HomeMy WebLinkAboutResolutions - 2015.05.21 - 21844REPORT (MISC. #15130) May 21, 2015
BY: Finance Committee, Thomas Middleton, Chairperson
IN RE: BOARD OF COMMISSIONERS — TRI-PARTY ROAD IMPROVEMENT PROGRAM
FISCAL YEAR 2015 APPROPRIATION — VILLAGE OF BEVERLY HILLS — RESURFACING OF
LAHSER ROAD — PROJECT NO. 52861
To the Oakland County Board of Commissioners
Chairperson, Ladies and Gentlemen:
The Finance Committee, having reviewed the above referenced resolution and cost participation
agreement, recommends that the resolution be amended. The changes are in bold and/or
strikethrough.
Change within the fifth WHEREAS paragraph, the County's one third (1/3) share of funding.
WHEREAS Oakland County's one third (1/3) share of the — Fiscal Year 2015 authorized amount of
Tr-Party Road Improvement funding for Project No. 52861 in the Village of Beverly Hills is $82,773
$37,655.
FINANCE COMMITTEE VOTE:
Motion carried unanimously on a roll call vote with Matis absent.
MISCELLANEOUS RESOLUTION # 15130
BY: Commissioner Bill Dwyer, District #14
IN RE: BOARD OF COMMISSIONERS — TRI-PARTY ROAD IMPROVEMENT PROGRAM FISCAL
YEAR 2015 APPROPRIATION — VILLAGE OF BEVERLY HILLS — RESURFACING OF LAHSER
ROAD - PROJECT NO. 52861
To the Oakland County Board of Commissioners:
Chairperson, Ladies and Gentlemen:
WHEREAS since the 1970s, the Oakland County Board of Commissioners has authorized the Tr-Party
Road Improvement Program to assist Oakland County's cities, villages and townships (CVTs) with the
construction, maintenance and repair of roads under the supervision, direction and control of the Road
Commission for Oakland County; and
WHEREAS Miscellaneous Resolution #09221, as amended by Miscellaneous Resolution #10045,
provides that any Oakland County appropriation in support of the Tr-Party Road Improvement Program
shall be distributed only after completion of all of the following:
1. The Road Commission for Oakland County (RCOC) and a city, village, or township (CVT) have
identified a project and the project is ready to be undertaken immediately; and
2. The RCOC has appropriated its 1/3 share of the funding for the project and transferred said
appropriation to a project account; and
3. The CVT has authorized its 1/3 share of the funding for the project and has executed a contract
for payment with the RCOC; and
4. The Commissioner(s) representing the CVT requesting the project submits a resolution
authorizing the appropriation of the County's 1/3 share of the project from the General Fund
Designated Fund Balance for Tr-Party Program. The resolution shall be approved by the Finance
Committee and the full Board; and
WHEREAS the Village of Beverly Hills , along with the RCOC has identified a project and said project is
ready to be undertaken immediately; and
WHEREAS the RCOC has appropriated its 1/3 share of the funding for the project in the Village of
Beverly Hills and said appropriation has been transferred to a project account; and
WHEREAS the Village of Beverly Hills has demonstrated that it has authorized its 1/3 share of the
funding for the project and has executed a contract for payment with the RCOC: and
WHEREAS Oakland County's one third (1/3) share of the — Fiscal Year 2015 authorized amount of Tr-
Party Road Improvement funding for Project No. 52861 in the Village of Beverly Hills is $82,773.
NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners hereby
approves the project submitted by the Village of Beverly Hills and authorizes the release of Tr-Party
Road Improvement Program funds from the Oakland County Designated Fund Balance.
BE IT FURTHER RESOLVED additional project costs, not greater than 15% from the original agreement,
which are consistent with the project as originally approved, will be paid when invoiced and appropriated
in the quarterly forecast resolution.
BE IT FURTHER RESOLVED that additional project costs exceeding 15% of the original agreement will
require a separate Finance Committee resolution.
BE IT FURTHER RESOLVED that the Oakland County Clerk is requested to forward copies of this
resolution to the Road Commission for Oakland County, Oakland County Fiscal Services and the Village
of Beverly Hills.
Chairperson, I move the adoption of the foregoing Resolution.
