Loading...
HomeMy WebLinkAboutResolutions - 1991.12.12 - 18442Miscellaneous Resolution 91286 December 12, 1991 BY: Planning and Building Committee, Larry P. Crake, Chairperson IN RE: Central Services/Radio Communications - 800 MHz County-Wide Communications System - Additional Construction and System Modifications Costs TO: THE OAKLAND COUNTY BOARD OF COMMISSIONERS TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr. Chairperson, Ladies and Gentlemen: 111-MIAS, the Oakland County Board of Commissioners, on Miscellaneous Resolution 90281, dated December 13, 1990, authorized the acquisition c,f a county-wide 800 MHz radio communication system from Motorola; aud WHEREAS, this radio communications system required the construction of 6 new towers on county property and the utilization of the existing tower at 196 Oakland and the NBD building in Troy or the Rochester water tower; and WHEREAS, for various reasons raised by county agencies and local governments, several of the tower sites had to be relocated, causing additional site preparation costs; and WHEREAS, in accordance with the contract conditions, additional costs for tower footings, due to substandard soil conditions, were to be borne by Oakland County; and WHEREAS, Motorola and a committee of representatives from the various county departments agree that the microwave intercommunications system should be changed from 2 GI-1z to 6 GHz for increased future capacity and as long-range insurance against preemption of the 2 GHz frequencies by the FCC; and WHEREAS, the construction of this radio system is on an extremely tight time schedule and these additional costs must be addressed in order to avoid costly delays, NOW, THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners approves the appropriation of an additional sum not to exceed $200,000 (as detailed on Schedule 1) to provide for the estimated costs of: tower footing cost increases, due to substandard soil conditions; site improvement cost increases, due to tower site location changes as a result of county decisions; and for half of the cost of the additional equipment necessary to build the microwave intercommunications system at 6 GHz. Motorola will absorb the other half of the 6 GHz substitution costs. M. R. Page 2 December 12, 1991 (1.--"rarry Cr e, Chairperson Planning Building Committee ";17 r APPROVE THr Dan idI, Murphy, Co BE IT FURTHER RESOLVED that release of these funds shall be conditioned upon the approval of the Radio Communications Oversight Committee. In addition, the Radio Communications Oversight Committee will review the radio contract options, as detailed on the attached Schedule 2, and will recommend the appropriate action to be taken, and the additional appropriation needs, to the Planning and Building and Finance Committees of the Board of Commissioners as part of a periodic status reporting policy. Mr. Chairperson, on behalf of the Planning & Building Committee I recommend the adoption of the foregoing resolution. OAKLAND COUNTY Schedule 1 COST SUMMARY 800 MHZ TRUNKING RADIO SYSTEM Contract with Motorola $5,846,602.50 Consultant 100,000.00 Construction Contingency 60,000,00 Total Project Authorized in MR 90281 $6,006,602.50 Estimated Additional Anticipated Costs: Costs Additional Footing Costs Due to Substandard Soil Conditions: Addison - Lakehead Pipeline Property $ 27,000.00 Independence Twp. DPW Property 4,700.00 Springfield - Road Commission Davisburg Property 3,800.00 Walled Lake - Novi County DPW Property Unknown Southfield - Navel Armory 56,000.00 Rochester Water Tower ; $ 91,500.00 Additional Site Development Costs: ; Addison - Lakehead Pipeline Property 16,800.00 Independence Twp. DPW Property 21,300.00 Springfield - Road Commission Davisburg Property 2,500.00 Novi 13,741.00 Rochester Water Tower 32,400.00 Milford - AmeriTech 31,200.00 -57,241.00 -26,041.00 Dispatch Center Tower 37,800.00 98,500.00 *Microwave (2 GHz to 6 GHz) (1/2 the cost) 70,000.00 Total Estimated Additional Costs $ 260,000.00 