MISCELLANEOUS RESOLUTION #22-004
Sponsored By: William Miller III
IN RE: Facilities Maintenance and Operations - Resolution Pontiac Health Center Building Renovation
Project
Chairperson and Members of the Board:
WHEREAS the ongoing operation of the Sheriffs Evidence Processing Center is critical; and
WHEREAS the existing evidence processing center located in the basement of the jail is operating in
inadequate building conditions, which has been subject to flooding on several occasions; and
WHEREAS Facilities Maintenance and Operations (FM&O) is recommending the renovation of the south side
of the existing Pontiac Health Center Building to provide a modern evidence processing center; and
WHEREAS the building will receive previously planned building maintenance improvements; and
WHEREAS the project will also include lower -level renovations that will provide storage to various County
departments; and
WHEREAS the renovation and relocation will be performed by in-house staff and outside contractors obtained
through the Purchasing Division; and
WHEREAS the design services for this project will be provided by Hooker DeJong Architects of Muskegon,
MI and the construction management services will be provided by Frank Rewold & Son of Rochester, MI (both
competitively bid annual contractors); and
WHEREAS funding for these renovations is included in the Building Improvement Fund; and
WHEREAS the total cost of the project is $4,690,789, which includes $2,241,676 for the main level building
renovation; $1,148,494 for previously planned building maintenance improvements; $751,290 for inflationary
contingency; $366,279 for lower -level storage area renovations; $152,050 for roof solar panel system
installation; and $31,000 for architectural, engineering, and construction administration fees (see attached
project estimate); and
WHEREAS funding in the amount of $4,427,259 is available for transfer from the FY 2022 Capital
Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund (#40400) for the
Pontiac Health Center Building Renovation Project; and
WHEREAS additional funding in the amount of $263,530 is available from previously approved projects in the
Project Work Order Fund (#40400) that were completed under budget as follows:
-$197,141 Project Work Order Fund (#40400) Remodeling and Expansion of Forensic Laboratory Toxicology
Unit Project 9100000001812-$66,389 Project Work Order Fund (#40400) Patrol Services Relocation Project
#100000001829.
NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners hereby
authorizes the Pontiac Health Center Building Renovation Project in the amount of $4,690,789.
BE IT FURTHER RESOLVED that the Board of Commissioners authorizes the transfer of funding for the
Pontiac Health Center Building Renovation Project (#100000003618) in the amount of $4,690,789 from the
Capital Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund (440400)
as detailed below:
BUILDING IMPROVEMENT FUND 040100)
FY 2022
Revenues:
1040801-148020-695500-40400
Transfer In- Proj Work Order
$ 263,530
1040801-148020-665882
Planned Use of Balance
$4,427,259
Total Revenues
$4,690,789
Expenditures
1040801448020-788001-40400
Transfer Out - Proj Work Order
$4.690.789
Total Expenditures
$4,690,799
Proiect Work Order Fund 0404001
Project ID 100000003618, Activity PROJ
Revenues:
1040801-148020-695500
Exnenditures
1040801-148020-796500
Proiect Work Order Fund (440400)
Transfer In — Building Fund
Total Revenues
Budgeted Equity Adjust
Total Expenditures
Project ID 100000001812, Activity PROJ
Revenues:
1040101-148020-665882 Planned Use of Balance
Total Revenues
Expenditures
1040101-148020-788001-40100 Transfer Out - Building Fund
Total Expenditures
Proiect Work Order Fund(#404001
Project ID 100000001829, Activity PROJ
Revenues:
1040101-148020-665882
Expenditures
1040101-148020-788001-40100
Planned Use of Balance
Total Revenues
Transfer Out - Building Fund
Total Expenditures
$4,690,789
$4,690,789
$4,690,789
$4,690,789
197,141
$ 197,141
$ 197,141
$ 197,141
66,389
$ 66,389
66,389
$ 66,389
Chairperson, the following Commissioners are sponsoring the foregoing Resolution: William Miller III.
David Woodward, Commissioner
Date: January 20, 2022
Date: January 26, 2022
Hila�rri,e Chambers, Deputy County Executive II
lam' rQnc� Date: February 2, 2022
Lisa Brown, County Clerk / Register of Deeds
COMMITTEE TRACKING
2021-01-12 Economic Development & Infrastructure - Recommend and Forward to Finance
2021-01-12 Finance - Recommend to Board
2021-01-20 Full Board
VOTE TRACKING
Motioned by Commissioner Michael Gingell seconded by Commissioner Penny Luebs to adopt the attached
Resolution: Pontiac Health Center Building Renovation Project.
