HomeMy WebLinkAboutResolutions - 1998.05.07 - 25455May 7, 1998 REPORT (Misc. #98105) PLANNING AND BUILDING COMMITTEE - CHARLES E. PALMER, CHAIRPERSON CENTRAL SERVICES - OAKLAND COUNTY INTERNATIONAL AIRPORT - 1998 GRANT PROGRAM ACCEPTANCE TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Chairperson, Ladies and Gentlemen: BY: IN RE: The Planning and Building Committee, having reviewed on May 7, resolution entitled, "Central Services - Oakland County International 1998 Grant Program Acceptance," reports with the recommendation resolution be adopted. 1998, the Airport - that the Chairperson, on behalf of the Planning and Building Committee, acceptance of the foregoing Report. I move the NG AND BUILDING—COMMITTEE P&B Committee Vote: Motion carried unanimously on a roll call vote. MISCELLANEOUS RESOLUTION #98105 May 7, 1998 BY: General Government Committee - Nancy Dingeldey, Chairperson IN RE: CENTRAL SERVICES - OAKLAND COUNTY INTERNATIONAL AIRPORT - 1998 GRANT PROGRAM ACCEPTANCE TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Chairperson, Ladies and Gentlemen: WHEREAS the County of Oakland is in receipt of Michigan Department of Transportation Grant Contracts, Project Nos. C-26-0079-1297/1597/1498, for Federal funds in a maximum obligation of $3,512,758, and State funds in the amount of $257,497, for the development and improvement of Oakland County International Airport; and WHEREAS the projects consist of acquisition of approximately 1.67 acres and 5 homes, and rehabilitation of Runway 9R/27L, taxiways, terminal apron, fencing and relocation of the northeast taxiway/service drive; and WHEREAS the Michigan Department of Transportation has received a grant from the Federal Aviation Administration for airport development projects and shall act as agent on behalf of the County in the administration of the projects; and WHEREAS the development projects as offered and approved by the Michigan Department of Transportation and Federal Aviation Administration require a local grant match of $243,248, which is available from the airport fund; and WHEREAS the Airport Committee has reviewed and approved the grant contracts subject to ratification by the Oakland County Board of Commissioners and believes it to be in the County's interest to accept the grant contracts; and WHEREAS the attached contracts have been approved in accordance with the County Executive's review process; and WHEREAS no application was requested from Oakland County, therefore the application provisions of M.R. #95098, do not apply. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners accepts the grant contracts in an amount not to exceed $3,770,255. BE IT FURTHER RESOLVED that the Chairperson of the Oakland County Board of Commissioners or the approved designee is authorized to execute the grant contracts and to approve grant modification up to fifteen (15) percent which is consistent with the original grant contracts. On behalf of the General Government Committee, I move the adoption of the foregoing resolution. GENERAL GOVERNMENT COMMITTEE GENERAL GOVERNMENT COMMITTEE VOTE: Motion carried unanimously on a roll call vote. 1 BLOCKGRANT 04/06/98 14EFONI:iUTIC TEL :517 -321 -6422 ILIpr 06 98 14:10 No .00. P.02 AGREEMENT NO. 98-0421 FED. PROJ. NO. C-26-0079-1297 AGENDA DAB AGREFMENT FOR A FEDERAL/STATE/LOCAL AIRPORT PRO. UNDER THE BLOCK. GRANT PROGRAM THIS AGREEMENT is made and entered into this date of by and between the Michigan Department orTransportation, hereinafter referred to as the DEPARTMENT, and the Oakland County Board of Commissioners, hereinafter referred to as the SPONSOR, for the purpose of fixing the rights and obligations of the parties in agreeing to the following undertaking at the Oakland County International Airport whose associated city is