Loading...
HomeMy WebLinkAboutAgendas/Packets - 2015.04.29 - 40296MEETING NOTICE OAKLAND, COUNTY PARKS AND RECREATION COMMISSION NOTICE IS HEREBY GIVEN that a SPECIAL meeting of the Oakland County Parks and Recreation Commission will be held at 2:00 p.m. on WEDNESDAY, APRIL 29, 2015, at Oakland County Parks and Recreation Administration Office, located at 2800 Watkins Lake Road, Waterford, Michigan 48328. GERALD A. FISHER CHAIRMAN Telephone- (248) 858-4603 ... . ... ....... . ...... 2800 Watkins Lake Road • Bldg 97W • Waterford, MI 48328-1917 248.858.0906 • 1.888.00PARKS • DestinationOakland.com (waAKLAND COUNTYPARKS April 22, 2015 Oakland County Parks and Recreation Commission Oakland County, Michigan Commissioners: A meeting has been called of the Oakland County Parks and Recreation Commission as follows: PLACE .................................... Oakland County Parks Administration Office 2800 Watkins Lake Road Waterford, MI 48328 TIME ................................... Wednesday, April 29, 2015 2:00 p.m. PURPOSE ................................ SPECIAL MEETING This meeting has been called in accordance with the authorization of Chain-nan Gerald Fisher of the Oakland County Parks and Recreation Commission. Sincerely, i Daniel J. Stencil, CPRE Gerald A. Fisher Executive Officer Chairman J. David VanderVeen Vice Chairman John A. Scott Secretary Next Meeting:Tuesday, May 12, 2015 (i� 2:00 p.m. Pecky D. Lewis, Jr. Chairperson Emeritus Red Oaks Nature Center A. David Baumhart Ili 30300 Hales Street Gregory C. Jamian Robert E. Kostin Madison Heights, Michigan 48071 Christine Long Gary R. McGillivray Jim Nash Daniel J. Stencll Executive Officer 0 ur mission is to provide quality recreational experiences that encourage healthy lifestyles, 2 support economic prosperity and promote the protection of natural resources. Page #'s Oakland County Parks and Recreation Commission Meeting Special Meeting & Budget Study Session Parks & Recreation Administration Offices 2800 Watkins Lake Road, Waterford, MI 48328 Wednesday, April 29, 2015 2:00 PM AGENDA 1 CaIl Meeting to Order Roll Call 2. 3 Pledge of Allegiance 4 Approval of Agenda 5 Public Comments: 6 REGULAR AGENDA: A. Proposed Waterford Oaks Greenhouse License Agreement: Recovery Park Presentation (20 Minutes) B. Proposed Ratification of Revised OC Board of Commissioners' Resolution on OCPR Request for Approval to Enter into a License Agreement and Professional Services Contract with Katherine's Catering for Food and Beverage Services C. Proposed FY 2016-2018 OCPR Commission Budget Presentation 1. OCPRC Budget 101 Orientation/Manual Distribution/Overview 2. Major Maintenance Programs 3. Capital Improvement Plan 4. Capital Equipment D, Overview of May 27, 2015 OCPR.0 Budget Study Session - Proposed Operating Budget FY 2016-2018 7. OLD BUSINESS 8, NEW BUSINESS 9. ADJOURN Action Required Approval Information I nformation/ApprovalB OC Presenter/Phone # G. Fisher 248.514.9814 G. Fisher/D. Stencil 248.858.4944 G. Fisher Recovery Park Staff D. Stencil/S. Wells 858.4634/P. Castonia 958.0909 Information D. Stencil/.). Phelps 858.5319/S. Wells Information D. Stencil/J. PhelpslS, Wells Information M. Donnellon 858.4623/D. Stencil/S. Wells Information M. Donnellon/D. Stencil/S. Wells S. Wells/.I. Dunleavy 858.4647/T. Hughes 343.1011 Information D. Stencil G. Fisher G. Fisher Next Meeting: 2:00-3:30 p.m. on May 12, 2015 Red Oaks Nature Center 30300 Hales St., Madison Heights, Michigan 48071 rR Red Oaks Connector Trail Dedication Ceremony (a) 4:00 p.m, * NOTIE : All phone numbers are area code (248) unless otherwise noted. As U reminder, if you have poi alrenrlt? done so, please arras kour celhrlar phones off or to a silent or vihrale mode far the dururion oftlre nreeling. This ti,ill allow the ttieeling to proceed wilhoul distractions or interruptions. Thank you for your cooperaliarr. 3 APRIL 29, 2015 III P,.i•'' �l:g.r�i OAKLAND COUNTY PARKS & RECREATION COMMISSION AGENDA AGENDA ITEM NO. 6 A ADMINISTRATION To: Chairman Fisher and Commission Members From: Daniel J. Stencil, Executive Officer Submitted: April 23, 2015 Subject: Proposed Waterford Oaks Greenhouse License Agreement: Recovery Park Presentation INTRODUCTION AND HISTORY The representatives from RecoveryPark will be present at the OCPR Commission meeting of April 29, 2015, to make a brief presentation regarding the Proposed Waterford Oaks Greenhouse License Agreement. 4 zgk� ►��'f V!"!,1, OAKLAND COUNTY PARKS & RECREATION COMMISSION AGENDA APRIL 29, 2015 To: Chairman Fisher and Commission Members From: Daniel J. Stencil, Executive Officer Sue Wells, Manager of Parks and Recreation Operations Phil Castonia, Chief of Business Operations Submitted: April 23, 2015 Subject: Proposed Ratification of Revised OC Board of Commissioners Approval to Enter into a License Agreement and Professional Catering for Food and Beverage Services INTRODUCTION AND HISTORY AGENDA ITEM NO. 6 B ADMINISTRATION Resolution on OCPR Request for Services Contract with Katherine's The Resolution on the OCPRC Request for Approval to Enter into a License Agreement and Professional Services Contract with Katherine's Catering for Food and Beverage Services was approved at the OCPR Commission meeting on April 14, 2015. Upon approval, this information was forwarded to the Board of Commissioners for Committee review and Board of Commissioners approval. After their review, the staff at the Board of Commissioners office made some minor changes to the resolution, The OCPR Commission was informed of this via email on Monday, April 20, 2015. It was determined that the changes do not appear to have any substantive impact on the intent, nor do they appear to conflict with the action taken by OCPRC. It was recommended that the Resolution proceed through the Board of Commissioners Committee review and the Oakland County Parks and Recreation Commission would place this item on the Special OCPRC Meeting on April 29, 2015, to ratify the changes recommended by the Board of Commissioners staff. In addition, at the April 14, 2015, OCPR Commission meeting the Commission requested financial forecasts for the Food and Beverage Conference Centers. That information has been included with this memo MOTION Move to approve the proposed changes to the Oakland County Board of Commissioners Resolution on OCPR Request for Approval to Enter into a License Agreement and Professional Services Contract with Katherine's Caterinq for Food and Beverage Services as recommended by the Board of Commissioners. 5 MISCELLANEOUS RESOLUTION IN RE: OAKLAND COUNTY PARKS AND RECREATION COMMISSION - REQUEST FOR APPROVAL TO ENTER INTO A LICENSE AGREEMENT AND PROFESSIONAL SERVICES CONTRACT WITH KATHERINE'S CATERING FOR FOOD AND BEVERAGE SERVICES TO THE OAKLAND COUNTY PARKS AND RECREATION COMMISSION Chairperson, Ladies and Gentlemen: WHEREAS the County and E.A. Fuller Oak Management Corporation ("Oak Management") entered into a lease dated December 14, 2006 (MR # 06245) and amended January 1, 2008 ("Lease") for food and beverages services for Oakland County Parks and Recreation Commission ("OCPRC") facilities; and WHEREAS the Lease provides for an expiration on December 31, 2015; and WHEREAS the Oakland County Board of Commissioners passed Miscellaneous Resolution #06245 stating, "...no further extensions beyond December 31, 2015 shall be made to this lease without an appropriate RFP process' and that current Oakland County Purchasing Policies would be followed; and WHEREAS Oakland County Parks and Recreation formed a Food and Beverage Committee comprised of key administration and operations staff and Parks Commissioners and enlisted the assistance of Oakland County's Purchasing Division, Health Division, and Corporation Counsel; and WHEREAS the Committee subsequently developed a combined golf operations and food and beverage Request for Proposal for the operation of White Lake Oaks and Lyon Oaks; and WHEREAS, after determining it would be in the best interest of Oakland County Parks and Recreation to continue to operate the golf courses in house, the Committee advertised the food and beverage opportunity to the vendors who responded to our Approved Caterer Request For Proposal; and WHEREAS two additional bids were received and after the evaluation process, a tentative agreement was negotiated; and WHEREAS it is the recommendation of the Oakland County Parks and Recreation Commission that the Oakland County Board of Commissioners approve and authorize the Oakland County Parks and Recreation Commission to enter into a license agreement and professional services contract with Katherine's Catering of Ann Arbor for the operation of the Lyon Oaks Grill Room and Conference Center and the White Lake Oaks Conference Center and Grill Room for a five-year contract beginning January 1, 2016, with two optional five- year extensions at the Oakland County Parks and Recreation Commission's sole discretion. NOW THEREFORE BE IT RESOLVED that the Oakland County Parks and Recreation Commission recommends the Oakland County Board of Commissioners approve and authorize the Oakland County Parks and Recreation Commission to enter into a license agreement and professional services contract with Katherine's Catering of Ann Arbor for the operation of the Lyon Oaks Grill Room and Conference Center and the White Lake Oaks Conference Center and Grill Room for a five-year contract beginning January 1, 2016, with two optional five-year extensions at the Oakland County Parks and Recreation Commission's sole discretion. Date: April 14, 2015 Moved by: Mr, Scott Supported by: Mr. Baumhart Ayes: Baumhart, Fisher, Fowkes, Kostin, Long, Nash, Potts, Scott, VanderVeen (9) Nays: McGillivray (1) Motion carried on a voice vote 6 MISCELLANEOUS RESOLUTION BY: Planning and Building Committee, Philip J. Weipert, Chairperson IN RE: OAKLAND COUNTY PARKS AND RECREATION COMMISSION - REQUEST FOR APPROVAL TO ENTER INTO A LICENSE AGREEMENT AND PROFESSIONAL SERVICES CONTRACT WITH KATHERINE'S CATERING FOR FOOD AND BEVERAGE SERVICES To The Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: WHEREAS the County and E.A. Fuller Oak Management Corporation ("Oak Management") entered into a lease dated December 14, 2006 (MR # 06245) and amended January 1, 2008 ("Lease") for food and beverages services for Oakland County Parks and Recreation Commission ("OCPRC") facilities; and WHEREAS the Lease provides for an expiration on December 31, 2015; and WHEREAS the Oakland County Board of Commissioners passed Miscellaneous Resolution #06245 stating, "...no further extensions beyond December 31, 2015 shall be made to this lease without an appropriate RFP process' and that current Oakland County Purchasing Policies would be followed; and WHEREAS the OCPRC Oakland County Parks and 146GFeatian formed a Food and Beverage Committee comprised of key administration and operations staff and Parks Commissioners and enlisted the assistance of Oakland County's Purchasing Division, Health Division, and Corporation Counsel to evaluate proposals for food and beverages services for OCPRC facilities; and WHEREAS the OCPRC in January 2014 recommended a food and beverage provider for Addison Oaks Conference Center and Glen Oaks Conference Center and Grill Room, but did not recommend a food and beverage provider for Lyon Oaks Conference Center and Grill Room and White Lake Oaks Conference Center and Grill Room; and WHEREAS on January 6, 2014 (MR # 14020) approved the food and beverage provider for Addison Oaks Conference and Glen Oaks Conference Center and Grill Room and instructed the OCPRC to immediately seek outsourcing options for Lyon Oaks and White Lake Oaks in conjunction with the golf course facilities; and WHEREAS the Food and Beverage Committee subsequently developed a combined golf operations and food and beverage Request for Proposal for the operation of White Lake Oaks and Lyon Oaks; and WHEREAS the Food and Beverage Committee determined that it would be in the best interest of the OCPRC to operate its golf courses in-house and recommended Katherine's Catering to provide food and beverage services at the Lyon Oaks and White Lake Oaks conference centers and grill rooms; andaftef ties--te ssn+,.�,— ir. YCL_, T;e2I; WHEREAS it is the recommendation of the Oakland County Parks and Recreation Commission that the Oakland County Board of Commissioners approve and authorize +he ^akla-na County PaFkA and Resfea#Wl the attached license agreement and professional services contract with Katherine's Catering of Ann Arbor for the operation of the Lyon Oaks Grill Room and Conference Center and the White Lake Oaks Conference Center and Grill Room for a five-year contract beginning January 1, 2016, with two optional five-year extensions at the Oakland County Parks and Recreation Commission's sole discretion. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners hereby approves and authorizes the Q_;_1kl_nP.d_ C-a-i.Inty Parks and R ttached license agreement and professional services contract with Katherine's Catering ^f °n~.for the operation of the Lyon Oaks Grill Room and Conference Center and the White Lake Oaks Conference Center and Grill Room for a five-year contract beginning January 1, 2016, with two optional five-year extensions at the Oakland County Parks and Recreation Commission's sole discretion. BE IT FURTHER RESOLVED that the Oakland County Board of Commissioners directs its Chairperson or designee to execute the attached license agreement and professional services contract with Katherine's Catering and all other related documents between the County and Katherine's Catering, which may be required. ,-Gr his designee, to sign the agfeement-. Chairperson, on behalf of the Planning and Building Committee, I move the adoption of the foregoing resolution. 7 MISCELLANEOUS RESOLUTION BY: Planning and Building Committee, Philip J. Weipert, Chairperson IN RE: OAKLAND COUNTY PARKS AND RECREATION COMMISSION - REQUEST FOR APPROVAL TO ENTER INTO A LICENSE AGREEMENT AND PROFESSIONAL SERVICES CONTRACT WITH KATHERINE'S CATERING FOR FOOD AND BEVERAGE SERVICES To The Oakland County Board of Commissioners Chairperson, Ladies and Gentlemen: WHEREAS the County and E.A. Fuller Oak Management Corporation ("Oak Management") entered into a lease dated December 14, 2006 (MR # 06245) and amended January 1, 2008 ("Lease") for food and beverages services for Oakland County Parks and Recreation Commission ("OCPRC") facilities; and WHEREAS the Lease provides for an expiration on December 31, 2015; and WHEREAS the Oakland County Board of Commissioners passed Miscellaneous Resolution #06245 stating, "...no further extensions beyond December 31, 2015 shall be made to this lease without an appropriate RFP process' and that current Oakland County Purchasing Policies would be followed; and WHEREAS Oakland County Parks and Recreation formed a Food and Beverage Committee comprised of key administration and operations staff and Parks Commissioners and enlisted the assistance of Oakland County's Purchasing Division, Health Division, and Corporation Counsel; and WHEREAS the Committee subsequently developed a combined golf operations and food and beverage Request for Proposal for the operation of White Lake Oaks and Lyon Oaks; and WHEREAS after determining it would be in the best interest of Oakland County Parks and Recreation to continue to operate the golf courses in house, the Committee advertised the food and beverage opportunity to the vendors who responded to our Approved Caterer Request For Proposal; and WHEREAS two additional bids were received and after the evaluation process, a tentative agreement was negotiated; and WHEREAS it is the recommendation of the Oakland County Parks and Recreation Commission that the Oakland County Board of Commissioners approve and authorize the Oakland County Parks and Recreation Commission to enter into a license agreement and professional services contract with Katherine's Catering of Ann Arbor for the operation of the Lyon Oaks Grill Room and Conference Center and the White Lake Oaks Conference Center and Grill Room for a five-year contract beginning January 1, 2016, with two optional five-year extensions at the Oakland County Parks and Recreation Commission's sole discretion. NOW THEREFORE BE IT RESOLVED that the Oakland County Board of Commissioners hereby approves and authorizes the Oakland County Parks and Recreation Commission to enter into a license agreement and professional services contract with Katherine's Catering of Ann Arbor for the operation of the Lyon Oaks Grill Room and Conference Center and the White Lake Oaks Conference Center and Grill Room for a five-year contract beginning January 1, 2016, with two optional five-year extensions at the Oakland County Parks and Recreation Commission's sole discretion. BE IT FURTHER RESOLVED that the Oakland County Board of Commissioners authorizes the Board's Chairperson, or his designee, to sign the agreement. Chairperson, on behalf of the Planning and Building Committee, I move the adoption of the foregoing resolution. PLANNING AND BUILDING COMMITTEE OAKLAND COUNTY PARKS AND RECREATION CONFERENCE CENTER CONTRACTS 2014 Actuals and 2015 - 2020 Estimated Projections FINANCIAL ANALYSIS AND COST RECOVERY PERCENTAGES KATHERINE'S CATERING 1 Gross Sales are projected to grow by approximately 7% on Banquets and 1% in the Grill Room each year after 2016. Figures provided by vendor. 2 Food and Beverage Fee and Equipment Fee is waived in year 1 of the contract (2016). 3 Food and Beverage Fee and Equipment Fee is waived in year 2 of the contract (2017), only if sales do not reach the projected $1.2 million mark. 4 Food and Beverage Fee is 3% of the total gross sales annually. 5 Utilities are reimbursed in full each year, future estimated amounts are based on 2% annual increase over 2014 actuals. 6 Equipment Fee starts at $10,000 in 2017 and goes up 3% annually. This is a new revenue item for new contracts starting in 2016. 7 Total projected expenses are future estimates based on 2% annual increase over 2014 actuals. 