Loading...
HomeMy WebLinkAboutResolutions - 2016.08.18 - 22547MISCELLANEOUS RESOLUTION # 16238 BY: Commissioner David Bowman, District #10 IN RE: BOARD OF COMMISSIONERS — PILOT LOCAL ROAD IMPROVEMENT PROGRAM FISCAL YEAR 2016 APPROPRIATION — CITY OF PONTIAC — RESURFACING OF FRANKLIN ROAD — PROJECT NO. 2016-25 To the Oakland County Board of Commissioners: Chairperson, Ladies and Gentlemen: WHEREAS the Oakland County Board of Commissioners has authorized the Pilot Local Road Improvement Program to assist Oakland County's cities and villages with the construction, maintenance and repair of roads under the supervision, direction and control of cities and villages; and WHEREAS Miscellaneous Resolution #16103 provides that any Oakland County appropriation in support of the Pilot Local Road Improvement Program shall be distributed only after completion of all of the following: 1. The municipality has fully completed and returned the standard project application form approved by the Local Road Improvement Program Subcommittee; and 2. The municipality has submitted a statement detailing that the project will fulfill the requirement of encouraging and assisting businesses to locate in the county, as required in MCL 123.872; and 3. The municipality has agreed to comply with the provisions of MCL 123.872 that require that a report shall be submitted to the Board of Commissioners outlining the project activities and the degree that the municipality has met the stated purpose of the project; and 4. The municipality has agreed to comply with policies and procedures of the program as approved by the Board of Commissioners including supplementary policies approved by the Local Road Improvement Program Subcommittee; and 5. The Local Road Improvement Program Subcommittee of the Finance Committee has reviewed and recommended approval of the application; and 6. The Commissioner(s) representing the city or village requesting the project submits a resolution authorizing the appropriation of the County's maximum 60% share of the project from the General Fund Designated Fund Balance for Pilot Local Road Improvement Program. The resolution shall be approved by the Finance Committee and the full Board; and 7. A public hearing on the proposed project is conducted during a meeting of the Board of Commissioners; and 8. The municipality has approved and executed a cost participation agreement prepared by Corporation Counsel in accordance with requirements provided in the policies and procedures of the program as approved by the Board of Commissioners including supplementary policies approved by the Local Road Improvement Program Subcommittee; and 9. The municipality submits an invoice to the county in accordance with the conditions included in the cost participation agreement; and WHEREAS the City of Pontiac has identified a project and submitted an application detailing the goals and outcomes of the project; and WHEREAS the City of Pontiac has demonstrated that it has available funding equal to a minimum of 50% the project costs; and WHEREAS Oakland County's share of the Fiscal Year 2016 authorized amount of the Local Road Improvement Program funding for Project No. 2016-25 in the City of Pontiac is $84,754; and WHEREAS a public hearing regarding the project has been held before the Board of Commissioners in accordance with the requirements of MCL 123.872; and WHEREAS upon review of the project application, the Board of Commissioners has determined that the completion of the project will encourage and assist businesses to locate in Oakland County. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners hereby approves the project submitted by the City of Pontiac and authorizes the release of Local Road Improvement Program funds from the Oakland County Designated Fund Balance. BE IT FURTHER RESOLVED that the Chairman of the Board of Commissioners is authorized to execute the cost participation agreement with the City of Pontiac prepared by Corporation Counsel for the Pilot Local Road Improvement Program Project No. 2016-25. BE IT FURTHER RESOLVED that the Oakland County Clerk is requested to forward copies of this resolution to Oakland County Fiscal Services and the City of Pontiac. Chairperson, I move the adoption of the foregoing Resolution. Commissioner David Bowman District #10 LOCAL ROAD IMPROVEMENT MATCHING FUND PILOT PROGRAM COST PARTICIPATION AGREEMENT Resurfacing Franklin Road City of Pontiac Board Project No. 2016-25 This Agreement, made and entered into this day of , 2016, by and between the Board of Commissioners of the County of Oakland, Michigan, hereinafter referred to as the BOARD, and the City of Pontiac, hereinafter referred to as the COMMUNITY, provides as follows: WHEREAS, the BOARD has established the Pilot Local Road Improvement Matching Fund Program, hereinafter the PROGRAM, for the purposes of improving economic development in Oakland County cities and villages. The terms and policies of the PROGRAM are contained in Attachment A. The BOARD intends the PROGRAM to assist its municipalities by offering limited funds, from state statutory revenue sharing