Pontiac, Michigan, hereinafter tereiTed to as the PROJECT and estimated in detail on Exhibit 1, dated April 6, 1998, attached hereto and made a part hereof. Rehabilitation or Primary Runway 9W2711., Parallel Taxiway and Connectors; Rehabilitate Terminal Apron; Construct Hold Apron; Strengthen Taxiways P and B; Rehabilitate High Intensity Runway Lights; Install Auxiliary Wind Cones; Relocation of Nl Taxiway/Service Road; and Construction of Fencing as defined in Contract No. FM 63-01 C83 as approved by the DEPARTMENT. JERF,AS, the PROJECT is eligible for federal funding pursuant the Airport and Airway Improve, sent Act ill I 982 as tmerideci and/or the Aviation Safety and Noise Abatement Act of 1979, and WHERF,AS, the DEPARTMENT has received a block grant from the 'Federal Aviation Administration (FAA) for airport development projects, and WHEREAS, the DEPARTMENT is responsible for the allocation and management of block grant Funds pursuant to the above noted act, NOW, THEREFORE, it is agreed: 1. The term PROJECT COST, as herein used, is defined in Attachment(s) I. PROJI:Cf COST shall also include administrative costs incurred by the DEPARTMENT in connection with ncrc tticiN nu nc.nn TO:248 666 3341 PAGE:02 APR-J7 98 11:02 FROM:MOOT AERONAUTICS 517-886-0366 AERONAUTICS - Runway Rehab This is a sub-grant Agreement (98-0421) issued pursuant to the condition of the Block Grant given to MOOT by the Federal Aviation Administration. This agreement is between MOOT and the Oakland County Board of Commissioners to provide Federal and State Grant timds for the rehabilitation of runway 9R127L, parallel taxiway, connecting taxiways and terminal apron; relocation of NE taxiway and service road; and construction of fencing at the Oakland County International Airport in Pontiac, Michigan. The Agreement shall be in effect for a period of 36 months. Source of Funds: Federal funds (Via Block Grant) $2,845,406 State Aeronautics funds 257,472 Oakland County 169,122 Total a2.22401(2 [-'1_11.1H 11 TEL:51T-321-6422 1:1Fir 06 98 14:10 No .00€. P.03 EXHIBIT I OAKLAND COUNTY INT'L AIRPORT PONTIAC, MICHIGAN Project No. C-26-0079-1297 ADMINISTRATION DEPARTMENT-AERO (F/S/L) (S/L PROJECT) 06-Apr-98 Federal State Local Total $3,470 $323 $207 $4,000 $3,470 $193 $193 $3,855 $0 $131 $15 $145 ENGINEERING $180,160 $16,763 $10,759 $207,682 , AERO - Design Included in 1196 Grant Consultant - Design Included in 1196 Grant "ERO - Const Supv (F/S/L) $5,205 $289 $289 $5,783 (S/L PROJECT) $0 $195 $22 $217 ' Consultant - Const Supv (F/S/L) $174,956 $9,720 $9,720 $194,395 (S/L PROJECT) $0 $6,558 $729 $7,287 CONSTRUCTION $2,504,646 $231,657 $149,426 $2,805,729 C83- Rehab Primary Rwy 9R127L, Assoc. Twys, & Apron (F/S/L) $2,467,746 $137,097 $137,097 $2,741,940 C83- Relocate NE Twy/Service Rd. (S/L. PARTICIPATION ONLY) $0 $92,510 $10,279 $102,789 Change Order to add Fencing (F/S/L) $36,900 $2,050 $2,050 $41,000 CONTINGENCIES $157,130 $8,729 $8,729 $174,589 Funding Contingencies (F/S/L) $157,130 $8,729 $8,729 $174,589 TOTAL PROJECT BUDGET $2,845,406 $257,472 $169,122 $3,272,000 RECEIVED DATE : 04/06/98 15:09 FRO AGREEMENT NO. 98-0406 FED. PROJ. NO. C-26-0079-1597 AGENDA DAB AGREEMENT FOR A FEDERAL/STATE/LOCAL AIRPORT PROJECT UNDER THE BLOCK GRANT PROGRAM THIS AGREEMENT is made and entered into this date of ,by and between the Michigan Department of Transportation, hereinafter referred to as the DEPARTMENT, and the Oakland County Board of Commissioners, hereinafter referred to as the SPONSOR, for the purpose of fixing the rights and obligations of the parties in agreeing to the following undertaking at the Oakland County International Airport whose associated city is Pontiac, Michigan, hereinafter referred to as the PROJECT and estimated in detail on Exhibit 1, dated March 26, 1998, attached hereto and