8 Depreciation amounts are accurate as no major CIP projects have been completed recently at these facilities. 9 Modified net is the amount of expenses without depreciation. 10 Modified % is the cost recovery if depreciation is not included. OAK MANAGEMENT 1 Gross Sales are projected to grow by approximately 2-5% each year after 2016. Figures provided by vendor. 2 Food and Beverage Fee includes a fixed rate ($65,000 for Addison and $50,000 for Glen) that goes up 3% annually after 2016. 3 Food and Beverage Fee also includes a tiered payment structure for total gross sales after the first $1.5 million annually. 4 Utilities are reimbursed in full each year, future estimated amounts are based on 2% annual increase over 2014 actuals. 5 Equipment Fee starts at $10,000 in 2016 and goes up 3% annually. This is a new revenue item for new contracts starting in 2016. 6 Total projected expenses are future estimates based on 2% annual increase over 2014 actuals. 7 Depreciation amounts are tentative and subject to increase as major CIP projects have recently been completed at these facilities. 8 Modified net is the amount of expenses without depreciation. 9 Modified % is the cost recovery if depreciation is not included. 0 OAKLAND COUNTY PARKS AND RECREATION CONFERENCE CENTER CONTRACTS 2014 Actuals and 2015 - 2020 Estimated Projections FINANCIAL ANALYSIS AND COST RECOVERY PERCENTAGES KA THERI NE'S CATERING LOCATION GROSS SALES FOOD & BEV FEE UTILITIES EQUIP MAINT FEE • PROJECTED COST RECOVERY ANALYSIS PER LOCATION PER LOCATION PER LOCATION PER LOCATION • RECOVERY % DEPRECIATION DEP. % MODIFIED NET MODIFIED % 2014 Lyon Oaks $ 721,221.00 $ 111,789.26 $ 93,695.96 $ • • .: 49% $ 86,266.00 38% $ 140,205.00 80% 2015 Lyon Oaks $ 700,000.00 $ 108,500.00 $ 95,569.88 $ • : • • • •231,000.42 • • 47% $ 86,400.00 37% $ 144,600.42 75% 2016 Lyon Oaks $ 688,679.00 waived $ 97,481.28 waived • 41% $ 86,300.00 37% $ 149,320.43 65% 2017 Lyon Oaks $ 726,698.00 $ 21,800.94 $ 99,430.90 $ 10,000.00 $ 131,231.84 $ 240,332.84• • • • • • 55% $ 86,300.00 36% $ 154,032.84 85% 2018 Lyon Oaks $ 767,276.00 $ 23,018.28 $ 101,419.52 $ 10,300.00 $ 134,737.80(110,401.69) 55% $ 86,300.00 35% $ 158,839.49 85% 2019 Lyon Oaks $ 810,591.00 $ 24,317.73 $ 103,447.91 $ 10,609.00 $ 138,374.64 $ 250,042.28.. 55% $ 86,300.00 35% $ 163,742.28 85% 2020 Lyon Oaks $ 856,836.00 $ 25,705.08 $ 105,516.87 $ 10,927.27 $ 142,149.22 $ 255,043.13' • 56% $ 86,300.00 34% $ 168,743.13 84% GROSS SALES FOOD & BEV FEE UTILITIES EQUIP MAINT FEE TOTAL " PROJECTED COST RECOVERY ANALYSIS YEAR LOCATION PER LOCATIO PER LOCATION PER LOCATION PER LOCATION • RECOVERY % DEPRECIATION DEP. % MODIFIED NET MODIFIED % 2014 White Lake Oaks $ 486,971.00 $ 56,001.67 $ 56,825.50 $ -$ 56,001.67 $ 190,381.00 29% $ 79,800.00 42% $ 110,581.00 51% 2015 White Lake Oaks $ 478,279.00 $ 55,002.09 $ 57,962.01 $ -$ 55,002.09 (139,186.54) 28% $ 79,900.00 41% $ 114,288.62 48% 2016 White Lake Oaks $ 438,679.00 waived $ 59,121.25 waived $ 59,121.25 $ 198,072.3930% $ 79,800.00 40% $ 118,272.39 50% 2017 White Lake Oaks $ 465,519.00 $ 13,965.57 $ 60,303.68 $ 10,000.00 $ 84,269.25 $ 202,033.84. • 42% $ 79,800.00 39% $ 122,233.84 69% 2018 White Lake Oaks $ 494,420.00 $ 14,832.60 $ 61,509.75 $ 10,300.00 .64 •. • 42% $ 79,800.00 39% $ 126,274.52 69% 2019 White Lake Oaks $ 525,557.00 $ 15,766.71 $ 62,739.94 $ 10,609.00 $ 89,115.65 $ 210,196.01•:• 42% $ 79,800.00 38% $ 130,396.01 68% 2020 White Lake Oaks $ 559,097.00 $ 16,772.91 $ 63,994.74 $ 10,927.27 . •214,399.93 43% $ 79,800.00 37% $ 134,599.93 68% OAK MANAGEMENT I ROSS SALES FOOD & BEV FEE UTILITIES EQUIP MAINT FEE • " • • COST RECOVERY ANALYSIS YEAR LOCATION dkER LOCATION PER LOCATION PER LOCATION PER LOCATION • RECOVERY % DEPRECIATION DEP. % MODIFIED NET MODIFIED % 2014 Addison Oaks $ 1,270,000.00 $ 120,650.00 $ 54,441.00 $ -120,650.00 264,930.00 (144,280.00) 46% $ 24,983.00 9% $ 239,947.00 50% 2015 Addison Oaks $ 1,365,000.00 $ 129,675.00 $ 55,529.82 $ - • •270,228.60 (140,553.60) 48% $ 25,100.00 9% $ 245,128.60 53% 2016 Addison Oaks $ 1:750:000:00 $ 77,500.00 $ 56,640.42 $ 10,000.00 052% $ 59,200.00 21% $ 216,433.17 67% 2017 Addison Oaks $ 1 70000 0 $ $ 80,650.00 80,650.00 $ $ 57,773.22 57,773.22 $ 10,300.00 $ 10,300.00 148,723.22 $ 281,145.84 $ (132,422.61) 53% 53% $ 59,200.00 59,200.00 21% 21% $ $ 221,945.84 221,945.84 67% 67% 2018 2018 Addison Oaks Addison Oaks $ $ 1,860,000.00 1,860pOOO.00 $ $ 88pO58.50 88,058.50 $ $ 58,928.69 58,928.69 $ 10,609.00 $ 10,609.00 • . 55% 157,596.19 286,768.75 $ (129,172.56) 55% $ 59,200.00 59,200.00 21% 21% $ $ 227,568.75 227,568.75 69% 69% 2019 2019 Addison Oaks Addison Oaks $ $ 1,950,000.00 1,950,000.00 $ $ 95,527.26 95,527.26 $ $ 60,107.26 60,107.26 $ $ 10,927.27 $ 10,927.27 .. • 57% 166,561.79 292,504.13 $ (125,942.34) 57% $ 59,200.00 59,200.00 20% 20% $ $ 233,304.13 233,304.13 71% 71% 2020 2020 Addison Oaks Addison Oaks $ $ 2p040p000.0 2,040,000.00 $ 103,458.07 $ 61,309.41 $ 11,255.09 059% $ 59,200.00 20% $ 239,154.21 74% GROSS SALES FOOD & BEV FEE UTILITIES EQUIP MAINT FEE • " PROJECTEDCOST RECOVERY ANALYSIS YEAR LOCATION PER LOCATIO PER LOCATION PER LOCATION PER LOCATION • RECOVERY % DEPRECIATION DEP. % MODIFIED NET MODIFIED 2014 Glen Oaks $ 1,075,000.00 $ 172,000.00 $ 69,499.00 $ -172,000.00 191,042.00 (19,042.00) 90% $ 54,655.00 29% $ 136,387.00 126% 2015 Glen Oaks $ 1,250,000.00 $ 200,000.00 $ 70,888.98 $ • • • • • • • 194,862.84 $ 5,137.16 103% $ 54,500.00 28% $ 140,362.84 142% 2016 Glen Oaks $ 1,550,000.00 $ 52,500.00 $ 72,306.76 $ 10,000.00 : • . . • • 68% $ 54,700.00 28% $ 144,060.10 94% 2017 Glen Oaks $ 1,941,000.00 $ 75,190.00 $ 73,752.89 $ 10,300.00 $ 159,242.89 $ 202,735.30 79% $ 54,700.00 27% $ 148,035.30 108% 2018 Glen Oaks $ 2,029,000.00 $ 82,575.00 $ 75,227.95 $ 10,609.00 $ 168,411.95 $ 206,790.00 • 81% $ 54,700.00 26% $ 152,090.00 111% 2019 Glen Oaks $ 2,087,000.00 $ 88,226.35 $ 76,732.51 $ 10,927.27 ::. : • • 83% $ 54,700.00 26% $ 156,225.80 113% 2020 Glen Oaks $ 2,145,000.00 $ 93,925.44 $ 78,267.16 $ 11,255.09 85% $ 54,700.00 25% $ 160,444.32 114% As of April 22, 2015 10 Katherine's Catering Projected Revenue and Expenses - Lyon Oaks $300,000.00 $250,000.00 --- - -- -- ---- $200,000.00 $150,000.00 $100,000.00 $50,000.00 2014 2015 2016 2017 2018 2019 2020 REVENUES EXPENSES 11 90% 80% 70% 60% 50% - 40% 30% - 20% 10% 0% 2014 Katherine's Catering Cost Recovery Percentages- Lyon Oaks 2015 2016 2017 2018 ■ RECOVERY % ■ DEP. % ■ MODIFIED % 2019 2020 12 $250,000.00 $200,000.00 $150,000.00 $100,000.00 $50,000.00 Katherine's Catering Projected Revenue and Expenses - White Lake Oaks 2014 2015 2016 2017 2018 2019 2020 REVENUES Historical Net after Utilities EXPENSES 13 Katherine's Catering Cost Recovery Percentages- White Lake Oaks 80% 70% 60% 50% MT - 40% 30% - m i - - 20 % 10% 2014 2015 2016 2017 2018 2019 2020 ■ RECOVERY % ■ DEP. % ■ MODIFIED % 14 $350,OOO.00 Oak Management Projected Revenueand Expenses -Addison Oaks $300,000.00 $250,000.00 $200,000.00 $150,000.00 $100,000.00 $50,000.00 2014 2015 2016 2017 2018 --REVENUES --�EXPENSES 2019 2020 15 80 70% 60% - 50 40 30 20 10% 0% Oak Managment Cost Recovery Percentages- Addison Oaks i 2014 2015 2016 2017 ■ RECOVERY% ■ DEP. % ■ MODIFIED 2018 2019 2020 16 $200,00o.00 $150,000.00 $100,000.00 $50, 000.00 M e Oak Management Projected Revenue and Expenses -Glen Oaks 2014 2015 2016 2017 2018 Z019 --REVENUES "EXPENSES 2020 17 160% 140% 120% 100% 80% 60% 40% 20% 0% 2014 Oak Managment Cost Recovery Percentages- Glen Oaks 2015 2016 2017 2018 ■ RECOVERY % ■ DEP. % ■ MODIFIED % 1111 2019 2020 18 OAKLAND COUNTY PARKS & RECREATION COMMISSION AGENDA APRIL 29, 2015 To: Chairman Fisher and Commission Members From: Daniel J. Stencil, Executive Officer Submitted: April 23, 2015 Subject: FY 2016-2018 Budget Overview/Process INTRODUCTION AND HISTORY AGENDA ITEM NO, G C--1 ADMINISTRATION Fiscal Services Coordinator Jeff Phelps and I will provide the Commission with an overview of the FY 2016-2018 Oakland County Parks and Recreation Budget, including the schedule and the process. The enclosed documents are for your review as part of the FY 2016-2018 Proposed Budget Presentation. We encourage the Commission's review and participation. We will be preparing Budget 101 Orientation Manuals for each Commission Member and will have them ready for distribution at the Commission meeting on Wednesday. It is our hope that this manual could be used to assist the Commission through the OCPR Budget process. If you have any questions please do not hesitate to contact the Presenter ahead of time or ask your questions during the Budget workshop sessions. 19 J Fhi.Sc:-`.z 2i COUNTY M I C H I G A N. MANAGEMENT & BUDGET April 14, 2015 Mr. Gerald A. Fisher, Chairman Parks & Recreation Commission Bldg. #97 West 2800 Watkins Lake Road Waterford, MI 48328 Dear Mr. Fisher: OAKLAND COUNTY EXECUTIVE L. BROOKS PATTERSON -Equalization Division (248) 858-0740 1 equal@oakgov.eorn Enclosed herewith please find a copy of the Oakland County 2015 Tax Rate Request Form L-4029. This form, filed annually, is required for all taxing jurisdictions within the county. As part of our function at Oakland County Equalization we calculate the annual millage reduction fractions required by the "Headlee" Amendment (MCL 211.34d) for all taxing jurisdictions for use by each in the completion of this form. Oakland County millages are subject to a "Headlee" Rollback for tax year 2015, as noted in Column 6, and used in the calculations of 2015 millage rates. When the "Headlee" Rollback of 0.9983 is applied to the Oakland County Parks and Recreation millage rate the maximum allowable rate is reduced from 0.2415 to 0.2410. Please be advised that. on Thursday, April 30, 2015 the Oakland County Operating and Parks and Recreation millages will be presented to the Finance Committee for their approval. Should you have . any questions related to this matter, please do not hesitate to contact me at 248.858-0760. Sincerely, 1 1 4 D vid , Hieber, Manager Oakland County Equalization 1,5 L-4029 P&R OC.docx Enclosure cc Michael Gingeli, Chariperson O.C. Board of Commissioners cc J, David VanderVeen, Vice -Chairman Parks & Recreation Commission 250 Elizabeth Lake Road, Ste. 1000 W 1 Oakland Pointe Office Building I Pontiac, MI 483411 Fax (248) 858-2074 1 oakgov.com 20 ORIGINAL TO: County Clerk(s) Michigan Department of Treasury COPY TO: Equalization Department(s) L-4029 614 (Rev. 4/08) COPY TO: Each township or city clerk 2015 Tax Hate Request (This form must be completed and submitted on or before September 30, 2015) MILLAGE REQUEST REPORT TO COUNTY BOARD OF COMMISSIONERS Carefully read the instructions on page 2. This form is issued under authority of MCI -Sections 211,24e, 211,34 and 211.34d. Filing is mandatory; Penalty applies. County 2015 Taxable Value of ALL Properties in the Unit as of 5-27-15, OAKLAND 51,803,169,207 Local Government Unit For LOCAL School Districts: 2015 Taxable Value excluding Principal Residence, Qualified Agricultural, Qualified Forest, Industrial OAKLAND COUNTY Personal and Commercial Personal Properties if a millage is levied against them. You must complete this form for each unit of government for which a property tax is levied. Penalty for non -filing is provided under MCL Sec 211.119. The following tax rates have been authorized for levy on the 2015 tax roll. (8) (5)•' (s) (7) Sec 211,34 (4) 2014 2015 2015 Truth in (10) (11) Original Millage Rate Current Year Millage Rate Assessing or (9) Millage Millage (12) Millage Permanently "Headlee" Permanently Equalization Maximum Requested Requested Expiration (2) (3) Authorized Reduced by Millage Reduced by Millage Allowable to be to be Date of (1) Purpose of Date of by Election, MCL 211.34d Reduction MCL 211.34d Rollback Millage Levied Levied Millage Source Millage Election Charter, etc. "Headlee" Fraction "Headlee" Fraction Levy' July 1 Dec. 1 Authorized Voted Operating 08/08/78 5.2600 4.2240 0.9983 4.2168 1.0000 4.2168 4.0900 Voted Parks & Rec 08/03/10 0,2415 0.2415 0.9983 0.2410 1.0000 0.2410 0.2410 12/31/2021 Prepared by ITelephcne Number ITitle of Preparer CERTIFICATION: As the representatives for the local government unit named above, we certify that these requested tax levy rates have been reduced, if necessary to comply with the state constitution (Article 9, Section 31), and that the requested levy rates have also been reduced, if necessary, to comply with MCL Sections 211,24e, 211.34 and, for LOCAL school districts which levy a Supplemental (Hold Harmless) Millage, 380.1211(3). ❑ Clerk Signature Print Namo Date ❑ Secretary ❑ Chairperson (Signature Print Name Date ❑ President "Under Truth in Taxation, MCL Section 211.24e, the governing body may decide to levy a rate which will not exceed the maximum authorized rate allowed in column 9. The requirements of MCL 211.24e must be met prior to levying an operating levy which is larger than the base tax rate but not larger than the rate in column 8. ** IMPORTANT: See instructions on page 2 regarding where to find the millage rate used in column (5) Date i4(re�lS��R41i 4)�ti1�tUsg<7tily�GoitiNiIfi�giieS?i)ig_;; 1litiilige Y# b�ler!it;d See:5EC f3ull,�titt 2: itf:20U8:4ur:;::: Total School District Operating Rates to be Levied (HH/Supp and NH Oper ONLY) Rate For Principal Residence, Qualified Ag, Qualified Forest and Industrial Personal For Commercial Personal For all Other I 21 Parks and Recreation Commission Oakland County Property Tax Values Impact of Headlee Rollback update of April 14, 2015 Parks and Recreation Propety Tax Revenue Parks and Percentage of Anticipated County Recreation Taxable Value Property Tax Property Headlee Fiscal Applicable Taxable Percentage Change Amount Amended/Adopted Received Tax Revenue Rollback Year Fiscal Year Value From Previous Year Millage MRF Max Levy (B)' (H) /1000 Budget Actual ML L (95%) ` (H) Impact FY2014 FY2015 $ 49,960,199,257 0.25 1.00000 0.25 0.2415 $ 12,065,388 $ 11,440,000 $ 11,533,559.88 95.59% FY2015 FY2016 $ 51,803,169,207 3.6889% 0.25 0.99202 0,248005 0.241 $ 12,484,564 $ 11,672,000 $ 11,861,000 $ (25,902) FY2016 FY2017 $ 54,000,000,000 4.2407% 0.248005 0.99507 0.2467823 0.241 $ 13,014,000 $ 12,022,000 $ 12,364,000 FY2017 FY2018 $ 56,700,000,000 5,0000% 0.246782 0.99221 0.244860 0.241 $ 13,664,700 $ 12,413,000 $ 12,982,000 22 Parks and Recreation Commission Capital Improvement Projects Completed in FY2014 - Budget to Actual Comparison Project Original Amended Project Number Type Project Description Budget Budget Total Expenses 100000001102 PKIMP CAT Asphalt Curb Parking Lot $ 65,016.00 $ 65,016.00 $ 26,552.26 100000001103 PBLDG CAT Rstrm-Concessn-StorageBldg $ 520,008.00 $ 739,240.36 $ 716,100.46 100000001330 PKIMP CAT Play Structure 1-5 yrs old $ 22,925.00 $ 62,465.97 $ 63,664.44 100000001481 PKIMP CAT Site Development -Phase 1 $ 260,500.00 $ 354,356.29 $ 387,823.28 100000001482 PBLDG CAT Pavilion -Play Area $ 72,485.00 $ 112,463.20 $ 97,747.92 100000001483 PKIMP CAT Play Structure 6-12yrs old $ 112.735.00 $ 124,931.95 $ 106,243.75 100000001736 PBLDG ADD Addison Oaks Yurt 1 $ 21,080.00 $ 48,QB0.00 $ 52,693.85 100000001737 PBLDG ADD Addison Oaks Yurt 2 $ 21,208.00 $ 48,208.00 $ 52,509.96 100000001738 PBLDG GRV Groveland Oaks Yurt 1 $ 21,208.00 S 26,208.00 $ 33,430,43 100000001739 PBLDG GRV Groveland Oaks Yurt 2 $ 21,208.00 $ 26,208.00 $ 33,918.22 100000001754 PKIMP RDD Pavilion Shade Structures $ 27,000.00 $ 27,000.00 $ 21,358.55 100000001755 PKIMP SAC Bleacher Replacement $ 140,000.00 $ 600,000.00 $ 558,352,18 100000001790 PBLDG SPG Starter Shack $ 75,000,00 $ 75,000.00 $ 61,937.25 100000001816 PKIMP ADD Electronic Entr Gate Sys $ 25,000.00 $ 25,000.00 $ 21,311.88 100000001817 PKIMP GRV Electronic Entr Gate Sys $ 40,000.00 $ 40,000.00 $ 26,580.65 100000001834 PKIMP IND Play Lot Beach Main $ 153,942.00 $ 153,942.00 $ 153,942.00 100000001835 PKIMP IND Play Lot Beach Satellite $ 42,389.00 $ 42,389.00 $ 42,389.00 100000001840 PKIMP WCM Fans $ 16,000.00 $ 16,000.00 $ 16,408.77 100000001843 PBLDG ADD Concession Ext Renovations $ 50,000.00 $ 50,000.00 $ 39,869.19 100000001917 PKIMP GRV Beach Improv and Dredge $ 15,000,00 $ 15,000.00 $ 12,691.00 100000002000 PKIMP WTR Greenhouse Roofing $ 19,000.00 $ 19,000.00 $ 18,598,27 $ 1,741,704.00 $ 2,670,508.77 $ 2,644,123.31 Balance - Favf(UnfavJ $ 38,463.74 $ 23,139.90 $ (1,19B.47) $ (33,466.99) $ 14,715,28 $ 18,688,20 $ (4,613.85) $ (4,301.96) $ (7,222.43) $ (7,710.22) $ 5,641,45 $ 41,647.82 $ 13,062.75 $ 3,688.12 $ 13,419.35 $ (408.77) $ 10,130.81 $ 2,309.00 $ 401.73 $ 126,386.46 Prepared by Fiscal Services Division 121212014 C:\UserslPhelpsilDocumentsl$DatalParks and RecreationlClPlMonthly Report120151FY2015 CIP Monthly Report. xlsx 23 Parks and Recreation Commission Capital Improvement Projects Completed in FY2015 as of April 22, 2015 Budget to Actual Comparison Original Amended Projects Closed in FY2015 Budget Budget 100000000867 ORN Pavilion -Dog Park $ 130,000 $ 251,261 100000001114 RSE Trail Development $ 389,S00 $ 389,500 100000001115 RSE Boardwalks -Docks -Overlooks $ 342,000 $ 342,000 100000001331 HGH Trail Development -Phase 1 $ 284,200 $ 284,200 100000001332 HGH Boardwalks -Docks -Overlooks $ 64,000 $ 64,000 100000001335 LYP Boardwalks -Docks -Overlooks $ 80,000 $ 80,000 100000001336 RWP Connector Trails $ 397,122 $ 397,122 100000001751 GRV Restroom/Shower Section C $ 613,97S $ 613,975 100000001752 HGH Parking Lot - Central $ 144,252 $ 178,847 100000001753 LYP Pavilion Small Dog Park $ 40,000 $ 40,000 100000001807 GLC HVAC Replacement $ 290,939 $ 290,939 100000001819 SAC Ellis Barn Improvements $ 643,056 $ 643,056 100000001825 GLC Interior Renovations $ 577,404 $ 577,404 100000001826 ACC Interior Renovations $ 450,000 $ 450,000 100000001847 GLG Irrigation Pond Dredging $ 296,000 $ 296,000 100000001881 ACC Roof Replacement $ 799,295 $ 799,29S 100000001967 GRV Roadway Putt Putt Light $ 22,500 $ 22,500 100000002007 ADD Asphalt Trail $ 43,000 $ 43,000 100000002009 ADD Concrete Sidewalks $ 18,500 $ 18,500 100000002011 IND Play Lot Twin Chimneys $ 39,000 $ 39,000 100000002012 GRV Play Lot Concession $ 250,000 $ 250,000 10000000202E RDP Removable Raised Flooring $ 45,355 $ 45,355 100000002096 ACC Entrance Drive Replacement $ 139,384 $ 139,384 $ 6,099,482 $ 6,255,333 Total Expenses $ 251,463 $ 130,309 $ 231,921 $ 135,206 $ 49,926 $ 76,850 $ 362,987 $ 590,190 $ 182,165 $ 28,254 $ 263,445 $ 591,988 $ 463,681 $ 571,917 $ 292,839 $ 657,232 $ 19,311 $ 38,216 $ 18,210 $ 36,012 $ 247,451 $ 41,210 $ 92,24S $ S,373,028 24 OAKLAND COUNTY PARKS & RECREATION COMMISSION AGENDA APRIL 29, 2015 AGENDA ITEM NO. 6 C 2 & 3 FACILITIES MAINTENANCE & DEVELOPMENT To: Chairman Fisher and Commission Members From: Daniel J. Stencil, Executive Officer Michael J. Donnellon, Jr., Chief of Park Facilities Maintenance & Development Submitted: April 7, 2015 Subject: GENERAL APPROVAL — FY2016-2026 PROPOSED Capital Improvement Program (CIP) & Maintenance Management Plans — (1) CIP Project Budget (2) Maintenance Project Budget (3) 10 Year Forecasts EXECUTIVE SUMMARY 1. In an effort to continue to maintain, improve and manage over 230 park facilities, buildings and structures within the 13 Oakland County Parks, staff continues to improve the identification and forecasting of both capital and maintenance projects. Of the Proposed FY2016 CIP/Maintenance Management Plan Projects, the proposed projects represent a 63.4% reinvestment into existing fixed assets and 36.6% investment in new assets. Of the new assets, 91,2% is the proposed new investment for the Independence Oaks Connector Trail. It is anticipated to be split equally between Independence Township and OCPRC ($600,000 each). 