Yes: David Woodward, Michael Gingell, Karen Joliat, Kristen Nelson, Eileen Kowall, Philip Weipert, Gwen
Markham, Angela Powell, Thomas Kuhn, Chuck Moss, Marcia Gershenson, William Miller III, Yolanda
Smith Charles, Charles Cavell, Penny Luebs, Janet Jackson, Gary McGillivray, Robert Hoffman, Adam
Kochenderfer (19)
No: None (0)
Abstain: None (0)
Absent: (0)
The Motion Passed.
ATTACHMENTS
1. MR Pontiac Health Sheriffs Renovation 12.28.21
2. Project Location-34East
3. Sheriffs Dept. Pontiac Health Renovation - Project Estimate (1)
STATE OF MICHIGAN)
COUNTY OF OAKLAND)
I, Lisa Brown, Clerk of the County of Oakland, do hereby certify that the foregoing resolution is a true and
accurate copy of a resolution adopted by the Oakland County Board of Commissioners on January 20, 2022,
with the original record thereof now remaining in my office.
In Testimony Whereof, I have hereunto set my hand and affixed the seal of the Circuit Court at Pontiac,
Michigan on Thursday, January 20, 2022.
Lisa Brown, Oakland County Clerk/Register of Deeds
December 28, 2021
MISCELLANEOUS RESOLUTION #21XXX
BY: Commissioner William Miller, Chairperson, Economic Development and Infrastructure Committee
IN RE: FACILITIES MANAGEMENT/FACILITIES MAINTENANCE & OPERATIONS / SHERIFF'S
EVIDENCE PROCESSING - PONTIAC HEALTH CENTER BUILDING RENOVATION PROJECT
To the Oakland County Board of Commissioners
Chairperson, Ladies and Gentlemen:
WHEREAS the ongoing operation of the Sheriffs Evidence Processing Center is critical; and
WHEREAS the existing evidence processing center located in the basement of the jail is operating in
inadequate building conditions, which has been subject to flooding on several occasions; and
WHEREAS Facilities Maintenance and Operations (FM&O) is recommending the renovation of the south
side of the existing Pontiac Health Center Building to provide a modern evidence processing center; and
WHEREAS the building will receive previously planned building maintenance improvements; and
WHEREAS the project will also include lower -level renovations that will provide storage to various County
departments; and
WHEREAS the renovation and relocation will be performed by in-house staff and outside contractors
obtained through the Purchasing Division; and
WHEREAS the design services for this project will be provided by Hooker DeJong Architects of Muskegon,
MI and the construction management services will be provided by Frank Rewold & Son of Rochester, MI
(both competitively bid annual contractors); and
WHEREAS funding for these replacements is included in the Building Improvement Fund; and
WHEREAS the total cost of the project is $4,690,789, which includes $2,241,676 for the main level building
renovation; $1,148,494 for previously planned building maintenance improvements; $751,290 for
inflationary contingency; $366,279 for lower -level storage area renovations; $152,050 for roof solar panel
system installation; and $31,000 for architectural, engineering, and construction administration fees (see
attached project estimate); and
WHEREAS funding in the amount of $4,427,259 is available for transfer from the FY 2022 Capital
Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund (#40400) for
the Pontiac Health Center Building Renovation Project.
WHEREAS additional funding in the amount of $263,530 is available from previously approved projects in
the Project Work Order Fund (#40400) that were completed under budget as follows:
-$197,141 Project Work Order Fund (#40400) Remodeling and Expansion of
Forensic Laboratory Toxicology Unit Project #100000001812
-$66,389 Project Work Order Fund (#40400) Patrol Services Relocation Project
#100000001829
NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners hereby
authorizes the Pontiac Health Center Building Renovation Project in the amount of $4,690,789.