made a part hereof. Land Acquisition (Parcels 54 and 158) for Airport Development is defined in Contract No. FM-63-01-Land as approved by the DEPARTMENT. WITNESSETH: WHEREAS, the PROJECT is eligible for federal funding pursuant the Airport and Airway Improvement Act of 1982 as amended and/or the Aviation Safety and Noise Abatement Act of 1979, and WI IEREAS, the DEPARTMENT has received a block grant from the Federal Aviation Administration (FAA) for airport development projects, and WHEREAS, the DEPARTMENT is responsible for the allocation and management of block grant funds pursuant to the above noted act, NOW, THEREFORE, it is agreed: 1. The term PROJECT COST, as herein used, is defined in Attachment(s) 3... PROJECT COST shall also include administrative costs incurred by the DEPARTMENT in connection with the PROJECT. Administrati ve costs incurred by the SPONSOR are not an eligible PROJECT COST. 04/07/98 1 BLOCKGRANT The DEPARTMENT will not make payments for any PROJECT work prior to receipt of payment from the SPONSOR for the SPONSOR's share of that item of PROJECT work. 10. Make final accounting to the SPONSOR upon completion of the PROJECT, payment of all PROJECT COSTS, and completion of necessary audits. Any excesses or deficiencies will be returned to or billed to the SPONSOR. IT IS FURTHER AGREED: 11. The PROJECT COST participation is estimated to be as shown below and as in the attached Exhibit I. Exhibit 1 is to be considered an estimate. The actual DEPARTMENT, FAA, and SPONSOR share of the PROJECT COST will be determined at the time of financial closure of the FAA grant. Federal share $217,352 Maximum DEPARTMENT share 0 SPONSOR share 24.151 Estimated PROJECT COST $241,503 12. The PROJECT COST shall be met in part with federal funds granted to the DEPARTMENT by FAA through the block grant program and by DEPARTMENT funds. Upon final settlement of costs, the federal funds will be applied to the eligible items of PROJECT COST at the rate of 90 percent up to the maximum obligation shown in Section 11 or as revised in the Budget Letter discussed in Section 14. The DEPARTMENT funds will be applied to the balance of the PROJECT COST at a rate of 50 percent for those items eligible for state participation up to the maximum obligation shown in section 11 or as revised in the Budget Letter. Any items of PROJECT COST not funded with FAA or DEPARTMENT funds will be the sole responsibility of the SPONSOR. 13. The SPONSOR hereby agrees the costs reported to the DEPARTMENT for this Agreement shall represent only those items which are properly chargeable in accordance with this Agreement. The SPONSOR also hereby certifies that it has read the Agreement terms and has made itself aware of the applicable laws, regulations, and terms of this Agreement that apply to the reporting of costs incurred under the terms of this Agreement. 14. The PROJECT COSTS shown in Section 11 are the maximum obligation of DEPARTMENT and federal funds under this Agreement. The maximum obligation of DEPARTMENT and federal funds may be adjusted to an amount less than the maximums shown in Section 11, through a budget letter issued by the DEPARTMENT. A Budget Letter will be used when updated cost estimates for the PROJECT reflect a change in the amount of funds needed to fund all PROJECT COSTS. The Budget Letter will be signed by the Administrator of the Airport Development Division of the Bureau of Aeronautics. 04/07/98 4 BLOCKGRANT CONSTRUCTION $0 $0 $0 $0 CONTINGENCIES $0 $0 $0 $0 EXHIBIT 1 OAKLAND COUNTY INTERNATIONAL AIRPORT PONTIAC, MICHIGAN Project No. C-26-0079-1597 26-Mar-98 State Federal ADMINISTRATION $0 DEPARTMENT-AERO $0 Local Total $0 $0 $0 $0 $0 $0 LAND $217,352 $0 $24,151 $241,503 Parcels 54 and 158 Acquisition $145,800 $0 $16,200 $162,000 Consultant Fees $13,549 $0 $1,505 $15,054 Relocation $38,547 $0 $4,283 $42,830 molition $9,643 $0 $1,072 $10,715 ivilscellaneous $9,814 $0 $1,090 $10,904 ENGINEERING $0 $0 $0 $0 Funding Contingencies $0 $0 $0 $0 TOTAL PROJECT BUDGET $217,352 $0 $24,151 $241,503 L - WLS c5.4 Gf -337 f3-1 71.1 Is SCALE. I" •200' 13-16 AVIPAC-ANO---- /3-2/A Zi..