2. Funds Requested: 1. Proposed FY2016 CIP Management Plan = $2,057,635 2. Proposed FY2016 Maintenance Management Plan = $ 800,000 3. Total Investment = $2,857,635 3. Of the estimated $89,840,149 in current replacement value (CRV) of park capital assets', these management plans represent a 1.8% reinvestment. 1. According to both the "National Research Council — Building Research Committee", and the "Association of Physical Plant Administrators (APPA), Capital Renewal and Deferred Maintenance Programs Report, 2009, Harvey Kaiser", an estimated 2% - 4% reinvestment (capital renewal) of the current replacement value of facilities is recommended. 2. 4%-5% is documented in the 2008 OCPRC Strategic Plan facilitated by PROS Consulting from their planning and consulting experiences across the country. PLANNING OVERVIEW 1. Refer to planning review (Appendix A, Page 75-79) for detailed planning information relative to management plans. 1. Capital/Maintenance Management Plan a) Initial budget history: 3. Completed as part of the Annual Budget Review Process 4, Began forecasting 15 years in FY2010 5. Modified the 15 year forecast to a 10 year forecast in FY2015, to align with various park planning efforts. ' Reference; OCPRC Industrial Appraisal Company — Insurance Summary Report, dated 9-30-2010. 25 Page 2 EMEMNIM b) FY2016 Capital Improvement Program Budget (Refer to Attached CIP Management Plan, Page 13 1. 28 Proposed Projects $ 2,057,635.00 a. Design/Engineering Projects (12) $ 313,000,00 b. Construction Projects (12) $ 1,419,635.00 C. Replacement Programs (4) $ 325,000.00 2. In -Progress Projects (Carry-over) $ 1,656,314.00 (Estimated 4-3-2015) c) FY2016 Maintenance Program Budget (Refer to Attached Maintenance Management Plan, Page 61 1. 13 Proposed Projects/Programs $ 800,000.003 a. Design/Engineering (0) $ 0.00 b. Construction Maintenance Projects (2) $ 30,000.00 C. Maintenance Programs (5) $ 370,000,00 d. Natural Resource Programs (1) $ 400,000,00 d) FY2016 — 2026 Capital Improvement Program 10 Year Forecast (Refer to Attached CIP Forecast, Pages 43-60 e) FY2016 — 2026 Maintenance Program — 10 Year Forecast (Refer to Attached Maintenance Forecast, Pages 71-74 PROJECT OVERVIEW 1. FY 2016 — 10 Year CIP & Maintenance Management Plans(Need): 1. Management Plan and Forecast purpose: a) In an effort to continue to improve, maintain and manage over 230 park facilities, buildings and structures within the 13 Oakland County Parks, staff continues to improve the identification and forecasting of both capital and maintenance projects. b) These management plans are based on master plans, public surveys and staff recommendations. 2. Considerations: a) Implementing and aligning fiscal practices with the County's Fiscal Services and Management/Budget Departments b) Defining, clarifying and improving commission approval processes. c) Staff's typical project budgeting philosophy includes; 1. Design/Engineering completed during Fiscal Year 1 2. Construction/installation completed during Fiscal Year 2+ 3. Capital and Maintenance Management Programs: a) Capital Management Programs 1. Pavement replacement 2. Roofing replacement a. Removed from FY2016, due to the completion of a Roofing Management Plan that identifies, priorities, forecast and schedule all individual roof replacements. 3. Building Equipment Replacement a. Aka; Heating, ventilation and air-conditioning (HVAC) equipment replacement 4. Fence Line Replacement b) Maintenance Programs 1. Pavement Maintenance/Repair 2. Carpet/flooring repair/replacement 3. Interior/exterior painting 4. Window/door replacement 5. Natural resources 6. ADA Transition Plan 2. Design/Engineering Consultants & Construction Managers 1. Prime design consultants — Not applicable 2. Construction manager— Staff utilized both George W. Auch and Frank Rewold & Son's to review projects initial scope of work and assist staff in validating the initial construction budget. 2 Upon Commission Approval on September 8, 2015, 'Proposed' projects will become `Active' staff projects that will follow typical commission approval procedures. 3 This amount is budgeted under the Facilities Maintenance (FM) budget center, #730789 General Program Administration. 26 Page 3 a) Design/engineering is based upon 10% of identified construction budget. b) Final design program is verified during the Conceptual Design Development Phase, resulting in a refined project budget representing total project costs, including design/engineering, permits, fees construction, etc. 3. Previous discussions/agenda dates 1. Commission Budget Workshop — TBD 2. Conceptual Review & Approval — TBD 4, Funding considerations 1. Typically the Project Status of `Pending' within the proposed fiscal year, indicates that the project is budgeted however not authorized for completion until a grant, partner or sponsorship agreement has been approved. 2. Staff continues to explore alternative funding opportunities, as applicable to all projects. 3, For efficiency, staff utilizes existing county contracts for design/engineering of construction and maintenance projects, when these design/engineering fees are under the following amounts; a) Design/Engineering & Construction - $50,000 b) Existing contracts with our construction managers are utilized when projects are over the $50,000. c) Any DesignlEngineering or Construction project over $100,000 requires commission approval. 4. If a project budget is validated during the Conceptual design process and is conceptually over the originally approved fiscal year budget, the source of additional funds is allocated from the Net -Position Unrestricted Funds. a) This requires commission approval. Project Timeline: 1. Annual Review Meetings with Park Staff 2. Update Project Database 3. Administrative Review 4. Commission Budget Workshop 5. Conceptual Commission Approval 6. Final Commission Approval ATTACHMENTS August/September/October 2014 November 2014 thru February 2015 February/March 2015 April 2015 August 2015 September 2015 1. Attachment A — FY2016 CIP & Maintenance Management Plans and 10 Year Forecasts 27 PROPOSED FY2016 CAPITAL IMPROVEMENT PROGRAM/MAINTENANCE MANAGEMENT PLANS AND 10 YEAR FORECASTS LODI-11-01"vMlviT 1' i DE•Y•`�-�1]L I WEDNESDAY, APRIL 29, 2015 @ 2:OOPM 29 MANAGEMENT PLANS AND 10 YEAR FORECASTS Table of Contents General Information • Sum ma ry (Copy of 05/12/15 Commission Memo) • Definitions Pages 4-7 • Commission Approval Work Flow Diagram Page 9 • Internal Program Approval Work Flow Diagram (Prelim) Page 10 • Budget Center Abbreviations Page 11 • Unit Descriptions Page 12 FY2015 CIP Management Plan TAB • Proposed* CIP Projects (listed by project type) (to be listed in final report) • Proposed* CIP Projects (listed by priority Category) Page 13 • Proposed* CIP Scope Reports Pages 15-42 • In -Progress CIP Projects (to be Listed in Final report) • 10 Year CIP Project Forecast Pages 43-60 FY2015 Maintenance Management Plan TAB • Proposed* Maintenance Projects (listed by project type) (to be listed in final report) • Proposed* Maintenance Projects (listed by priority category) Page 61 • Proposed* Maintenance Scope Reports Pages 63-70 • In -Progress Maintenance Projects (to be listed in Final Report) • 10 Year Maintenance Project Forecast Pages 71-74 Appendix A • Planning Review— FY2016 CIP/Maintenance Management Plans Page 75-79 *Upon commission approval on September 8, 2015'Proposed' projects become 'Active' staff projects. 3 30 MANAGEMENT PLANS AND 10 YEAR FORECASTS Definitions Capital Improvement Program (CIP) — Management Plan & 10 - Year Forecast: The CIP Management Plan & 10 - Year Forecast includes specific cost center projects that are over an investment of $5,000 that extends the life/replaces an existing facility or creates a new facility, including the following CIP replacement programs: • Roofing Management Program (FY2016 = $0) o Phased replacement program of 230+ park -wide roofing systems, including asphalt shingles, EPDM Membrane, composite and other roofing types. ■ Proposed for FY2016 and with the completion of the Roofing Management Program Analysis by Facilities Planning & Engineering in early January, 2015, individual facility roofs are prioritized and forecast within the management plan, rather than budgeting an annual lump sum amount. (Please refer to Project #16) • ADA Transition Program (FY2016 = $150,000) o Program includes individual budget center projects focusing on the recommended priorities established by the Department of Justice (DOJ). o Includes the continued implementation of the 2003 ADA Transition Plan and identified replacement projects, as well as additional recommendations by the staff ADA Transition Committee. o Previously budgeted as a Maintenance & Operations Program. • Pavement Management Program (FY2016 = $300,000) o Phased replacement program of one million plus square yards of various paving materials including asphalt, concrete and paver units, focusing on vehicle circulation/parking and pedestrian routes to the various facilities. • Building Equipment Replacement Program (FY2016 = $50,000) o Phased replacement program of more than 500 various heating, ventilation and air conditioning systems such as furnaces, boilers, hot water heaters, softeners etc. • Fence Line Replacement Program (FY2016 = $150,000) o Phased replacement program for more than 320,000 lineal feet (60 miles) of various perimeter and interior fencing types for recreational security, safety and potential encroachments. 4 31 MANAGEMENT PLANS AND 10 YEAR FORECASTS Definitions Maintenance Management Plan & 10 - Year Forecast: The Maintenance Management Plan & 10 - Year Forecast includes maintenance projects exceeding $5000 on either an individual cost center basis, or a park -wide cumulative total. This management plan is budgeted within the Facilities Maintenance — Maintenance & Operating Budget, Line Item #730789 — General Program Administration (NEED TO CONFIRM). Routine maintenance categories have been identified by staff to be completed together as one annual effort for management efficiencies, cost reductions due to project consolidation, routine life cycle and maintenance standards. These categories do not include minor maintenance due to vandalism, damage or emergency repairs and may be completed by OCPR Staff if resources are available. These categories assist with the establishment of a traceable, routine standard of maintenance for forecasting a replacement fiscal year. The maintenance management plan categories are as follows: ■ Pavement Maintenance o Program includes individual budget center projects that are approximately $1,500 and above o Includes cutting, patching, grinding, sealcoating or crack sealing various pavements including parking lots, curbs, sidewalks, pathways, pool decks o Portions, if not all of the program, may be coordinated through existing Facilities Planning & Engineering Department (General Fund Staff). • Carpet/Flooring Replacements o Program includes individual budget center projects that are approximately $1,000 and above o Includes all interior and exterior flooring types including carpeting, vinyl tile and ceramic tile ■ Window/Door Replacements o Program includes individual budget center projects that are approximately $1,000 and above based on park -wide standards for various park facilities. o Includes all interior and exterior window and door types, including decorative doors, utility doors, overhead doors and hardware replacement. ■ Exterior/Interior Painting/Coatings o Program includes individual budget center projects that are approximately $2,500 and above. o Includes the interior/exterior of all building and park components, including signs and playgrounds based on standard facility or park colors 0 Includes all surfaces requiring painting, staining or other coatings as applicable ■ Forestry (Tree) Program o Program includes installation, removal & replacement of trees within individual budget centers that are approximately $1,000 and above o Program focuses on approximately 2,200 acres of developed park land and buffer areas. o May include the installation of trees within our natural areas. • Natural Resource Management o Program includes individual budget center projects that are approximately $500 and above. o Includes all natural resource projects and programs, including prescribed burns, wildlife and vegetation management, monitoring and aerial surveys 5 32 MANAGEMENT PLANS AND 10 YEAR FORECASTS Definitions Project Priority Category Definitions: Each project is assigned an initial priority category. The primary purpose of these categories is to establish and communicate each project's importance for budgetary approval purposes. Additionally, these priority categories assist management to assign Active projects as explained below and create project schedules, which are regularly reported to the commission. The priority levels are as follows: • Priority Category #1— Health and Safety: o Completion of a project is important to protect patrons and staff from physical injury or harm. o Completion of a project is important to protect patrons and staff against the transmission of biological disease. • Priority Category #2 — Regulatory: o Completion of a project is needed for compliance with local, state or federal laws, ordinances and regulations. o Completion of a project is needed for compliance with public or private sponsorship, or other funding arrangements. • Priority Category #3 — Customer Service — Revenue Generation: o Completion of project may enhance annual revenue to a facility or budget center from patron pay per use fees. • Priority Category #4 — Customer Service — Efficiency and Operational Savings: o Completion of project may decrease annual operational costs for facilities or budget centers. • Priority Category #5 — Customer Service — Facility Enhancement: o Completion of a project may clearly increase customer satisfaction or significantly enhance the experience of patrons. o Completion of a project may enhance the natural, aesthetic, structural quality or the useful life of a facility. 