HomeMy WebLinkAboutResolutions - 2021.09.02 - 34837BOARD OF COMMISSIONERS
September 2, 2021
MISCELLANEOUS RESOLUTION #21-332
Sponsored By: William Miller III
IN RE: 2021 Roof Replacement Program Projects
Chairperson and Members of the Board:
WHEREAS the Fiscal Year 2021 Capital Improvement Program includes funding for a Roof Replacement
Program; and
WHEREAS based on Facilities Planning & Engineering (FPE) annual evaluation and prioritization efforts, the
building roofs in need of replacement to prevent leakage, building damage, and inconvenience to residents,
employees, and the public include the South Oakland Health Center (SOHC), 27725 Greenfield Road,
Southfield, MI 48076 (16,150 sq. ft.) and the Switch Gear Building, 2250 Pontiac Lake Road, Waterford, MI
48328 (1,230 sq. ft.) (see attached campus map); and
WHEREAS the roofs were installed in 1992 and 1997 at SOHC, and 1994 at the Switch Gear Building and
their warranties expired on 1/22/02, 8/14/17, and 1/30/04, respectively; and
WHEREAS the projects will involve replacement of the existing roofing with a minimum layer of 1-'/2"
insulation, %2" Firestone High Density insulation board, 90 mil EPDM, metal (lashings, fall restraint systems;
and
WHEREAS the roof replacements will have 30-year warranties; and
WHEREAS in accordance with Purchasing Division procedures, bids for the project were solicited, received,
and reviewed by the FPE Division and the Purchasing Division, and
WHEREAS per the bid summary table attached, the lowest responsible bidder was Bloom Roofing Systems
Inc., of Brighton, Michigan; and
WHEREAS Purchasing and FPE met with Bloom Roofing Systems, Inc. to review their bid and confirm all
work was understood and included; and
WHEREAS the total cost of the project is $597,429, including $339,354 for reroofing from Bloom Roofing
Systems, Inc.; $77,500 for fall restraint systems from PEAK Fall Protection; $56,000 for lightning protection
system replacement from Guardian Equipment; $26,000 for grounds and electrical services from Facilities
Maintenance and Operations; $20,650 for design services from Spalding DeDecker; and $77,925 for
contingency (see attached project estimate); and
WHEREAS funding in the amount of $597,429 is available for transfer from the FY 2021 Capital
Improvement Program/Building Improvement Fund (440100) to the Project Work Order Fund (#40400) for the
FY 2021 Roof Replacement Program Projects.
NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners authorizes the
FY 2021 Roof Replacement Program Projects in the amount of $597,429.
BE IT FURTHER RESOLVED that the Board of Commissioners authorizes the transfer of funding for the FY
2021 Roof Replacement Program Projects (#100000003489) in the amount of $597,429 from the Capital
Improvement Program/Building Fund (#40100) to the Project Work Order Fund (#40400) as detailed below:
FY 2021
Building hnprovement Fund (#40100)
1040801-148020-788001-40400 Transfer Out ($597,429)
Project Work Order Fund (#40400)
Project: 100000003489, Activity; PROJ
1040801-148020-695500-40100 Transfer In $597,429
$ -0-
Chairperson, the following Commissioners are sponsoring the foregoing Resolution: William Miller 111.
Date: September 15, 2021
Hilarie Chambers, Deputy County Executive II
Date: September 15, 2021
Lisa Brown, County Clerk I Register of Deeds
COMMITTEE TRACKING
2021-08-25 Economic Development & Infrastructure - recommend and forward to Finance
2021-08-25 Finance - recommend to Board
2021-09-02 Full Board
VOTE TRACKING
Motioned by Commissioner Michael Gingell seconded by Commissioner William Miller III to adopt the
attached Other Action: 2021 Roof Replacement Program Projects.
Yes: David Woodward, Michael Gingell, Robert Hoffman, Michael Spisz, Karen Joliat, Kristen Nelson,
Christine Long, Philip Weipert, Gwen Markham, Angela Powell, Thomas Kuhn, Marcia Gershenson,
William Miller 111, Adam L. Kochenderfer, Yolanda Smith Charles, Charles Cavell, Gary R. McGillivray,
Janet Jackson, Penny Luebs (19)
No: None (0)
Abstain: None (0)
Absent: Commissioner Kowall, Commissioner Moss (2)
The Motion Passed.
ATTACHMENTS
MR Roof Replacement Program 082521-EDT
STATE OF MICHIGAN)
COUNTY OF OAKLAND)
I, Lisa Brown, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and
accurate copy of a resolution adopted by the Oakland County Board of Commissioners on September 2, 2021,
with the original record thereof now remaining in my office.
In T estimony Whereof, I have hereunto set my hand and affixed the seal of the Circuit Court at Pontiac_,
Michigan on Thursday, September 2, 2021.