funds, for specific, targeted road maintenance and/or improvement projects on roadways under the jurisdiction of cities and villages; and WHEREAS, the BOARD shall participate in a city or village road project in an amount not exceeding 50% of the cost of the road improvement, hereinafter referred to as the PROJECT, and also not exceeding the Preliminary Distribution Formula as it relates to the COMMUNITY, (Attachment B); and WHEREAS, the COMMUNITY has identified the PROJECT as the Resurfacing of Franklin Road, as more fully described in Attachment C, attached hereto, and made a part hereof, which improvements involve roads under the jurisdiction of and within the COMMUNITY and are not under the jurisdiction of the Road Commission for Oakland County or state trunk lines; and WHEREAS, the COMMUNITY has acknowledged and agreed to the BOARD's policies regarding the PROGRAM, Attachment A, and further acknowledge and agree that the PROJECT's purpose is to encourage and assist businesses to locate and expand within Oakland County and shall submit a report to the BOARD identifying the effect of the PROJECT on businesses in the COMMUNITY at the completion of the PROJECT. In addition, the COMMUNITY acknowledges that the program is meant to supplement and not replace funding for existing road programs or projects; and WHEREAS, the COMMUNITY has acknowledged and agreed that the PROGRAM is expressly established as a pilot program and there is no guarantee that the PROGRAM will be continued from year to year. The COMMUNITY further acknowledges and agrees that if the PROJECT is a multi-year road improvement project, the maximum number of years for the PROJECT funding is three (3) years, although the BOARD anticipates that most PROJECT's funded under the PROGRAM will be completed by the end of calendar-year 2017, and there is no obligation on behalf of the BOARD to fund either the PROJECT or the PROGRAM in the future; and WHEREAS the COMMUNITY has acknowledged and agreed that the COMMUNITY shall assume any and all responsibilities and liabilities arising out of the administration of the PROJECT and that Oakland County shares no such responsibilities in administering the PROJECT; and WHEREAS, the estimated total cost of the PROJECT is $199,000; and WHEREAS, said PROJECT involves certain designated and approved Local Road Improvement Matching Funds in the amount of $84,754, which amount shall be paid to the COMMUNITY by the BOARD; and WHEREAS, the BOARD and the COMMUNITY have reached a mutual understanding regarding the cost sharing of the PROJECT and wish to commit that understanding to writing in this Agreement. NOW, THEREFORE, in consideration of the mutual covenants set forth herein and in conformity with applicable law and BOARD resolution(s), it is hereby agreed between the COMMUNITY and the BOARD that: 1. The BOARD approves of the PROJECT, and in reliance upon the acknowledgements of the COMMUNITY, finds that the PROJECT meets the purpose of the PROGRAM. 2. The BOARD approves of a total funding amount under the PROGRAM for the PROJECT in an amount not to exceed $84,754, The COMMUNITY shall submit an invoice to the COUNTY in the amount of $84,754, addressed to Lynn Sonkiss, Manager of Fiscal Services, Executive Office Building, 2100 Pontiac Lake Road, Building 41 West, Waterford, MI 48328, upon execution of this Agreement. Upon receipt of said invoice, the BOARD shall pay the COMMUNITY the sum of $84,754 from funds available in the PROGRAM. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and date first written above. OAKLAND COUNTY BOARD OF COMMISSIONERS By: Its: COMMUNITY By: It's: Attachment "A" PILOT LOCAL ROAD IMPROVEMENT MATCHING FUND PROGRAM STATEMENT OF PURPOSE Oakland County Government recognizes that Michigan law places the primary responsibility for road funding on the State and non-county local units of government. However, the County also recognizes that the law does permit a limited, discretionary role for the County in assisting a road commission and local units within a county by supporting some road maintenance and improvement efforts. Accordingly, for many years Oakland County has voluntarily provided limited assistance to its cities, villages and townships (CVT's) and to the Road Commission of Oakland County (RCOC) by investing in a discretionary Tr-Party Road Program. Authorized under Michigan law, the County's tri-party funding contributions primarily facilitate safety improvement projects on CVT roads under the jurisdiction of the RCOC. By law, tri-party funds cannot be used to fund projects on roads solely under the jurisdiction of CVT's. Recognizing a continuing need to better maintain local CVT streets and roads, yet being ever mindful of the County's limited responsibility for and jurisdiction over non-county roads and streets, Oakland County Government wishes to pilot a discretionary program that is more flexible than the current Tr-Party Road Program, one that will allow Oakland County to assist its cities and villages with maintenance and safety projects on non-county roads. Not being the funding responsibility of County government, local