6 33 MANAGEMENT PLANS AND 10 YEAR FORECASTS Definitions Project Status Definitions: Since the budget process requires a snapshot of the current fiscal year expenses of the CIP budget, staff needed to clearly identify what projects were being proposed for the following fiscal year. This was accomplished by indicating the following status of each project. • Active: o New and/or previously forecasted projects that will become ACTIVE and managed according to the Commission Approval Workflow once approved in the proposed funded fiscal year. ■ Active management of these projects typically will begin October 1s` of the proposed fiscal year. • Pending o New and/or previously forecasted projects that are PENDING approval of funding sources from grants, partnerships, sponsorships, etc. within the proposed funded fiscal year or future unfunded fiscal years. ■ Commission approval is required for a pending project to become active. • In -Progress o Current projects, typically under contract, that contractual obligations or expenditures may extend past October 1't of the proposed fiscal year. 7 34 35 COMMISSION APPROVAL WORKFLOW: CAPITAL & MAINTENANCE PROJECTS STEP 1 STEP 2 STEP 3 STEP 4 .. CONCEPTUAL k... � DESIGN INITIAL CONCEPTUAL PRESENTATION, PROJECT $COPE DESIGN BUDGET CONSTRUCTION He BUDGET ENGINEERING RFQ CONFIRMATION & DOCUMENTS PROJECT JUSTIFICATION • Initial design & Requires commission Requires commission Progress provided to construction budget approval IF: approval IF: commission by: • Commission approval as • Proposed design / • Conceptual • Commission active or pending engineering costs construction cost is Approval Schedule project within the are over $100,000 over $100,000 • Monthly/Quarterly current fiscal year • Design / • Project is over Report budget engineering is over initial budget • Executive officer's budget • Approved report (EOR) management plan is adjusted FISCAL YEAR ONE STEP 5 CONSTRUCTION IMPLEMENTATION Requires commission approval IF: • Construction contract is over $100,000 • Contract is over initial budget FISCAL YEARS TWO & THREE \ As of April 6, 2015 Page 1 9 36 i 31 PROGRAM APPROVAL WORKFLOW: PARK WIDE PROGRAMS STEP 1 STEP 2 STEP 3 cee C INITIAL PROJECT PROJECT SCOPE PROJECT APPROVAL COMPLETION & BUDGET • Identify locations, units, specifics to create scope • Obtain proposals for potential projects • Approval of project by FOM • CIP Created • Supervisor to contact contractor to begin project • Inspectors assigned to project to assist in oversight • Supervisors to monitor project • Regular updates communicated to Executive Officer STEP 4 STEP S PROJECT TRACKIN! INVOICING & QUARTERLY TRANSFERS • Supervisor to authorize & code all Invoices • Facilities administrative assistant to process invoices • Final authorization by Chief • Create project tracking log • Record invoices & monitor project balance • Complete quarterly transfer with fiscal As of April 6, 2015 Page 1 10 37 MANAGEMENT PLANS AND 10 YEAR FORECASTS FY2015 Park Department Abbreviations OAKLAND COUNTY PARKS & RECREATION FY2015 Fund 50800 Department 1 Program Chart Abbrev. I Dept. 1 Budget Center Description Staff Lead ADM Administrative Services Dan Stencil/Sue Wells FSA Fiscal Services - Administration Gaia Piir FSP Fiscal Services - Parks & Rec Holly Conforti FSP Fiscal Services - Parks & Rec Holly Conforti GLG Glen Oaks Golf Course Tom Hughes LYG Lyon Oaks Golf Course Tom Hughes RDG Red Oaks Golf Course Tom Hughes SPG S ringfield Oaks Golf Course Me Jim Dunleavy WLG Lake Oaks Golf Course Tom Hughes ACC Addison Oaks Conference Center Tom Hughes GLC Glen Oaks Conference Center Tom Hughes GRC Groveland Oaks Concessions Jim Dunleavy LYC Lyon Oaks Conference Center Tom Hughes RWC Red Oaks Waterpark Concessions Tom Hughes SPC Springfield Oaks Concession Jim Dunleavy WWC Waterford Oaks Waterpark Concessions Jim Dunleavy WLC White Lake Oaks Conference Center Tom Hughes WCM (Oakland County Market (Jim Dunleavy ADD Addison Oaks Park Tom Hughes GRV Groveland Oaks Park Jim Dunleavy HGH Highland Oaks Park Jim Dunleavy IND Independence Oaks Park Jim Dunleavy LYP Lyon Oaks Park Tom Hughes ORN Orion Oaks Park Jim Dunleavy RDD Red Oaks Dog Park Tom Hughes RDP Red Oaks Park Tom Hughes RSE Rose Oaks Park Jim Dunleavy SAC Springfield Oaks Activity Center/Park Jim Dunleavy WTR Waterford Oaks Activity Center/Park Jim Dunleavy REC Recreation Programs & Services Terry Fields CAT Catalpa Oaks Park Tom Hughes RWP Red Oaks Waterpark Tom Hughes WBX Waterford Oaks BMX Jim Dunleavy WWP Waterford Oaks Waterpark Jim Dunleavy FM Facilities & Maintenance Mike Donnellon Additional account numbers: CIPxxxx ICIP Projects (xxxx = CIP project number) I Mike Donnellon 11 38 MANAGEMENT PLANS AND 10 YEAR FORECASTS Unit Cost Acronyms Unit —ID Unit —Name Unit —Description Unit_Calc SF Square Foot Surface Area of a facility or land mass regardless of depth or elevation SY Square Yard Surface Area of a facility or land mass regardless of depth or elevation 3'x3' = 9 SF LF Linear Foot Linear measurement of a facility regardless of width M Linear Mile Linear measurement of a facility regardless of width 5,280 LF YD Linear Yard Linear measurement of a facility regardless of width 3 LF GAL Gallon Volume measurement in US Gallons AC Acre Surface Area of a facility or land mass regardless of depth or elevation 43,560 SF TON Tonnage Weight measurement of materials for a facility 2,000 LBS CYD Cubic Yard Volume measurement of materials for a facility 3'X3'X3' = 27 CF EA Each Cost for Individual elements of a facility CF Cubic Foot Volume measurement of materials for a facility SPC Space(s) Cost for individual elements of a facility HOLE Golf Hole(s) Cost for Individual elements of a facility, in particular to Golf Courses SITE Site(s) Cost for individual elements of a facility, in particular to Camp Grounds LS Lump Sum Overall cost of facilities, based on prior projects or experience PCT Percentage Percentage of facility costs. SM Square Mile Surface Area of a facility or land mass regardless of depth or elevation 640 AC FTR Feature(s) Cost of individual elements of a facility, in particular to Waterparks SFF Square Face Foot Vertical surface area of a facility or wall (Length x Ave. Height) LF X Avg. Height FLD Field(s) Cost for individual elements of a facility, in particular to recreational fields Other Other All other units to determine initial project budgets 12 39 FY2016 Proposed Projects for OCPRC Approval (listed by Priority Category) Priority Category Cost Center Capital Improvement Program Project Name Budget Page # 1 Health and Safety 1 ADM Pavement Management Program $200,000.00 21 1 IND Boathouse - Dock & Deck Replacement -Design $15,000.00 25 1 ADM ADA Transition Program $50,000.00 20 Total Health and Safety (5) $265,000.00 2 Regulatory 2 2 SAC IND Dam Improvements - Design Accessible Docks - MNRTF Grant $30,000.00 $82,000.00 40 26 Total Regulatory (3) $112,000.00 3 Customer Service -Revenue Generation 3 SPC Concession Remodeling - Design $47,000.00 41 3 ADD Concession Remodeling- Design $15,000.00 18 3 RWP Wave Pool -Wave Equipment Replacement - Constr. $325,000.00 37 3 ADD Water Feature- Design $36,000.00 17 3 IND Nature Center Exhibit Remodeling - Design $35,000.00 28 3 ADD Boathouse - Buhl Lake - Design $20,000.00 16 Total Customer Service -Revenue Generation (7) $478,000.00 4 Customer Service -Efficiency & Operational Savings 4 ADM Energy Management System Upgrade (Phase III - Final) $75,000.00 23 4 IND Contact Station Roof Replacement $10,300.00 31 4 IND South Maint. Building Roof Replacement $51,300.00 29 4 IND West Maint. Building Roof Replacement a $20,900.00 30 4 RDG Maintenance Building Roof Replacement $33,300.00 34 4 SAC Horse Arena Annoucers Pavilion Roof Replacement $5,500.00 38 4 LYG Boardwalk Replacement Hole # 17 $75,000.00 33 4 ADM Building Equipment Replacement Program $50,000.00 19 4 RWP Fenceline Replacement Program $25,000.00 22 4 SAC Barn -Siding Replacement $25,000.00 39 4 FM Wood Shop - Ventilation System Replacement $30,000.00 24 4 LYC Interior Renovation - Design $40,000.00 32 4 RDG Tunnel Replacement -Design $20,000.00 35 Total Customer Service -Efficiency & Operational Savings (15) $461,300.00 5 1 1 Customer Service -Facility Enhancement 5 ACC Garden/Entrance Landscape Renovation - Design $25,000.00 15 5 IND Upper Bushman Boardwalk/Trail Phase II-Constr.* $686,335.00 27 5 RWP Restroom - River Pumphouse - Design $15,000.00 36 5 WTR East-West Connector Trail - Design $15,000.00 42 Total Customer Service -Facility Enhancement (4) 1 $741,335.00 Grand Total All Capital Improvement Program Projects $2,057,635.00 * An additional $600,000 will be funded by Independence Township to completely fund this project. K:\ParksRec\General\Design\Financial\Budgets\FY2016 Budgets\2015.04.24 Numbered FY2016 Proposed Projects.xlsx 4/24/2015 10:34 AM 13 4O 14 41 GA p D Scope Description Project # 25 C Capital Improvement Status Pending ACC Addison Oaks Conference Center Project Name Garden/Entrance Landscape Renovation - Design CIP Number Project Scope Complete landscape planting bed renovation of the existing entrance, courtyard and garden areas, including irrigation, lighting, drainage, brick paver reinstallations, step refurbishment and garden wall replacement Project Comments Priority Title Forecasted Year Proposed Amount Budgeted Amount 12-17-2013 Newly identified project for FY2015. Existing layout of the paved surface area and gardens wall will essentially remain the same. Need to confirm the following units: Brick Pavers - 8,000 SF @ $5.00/ SF = $40,000 Garden Wall - 500 LF x 6' High = 3,000 SFF x 2 sides = 6,000 SFF x $100/SFF = $60,000 (Courtyard, Entrance and the West and South garden wall) Planting Beds - 12,000 SF x $5.00/SF = $60,000 Irrigation system - $20,000 LS Landscape Lighting $20,000 LS Drainage $20,000 LS Initial Project Estimate = $220,000.00 (FY2016) Design = $22,000 (FY2015) Consider completing the renovation in phases with park staff and resources, however budget is estimated based on contracting the project. Need to confirm project applicability to the Strategic Plan, Five -Year Recreational Master Plan, Park Vision and Facility Concepts (Master Plan), ADA Transistion Plan. Need to consider alternative funding or volunteer opportunities. 1-30-2014 Changed project status from pending to active. 3-12-15 Adjusted fiscal year from FY2015 to FY2016, changed project status from Active to Pending to reflect in the FY2016 budget scopes. Customer Service - Facility Enhancement 2016 $25,000.00 24-Apr-15 10:05 AM 15 42 Scope Description i �e;unart or'Ual.landxorn Project # 14 C Capital Improvement ADD Addison Oaks Project Name Boathouse -Buhl Lake, Design CIP Number 601 Status Pending Project Scope Design/engineering for the replacement of the existing boathouse rental trailer/facility to include a rental office, equipment storage, restroom and any necessary site improvement or restoration Project Comments Include rental, office and restroom space. Include necessary site improvements. As of February 28, 2013 a total of $2,690.88 of the approved funded amount of $10,000.00 has been expended. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-30-2014 Changed project status from Active to Pending. 11-24-14 Per forecast meeting replace fishing dock and increase length. 2/27/15 Design may be completed with in-house staff. 3-19-15 Clarified scope of work based upon previous internal staff discussions. Customer Service - Revenue Generation 2016 $20,000.00 24-Apr-15 10:05 AM 16 43 Scope Description i �e;unart or'Ual.landxorn Project # 12 C Capital Improvement ADD Addison Oaks Project Name Water Feature -Design CIP Number Status Pending Project Scope Design/engineering of a new spray pad or other zero depth water feature near campground or beach facility Project Comments No change for FY2014. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-3-2014 - Initial budget is based upon past project experience. Construction estimate/budget will be validated during the conceptual design process for commission approval. The project design budget was reduced match other similar projects at Groveland and Independence Oaks. 1-30-2014 Changed project status from Pending to Active. 2/27/15 Confirm with Master Plan that will be completed in FY2015. 3/31/15 Also as part of this design the concession area site will need to be designed to accommodate the new water feature. This includes design/engineering to address drainage issues and grading around building, including concrete walks, railings, accessible ramps, landscaping and restoration. Customer Service - Revenue Generation 2016 $36,000.00 24-Apr-15 10:05 AM 17 44 Scope Description i �e;unart or'Ual.landxorn Project # g C Capital Improvement ADD Addison Oaks Project Name Concession Remodeling - Design CIP Number Status Pending Project Scope Design/engineering for remodeling of the existing 2500 square foot concession building, including central food service hub for remote concessions, kitchen equipment, retail sundries area and patron queing area Project Comments 3-12-15 To be completed in conjunction with RWC, WWC, SPC & GRC for economies of scale. Priority Title Forecasted Year Proposed Amount Budgeted Amount 3-16-15 Design/engineering is recommended to be completed in FY2016 per budget hearing, construction moved to FY2018 from FY2016. Customer Service - Revenue Generation 2016 $15,000.00 24-Apr-15 10:05 AM 18 45 Scope Description i �e;unart orrUal.landxorn Project # 18 C Capital Improvement ADM Administrative Services Project Name Building Equipment Replacement Program CIP Number Status Pending Project Scope A phased yearly replacement program of 500+ heating, venting and air- conditioning systems parkwide, including roof top units, boilers, condensers, water heaters, softeners, etc, based on a 30 - year lifecycle Project Comments 3-1-2013 - No formal program has been ever been established. Current practice for replacement is usually completed on a reactionary as -needed basis. It is anticipated that the formal program will begin after completing engineering validation and budget estimating by staff and consultants for FY2015, therefore yearly estimates will be adjusted annually starting FY2015. 1-22-2014 - Refer to attached initial March 2013 replacement program list. Currently, the preventative maintenance staff are working with our Annual Contractor, Service Heating and Plumbing for the purpose of establishing a yearly program budget. The proposed FY2015 initial budget amount has been reviewed with other FY budget forecasts currently under review. Please refer to attached SHP Letter dated 12-11- 2013. Based upon FY2015 initial budget, the previous forecasted amount of $15,000 was changed to $30,000. If approved, FY2015 will be the first year of the Building Equipment Replacment Program based on a completed analysis of FY2015 by our Annual Contractor and Park Preventative Maintenance Staff. Since this program includes various pieces of building equipment the title was changed from HVAC Equipement Replacement Program to Building Equipment Replacement Program. 1-30-2014 Changed the project status from Pending to Active. 3-12-15 Changed the project status from Active to Pending so that it would pull scope for FY2016, also adjusted the proposed amount from $30,000 to $50,000. Priority Title Customer Service - Efficiency/Operational Savings Forecasted Year 2016 Proposed Amount $50,000.00 Budgeted Amount 24-Apr-15 10:05 AM 19 46 A A lip COM Scope Description Project # 5 C Capital Improvement ADM Administrative Services Project Name ADA Transition Program CIP Number Status Pending Project Scope Evaluation and 10year phased completion of various compliance projects identified in the 2006 American with Disabilities Act required transition plan as completed by Stewart, Petit and Yast Associates at an approximate compliance cost of $7 Million. Project Comments 2-19-2014 - Staff are currently evaluating the completed 2006 ADA Transition Plan based on the parks 10 yr Master planning schedule. Of the $7 million identified within the transistion plan, some of the projects will be corrected during a facility renovation project. Therefore, only $3 million is forecasted over the 10 year period of time. Priority Title Regulatory Forecasted Year 2016 Proposed Amount $50,000.00 Budgeted Amount 24-Apr-15 10:05 AM 20 47 i �e;unart or'Ual.landxorn Scope Description Project # 2 C Capital Improvement ADM Administrative Services Project Name CIP Number Project Scope Project Comments Priority Title Forecasted Year Proposed Amount Budgeted Amount Pavement Management Program Status Pending Yearly pavement replacement program based on a 2.5% of more than 1,000,000 SYDS of asphalt and concrete within all cost centers Replacement cost based on approximately 2.5% of total SYDS. Coordinate this program with established Facilities Engineering (General fund) program. A portion of the FY2014 funds will be used to establish a phased management program based on age and condition. Does not include small maintenance repairs as identified in the Maintenance Program. 1-17-2014 - Annual expediture unchanged. Health and Safety 2016 $200,000.00 24-Apr-15 10:05 AM 21 48 GA p D Scope Description Project# 19 C Capital Improvement Status Pending ADM Administrative Services Project Name Fenceline Replacement Program CIP Number Project Scope Removal and replacment of approx. 2.5% of 400,000 linear feet of property and internal fencing, comprising of various chain link hieghts, 4' farm fence and other fencing types/standards, based on damage, age and life -cycle, for safety and access Project Comments 2-19-2014 - 400,000 Linear feet of fencing at an average of $30/linear feet = $12,000,000 x 2.5% _ $300,000 (10,000 Linear feet per year). Based on an average of 25-30 year life -cycle for fencing, a goal would be to address/replace approximately 14,000 to 16,000 linear feet of fencing per year. As part of the first fiscal year of this program, staff will created a standard for park fencing as well as begin to identify and prioritize areas of concerns to be included within the various budget center forecasts over the following 3 fiscal years. 7-2-2014 - Proposed amount changed from $300,000 to $150,000 due to budget constraints. Priority Title Customer Service - Efficiency/Operational Savings Forecasted Year 2016 Proposed Amount $25,000.00 Budgeted Amount 24-Apr-15 10:05 AM 49 22 A A lip COM Scope Description Project # 15 C Capital Improvement ADM Administrative Services Status Pending Project Name Energy Management System Upgrade (phase III - final) CIP Number Project Scope Parkwide phased EMS system upgrade, to meet the current OC energy management policy, cost recovery, minimizing on -call response times, utilizing new monitioring technology Project Comments 3-12-15 Project scope established as final phase of energy management system upgrade. Priority Title Forecasted Year Proposed Amount Budgeted Amount 3-19-15 Previous facilities included: Phase I - ACC, ADM, GLC, GLG, IND Phase 11 - CAT, RDP, WLC, WLG, WTR (Activity Center) Phase III includes - SAC, SPC, SPG, LYC, LYG, RDG, WTR (Lookout Lodgea0 Customer Service - Efficiency/Operational Savings 2016 $75,000.00 24-Apr-15 10:05 AM 23 50 A A lip COM Scope Description Project # 21 C Capital Improvement ADM Administrative Services Status Pending Project Name FM Wood Shop - Ventilation System Replacement CIP Number Project Scope Replacement of the 20 year old wood shop ventilation system and dust collection system utilizing park staff for installation Project Comments 3-12-15 Scope created. Priority Title Forecasted Year Proposed Amount Budgeted Amount Customer Service - Efficiency/Operational Savings 2016 $30,000.00 24-Apr-15 10:05 AM 24 51 Scope Description i �e;unart or'Ual.landxorn Project # 4 C Capital Improvement IND Independence Oaks Project Name Boat House -Dock & Deck Replacement - Design CIP Number Status Pending Project Scope Design/engineering for replacement of existing 20+ year old docks located at the boat house rental facility; including approximately 4000 sq ft of 12+ year old treated wood decking and handrails on perimeter deck including modification/reinforcement Project Comments 1-22-2014 - Replacement costs is based upon the Groveland/Addison Oaks 2012 Boat House Dock Replacements. 2-25-15 Coordinate with boat house deck replacement. Due to this coordination the boat house deck replacement project has been closed and the scope and budget of this project has been adjusted to reflect this coordination as one larger project. 