Original Contingency Appropriation (MR 90281) 60,000.00 Additional Funds Requested 200,000.00 *Motorola will pay 1/2 the cost. November 25, 1991 OAKLAND COUNTY COST SUMMARY 800 MHz TRURKING RADIO SYSTEM OPTIONS Schedule 2 Sims II Additional Terminals (3) CAD Interface Encryption (50 units) Mobile and Portable Amount & Feature Adjustments: Portables Less 23 ea. (473 bid 450 act.) Rotary Display Interconnect Option (30 ea.) 2-watt Portable (Parks & Recreation) Chargers Mobiles Less 10 ea. (395 bid 385 act.) Reduce power 35 w to 15w Net deduct Estimated Possible Future Option Costs $ 88,000.00 10,000.00 53,000.00 25,000.00 - 41,980.00 $134,020.00 November 25, 1991 December 12, 1991 FISCAL NOTE (Misc. 91286) BY: FINANCE COMMITTEE, DR. G. WILLIAM CADDELL, CHAIRPERSON IN RE: Central Services/Radio Communications - 800 MHz County- Wide Communications System - Additional Construction and System Modifications Costs TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Mr. Chairperson, Ladies and Gentlemen: Pursuant to Rule XI-G of this Board, the Finance Committee has reviewed Miscellaneous Resolution #91286and finds: 1) The 1992-1993 Recommended Biennial Budget includes a project contingency of $594,660. 2) The project contingency will be reduced from $594,660 to $334,660 with the $260,000 designated for additional costs as detailed in Schedule 1. 3) The Radio Communications Fund currently has Retained Earnings of $561,766 reserved for Radio upgrades, therefore, no budget amendments are necessary. 4) Any additional contract change orders will be presented to the Board of Commissioners for approval. FINANCE COMMITTEE radio\modcosts.fn Contract with Motorola Consultant Construction Contingency $5,846,602.50 100,000.00 60,000,00 OAKLAND COUNTY COST SUMMARY 800 MHZ TRUNKING RADIO SYSTEM Schedule 1 Total Project Authorized in MR 90281 $6,006,602.50 Additional Anticipated Costs: Additional Footing Costs Due to Substandard Soil Conditions: Addison Lakehead Pipeline Property Independence Twp. DPW Property Springfield - Road Commission Davisburg Property Walled Lake - Novi County DPW Property Southfield - Naval Armory Rochester Water -Tower Estimated Costs $ 27,000.00 4,700.00 3,800.00 Unknown 56,000.00 $ 91,500.00 31,200.00 -57,241.00 Addison - Lakehead Pipeline Property Independence Twp. DPW Property Springfield - Road Commission Davisburg Property Novi Rochester Water Tower Milford - AmeriTech Dispatch Center Tower Microwave (2 GHz to 6 GHz) Total Estimated Additional Costs Original Contingency Appropriation (MR 90281) AdditionaT Funds Requested 16,800.00 21,300.00 2,500.00 13,741.00 32,400.00 -26,041.00 37,800.00 98,500.00 . 70,000.00 ' $ 260,000.00 60,000.00 200,000.00 November 25, 1991 OAKLAND COUNTY COST SUMMARY 800 MHz TRUNKING RADIO SYSTEM OPTIONS Schedule 2 $ 88,000.00 10,000.00 53,000.00 25,000.00 Sims II Additional Terminals (3) CAD Interface Encryption (50 units) Mobile and Portable Amount & Feature Adjustments: Portables Less 23 ea. (473 bid 450 act.) Rotary Dlplay Interconnect Option (30 ea.) 2-watt Portable (Parks & Recreation) Chargers Mobiles Less 10 ea. (395 bid 385 act.) Reduce power 35 w to 15w Net deduct - 41,980.00 Estimated Possible Future Option Casts $134,020.00 November 25, 1991 Resolution # 91286 December 12, 1991 Moved by Crake supported by Moffitt the resolution be adopted. , AYES: Moffitt, Oaks, Olsen, Palmer, Pappageorge, Pernick, Price, Serra, Skarritt, Wolf, Aaron, Caddell, Crake, Huntoon, Jensen, Johnson, McConnell, McCulloch, Millard. (19) NAYS: None. (0) A sufficient majority having voted therefor, the resolution was adopted. STATE OF MICHIGAN) COUNTY OF OAKLAND I, Lynn D. Allen, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County .Board of Commissioners on December 12, 1991 with the on record thereof now remaining in my office. In Testimony Whereof, I have hereunto set MY hand and affixed the seal of the County of Oakland at Pontiac, Michigan this 12th day of—) December ,;-; 1991• / Allen, County Clerk Lynn