CVT roads generally cannot be maintained or improved using county funds because doing so would be considered to be the "gifting" of County resources. However laudable the purpose, Michigan law generally forbids the gifting of government resources. To avoid application of the constitutionally-based gifting restriction, the state legislature must, and in this arena has, determine that a public benefit results from a taxpayer investment, one that provides a quid pro quo sufficient to avoid application of the gifting prohibition. Here, the legislature has determined that the economic development benefit presumed to accrue to a county as a result of local street and road investments can provide a sufficient quid pro quo to county taxpayers justifying a discretionary county investment in a non-county road, a benefit that constitutes a fair exchange for value and not a gift. This legislative determination is set forth in 1985 P.A. 9, which amended 1913 P.A. 380, by adding a new section 2, which in pertinent part provides: "(1)„.A county may grant or loan funds to a township, village or city located within that county for the purpose of encouraging and assisting businesses to locate and expand within the county... (2) A loan or grant made under subsection (1) may be used for local public improvements or to encourage and assist businesses in locating or expanding in this state, to preserve jobs in this state, to encourage investment in the communities in this state, or for other public purposes." Communities that wish to attract, retain and grow business, retain jobs and encourage community investment, needs a safely maintained road infrastructure. This road infrastructure must include both residential and commercial roads as workers and consumers need to get to and from work, shopping, schools and recreation. In a fiscally prudent and limited manner, the County wishes to help its cities and villages accomplish this objective by test-piloting a new local road improvement matching fund program. Any such program must be mindful of the limits imposed under Public Act 9. One important restriction Public Act 9 imposed on grants or loans made pursuant subsection 2 of the Act is the mandate that, "A grant or loan under this subsection shall not be derived from ad valorem taxes except for ad valorem taxes approved by a vote of the people for economic development." This means that funding for an expanded local road assistance program cannot utilize proceeds from any of Oakland County's ad valorem tax levies since no levy has been approved by voters specifically for economic development. Given this limitation, it appears that the state statutory revenue sharing appropriated to the County can provide a non-ad valorem source of funds that legally can be used to support the pilot program. Competition for those funds, which are limited in amount, is fierce and their yearly availability is subject to the state legislative process. In the recent past, the State stripped all of those funds away from Michigan counties. Understanding that reality, it shall be the policy of the Oakland County Board of Commissioners that the Board shall not appropriate any county funds for a local road improvement matching fund program for non- county roads in any year where the State of Michigan fails to appropriate statutory revenue sharing funds to Oakland County in an amount sufficient to allow the County to first prudently address its core functions. Act 9 imposes additional conditions on grants and loans. These include requirements that the loan or grant shall be administered within an established application process for proposals; that any grant or loan shall be made at a public hearing of the county board of commissioners and that the Board shall require a report to the county board of commissioners regarding the activities of the recipient and a report as to the degree to which the recipient has met the stated public purpose of the funding. Understanding all of the above, the Oakland County Board of Commissioners hereby establishes the following Pilot Local Road Improvement Matching Fund Program: PROGRAM SUMMARY The Board of Commissioners establishes a Pilot Local Road Improvement Matching Fund Program for the purposes of improving economic development in Oakland County cities and villages. The County intends this Program to assist its municipalities by offering limited matching funds for specific, targeted road maintenance and/or improvement projects on roadways under the jurisdiction of cities and villages. A city or village participating in the Local Road Improvement Matching Fund Program shall match any fund authorized by the Board of Commissioners in an amount equal to a minimum of 50% of the cost of the total project award. County participation shall be limited to a maximum of 50% of the cost of the total project budget. Funding shall be utilized to supplement and enhance local road maintenance and improvement programs. Funding is not intended to replace existing budgeted local road programs or to replace funding already committed to road improvements. PROJECT GUIDELINES