Loading...
HomeMy WebLinkAboutResolutions - 2020.04.29 - 33133MISCELLANEOUS RESOLUTION #20120 April 29, 2020 BY: Commissioner David T. Woodward, Chairperson, Emergency Operations and Oversight Committee IN RE: WATER RESOURCES COMMISSIONER — RESOLUTION TO AUTHORIZE ADVANCE FROM LONG-TERM REVOLVING FUND TO THE VILLAGE OF LAKE ORION FOR REPLACEMENT OF ITS SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM To the Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: WHEREAS the Village's Sewage Disposal System is served by 16 sanitary sewer lift stations throughout the Village; and WHEREAS each lift station is connected to a series of Supervisory Control and Data Acquisition (SCADA) units which provide critical "real time" information about the status and operation of each lift station; and WHEREAS the existing SCADA system is a complex network of radios, servers, and computers utilized to monitor the operations of the sanitary sewer system; and WHEREAS the SCADA system is designed to provide site-specific alarms to Oakland County's Safety Dispatch, which is staffed at all times, 24 -hours per day, seven days per week; and WHEREAS the existing SCADA system is more than 20 years old having been installed during the 1990s; and WHEREAS the existing SCADA system is dependent on outdated equipment and technology that is no longer supported by the manufacturer; and WHEREAS the Village's existing SCADA system will be decommissioned in October 2020 and replaced with the new system identical to systems that have been installed in all of the other Oakland County municipalities where the SCADA systems are operated and maintained by the Oakland County Water Resources Commissioner's office; and WHEREAS the Village's existing SCADA system must be upgraded to allow uninterrupted and continuing service to its residents; and WHEREAS the cost of upgrading the system is estimated to be $350,800; and WHEREAS the Village of Lake Orion desires to borrow $300,000 from Oakland County's Long -Term Revolving Fund; and WHEREAS Miscellaneous Resolution No. 02019 authorized that monies be made available for loans to local units for amounts up to $150,000 and exception is being requested to authorize a loan to the Village of Lake Orion for the replacement of its SCADA System in an amount not to exceed $300,000; and WHEREAS Miscellaneous Resolution No. 89276 states that an interest rate no less than the prevailing six- month Treasury Bill rate should be charged. The six-month Treasury Bill rate is quite a bit lower than the average interest rate from the Treasurer's pooled investments and therefore the rate to be charged will be the last published Treasurer's pooled investment average monthly rate for the month of February 2020 is 1.784 percent; and WHEREAS the loan will be repaid over alive -year period with funds generated from rates paid by customers of the Village of Lake Orion sewage disposal system; and WHEREAS funding is currently available in the Long -Term Revolving Fund to issue a loan in the not to exceed amount of $300,000 to the Village of Lake Orion. NOW THEREFORE BE IT RESOLVED that the Board of Commissioners of the County of Oakland, Michigan, as follows: 1. The Board hereby authorizes the advance from the County's Long -Term Revolving Fund to the Village of Lake Orion in an amount not to exceed $300,000 to pay the costs of replacement of its SCADA system, such advance to be repaid by the Village in annual principal installments over a period not to exceed five years from the date of the advance with interest on the unpaid balance from time to time as a rate to be determined by the Chairperson of the Board and County Clerk which determination shall be evidenced by their signatures on the hereinafter described contract. 2. The advance shall be repaid from the revenue of rates assessed against customers of the Village's sewage disposal system and shall be further secured by the full faith and credit of the Village. The Village may prepay principal installments in whole or in part on any date without penalty. EMERGENCY OPERATIONS AND OVERSIGHT COMMITTEE VOTE: Motion carried unanimously on a roll call vote. 3. The Chairperson of the Board and the County Clerk are hereby authorized to execute and deliver a contract with the Village for the advance of money by the County and repayment by the Village as described in this resolution, and such contract is hereby approved. The contract may be executed in counterparts, each of which shall be an original and all of which shall constitute but one and the same instrument. 