Lisa Brown, Oakland County Clerk/Register gfDeedt
Oakland County
Service Center
;780 north TelPjraph Rd
Pontiac, MI 4B:vN
(248) B58-' 000
wu'w Rak.QCV.Com
West CampuS
4'. West = Ere-uhve Office Budding
43 tA@sl = Fdnnai s Mdlket
4? V;1�st = A.Jmlmsualhra Anne, I
44 Nmst= Inr-rmahon Tdnhhningy
fit 'N"t= QAKiand County Crndit Union
55 VJ2 at= Castor Seal Snwty
57 N.ust = Bay Scouts ofl.menca
59 Wbst = kuuJ Cummusran Coinplex.
53 /ee St . rtitlJran s Village J Buddha
65 `Aast - Chlldrena V111ails, A Building
VVest = Ch lkjren 5'/illago 0 Buldmg
73 VJPs1= Children s Villag- r Building
77 Vrst = Children 5 Vi lage b Bulaing
5: Vk_'st = Children s'Jill agt G Bwldl rig
83 Vla5t = ChAiJ ra s Village H Building
85 Vksl= Kll&lan
87 if.e St - 'h1u,ann Vlllecy= Srhaol
7i vw,'ct = I is Army P'rNe Contbr
45 Vote st= Puhh:. Nlnrhs f3lgbding
67 :^,est- Parks and kaneabcn
83 West-..
85 West
'`97 West
+'95,
P West
81 West
as Walt
i 67 a77
West West
�
73
' West
71 r
West
West
g3Wnat Carnpus
3SE. st
County Conte, Drive, East
24 East
d22 Fast
28
26 East
34 ER51 ,,,; I x.,- t 4 18 Eaet
x ` East /` �-
3 ,°57 West .� j '?°
18 East
v u. }6 East I Courthouse
W = ' M' dbS West +„ I"1200"6ul klln9l
28 Ea 61
r i
3Y East
N
u
t4 East I •72
.
ro West
a-
` Fast
Ra i
49iWaat
PROJECT SITE
Pontiac take Ra. i
-':i
SWITCHGEAR
I°Et'
—'—"
47 West
BUILDING
';.t l 43 ' "g
East Campus wasc i�'i
'0 East =.Jail & tav: Enforcement O mpleA a. ��
13 East - Court Tmver 7urtple-
'4 East A/ast'VVlnp Extension
'5 East = Cantral Gara3e
8 East = Administrative Annex V
^0 East = Grounds 6ulldli
22 Ea=1= Pavr¢r H.wjw
J4 East = P Building
26 East = North Clone ButJing
2F East = Medical Examiners Facility
30 East = Child Care Facility
32 East _ Med¢al Care Facility
34 East = North Health Center
2," East = Health Ulnslnn
38 East = Sheriffs Office Administrative Bulding
10 putilic Parking
4-1 c:empus
,.a west
eR�aPROJECT SITE
SOUTH OAKLAND
HEALTH CENTER
Oakland Schools
Administration 27725 GREENFIELD RD.,
SOUTHFIELD, MI 48076
Map,reesayby2;Plon dcountys One Step Shop /'p420U,
I- I
t '
7 Elizabeth Lake Rd.
1
M
Esbrns-e Dat=- W512021
FM P v,e:t Maraaer MOYET, CARMELO
F=EP, 20-333
Pmject 2021 CIP Roofing - South Oakland Health
Center
YJOr 981702
DESCRIPTION
ESTIMATE
FM-730352 CONSTRUCTION
F!?-?2?+c Z-Lghtn.rg�r�cect:cn
G,amian Eou.Fmert SOIL
53Er3fiL.'DD
Fat-733it2-Ligrrn ra=ro- -ticn
G,: m,an Egr:Fment wit& ',ear
52C,DOD.30
FE1-73D-F: SiteartrF,
FMaCt Grounca
"s2c,3gC.30
Fht_?'3SE2-Roo{:rn
6!aom Rc FIPQ'Systers Inc
S33e,35_-430
CONSTRUCTION Total:
$420,35400
FM-730562 ELECTRICAL
F?J-733502-Electo_alLightr.3
FM30 El -,;Ica
$1,306 .30
ELECTRICAL Total:
$L000 Do
€M-721241 MISCELLANEOUS
F111 112»1-h8sce-la neou_
PEAK Fail Protection SCHC
562 300,30
FV-71
PEAF Fail Frot�tlw S---Euuamp
S75,50C,30
MISCELLANEOUS Total-
$77,500.00
FM-730359 CONTINGENCY
Fbi_,^3;e0_Contneenoy
Gen:.-.gcnct 't?c
577, 321,30
CONTINGENCY Total:
$77,925-00
Others CONSULTANTS
F%1-7214b4-A rch Con s u:tant Sna ln,ng 7eJeckar Des =Wrist Mpm.t ;al. As- ur. S_C,85C,30
CONSULTANTS Total$20,650130
Subtotal- $519,50dA0
Ccn¢.ngenct S-792500
GRAND TOTAL: $597,429.00
a e:�c2 t