Loading...
HomeMy WebLinkAboutResolutions - 2001.02.22 - 26377Ridge receives the $55,275.89 allocation, no further the Environmental Infrastructure Fund will be made recommends adoption of the resolution. FISCAL REPORT (M.R. #01027) February 22, 2001 BY: FINANCE COMMITTEE, SUE ANN DOUGLAS, CHAIRPERSON IN RE: ENVIRONMENTAL INFRASTRUCTURE FUND REIMBURSEMENT FOR PROJECT IN THE CITY OF PLEASANT RIDGE - OPTIONAL ACCELERATED PAYMENT SCHEDULE ALLOCATION TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Chairperson, Ladies and Gentlemen: The Finance Committee, having reviewed the above referenced resolution, reports as follows: 1. $55,275.89 is available in the Environmental Infrastructure Fund, under the Optional Accelerated Payment Schedule, to provide to Pleasant Ridge for this project; no additional appropriation is required. 2. Once Pleasant payments from to the city. 3. The Committee Chairperson, on behalf of the Finance Committee, I move acceptance of the foregoing report. FINANCE COMMITTEE FINANCE COMMITTEE: Motion carried unanimously on a roll call vote with Palmer absent. MISCELLANEOUS RESOLUTION #01027 BY: COMMISSIONER MICHELLE FRIEDMAN-APPEL, DISTRICT #23 IN RE; ENVIRONMENTAL INFRASTRUCTURE FUND REIMBURSEMENT FOR PROJECT IN THE CITY OF PLEASANT RIDGE - OPTIONAL ACCELERATED PAYMENT SCHEDULE ALLOCATION TO THE OAKLAND COUNTY BOARD OF COMMISSIONERS Chairperson, Ladies and Gentlemen: WHEREAS the Oakland County Board of Commissioners established an Environmental Infrastructure Funds and Disbursement Policy per Miscellaneous Resolution #99093 in an effort to increase the share of dollars flowing into infrastructure projects for the County and its cities, villages and townships (CVTs); and WHEREAS pursuant to M.R. #00035, the Board of Commissioners modified the Environmental Infrastructure Funds Disbursement Policy by authorizing an Optional Accelerated Payment Schedule by which communities may request their remaining years payment in advanced, at a discounted rate, with the knowledge that no further payments will be made from the Environmental Infrastructure Funds; and WHEREAS pursuant to the Modified Disbursement Policy, Pleasant Ridge has requested use of the Optional Accelerated Payment Schedule to defer the costs associated with the Millington Road Water Main and Pavement Replacement Project; and WHEREAS the Optional Accelerated Payment Schedule authorized amount of funding for Pleasant Ridge is $55,275.89 from the Environmental Infrastructure Fund. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners approves the projects submitted by the City of Pleasant Ridge as eligible for reimbursement from the Environmental Infrastructure Fund. BE IT FURTHER RESOLVED that the Board authorizes the use of the Optional Accelerated Payment Schedule to pay Pleasant Ridge the amount of $55,275.89 from the Environmental Infrastructure Fund (Account #90-263251-41000-3985). No further payments from the Environmental Infrastructure Fund will be made to the City of Pleasant Ridge after receipt of the $55,275.89. Chairperson, I move the adoption of the foregoing resolution. Sincerely, &14.