HomeMy WebLinkAboutResolutions - 1999.12.16 - 25694MISCELLANEOUS RESOLUTION 199348
BY: COMMISSIONER DONALD W. JENSEN, DISTRICT #15
IN RE; ENVIRONMENTAL INFRASTRUCTURE FUND REIMBURSEMENT FOR PROJECT IN THE CITY
OF BIRMINGHAM
TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS
Chairperson, Ladies and Gentlemen:
WHEREAS the Oakland County Board of Commissioners established an
Environmental Infrastructure Funds and Disbursement Policy per Miscellaneous
Resolution #99093 in an effort to increase the share of dollars flowing into
infrastructure projects for the County and its cities, villages and townships
(CVT's); and
WHEREAS pursuant to the Disbursement Policy, City of Birmingham has
submitted a resolution of authorization to the County for reimbursement of
expenses incurred in connection with an eligible environment remediation of
improvement project; and
WHEREAS the City of Birmingham is requesting reimbursement for work
related to improving the combined sewer systems connected to the Ridgedale
Ave. and Chester St. Paving Project, hopefully reducing basement back-ups; and
WHEREAS the City of Birmingham has requested reimbursement from the
County in the amount of $118,027.36 for this particular project; and
WHEREAS the current authorized amount of funding for the City of
Birmingham is $118,027.36 from the Environmental Infrastructure Fund as
repayment to the City of Birmingham for expenses incurred in connection with
environmental remediation or improvement projects.
NOW THEREFORE BE IT RESOLVED that the Oakland County Board of
Commissioners approves the improving the combined sewer systems connected to
the Ridgedale Ave. and Chester St. Paving Project as eligible for
reimbursement from the Environmental Infrastructure Fund.
BE IT FURTHER RESOLVED that the Board authorizes the release of funds in
the amount of $118,027.36 from the Environmental Infrastructure Fund (Account
4#90-263234-41000-3985)as repayment to the City of Birmingham for expenses
incurred in connection with environmental remediation or improvement projects.
Chairperson, I move the adoption of the foregoing resolution.
City of Birmingham
151 Martin Street
P.O. Box 3001
Birmingham, Michigan 48012-3001
Off ices 248) 644 -180(1 FAX 2481 644-5614
November 18. 1999
Mr. Thomas Ott
Manager
Oakland Co. Fiscal Services Division
1200 N. Telegraph Rd.
Pontiac, MI 48341
RE: Environmental Infrastructure Fund Reimbursement Request
Our Contract #3-99(P)
Dear Mr. Ott,
Pursuant to Oakland County Board of Commissioners Miscellaneous Resolution (MR)
99093, the City of Birmingham hereby requests reimbursement under Oakland
County's Environmental Infrastructure Fund Program for expenses incurred in
connection with an eligible environmental remediation or improvement project
undertaken by our City.
The project is known as the Ridgedale Ave. and Chester St. Paving Project, Contract
#3-99(P). Essentially, all of Ridgedale Ave. and one block of Chester St. had their
pavements improved as a special assessment district, at the request of the adjacent
residents. The improvement entailed installing a permanent pavement in place of the
original gravel and chip sealed road. As we routinely do, the City chose to improve the
combined sewer systems on both streets to accommodate the 10-year storm design
criteria. On Ridgedale Ave., 8" dia. combined sewers were replaced with 15" or 18"
dia. sewers. On Chester St., a 36" dia. sewer supplemented an existing 15" combined
sewer. In both areas, existing buildings in the adjacent and upstream areas will be
significantly less prone to basement backup issues as a result of these improvements.
Attached you will find the itemized pay estimate for this project, detailing different
costs that have been incurred to date. Item Numbers 22, 23, and 24 demonstrate
expenses incurred by the City in excess of our allotment. S118.027.36. Note that the
City's sewer fund was scheduled to pay for these sewer expenses, not the special
assessment district.
Also attached is a copy of the applicable resolution passed by our City Commission.
The City of Birmingham understands that the review and processing of this
reimbursement request will be governed by the provisions of MR99093, and certifies
that all expenses submitted for reimbursement were incurred with a qualifying
environmental remediation or improvement project.
If you have any questions, feel free to contact me at 248-644-3865.
Sincerely,
Paul T. O'Meara, P.E.