Program funding shall be utilized solely for the purposes of road improvements to roads under the jurisdiction of local cities and villages. Road improvements may include, but not be limited to, paving, resurfacing, lane additions or lengthening, bridges, or drainage as such improvements relate to road safety, structure or relieving congestion. Program funding: May be utilized to supplement a local government's matched funding for the purposes of receiving additional federal transportation funding; May not be utilized to fulfill a local government's responsibility to fund improvements to state trunklines; Shall be limited to real capital improvements to roadways and shall not be utilized for other purposes, such as administrative expenses, personnel, consultants or other similar purposes; Shall not be utilized for non-motorized improvements, unless these improvements are included in a project plan for major improvements to a motorized roadway; Shall be utilized for projects that will result in a measurable improvement in the development of the local economy and contribute to business growth. Recipients shall be responsible for providing an outline of the economic benefits of the project prior to approval and for reporting to the Board of Commissioners after the completion of the project on the benefits achieved as a result of the projects. ADMINISTRATION Local Road Improvement Matching Fund Program projects may be appropriated by the Board of Commissioners in compliance with the County budget process. The amount of funds to be dedicated for the Pilot Program shall be determined by the Board of Commissioners on an annual basis. Program funding may be reduced or eliminated based upon the ability of the County government to meet primary constitutional and statutory duties. The Board of Commissioners expressly reserves the right to adjust the County matching funds share at any time based upon County budget needs. In accordance with MCL 123.872, funds dedicated to the Local Road Improvement Matching Fund Program shall not be derived from ad valorem tax revenues. Program funding shall be limited to funds derived from the County's distribution from the Michigan General Revenue Sharing Act. Reduction or elimination of the County's distribution of revenue sharing funds may result in the elimination or suspension of the program. Funding availability shall be distributed based upon a formula updated annually. The formula will consist of: 1. A percentage derived from the number of certified local major street miles in each city and village divided by aggregate total of certified local major street miles of all cities and villages in the county. 2. A percentage derived from the population of each city and village as determined by the last decennial census conducted by the U.S. Census Bureau divided by the aggregate total population of cities and villages in the county. 3. A percentage derived from the three year rolling total of the number of crashes on city and village major local streets divided by the aggregate three year rolling crash numbers for all city and village major local streets. The crash data will be supplied by the Road Commission for Oakland County using data from the Traffic Improvement Association. Each city and villages percentage allocation shall be determined by adding each factor percentage and dividing that total by three. The amount of funds available for match shall be determined by the total amount of funds allocated by the Board of Commissioners added to an equal amount representing the match provided by local cities and villages, The Chairman of the Finance Committee of the Board of Commissioners shall establish a Subcommittee on the Local Road Improvement Program. This subcommittee shall consist of three members, with two members representing the majority caucus and one member representing the minority caucus. It shall be the responsibility of the Subcommittee to direct the administration of this program, receive applications for program funding and make recommendation of acceptance to the Finance Committee and Board of Commissioners. The Subcommittee may consult with county departments, staff and the Road Commission for Oakland County in the conduct of its business. DISBURSEMENT The Subcommittee shall forward recommendations for approval of Local Road Improvement Matching Fund Program projects to the Chairman of the Board of Commissioners. This recommendation shall include a cost participation agreement between the County and participating municipality. Minimally, cost participation agreements shall include: responsibility for administering the project, the project location, purpose, scope, estimated costs including supporting detail, provisions ensuring compliance with project guidelines, as well as disbursement eligibility requirements. The cost participation agreement shall also require the maintenance of supporting documentation to ensure compliance with the following provisions: 1. Any and all supporting documentation for project expenditures reimbursed with appropriated funding shall be maintained a minimum of seven years