BE IT FURTHER RESOLVED that the Board of Commissioners authorizes the transfer of funding for the
Pontiac Health Center Building Renovation Project (#100000003618) in the amount of $4,690,789 from the
Capital Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund
(#40400) as detailed below,
BUILDING IMPROVEMENT FUND 4401001
FY 2022
Revenues:
1040801-148020-695500-40400
Transfer In- Proj Work Order
$ 263,530
1040801-148020-665882
Planned Use of Balance
$4,427,259
Total Revenues
$4,690,789
Expenditures
1040801-148020-788001-40400
Transfer Out - Proj Work Order
$4,690,789
Total Expenditures
$4,690,789
PROJECT WORK ORDER FUND (#40400)
Project ID 100000003618, Activity PROJ
Revenues:
1040801-148020-695500 Transfer In — Building Fund $4,690,789
Total Revenues $4,690,789
Expenditures
1040801-148020-796500 Budgeted Equity Adjust $4690,789
Total Expenditures $4,690,789
PROJECT WORK ORDER FUND (#40400)
Project ID 100000001812, Activity PROJ
Revenues:
1040101-148020-665882 Planned Use of Balance 197,141
Total Revenues $ 197,141
Expenditures
1040101-148020-788001-40100 Transfer Out - Building Fund 197,141
Total Expenditures $ 197,141
PROJECT WORK ORDER FUND (#40400)
Project ID 100000001829, Activity PROJ
Revenues:
1040101-148020-665882 Planned Use of Balance 66,389
Total Revenues $ 66,389
Expenditures
1040101-148020-788001-40100 Transfer Out - Building Fund 66,389
Total Expenditures $ 66,389
Chairperson, on behalf of the Economic Development and Infrastructure Committee, I move the adoption
of the foregoing resolution.
Commissioner William Miller, District #14
Chairperson, Economic Development
and Infrastructure Committee
61
ES
G BLDG,
I
CHILDREN'S
VILLAGE
RESERVE
\9 J�
\tio \`
TOM-59
P HIGHIAND ROAD \
O 112 MILES I
90 �
�rVIN I IAL, LAI(t
\
=avlcEcw�A
Campus Map
tit
\
F-It®
1 TOOA _ANDAVE.
(112 MILE)
0 J n
A
#
Qo
\ R
NORTH OAK:AND \
ES \HEALTH CENTER
PATROL SERVICES\\
V�6 LNG \\ \
ES \C�\9
FASTER SEAL �\
1
ES
I+ CREDIT C
UNION as
ES
�E9
ES ❑❑
AJDCOMMISSO �\,-AMPIJSDRiVE
0 0\I! o
o0
6000
o (a-
—1 I \
o
�•` Y
32
kST
LSHI
DRAIN COMMISSIONSEPTIC DEPOSITORY
8sT _ST TE9 A'L EXAMIN-i.E SsT r � FACILITY \\D BUILDING
aceNTRARA
B,
�ouRCE � LBiDc L _TER MATERIALS MANAGEMENT
r — cS HEATING PLANT \
Q� \ 1155 GAKLAND AVE.,
n� CENTRAL 'I ES
2U
a ST ` ST \
18 ADMINISTRATIVE \
ST ANNEX II
NORTH OFFIIp \/�
BUILDING
� CENTRAL GARAGE
� iJ Po9
T ST l)
CONTROL
\ AUTHORITY 'NES IM1- MAIN JAIL
\\\ EXTEN N D 1'- D COMPLEX
\ r STD —_ I u�
L _ 6URTHCN
COMPLEX
sE_—
COMMPLEX PITU EVA S
EAST ANNEX
47 I` \ 0 ® 0 U mIN�INXIINE ProjectLocatic J
Bldg. 34 East �)
,o
� _ OVSION
'1 SIGN
0
)ffICEI �
J
LDG.2
OAKLAND POINTE
230 ELIZABETE'LK RD
Uq
E �BLDG OAKtAND POINTE�
z 250 ELIZABETH LK
TO ELIZABETH Jo
LAKE RD �
(1 MILE( V —# r—_ir ELIZABET
ELRABETH (AKE ROAD
Estimate Date: 12114/2021
FPE#:
WO#:1029672
FM-730352 CONSTRUCTION
FM-730352-Architectural
FM-730352-Architectural
FM-730352-Environmental W ork
FM-731241 MISCELLANEOUS
FM-731241-Miscellaneous
FM-730359 CONTINGENCY
F M-730359-Contingency
Others CONSULTANTS
FM-731444-ArchConsultant
Project Estimate
FM Project Manager: FOSTER, STEPHEN
Project: Pontiac Health South Building Renovation - Sheriff's Evidence Processing
DESCRIPTION ESTIMATE
Base Scope: Renovation of South Side PH Bldg $2,241,676.00
Expanded Scope: Basement renovation $366,279.00
Add Alt #1 Scope: Roof Solar Panels $152,050.00
CONSTRUCTION Total: $2,760,005.00
Previously planned PH maintenance projects
MISCELLANEOUS Total:
Owners 20% Inflationary Contigency
CONTINGENCY Total:
Hooker DeJong AE Construction Administration
CONSULTANTS Total:
Subtotal:
Contingency:
GRAND TOTAL:
$1,148,494.00
$1,148,494.00
$751,290.00
$751,290.00
$31,000.00
$31,000.00
$3,939,499.00
$751,290.00
$4,690,789.00
12/141202