3-3-15 Scope changed to design/engineering FY2016, which will be done in house per budget hearing. Construction moved to FY2017 with the possibility of in house staff doing work. Priority Title Health and Safety Forecasted Year 2016 Proposed Amount $15,000.00 Budgeted Amount 24-Apr-15 10:05 AM 25 52 A A lip COM Scope Description Project # 8 C Capital Improvement IND Independence Oaks Project Name Accessible Docks - MNRTF Grant CIP Number Status Pending Project Scope Replace existing floating dock with a new universally accessible fishing pier on Crooked Lake, the new floating dock will also be used for access to pontoon boat, includes improved access pathway, transition platform and accessible parking spaces Project Comments 3-16-15 Scope created for grant application. Priority Title Regulatory Forecasted Year 2016 Proposed Amount $82,000.00 Budgeted Amount 24-Apr-15 10:05 AM 26 53 GA p D Scope Description Project # 26 C Capital Improvement Status Pending IND Independence Oaks Project Name Upper Bushman Boardwalk/Trail (Safety Path) Phase II -Construction CIP Number 1891 Project Scope Construction of approximately 1.6 miles of asphalt/boardwalk trail access along Sashabaw Road from the newly acquired Independence North Property to the Main Entrance of the park. Project Comments This phase requires a partnership between OCPRC and Independence Township, since natural areas may impact overall route. Due to partnership, Phase III may be more appropriate to complete before Phase II. 1-22-2014 - Modified project scope to include the length and type of trail. Staff expect this project to carry into FY2015/FY2016, for completetion of the grant application/agreement process. Staff are currently working with our annual contract design/engineers to complete the necessary conceptual and construction drawing for the project. Construction estimate/budget will be validated during the conceptual design process for commission approval. 1-30-2014 Changed the project status from Pending to Active. 3-26-2014 - No budgetary adjustments were made, however construction management review of the project for an 8' wide path/boardwalks is approximately 1,195,000 and a 10' wide path/Boardwalk is 1,425,000. 3-12-15 Adjust fiscal year from FY2015 to FY2016 for completion of inter -local agreements, also reduced proposed amount from $1,586,335 to $1,286,335 for completion of design engineering in FY2015 ($300,000). 4-24-15 Adjusted budget to reflect only OCPRC investment. Independence Township will be responsible for the remaining $600,000 through an innerlocal agreement yet to be drafted. Priority Title Customer Service - Facility Enhancement Forecasted Year 2016 Proposed Amount $686,335.00 Budgeted Amount 24-Apr-15 10:05 AM 54 27 QA p D Scope Description Project# 13 C Capital Improvement Status Pending IND Independence Oaks Project Name Nature Center -Exhibit Remodeling -Design CIP Number Project Scope Design/engineering for the replacement of the 10+ year old exhibits due deteriation of the exhibits, with new technologically based exhibits for interpretive/educational value, including any room finish changes. Project Comments 1-22-2014 - Previous 2001 exhibit replacement was $353,000, including room finishes. Therefore, the budget was increased to reflect a 10% design engineering budget based on previous expenditures. Modified project scope for clarity. Adjusted project Fiscal Year from FY2020 to FY2016. Construction estimate/budget will be validated during the conceptual design process for commission approval. 3-17-15 Per discussion at budget hearing need to look at making the new exhibits portable so they can travel to the various nature centers. Priority Title Customer Service - Revenue Generation Forecasted Year 2016 Proposed Amount $35,000.00 Budgeted Amount 24-Apr-15 10:05 AM 55 28 A A lip COM Scope Description Project # 16 C Capital Improvement IND Independence Oaks Project Name South Maintenance Building Roof Replacement CIP Number Status Pending Project Scope Replacement of 1155 square foot of asphalt shingles on the South Maintenace Building Roof Project Comments 3-12-2105 - This project has been identified and prioritized by Facilities Planning and Engineering to be completed as part of the Roofing Management Program in FY2016. Priority Title Forecasted Year Proposed Amount Budgeted Amount Customer Service - Efficiency/Operational Savings 2016 $51,300.00 24-Apr-15 10:05 AM 29 56 A A lip COM Scope Description Project # 16 C Capital Improvement IND Independence Oaks Project Name West Maintenance Building Roof Replacement CIP Number Status Pending Project Scope Replacement of 2460 square foot of asphalt shingles on the West Maintenance Building roof Project Comments 3-12-2105 - This project has been identified and prioritized by Facilities Planning and Engineering to be completed as part of the Roofing Management Program in FY2016. Priority Title Forecasted Year Proposed Amount Budgeted Amount Customer Service - Efficiency/Operational Savings 2016 $20,900.00 24-Apr-15 10:05 AM 30 57 A A lip COM Scope Description Project # 16 C Capital Improvement IND Independence Oaks Project Name Contact Station Roof Replacement CIP Number Status Pending Project Scope Replacement of 350 square foot of EPDM membrane for contact station roof Project Comments 3-12-2105 - This project has been identified and prioritized by Facilities Planning and Engineering to be completed as part of the Roofing Management Program in FY2016. Priority Title Forecasted Year Proposed Amount Budgeted Amount Customer Service - Efficiency/Operational Savings 2016 $10,300.00 24-Apr-15 10:05 AM 31 58 GA p D Scope Description Project# 22 C Capital Improvement Status Pending LYC Lyon Oaks Conference Center Project Name Interior Renovation - Design CIP Number Project Scope Design/engineering for the interior renovation of the conference center banquet area and other public spaces within the facility, including the grill room Project Comments 3-20-2014 Construction estimate/budget will be validated during the conceptual design process for commission approval. This construction estimate/budget will require review by CM prior to the project being funded. Initial project budget is based upon the two previous interior renovation projects for Addison and Glen Oaks Conference Centers. Average total project costs for the two interior projects are $650,000 each with approximately $40,000 in design/engineering costs. 2-27-15 Propose for FY2016 (contingent on food service contract) 3-16-15 Adjusted from $40,000 to $60,000 to reflect costs expended in ACC interior renovation design. Priority Title Customer Service - Efficiency/Operational Savings Forecasted Year 2016 Proposed Amount $40,000.00 Budgeted Amount 24-Apr-15 10:05 AM 59 32 A A lip COM Scope Description Project # 17 C Capital Improvement LYG Lyon Oaks Golf Course Project Name Boardwalk Replacement Hole #17 CIP Number Status Pending Project Scope Replacement of approximately 100 linear feet of 10' wide golf cart boardwalk, due to inadequate base post construction resulting in irregular frost heaving of the deck, including the widening of deck to 14' for two-way cart traffic Project Comments 3-12-15 Project scope created. Priority Title Forecasted Year Proposed Amount Budgeted Amount Customer Service - Efficiency/Operational Savings 2016 $75,000.00 24-Apr-15 10:05 AM 33 60 A A lip COM Scope Description Project # 16 C Capital Improvement RDG Red Oaks Golf Course Project Name Maintenance Building Roof Replacement CIP Number Status Pending Project Scope Replacement of 2420 square foot of metal roofing on the Maintenance Building roof Project Comments 3-12-2105 - This project has been identified and prioritized by Facilities Planning and Engineering to be completed as part of the Roofing Management Program in FY2016. Priority Title Forecasted Year Proposed Amount Budgeted Amount Customer Service - Efficiency/Operational Savings 2016 $33,300.00 24-Apr-15 10:05 AM 34 61 i �e;unart or'Ual.landxorn Scope Description Project # 23 C Capital Improvement RDG Red Oaks Golf Course Status Pending Project Name Tunnel Replacement - Design CIP Number Project Scope Design and replacement of the existing corrugated metal structured tunnel due to deterioating structure Project Comments Consider a concete box culvert structure. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-29-2015 Increased project budget from $25,000 to $60,000, based upon the installation of the Independence Oaks box culvert replacement project at $120,605 which included road paving & dewatering. Assuming the tunnel replacement is approximately 50% of the project. Construction estimate/budget will be validated during the conceptual design process for commission approval. 1-30-2014 Changed project status from Pending to active. 3-26-2014 - Adjusted construction budget from $60,000 to $85,000 based upon a construction management review of the existing facility. 7-2-2014 - Project postponed due to budget constraints. 2-27-15 Propose for FY2016. 3-16-15 Adjusted amount from $85,000 to $20,000 for design of project, construction to be completed at a later date. Health and Safety 2016 $20,000.00 24-Apr-15 10:05 AM 35 62 i �e;unart or'Ual.landxorn Scope Description Project # 27 C Capital Improvement RWP Red Oaks Waterpark Status Pending Project Name Restroom-River Pumphouse-Design CIP Number 1230 Project Scope Design/engineering of a new 16'x20' family restrooms off existing pumphouse facility as conceptually designed by DLZ in FY2009 Project Comments 1-30-2014 Changed project status from Pending to Active and Adjusted project fiscal year from FY2016 to FY2015, based upon the completed water park analysis in 2013 by GreenPlay and Water Techology.. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-31-2014 - DLZ 2009 Budget for a stand alone family restroom was estimated at approximately $95,783. This construction estimate/budget will require review by CM prior to the project being funded. Refer to the DLZ engineering line item estimate for more detail. Modified scope to include approximate size of the family restroom (320 SF). Current construction estimates of restrooms and small size of this project should be approximately $300 to $350/SF, $112,000. No modifications to the current design/engineering budget are required at this time. Anticipate construction to be slab on grade, masonry wall and membrane flat roof, matching existing pump house. 3-12-15 Adjusted fiscal year from FY2015 to FY2016 and adjusted proposed budget amount from $12,000 to $15,000, additionally adjusted project from Active to Pending to reflect in FY2016 budget scopes. Customer Service - Facility Enhancement 2016 $15, 000.00 24-Apr-15 10:05 AM 36 63 A A lip COM Scope Description Project # 10 C Capital Improvement RWP Red Oaks Waterpark Project Name Wave Pool -Wave Equipment Replacement CIP Number Status Pending Project Scope Replacement of the existing 20+ year old wave making equipment Project Comments 1-29-2014 - Increased project budget from $100,000 to $325,000 based upon the Waterpark Anaylsis completed by GreenPlay, Inc. and WaterTechnology, Inc. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-30-2014 Changed project status from Pending to Active. 3-12-15 Adjusted fiscal year from FY2015 to FY2016. For project completion to start in September after park operation is closed. Customer Service - Revenue Generation 2016 $325,000.00 24-Apr-15 10:05 AM 37 64 QWLAND R Scope Description Project # 16 COUNW C Capital Improvement Status Pending SAC Springfield Oaks Activity Center/Park Project Name Horse Arena Announcers Pavilion Roof Replacement CIP Number Project Scope Replacement of 225 square foot of asphalt shingles on the Horse Arena Announcers Pavilion roof Project Comments 3-12-2105 - This project has been identified and prioritized by Facilities Planning and Engineering to be completed as part of the Roofing Management Program in FY2016. Priority Title Forecasted Year Proposed Amount Budgeted Amount 3-17-15 Need to have Colin submit a bid for this project to potentially have in-house staff complete roof. Customer Service - Efficiency/Operational Savings 2016 $5,500.00 24-Apr-15 10:05 AM 38 65 GA D Scope Description Project# 20 C Capital Improvement Status Pending SAC Springfield Oaks Activity Center/Park Project Name Barn Siding Replacement CIP Number Project Scope Removal and replacement of the existing wood siding on (4) existing barns with metal siding eliminating the need of continual painting Project Comments Consider a phased approach over 4 years. 1-30-2014 Changed project status from Pending to Active and added funds for 2016, 17 & 18. Priority Title Forecasted Year Proposed Amount Budgeted Amount 2-25-15 No change. 3-16-15 Changed from Maintenance to Capital project since this is for replacement. Customer Service - Efficiency/Operational Savings 2016 $25,000.00 24-Apr-15 10:05 AM 39 66 QA p D Scope Description Project# 6 C Capital Improvement Status Pending SAC Springfield Oaks Activity Center/Park Project Name Dam Improvements - Design CIP Number Project Scope Design/engineering for the first phase of improvements identified by SME of the removal and replacement of existing deteriorating water spillway and other site restoration, in collaboration with Springfield Township Officials/Board. Project Comments Priority Title Forecasted Year Proposed Amount Budgeted Amount Partner with Springfield for funding responsibilitiy. Verify Budget with SME Report. 2-7-2014 - Carried FY2014 project design budget over and into FY2015. In discussion with Springfield Township Officials , who have a finacial interest in the maintenance of this Mill Pond, staff and officials are exploring options, alternatives and opportunities with this dam, inlcuding additional partnering and funding. No design or construction work is expected for FY2014, however staff are finalizing an Inter -local agreement for project management and process, that will require General Commission Approval in FY2014. Anticipate OCPRC General Approval at May/June/July Commission meeting (Subject to Change). 3-38-2014 - Adjusted budget amount per construction management review from $150,000 to $195,000. Adjusted FY2015 Budget to included only 15% of construction costs for design/engineering $30,000. 4-9-2014 - Changed Project Priority from 3 to 2. 3-12-15 Project moved from FY2015 to FY2016, anticipating project design/engineering to begin late summer of 2015. 3-19-15 Adjust from FY2016 to FY2017. Regulatory 2016 $30,000.00 $150, 000.00 24-Apr-15 10:05 AM 40 67 QA p D Scope Description Project# g C Capital Improvement Status Pending SPC Springfield Oaks Concessions Project Name Concession Remodeling - Design CIP Number Project Scope Design/engineering for the remodeling of the existing square foot concession building, including central food service hub for remote concessions, kitchen equipment, retail sundries area and patron queing area. Project Comments 2-25-2014 - Construction estimate/budget will be validated during the conceptual design process for commission approval. Current scope description only includes remodeling within the current building envelope. Concept development through the design/engineering will confirm/validate spatial requirements to meet the intial scope of work. Existing concession building includes the following areas: Public Restrooms - Approx. 20% or 510 SF @ $225/SF = $114,750 Concession Operation Area - Approx. 35% or 900 SF @ $300/SF = $270,000 Storage - Approx. 15% or 400 SF @ $50/SF = $20,000 Public Area - Approx. 30% or 750 SF @ 100/SF = $75,000 10% Contingency = $48,000 Total initial remodeling estimate = $528,000 Concession building construction is slab on grade, masonry wall and metal roof. 3/24/15 CIP created in conjunction with phase I design $97,290 per commission approval. Priority Title Customer Service - Revenue Generation Forecasted Year 2016 Proposed Amount $47,000.00 Budgeted Amount 24-Apr-15 10:05 AM 68 41 QkKLAND R Scope Description Project # 28 COUNW C Capital Improvement Status Pending WTR Waterford Oaks Activity Center/Park Project Name East-West Campus Connector Traill-Design CIP Number Project Scope Design/Engineering of a new pathway/trail between OCPRC Administration and the county campus Project Comments This project requires coordination with FM&O and RCOC, since funding will be a partnership between entities. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-30-2014 Adjusted project fiscal year from FY2015 to FY2016. 3-3-15 Need to confirm construction budget however, initially budget is based upon a minimum $300,000 project expenditure. Customer Service - Facility Enhancement 2016 $15,000.00 24-Apr-15 10:05 AM 42 69 Oakland County Parks and Recreation Commission OWD Capital Improvement Program Management Plan and 10 Year Forecast (PROPOSED) COUNTY PARKS 24-Apr-15 Proposed Capital Improvement Budget Plan Column 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan Forecasted Projects Abbrev Budget Center Name Status 2016, 2017 21 018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement ACC [Addison Oaks Conference Center Priority Title Health and Safety Deck Replacement Pending F$o.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Efficiency/Operational Savings Irrigation Improvements-Conf. Center Pending $0.00 $0.00 $0.00 $0.00 $25,000.00 1 $0.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service -Facility Enhancement Garden/Entrance Landscape Renovation - Construction Pending $0.00 $0.00 $250,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Garden/Entrance Landscape Renovation- Design Pending L$25,000.00 JL$0.00 ��$0.00 $0.00 J $0.00 $0.00 $0.00 $0.00 $0.00 1 $0.00 '$0.00 Entrance Drive Lighting -Construction Pending I $0.00 _ I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $100,000.00 Entrance Drive Lighting -Design Pending 0.0 0.0 $0. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $10,000.00 $0.00 TOtaIS: I$25,000.00 I$60,000.00 1$250,000.00 II$0.00 I$25,000.00 1$0.00 $0.00 $0.00 I$0.00 $10,000.00 I$100,000.00 43 70 Proposed Capital Improvement Budget Plan Column FY2016 (Funded) Unfunded Future Years Forecast Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 Capital Improvement ADD Addison Oaks Priority Title Health and Safety Play Lot, Beach Pending $0.00 $120,000.