from the date of final reimbursement for actual expenditures incurred, 2, The Oakland County Auditing Division reserves the right to audit any and all project expenditures reimbursed through the program. Upon receipt of recommendation of project approval from the Subcommittee, the County Commissioner or Commissioners, representing the area included in the proposed project, may introduce a resolution authorizing approval of the project and the release of funds. Resolutions shall be forwarded to the Finance Committee of the Board of Commissioners, who shall review and issue a recommendation to the Board on the adoption of the resolution. The Chairperson of the Finance Committee shall schedule a public hearing before the Board of Commissioners prior to consideration of final approval of the resolution. The deadline for projects to be submitted for consideration shall be established by the Subcommittee. The Subcommittee may work with participating municipalities to develop a plan for projects that exceed that municipality's annual allocation amount. This may include a limited plan to rollover that municipality's allocation for a period of years until enough funding availability has accrued to complete the project, subject to funding availability. Upon completion of project plans and execution of the local participation agreement by the County and governing authority of the local municipality, the participating municipality shall submit an invoice in accordance with the terms and conditions included in the agreement. The Oakland County Department of Management and Budget Fiscal Services Division shall process payments in accordance with policies and procedures as set forth by the Department of Management and Budget and the Oakland County Treasurer. In the event an eligible local unit of government chooses not to participate in the Local Road Improvement Matching Fund Program, any previously undistributed allocated funding may be reallocated to all participating local units of government in accordance with the formula included in this policy. At the completion of each project, the participating local government shall provide a report to the Board of Commissioners regarding the activities of the recipient and the degree to which the recipient has met the stated public purpose of the funding as required by MCL 123.872. LOCAL ROAD IMPROVEMENT SUBCOMMITTEE FINANCE COMMITTEE, OAKLAND COUNTY BOARD OF COMMISSIONERS Provision regarding existing funded local road programs and projects. The standard project agreement shall require participating municipalities to acknowledge that the Local Road Improvement Program is meant to supplement and to not replace funding for existing road programs or projects. Fulfillment of economic benefit provisions of MCL 123.872. The Pilot Local Road Improvement Program has been established by the Oakland County Board of Commissioners under the authority granted by MCL 123.872, which provides that "A county may grant or loan funds to a township, village or city located within that county for the purposes of encouraging and assisting businesses to locate and expand within the county". It shall be the responsibility of the municipality to outline the extent to which the project included in their application will meet these standards. The Subcommittee shall only consider projects that meet the standards provided in MCL 123.872. The standard project agreement shall include a provision requiring the participating municipality to fulfill the statutory requirement included in MCL 123.872 that, "the grant or loan contract made by county shall require a report to the county of board of commissioners regarding the activities of the recipient and the degree to which the recipient has met the stated purpose of the funding." Multi-year projects. The Local Road Improvement Program has been expressly established as a pilot program. There is no guarantee the program will be continued from year to year. The Subcommittee recognizes that the allocation authorized for local governments may not provide adequate funding in a single year to allow a project to move forward. Local governments shall be offered the opportunity to submit project plans that would necessitate the accumulation of multiple years of the community's allocation amount to fulfill the county's share of a project budget. A multi-year project plan submittal shall not exceed three years in duration. The allocation amount available to each community is subject to change annually based upon the factors utilized in the formula. Consideration of multi-year project plans does not obligate Oakland County in any way to funding any project or program in the future. These plans are meant to be utilized for planning purposes and for consideration by the Oakland County Board of Commissioners regarding authorizing a limited carryover of a community's allocation year to year. Completion of projects and submittal of post-project report. The standard cost participation agreement shall include a provision requiring the municipality to complete the project and submit the required post-project completion report prior to the end of the next calendar year following the date of project approval. An alternative schedule may be approved for a project by action of the Board of Commissioners, upon recommendation of the Subcommittee. PRELIMINARY DISTRUBUTION FORMULA OAKLAND COUNTY LOCAL ROAD IMPROVEMENT PILOT PROGRAM '46INN'i burn Hills lik.gliit . 