••••••n•111.n•• rar4TOMI 111= "*" . 1...• 1.1.041.....• .41,00. labol101.1 •••••• ...1. PIS .11•••}11 .........04.n•n••nnn /3-2/8 WATERFORD TWP WI/2 SEC. 16 T.3N. R.9E. 13-9E 13-9F AGREEMENT NO. 98-0337 FED. PROJ. NO. B-26-0079-1498 AGENDA DAB AGREEMENT FOR A FEDERAL/STATE/LOCAL AIRPORT PROJECT UNDER THE BLOCK GRANT PROGRAM THIS AGREEMENT is made and entered into this date of , by and between the Michigan Department of Transportation, hereinafter referred to as the DEPARTMENT, and the Board of Commissioners of the County of Oakland, hereinafter referred to as the SPONSOR, for the purpose of fixing the rights and obligations of the parties in agreeing to the following undertaking at the Oakland County International Airport whose associated city is Pontiac, Michigan, hereinafter referred to as the PROJECT and estimated in detail on Exhibit 1, dated February 25, 1998, attached hereto and made a part hereof. Land Acquisition (Parcels 129, 130 and 225) in the West Runway Protection Zone as defined in Contract No. FM 63-01-Land as approved by the DEPARTMENT. WITNESSETH: WHEREAS, the PROJECT is eligible for federal funding pursuant the Airport and Airway Improvement Act of 1982 as amended and/or the Aviation Safety and Noise Abatement Act of 1979, and WHEREAS, the DEPARTMENT has received a block grant from the Federal Aviation Administration (FAA) for airport development projects, and WHEREAS, the DEPARTMENT is responsible for the allocation and management of block grant funds pursuant to the above noted act, NOW, THEREFORE, it is agreed: 1. The term PROJECT COST, as herein used, is defined in Attachment(s) 3. PROJECT COST shall also include administrative costs incurred by the DEPARTMENT in connection with the PROJECT. Administrative costs incurred by the SPONSOR are not an eligible PROJECT COST. 03/20/98 1 BLOCKGRANT The DEPARTMENT will not make payments for any PROJECT work prior to receipt of payment from the SPONSOR for the SPONSOR's share of that item of PROJECT work. 10. Make final accounting to the SPONSOR upon completion ofthe PROJECT, payment of all PROJECT COSTS, and completion of necessary audits. Any excesses or deficiencies will be returned to or billed to the SPONSOR. IT IS FURTHER AGREED: 11. The PROJECT COST participation is estimated to be as shown below and as in the attached Exhibit 1. Exhibit 1 is to be considered an estimate. The actual DEPARTMENT, FAA, and SPONSOR share of the PROJECT COST will be determined at the time of financial closure of the FAA grant. Federal share $450,000 Maximum DEPARTMENT share 25 SPONSOR share 49.97 Estimated PROJECT COST $500,000 12. The PROJECT COST shall be met in part with federal funds granted to the DEPARTMENT by FAA through the block grant program and by DEPARTMENT funds. Upon final settlement of costs, the federal funds will be applied to the eligible items of PROJECT COST at the rate of 90 percent up to the maximum obligation shown in Section 11 or as revised in the Budget Letter discussed in Section 14. The DEPARTMENT funds will be applied to the balance of the PROJECT COST at a rate of 50 percent for those items eligible for state participation up to the maximum obligation shown in section 11 or as revised in the Budget Letter. Any items of PROJECT COST not funded with FAA or DEPARTMENT funds will be the sole responsibility of the SPONSOR. 