4. The contract shall be approved by the County Department of Corporation Counsel prior to its effectiveness. 5. All resolutions and parts of resolutions insofar as they conflict with the provisions of this resolution are rescinded. BE IT FURTHER RESOLVED that no budget amendment is required. Chairperson, on behalf of the Emergency Operations and Oversig mmittee, I m the ad tion of the foregoing resolution. J Commissioner David T. Woodward, District 19 Chairperson, Emergency Operations and Oversight Committee CONTRACT FOR ADVANCEMENT OF FUNDS THIS CONTRACT FOR ADVANCEMENT OF FUNDS (hereinafter the "Contract"), dated as of the day of 2020, is between the COUNTY OF OAKLAND, a Michigan constitutional corporation ("County"), whose address is 1200 N. Telegraph, Pontiac, Michigan 48341 and the VILLAGE OF LAKE ORION, a Michigan municipal corporation, whose address is 21 East Church Street, Lake Orion, Michigan 48362 ("Village"). In this Agreement, either the County and/or the Village may also be referred to individually as a 'Party" or jointly as "Parties." Recitals: WHEREAS the Village's Sewage Disposal System is served by 16 sanitary sewer lift stations throughout the Village; and WHEREAS each lift station is connected to a series of Supervisory Control and Data Acquisition (SCADA) units which provide critical "real time" information about the status and operation of each lift station; and WHEREAS the existing SCADA system is a complex network of radios, servers, and computers utilized to monitor the operations of the sanitary sewer system; and WHEREAS the SCADA system is designed to provide site-specific alarms to Oakland County's Safety Dispatch, which is staffed at all times, 24 -hours per day, seven days per week; and WHEREAS the existing SCADA system is more than 20 years old having been installed during the 1990s; and WHEREAS the Village intends to undertake a Project to replace its existing SCADA system which has been determined to be necessary and conducive to public health, convenience and welfare and necessary to the protection of the public health in the Village; and WHEREAS the existing SCADA system is dependent on outdated equipment and technology that is no longer supported by the manufacturer; and WHEREAS the Village's existing SCADA system will be decommissioned in October 2020 and replaced with the new system identical to systems that have been installed in all of the other Oakland County municipalities where the SCADA systems are operated and maintained by the Oakland County Water Resources Commissioner's office; and WHEREAS the Village's existing SCADA system must be upgraded to allow uninterrupted and continuing service to its residents; and WHEREAS the cost of upgrading the system is estimated to be $350,800.00; and WHEREAS the Village of Lake Orion desires to borrow $300,000.00 from Oakland County's Long -Term Revolving Fund; and WHEREAS pursuant to Miscellaneous Resolution #92252, the Board of Commissioners of the County (the "Board") established a Long -Term Revolving Fund for the purpose of providing financing for specific capital projects as approved by the Board with the funds advanced being recovered through special assessments, or contracts with municipalities or drainage districts; and WHEREAS in order for the Village to replace its existing SCADA system in the most efficient manner and at the lowest possible cost, the parties hereto have determined that the County shall advance $300,000.00 from the County's Long -Term Revolving Fund to the Village to pay costs of the Project, such advance to be repaid to the County with interest as set for this contract; and WHEREAS the advance will be repaid by the Village from the rates collected by the Village and will be further secured by the full faith and credit of the Village. NOW, THEREFORE, the parties hereto agree as follows: 1. Advance of Countv Funds. The County shall advance $300,000.00 to the Village on the day of , 2020, or such earlier date as determined by the County Water Resources Commissioner, to finance the Project. The Village shall apply such money to pay for costs of constructing the Project in accordance with applicable proceedings for the Project. 