Loading...
HomeMy WebLinkAboutResolutions - 2017.02.15 - 22791MISCELLANEOUS RESOLUTION #17038 February 15, 2017 BY: Commissioner Christine Long, Chairperson, General Government Committee IN RE: HEALTH DIVISION/FACILITIES PLANNING & ENGINEERING — HEALTH DIVISION LEAD ANALYZER LAB REMODELING PROJECT To The Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: WHEREAS to quickly respond to any concerns that may arise regarding water content or ingestion of lead, copper, and/or arsenic, the Oakland County Health Division intends to purchase a lead analyzer for its Laboratory that can assess levels of lead, copper, and/or arsenic in water and blood; and WHEREAS to operate effectively and within building and safety codes, the Laboratory requires a new air flow / fan hood to be installed, along with dedicated electrical and gas lines; and WHEREAS this remodeling work will be performed by annual contractors selected via competitive bid per Purchasing Division guidelines and with their assistance; and WHEREAS per Project Estimate attached, the remodeling costs will be $43,401, including $32,189 for professional services and remodeling, $5,551 for electrical and security upgrades, and $5,661 for contingency; and WHEREAS funding is available to transfer in the amount of $43,401 from favorability within the Health Division General Fund (#10100) to the Project Work Order Fund (#40400). NOW THEREFORE BE IT RESOLVED that the Board of Commissioners authorizes the Health Division Laboratory Lead Analyzer Remodeling Project in the amount of $43,401. Chairperson, on behalf of the General Government Committee, I move the adoption of the foregoing resolution. Commissioner Christine Long, District #7 Chairperson, General Government Committee GENERAL GOVERNMENT COMMITTEE VOTE: Motion carried unanimously on a roll call vote with Gershenson, KowaII, and Kochenderfer absent. Facilities Management CONSTRUCTION Total: VOICE & DATA Total: ELECTRICAL Total: CONTINGENCY Total: CONSULTANTS Total: $3,052 $9,350 $763 $4,900 $5,980 $1,000 $500 $25,545 $551 $551 $5,000 $5,000 $5,661 $5,661 $2,653 $3,991 $6,644 Project Estimate Date: 718116 FM Project Manager: BATTISHILL, BRETT FPE#: 16-298 Project: CMH - 342 - Resource & Crisis Center Lab Lead Analyzer VVO#. 544549 TRADE DESCRIPTION ESTIMATE FM-730352 CONSTRUCTION FM-730352-Architectural FM-730352-Architectural FM-730352-Flooring FM-730352-MechanicalVVork FM-730352-Plumbing FM-730352-Lightning Protection FM-730352-Roofing FM-730443 VOICE & DATA FM-730443-VDJack,Cable FM-730562 ELECTRICAL FM-730562-ElectricalLighting FM-730359 CONTINGENCY FM-730359-Contingency Others CONSULTANTS FM-731444-ElectricalConsultant FM-731444-MechanicalConsultant JFR Architects Allied Building Service Floor Transformations Johnson Controls Service Plumbing-gas lines, regL Guardian Equipment Butcher & Butcher Thumb Alarm FM&O electrical work Contingency 15% Berbiglia Associates Berbiglia Associates Subtotal: $37,740 $0 GRAND TOTAL: $43,401 1/11/2017 Resolution #17038 February 15, 2017 The Chairperson referred the resolution to the Planning and Building Committee and the Finance Committee. There were no objections.