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Revenue Generation Firewood Storage building Pending $0.00 $0.00 $0.00 $0.00 $15,000.00 ParkingLot-LakeGeorge- Construction Pending $0.00 $0.00 $0.00 $0.00 I $0.00 Parking Lot -Lake George - Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 Water Feature -Construction Pending $0.00 $180,000.00 $180,000.00 $0.00 $0.00 Water Feature -Design Pending $36,000.00 $0.00 $0.00 $0.00 $0.00 Dog Park -Fencing Pending F$0.00 L$0.00 �:]L$0.00$0.00 $20,000.00 Boathouse -Buhl Lake, Design Pending $20,000.00 $0.00 $0.00 $0.00 $0.00 Concession Remodeling - Construction Pending $0.00 $0.00 $0.00 $75,000.00 $75,000.00 Boathouse -Buhl Lake, Construction Pending �$0.00 I$140,000.00 $140,000.00 II$0.00 $0.00 Dog Park Pending $0.00 $0.00 $0.00 $0.00 $30,000.00 Concession Remodeling - Design Pending $15,000.00 $0.00 $0.00 $0.00 $0.00 Camping, Equestrian Group Area -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 Campground - Amphitheater Area - Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 Campground - Amphitheater Area - Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 Cabins (2)-Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 Cabins (2)-Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 Court Games Area Pending $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Pole Barn, Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 Pole Barn, Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 Asphalt Trail -Lake George -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 Asphalt Trail -Lake George -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 Maintenance Yard Renovation - Construction Pending $0.00 $150,000.00 $100,000.00 $0.00 I $0.00 Priority Title Customer Service - Facility Enhancement Asphalt Day Use Parking Lot, Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 1 10 Year Forecast Capital Improvement Management Plan (Forecasted Projects) 2021 2022 2023 L2024 2025 2026 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 V $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150,000.00 $0.00 $0.00 $0.00 $0.00 $15,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $65,000.00 $0.00 $0.00 $15,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150,000.00 $0.00 $0.00 $0.00 $10,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $48,000.00 $0.00 V $0.00 $0.00 $32,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $320,000.00 $0.00 $0.00 $47,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $475,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $396,000.00 44 71 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement ADD Addison Oaks Asphalt Day Use Parking Lot, Design Pending 1 $0.00 $0.00 $0.00 $0.00 F$0.00 I $0.00 $0.00 $0.00 $0.00 $40,000.00 $0.00 Playground -Section A & B Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $75,000.00 $0.00 $0.00 $0.00 $0.00 Asphalt Trail -Campground -Construction Pending $0.00 $0.00 $0.00 II $0.00 $0.00 1 $0.00 $198,000.00 $0.00 $0.00 $0.00 $0.00 Totals: I$71,000.00 I$590,000.00 II$420,000.00 lI$75,000.00 $140,000.00 I$62,500.00 I$908,200.00 I$147,000.00 I$470,000.00 I$88,000.00 I$461,000.00 Administrative Services (Priority Title (Health and Safety Pavement Management Program Pending $200,000.00 $300,000.00 $150,000.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Priority Title (Regulatory ADA Transition Program Pending $50,000.00 1 $350,000.00� $350,000.00 $350,000.00 $350,000.00 $350,000.00 $350,000.00 $250,000.00 $150,000.00 $150,000.00 $0.00 (Priority Title (Customer Service - Efficiency/operational Savings Building Equipment Replacement Program Pending $50,000.00 1 $30,000.00 $30,000.00 1 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Energy Management System Upgrade (phase III - final) Pending $75,000.00 $0.00 $0.00 $0.00 $0.00 ^ $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Fenceline Replacement Program Pending $25,000.00$300,000.00 $300,000.00 $150,000.00 $150,000.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 FM Wood Shop - Ventilation System Replacement Pending $30,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Facility Enhancement Administration HVAC Replacement -Phase II- Pending $0.00 $180,000.00 $180,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Construction (Totals: I I$430,000.00 I$1,160,000.00 II$1,010,000.00 II$550,000.00 $500,000.00 I$400,000.00 I$350,000.00 I$250,000.00 I$150,000.00 I$150,000.00 $0.00 45 72 FY2016 Abbrev Budget Center Name Status Capital Improvement CAT Catalpa Oaks Proposed Capital Improvement Budget Plan Column (Funded) Unfunded Future Years Forecast 2016 2017 2018 2019 2020 1 10 Year Forecast Capital Improvement Management Plan (Forecasted Projects) 2021 2022 2023 L2024 2025 2026 Priority Title Customer Service - Revenue Generation Phase II -Irrigation System -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $50,000.00 I $50,000.00 $50,000.00 $50,000.00 $0.00 $0.00 Phase Vll-PlayStructure Pending $0.00 $0.00 $0.00 $0.00 I $0.00 I $0.00 I $0.00 $0.00 $0.00 $50,000.00 $0.00 Phase II -Recreational Fields -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Phase III - Recreational Commons -Design Pending $0.00 $9Q000.00 $90,000.00 $0.00 $0.00 V $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Phase III -Park Boundary Fence Pending $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $240,000.00 $0.00 $0.00 $0.00 Recreational Commons -Construction Pending $0.00 $0.00 $0.00 $8 I $0.00 I $500,000.00 $0.00 $500,000.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement Phase IV - Pavilion/Warming Shelter -Design Pending $0.00 $0.00 $0.00 $0.00 I $0.0o I $0.00 $10,000.00 $0.00 $0.00 $0.00 $0.00 Phase IV -Asphalt Trail Pending $0.00 $0.00 $0.00 $o.00 $0.00 I $0.00 I $0.00 $136,000.00 $0.00 $0.00 $0.00 Phase IV - Pavilion/Warming Shelter -Construction Pending $0.00 $0.00 $0.00 $0.00 I $0.00 ^ $0.00 I $0.00 $100,000.00 $0.00 $0.00 $0.00 Phase II -Asphalt -Parking Lot -Construction Pending $0.00 $0.00 $0.00 $250,000.00 $250,000.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $90,000.00 $90,000.00 $1,050,000.00 $250,000.00 $750,000.00 $260,000.00 $1,226,000.00 $250,000.00 $50,000.00 $0.00 Glen Oaks Conference Center Priority Title I Customer Service - Efficiency/Operational Savings Conference center deck replacement Pending $0.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$0.00 I$60,000.00 $0.00 $0.00 I$0.00 I$0.00 $0.00 I$0.00 I$0.00 $0.00 $0.00 GLG Glen Oaks Golf Course Priority Title Customer Service - Revenue Generation Fenceline Replacement Pending $0.00 $40,000.00 $0.00 $0.00 $0.00 V $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Drainage Improvement - Construction Pending $0.00 J $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $180,000.00 $0.00 $0.00 $0.00 Drainage Improvements - Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $18,000.00 $0.00 $0.00 $0.00 $0.00 Irrigation System - Replacement - Phase II Pending $0.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $100,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $78,000.00 $180,000.00 $0.00 $0.00 $0.00 46 Proposed Capital Improvement Budget Plan Column 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement GRC Groveland Oaks Concessions (Priority Title (Customer Service - Revenue Generation Concession Remodeling - Construction Pending $0.00 $0.00 $0.00 $100,000.00 $175,000.00 I $175,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I I$0.00 I$0.00 II$0.00 II$100,000.00 $175,000.00 I$175,000.00 I$0.00 I$0.00 I$0.00 $0.00 I$0.00 47 74 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 L2024 2025 2026 Capital Improvement GRV Groveland Oaks Priority Title Health and Safety Waterslide Replacement -Construction Pending $0.00 $0.00 $0.00 $50,000.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Waterslide Replacement -Design Pending $0.00 $0.00 $10,000.00 $0.00 I $0.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Revenue Generation (2) Devil's Island Yurts Pending $0.00 $55,000.00 $55,000.00 $0.00 $0.00 V $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Cabins 2, Phase 4- Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $14,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Cabins 2, Phase 4-Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $140,000.00 $0.00 $0.00 $0.00 $0.00 Fire Wood storage building Pending $0.00 $0.00 $0.00 $0.00 $6,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Dog Park Pending $0.00 L$0.00 __]L$0.00$0.00 $0.00 $0.00 $30,000.00 $0.00 $0.00 $0.00 $0.00 Dog Park -Fencing Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $75,000.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Fence Line Replacement Pending $0.00 $80,000.00 $0.00 $0.00 $0.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Rental Equipment Station -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $135,000.00 $135,000.00 $0.00 $0.00 $0.00 Dump -Station Queing Road -Design Pending $0.00 $0.00 $0.00 $0.00 �I $0.00 I $0.00 $10,000.00 $0.00 $0.00 $0.00 $0.00 Dump -Station Queing Road -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $50,000.00 $50,000.00 $0.00 $0.00 Contact Station -Renovation -Construction Pending $0.00 -]L$0.00 �L$0.00 II $0.00 $0.00 I $0.00 $0.00 $205,000.00 $205,000.00 $0.00 $0.00 Rental Equipment Station -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $30,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Campground-Stage/Gazebo-Design Pending $0.00 $0.00 $18,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Campground-Stage/Gazebo-Construction Pending $0.00 $0.00 $60,000.00 $60,000.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Contact Station -Renovation -Design Pending $0.00 $0.00 _ $0.00 $0.00 $0.0o I $0.00 $41,000.00 $0.00 $0.00 $0.00 $0.00 Priority Title Enhancement Customer Service - Facility Restroom/Shower-Section A -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $630,000.00 $0.00 $0.00 $0.00 Restroom/Shower-Section A -Design Pending $0.00 $0.00 T I $0.00 1 $0.00 $0.00 I $0.00 $63,000.00 $0.00 $0.00 $0.00 $0.00 Restroom/Shower Facility, Group Area -Design Pending $0.00 $0.00 $00.00.00 $$0.00 I $0.00 $0.00 $0.00 $84,000.00 $0.00 $0.00 Restroom/Shower Facility, Group Area - Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fishing Docks Pending $0.00 $0.00 $74,000.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trails -Aggregate Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $330,000.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $135,000.00 $217,000.00 $110,000.00 $66,500.00 $44,000.00 $824,000.00 $1,020,000.00 $339,000.00 $0.00 $0.00 48 Proposed Capital Improvement Budget Plan Column FY2016 (Funded) Unfunded Future Years Forecast Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 Capital Improvement HGH Highland Oaks (Priority Title (Customer Service - Facility Enhancement Trail Development -Phase 2 Pending $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I I $0.00 I$0.00 II $0.00 II $0.00 I $0.00 10 Year Forecast Capital Improvement Management Plan (Forecasted Projects) 2021 2022 2023 L2024 2025 2026 $0.00 I $286,000.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 1$286,000.00 I$0.00 I$0.00 $0.00 $0.00 49 76 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 L2024 2025 2026 Capital Improvement IND i Independence Oaks Priority Title Health and Safety Boardwalk/Dock Replacement Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $45,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Boat House -Dock & Deck Replacement - Design Pending $15,000.00 $0.00 $0.00 $0.00 I $0.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Boathouse -Dock &Deck Replacement -Construction Pending $0.00 $100,000.00 $100,000.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Regulatory Play Lot -Pines Pending $0.00 $0.00 $0.00 $0.00 $0.00 Upper Bushman Boardwalk/Trails Phase III -Design Pending $0.00 11 $0.00 1 $0.00 $0.00 I $0.00 Twin Chimneys Universally Accessible Improvements - Pending $0.00 $120,000.00 $0.00 $0.00 $0.00 Construction Accessible Docks - MNRTF Grant Pending $82,000.00 $0.00 $0.00 $0.00 $0.00 Play Lot -Moraine Knoll Pending $0.00 $0.00 $0.00 $0.00 $40,000.00 Upper Bushman Boardwalk/Trails Phase III- Pending $0.00 $0.00 $0.00 $0.00 $0.00 Construction Priority Title Customer Service - Revenue Generation Nature Center -Exhibit Remodeling -Construction Pending $0.00 $175,000.00 $175,000.00 $0.00 $0.00 Nature Center -Exhibit Remodeling -Design Pending $35,000.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Contact Station Roof Replacement Pending $10,300.00 $0.00 $0.00 $0.00 $0.00 Electronic Entry gates Pending $0.00 $0.00 $0.00 $0.00 $0.00 Retaining Wall -Lakeview Pavilion Pending $0.00 _][$25,600.00_]L$0.00 $0.00 $0.00 South Maintenance Building Roof Replacement Pending $51,300.00 $0.00 $0.00 $0.00 $0.00 Twin Chimney -Canvas Replacement Pending $0.00 $10,000.00 $0.00 $0.00 $0.00 West Maintenance Building Roof Replacement Pending $20,900.00 $0.00 1 $0.00 $0.00 $0.00 Pole Barn Addition- Construction Pending $0.00 Jl $0.00 II $0.00 II $0.00 $80,000.00 Pole Barn Addition -Design Pending $0.00 $0.00 $0.00 $12,000.00 $0.00 Priority Title Customer Service - Facility Enhancement Clintonwood Connector Trail Pending $0.00 $0.00 $0.00 $0.00 $0.00 $40,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $55,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $550,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 V $0.00 $120,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $80,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $340,000.00 $0.00 $0.00 $0.00 $0.00 50 77 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement IND Independence Oaks Upper Bushman Boardwalk/Trail (Safety Path) Phase II- Pending $686,335.00 $0.00 1 $0.00 $0.00 $0.00 I $0.00 Construction Nature Center-Nature's Playground Pending $0.00 $0.00 $0.00 $0.00 $0.00 $12,000.00 Play Lot -Beach Cove (New) Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tota I s: I $900,835.00 I $430,600.00 II $275,000.00 II $12,000.00 $120,000.00 I $177,000.00 Lyon Oaks Conference Center (Priority Title (Customer Service - Efficiency/Operational Savings Interior Renovation - Construction Pending $0.00 � $450,000.00 $200,000.0� $0.00 $0.00 V $0.00 Interior Renovation - Design Pending $40,000.00 A $0.00 $0.00 $0.00 _,J$0.00 I $0.00 Parking Lot Replacement - Construction Pending $0.00 $0.00 $400,000.00 $0.00 I $0.00 I $0.00 Tota I S: I I $40,000.00 I $450,000.00 II $600,000.00 II $0.00 I $0.00 I $0.00 LYG Lyon Oaks Golf Course (Priority Title I (Customer Service - Revenue Generation Disc Golf -18 Holes -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Disc Golf-18 Holes -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 (Priority Title (Customer Service - Efficiency/Operational Savings Astro-turf Soccer Field Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Boardwalk Replacement Hole #17 Pending $75,000.00 $0.00 $0.00 $0.00 $0.00 V $0.00 (Priority Title (Customer Service - Facility Enhancement Parking Lot Replacement - Construction Pending L$0.00 $400,000.00 $0.00 $0.00 $0.00 $0.00 Totals: I$75,000.00 I$400,000.00 II$0.00 II $0.00 I$0.00 I$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $460,000.00 $55,000.00 I$550,000.00 1$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $180,000.00 $0.00 $0.00 $0.00 $18,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $18,000.00 I $180,000.00 $0.00 $0.00 51 78 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 L2024 2025 2026 Capital Improvement LYP Lyon Oaks Park Priority Title Customer Service - Efficiency/Operational Savings Nature Center Roof Replacement Pending $0.00 $21,300.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement Recreational Sports Field Lighting -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 Dog Park Lighting -Construction Pending $0.00 $0.00 $0.00 $o.00 I $0.00 Dog Park Lighting -Design Pending $0.00 $0.00 $0.00 $o.00 $0.00 Dog Park/Recreational Field Restroom-Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 Recreational Sports Field Lighting -Design Pending $0.00 $0.00 $0.00 $0.00 Dog Park/Recreational Field Restroom-Design Pending $0.00 L0.00 $0.00 1 $0.00 $21,000.00 Totals: I$0.00 I$21,300.00 $0.00 II$0.00 I$21,000.00 Orion Oaks Priority Title Health and Safety $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 V $0.00 $0.00 $300,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $365,000.00 $0.00 $0.00 $0.00 $0.00 $36,500.00 $0.00 $0.00 $0.00 $0.00 $210,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $30,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $210,000.00 1$66,500.00 I$665,000.00 I$0.00 $0.00 $0.00 Dock Replacement - Lake Sixteen Pending I $0.00 $0.00 $70,000.00 $0.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Revenue Generation Day Use Area - Phase I Development -Construction Pending $0.00 J $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,600,000.00 Day Use Area - Phase I Development -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 V $0.00 I $0.00 $0.00 $0.00 $160,000.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Pole Barn -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $180,000.00 $0.00 $0.00 $0.00 $0.00 Pole Barn -Design Pending $0.00 $0.00 $0.00 $o.00 I $0.00 I $26,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement Dog Park Irrigation -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $20,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Dog Park Lighting -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $565,000.00 $0.00 $0.00 $0.00 $0.00 Dog Park Lighting -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $36,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Parking Lot Paving -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $300,000.00 $0.00 $0.00 Parking Lot Paving -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $30,000.00 $0.00 $0.00 $0.00 Totals: $0.00 $0.00 $70,000.00 $0.00 $0.00 $82,000.00 $745,000.00 $30,000.00 $300,000.00 $160,000.00 $1,600,000.00 52 79 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast (Funded) Unfunded Future Years Forecast capital Improvement Management Plan (Forecasted Projects) Status � u Abbrev Budget Center Name 2016 ' 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement RDD Red Oaks Dog Park (Priority Title (Customer Service - Efficiency/Operational Savings Storm Water Reclamation -Dog Park -Construction Pending $0.00 II $400,000.00 I $250,000.00 $0.00 W $0.