORING LOGS
& NOTES 1-5, MDOT SPECIFICATIONS FOR BORING B,J. 1-5,
UTILITY TRENCH DETAILS 1-3.
DRAWINGS: SP-1, SP-2, SP-3, SP-4, D-1, D-2, D-3, A-1, A-2, A-3,
A-4, A-5, M-1, M-2, M-3, E-1, E-2, E-3, E-4, E-5, R-1,
R-2.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
By:
By:
Title: President
Title: Secretary
May 22, 1990
88-25--R-Vehicle Impound Yard
Trusty Camp
Contract
is #90078.
SIGNED: are
LETTER OF TRANSMITTAL
OAKLAND COUNTY EXECUTIVE - DEPARTMENT OF PUBLIC WORKS - FACILMES ENGINEERING DIVISION
ONE PUBLIC WORKS DRIVE - OAKLAND COUNTY SERVICE CENTER - PONTIAC, MICHIGAN 48054
Roy Rewold, Chairman TO DATE
Board of Commissioners PROJECT _
LOCATION .
REGARDING
ATTENTION:
GENTLEMEN:
WE ARE SENDING YOU [21 HEREWITH Cr_ri DELIVERED BY HAND El UNDER SEPARATE COVER
VIA THE FOLLOWING ITEMS:
Copies Oats or Number DESCRIPTION
3 5/24/90 1 Contract #832
THESE ARE TRANSMITTED AS INDICATED BELOW:
O APPROVED AS NOTED 0 RETURNED CORRECTED PRINTS
O APPROVED 0 SUBMIT COPIES FOR
O CALL ME REGARDING 0 RESUBMIT COPIES FOR
ATTACHMENT 0 FOR BIDS DUE
0 FORWARD BID DEPOSIT IN THE
ID FOR YOUR FILE
XII FOR APPROVAL
E3 AS REQUESTED
0 FOR REVIEW AND COMMENT
Please sign and return all copies orTre CICSontract -to my REMARKS:
attention for signing by the contractor. Resolution Number
(If Enclosures Are Not As indicated, Please Notify Us At Once.)
Facilities Engineering
TITLE:
WHITE - Addressee YELLOW - File
PROJECT NO.: 88-25R CONTRACT NO.: 832
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board Of Commissioners, hereinafter called the "OWNER"
and Future Fence Company, 4343 Nancy, Detroit, MI 48212, an individual
doing business under an assumed name, herinafter called the "CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
OAKLAND COUNTY TRUSTY CAMP
VEHICLE IMPOUND YARD
AUBURN HILLS, MI
COUNTY PROJECT 88-25R
AS PREPARED BY: The Facilities Engineering Division of the Oakland
County Executive's Department of Public Works, all in accordance with
this agreement, the General Conditions of the Contract, the Proposal, the
Specifications, and the Drawings.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receiving written notice, and shall fully complete the Work within
thirty (30) calendar days from the notice to proceed. The OWNER shall
pay the CONTRACTOR for the performance of the Contract, subject to
additions and deductions provided therein, as follows: Twenty-One
Thousand Four Hundred Fifty-Six and 00/100 ($21,456.00), which price is
the base bid.
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
WITNESS; FUTURE FENCE CO.
Title: Chairman
Contract No 832
Project No.: 88-25R
Page 2
The following is a list of the Drawings and Specifications all
dated April 9, 1990, which form a part of the Contract:
SPECIFICATIONS: AB-1, IS 1-5, PF 1-3, G 1-3, GC 1-28, 01085 1-3,
01300 1-6, 01500 1-6, 02200 1-2, and 02711 1-3
DRAWINGS: Cover Sheet & Sheet #1
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
BY :
By:
Title: President
Title: Secretary
PROJECT NO.: 88-25R CONTRACT NO.: 832
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board Of Commissioners, hereinafter called the "OWNER"
and Future Fence Company, 4343 Nancy, Detroit, MI 48212, an individual
doing business under an assumed name, herinafter called the "CONTRACTOR."
WITNESSETR, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means - of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
OAKLAND COUNTY TRUSTY CAMP
VEHICLE IMPOUND YARD
AUBURN HILLS, MI
COUNTY PROJECT 88-25R
AS PREPARED BY: The Facilities Engineering Division of the Oakland
County Executive's Department of Public Works, all in accordance with
this agreement, the General Conditions of the Contract, the Proposal, the
Specifications, and the Drawings.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receiving written notice, and shall fully complete the Work within
thirty (30) calendar days from the notice to proceed. The OWNER shall
pay the CONTRACTOR for the performance of the Contract, subject to
additions and deductions provided therein, as follows: Twenty-One
Thousand Four Hundred Fifty-Six and 00/100 ($21,456.00), which price is
the base bid.