11/61t:ii\) r("e4\tY\
Commissioner Bill Dwyer
District #14
Quality Life through Good Roads "We Care"
( L4-
=fita
CCP a411;a5MOA,
for OAKLAND COUNTY
Inter—Departmental Memorandum
PROGRAMMING DIVISION
DATE: April April 13, 2015
To: Thomas G. Blust, RE., Director of Engineering
FROM: Thomas G. Noechel, Programming Supervisor -7700
SUBJECT: PROJECT NO. 52861, LAHSER ROAD
13 MILE ROAD TO MAPLE ROAD
LOCAL COST PARTICIPATION AGREEMENT/TRI-PARTY PROGRAM
VILLAGE OF BEVERLY HILLS
Attached for your review and submission to the Board for their approval is the local cost
participation agreement with the Village of Beverly Hills for the resurfacing of Lahser
Road from 13 Mile Road to Maple Road. Construction on this project is expected to
begin this spring.
The estimated total cost is $4,136,500 and will be partially funded with Federal Surface
Transportation Program funds in the amount of $2,571,250. The remaining local match
of $1,565,250 will be shared between the RCOC, the County of Oakland, the Village of
Beverly Hills, and the Charter Township of Bloomfield. This agreement is with the
Village of Beverly Hills and they have elected to use $112,964 in Tr-Party Program
funds along with a contribution of $157,036 to fund their $270,000 share. Our total
estimated share is $1,204,022 and is in the FY15 budget.
The project is in the district of County Commissioners Shelly Goodman Taub and
William Dwyer. The agreement is in our standard approved format, and I recommend
Board approval and authorize the Managing Director to execute the agreement on
behalf of the Board.
/je
Attachments
Recommended for Board Approval
Thomas G. Blust,
Director of Engineering
COST PARTICIPATION AGREEMENT
CONSTRUCTION
Lahser Road
13 Mile Road to Maple Road
Village of Beverly Hills
Board Project No, 52861
This Agreement, made and entered into this 2.-11Lt, day of rVW:.--1 1--- , 2015,
by and between the Board of Road Commissioners for the County of Oakland, Michigan,
hereinafter referred to as the BOARD, and the VILLAGE OF BEVERLY HILLS, hereinafter
referred to as BEVERLY HILLS, provides as follows;
WHEREAS, the BOARD, BEVERLY HILLS, and the Charter Township of Bloomfield,
hereinafter referred to as BLOOMFIELD TOWNSHIP, in cooperation with the Michigan
Department of Transportation, hereinafter referred to as MOOT, have programmed the
resurfacing of Lahser Road from 13 Mile Road to Maple Road, as described in Exhibit "A",
attached hereto, and made a part hereof, which improvements involve roads under the
jurisdiction of the BOARD and within BEVERLY HILLS and BLOOMFIELD TOWNSHIP, which
improvements are hereinafter referred to as the PROJECT; arid
WHEREAS, the estimated total cost of the PROJECT is $4,136,500; and
WHEREAS, the BOARD has entered into an agreement with IVIDOT in Contract
No, 15-5094 for partial funding of the PROJECT with federal program dollars under the Surface
Transportation Program in the amount of $2,571,250; and
WHEREAS, the BOARD, as the requesting party therein, will be the party financially
responsible to MDOT to bear all costs of the PROJECT in excess of federal funds, hereinafter
referred to as the LOCAL MATCH; and
WHEREAS, BEVERLY HILLS' share of said LOCAL MATCH involves certain designated
and approved Tr-Party Program funding in the amount of $112,964, which shall be paid through
equal contributions by the BOARD, BEVERLY HILLS, and the Oakland County Board of
Commissioners, hereinafter referred to as the COUNTY; and
WHEREAS, all the parties hereto have reached a mutual understanding regarding the
cost sharing for the LOCAL MATCH and wish to commit that understanding to writing in this
Agreement.
NOW, THEREFORE, in consideration of the mutual covenants set forth herein and in
conformity with applicable law, it is hereby agreed between BEVERLY HILLS and the BOARD
that:
1. BEVERLY HILLS and BLOOMFIELD TOWNSHIP approve of the PROJECT, declare its
public necessity, and authorizes the BOARD and MDOT to perform or cause to be
performed, and complete the PROJECT along with all administration in reference
thereto.
