HomeMy WebLinkAboutResolutions - 1965.08.10 - 19621Miscellaneous Resolution BY: Mr. Levinson August 10, 1965 IN RE: STATUS REPORT ON COUNTY WASTE DISPOSAL FACILITY AND DATA PROCESSING CENTER TO THE OAKLAND COUNTY BOARD OF SUPERVISORS Mr. Chairman, Ladies and Gentlemen: In the past several months the Buildings and Grounds Committee and the Board of Auditors have implemented several projects in the County Service Center necessitated by the continuous growth of the County. Your Ways and Means Committee has concurred in these projects and wishes to report to the Board of Supervisors on the status of two of the projects. 1. The Service Center Waste Disposal Project will be located at a site along the Grand Trunk Railroad at the north end of the Service Center. The facility will contain 600 square feet and will house a pathological crematory and a general refuse incinerator, both complete with flue gas washers. Consumers Power Company will be installing a main gas line for which an easement will be needed, and a 10-inch water main will be extended to the vicinity from which a service can be obtained. The contract for the incinerator has already been awarded on August 9, 1965, and separate contracts will be let in the near future for water extension and the building. The total estimated project cost is $55,000, which funds were provided for in the 1965 utilities working capital fund, and work on the project is expected to commence next month. 2. The Data Processing Center is being constructed in the basement of the Court House in the area formerly used as a jury assembly room. At this time partition and electrical work is being done with the raised floor to be installed some time during the week of August 16, 1965. Data processing equipment is on the premises, ready to be assembled in place when the other preliminary work is completed. a—'id Levinson, Chair 0;12:4&-e-1 6,rnas H. Oi Donoghue Huh . - arry WI: Horton - FcIL Yocke Y The Center will furnish data processing services to County departments, increase efficiency and aid in providing better citizen service. It is also contemplated that local units of government and other public agencies will avail themselves of this service at nominal cost. The estimated protect cost for the Data Processing Center is $40,000, funds as provided for from the encumbered data processing fund at the end of 1964. Your Ways and Means Committee will report on other pending protects as implementation and work progresses. MR. CHAIRMAN, on behalf of the Ways and Means Committee, I move that the foregoing report be received and placed on file. WAYS AND MEANS /COMMITTEE