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
Contract No.: 832
Project No.: 88-25R
Page 2
The following is a list of the Drawings and Specifications all
dated April 9, 1990, which form a part of the Contract:
SPECIFICATIONS: AB-1, IB 1-5, PP 1-3, G 1-3, GC 1-28, 01085 1-3,
01300 1-6, 01500 1-6, 02200 1-2, and 02711 1-3
DRAWINGS: Cover Sheet & Sheet #1
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall be deemed an original, in
the year and day first above mentioned.
WITNESS: COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
Title: Chairman
WITNESS: FUTURE FENCE CO.
By: Title: President
By: Title: Secretary
PROJECT NO.: 88-25R CONTRACT NO.: 832
CONTRACT
THIS AGREEMENT, made this the 24th day of May, 1990, by and between
the County of Oakland, a Michigan Constitutional Corporation, acting
herein through its Board Of Commissioners, hereinafter called the "OWNER"
and Future Fence Company, 4343 Nancy, Detroit, MI 48212, an individual
doing business under an assumed name, herinafter called the ."CONTRACTOR."
WITNESSETH, that the CONTRACTOR and the OWNER for the considerations
hereinafter named agree as follows:
The CONTRACTOR shall furnish all the materials, means of
construction, and other accessories and perform all of the Work shown on
the Drawings and described in the Specifications entitled:
OAKLAND COUNTY TRUSTY CAMP
VEHICLE IMPOUND YARD
AUBURN HILLS, MI
COUNTY PROJECT 88-25R
AS PREPARED BY: The Facilities Engineering Division of the Oakland
County Executive's Department of Public Works, all in accordance with
this agreement, the General Conditions of the Contract, the Proposal, the
Specifications, and the Drawings.
The CONTRACTOR hereby agrees to commence Work under this Contract
upon receiving written notice, and shall fully complete the Work within
thirty (30) calendar days from the notice to proceed. The OWNER shall
pay the CONTRACTOR for the performance of the Contract, subject to
additions and deductions provided therein, as follows: Twenty-One
Thousand Four Hundred Fifty-Six and 00/100 ($21,456.00), which price is
the base bid.
The OWNER shall process payments on account of the Contract as
provided therein, as follows: On or about the fifth (5th) day of each
month ninety (90) percent of the value, based on the Contract prices of
labor and materials incorporated in the Work and of the materials
suitably stored at the site thereof up to the last day of the previous
month, less the aggregate of previous payments; and upon substantial
completion of the entire Work, a sum sufficient to increase the total
payments to ninety-five (95) percent of the Contract price. The OWNER
may at any time after fifty (50) percent of the Work has been completed,
if he finds that satisfactory progress is being made and with written
consent of surety, approve any of the remaining partial payments for
payment in full.
Final payment shall be due thirty (30) days after completion of the
Work provided the Contract is fully performed. Before final payment, the
CONTRACTOR shall submit evidence satisfactory to the OWNER that all
payrolls, material bills, and other indebtedness connected with the Work
have been paid.
COUNTY OF OAKLAND, BY THE OAKLAND COUNTY BOARD
OF COMMISSIONERS
WITNESS:
Title: Chairman
WITNESS:
Title: President
Title: Secretary
By:
By:
FUTURE FENCE CO.
Contract No.: 832
Project No.: 88-25R
Page 2
The following is a list of the Drawings and Specifications all
dated April 9, 1990, which form a part of the Contract:
SPECIFICATIONS: AB-I, IB 1-5, PF 1-3, G 1-3, GC 1-28, 01085 1-3,
01300 1-6, 01500 1-6, 02200 1-2, and 02711 1-3
DRAWINGS: Cover Sheet & Sheet #1
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
in three (3) counterparts, each of which shall he deemed an original, in
the year and day first above mentioned.
'Resolution # goin May 24, 1990
Moved by Caddell supported by Ferrens the report be accepted.
A sufficient majority having voted therefor, the report was accepted.
Moved by Caddell supported by Jensen the resolution be adopted.
AYES: R. Kuhn, S. Kuhn, Law, Luxon, McConnell, McCulloch, McPherson,
Moffitt, Olsen, Pappageorge, Pernick, Rewold, Skarritt, Wolf, Aaron, Bishop,
Caddell, Calandra, Chester, Crake, Ferrens, Gosling, Huntoon, Jensen, Johnson.
(25)
NAYS: None. (0)
A sufficient majority having voted therefor, the resolution was adopted.
STATE OF MICHIGAN)
COUNTY OF OAKLAND
I, Lynn D. Allen, Clerk of the County of Oakland, do hereby certify that the foregoing
resolution is a true and accurate copy of a resolution adopted by the Oakland County
Board of Commissioners on May 1990
with the original record thereof now remaining in my office.
In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County
of Oakland at Pontiac, Michigan this 24th d1/1-- May 19 90