AGENDA ITEM: FY2023 Roof Restraint Safety System Projects
DEPARTMENT: Facilities Management
MEETING: Board of Commissioners
DATE: Thursday, May 11, 2023 6:00 PM - Click to View Agenda
ITEM SUMMARY SHEET
COMMITTEE REPORT TO BOARD
Resolution #2023-2838
Motion to approve the Roof Restraint Safety System Projects and authorize the transfer of funding
in the amount of $623,924 from the Capital Improvement Program/Building Fund (#40100) to the
Project Work Order Fund (#40400) for the Roof Restraint Projects (PRJ-17292); further amend the
FY 2023 Budget as detailed in the attached Schedule A.
ITEM CATEGORY SPONSORED BY
Budget Amendment Yolanda Smith Charles
INTRODUCTION AND BACKGROUND
County owned buildings require employees to work on building rooftops and roof restraint safety
systems are needed to provide safety for these county employees. Occupational Safety and Health
Administration (OSHA) and Codes outline the need for these systems. The roof restraint safety
systems are for the Jail (10 East), Public Works Building (95 West), Courthouse and Board of
Commissioners Auditorium (12 East), Patrol Services (57 West), and Little Oaks (30 East).
Following the Purchasing Division policies and procedures, Facilities Planning and Engineering
(FP&E) and Purchasing solicited a proposal for roof restraint safety systems from annual
competitively bid and selected contractors. Peak Fall Protection provided the lowest responsible bid
with a total project cost of $623,924, including $489,937 for engineering, materials, fabrication, and
installation, $30,000 for roof patching, and $103,987 for contingency. The funding in the amount of
$623,924 is available for transfer from the FY2023 Capital Improvement Program/Building
Improvement Fund (#40100) to the Project Work Order Fund (#40400) for the Roof Restraint Safety
System Projects.
POLICY ANALYSIS
The request is for the approval of the Roof Restraint Safety System Project for $623,924. County
owned buildings require employees to work on building rooftops and roof restraint safety systems
are needed to provide safety for these county employees. Occupational Safety and Health
Administration (OSHA) and Codes outline the need for these systems. The roof restraint safety
systems are for the Jail (10 East), Public Works Building (95 West), Courthouse and Board of
Commissioners Auditorium (12 East), Patrol Services (57 West), and Little Oaks (30 East).
Facilities Planning and Engineering (FP&E) and Purchasing solicited a proposal for roof restraint
safety systems from annual competitively bid and selected contractors per policies and procedures.
Peak Fall Protection provided the lowest responsible bid with a total project cost of $623,924,
including $489,937 for engineering, materials, fabrication, and installation, $30,000 for roof patching,
and $103,987 for contingency.
The funding in the amount of $623,924 is available for transfer from the FY2023 Capital
Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund
(#40400) for the Roof Restraint Safety System Projects. A budget amendment is required as
reflected in the Schedule A-Budget Amendment.
BUDGET AMENDMENT REQUIRED: Yes
Committee members can contact Michael Andrews, Policy and Fiscal Analysis Supervisor at
248.425.5572 or andrewsmb@oakgov.com, or the department contact persons listed for additional
information.
CONTACT
Jason Warner, Manager Facilities Planning & Engineering
ITEM REVIEW TRACKING
Yolanda Smith Charles, Board of Commissioners Created/Initiated - 5/12/2023
AGENDA DEADLINE: 05/11/2023 6:00 PM
ATTACHMENTS
1. Schedule A Roof Restraint Safety System Project
2. Roof Fall Protection FY2023-Project Estimate-21-171
3. cable (002).photo
COMMITTEE TRACKING
2023-05-03 Economic Development & Infrastructure - Forward to Finance
2023-05-03 Finance - Recommend to Board
2023-05-11 Full Board - Adopted
Motioned by: Commissioner Angela Powell
Seconded by: Commissioner Robert Hoffman
Yes: David Woodward, Michael Spisz, Michael Gingell, Penny Luebs, Karen Joliat, Kristen
Nelson, Christine Long, Robert Hoffman, Philip Weipert, Gwen Markham, Angela Powell, Janet
Jackson, Gary McGillivray, William Miller III, Yolanda Smith Charles, Charles Cavell, Brendan
Johnson, Ajay Raman (18)
No: None (0)
Abstain: None (0)
Absent: Marcia Gershenson (1)
Passed
Oakland County, Michigan
FACILITIES MANAGEMENT/FACILITIES MAINTENANCE AND OPERATIONS - FY2023 ROOF RESTRAINT SAFETY SYSTEM PROJECTS
Schedule "A" DETAIL
R/E Fund Name Division Name
Fund #
(FND)Cost Center (CCN) #
Account #
(RC/SC)
Program #
(PRG)Grant ID (GRN) #
Project ID #
(PROJ)
Region
(REG)
Budget
Fund
Affiliate
(BFA)
Ledger
Account
Summary Account Title
FY 2023
Amendment
FY 2024
Amendment
FY 2025
Amendment
E Building Improvement Facilities Engineering Admin FND40100 CCN1040801 SC788001 PRG148020 BFA40400 788001 Transfer Out $(623,924.00)$-$-
Total Expenditures $(623,924.00)$-$-
R Project Work Order Facilities Engineering Admin FND40400 CCN1040801 RC695500 PRG148020 PROJ-17292 BFA40100 695500 Transfer In $623,924.00 $-$-
Total Revenues $623,924.00 $-$-
Project Estimate
DESCRIPTION ESTIMATE
Estimate Date: 4/12/2023
FPE#: 21-171
WO#: 1016421
FM Project Manager: MACDOUGALL, MATT
Project: Roof Restraint Safety System
FM-730352 CONSTRUCTION
FM-730352-Roofing Roof Restraint Safety System $489,937.00
FM-730352-Roofing Roof Patching $30,000.00
$519,937.00Total:CONSTRUCTION
FM-730359 CONTINGENCY
FM-730359-Contingency 20% Project Contingency $103,987.00
$103,987.00Total:CONTINGENCY
GRAND TOTAL:
Subtotal Without Contingency:
Contingency:
$519,937.00
$103,987.00
$623,924.00