HomeMy WebLinkAboutResolutions - 2017.02.15 - 22791MISCELLANEOUS RESOLUTION #17038 February 15, 2017
BY: Commissioner Christine Long, Chairperson, General Government Committee
IN RE: HEALTH DIVISION/FACILITIES PLANNING & ENGINEERING — HEALTH DIVISION LEAD
ANALYZER LAB REMODELING PROJECT
To The Oakland County Board of Commissioners
Chairperson, Ladies and Gentlemen:
WHEREAS to quickly respond to any concerns that may arise regarding water content or ingestion of
lead, copper, and/or arsenic, the Oakland County Health Division intends to purchase a lead analyzer for
its Laboratory that can assess levels of lead, copper, and/or arsenic in water and blood; and
WHEREAS to operate effectively and within building and safety codes, the Laboratory requires a new air
flow / fan hood to be installed, along with dedicated electrical and gas lines; and
WHEREAS this remodeling work will be performed by annual contractors selected via competitive bid per
Purchasing Division guidelines and with their assistance; and
WHEREAS per Project Estimate attached, the remodeling costs will be $43,401, including $32,189 for
professional services and remodeling, $5,551 for electrical and security upgrades, and $5,661 for
contingency; and
WHEREAS funding is available to transfer in the amount of $43,401 from favorability within the Health
Division General Fund (#10100) to the Project Work Order Fund (#40400).
NOW THEREFORE BE IT RESOLVED that the Board of Commissioners authorizes the Health Division
Laboratory Lead Analyzer Remodeling Project in the amount of $43,401.
Chairperson, on behalf of the General Government Committee, I move the adoption of the foregoing
resolution.
Commissioner Christine Long, District #7
Chairperson, General Government Committee
GENERAL GOVERNMENT COMMITTEE VOTE:
Motion carried unanimously on a roll call vote with Gershenson, KowaII, and Kochenderfer absent.
Facilities Management
CONSTRUCTION Total:
VOICE & DATA Total:
ELECTRICAL Total:
CONTINGENCY Total:
CONSULTANTS Total:
$3,052
$9,350
$763
$4,900
$5,980
$1,000
$500
$25,545
$551
$551
$5,000
$5,000
$5,661
$5,661
$2,653
$3,991
$6,644
Project Estimate
Date: 718116 FM Project Manager: BATTISHILL, BRETT
FPE#: 16-298 Project: CMH - 342 - Resource & Crisis Center Lab Lead Analyzer
VVO#. 544549
TRADE DESCRIPTION ESTIMATE
FM-730352 CONSTRUCTION
FM-730352-Architectural
FM-730352-Architectural
FM-730352-Flooring
FM-730352-MechanicalVVork
FM-730352-Plumbing
FM-730352-Lightning Protection
FM-730352-Roofing
FM-730443 VOICE & DATA
FM-730443-VDJack,Cable
FM-730562 ELECTRICAL
FM-730562-ElectricalLighting
FM-730359 CONTINGENCY
FM-730359-Contingency
Others CONSULTANTS
FM-731444-ElectricalConsultant
FM-731444-MechanicalConsultant
JFR Architects
Allied Building Service
Floor Transformations
Johnson Controls
Service Plumbing-gas lines, regL
Guardian Equipment
Butcher & Butcher
Thumb Alarm
FM&O electrical work
Contingency 15%
Berbiglia Associates
Berbiglia Associates
Subtotal: $37,740
$0
GRAND TOTAL: $43,401
1/11/2017
Resolution #17038 February 15, 2017
The Chairperson referred the resolution to the Planning and Building Committee and the Finance
Committee. There were no objections.