- Sherry V. Ball City Manager 23925 Woodward Avenue • Pleasant Ridge, Michigan 48069 248-541-2900 • Fax 248-541-2504 RECYCLED PAPER City of Pleasant (Ridge January 9, 2001 Mr. Thomas Ott, Manager Oakland County Fiscal Services Division 1200 North Telegraph Road Pontiac, Michigan 48341 Re: Environmental Infrastructure Fund Reimbursement Request Dear Mr. Ott: Pursuant to Oakland County Board of commissioner Miscellaneous Resolution (MR) 99093, the City of Pleasant Ridge hereby requests reimbursement under Oakland County's Environmental Infrastructure Fund Program for expenses incurred in connection with an eligible environmental remediation or improvement project undertaken by the City. Attached in support of this request are the following: 1. ATTACHMENT A: PROJECT DESCRIPTION 2. ATTACHMENT B: GOVERNING BODY RESOLUTION 3. ATTACHMENT C: EXPENSE INVOICES The City understands that the review and process of this reimbursement request will be governed by the provisions of MR 99093, and certifies that all expenses submitted for' reimbursement were incurred in connection with a qualifying environmental remediation or improvement project. Thank you for your assistance. Should you have any questions, please feel free to contact me. Cc: County Commissioner, District 23 City of Pleasant Ridge RESOLUTION INFRASTRUCTURE FUND EXPENSE REIMBURSEMENT REQUEST WHEREAS, upon the recommendation of the Oakland County Executive, the Oakland County Board of Commissioners has established an Environmental Infrastructure Fund Program to assist Oakland County cities, villages and townships in addressing clean water and storm water needs; and WHEREAS, Oakland County's Environmental Infrastructure Fund Program authorizes Oakland County cities, villages and townships to apply for reimbursement of eligible expenses incurred in connection with enviromtental remediations or improvements relating to ground and/or surface water, water supply, sewer and/or drainage systems and/or water pollution control efforts incurred as part of a city, village or tOwnship road project; and WHEREAS, the City of Pleasant Ridge, Oakland County, Michigan has incurred expenses in Connection with environmental remediation or improvement project(s) believed to be eligible for reimbursement under Oakland County's Environmental Infrastructure Fund Program. NOW, THEREFORE BE IT RESOLVED, that the Pleasant Ridge City Commission authorizes and directs its City Manager, in the manner and to the extent provided for under Oakland County Board of Commissioners Miscellaneous Resolution 99093, to request reimbursement of eligible environmental remediation for improvement project expenses under Oakland County's Environmental Infrastructure Fund Program. I, Sherry W. Ball, being the duty certified Clerk of the City of Pleasant Ridge, Oakland County, Michigan, do hereby certify that the aforementioned is a true and accurate copy of a Resolution adopted by the City Commission of the City of Pleasant Ridge at the Regular Meeting held Tuesday, November 14, 2000. Sherry Wi Ball, City Clerk RECYCLED PAPER 23925 Woodward Avenue • Pleasant Ridge, Michigan 48069 248-541-2900 • Fax 248-541-2504 IP • 1•1 0.' RECYCLED PAPER City of Pleasant Ridge MILLINGTON ROAD — WATER MAIN AND ROAD RECONSTRUCTION PROJECT PROJECT DESCRIPTION The City of Pleasant Ridge, as part of its twenty-year infrastructure improvement plan, recently completed the Millington Road Water Main and Pavement Replacement project. The water main replacement project included 980 LF of 8" diameter water main, which rims along the entire length of Millington Road and connects at Woodward Avenue at the east end and Ridge Road to the west. Abandonment of the existing water main was done in strict compliance with the State of Michigan Health Department permit. The new water main