HomeMy WebLinkAboutResolutions - 2021.09.02 - 34835BOARD OF COMMISSIONERS September 2, 2021 MISCELLANEOUS RESOLUTION #21-330 Sponsored By: William Miller Ill IN RE: Fiscal Year (FY) 2021 Repaving Program Project Chairperson and Members of the Board: WHEREAS the Fiscal Year 2021 Capital Improvement Program includes funding for the Re -Paving Program Project to improve structural integrity and drainage as well as improve service to residents, employees, and the public; and WHEREAS the annual inspections of all parking lots determined that the Oakland County Children's Village Campus (pavements installed in 1998), Courthouse West Wing Extension (pavements installed in 2013), and Executive Office Building (147,055 sq. ft.) (pavements installed in 2006) should be selected for re -paving in FY 2021; and WHEREAS the pavements were installed in 1999 (Children's Village), 2013 (BOC), and 2006 (EOB), and WHEREAS the project will involve replacement of the existing asphalt and base, with new asphalt and base; replacement of sections of concrete curb and gutter, with new concrete curb and gutter; along with storm structure and system improvements; and WHEREAS the pavement replacements will have a two-year contractor guarantee; and WHEREAS in accordance with Purchasing Division procedures, bids for the project were solicited, received, and reviewed by the Facilities Planning & Engineering Division (FPE) and the Purchasing Division; and WHEREAS the lowest responsible bidder was Asphalt Specialists Inc. of Pontiac, Michigan; and WHEREAS Purchasing and FPE met with Asphalt Specialists Inc. to review their bid and confirm all work was understood and included; and WHEREAS the total project cost is $1,438,510, including $1,193,729 for sitework from Asphalt Specialists Inc., $20,449 for sitework and plumbing from Facilities Maintenance and Operations Grounds and Maintenance, $36,700 for civil engineering services from PEA, and $187,632 for contingency (see attached project estimate); and WHEREAS funding in the amount of $1,438,510 is available for transfer from the FY 2021 Capital Improvement Program/Building Fund (440100) to the Project Work Order Fund (440400) for the FY 2021 Repaving Program Project. NOW THEREFORE BE 1T RESOLVED that the Board of Commissioners authorizes the FY 2021 Repaving Program Project in the amount of $1,438,510. BE IT FURTHER RESOLVED that the Board of Commissioners authorizes the transfer of funding for the FY 2021 Repaving Program Project (#100000003515) in the amount of $1,438,510 from the FY 2021 Capital Improvement Program/Building Fund (940100) to the Project Work Order Fund (#40400) as detailed below: FY 2021 Building Improvement Fund (#40100) 1040801-148020-788001-40400 Transfer Out ($1,438,510) Proiect Work Order Fund (#40400) Project ID 100000003515, Activity PROJ 1040801-148020-695500-40100 Transfer In $$1438,510 $ -0- Chairperson, the following Commissioners are sponsoring the foregoing Resolution: William Miller Ill. WI' ( �I � 1 1 Hilarie Chambers, Deputy County Executive II Lisa Brown, County Clerk / Register of Deeds Date: September 15, 2021 Date September 15, 2021 COMMITTEE TRACKING 2021-08-25 Economic Development & Infrastructure - recommend and forward to Finance 2021-08-25 Finance - recommend to Board 2021-09-02 Full Board VOTE TRACKING Motioned by Commissioner Michael Gingell seconded by Commissioner William Miller III to adopt the attached Other Action: Fiscal Year (FY) 2021 Repaving Program Project. Yes: David Woodward, Michael Gingell, Robert Hoffman, Michael Spisz, Karen Joliat, Kristen Nelson, Christine Long, Philip Weipert, Gwen Markham, Angela Powell, Thomas Kuhn, Marcia Gershenson, William Miller II1, Adam L. Kochenderfer, Yolanda Smith Charles, Charles Cavell, Gary R. McGillivray, Janet Jackson, Penny Luebs (19) No: None (0) Abstain: None (0) Absent: Commissioner Kowall, Commissioner Moss (2) The Motion Passed. ATTACHMENTS Pages from MR-Facilitites Mgmm - FPE Repaving Program Project STATE OF MICIIIGAN) COUNTY OF OAKLAND) 1, Lisa Brown, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and accurate copy of a resolution adopted by the Oakland County Board of Commissioners on September 2, 2021, with the original record thereof now remaining in my office. In Testimony Whereof, I have hereunto set my hand and affixed the seal of the Circuit Court at Pontiac, Michigan on Thursday, September 2, 2021. Lisa Brown, Oakland County Clerk / Register of Deeds roject Estimate Estimate [late: 7;212021 FlA Project Manager- MOYET. C.ARMELO FPE# 19-402 Project = 2020 Paving - Oakland County Parking Lots and Roads0dves LV0#-360708 QESrj RIPTION ESTIMATE FM-730352 CONSTRUCTION FAA-730352-Sitewor'n AsphahSpecialists Inc {ASI} $1,193,729.00 F?A-730352-Sitework FMC's Grounds $9.445.U0 FM-730352-Plumbtng FMC Maintenance $1 :,004 00 CONSTRUCTION Total: $1,214.178.00 FM-730359 CONTINGENCY FP0-730359-Contingency Contingency 15`M 5'187,62 00 CONTINGENCY Total: $157,632.00 Others CONSULTANTS FM-7 i 1444-CivilConsultant PEA SY,700 00 CONSULTANTS Total: $36.700.00 Subtotal: S1,250.878,0 Cbot;ngerrcy St87,63200 GRAND TOTAL: $1,433,510.00