2. The PROJECT shall include total payments to the contractor,
3. The estimated total LOCAL MATCH is $1,565,250 and shall be funded in the following
order:
a. Tr-Party Program funding shall be invoiced simultaneously as follows:
b. BEVERLY HILLS snail contribute $270,000 toward the LOCAL MATCH for the
Village of Beverly Hills' participating and non-participating portions of the
PROJECT ($112,964 in Tr-Party Program funds and a $167,036 contribution).
Any PROJECT costs in the Village of Beverly Hills above the estimated amount of
$270,000 shall be funded first with any available Tr-Party Program funds and any
difference shall be funded entirely by BEVERLY HILLS.
c, BLOOMFIELD TOWNSHIP shall contribute $174,000 toward the LOCAL MATCH
for the Charter Township of Bloomfield's participating and non-participating
portions of the PROJECT ($135,354 in Tr-Party Program funds and a $38,646
contribution). Any PROJECT costs in the Charter Township of Bloomfield above
the estimated amount of $174,000 shall be funded first with any available Tri-Party
Program funds and any difference shall be funded entirely by BLOOMFIELD
TOWNSHIP.
Lahser Road
Village of Beverly Hilis
Project No, 52861
3/10/2015
d. The BOARD shall contribute $1,121,250 toward the LOCAL MATCH on the
Federal participating portion of the project.
4. Upon execution of this agreement, the BOARD shall submit an invoice to BEVERLY
HILLS in the amount of $194,691 (being 100% of BEVERLY HILLS Tr-Party
contribution of $37,655 and 100% of BEVERLY HILLS' non-Tri-Party contribution of
$157,036),
5. Upon execution of this agreement and approval by the COUNTY, the BOARD shall
submit an invoice to the COUNTY in the amount of $37,655 (being 100% of the
COUNTY'S Tr-Party contribution).
a. The invoice shall be sent to:
Lynn Son kiss, Manager of Fiscal Services
Executive Office Building
2100 Pontiac Lake Road, Building 41 West
Waterford, MI 48328
6. The total actual LOCAL MATCH will be determined from the records of the BOARD
upon completion of State financial audits of the PROJECT and a final determination of
the total federal funds used on the PROJECT. Final adjustments in the financial
obligations of the parties hereto will be made upon completion of the required audits.
7. Upon receipt of said invoice(s), the BEVERLY HILLS and the COUNTY shall pay to the
BOARD the full amount thereof, within thirty (30) days of such receipt.
8. The BOARD shall execute a separate Cost Participation Agreement with BLOOMFIELD
TOWNSHIP. for their share of the estimated total PROJECT cost.
Lah.s.er Road -3-
Vidage of Beverly HiNs
Project No. 52661
3/16/2015
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and
date first written above,
BOARD OF ROAD COMMISSIONERS FOR THE
COUNTY OF OAKLAND
A Public Body Corporate
By
Its Managing Director
VILLAGE OF BEVERLY HILLS
/ (? //
Its \drLL1 14k 6 l'-'A_ •
Leiser Road - 4 -
Village of Beverly Hills
Project No. 52861
3/16/2015
EXHIBIT A
TRI-PARTY PROGRAM
Lahser Road
13 Mile Road to Maple Road
Village of Beverly Hills
Board Project No, 52861
Resurfacing on Lahser Road from 13 Mile Road to Maple Road,
ESTIMATED PROJECT COST
Contractor Payments $4,136,500
Less Federal Funds $2,571,250
Total Estimated Local Share $1,565,250
COST PARTICIPATION BREAKDOWN
BEVERLY
HILLS
BLoOMFIELD
TWP COUNTY BOARD TOTAL
FY07 Tri-Party Program $6,143 $0 $6,143 $6,144 $18,430
FY08 Tr-Party Program $4,547 $0 $4,547 $4,546 $13,640
FY11 Tri-Party Program $4,563 $0 $4,563 $4,562 $13,688
FY12 Tr-Party Program $5,841 $0 $5,841 $5,842 $17,524
FY13 Tr-Party Program $5,817 $0 $5,817 $5,817 $17,451
FY14 Tri-Party Program $5,346 $0 $5,346 $5,345 $16,037
FY15 Tr-Party Program $5,398 $45,118 $50,516 $50,516 $151,548
