Loading...
HomeMy WebLinkAboutResolutions - 2018.03.08 - 23340MISCELLANEOUS RESOLUTION #18066 March 8, 2018 BY: Commissioner Tom Middleton, Chairperson, Finance Committee IN RE: FACILITIES MANAGEMENT/FACILITIES PLANNING & ENGINEERING - SHERIFF'S ADMINISTRATION TO RESOURCE CRISIS CENTER STEAM TUNNEL REMEDIATION PHASE II' PROJECT To the Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: WHEREAS the Community Mental Health Authority Resource and Crisis Center and the Sheriff's Administration building are connected to the Central Heating Plant via steam tunnels (see attached map); and WHEREAS the 1200 foot steam tunnel between the Resource and Crisis Center and the Sheriff's Administration building is constructed of steel corrugated pipe; and WHEREAS the tunnel was decaying due to seepage of moisture and corrosion from salt over the years; and WHEREAS the Board of Commissioners passed MR#17156 to create a project work order for Facilities Management to perform spot-repairs to the tunnel wall and floor, install a new cathodic protection system to significantly slow down future decay, renovate air vents to funnel out moisture, replace sump pumps, and apply a 360-degree waterproof coating to the tunnel walls; and WHEREAS the Planning & Building Committee authorized Facilities Planning & Engineering to advertise and receive bids for the Sheriff's Administration to Resource Crisis Center Steam Tunnel Remediation Project; and WHEREAS the County's annual contractor George W. Auch Company was selected and subsequently bid the various trades; and WHEREAS the Request for Proposal asked for scalable pricing to help Facilities Management decide which work to do and when; and WHEREAS since last summer, Facilities Planning & Engineering has been replacing the cathodic protection system and upgrading the electrical and mechanical systems (e.g., exhaust fans, lighting, sump pump, etc.) throughout 100% of the tunnel; and WHEREAS with the remaining budget, Facilities Planning & Engineering will perform spot-repairs to the tunnel wall and floor in the north 800-feet of the tunnel; and WHEREAS the Capital Improvement Program includes funds for additional steam tunnel repairs in FY 2018; and WHEREAS with the FY 2018 Capital Improvement Plan steam tunnel repair funds of $496,800, Facilities Planning & Engineering will perform spot-repairs to the tunnel wall and floor in the north 800-feet of the tunnel; and WHEREAS Facilities Planning & Engineering has consulted with Purchasing and George W. Auch Company, an annual (competitively bid) contractor, will continue with the project; and WHEREAS the total cost to continue remediation in the amount of $496,800 includes $262,991 for tunnel repairs and quality control, $44,000 for the construction supervisor, $21,916 for Facilities Maintenance & Operations labor, $12,325 for bond and insurances, $18,543 for construction management fees, and $137,025 for contingency (15% construction management contingency and 12% Facilities Management contingency) (see attached project estimate); and WHEREAS funding in the amount of $496,800 for the project is available for transfer from the Capital Improvement Program/Building Fund (#40100) to the Project Work Order Fund (#40400) for the Sheriff's Administration to Resource Crisis Center Steam Tunnel Remediation Phase II Project. