Loading...
HomeMy WebLinkAboutResolutions - 1999.04.29 - 25596s• : MISCELLANEOUS RESOLUTION #99098 April 20, 1999 BY: Finance Committee, Sue Ann Douglas, Chairperson IN RE: FACILITIES MANAGEMENT - FACILITIES AND OPERATIONS DIVISION AUTHORIZATION AND APPROPRIATION FOR MEDICAL CARE FACILITY RENOVATIONS To the Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: WHEREAS, renovations and improvements to the Medical Care Facility were approved as part of the 1999 Capital Improvement program, and WHEREAS, through the years the Pharmacy and Laboratory functions have expanded and the respective areas are overcrowded; and WHEREAS, the proposed renovations will relieve the overcrowded conditions by providing additional space; and WHEREAS, it is recommended the work be performed by in-house staff and outside contractors obtained through the Purchasing Division; and WHEREAS, the total project cost for the Medical Care Facility renovation is estimated to be $110,000 which includes contingency amounts; and WHEREAS, funding in the amount of $110,000 is available in the 1999 Capital Improvement Program in the building projects section. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners approves the renovation of the Medical Care Facility to meet the specific requirements of the occupants. BE IT FURTHER RESOLVED that funds in the amount of $110,000, available in the Capital Improvement Fund (401), be transferred to the Project Work Order Fund (404). Chairperson, on behalf of the Finance Committee, I move the adoption of the foregoing resolution. FINANCE COMMITTEE FINANCE COMMITTEE VOTE: Motion carried unanimously on a roll call vote. • O. OAKLAND COUNTY EXECUTIVE DEPARTMENT OF FACILITIES MANAGEMENT Authorization to Proceed and Appropriation of Funds for Medical Care Facility Renovations OVERVIEW: April 20, 1999 The Medical Care Facility Renovation project was tentatively approved by the Board of Commissioners as a part of the 1999 Capital Improvement Program and is listed in the Building Section as Item #12 at a preliminary estimated cost of $100,000. The Medical Care Facility was constructed in 1977 and included small Pharmacy and Laboratory areas to service the patients at the facility. Through the years, each function has expanded its area of responsibility to the point that additional space is needed for each operation to function efficiently. For example: Pharmacy: • Staff has increased from two (2) to six (6) personnel since 1977. • In addition to filling prescriptions for the Medical Care Facility patients, they now fill prescriptions for Jail inmates and Children's Village residents. • The growth In the number of prescriptions for the Jail and Children's Village has increased dramatically. • The opening of the Walled Lake Office Building has also increased demand for additional services. Laboratory: • The former laboratory at the Pontiac Health Center was consolidated at the Medical Care Facility several years ago with a nominal increase in space. • Additional work space is now required for: • DNA testing for chlamydia and gonorrhea. • Expanded work space for new chemistry unit (new equipment larger than old equipment). • Water testing equipment for a new program added in 1998. • Work space needed for new typist. • Existing conditions overcrowded. • Obtaining a new analyzer to test for glycohemoglobins to comply with new diabetic code. • Numerous new tests and equipment have been added through the years with no increase in space. The proposed renovations will increase the Laboratory area an additional 42% and provide a total of 1,708 square feet for this function. The Pharmacy will gain an additional 15% in area and provide a total of 770 square feet. ESTIMATED COST AND FUNDING: The total estimated cost of this project is: Pharmacy Laboratory Contingency Total Estimated Cost $ 11,000 90.000 9.000 $110,000 RECOMMENDATION: The proposed renovation be approved in the amount of $110,000, in The proposed renovation be performed by in-house staff and outside through the Purchasing Division. cluding contingency. contractors obtained Finance Committee Finance Committee Also, attached for the Committee's consideration, is a report to the recommending approval of the project and a copy of the proposed resolution for this project. Attachments PLANNING AN7 , DING COMMITTEE 9 APRIL 29, 1999 REPORT (Misc. #99098) BY: Planning and Building Committee - Charles E. Palmer, Chairperson RE: Medical Care Facility Renovations TO: OAKLAND COUNTY FINANCE COMMITTEE Chairperson, Ladies and Gentlemen: The Planning and Building Committee, having reviewed the need to renovate and expand the Medical Care Facility Pharmacy and Laboratory areas and the Department of Facilities Management Report dated April 20, 1999, recommends approval of the project. The Committee further recommends funding for the total project cost of $110,000, including contingency, be approved. Additionally, the Planning and Building Committee supports the attached Finance Committee Resolution. Chairperson, on behalf of the Planning and Building Committee, I submit the foregoing report. Planning and Building Committee Vote: Motion carried unanimously on a roll call vote. Resolution #99098 April 29, 1999 Moved by Douglas supported by Dingeldey the Planning and Building Committee Report be adopted. A sufficient majority having voted therefor, the report was accepted. Moved by Douglas supported by Dingeldey the resolution be adopted. AYES: Coleman, Devine, Dingeldey, Douglas, Galloway, Garfield, Gregory, Jensen, McPherson, Millard, Moffitt, Obrecht, Palmer, Patterson, Schmid, Sever, Suarez, Taub, Appel, Causey-Mitchell, Colasanti. (21) NAYS: None. (0) A sufficient majority having voted therefor, the resolution was adopted. 'TEBY A ty Executive Date , Brooks Patt CountyExecutIve Date / 0 HE FOREGO HE FOREGOING RESOLUTION STATE OF MICHIGAN) COUNTY OF OAKLAND) I, G. William Caddell, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on April 29, 1999 with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County of Oakland at Pontiac, Michigan this 29h daVof April, 1999. G. William Caddell, County Clerk