Contribution $157,036 $38,646 $0 $1,121,250 $1,316,932
TOTAL SHARES $194,691 $83,764 $82,773 $1,204,022 $1,565,260
Lahser Road
-5 -
Village of Beverly NUts
Project No. 52561
3/16/2015
Resolution #16130 May 6, 2015
The Chairperson referred the resolution to the Finance Committee. There were no objections,
COST PARTICIPATION AGREEMENT
CONSTRUCTION
Lahser Road
13 Mile Road to Maple Road
Village of Beverly Hills
Board Project No. 52861
This Agreement, made and entered into this 2,-.01) day of kV--) L— , 2015,
by and between the Board of Road Commissioners for the County of Oakland, Michigan,
hereinafter referred to as the BOARD, and the VILLAGE OF BEVERLY HILLS, hereinafter
referred to as BEVERLY HILLS, provides as follows:
WHEREAS, the BOARD, BEVERLY HILLS, and the Charter Township of Bloomfield,
hereinafter referred to as BLOOMFIELD TOWNSHIP, in cooperation with the Michigan
Department of Transportation, hereinafter referred to as MDOT, have programmed the
resurfacing of Lahser Road from 13 Mile Road to Maple Road, as described in Exhibit "A",
attached hereto, and made a part hereof, which improvements involve roads under the
jurisdiction of the BOARD and within BEVERLY HILLS and BLOOMFIELD TOWNSHIP, which
improvements are hereinafter referred to as the PROJECT; and
WHEREAS, the estimated total cost of the PROJECT is $4,136,500; and
WHEREAS, the BOARD has entered into an agreement with MDOT in Contract
No. 15-5094 for partial funding of the PROJECT with federal program dollars under the Surface
Transportation Program in the amount of $2,571,250; and
WHEREAS, the BOARD, as the requesting party therein, will be the party financially
responsible to MDOT to bear all costs of the PROJECT in excess of federal funds, hereinafter
referred to as the LOCAL MATCH; and
WHEREAS, BEVERLY HILLS' share of said LOCAL MATCH involves certain designated
and approved Tr -Party Program funding in the amount of $112,964, which shall be paid through
equal contributions by the BOARD, BEVERLY HILLS, and the Oakland County Board of
Commissioners, hereinafter referred to as the COUNTY; and
d. The BOARD shall contribute $1,121,250 toward the LOCAL MATCH on the
Federal participating portion of the project.
4. Upon execution of this agreement, the BOARD shall submit an invoice to BEVERLY
HILLS in the amount of $194,691 (being 100% of BEVERLY HILLS' Tr-Party
contribution of $37,655 and 100% of BEVERLY HILLS' non-Tr-Party contribution of
$157,036).
5. Upon execution of this agreement and approval by the COUNTY, the BOARD shall
submit an invoice to the COUNTY in the amount of $37,655 (being 100% of the
COUNTY'S Tr-Party contribution).
a. The invoice shall be sent to:
Lynn Sonkiss, Manager of Fiscal Services
Executive Office Building
2100 Pontiac Lake Road, Building 41 West
Waterford, MI 48328
6. The total actual LOCAL MATCH will be determined from the records of the BOARD
upon completion of State financial audits of the PROJECT and a final determination of
the total federal funds used on the PROJECT. Final adjustments in the financial
obligations of the parties hereto will be made upon completion of the required audits.
7. Upon receipt of said invoice(s), the BEVERLY HILLS and the COUNTY shall pay to the
BOARD the full amount thereof, within thirty (30) days of such receipt.
8, The BOARD shall execute a separate Cost Participation Agreement with BLOOMFIELD
TOWNSHIP. for their share of the estimated total PROJECT cost.
Lahser Road - 3 -
Village of Beverly Hills
Project No. 52861
3/16/2015
EXHIBIT A
TRI-PARTY PROGRAM
Lahser Road
13 Mile Road to Maple Road
Village of Beverly Hills
Board Project No. 52861
Resurfacing on Lahser Road from 13 Mile Road to Maple Road.