was tested and approved prior to service transfers being completed and new fire hydrants were in service. This total cost of this improvement project is approximately $92,111.98. This does not include the cost of inspection or engineering associated with the project. DATE: 12/01100 ANDERSON ECKSTEIN & WESTRICK 51301 SCHOENHERR ROAD SHELBY TOWNSHIP,MICHIGAN 48315 CONSTRUCTION ESTIMATE AEW PROJECT NO. Name and Location: CONTRACT DATE: 175-031 MILUNGTON ROAD WATER MAIN AND PAVEMENT REPLACEMENT 3/24/00 COMPLETION DATE: 11/15100 CONTRACTOR: FLORENCE CEMENT COMPANY INC. Address: 1970 Brinston Drive, Troy, MI 48083-2276 OWNER: CITY OF PLEASANT RIDGE Address: 23925 Woodward Ave., Pleasant Ridge, MI 48069 ITEM OF WORK Bonds, Insurance and Initial Setup Expense (Max. 3% of Bid) 2 ItrifgarleViefliint-- Removing Sidewalk Removing Concrete Drive Aprons Removing Fite Hydrants Abandon Existing Water Main Abandon Gate Valve and Well 8" Die. Ductile Iron, CL54 Water Main, Trench Detail G 8" Die. Ductile Iron, CL 54 Water Main, Bore and Case 10' Die. Ductile iron, CL54 Water Mein, Trench Detail G 12" Die. Ductile iron, CL54 Water Main, Trench Detail G 8" DI.. Gate Valve and Well Standard Fire Hydrant Assembly Adjust Water Shut Off Box Long Side Service Replacement ( Bore Method ) Short Side Service Replacement 4" Die. Perforated Underdrain 12" Die. C76-CLIV Storm Sewer, Premium Joint, Trench Del. B Sewer Tap, 12" Die. 3' Dia. Catch Basin with 24" Sump and 10" Die. Sewer Trap Subgrade Undercutting, Type II Adjust Drainage Structure Cover Class II Granular Subbase 8" Thick, 27' b/b Nonreinf. Concrete Pavement viler 35P, 6 Sack Mix 6' Thick Nonreinf. Concrete Drive Aprons, Grade 35P, 6 Sack Mix Drainage Structure Covers 4' Thick Concrete Sidewalk 6' Thick Concrete Sidevadk 8" Sidewalk Ramps Cement, Type 1A 6" DI.. PVC Sanitary Sewer Lead (Sch. 40) Repair/Replacement) Station Grading 3' Topsoil Surface and Class 'A" Sod Soil Erosion and Sedimentation Control Barricade, Type II, (Plastic Drum) Lighted, Furnished, Operated Barricade, Type III, Lighted, Furnished, Operated Lighted Arrow, Type B, Furnished, Operated Temp. Pavement Marking, Type R (rape), 4" White Sign, Type B, Temp., (Special) Sign, Type B, Temporary Anal T.V. Inspection and Log Inspection of Material and Work to be Performed (Crew Days) Remove and Replace the Woodward Ave. Pavement Remove and Replace the Ridge Road Pavement Remove and Replace Concrete Curb and Gutter Estimate No. 4 (FINAL) WORK COMPLETED FROM: 10/31/00 to 11/15100 CONTRACT AMOUNT: $268,865.15 REVISED TO: $251,371.88 I ()tilos! I Quantities I Quantities I I Unit I Estimated I Last I Completed I Unit I Amount Used I Quantities I Period I to Date I Noe I I I I I I L.S. 1.00 1.00 1.00 7,000.00 7,000.00 S.Y. 2,758.00 2,696.60 2,696.60 4.50 12,134.70 S.F. 4,650.00 4,420.70 4,420.70 0.50 2,210.35 S.F. 1,870.00 1,829.70 1,829.70 0.70 1,280.79 EA. 2.00 2.00 2.00 360.00 720.00 LS. 1.00 1.00 1.00 850.00 850.00 EA. 2.00 2.00 2.00 345.00 890.00 L.F. 785.00 965.30 965.30 43.50 41,990.55 L.F. 165.00 0.00 0.00 43.50 0.00 L.F. 16.00 0.00 0.00 165.00 0.00 IF. 12.00 9.70 9.70 240.00 2,328.00 EA. 2.00 2.00 2.00 3,175.00 6,350.00 EA. 2.00 2.00 2.00 2,400.00 4,800.00 EA. 1.00 1.00 1.00 100.00 100.00 EA. 10.00 7.00 7.00 690.00 4,830.00 EA. 10.00 9.00 9.00 400.00 3,800.00 L.F. 160.00 0.00 0.00 5.75 0.00 L.F. 68.00 72.00 72.00 34.00 2,448.00 EA. 4.00 4.00 4.00 130.00 520.00 EA. 4.00 4.00 4.00 1,200.00 4,800.00 C.Y. 125.00 0.00 