13. The SPONSOR hereby agrees the costs reported to the DEPARTMENT for this Agreement shall represent only those items which are properly chargeable in accordance with this Agreement. The SPONSOR also hereby certifies that it has read the Agreement terms and has made itself aware of the applicable laws, regulations, and terms of this Agreement that apply to the reporting of costs incurred under the terms of this Agreement. 14. The PROJECT COSTS shown in Section 11 are the maximum obligation of DEPARTMENT and federal funds under this Agreement. The maximum obligation of DEPARTMENT and federal funds may be adjusted to an amount less than the maximums shown in Section 11, through a budget letter issued by the DEPARTMENT. A Budget Letter will be used when updated cost estimates for the PROJECT reflect a change in the amount of funds needed to fund all PROJECT COSTS. The Budget Letter will be signed by the Administrator of the Airport Development Division of the Bureau of Aeronautics. 03/20/98 4 BLOCKGRANT $0 $0 Funding Contingencies $0 $0 EXHIBIT 1 OAKLAND COUNTY INTERNATIONAL AIRPORT PONTIAC, MICHIGAN Project No. B-26-0079-1498 25-Feb-98 Federal State Local Total ADMINISTRATION $450 $25 $25 $500 DEPARTMENT-AERO $450 $25 $25 $500 LAND $449,550 $0 $49,950 $499,500 Parcels 129, 130, & 225 Acquisition $310,500 $0 $34,500 $345,000 Consultant Fees $29,700 $0 $3,300 $33,000 Relocation $60,750 $0 $6,750 $67,500 Demolition $29,700 $0 $3,300 $33,000 Miscellaneous $18,900 $0 $2,100 $21,000 ENGINEERING $0 $0 $0 $0 AERO - Design $0 $0 $0 $0 Consultant - Design $0 $0 $0 $0 AERO - Const Supv $0 $0 $0 $0 Consultant - Const Supv $0 $0 $0 $0 CONSTRUCTION $0 $0 $0 $0 CONTINGENCIES $0 $0 $0 $0 TOTAL PROJECT BUD $450,000 $25 $49,975 $500,000 0 4 p•trl 0/ • 007 FISCAL NOTE (MSC. #98105) May 7, 1998 BY: FINANCE COMMITTEE, SUE ANN DOUGLAS, CHAIRPERSON IN RE: CENTRAL SERVICES - OAKLAND COUNTY INTERNATIONAL AIRPORT - 1998 GRANT PROGRAM ACCEPTANCE To the Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: Pursuant to Rule XII-F of this Board, the Finance Committee has reviewed the above referenced resolution and finds: 1. Oakland County has received a Michigan Department of Transportation Grant Project #c-26-0079-1297/1597/1498, for Federal funds in the maximum obligation of $3,512,758 and State funds in the amount of $257,497 for the development and improvement of Oakland County International Airport. 2. The project includes acquisition of approximately 1.67 acres with five (5) houses; rehabilitation of runway 9R/27L, taxiways, and terminal apron; fencing and relocation of the northeast taxiway/service drive. 3. The required County match in the amount of $243,248 is available in the Airport fund balance. 4. The Airport Committee has reviewed and approved the grant, subject to ratification by the Oakland County Board of Commissioners. 5. The following amendment be made to the FY 1998 Adopted Budget: 13-137201-00050-8005 Estimated Profit or Loss 13-137201-00050-2872 Grant Match $(243,248) 243.248 $ FINANCE COMMITTEE FINANCE COMMITTEE VOTE: Motion carried unanimously on a roll call vote. i Resolution #98105 May 7, 1998 Moved by Dingeldey supported by Powers the Planning and Building Committee Report be accepted. A sufficient majority having voted therefor, the report was accepted. Moved by Dingeldey supported by Powers the resolution be adopted. AYES: Garfield, Gregory, Huntoon, Jacobs, Jensen, Johnson, Kaczmar, Kingzett, Law, McCulloch, McPherson, Moffitt, Obrecht, Palmer, Powers, Schmid, Taub, Wolf, Amos, Coleman, Devine, Dingeldey, Douglas. (23) NAYS: None. (0) A sufficient majority having voted therefor, the resolution was adopted. STATE OF MICHIGAN) COUNTY OF OAKLAND) I, Lynn D. Allen, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on May 7, 1998 with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County of Oakland at Pontiac, Michigan this 7th day (4 May 199 LynA D. Allen, County Clerk