ESTIMATED PROJECT COST
Contractor Payments
Less Federal Funds
Total Estimated Local Share
$4,136,500
$2,571,250
$1,565,250
COST PARTICIPATION BREAKDOWN
BEVERLY
HILLS
BLOOMFIELD
TWP COUNTY BOARD TOTAL
FY07 Tr-Party Program $6,143 $0 $6,143 $6,144 $18,430
FY08 Tr-Party Program $4,547 $0 $4,547 $4,546 $13,640
FY11 Tr-Party Program $4,563 $0 $4,563 $4,562 $13,688
FY12 Tr-Party Program $5,841 $0 $5,841 $5,842 $17,524
FY13 Tr-Party Program $5,817 $0 $5,817 $5,817 $17,451
FY14 Tr-Party Program $5,346 $0 $5,346 $5,345 $16,037
FY15 Tri-Party Program $5,398 $45,118 $50,516 $50,516 $151,548
Contribution $157,036 $38,646 $0 $1,121,250 $1,316,932
TOTAL SHARES $194,691 $83,764 $82,773 $1,204,022 $1,565,250
Lahser Road -5-
Village of Beverly Hills
Project No. 52861
3116/2015
Resolution #15130 May 6, 2015
The Chairperson referred the resolution to the Finance Committee. There were no objections.
FISCAL NOTE (MISC. #15130) May 21, 2015
BY: Finance Committee, Tom Middleton, Chairperson
IN RE: BOARD OF COMMISSIONERS — TRI-PARTY ROAD IMPROVEMENT PROGRAM FISCAL YEAR
2015 APPROPRIATION — VILLAGE OF BEVERLY HILLS — RESURFACING OF LAHSER ROAD -
PROJECT NO. 52861
TO: The Oakland County Board of Commissioners
Chairperson, Ladies and Gentlemen:
Pursuant to Rule XII-C of this Board, the Finance Committee has reviewed the above referenced resolution
and finds:
1. On December 11,2014, the Board of Commissioners approved Miscellaneous Resolution #14295
which designated $2,000,000 in fund balance for the Tr-Party Road Improvement Program for
projects managed by the Road Commission for Oakland County (RCOC).
2. Funding of $37,655 is available in the General Fund Assigned Fund Balance for Tr-Party 2015 and
prior funding (account #383510) for project 52861.
3. This project is for the resurfacing of Lahser Road from 13 Mile Road to Maple Road.
4. The resolution allows for additional project costs not greater than 15% from the original agreement,
which is consistent with the project as originally approved, to be paid when invoiced and appropriated
in the quarterly forecast resolution.
5. Additional project costs exceeding 15% of the original agreement will require a separate Finance
Committee resolution to appropriate the additional Oakland County share of the project costs prior to
payment.
6. The FY 2015 budget be amended as follows:
GENERAL FUND #10100
FY 2015
Revenue
9010101-196030-665882 Planned Use of Balance $37,655
Total Revenues $37,655
Expenditures
9010101-153010-740135 Road Cornmission Tr-Party $37,655
Total Expenditures $37,655
FINANCE COMMITTEE VOTE:
Motion carried unanimously on a roll call vote with Matis absent.
Resolution #15130 May 21, 2015
Moved by Spisz supported by Jackson the resolutions (with fiscal notes attached) on the amended
Consent Agenda be adopted (with accompanying reports being accepted).
AYES: Dwyer, Fleming, Gingell, Gosselin, Hoffman, Jackson, KowaII, Long, Matis, McGillivray,
Middleton, Quarles, Scott, Spisz, Taub, Weipert, Woodward, Zack, Crawford. (19)
NAYS: None. (0)
A sufficient majority having voted in favor, the resolutions (with fiscal notes attached) on the amended
Consent Agenda were adopted (with accompanying reports being accepted).
6 HEREBY APPFIOVE THIS RESOLUTION
CHIEF DEPUTY COUNTY EXECUTIVE
ACTING PURSUANT TO MCL 45.559A (7)
STATE OF MICHIGAN)
COUNTY OF OAKLAND)
I, Lisa Brown, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and
accurate copy of a resolution adopted by the Oakland County Board of Commissioners on May 21, 2015,
with the original record thereof now remaining in my office.
In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County of Oakland at
Pontiac, Michigan this 21 st day of May 2015.
Lisa Brown, Oakland County