Loading...
HomeMy WebLinkAboutResolutions - 1960.09.19 - 19283September 19, 1960 RESOLUTION BY: Mr. Heacock IN RE: REPORT -- BIDS FOR RELOCATION OF WEST BOULEVARD TO THE OAKLAND COUNTY BOARD OF SUPERVISORS Mr. Chairman, Ladies and Gentlemen: Pursuant to Miscellaneous Resolution 3678 the Ways and Means and Buildings and Grounds Committees advertised for bids for construction of the relocation of West Boulevard. Bids advertised to be opened at a joint meeting of the Committees on August 10, 1960, produced a single bid in the amount of $87,600, which was $17,600 over the $70,000 estimated cost as set by the County Engineer. The joint Committees rejected this bid and advertised for new bids to be taken on August 31, 1960. The five bids opened on said date were as follows: Name of Bidder Base Bid Alternate Total Pike-Melvin, Detroit $50,397.15 $11,218.20 $61,615.35 Holloway Construction Co. 52,355.00 12,631.25 64,986.25 S. B. Jones 56,197.00 12,291.00 68,488.00 C. W. Anderson 63,349.00 12,840.00 76,189.00 C. W. Cousineau 53,000.00 24,000.00 77,000.00 Engineer's Estimate 57,000.00 13,000.00 70,000.00 By joint resolution of the Committees on August 31, 1960, the low bid of Pike-Melvin of Detroit for the construction of the relocation of West Boulevard at a total contract price of $61,615.35 was accepted and the Board of Auditors was authorized to execute a contract on behalf of the County and obtain from the successful bidder the required performance, labor and material and maintenance bonds pursuant to the authority granted by the Board under Miscellaneous Resolution 3678. David ° John L. Carey evinson, Chairman R. C. Cummings Orph C . Holmes - - Leroy Davis' f, J. Wesley Duncan Duane Hursfall Am/a L. Hulet Paul W. iv;cGovcr:-) ' A. Taylor nzies MR. CHAIRMAN, on behalf of the Ways and Means and Buildings and Grounds Committees, I move that the foregoing report be received and placed on file. WAYS AND MEANS COMMITTEE BUILDINGS AND GROUNDS COMMITTEE