2. Renavment of Advance by the Villaee. The Village shall repay the advance to the County in the principal amount and on the dates set forth in Exhibit A attached hereto, together with interest due and payable on each principal payment date at the rate of percent per annum on the unpaid principal balance; provided however, that all unpaid principal and interest thereon shall be due and payable on the day of ,202—. 3. Nature of Villaee Oblieation. The Village agrees to pay the amounts required pursuant to paragraph 2 above from the rates assessed, and the Village hereby pledges the rates for that purpose. In addition, the Village pledges its full faith and credit to the repayment of the advance in the event that the rates collected are insufficient. The Village's obligation to make payments shall be absolute and unconditional and shall not be subject to any abatement reduction, setoff, defense, counterclaim, or recoupment for any reason whatsoever, including without limitation, abatements or reductions due to any present or future claims of the Village against the County. This Contract shall not terminate, nor shall the obligation of the Village be affected by reason of any defect in or damage to or destruction of all or any part of the Project from whatever cause, it being the intention of the parties hereto that the foregoing payments payable hereunder shall be payable in all events. 4. Lawsuits and Claims. The parties hereto agree that the costs and expenses of any lawsuits or Claims (as hereinafter defined) arising directly or indirectly out of this Contract or the construction or financing of the Project, to the extent that such costs and expenses are chargeable against the County or the Village, shall be deemed to constitute a part of the cost of the Project and shall be paid by the Village in the same manner as other costs of the Project. In this Contract, 'claims" means any alleged losses, claims, complaints, demands for relief, or damages, liability, penalties, costs, and expenses, including, but not limited to, reimbursement for reasonable attorney fees, witness fees, court costs, investigation expenses, litigation expenses, amounts paid in settlement and/or other amounts or liabilities of any kind which are imposed on, incurred by, or assessed against the County or the Village, or for which the County or the Village may become legally and/or contractually obligated to pay or defend against, whether direct, indirect or consequential, whether based upon any alleged violation of the federal or State of Michigan constitutions, any federal or State of Michigan common law, whether any such claims are brought in law or equity, tort, contract, or otherwise, and/or whether commenced or threatened. 2 5. Pavment of Principal. The Village may prepay principal installments in whole or in part on any date without penalty. All prepayments shall be applied in such order of principal installments as determined by the Village. 6. Survival of Provisions. If any provision of the Contract or the application to any person or circumstance is, to any extent, judicially determined to be invalid or unenforceable, the remainder of this Contract, or the application of the provision to persons or circumstances other than those as to which it is invalid or unenforceable, is not affected and is enforceable, provided the invalid provision does not substantially alter this Contract or make execution impractical. 7. Effectiveness and Counterparts. This Contract shall become effective upon its execution by each of the parties hereto. This Contract may be executed in one or more counterparts, which together shall constitute one and the same Contract. IN WITNESS WHEREOF, the County and the Village have caused this Contract to be executed and delivered by the undersigned, being duty authorized by their respective governing bodies. COUNTY OF OAKLAND Its Chairperson, Board of Commissioners �C Its Cleric VILLAGE OF LAKE ORION By: Its President And By: Its Clerk 3 Form DC -001 OAKLAND COUNTY MEMORANDUM WATER RESOURCES COMMISSIONER TO: Commissioner David Woodward, Chairperson, Emergency Operations and Oversight Committee FROM: John Basch, Senior Attorney SUBJECT: Advance from the Long -Term Revolving Fund to the Village of Lake Orion DATE: April 6, 2020 The