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$0.00 I$400,000.00 II$250,000.00 $0.00 I$0.00 I$0.00 $0.00 $0.00 I$0.00 $0.00 $0.00 Red Oaks Golf Course IPriority Title (Health and Safety Tunnel Replacement- Design Pending $20,000.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Revenue Generation Golf Training Facility -Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $70,000.00 $0.00 Golf Training Facility -Construction Pending I $0.00 i I $0.00� $0.00 $0.00 $0.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $770,000.00 Priority Title Customer Service - Efficiency/Operational Savings Maintenance Building Roof Replacement Pending $33,300.00 J $0.00 "'1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Storm Water Reclamation -Golf Course -Construction Pending $0.00 $540,000.00 II $540,000.00 $0.00 _j $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$53,300.00 I$540,000.00 I$540,000.00 II$0.00 I$0.00 1$0.00 $0.00 $0.00 I$0.00 1$70,000.00 I$770,000.00 LRSE Rose Oaks Priority Title I Customer Service - Revenue Generation Day Use Development -Phase I, Construction Pending $0.00 11 $0.00 $0.00 $0.00 $0.00 I $0.00 $175,000.00 $175,000.Oo $0.00 $0.00 $0.00 Day Use Development -Phase I, Design Pending $0.00 J $0.00 $0.00 $0.00 $0.00 $35,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement Trail Development -Phase II Pending L$0.00 $0.00 -]$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $192,500.00 $192,500.00 $0.00 Totals: $0.00 L$0.00 $0.00 II$0.00 _]$0.00 I$35,000.00 1$175,000.00 I$175,000.00 I$192,500.00 1$192,500.00 $0.00 �m led Oaks Waterpark Concessions Priority Title Customer Service - Revenue Generation Concession Remodeling - Construction Pending $0.01,11- $312,500.00 II $312,500.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $0.00 $312,500.00 $312,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 53 80 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast (Funded) Unfunded Future Years Forecast capital Improvement Management Plan (Forecasted Projects) Status � u Abbrev Budget Center Name 2016 ' 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement RWP Red Oaks Waterpark (Priority Title (Customer Service - Revenue Generation Wave Pool -Wave Equipment Replacement Pending $325,000.00 II $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Efficiency/Operational Savings Fencing -Replacement Pending $0.00 1 $0.00 $200,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Bathhouse -Remodeling -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $600,000.00 $0.00 $0.00 $0.00 $0.00 Bathhouse -Remodeling -Design Pending $0.00 $0.00 $0.00 $0.00 Ed $0.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Berm -Security System Pending $0.00 J $20,000.00 �� $0.00 $0.00 $0.00 $0.00 $0. 00 $0.00 $0.00 $0.00 $0.00 (Priority Title Customer Service - Facility Enhancement Restroom-River Pumphouse-Construction Pending $0.00 $130,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Restroom-River Pumphouse-Design Pending $15,000.00 0.00 $0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: $340,000.00 $150,000.00 1 $200,000.00 $0.00 $0.00 $60,000.00 $600,000.00 $0.00 $0.00 $0.00 $0.00 54 81 Proposed Capital Improvement Budget Plan Column FY2016 (Funded) Unfunded Future Years Forecast Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 Capital Improvement SAC Springfield Oaks Activity Center/Park Priority Title Health and Safety Dam Improvements -Culvert Replacement Pending $0.00 $75,000.00 $75,000.00 $0.00 $0.00 Public Address System - Construction Pending $0.00 $150,000.00 $15Q000.00 $0.00 $0.00 Public Address System -Design Pending $0.00 $30,000.00 $0.00 $0.00 $0.00 Water Tower -Improvements Pending $0.00 $300,000.00 $0.00 $0.00 I $0.00 Priority Title Regulatory Dam Improvements -Design Pending $30,000.00 $0.00 $0.00 $0.00 $0.00 Storm Water System Renovation - Design Pending $0.00 $0.00 $0.00 $0.00 Storm Water System Renovation - Construction Pending $0.00 L$0.00 -]L$0.00 $0.00 $0.00 Davisburg Dam -Slope Armor Renovation Pending $0.00 $0.00 $0.00 $230,000.00 $0.00 Dam Improvements - Construction Pending $0.00 $0.00 $0.00 $o.00 $0.00 Ellis Barn Improvement-Verticle Lift Pending $0.00 I $250,000.00 $0.00 II $0.00 JI $0.00 Priority Title Customer Service - Revenue Generation Davis House Relocation -Design Pending $0.00 $10,000.00 $0.00 $0.00 I $0.00 Dog Park Pending $0.00 $0.00 $0.00 $0.00 $30,000.00 Horse Bldg. K - Construction Pending $0.00 _]L$425,000.0�L$0.00 11 $0.00 $0.00 NR Feature/Fishing Pond Pending $0.00 $0.00 $0.00 $0.00 $0.00 Dog Park Fence Pending $0.00 $0.00 $0.00 $0.00 $20,000.00 Davis House Relocation -Construction Pending $0.00 $0.00 $50,000.00 $50,000.00 $0.00 Ellis Barn Restroom - Design Pending $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Barn Siding Replacement Pending $25,000.00 $25,000.00 $25,000.00 $0.00 $0.00 Horse Arena Announcers Pavilion Roof Replacement Pending $5,500.00 $0.00 1 $0.00 1 $0.00 $0.00 Restroom/Shower- Replacement, Design Pending $0.00 $0.00 $0.00 $0.00 $30,000.00 Restroom/Shower-Replacement-Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement Bldg. F-Design Pending $0.00 [$0.00 -]L$0.00 II $0.00 $0.00 Parking Lot -Rotary Park -Construction Pending $0.00 II $0.00 II $0.00 II $0.00 1 $0.00 1 10 Year Forecast Capital Improvement Management Plan (Forecasted Projects) 2021 2022 2023 21 2025 2026 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 N $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $250,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $195,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 V $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $30,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $600,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 ww 55 (� Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 L2024 2025 2026 Capital Improvement SAC Springfield Oaks Activity Center/Park Parking Lot -Rotary Park -Design Pending $0.00 $0.00 1 $0.00 $0.00 I $0.00 I $5,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trail Development -Rotary Park Pending $0.00 $0.00 $0.0 $0.0 $0.00 $0.00 $20,000.00 $0.00 $0.00 $0.00 $0.00 Totals: $60,500.00 $1,265,000.00 $300,000.00 $280,000.00 $80,000.00 $800,000.00 $95,000.00 $250,000.00 $0.00 $0.00 $55,000.00 Springfield Oaks Concession Priority Title Customer Service - Revenue Generation Grill Room Remodeling -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $470,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Grill Room Remodeling - Design Pending $0.00 J $0.00 $0.00 $0.00 $52,000.00 I $0.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 Clubhouse -Deck Pending $0.00 $0.00 1 $0.00 1 $0.00 $0.00 I $40,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 Concession Remodeling - Design Pending $47,000.00 $0.00 _ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement Parking Lot-Staff/Volunteer-Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 V $0.00 $22,000.00 $0.00 $0.00 $0.00 $0.00 Parking Lot-Staff/Volunteer-Design Pending $0.00 $0.00 $0.00 $0.00 $20,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$47,000.00 I$0.00 $0.00 $0.00 $72,000.00 J$510,000.00 $22,000.00 I$0.00 I$0.00 $0.00 $0.00 Springfield Oaks Golf Course Priority Title [Regulatory Storm Water System Renovation - Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $250,000.00 $0.00 $0.00 $0.00 $0.00 Storm Water System Renovation - Design Pending $0.00 $0.00 $0.00 $0.00 I $0.00 I $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Maintenance Area -Paving Pending $0. $0.00 $0.00 I $100,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Irrigation System - Replacement - Phase II Pending 0.0 $140,000.00 $140,000.00 $140,000.00 JI $140,000.00 $140,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement Fence Line Replacement Pending $0.00 $0.00 $0.00 $0.00 $0.00 V $0.00 $0.00 $125,000.00 $0.00 $0.00 $0.00 ParkingLot- Staff/Volunteer, Construction Pending $0.00 J $0.00 $0.00 $0.00 $0.00 $0.00 $22,000.00 $0.00 $0.00 $0.00 $0.00 Parking Lot-Staff/Volunteer-Design Pending $0.00 $0.00 $0.00 $0.00 I $20,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $140,000.00 $140,000.00 $140,000.00 $260,000.00 $190,000.00 $272,000.00 $125,000.00 $0.00 $0.00 $0.00 56 83 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast (Funded) Unfunded Future Years Forecast FY2016 Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement WCM Waterford Oaks County Market Priority Title Customer Service - Revenue Generation Parking Lot Expansion -Construction Pending $0.00 $0.00 $375,000.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Window/Door Replacement Pending $0.00 $0.00 $0.00 $0.00 I $100,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Vendor Pavilion -Design Pending $0.00 $75,000.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Parking Lot Expansion -Design Pending $0.00 $37,500.00 $0.00 $0.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Building Expansion -Construction Pending $0.00 $0.00 $0.00 $30Q000.00 $300,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Building Expansion -Design Pending [$0.00 __-] $60,000.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Vendor Pavilion -Construction Pending $0.00 L$0.00 , $0.00 $0.00 $375,000.00 I $375,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$0.00 I$172,500.00 II$375,000.00 II$300,000.00 $775,000.00 I$375,000.00 1$0.00 I$0.00 I$0.00 $0.00 $0.00 WLC White Lakes Oaks Conference Center -4 Priority Title Health and Safety Side walk lighting Pending $0.00 $20,000.00 $0.00 $0.00 $0.00 V $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Revenue Generation Grill Room Remodeling - Construction Pending $0.00 J $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $259,000.00 Grill Room Remodeling - Design Pending $0.00 $0.00 1 $0.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $60,000.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Accoustical Renovations Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $75,000.00 $0.00 $0.00 Priority Title Customer Service - Facility Enhancement North Parking Lot -Construction Pending $0.00 � $0.00 $o.00 $0.00 $0.00 $0.00 $0.00 $281,250.00 $0.00 $0.00 Totals: $0.00 $20,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $356,250.00 $60,000.00 $259,000.00 57 84 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast (Funded) Unfunded Future Years Forecast capital Improvement Management Plan (Forecasted Projects) Status � u Abbrev Budget Center Name 2016 ' 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement W LG White Lake Oaks Golf Course Priority Title I (Health and Safety 1st Tee Renovation Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150,000.00 $0.00 $0.00 $0.00 $0.00 Tee box safety fencing Pending $0.00 _ $0.00 $0.00 $0.00 $0.00 $0.00 $75,000.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Revenue Generation Irrigation System - Replacement - Phase II Pending $80,000.00 $80,000.00 $80,000.00 $80,000.00 $80,000.00 $0.00 $0.00 $0.00 1 $0.00 $0.00 Priority Title Customer Service - Efficiency/operational Savings Fence Line Replacement Pending $0.00 [$0.00--ir- $0.00 $65,000.0 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Storage Building -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $80,400.00 $0.00 $0.00 Maintenance Building Addition -Construction Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $200,000.00 Drainage Improvements -Construction Pending $0.00 $0.00 $0.00 $0.00 $90,000.00 $90,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drainage Improvements -Design Pending $0.00 $18,000.O0 j $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Maintenance Building Addition -Design Pending $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20,000.00 $0.00 (Priority Title (Customer Service - Facility Enhancement North Parking Lot Expansion -Construction Pending $0.00 _1L0.00 $0.00 $0.00 $0.00 $281,250.00 $0.00 $0.00 $0.00 $0.00 Sign Replacement Pending $0.00 $25,000.00 $0.0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $123,000.00 $80,000.00 $145,000.00 $230,000.00 I$451,250.00 I$225,000.00 $0.00 I$80,400.00 I$20,000.00 I$200,000.00 58 85 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016J 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement WTR Waterford Oaks Activity Center/Park (Priority Title (Health and Safety Boardwalk/Dock Replacement Pending $0.00 $60,000.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IPriority Title (Regulatory Storm Water Improvements Pending $0.00 $0.00 $100,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Revenue Generation Dog Park Pond - PK, Construction Pending $0.00 $0.00 $0.00 $140,000.00 $140,000.00 $140,000.00 I $0.00 $0.00 $0.00 I $0.00 $0.00 Dog Park Pond - PK, Design Pending $0.00 [$0.00 -:]$45,000.00 II $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Picnic Shelter, Parkview Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40,000.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Efficiency/Operational Savings Irrigation -Paradise Peninsula Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $15,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Redevelopment Phase I - Design Pending $0.00 $3001000.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Redevelopment Phase I -Construction Pending L$0.00 ] $550,000.00 JI $0.00 II $0.00 _A$0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Facility Enhancement Ashpalt Trail System, Phase 2 Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $120,000.00 Play Lot -Rabbit Run Pending $0.00 $0.00 $0.00 $0.00 $40,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trails -New Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $60,000.00 $0.00 $0.00 Paving -Service Road Pending $0.00 $75,000.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Paradise Pennisula-Shade Structure Pending $0.00 $0.00 $0.00 $0.00 $0.00 I $20,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 East-West Campus Connector Trail -Construction Pending $0.00 $0.00 $0.00 $60,000.00 $60,000.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Accessible Playground -Enhancements Pending 00.00 $25,000.00 $25,000.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 East-West Campus Connector Traill-Design Pending $15,000.00 ] $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$15,000.00 I$810,000.00 II$230,000.00 I$200,000.00 $240,000.00 I$175,000.00 1$0.00 $40,000.00 I$60,000.00 1$0.00 I$120,000.00 WWC Waterford Oaks Waterpark Concessions (Priority Title (Customer Service - Revenue Generation Concession Remodeling - Construction Pending $0.00 $400,0005,000.00 $ .00 $220.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$0.00 I$400,000.00 11$225,000.00 II$0.00 I$0.00 I$0.00 $0.00 I$0.00 I$0.00 $0.00 $0.00 59 86 Proposed Capital Improvement Budget Plan Column 1 10 Year Forecast (Funded) Unfunded Future Years Forecast Capital Improvement Management Plan (Forecasted Projects) Status � u Abbrev Budget Center Name 2016 ' 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Capital Improvement WWP Waterford Oaks Waterpark (Priority Title (Customer Service - Revenue Generation New Water Feature-WP-Construction Pending $0.00 $440,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Rental Pavilion -Pine Cove Pending $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $180,000.00 Redevelopment Phase I, Design Pending $0.00 $100,000.00 J $0.00 $0.00 ,I $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings Wave Pool -Water Spray System Pending $0.00 r I $20,000.00 II $0.00 $0.007� $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Bath house -Remodeling Pending $0.00 $0.00 II $600,000.00 j $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Filter Separation System Pending $0.00 �0.00 $0.00� $150,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Raft Ride -Accessible Lift System -Design Pending $0.00 �0.00 $10,000.00 $0.00 $0.00 $0.00 $0.00 �$0.00 $0.00 $0.00 $0.00 Raft Ride -Conveyor Belt Replacement Pending $0.00 $15,000.00 L$0.0gjjWL$0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $575,000.00 $610,000.00 $150,000.00 I$0.00 I$0.00 $0.00 $0.00 I$0.00 $0.00 I$180,000.00 Totals: $2,057,635.00 $8,092,400.00 $6,254,500.00 $3,484,500.00 I$3,014,500.00 1$4,556,750.00 $5,366,700.00 I$4,181,000.00 I$2,928,150.00 1$800,500.00 I$3,745,000.00 Capital Improvement Summary Capital Improvement Pending Total Grand Total of FY2016 Funded $2,057,635.0 $2,057,635.00 $2,057,635.00 60 87 FY2016 Proposed Projects for OCPRC Approval (listed by Priority Category) Priority Category Cost Center Maintenance Project Name Budget Health & Safety 1 ADM IP@vement Maintenance Program $120,000.00 69 Total Health and Safety (1) $120,000.00 Customer Service -Revenue Generation 3 ADM Carpet/Flooring Management Program $50,000.00 68 Total Customer Service -Revenue Generation (1) $50,000.00 Customer Service -Efficiency & Operational Savings 4 ACC Stucco Repair $20,000.00 63 4 GLG Exterior Stone Repair $10,000.00 70 4 ADM Window/Door Replacement $50,000.00 66 4 ADM Interior/Exterior Painting Management $50,000.00 67 Total Customer Service -Efficiency & Operational Savings (4) $130,000.00 Customer Service - Facility Enhancement E ADM ADM Natural Resource Management Program Tree Planting Program $400,000.00 $100,000.00 64 65 Total Customer Service -Facility Enhancement (2) $500,000.00 Grand Total All Maintenance Projects $800,000.00 K:\ParksRec\General\Design\Financial\Budgets\FY2016 Budgets\2015.04.24 Numbered FY2016 Proposed Projects.xlsx 4/24/2015 1034 AM 61 SS 62 89 GAp D Scope Description Project # 31 KS M Maintenance Status Pending ACC Addison Oaks Conference Center Project Name Stucco Repair CIP Number Project Scope Annual stucco repair/replacement of the existing stucco building fagade, heavy timber accents and chimney repairs Project Comments 1-17-2013 - Increase budget from $10,000 to $80,000 for the necessary chimney repairs as quoted by National Restoration, Inc. (Annual Contractor). 