Loading...
HomeMy WebLinkAboutResolutions - 2015.10.07 - 22030MISCELLANEOUS RESOLUTION # 15251 October 7, 2015 BY: Planning and Building Committee, Philip Weipert, Chairperson IN RE: FACILITIES MANAGEMENT/BOARD OF COMMISSIONERS — AUTHORIZATION TO PROCEED WITH REMODELING OF COMMITTEE ROOM A To The Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: WHEREAS the Committee Room A has recently had the counter, carpet, and coat closet replaced, numerous other aspects of the room remain outdated; and WHEREAS the Chairperson of the Board of Commissioners has requested that Committee Room A be fully remodeled; and WHEREAS Board Administration and Facilities Management have been working together to determine what should be remodeled and to what level; and WHEREAS the proposed Committee Room A remodeling project would involve the following: • New conference table and chairs • New AN equipment and built in table microphones • Dual window blinds (partial + full light block) • New drop ceiling and lights • LED flat screen television system and; WHEREAS the proposed Committee Room A remodeling project work will be performed by competitively bid annual contractors; and WHEREAS the total proposed Committee Room A remodeling project cost will be $103,000, including $89,561 for construction and $13,439 for contingency. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners authorizes the Committee Room A remodeling project in the amount of $103,000. BE IT FURTHER RESOLVED that the Board of Commissioners authorizes transfer of funding in the amount of $103,000 from the Capital Improvement Program/Building Fund (#40100) to the Project Work Order Fund (#40400) to establish the Committee Room A remodeling project (#100000002223) as detailed below: BUILDING IMPROVEMENT FUND (#40100) 1040101-148020-788001-40400Transfer Out PROJECT WORK ORDER FUND (#40400) 1040101-148020-695500-40100Transfer In ($103,000) $103,000 $ -0- Chairperson, on behalf of the Planning & Building Committee, I move the adoption of the foregoing resolution. PLANNING AND BUILDING COMMITTEE PLANNING AND BUILDING COMMITTEE VOTE: Motion carried unanimously on a roll call vote. Project Estimate Date: 2127113 FM Project Manager: BAILEY, JONATHAN FPE#: 13-112 Project BOC - design & quote changes for Committee Room A WO#: 217140 TRADE DESCRIPTION ESTIMATE FM-730352 CONSTRUCTION FM-730352-Flooring Flooring Transformations $1,000 FM-730352-Architectural Allied - ceiling demo and new $6,500 FM-730352-HVAC FMO HVAC $1,000 FM-730352-PatchandPaint FM0 - painting and floor cores $1,500 CONSTRUCTION Total. $10,000 FM-730443 VOICE & DATA FM-730443-VDJack,Cable IT-Thumb $2,982 VOICE & DATA Total: $2,982 FM-730562 ELECTRICAL FM-730562-ElectricalLighting FMO - Electrical $4,500 ELECTRICAL Total: $4,500 FM-731241 MISCELLANEOUS FM-731241-Miscellaneous FM-731241-Miscellaneous Sheer Shop - Window Tratments AV - Midwest MISCELLANEOUS Total $9,120 $23,654 $32,774 FM-760160 FURNITURE FM-760160-FurnitureNewinstallation FM-760160-FurnitureNewInstallation Aires - New chairs Airea - Kimball Conf. Table FURNITURE...Total:: $15,399 $23,906 $39,305 FM-730359 CONTINGENCY FM-730359-Contingency 15% contingency 8/27/2015 Resolution #15251 October 7, 2015 The Chairperson referred the resolution to the Finance Committee. There were no objections.