Loading...
HomeMy WebLinkAboutResolutions - 1962.10.01 - 199214.;51'04 (R) cantri . 5) is pot F the juristion.affected, 4' to the t with ts to be in.z.1.7.::dd in the appl fcilowin.e4 Ir the Your joint (1) (2) I J. ce Genter„ handled by the County of t-ne Ela•d of Sive, a joint Binf Grounds, Special .446 called by .t4e Chairman (;-1.7 the BoarC The reoently enacted Ptibli Law 87-65• was provides autrity to accelerate Governt and State and local (8) Improvn . These are utilitio at the A) the ±Fc. r rd *f Public iltr.m d$a) At thG joint meeting of theCommittees a special steering - coy)Bittee was app3int4d The committe incl ,des the Chafrme'. of tho fonr Committees v th-A is Kays and Means Buildings and Grou Special County Building 5 ad Juvenile Affairs; the Board of Auditor and the Corporation Counsel At a joi-t session of the f4ur Committees held on Sept-mber 27 9 1962 a rep -rt:Of the special steerig c4—ittee as c4nsidered. This report listed ltprojects which are r,qu-ted to be in'lt.ded in an application to he made by the Couty under Public L. In r.r1r to put the Housing aod Home Fin,nce Agency on notite of the possible program to be filed by the County the steering committee requested the Chairman of the Board to forwxd a notice 4f furmal intent, to fild the applications for th 11. pr•jects ad M'ea re- quest for the necess,ry application fors to be filed with the Feder-1 Govermvent for Ir=sa capital improvements. Attached to this. Resolutio is a list of the 11 projects,, - The Joint comtattees recommend tt the Bard As fo1l ,tws8 (1) That formal applicatio for these projects b authlrized to be fil-d by tfl Chai en aA Clerk of the Board with the Houeing and Finance Agecy OD behalf of the County. (2) That the joint C-mmittees be auth*rized to conti'u to stIgly these projects 1:01:ding the -.nn-r 4f financing the COuritys share. (3) That the joint Cmmittees report to the Bard on progress made on these „applic .tions including th financing at the not meeting of the Board, G. I'g.:Ajitei. move the adoption of the foregoing WAYS AA # • omamp COMITY FEDERAL AcCEpTED PUBLIC WORKS PROGRAN 1. County Office Wing (a) Approximate cost $960 9 000,00 (b) Can be under construction within 120 days. 2. Childrens Village Diagnostic and Service Celter (First Stage) (a) Approxi -to cost $1 9 000,000,00 (b) Can be mder construction within 120 days. 3. Service Center Stor- Sewer (a) Approximate cost $225 9 000.00' (b) Can be under construction within 120 d Service Center Sa itary Sewer ... (a) Approxi te cost $110 9 000.00 (b) C n be under construction .ithin 120 days. Service Center Steam Line (a) Aiproximate cost $440 0 000.00 (b) Can be under construction within 120 days. 6. Service Center Water Lines (a) Approxi ..te cost $162,500.00 (b) Can be under const.ction within 120 d,ys. 7. Service Center - Construction of U .4=derground Blectri- c 1 Fewer Supply Lines (a) Approxi , te cost $3459000000 (b) Can be under construction withi4 120 days. 6. Service Center Parking Lots (lacktop) (a) Approximate cost $100 9 00000 (b) Can be under construction within 120 days. 9. Service Center kaintenaAce Building . () Approximate cost $504000.00 (b) Can be under construction within 120 thy 10. Service Center Garage Ext n-ion (a) Approxi 'Am. cost $90 9 000.0 (b) Can be under construction within 120.d 11.Renovatic4117 a oxlating OnklatO Cou0ty MAicali Car ftp5aity, Approadusto cost $500000,00 (• Can be under c4nstructi n within 120 days. ye. ys. #4023 Moved by Levinson supported by Staman the report be adopted. Moved by Cheyz supported by Noel the report be amended to give priority to the Children's Village and Medical Care Facility when the money is available. Discussion followed. A sufficient majority not having voted therefor, the amendment lost. Vote on adoption of report .::-, - A sufficient majority having voted therefor, the report was adopted.