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners approves the Sheriff's Administration to Resource Crisis Center Steam Tunnel Remediation Phase II Project (#100000002604) in the amount of $496,800. BE IT FURTHER RESOLVED that the Board of Commissioners authorizes the transfer of funding in the amount of $496,800 from the Capital Improvement Program/Building Improvement Fund (#40100) to the Project Work Fund (#40400) to the Sheriff's Administration to Resource Crisis Center Steam Tunnel Remediation Phase ll Project as detailed below: FINANCE COMMITTEE VOTE: Motion carried unanimously on a roll call vote. Building Improvement Fund (#40100) 1040801-148020-788001-40400 Transfer Out Project Work Order Fund (#40400) Project: 100000002604, Activity; PROJ 1040801-148020-695500-40100 Transfer In ($496,800) $496,800 $ -0- Chairperson, on behalf of the Finance Committee, I move the adoption of thporegoing resolution. Commissioner Thomas Middleton, District 4 Chairperson, Finance Committee 23 AL EXAMINER FACILITY SHERIFF'S' ADMAISTRATIO 5 I 24 EAST I WING CENTRAL GARAGE ks‘ BLDG OAKLAND POE 250 ELIZABETH LK. R OPALAYDOCUNTYSKtiTi0GENVFA Campus Map ft leA/10105,2015 TO EL/ZABETH LAKE RD. (1 MILE) —METH 01, STEAM TUNNEL RENOVATIONS NORTh OFFIC BUILDING MATERIALS MANAGEMENT 1155 OAKLAND AVE „J. BLDG. & CENTRAL Ti4G PLANT 2C ADMINISTRATIVE ANNEX 11" 16 TO IVI-519 HIGHLAND ROAD 1 112 MILES ROA- i=j1c°mPLEK o - o oF a a N JAIL LDG. 2 OAKLAND- POINTE 230 ELIZABETH LK. PL. iTO OAKLAND AVE. (112 MILE) EST A BLDG L61 VES" DRAIN COMMISSION • SEPTIC DPP !TO,P'' H BLDG. G BLDG. ELIZABETH LAKE ROAD Project Estimate Estimate Date: 2/15/2018 FM Project Manager: MOYET, CARMELO FPE#: Project: 38E to 32E Utility Tunnel Repairs - Phase 2 - NORTH 800' TUNNEL REPAIRS W04:701935 TRADE DESCRIPTION ESTIMATE FM-730352 CONSTRUCTION FM-730352-Civil Work Auch Construction $262,991.00 CONSTRUCTION Total: $262,991.00 FM-731241 MISCELLANEOUS FM-731241-Miscellaneous FM-731241-Miscellaneous FM-731241-Miscellaneous FM-731241-Miscelianeous FM-730359 CONTINGENCY FM-730359-Contingency Auch Construction Supervisor Auch Construction CM Fees Auch Construction Bond FM&O Labor Contingency (15% CM, 12% FM) MISCELLANEOUS Total: CONTINGENCY Total: $44,000.00 $18,543.00 $12,325.00 $21,916.00 $96,784,00 • $137,025.00 $137,025.00 Subtotal: $359,775.00 GRAND TOTAL: $496,800.00 2/15/201a CAmmissioner Philip J. Weipert, hairperson, Planning and Building Committee REPORT (111S.C, 1118060) March 1, 2018 vv BY: Philip J. eipert, Chairperson, Planning and Building Committee IN RE: FACILITIES MANAGEMENT/FACILITIES PLANNING & ENGINEERING — SHERIFF'S ADMINISTRATION TO RESOURCE CRISIS CENTER STEAM TUNNEL REMEDIATION PHASE II PROJECT To the Oakland County Finance Commitee Chairperson, Ladies and Gentlemen: The Planning and Building Committee, having reviewed the above referenced resolution on February 27, 2018, reports with the recommendations that the County enter into a contract with George W. Auch of Pontiac in the amount of $391,968. The Committee further recommends funding for the total project cost of $496,800, including contingency, be approved. Chairperson, on behalf of the Planning and Building Committe , report. PLANNING AND BUILDING COMMITTEE Motion carried unanimously on a roll call vote with Dwyer absent. e t4vacceptance of the foregoing Resolution #18066 March 8, 2018 Moved by Fleming supported by McGillivray the resolutions (with fiscal notes attached) on the amended Consent Agenda be adopted (with accompanying reports being accepted). AYES: Crawford, Dwyer, Fleming, Gershenson, Gingell, Hoffman, Jackson, Kochenderfer, KowaII, Long, McGillivray, Middleton, Quarles, Spisz, Taub, Weipert, Woodward, Zack, Berman, Bowman. (20) NAYS: None. (0) A sufficient majority having voted in favor, the resolutions (with fiscal notes attached) on the amended Consent Agenda were adopted (with accompanying reports being accepted). I HOMY APPROVE THIS RESOLUTION CHIEF DEPUTY COUNTY EXECUTIVE ACTING PURSUANT TO MCL 45.559A (7) STATE OF MICHIGAN) COUNTY OF OAKLAND) I, Lisa Brown, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on .March 8, 2018, with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County of Oakland at Pontiac, Michigan this 8th day of March, 2018. Lisa Brown, Oakland County