Assistant Director of Engineering
The following motion was adopted by the Birmingham City Commission on November
15. 1999
MOTION: Motion by Wooley, seconded by Chafetz:
WHEREAS, upon the recommendation of the Oakland County Executive, the Oakland
County Board of Commissioners has established an Environmental Infrastructure Fund
Program to assist Oakland County cities, villages and townships in addressing clean
water and storm water needs, and
WHEREAS, Oakland County's Environmental Infrastructure Fund Program authorizes
Oakland County cities, villages and townships to apply for reimbursement of eligible
expenses incurred in connection with environmental remediations or improvements
relating to ground and/or surface water, water supply, sewer and/or drainage systems
and/or water pollution control efforts incurred as part of a city, village or township road
project; and
WHEREAS, THE City of Birmingham, Oakland County, Michigan has incurred
expenses in connection with an environmental remediation or improvement project
believed to be eligible for reimbursement under Oakland County's Environmental
Infrastructure Fund Program.
NOW, THEREFORE, BE IT RESOLVED that this commission authorizes and directs its
city manager, as agent for the City of Birmingham, in the manner and to the extent
provided for under Oakland County Board of Commissioners miscellaneous resolution
99093, to request reimbursement of $118,027.36 under Oakland County's Environmental
Infrastructure Fund Program.
I, Judith A. Berm, Clerk of the City of Birmingham, do hereby certify that the foregoing
resolution was adopted by the Birmingham City Commission at their regular meeting
held Monday, November 15, 1999.
AtL cL
Ju th A. Berm
CI y Clerk
'NeU-22-1999 16:21 CITY OF EIRMINGHPM
24665409757 P.02/04
CITY OF BIRMINGHAM
ENGINEERING DEPARTMENT
APPLICATION AND CERTIFICATE FOR PAYMENT
CONTRACT: 3-99(P) FOR WORK COMPLETED BY: SEPTEMBER 18, 1999
RIDGEDALE AVENUE & CHESTER STREET PAVING
ESTIMATE # 3
•
PLAN UNIT TOTAL QTY QTY
# ITEM OF WORK UNIT QTY PRICE PRICE THIS COM- AMOUNT
S $ EST. PLETE $
I Remove Concrete Curb & Gutter LFT 190 $8.00 51,520.00 275 415 53,320.00
2,Remove Conc Pvmnt/Approach SYD 366 56.00 52,196.00 186 285 $1,710.00
3 Remove Cone Sidewalk or Ramp SFT 3808 $0.60 52,284.80 3050 3900 52,340.00 +- 4 Removing Tree, CI. 1 EA 2 5350.00 $700.00 0 o' 50.00
5 Removing Tree, CL 3 EA 1 $1 000.00 51,000.00 o 0 $0.00
6,Remove Structure EA j 10 $250.00 52,500.00 9 11 $2,750.00
, 7 'Abandon Structure EA 2 $200.00 5400.00 o 0 $0.00
a Inlet Filter EA 21 51.00 $21.00 0 o 50.00
9 Inlet Sediment Pit EA 20 $1.00 520.00 0 0 $0.00
10 Excavation CYD 1780 $16.00 528,480.00 850 1200 519,200.00
11 Subgrade Undercutting CYD 380 528.00 510,640.00 100 100 52,300.00
12 Aggregate Base, 2IAA TON 96 $18.00 51,728.00 12 108 51,944.00
13 Conc Curb/Gutter, Birm Roll Curb LFT 4620 $7.50 $34,650.00 3280 46201 S34,650.00
14 Bit Mix No. 700,20C TON 1285 526.58 534,155.30 777 777 520,652.66
15 Bit Mix # 1100L, 20AA, Leveliris TON 551 532.10 517 687.10 219 219 57.029,90
16 Bit Mix # 11001, 20AA, Wearing TON 551 S42.00 523,142.00 143 143 56,006.00
17 Bit Mix it 1100L, 20AA, Drives TON 19 572.00 51,368.00 20 20 S1,440.00
18 Bit Mix 0/ 1100T, 20AA, Drives TON 44 572.00 53,168.00 35 35 52,520.00
-----t 19 Concrete Drive Approach SYD 535 530.50 516,317.50 313 482 314,701.00