Village of Lake Orion would like to borrow $300,000.00 from Oakland County's Long -Term Revolving Fund to help fund the upgrade of its obsolete Supervisory Control and Data Acquisition (SCADA) system. The Village's existing SCADA system, a complex network of radios, servers, and computers which make up the Village's more than 20 -year-old system, is dependent on outdated equipment and technology that is no longer supported by the manufacturer. The Village's existing SCADA system must be upgraded to allow continuing and uninterrupted service to Lake Orion residents. Lake Orion's sewage disposal system, which is operated and maintained by the Oakland County Water Resources Commissioner's office, utilizes 16 sanitary lift stations. Each lift station is connected to a series of SCADA electronic panels which provide critical "real time" information about the status and operation of each lift station. Cost of upgrading the Village's existing SCADA system is estimated to be $350,800.00. To help fund this critically important project, the Village desires to borrow $300,000.00 from Oakland County's Long -Term Revolving Fund at a rate set by the County to be repaid over a five-year period from funds generated from rates paid by users of the sewage disposal system and further secured by the full faith and credit of the Village. Requested Action: Authorize a loan of $300,000.00 from Oakland County's Long -Term Revolving Fund to the Village of Lake Orion to help fund the upgrade of the Village's obsolete SCADA system at an interest rate determined by Oakland County to be repaid over a five-year period from funds generated from rates paid by users of the Village's sewage disposal system and further secured by the full faith and credit of the Village. OAKLAND COUNTY WATER RESOURCES COMMISSIONER Page 1 of 1 Rev: 02/12/2018 EXHIBIT A Oakland County, Michigan Village of Lake Orion - SCADA System Replacement - Loan from The Long -Term Revolving Fund Loan Repayment Schedule Loan Amount $300,000.00 Compounded Quarterly Date of Issuance 1 -May -2020 Interest Rate 1.784% County Resolution # Due Date I Payment I Principal I Interest I Principal Balance $300,000.00 1 -Jul -2020 15,892.00 15,000.00 892.00 285,000.00 1 -Oct -2020 16,271.10 15,000.00 1,271.10 270,000.00 1 -Jan -2021 16,204.20 15,000.00 1,204.20 255,000.00 1 -Apr -2021 16,137.30 15,000.00 1,137.30 240,000.00 1 -Jul -2021 16,070.40 15,000.00 1,070.40 225,000.00 1 -Oct -2021 16,003.50 15,000.00 1,003.50 210,000.00 1 -Jan -2022 15,936.60 15,000.00 936.60 195,000.00 1 -Apr -2022 15,869.70 15,000.00 869.70 180,000.00 1 -Jul -2022 15,802.80 15,000.00 802.80 165,000.00 1 -Oct -2022 15,735.90 15,000.00 735.90 150,000.00 1 -Jan -2023 15,669.00 15,000.00 669.00 135,000.00 1 -Apr -2023 15,602.10 15,000.00 602.10 120,000.00 1 -Jul -2023 15,535.20 15,000.00 535.20 105,000.00 1 -Oct -2023 15,468.30 15,000.00 468.30 90,000.00 1 -Jan -2024 15,401.40 15,000.00 401.40 75,000.00 1 -Apr -2024 15,334.50 15,000.00 334.50 60,000.00 1 -Jul -2024 15,267.60 15,000.00 267.60 45,000.00 1 -Oct -2024 15,200.70 15,000.00 200.70 30,000.00 1 -Jan -2025 15,133.80 15, 000.00 133.80 15,000.00 1 -Apr -2025 15,066.90 15,000.00 66.90 - Total 313,603.00 300,000.00 13,603.00 Interest: 10100-9010101-182200-630994 Principal: 46200-6010101-155010-153100-40210 J:\BOC\General\20 Committee Agenda Items\04 APRIL'20\WRC EXHIBIT A - Vlg Lake Orion - SCADA Replacement Long Term Rev Fund Payment Schedule Resolution #20120 April 29, 2020 Moved by Taub seconded by Jackson the resolutions on the Consent Agenda be adopted (with accompanying reports being accepted). Discussion followed. AYES: Hoffman, Jackson, Kochenderfer, Kowall, Kuhn, Long, Luebs, Markham, McGillivray, Middleton, Miller, Nelson, Powell, Quarles, Spisz, Taub, Weipert, Woodward, Zack, Gershenson, Gingell. (21) NAYS: None. (0) A sufficient majority having voted in favor, the resolutions on the Consent Agenda were adopted (with accompanying reports being accepted). I HEREBY APPROVE THIS RESOLUTION CHIEF DEPUTY COUNTY EXECUTIVE ACTING PURSUANT TO MCL 45.559A (7) STATE OF MICHIGAN) COUNTY OF OAKLAND) I, Lisa Brown, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on April 29, 2020, with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the Circuit Court at Pontiac, Michigan this 29th day of April, 2020. p Lisa Brown, Oakland County