HomeMy WebLinkAboutResolutions - 1990.08.09 - 18214August 9, 1990 REPORT (Misc. 90184) TO: Finance Committee, Dr. G. W. Caddell, Chairperson BY: Planning and Building Committee, Larry P. Crake, Chairperson RE: Award of Contrct for Marine Storage Building Floor Slab Mr. Chairperson, Ladies and Gentlemen: The Planning and Building Committee, having reviewed the bids for the above-referenced project, reports with the recommendation that the contract be awarded to No. 1 Restoration, Inc., of Ypsilanti, Michigan, in the amount of $14,498.00, for a total project cost of $15,500.00. Mr. Chairperson, on behalf of the Planning and Building Committee, I submit the foregoing report. annini and Building Committee PLANNING & BUILDING COMMITTEE: Unanimous with S. Kuhn, McConnell, McCulloch and Luxon absent. MISCELLANEOUS RESOLUTION #90184 August' 9, 1990 FINANCE COMMITTEE I HEFIE,BY APPWVE T FORM 0, NG RESOLUTION / A gi Zi9i9 29 aniel T. Murp BY: FINANCE COMMITTEE, DR. G. WILLIAM CADDELL, CHAIRPERSON IN RE: PUBLIC WORKS/FACILITIES ENGINEERING DIVISION - AWARD OF CONTRACT FOR MARINE STORAGE BUILDING FLOOR SLAB TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr. Chairperson, Ladies and Gentlemen: WHEREAS by Miscellaneous Resolution #90138 Board of Commissioners authorized the County Executive's Facilities Engineering Division to receive bids for adding a concrete floor slab to the Marine Storage Building; and WHEREAS in accordance with bidding procedures, bids for the installation of the above mentioned were received and opened on July 18, 1990; and WHEREAS the County Executive's Department of Public Works has reviewed all bids submitted and recommends that the lowest responsible bidder, No. 1 Restoration Co., Inc. be awarded a contract for construction in the amount of $14,498; and WHEREAS additional costs are estimated to be $1,002; and WHEREAS the total cost of the above mentioned work is estimated to be $15,500 as detailed in the attached schedule; and WHEREAS funding for the above mentioned project is available in the 1990 Capital Improvement Program - Building Fund Miscellaneous Remodeling Section. NOW THEREFORE BE IT RESOLVED as follows: 1) The contract proposal of No. 1 Restoration Co., Inc. of Ypsilanti, Michigan in the amount of $14,498 be accepted and the contract awarded in concurrence with the Planning and Building Committee recommendations, 2) Funds be provided in the amount of $1,002 to cover the remaining project costs, 3) The Chairperson of the Board of Commissioners is hereby authorized and directed to execute a contract with No. 1 Restoration Co., Inc. of Ypsilanti, Michigan on behalf of County of Oakland, 4) The County Executive's Department of Public Works, Facilities Engineering Division, shall notify the awardee of this award, in writing no later than 10 days after adoption of this resolution. The award shall not be effective until the awardee has been notified. Mr. Chairperson, on behalf of the Finance Committee, I move the adoption of the foregoing resolution. OAKLAND COUNTY EXECUTIVE DEPARBIENT OF CENTRAL SERVICES FACILITIES ENGINEERING DrvisioN AWARD OF CONTRACT FOR MARINE STORAGE BUILDING FLOCR SLAB Project 0 90-5 July 31, 1990 In accordance with authorization received on June 14, 1990, in the form of Miscellaneous Resolution 90138, drawings and specifications for the Marine Division Storage Building Floor Slab were prepared. The project was advertised and bids were received at 3:00 p.m. on Wednesday, July 18, 1990. These bids are summarized on the attached Bid Tabulation She The low responsible bidder was No. 1 Restoration Co., Inc., of Ypsilanti, Michigan, with a bid of $14,498.00. This contractor has never worked for the County before but we have checked their references and feel that they are competent. They are currently doing work for Oakland Community College. The project is expected to be completed by September 1, 1990, and the total cost is estimated to be: 1. Construction 2. Administrative Expense Sub Total 3. Contingency (3%) Total Project Cost $14,498.00 502,00 $15,000.00 500.00 $15,500.00 Funding in the amount of $15,500.00 is available from the Miscellaneous Remodeling line item in the 1990 Capital Improvement Program. We are, therefore, recommending that a contract in the amount of $14,498.00 be awarded to No. 1 Restoration Co., Inc. Further, we are recommending that total project funding in the amount of $15,500.00 be appropriated. - RESOLUTION #90184 August 9, 1990 . Moved by Caddell supported by Jensen the Planning and Building Committee Report be accepted. A sufficient majority having voted therefor, the report was accepted. Moved by Caddell supported by Jensen the resolution be adopted. AYES: Ferrens, Gosling, Huntoon, Jensen, Johnson, R. Kuhn, Law, McConnell McCulloch, McPherson, Moffitt, Olsen, Pappageorge, Rewold, Skarritt. Wolf, Aaron, Caddell, Chester, Crake. (20) NAYS: None. (0) A sufficient majority having voted therefor, the resolution was adopted. STATE OF MICHIGAN) COUNTY OF OAKLAND I, Lynn D. Allen, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on August 9, 1990 with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the Cojety of Oakland at Pontiac, Michigan this 9th day or—/ ("/ 19111L Lynn/. Allen, County Clerk