Loading...
HomeMy WebLinkAboutResolutions - 2015.05.21 - 21846MISCELLANEOUS RESOLUTION #15137 May 21, 2015 BY: Finance Committee, Tom Middleton, Chairperson IN RE: FACILITIES MANAGEMENT/FACILITIES PLANNING & ENGINEERING - 2016 ROOF REPLACEMENT PROGRAM PROJECTS To the Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen WHEREAS the Public Works Building (62,650 sq. ft.), Central Heating Building (3,700 sq. ft.), L Building (5,200 sq. ft.), and Children's Village H - Low-Slope (3,300 sq. ft.) roofs for a total of 74,850 sq. ft. (see campus map attached) are in need of replacement to prevent leakage, building damage, and inconvenience to residents, employees, and the public; and WHEREAS the roof was last replaced at the Public Works Building in 1986 and 1989, at the L Building and Central Heating Building in 1986, at Children's Village H - Low-Slope in 1975 and their warranties have expired; and WHEREAS the projects will involve replacement of the existing roofing with two layers of 2" insulation, 1.6" Firestone HailGuard, 90 mil EPDM, and metal flashings; and WHEREAS the roof replacements will have 30 year warranties; and WHEREAS the Planning & Building Committee authorized the Facilities Planning & Engineering Division to advertise and receive bids for the Roof Replacement Program projects; and WHEREAS in accordance with Purchasing Division procedures, bids for the project were solicited, received, and reviewed by the Facilities Planning & Engineering Division and the Purchasing Division; and WHEREAS per the bid summary table attached, the lowest responsible bidder was Butcher & Butcher of Rochester Hills, Michigan; and WHEREAS Purchasing and Facilities Planning & Engineering met with Butcher & Butcher to review their bid and confirm all work was understood and included; and WHEREAS the total project cost of $1,007,072 which includes a contingency of $155,100 is recommended by the Facilities Planning & Engineering Division; and WHEREAS the FY 2014 Capital Improvement Program (CIP) identified estimated available funding of $60,000 for the Children's Village roof replacement which was included in planning the 2015 CIP projects; and WHEREAS additional funding of $947,072 is available in the FY 2015 CIP for the Public Works Building, Central Heating Building, and L Building roof replacements; and WHEREAS the $60,000 is available as part of the Building Authority bond proceeds for the Facilities Infrastructure and Info Tech Projects Fund (#41423) and $947,072 is available to transfer from the Capital Improvement Program/Building Fund (#40100). NOW THEREFORE BE IT RESOLVED that the Board of Commissioners authorizes the 2015 Roof Replacement Program projects which includes the Public Works Building, Central Heating Building, and L Building (#100000002176) in the amount of $947,072 along with the Children's Village H Bldg (#100000002174) in the amount of $60,000. BE IT FURTHER RESOLVED that the Board of Commissioners authorizes the transfer of funding in the amount of $947,072 for the 2015 Roof Replacement Program projects which includes the Public Works Building, Central Heating Building, and L Building from the Capital Improvement Program/Building Fund (#40100) to the Project Work Order Fund (#40400) as detailed below: BUILDING IMPROVEMENT FUND (#40100) 1040101-148020-788001-40400Transfer Out .($947,072) PROJECT WORK ORDER FUND (#40400) Project ID 100000002176 1040101-148020-695500-40100Transfer In $947,072 $ -0- Chairperson, on behalf of the Finance Committee, I move the adoption of the foregoing resolution. FINANCE COMMITTEE VOTE: Motion carried unanimously on a roll call vote with Matis absent. MEMORANDUM TO: Tom Middleton, Chairperson, Finance Committee FROM: Art Holdsworth, Director Department of Facilities Management DATE: May 12, 2015 SUBJECT: 2015 C1P Re-roofing Program Presented below is a breakdown of the 2015 CIP Re-roofing Program costs. Re-roofing: $798,072 Butcher & Butcher Proposal Lightning Protection, Guardian Equipment (annual contractor): $15,000 Steam Plant/L-bldg. $14,900 CV-H bldg. $24,000 Public Works bldg. Subtotal: $851,972 Contingency (18%): $155,100 Project Total: $1,007,072 Requested PW0s and Funding Sources: $947,072 2015 CIP $60,000 2014 CIP Project Total: $1,007,072 County of Oakland Purchasing Division Bid Tabulation Solicitation Event 003311 Description: FPE Oakland County Roof Replacement Project ITEM NO. COMPANY 4 DESCRIPTION 4, Bidder #1 Bidder #2 Bidder #3 Bidder #4 Bidder 45 Bidder #6 Bidder #7 Butcher & Butcher Construction