0.00 18.00 0.00 EA. 3.00 3.00 3.00 150.00 450.00 TON 350.00 305.60 305.60 8.00 2,444.80 S.Y. 2,715.00 2,726.80 2,726.80 27.25 74,305.30 S.F. 1,915.00 2,111.40 2,111.40 2.85 6,017.49 LBS. 1,200.00 1,200.00 1,200.00 1.20 1,440.00 S.F. 2,895.00 4,493.00 4,493.00 2.30 10,333.90 S.F. 1,655.00 725.00 725.00 2.85 2,068.25 S.F. 100.00 19.80 19.80 4.10 81.18 SACKS 10.00 0.00 0.03 10.00 0.00 L.F. 250.00 62.00 62.00 50.00 3,100.00 L.F. 882.00 882.00 882.00 13.75 12,127.50 S.Y. 950.00 1,423.90 1,423.90 9.40 13,384.66 L.S. 1.00 0.00 0.00 500.00 0.00 EA. 45.00 45.00 45.00 36.00 1,820.00 EA. 8.00 9.00 9.00 93.00 837.00 EA. 1.00 1.00 1.00 1,550.00 1,550.00 L.F. 210.00 200.00 200.00 3.35 870.00 S.F. 50.00 72.00 72.00 5.15 370.80 S.F. 94.00 88.00 88.00 3.10 272.80 L.F. 745.00 0.00 0.00 1.00 0.00 DAY 48.00 30.50 30.50 445.00 13,572.50 S.Y. 35.00 20.50 20.50 85.00 1,742.50 S.Y. 48.00 59.90 59.90 60.00 3,594.00 L.P. 30.00 27.50 27.50 18.75 515.83 I.R.C., Grade Unit Used I Each Each LSUM 0.00 0.00 0.00 2.00 2.00 1.00 2.00 2.00 1.00 DATE: 12/01/00 ANDERSON ECKSTEIN & WESTRICK 51301 SCHOENHERR ROAD SHELBY TOWNSHIP,MICHIGAN 48315 CONSTRUCTION ESTIMATE AEW PROJECT NO. Name and Location: CONTRACT DATE: 175-031 MILUNGTON ROAD WATER MAIN AND PAVEMENT REPLACEMENT 3/24/00 COMPLETION DATE: 11/15/00 CONTRACTOR: FLORENCE CEMENT COMPANY INC. Address: 1970 Brinston Drive, Troy, MI 48083-2276 OWNER: cry OF PLEASANT RIDGE Address: 23925 Woodward Ave., Pleasant Ridge, MI 48069 ITEM OF WORK EXTRAS: Long side 1-112" service replacements Furnish and install cleanouts Ridge Road tie in 10" in lieu of 8" Estimate No. 4 (FINAL) WORK COMPLETED FROM: 10/31/00 to 11/15/00 CONTRACT AMOUNT: $268,865.15 REVISED TO: $251,371.88 Original I Quantities I Quantities Estimated I Last I Completed I Quantities I Period I to Date I , 1,400.00 270.00 883.18 Unit Price Amount 2,800.00 540.00 883.18 REMARKS: ANDERSON, ECKSTEIN AND WESTRICK, INC. Total Amount Earned Less 0.00% RETAINED Less 0.00% FOR WATER MAIN NOT IN SERVICE Less 0.00% FOR UNCOMPLETED RESTORATION Less 30.5 CREW DAYS Al $445.00 /CREW DAY Net Amount Earned Less Previous Estimate Plus 17.5 Crew Days under Contract amount 8445.00/C1 FINAL AMOUNT DUE 251,371.88 0.00 0.00 0.00 13,572.50 237,799.38 227,799.38 7,787.50 17,787.150 Prepared by Date We have reviewed this final estimate and agree with all final quantities. CONTRACTOR: FLORENCE CEMENT COMPANY INC. Authorized by Date 2 Resolution #01027 February 1, 2001 The Chairperson referred the resolution to the Finance Committee. There were no objections. FORE0' _ . Brooks POton. County Exectitive )?0,41 I HEREBY Resolution #01027 February 22, 2001 Moved by Taub supported by Moss the resolutions on the Consent Agenda be adopted (with accompanying reports being accepted and appointments being confirmed). AYES: Appel, Brian, Buckley, Causey-Mitchell, Crawford, Dingeldey, Douglas, Galloway, Garfield, Gregory, McPherson, Melton, Millard, Moss, Patterson, Sever, Suarez, Taub, Webster, Amos. (20) NAYS: None. (0) A sufficient majority having voted therefore, the resolutions on the Consent Agenda were adopted, with accompanying reports being accepted and appointments being confirmed. pr-r. ori I IrIcM1 2/2-6ki Data STATE OF MICHIGAN) COUNTY OF OAKLAND) I, G. William Caddell, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on February 22, 2001 with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the County of Oakland at Pontiac, Michigan this 22nd day qf February, 2001.