HomeMy WebLinkAboutResolutions - 1963.12.10 - 20324Misc.
47'1
Submitted by
Recommended by the Board of Public Works
IN RE: AMENDING RATES FOR WATER AND SEWAGE TREATMENT SYSTEMS
Mr. Chairman, Ladies and Gentlemen:
I offer the following resolution:
WHEREAS, pursuant to Ordinance No. 3394, the Board of Supervisors, by Mis-
cellaneous Resolution No. 3395, passed June 23, 1958, did establish rates for water
and sewage treatment systems, and
WHEREAS, the Board of Supervisors, by Miscellaneous Resolution No. 3525,
passed May 4, 1959, Miscellaneous Resolution No. 3752, passed January 10, 1961,
and Miscellaneous Resolution No. 3924, passed February 16, 1962, did amend Reso-
lution No. 3395, and
WHEREAS, the Board of Public Works has deemed it advisable to further amend
the Service Rates for each premise in the Evergreen-Farmington Sewage Disposal
Systems due to reduced customer operating costs.
NOW THEREFORE BE IT RESOLVED, that the "Schedule of Service Rates for each
Premise" as established by Miscellaneous Resolution No. 3395, as amended by Mis-
cellaneous Resolutions No. 3325, 3752, and 3924, be further amended to read as
follows:
SCHEDULE OF SERVICE RATES FOR EACH PREMISE
(Section A) Metered Services
Item 1. Water Rate $1.50 per 1000 cu. ft. Min. $2. 50 per
quarter plus monthly
meter service charge.
Item 2. Meter Service Rate $ 50 per month-5/8" meter
. 65 per month-3/4" meter
1. 00 per month- 1" meter
1. 70 per month-1-1" meter
2. 70 per month- 2" meter
3. 65 per month- 3" meter
Item 3. All other premises that are
connected to any sewer that
utilizes the Evergreen -
Farmington Interceptor $1. 07 per 1000 cu. ft. of
water consumed Min. $1. 78 per quarter
(Section B) Flat Service Rate
(Where meters are not used by the Department of Public
Works as a means of determining actual water consumption)
Item 4. Water Rate $13. 50 per quarter for single family residence
Nays: None. ())
Item 5. All premises connected to the
Michigan State University -
Oakland Sewage Treatment
Plant
Item 6. All other premises that are
connected to any sewer that
utilizes the Evergreen-
Farmington Interceptor
$9. 50 per unit per quarter
$1. 07 per 1000 cu. ft. of assigned
water consumption
BE IT FURTHER RESOLVED, that the foregoing amended "Schedule of Service Rates
for Each Premise" shall become effective on and after January 1, 1964.
Mr. Chairman, I move the adoption of the foregoing resolution.
Moved by Mr. Calhoun
Mr. Marshall Supported by
Yeas: Allerton, Alward, Bachert, Beecher, Bloe, Brickner, Calhoun, Campbell,
John Carey, Case, Charteris, Cheyz, Clarkson, Davids, Davis, Demute, Dewan, Dohany,
J. W. Duncan, WM. Duncan, Durbin, Edward, Edwards, Ewart, Fouts, Goodspeed, Hall,
Hamlin, Heacock, Horton, Huber, Hursfall, Jackson, Kennedy, Kephart, Knowles,
Laurie, Lessiter, Levin, Levinson, MacDonald, Marshall, McAleer, McCartney,
McGovern, Michrina, O'Donoghue, Oldenburg, Patnales, Perinoff, Potter, Potthoff,
Rehard, Remer, Rhinevault, Seeterlin, Slavens, Smith, Solley, Stephenson, Tapp,
Taylor, Tiley, Tinsman, Turner, Yell, Wagner, Webber, Yockey. (69)
Absent: James Carey, Cooley, Cummings, Forbes, Hagstrom, Hoard, Wallace Hudson
Ingraham, Lahti, Melchert, Menzies, Miller, Mitchell, Moore, Osgood,
Wood. (16)
Motion carried
-2-
(a) R.epreserr ..
Iviiitt the
meta
c.oUrAruct.,-
CFA-1120
(11-62)
AND HOME FINANCE AGENCY
it FACILITIES ADMINISTRATION
It-iP,.ffiSS AND CONDITIONS
Cons11;-.''. Part of the Grant Agreement Providing For the
Financhs.:, an-J Construction of Public Works or Facilities
Under Title of the Housing Amendments of 1955, as Amended
by the PiWLic Works Acceleration Act, Public Law 87-658.
Section. 1,' As need In these Terms and Conditions:
"Government" means the United States of America.
"Project" ine-ans the Public Works or Facilities covered by the Grant Agreement.
"
corer
tract hist; ;ht.
c.outract between the Government and the Applicant
and includes both these Terms and Conditions and other con-
"Applicant" the public entity designated in the Grant Agreement.
'Project Costs' means the cost of constructionwork for the Project, cost of necessary
arebitecturat/engtheoring services, legal, administrative and clerical costs, costof
land acquisition, nee1e.1:-.0:.y travel expenses, interest during construction and de-
"velopitterit, and other necessary miscellaneous expenses, all -as determined by the
Go ye). tunent.
"E.Y4o.ale Project (osts" means Project Costs less the costs of land, rights-of-way,
i•;! is! cji, ;;ATIles and equipment with the exception of those items directly
s r! e:1 , ir for the completion of construction, planning financed by a
Fl : 1:nder Section 702 of the Housing Act of 1954, as amended, and
,..1 1 aneous expenses, all as determined by the Government.
1...)ejosit
means a bank or trust company which is a member of the Federal
!.•e. Corporation.
Section 2. Prerequisites to Government's Obligations. The .Government shall be under no obliga-
tion to disburse funds under the Grant Agreement if:
re' i ei.....1,raHon made by the Applicant to the Government in connection
1 .n.1 shall 'ee eet or incomplete in any material respect, or the Govern-
that the 4211eant has failed to proceed promptly with Project financing or