Royal Roofing Advanced Roofing Lutz Roofing Company JD Candler Roofing Newton Crane Rofing LaDuke Corp Unit of measure Price Price Price Price Price Price Price Total Roof Area (100 sq ft shingle; 78,940 sq ft EPDM) Sub Total $771.500.00 $799,800.00 $857,310.00 $860,850.00 $874,981.00 $919,000.00 8986,700.00 2 Cost of Performance Bond and Payment Bond 100% of the Contract Price $11,572.00 $12,000.00 89,230.00 $8,750.00 85,000.00 $13,700.00 $24,675.00 Total Bid Price Total $798,072.00 $826,800.00 $881,540.00 $884,600.00 $894,981.00 $947,700.00 51,026,375.00 Unit Pricing 4 2" Tectum Deck Repair S.F. $18.50 $15.00 $8.00 $20.00 $25.00 $17.00 $17.00 5 Metal Deck (clean, paint) S.F. $2.35 $2.25 $1.50 $1.50 $1.30 $2.35 $3.00 6 Metal Deck (patch) S.F. $7.75 $4.50 $4.50 $5.00 $4.00 $4.00 $10.00 7 Metal Deck (replace) S.F. $4.95 $6.00 $6,50 $6.50 $5.75 $700 $8.00 8 Metal cladding for fascia S.F. $15.00 $12.00 $10.00 (L.F.) T&111 $5.00 $15.00 $13.00 9 Metal counter flashing S.F. $15.00 $7.25 $8.00 (L.F.) $6,00 $4.00 $7.00 $15.00 10 118" per Foot Tapered Polyiso S.F. $2.75 $3,90 84,00 $3.00 $4.50 $2.50 $4.50 11 1/4" per Foot Tapered Polyiso S.F. $3.25 $4.50 $6.00 $4,00 $4.75 $5.00 $5.50 12 4' x 4' Pre-Fa.b ISO Roof Sump Panel S.F. $20,00 $1.40 $8.00 $2.50 $6.25 $5.00 $10.00 13 Wood blocking replacement a 1 x 4 L.F. $2.50 $2.00 $2.00 $2.50 $2.50 $3.50 $2.70 b. 1 x 6 L.F. $2.75 $2.50 $2,50 $3.00 $2.75 $3.50 $3.00 c. 1 x 8 L.F. $3.00 $3.00 $3.00 $3.50 $3.00 $4.00 $3.40 d. 2 x 4 L.F. $3.50 $2,50 $2.00 $2.50 $2.75 $3.50 $3.40 e. 2 x 6 L.P. $3.75 $3.00 $2.50 $3.00 $3.00 $3.50 $3.60 f. 2 x 8 L.F. $4.50 $3,50 $3.00 $3.50 $3.25 $4.00 $3.80 g. 7/16" 0.S.B.Deck S.F. $4.50 $3.00 $2.00 $4.00 $4.00 $4.00 $3.25 h. 3/4" Plywood Deck S.F. $5.00 $3.50 $3.00 $4.50 $4.00 $4.00 $3.75 i. 3/4" Treated Plywood S.F. $5,75 $4.75 $3.00 $4.50 $4.00 $4.50 $4.25 14 Time and material work (include labor, equipment, etc.) HR. $59,50 $95.00 $72.69 $76.50 $90.00 $85.00 $83.00 15 Material markup % 20 15 10 15 15 15 12 Unit cost totals $204.30 $194.55 $144.19 $171.00 $194.89 $199.35 $212.15 Alternates 16 22 East, Central Heating Plant:Low-Slope roof (3,350 sq ft.): install Firestone 1.5" HD Composite isocyanurate boards in place of Firestone 1.5" HailGard lsocyanurate boards $1,500.00 Deduct $49,300.00 (area D base bid) No bid $1,010.00 Deduct $500.00 $500.00 Deduct $0.00 Page 1 of 2 County of Oakland Purchasing Division Bid Tabulation Solicitation Event 003311 Description: FPE Oakland County Roof Replacement Project ITEM NO. COMPANY DESCRIPTION 4, Bidder #1 Bidder 42 Bidder 43 Bidder #4 Bidder #5 Bidder #6 Bidder #7 Butcher & Butcher Construction Royal Roofing Advanced Roofing Lutz Roofing Company JD Candler Roofing Newton Crane Rofing LaDuke Corp Unit of measure Price Price Price Price Price Price Price 17 22 East, L Building: Low-Slope roof (5,840 sq ft.): install Firestone 1.5" HD Composite Isocyanurate boards in place of Firestone 1.5" HailGard Isocyanurate boards $2,570.00 Deduct $68,400 (area A-B- C base bid) No bid $1,530.00 Deduct $750.00 $1,000.00 Deduct $0.00 18 95 West, Public Works Building: Low-Slope roof (63,700 sq ft.): install Firestone 1.5" HD Composite Isocyanurate boards in place of Firestone 1.5" HailGard Isocyanurate boards $8,500.00.00 Deduct $590,000 (base bid) No bid $10.000.00 Deduct $3,500.00 $6,200.00 Deduct $0.00 $798,072.00 -1500 -2570 -8500 $785,502.00 $884,600.00 -$12,540.00 $872,060.00 Page 2 of 2 Tin OAKLAND MP_ 0.123/11E1 MATERIALS 1155 OAKLAND AVEII II Pair_ tONNIS1 TO ilia; H1GHLIVO MSC! S2.11111.1ar aticaosurromecerm 10 11W:101i LAKE RIX 0 MILEI Resolution #15137 May 21, 2015 Moved by Spisz supported by Jackson the resolutions (with fiscal notes attached) on the amended Consent Agenda be adopted (with accompanying reports being accepted). AYES: Dwyer, Fleming, Gingell, Gosselin, Hoffman, Jackson, Kowall, Long, Matis, McGillivray, Middleton, Quarles, Scott, Spisz, Taub, VVeipert, Woodward, Zack, Crawford, (19) NAYS: None. (0) A sufficient majority having voted in favor, the resolutions (with fiscal notes attached) on the amended Consent Agenda were adopted (with accompanying reports being accepted). RINNEBY APPROVE THIS RESOLUTION CHIEF DEPUTY COUNTY EXECUTIVE ACTING PURSUANT TO MCL 45,559A (7) STATE OF MICHIGAN) COUNTY OF OAKLAND) I, Lisa Brown, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on May 21, 2015, with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County of Oakland at Pontiac, Michigan this 2l of May 2015. - Lisa Brown, Oakland County