32-33 .:Iiii: 4.82% ....iiiRiM: 2.1,412 . . 230% 236 2.99% ' Rrlial.:40. RailEARlital 1.34% $59,751 $29,877 Berkley 15.63 233% 14,970 1.96% 55 0.3155 133% $317,583 $15,342 Beverly Hills 10_99 1.64% 10,267 134% 40 0.23% 1,57% $21,396 $16,699 Bingham Farms 1.02 515% 1,111 0.1594 54 031% 5.20% $4,025 $2,013 Birmingham 2137 325% 20,103 2.63% 585 3,29% 3.06% $61196 530,5981 Bloomfield Hills 0.43 1.32% 3,859 0.51% 235 1.33% 1.05% $21,039 $10,520 Clarkston 1.48 0.32% 882 0.12% 37 0.21% 0.18% $3,640 $1,820 Clawson 9.62 1.44% 11,825 1.555e 134 075% 1.25% $24,950 $12,480 Farmington 726 1.10% 10,372 136% 183 1.04% 1.16% $23,284 $11,642 Farmington Hills 58.36 8,71% 79,745 10.43% 1955 12,05% 10.07% $201,532 $1100,746 Femdale 20.99 3.13% 19,900 2.65% 219 1.24% 2.33% $46,513 $23,257 Franklin 434 0.65% 3,150 0.41% 48 0.27% 034% $8,878 $4,439 Hazel Park 17.12 2_55% 16,422 2.15% 188 1.0696 132% 636,445 $19,228 Holly 7 1.04% 6,086 Dim% 33 0.47% 0.77% 915,421 $7,711 Huntington Woods 5.95 1_04% 5,233 033% 58 0.33% 0.73% $14,533 67,257 Keego harbor 1.93 0.29% 7,970 0,39% 80 036% 038% $7,647 $8,774 Lake Angel. 0 0.0053 790 0.04% 22 0.1.2% 0.05% $1,004 $542 Lake Orlon 2.74 5.41% 2,573 03956 123 0.70% 0.50% $9,980 $4,990 Lathrop Village 7.36 1.10% 4,575 0,53% 185 1.05% 0.89311 $17,867 $8,934 Leonard 1.34 0.35% 403 0.05% 4 0.02% 0.14% $2,017 $1,409 Madison HeTghts 215 3.21% 29,694 3.89% 745 4.22% 3.77% $73,431 637,716 lvITIfiard 73 1.09% 3,175 0.01% 128 0.01% 5.84% 616,716 $3,358 Northville' 0.8 0.12% 5,970 0.78% 109 0.02% 0.51% $10340 $5,059 Novi 3952 3.50% 55,224 7.23% 1313 7.44% 6.86% 5137,104 $68,552 Oak Park 18.35 2.74% 29,319 3.84% 275 1.56% 2.71% $54,220 $27,110 Orchard Lake 1.8 0.27% 2375 03114 120 0.68% 0.42% 68,397 $4,199 Ortonville 3.21 0.48% 1,442 1113% 40 0.23% 030% 65,962 $2,981 Oxford 631 090% 3,436 0.45% 107 0,60% 0.65% $13,006 $5,553 Pleasant Ridge 359 0.54% 2,526 0.33% 145 0,82% 0.56% $11,254 65,527 Pontiac 75.21 10.47% 59,515 7.79% 1364 7,16% 8.48% $169,507 $84,754 Rochester 8.59 1.28% 12,711 1.56% 245 1.39% 1.44% $28,879 $14,443 Rochester HMS 38.51 5.7633 70,995 9.29% 1945 11.02% 8.69% $173,830 $80,915 Royal Oak 63.96 5.54% 57,238 7.4956 1083 6.14% 7.77% $154,461 677,231 South Lyon 433 0,66% 11,327 1_48% 144 5.81% 0199% $19,717 $3,055 Southfield 54.71 3.51% 71,739 339% 2452 1330% 10.98% $219,625 5109,813 Sylvan Lake 2.58 0.35% 1,720 0.23% 66 038% 0.33% 56,574 $3,287 Troy 57.34 8.55% 84,980 10.60% 2343 13.28% 10.8154 $216,111 $100,156' Walled Lake 534 0.80% 6,999 0.93% 1.53 0.87% 5.86% $17,212 83,656 Wixom 10.49 1.55% 13,498 1.77% 405 231% 1.130% 537,628 $18,814 Wolverine 3.59 0.55% 4,313 036% 57 0.33% 2.48% $8,598 $4,799 TOTAL 67029 100.00% 764,251 100.00% 17,539 100.00% 100.0015 $2,505000 $1,933,500 ATTACHMENT C Pilot Local Road Improvement Matching Fund Program Resurfacing of Franklin Road City of Pontiac Board Project No. 2016-25 Resurfacing of Franklin Road from South Boulevard to Rapid Street. ESTIMATED PROJECT COST Resurfacing of Franklin Road $199,000 COST PARTICIPATION BREAKDOWN COMMUNITY BOARD TOTAL TOTAL COST $114,246 $84,754 $199,000 City of Pontiac Office of the Deputy Mayor 47450 Woodward Avenue - Pontiac, Michigan 48342 Phone: 248,758.3322 Fax: 248,758.3292 July 29, 2016 Local Road Improvement Subcommittee Oakland County Board of Commissioners 1200 N. Telegraph Road Pontiac, MI 48341-04Th RE: 2016 Local Road Improvement Matching Fund Pilot Program Dear Honorable Oakland County Board of Commissioners: For your review and consideration, enclosed is the City of Pontiac's application for the County's 2016 Local Road improvement Matching Fund Pilot Program. Thank you in advance for your attention to our request. Please let me know if additional information is needed. Sincerely, .ea.zel; Jane Bais DiSessa Deputy Mayor Cc: Dr. Deirdre Waterman, Mayor, City of Pontiac Mr. Terrernce King, DPW Director, City of Pontiac Mr, John Baiint, City Engineer, City of Pontiac Mr. Nevrus Nazarko, Finance Director, City of Pontiac BOARD. OF .commrssioNgm I100 N TNegilaph ,Rtiad .poilAihc,14.1483i1-6175 Phone: -.14.11),i49,:41 Op (24-t1)135ti'-:1572 2016APPLICATIONFORK L.QQALAQA0 IMPROVEMENT IVIA -MHING FUNO.PIL.QT PROGRAM !BaCkprroundi: Oakland County has ettabliShed a Loobli4dad ImproVem'erft Matehing Fluid Pilet Program for the ptirposes of iltiprbVjiig.eConerniC development in 'Oakland County.•titiesiand Villages. The County intends this Program to assist its municipalities by offering limited matching funds for specific ; targeted road mia3nTehanceAnd/br.,•in -iproyerrient projects on roadways under the jUrisdaion Of Citio. and villages Prdiett PciticitS The Oakland County. Board of COmmissionersAnd.the Local. 