20 Concrete Sidewalk or Ramp, 4" SFT 3923 $2.50 $9,807.50 2680 3530 58,825.00 _,---
21 Concrete Sidewalk, 6" SFT 2195 $3.50 $7,682.50 1376 1976 56,916.00
22 C-76-rv RCP Sewer, 36" LFT 642 $99.00 $63,558.00 11 644 563,756.00
23 C-76-IV RCP Sewer, 18" LFT 488 $89.00 543,432.00 147 492 543,788.00
24 C-76-1V RCP Sewer, 15" LFT 630 566.00 541,580.00 660 660 543.560.00
25 C-76-IV RCP Sewer, 12" LFT 458 $36.00 $16,488.00 0 515 $18,540.00
Page 1
1.41=U-22-13S 16: 22 CITY OF BIRMINGHPM 24E65409757 P.03/04
PLAN UNIT TOTAL QTY QTY
ITEM OF WORK UNIT QTY PRICE PRICE THIS COM- AMOUNT s s EST. PLETE s
26 PVC Schedule 40 Sewer, 8" LFT 10 540.00 $400.00 51 98 53,920.00
PVC Schedule 40 Sewer, 6"
27 (Beyond 10') LFT 160 540.00 56,400.00 0 13 5520.00
28 30" Casing Pipe, Bore & Jack LFT 16 $200.00 $3,000.00 10 10 52,000.00
29 Inlet, 2' Diameter EA 6 $1,250.00 $7,500.00 12 $15,000.00
30 Catch Basin, 4' Diameter EA 14 $1,400.00 $19,600.00 6 8 $11,200.00
31 Drainage Structure, 4' Diameter EA 4 $1,375.00 $5,500.00 6 6 $8,250.00
32 Drainage Structure, 6' Diameter EA 7' $1,650.00 511,550.00 2 7 $11,550.00
33 Sewer Tap, 36" EA 1 $750.00 $750.00 o 1 $750.00
34 Sewer Tap, 18" EA 3 51,220.00 53,660.00 0 3 $3,660.00
35 Sewer Tap, 15' EA 1 5450.00 $450.00 1 I 5450.00
36 Sewer Tap, 12" EA 6 5300.00 S1,800.00 6 6 51.800.00
37 Sewer Bulkhead, 18" EA 2 $200.00 $400.00 3 3 5600.00
38 Sewer Bulkhead, 12" EA 1 5150.00 $150.00 1 1 5150.00
9 Sewer Bulkhead, 8" EA 3 5125.00 5375.00 12 30 53.750.00
40 Sewer Point Repair, 8" LFT 12 525.00 5300.00 18 18 S450.00
41 Abandon Sewer, 8" (Grout Full) LFT 27 55.00 $135.00 0 0 50.00
42 Lower Existing 12" Water Main EA I S500.00 $500.00 0 1 $500.00
43 Relay Existing Sewer Lead jLFT 80 $30.00 $2,400.00 98 178 55,340.00
44 Adjusting Structure Cover EA 19 5375.00 $7,125.00 2 11 54,125.00
45 Reconstructing Structure VFT 28 $250.00 57,000.00 0 4 51,000.00
46 Sawcut Existing Sidewalk LFT 155 $2.00 5310.00 95 250 5500.00
47IRcmove and Re • lace Casting EA 3 $475.00 $1,425.00 0 2 5950.00
48 Remove and Replace Hydrant EA , 1 52,500.00 $2,500.00 0 1 52,500.00
f 49 R & R Traffic Signal Loops LS 1 $1,000.00 $1,000.00 0 0 50.00
50 R & R Existing Wood Guardrail LFT 37 $10.00 $370.00 1 1 510.00
51 R & R Brick Walk SFT 20 $20.00 5400.00 20 20 S400.00
52 Sign, Type LIT EA 4 530.00 $120.00 0 0 $0.00
53 Steel Post, 3 Pound LFT 20 58.50 $170.00 0 0 $0.00
54 Topsoil Surface, 2" S'YD 3197 50.90 52,877.30 800 SOO $720.00
55 Chemical Fertilizer Nutrient LBS 35 59.00 $315.00 0 0 S0.00
56 Class A Seeding LBS 45 516.00 $720.00 0 0 50.00
57 Class A Soddin • SYD 3197 $3.20 $10,230.40 800, 800 52,560.00
58 Internal Sewer Inspection LFT 1760 $2.50 $4,400.00 0 0 $0.00 '
59 Sewer & Water Main Allowance LS 1 515,000.00 515,000.00 -0.3 0 $0_00
60 Traffic Maintenance & Control LS 1 59,750.00 $9,750.00 0.60 1 $9,750.00
61 Inspector Crew Days DAYS, 41 $240.00 $9,840.00 16 41 $9.840.00
Page 2
NOV-22-1999 1622 CITY OF BIRMINGHAM 24885409757 P. 04/04 airnNP
PLAN UNIT TOTAL QTY QTY
# ITEM OF WORK UNIT QTY PRICE PRICE THIS COM- AMO . 5 S EST. • PLETE S
E-1 Time & Material Chester LS S5,320.59 $5,320.59 1 1 $5,320.59 n , 4
E-2 Add Depth Sewer Tap Ridgedale LS 5603.75 ' 1 1 5603.75
E-3 Stump Removal EA 5200.00 5200.00 3 3 5600.00
E-4 8" Sewer Taa__ EA $0.00 $0.00 1 2, 2 $0.00
E-5 Re-hook Water Service EA 50.00 50.00 1 1 $0.00 _
E-6 Sewer Bulkhead 6" EA . 50.00 50.00 . 17_ 17 $0.00
.E-7' 6" Sewer Tap EA $0.00 50.00 „ 3 3, $0.00