Loading...
HomeMy WebLinkAboutReports - 2023.05.25 - 38230 AGENDA ITEM: FY 2023 Roof Replacement Projects DEPARTMENT: Facilities Planning & Engineering MEETING: Board of Commissioners DATE: Thursday, May 25, 2023 7:28 PM - Click to View Agenda ITEM SUMMARY SHEET COMMITTEE REPORT TO BOARD Resolution #2023-2911 Motion to approve the FY2023 Roof Replacement Project and authorize the transfer of funding in the amount of $1,331,760 from the Capital Improvement Program/Building Fund (#40100) to the Project Work Order Fund (#40400) for the FY2023 Roof Replacement Projects (PRJ-17304); further amend the FY 2023 Budget as detailed in the attached Schedule A. ITEM CATEGORY SPONSORED BY Budget Amendment Yolanda Smith Charles INTRODUCTION AND BACKGROUND County owned buildings require ongoing maintenance and replacement of building systems including roofing when end of service life is reached. Facilities Planning and Engineering (FPE) and the Purchasing Division solicited proposals to remove existing asphalt shingle roof systems and replace with standing seam metal roof systems located at Patrol Services (57 West), and Little Oaks (30 East) from annual competitively bid and selected contractors. Cass Sheet Metal provided the lowest responsible bid and the total project cost is $1,331,760. The project cost includes • $302,500 for roofing the Patrol Services building • $559,850 for roofing the Little Oaks child care center • $29,100 for Professional Services • $29,270 for Lightning Protection at Patrol Services • $34,560 for Lightning Protection at Little Oaks • $22,871 For Electrical • $21,280 for Downspout Receptacles and Demolition Assistance, • $25,000 for Acoustical Insulation, • $102,443 for a 10% Construction Contingency, as well as $204,886 for Market Inflation Contingency (see attached project estimate). The funding ($1,331,760) is available for transfer from the FY 2023 Capital Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund (#40400) for the FY 2023 Roof Replacement Projects (#PRJ-17304). POLICY ANALYSIS Facilities Planning and Engineering (FPE) is requesting approval of the roof replacement projects for the Patrol Services building (57 West) and Little Oaks Child Care Center (30 East) as the current roofs have reached end of life. FPE and Purchasing solicited proposals to remove existing asphalt shingle roof systems and replace with standing seam metal roof systems for these two facilities from annual competitively bid and selected contractors. Cass Sheet Metal provided the lowest responsible bid and the total project cost is $1,331,760. The project cost includes: • $302,500 for roofing the Patrol Services • $559,850 for roofing the Little Oaks • $29,100 for Professional Services • $29,270 for Lightning Protection at Patrol Services • $34,560 for Lightning Protection at Little Oaks • $22,871 For Electrical • $21,280 for Downspout Receptacles and Demolition Assistance, • $25,000 for Acoustical Insulation, • $102,443 for a 10% Construction Contingency, as well as $204,886 for Market Inflation Contingency (see attached project estimate) The market inflation contingency has been added due to construction materials and labor rates fluctuating frequently (precautionary measure). The metal roofing will solve issues with ice damming that happens during the winter and will provide a longer roof life. The funding ($1,331,760) is available for transfer from the FY2023 Capital Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund (#40400) for the FY2023 Roof Replacement Projects (#PRJ-17304). A budget amendment is required as reflected in the Schedule A-Budget Amendment. BUDGET AMENDMENT REQUIRED: Yes Committee members can contact Michael Andrews, Policy and Fiscal Analysis Supervisor at 248.425.5572 or andrewsmb@oakgov.com, or the department contact persons listed for additional information. CONTACT Jason Warner, Manager Facilities Planning & Engineering ITEM REVIEW TRACKING Yolanda Smith Charles, Board of Commissioners Created/Initiated - 5/25/2023 AGENDA DEADLINE: 06/04/2023 7:28 PM ATTACHMENTS 1. Schedule A Roof Replacement Project FY23 2. 21-418.Project Cost Estimate COMMITTEE TRACKING 2023-05-17 Economic Development & Infrastructure - Recommend and Forward to Finance 2023-05-17 Finance - Recommend to Board 2023-05-25 Full Board - Adopted Motioned by: Commissioner Yolanda Smith Charles Seconded by: Commissioner Christine Long Yes: David Woodward, Michael Spisz, Penny Luebs, Karen Joliat, Kristen Nelson, Christine Long, Robert Hoffman, Philip Weipert, Gwen Markham, Angela Powell, Marcia Gershenson, William Miller III, Yolanda Smith Charles, Brendan Johnson, Ajay Raman (15) No: None (0) Abstain: None (0) Absent: Charles Cavell, Gary McGillivray, Janet Jackson, Michael Gingell (4) Passed Oakland County, Michigan FACILITIES MANAGEMENT/FACILITIES MAINTENANCE AND OPERATIONS - FY2023 ROOF REPLACEMENT PROJECTS Schedule "A" DETAIL R/E Fund Name Division Name Fund # (FND)Cost Center (CCN) # Account # (RC/SC) Program # (PRG)Grant ID (GRN) # Project ID # (PROJ) Region (REG) Budget Fund Affiliate (BFA) Ledger Account Summary Account Title FY 2023 Amendment FY 2024 Amendment FY 2025 Amendment E Building Improvement Facilities Engineering Admin FND40100 CCN1040801 SC788001 PRG148020 BFA40400 788001 Transfer Out $(1,331,760.00)$-$- Total Expenditures $(1,331,760.00)$-$- R Project Work Order Facilities Engineering Admin FND40400 CCN1040801 RC695500 PRG148020 PROJ-17304 BFA40100 695500 Transfer In $1,331,760.00 $-$- Total Revenues $1,331,760.00 $-$- Project Estimate DESCRIPTION ESTIMATE Estimate Date: 4/21/2023 FPE#: 21-418 WO#: 1057696 FM Project Manager: MACDOUGALL, MATT Project: 30 East Little Oaks, 57 West Patrol Services Roofing FM-730352 CONSTRUCTION FM-730352-Roofing Roofing Patrol Services $302,500.00 FM-730352-Roofing Roofing Little Oaks $559,850.00 FM-730352-Architectural Roofing Technology Associates $29,100.00 FM-730352-LightningProtection Lightning Protection Patrol Services $29,270.00 FM-730352-LightningProtection Lightning Protection Little Oaks $34,560.00 $955,280.00Total:CONSTRUCTION FM-730562 ELECTRICAL FM-730562-ElectricalLighting FM&O Electrical $22,871.00 $22,871.00Total:ELECTRICAL FM-731241 MISCELLANEOUS FM-731241-Miscellaneous Acoustical Insulation $25,000.00 FM-731241-Miscellaneous FM&O Grounds downspout receptacles,demo assistance $21,280.00 $46,280.00Total:MISCELLANEOUS FM-730359 CONTINGENCY FM-730359-Contingency 10% Construction Contingency $102,443.00 FM-730359-Contingency 20% Contingency - Market Inflation $204,886.00 $307,329.00Total:CONTINGENCY GRAND TOTAL: Subtotal Without Contingency: Contingency: $1,024,431.00 $307,329.00 $1,331,760.00 4/21/2023