'Road Improvement :Subcommittee , has established policies, procedures andiguidelines.for project consideration: These documents. have been included as Attachment AvailAble Funding: Oakland County's maximum contribution for projects In eligible cities or villages has been established within the dj§tril)ution formula included as Attachment The maxirrium COUntv,share for 2016 program proiects in Pontiac has. been set at ,$84754: 'kequireti ilifthhing Funds: A Oty orVillagp participating:in the Lotal Rbad ImproVement Matching Fund program shall match Any funds authorized by the Oakland County Board of Commissioners in an amount equal to .a minimum of .50% of the cost of the total project award. Funding shall he utilized to supplement and enhance local. road maintenance and improvement pr'ogOmq, Funding is not intended, to replabe eXisting' budgeted loCal;ibad programs or to rePlace fUnding -already committed td road improVemente., REQUESTING LOCAL GOVERNMENT m UNICIPALITY City of Pontiac CONTACT PERSON Jane Bais DiSessa TE-LEPH ONE NUMBER 248-758-3233 STREET ADDRESS 47450 Woodward Avenue crrY/20 Pontiac, MI 48342 •E-MAILADDR5SS jbais-disessa@pontiac. mi.us PROJECT IN FORIVIA‘TION SHORT DE5CrtIPTi.O.N:CF PROJECT Resurfacing of Franklin Road ROAD/ROAD.(STO BEJMPFtQVEb Franklin Road from South Boulevard to Rapid Street DESCRIPTION The City of Pontiac is beginning a project to resurface Franklin Road from South Boulevard, North to approximately Rapid Street. The project length is 0,34 miles, approximately 6 blocks, We plan to mill the existing asphalt, perform curb and gutter repair and reconstruct a short section of the roadway, then put down another 2" asphalt overlay. The project time frame is approximately 2 week-&.--- 2 PROJECT BUDGET FuNqwp EQLIESTE $84,754 LOCAL. IVIATI--E $114,246 TOTALPROJECT OUDGEI" $199,000 DE$ORIPTIDN.OF PROPOSED PROJECT £XPEPPITURES: Please see attached Engineer's Estimate EGONOMIGIMPACt OF PROJ.ECT The Local. Ra.ad .I.Mproverint Pilot PrOktaril has beeh established under IVICL.113:872, the Gifts of .Pi -operty Act; whiat .proVikg that "A..cv Linty may granter loan :funcN fo a toWnship; Village, or :citY loCated :within that county fbr the purpose rof encouPaM rig .ana assisting liOsiiiesSes:to lotate'and ekband Within the. to Lint.V.' DESCRIBE HOWTHE.P:RNECT MEETS TJ-1 T-ATUTORY REQpIRMENT OFENCO,ORAG/NG Ahlb sssreje B.OS)NESSTp. LoCATE AND EXPAND IN THE OCONTY The City of Pontiac is requesting funds to assist in the resurfacing of approximately 0.34 miles of Franklin Road. This portion of Franklin Road is adjacent to the new M1 Concourse project which is currently under construction. The M1 Concourse project is a $50 million dollar motorsport facility is one of Oakland County's primary sources for motorsports throughout metro Detroit. The grand opening for this facility is scheduled for August 14, 2016. This improvement of Franklin Road will not only assist the MI Concourse development, it will further impact the region by: 'Creating a sense orpricIWIrthe omflTcrntty • Encouraging new businesses to move in • Attract new customers • Create a safer environment In addition, transportation studies have shown that communities that improve the quality of their roads will positively impact their population's standard of living by reducing the expense of vehicle repairs as well as increase vehicle fuel efficiency. Quality roads are critical and will capture economic opportunities. OPTIONAL MUL11-YEAR PROJECT PLAN The Local Road ImijeoVernent Piograril has been expresilii established as a pilot iSC4rani. There iSrio guarantee the program will be continued frorp' Veal' to year. The Local Road Improvement Program 5ubtorrieriitteecoghLtes that the allocation authorized for ldeatgove'rcirher0 may'snOt .ProVide adequate funding n a Sitigle year to a IlOYu:a project fp move for d.Label govecnineas sbalfbe offeredlheopportunity.fo subroit.oroject plans.that .would necessitate the acoumorlation ,of multiple years of the.corrimuniW.'s-alloca -pOn amount tg fulfill the tpurity's share of a project budget.. A m ultl-year protect pi•eli subrOfttal:ghaN not exceed tkree-Vearsin duration', The allocation ornoQht available to each .community is.:subject to c.hiange.anntially based upon The factors utilized in therfistrihotion fcirmula..Consideration of multi.-yarprojeth'plaps does hot obligate Oalclarrld couiity inny m:/ay to fund any.pajector•program in the future. These pl'art...Q.re• moaritto heuti:lized fO-r planhing!AurpbseS.Labd for consideratiOn bylthe Oalciand.County$oard of Commisbners tp authorize a 'lin-died .carryover of a .c5rgraunity's allocation year tovear„ DESORPTIONVF. MULTWEAR PLAN [NCLUDING ESTIMATED PROJECT BUDGET AND CARRYOVERPERIOD OF COMMUNITY'S i0OkTION N/A ADDITIONAL INFORMATION The Loc-00nad ifnproNernent P!-,ograrn S.1,i-bccrnmittee:Offhe flnarrpe tOmmittee'oftePakland cou.nty. toayd of GO.1)1.1-ni$Mijbo'r.s. has been 0,5.00 With managing this program and making reCO'rnMendat.itins. fOr-ProjeCt.aPpro9,al„Plea se .supply 'any additional info rmation.you believe maybe:helpful inthe:consideration..of your application. !CI PTJONAL ADD M °NAL I N PORMA TI 0 N . REPORT FO.L.L.C.ANING COMPLETION OF THE PROJECT .MC(123,872 requires that ":th.grant or roan:contract matiety a:county shall reqUirea report to the county board of -CornrhiSsioners reOardinp the activitithOf the recipient -arid the degree to Which the .recipient has met the Stated public 'purpose o'f the:'fundinf'.. T„ on behalf a City of Pontiac , have. been:provided With '.C.Opy of the. . - P-oliCies and Procedures,ofthe Local Road Improvement Program (Attachment ."A) and agree to comply with these terrns and ConditiOnS:. 'I •on behalf Of' City of Pontiac .,-understand and _agreeto comply with the "recldieeffieljt•tO:faroVide the Oakland County Roaitl of Commissioners With 'a report folloYving the completion Of an ,approve 0 projet ontlining the degree to which the project:met the:stated purpose of 4)eti.nding.: sV-11 f0re of Authorized l:!arty Jane Bais DiSessa Printed Name and Titlei .p,lease ret rn cOmpletedlappliCation to: tothflioQi Itripioxiefilent 5Lilkomoriqee oal4:10 coilricy Board of pornmissioner 12,00 N. Telegrapii.Road Pontiac, iVI,1 4834140475 A Pdf COpy .of applicailoh Ca n,be erriailedtd; Chris Ward, Senior Analys'tssi,:iardc,c6Doal4goAn1 Questions :regarding the appkition and approval process ShoUld be directed to Chris Ward at-the:email ad -dress above or by:Phone. at (74058-0111 7-29-16 ATTACHMENT City of Pontiac - Project Budget VtA 7iSo ENGINEER'S OPINION OF PROBABLE PROJECT COST PRO,IECT: FrAvIdiu BoAd - C.P14 OverIty LOCATION; Pontine, Pell BASIS FOX ESTIMATE: I ) CONCEPTUAL IX] PRELUNARY [j FINAL Scope: 2" CPM overlay al Flanklin Road from South Blvd. to Rockwell 150' length of full k & It north of South Blvd Goal: hlr<i,nn•ec scope of work with targeted bodget of 5150K - $20005 Project Length: 1,00015 DATE: 6/7/2016 PROTECT 040, 20160419 ESIIMATOR: COB CIIECIaD BY: ESCREPT ON rgimsir. UNIT UNIT TOTAL IIIIIIIIIIIIIIIIIIIIIIIIII 1 LSum PRICE Mobilization, Max 10% S 19,750.06 I 19,75000 BxcaYttdon, Earth (SPECIAL) 150 CYd 5 25,00 S 5,75000 Cash and eau." ker. (SPECIAL - PATCaNG 250 Ft 0 2000 S 5,000.00 Putt, Rem, Special 600 • S 1000 S 6 000 OD Curb sod (Suns; . Cope, Dec C4 SPECIAL PATCHING 250 0 30.00 S 7,500.00 CON. Milting PIMA Foot 5 100 • 0 2.00 S 10-200.00 ikaretistec Base, Stool,, ble—difiediSPECIAL) 600 • 5 15,0E S 5.060.00 BMA 5E3 620 Ton S 100,00 S 62,000.00 PIMA 4E3 140 Ton S 125.00 S 12,500.00 flilvIA 5)E 150 Tou S 100,00 S 15.000,00 Structutu Adjustroen5. Case I 111.321111 0- 111011011.11 5 600 11111.111111.1Millaine Pt Pt S 500.00 5 250,00 S 200.00 5 0.35 5 5,000.03 Structure As,ljektment, ET 102011, 2" 5 2,000.00 Structure Adjustment, Additiorral Depth S 1.200.00 S 1 260.00 Pavt.hdrIty.,, Regular Dry, 4 inch, Yellow Pavt ReC Dad • splication 4 inch,. Yellove P.4 Niche, Regular Dey, 4 inch, WIthe 3,600 2:95 Ft Ft S 010 5 360,00 S 0.55 S 87.50 PaYt Milcg, Itcolat Dry, 2..1A Apnlimlaina, 4 inch, White 250 Ft 0 0.10 S 25.00 PaWFir g, v (3Tt`e-,1T19TasuC, IA Turn g-row',.,-511 2 2 W. 5-- 65.111- ST - —5.30;IT foot tdrkg, Ovly Cad Plastic, Only Span : 165.03 S 330.00 Pavt ivirkg. Oyly Cold Plastic,. 11 inch, Stop Ear 24 51 1 8.00 5 192.00 Si , Tit B. T •. s.,--i&artia, Pun. & a Plastic Prdzn. Nigh imensity, Funn 14 Open s 10.01 0 2,752.75 5 113.01 S 00.01 s 47,000,04 S l 061 CO S 1,1700.20 S 27,050,00 Barricade, Type III, High Intensi Double Sided, ".ted, FM & . • Minor Traf Devices Traffic Rcelotor Ccattrol 170 Syd S 1,00 S 20. 10 S 1,00 S 3400.00 Kers. watinri, Inc, 2" Toptog, Mulch and Hydrosee4 TOP Mix Notes: Costs um Include& Design., constroction engineering, inspection, layout, etc. Base repairs, joint repairs not included in scope " Underground / utility in:prove-main Signs) we:Lk Petursigning impreyements Assocaptious: Desiga We of improvement islms thee. Sy with reflective cracking expected after first winter As directed/ neededguir• dity of 29Y of curb at gotten replacement included / Temp siming quantities incomplete El structure cover/adjustment rings /product ID lobs finalized Total Construction Costs 193,039-45 -Given the small quanfitiesitenall work areakhange in character of thework compared to Paddock Street -what entire sista is being recoustenclod, the unit cost for earth excavation, curb removal and replace:rotor, and aggregate bast is highei. Is order to avoid problems trying to mettle =me unit prices from Paddock St. I suggest we call them "SPECIAL" WS are not hacked into the same units. -Sign, Type TI ..1500 sft quantity orit,inelly listed seems excessive. I changed to 275 sft to match what is on the Paddock Street project, assuming it should be more or less equal to that -Restoration 2,000 syd6tantity oriVinally listed see= excessive. I changed to 175 Syd (assuming back of curb 6 wide N.250' at the curb repairs), -1-1MA mixes art assumed to hays final AC bude 0064-22. -Oar proposal is based upon completing the scope of work under a total road closure., with all traffic detoured, Iseffsc, Notes I Comments: ' /DA Sidewalk and P.amp improvements planned as future projects and not in this scope )44201V.P.Funklin RnodlCvpy of Franklin_CoN_EV-COP Resolution #16238 August 18, 2016 The Chairperson referred the resolution to the Finance Committee. There were no objections.