12-17-2013 - Since 2007, $10,000 has been budgeted annually in the parks building maintenance line item for annual repair and replacment of the existing stucco fagade. Consider exploring fundraising activites for the sustainability of the historic structure. The FY2014 Chimney and stucco repairs will be coordinated with the budgeted roof replacement project. 4-9-2014 - Modified forecast to show the $20,000 annual expenditure. 7-2-2014 - Proposed amount changed from $20,000 to $10,000 due to budget constraints. 11-12-14 - Commission approved amount for FY2015 is $20,000 maintenance building is next building to be addressed for stucco repair/replacement. Priority Title Customer Service - Efficiency/Operational Savings Forecasted Year 2016 Proposed Amount $20,000.00 Budgeted Amount 21-Apr-15 8:47 AM 90 63 A A lip CUD Scope Description Project # 35 M Maintenance ADM Administrative Services Project Name Natural Resource Management Program CIP Number Status Pending Project Scope Annual Natural Resource Management Program for all necessary in-house and contracted services for prescribed burns, deer surveys, permit/fees, habitat/wildlife management, native plantings, and other related natural resource management Project Comments 2-19-2014 - This program will complete and replace the following FY2014 NR Projects: NR-Aerial Deer Survey NR-Arborist Services NR-Environmental Permits & Fees NR-Habitat Management NR-Wildlife Management NR-Native Plantings NR-Prescribed Burns NR-Herpetological Study Escalation of budget over the 15yrs represents a goal to meet or exceed national standards for the preservation and management of our natural areas. Priority Title Forecasted Year Proposed Amount Budgeted Amount Requires verification from Natural resources. 4-1-2014 NR-Herpetological Study - This study is being included into the overall Natural Resource Management Program instead of a stand alone project. 2014/2015 - Baseline Herpetological Studies (10 Parks) FY14-$110,000 budgeted, FY15 - $110,000 proposed budget 2016 - Critical Habitat Assessments & Report Preparation (10 Parks) - $45,000 proposed budget 2017 - Identification of Grant Funding Opportunities for Implmentation of Management Recommendations - $5,000 proposed budget Customer Service - Facility Enhancement 2016 $400,000.00 21-Apr-15 8:47 AM 64 91 GAKJ__� ND FLINTY PARKS M Maintenance ADM Administrative Services Scope Description Project Name Tree Planting Program CIP Number Status Pending Project # 36 Project Scope Annual Natural Resource Management Program for all necessary in-house and contracted tree planting in park natural buffers and public areas based upon 500 trees annually. Project Comments NR-Natural Resources Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-22-2014 - The FY2015 budget was increased to accommodate a larger park -wide tree planting effort by Land Management Staff, volunteer, contractors etc, including the re-establishment of the Tree Tribute Program. Therefore the Project Scope was changed to include approximately 500 deciduous & evergreen trees. Customer Service - Facility Enhancement 2016 $100,000.00 21-Apr-15 8:47 AM 65 92 r + a i �e;q�nationt]a1cWn�.[arn Scope Description Project # 33 M Maintenance ADM Administrative Services Project Name Window/Door Replacement CIP Number Status Pending Project Scope Yearly management of nearly 2,500 windows and door in all cost centers Project Comments Maintenance costs are based on an average lifecycle of 25 - 35 years. A portion of the FY2014 funds will be used to validate a phased management program. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-22-2014 - Unchanged for FY2015. Evaluation of a phased management program is expected to be completed by September 2014. Customer Service - Efficiency/Operational Savings 2016 $50,000.00 21-Apr-15 8:47 AM 66 93 r + a i �e;q�nationt]a1cWn�.[arn Scope Description Project # 34 M Maintenance ADM Administrative Services Project Name Interior/Exterior Painting Management CIP Number Status Pending Project Scope Yearly interior and exterior paint of approximately 150 facilities with varying surface types of wood, metal, masonry EFIS etc, within all cost centers, including walls, facades and structures Project Comments 3-1-2013 - This does not include the Addison Oaks Bulh Estate Stucco Repair. Maintenance cost based on approximately 4-6 facilities per fiscal year. A portion of the FY2014 funds will be used to validate a phased - management program based on condition and age. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-22-2014 - Unchanged for FY2015. Customer Service - Efficiency/Operational Savings 2016 $50,000.00 21-Apr-15 8:47 AM 67 94 r + a i �e;q�nationt]a1cWn�.tarn Scope Description Project # 30 M Maintenance ADM Administrative Services Project Name Carpet/Flooring Management Program CIP Number Status Pending Project Scope Yearly replacement of carpet, hardwood, VCT, epoxy, tile etc. of approximately 100,000 SYD of interior building space Project Comments Maintenance cost based on approximately 2.5% of total building space. Potentially reduce in FY2015 to 1% or less. A portion of the FY2014 funds will be used to validate a phased management program based on condition and age. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-22-2014 Unchanged for FY2015 Customer Service - Revenue Generation 2016 $50,000.00 21-Apr-15 8:47 AM 68 95 r + a i �e;q�nationt]a1cWn�.[arn Scope Description Project # 29 M Maintenance ADM Administrative Services Project Name Pavement Maintenance Program CIP Number Status Pending Project Scope Yearly pavement maintenance program of more than 1,000,000 SYDS of Asphalt and Concrete within all cost centers, including cut & patching, crack filling, striping, small replacement project under $5,000 Project Comments 3-1-2013 - Maintenance cost based on approximately 2.5% of total SYDS and does not included complete replacement of asphalt & concrete. Coordinate this program with established Facilities Engineering (General fund) Program. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-22-2014 - The approved FY2014 program will be completed during the spring and summer months of 2014, with a continued yearly evaluation of pavement projects for the following fiscal years. Health and Safety 2016 $120,000.00 21-Apr-15 8:47 AM 69 96 A A lip .CUD Scope Description Project # 32 M Maintenance GLG Glen Oaks Golf Course Project Name GLG-Exterior Stone Repair CIP Number Status Pending Project Scope Repair existing cultured stone and real stone exterior of building. Project Comments The cultured stone continues to require yearly attention due to detaching from building structure. Priority Title Forecasted Year Proposed Amount Budgeted Amount 1-22-2014 Unchanged for FY2015. 7-2-2014 Proposed amount changed from $10,000 to $5,000 due to budget constraints. Customer Service - Efficiency/Operational Savings 2016 $10,000.00 21-Apr-15 8:47 AM 70 97 Oakland County Parks and Recreation Commission OWD Maintenance Management Plan and 10 Year Forecast (PROPOSED) COUNTY PARKS 21-Apr-15 Proposed Maintenance Plan Columns 10 Year Forecast FY2016 (Funded) Unfunded Future Years Forecast Maintenance Management Plan (Forecasted Projects) Abbrev Budget Center Name Status 2016 12017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Maintenance ACC Addison Oaks Conference Center (Priority Title (customer service - Efficiency/operational Savings Water Tower -Demolition Pending $0.00 $20,000.00 $0.00 $0.00 $0.00 I $0.00 I $0.00 $0.00 $0.00 I $0.00 $0.00 Stucco Repair Pending $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 I $20,000.00 I $20,000.00 $20,000.00 $20,000.00 I $20,000.00 $20,000.00 Totals: I I$20,000.00 I$40,000.00 I1$20,000.00 $20,000.00 I$20,000.00 I$20,000.00 1$20,000.00 I$20,000.00 I$20,000.00 1$20,000.00 $20,000.00 ADD Addison Oaks IPriority Title (Health and Safety Bulh Lake Dam -Structural Inspection Pending $0.00 $0.00 $5,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pedestrian Bridge -Structural Inspection Pending $0.00 $0.00 $2,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$0.00 I$0.00 I1$7,500.00 lI$0.00 I$0.00 I$0.00 $0.00 I$0.00 I$0.00 $0.00 $0.00 71 98 Proposed Maintenance Plan Columns FY2016 (Funded) Unfunded Future Years Forecast Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 Maintenance ADM Administrative Services 10 Year Forecast Maintenance Management Plan (Forecasted Projects) 2021 2022 2023 2024 2025 2026 Priority Title (Health and Safety Pavement Maintenance Program Pending $120, 000 00 $150,000.00 $150,000.00 $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 (Priority Title I (Customer Service - Revenue Generation Carpet/Flooring Management Program Pending $50,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 I $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 I $150,000.00 (Priority Title (Customer Service - Efficiency/Operational Savings Interior/Exterior Painting Management Pending $50,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $120,000.00 $120,000.00 $120,000.00 $120,000.00 $120,000.00 $120,000.00 Window/Door Replacement Pending $50,000.00 $mQ000.00 $50,000.00 $50,0 0 00.00 $50,000.00 V $50,000.00 $50,000.00 $50,000.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Facility Enhancement Tree Planting Program Pending I $100,000.00 I $100,000.00 $100,000.00 II $100,000.00 $100,000.00 V $50,000.00 $50,000.00 $50,000.00 $0.00 I $0.00 I $0.00 Natural Resource Management Program Pending $400,000.00 $230,000.00 $225,000.00 $225,000.00 I $300,000.00 I $300,000.00 $300,000.00 $300,000.00 $400,000.00 I $400,000.00 I $400,000.00 Totals: I I$770,000.00 'I$730,000.00 $725,000.00 'I$725,000.00 11$800,000.00 lI$820,000.00 I$820,000.00 I$820,000.00 I$820,000.00 I$820,000.00 I$820,000.00 GLG Glen Oaks Golf Course IPriority Title (Health and Safety Bridge #1, #3 & #9-Structural Inspections Pending $0.00 $0.00 $7,500.00 $0.00 $0.00 $0.00 $0.00 $8,500.00 $0.00 $0.00 $0.00 (Priority Title (Customer Service - Efficiency/Operational Savings GLG-Exterior Stone Repair Pending I $10,000.00 I[ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$10,000.00 II$0.00 $7,500.00 I$0.00 I$0.00 I$0.00 $0.00 I$8,500.00 I$0.00 $0.00 I$0.00 72 99 Proposed Maintenance Plan Columns FY2016 (Funded) Unfunded Future Years Forecast Abbrev Budget Center Name Status 2016 2017 2018 2019 2020 Maintenance GRV Groveland Oaks Priority Title Health and Safety Bridge Inspection -Devil's Island Pending $0.00 $0.00 $2,500.00 $o.00 $0.00 Bridge Inspection -Main 1 Pending $0.00 $0.00 $2,500.00 $0.00 $0.00 Bridge Inspection -Main 2 Pending $0.00 $0.00 $2,500.00 $0.00 $0.00 Bridge Inspection -Virgin Island Pending $0.00 $0.00 $2,500.00 $0.00 $0.00 Priority Title Regulatory Septic Field -Inspection Pending imkm..�$0.00 $5,000.00 �I $0.00 Totals: I$0.00 I$0.00 II$15,000.00 $0.00 I$0.00 Independence Oaks 10 Year Forecast Maintenance Management Plan (Forecasted Projects) 2021 2022 2023 2024 2025 011111 ci $0.00 $0.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $6,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 I$18,500.00 $0.00 $0.00 $0.00 Priority Title Health and Safety Farmhouse-Domolition/Removal/Relocate Pending Sn n�� o.00 $ .O $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20,000.00 Totals: $o.00 $o.00 $o.00 $o.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20,000.00 Springfield Oaks Activity Center/Park "M Priority Title Regulatory Water Tower -Inspections Pending $0.00 $O.00 $8,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priority Title Customer Service - Efficiency/Operational Savings 4-H Horse Barn -Siding Replacement Pending $0.00 $25,000.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: I$0.00 I$0.00 II$33,000.00 $0.00 I$0.00 I$0.00 $0.00 $0.00 I$0.00 $0.00 $0.00 73 100 FY2016 Abbrev Budget Center Name Status Maintenance Proposed Maintenance Plan Columns (Funded) Unfunded Future Years Forecast 2016 1 2017 2018 2019 2020 WLG White Lake Oaks Golf Course 10 Year Forecast Maintenance Management Plan (Forecasted Projects) 2021 2022 2023 2024 2025 2026 (Priority Title (Customer Service - Efficiency/Operational Savings Pond Dredge Pending $0.00 $100,000.00 $0.00 $0.0�I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals: $0.00 $100,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 WP Waterford Oaks Waterpark Priority Title Customer Service - Efficiency/Operational Savings Kiddie Water Structure -Painting Pending 50.00 _::� 0.o0 $15, � $0.00 $0.00 $o.o0 $0.00 $0.00 $O.00 $0.00 Totals: I$0.00 I$0.00 II$15,000.00 II $0.00 I$0.00 I$0.00 $0.00 I$0.00 I$0.00 $0.00 $0.00 TOtalS: $800,000.00 $870,000.00 $823,000.00 $745,000.00 $8z0,000.00 1$840,000.00 I$840,000.00 I$867,000.00 I$840,000.00 I$8a0,000.00 $860,000.00 Maintenance Management Summary Maintenance Pending Total Grand Total of FY2016 Funded :11 111 11 $800,000.00 $800,000.00 74 101 QAKLANDCOUNTYPARKS PLANNING REVIEW PLANNING AND RESOURCE DEVELOPMENT CIP/Maintenance Management Plans Updated: April 3, 2015: Page 1 of 5 The Planning Review is an overview of planning documents and demographic trends related to projects identified by OCPR's Capital Improvement and Maintenance Management Plans and 10-Year Forecasts documents. The intent is to inform the proposed project in a way that will improve outcomes and provide critical information to the Parks Commission regarding the project's relevance to the goals and objectives of OCPR. Budget Center Multiple Management Plan Scope The Capital Improvement Program and Maintenance Management Plans identify and forecast both capital and maintenance projects for the purpose of improving, maintaining and managing over 230 park facilities, buildings and structures within the 13 Oakland County Parks. The Management Plans are based on master plans, public need, and staff recommendations. The Management Plans provide guidelines for the development and implementation of capital improvement and maintenance projects, including: ■ Project type and status definitions ■ Alignment of practices with Oakland County Fiscal Services Department ■ Master planning processes ■ Design and construction work flows ■ Commission approval processes The Management Plans also provide for capital and maintenance programs for pavement, roofing, building equipment, and fence line replacement. Maintenance programs include pavement repair, flooring repair/replacement, painting, window/door replacement, natural resources, and the ADA Transition Plan. (OCPRC, Sept 2014) Budget Forecast See Commission memo for forecast amount for FY2016 Strategic Plan 1.2.2 Recreation Facilities Vision: Develop and maintain year round recreation facilities that support passive and active recreation pursuits for people of all ages 1.2.2.1 Recreation Facilities Goal: Upgrade existing recreation facilities and add additional recreation facilities and amenities that energize the community to want to live, work, and play in Oakland County 1.2.2.2 Strategies: #1— Develop an asset management plan for infrastructure maintenance and improvements based on updating a minimum of 4-5% of the system annually. NOTE: this rate of re -investment from the 2008 plan may be high — staff are researching current standards for re -investment rates. (PROS Consulting, April 2008, pp. 3-4) Recreation Plan Objective 2.2: Planned Capital Improvement and Major Maintenance Projects — Implement capital improvement and major maintenance projects that have been identified in the park master planning process or in capital 75 102 QAKLANDCOUNTYPARKS PLANNING REVIEW PLANNING AND RESOURCE DEVELOPMENT CIP/Maintenance Management Plans Updated: April 3, 2015: Page 2 of 5 project/major maintenance forecasts and pursuant to the results of the facility planning process (OCPRC, February 2013, p. 13) Objective 4.6: Fiscal Responsibility — Manage and develop OCPRC finances that will ensure the long-term provision of recreational services that meet the needs of Oakland County residents Action 4.6.D. Implement a protocol for evaluating proposed capital expenditures, both planned and unplanned that is guided by facility plans (OCPRC, February 2013, pp. 44-45) Park Master Planning In past years, the decision to reinvest in existing park assets and add new assets was driven by the CIP process. Now, as park master plans are being completed —the CIP process is guided by the park master plans. Design staff and Planning staff are working together to ensure a smooth transition from park planning to design and construction and collaborating together on required Parks Commission approvals. OCPR's park master planning process was developed in partnership with the OCPR Parks Commission. It provides a foundation for decision -making regarding capital improvements that is based on documented recreational need, public engagement, and alignment with the strategic mission and goals of OCPR. The master planning process aligns capital improvements with operational and marketing planning. By incorporating the principles of universal design, we strive to provide facilities and structures that are accessible to people of all abilities. The park master planning process steps are: I. Pre -Planning— baseline research and workplan development ■ Parks Commission authorization is required to launch public engagement in next phase II. Inventory and Analysis — community, stakeholder, park user, and public engagement III. Concept Development— development of park vision, objectives and performance metrics, and facility concepts ■ Parks Commission authorization is required to solicit public comment on draft Park Vision and Facility Concepts IV. Concept Refinement — refinement of concepts based on public input and additional research ■ Parks Commission final approval of Park Vision and Facility Concepts is required V. Forecasting — linking of master planning concepts to CIP, maintenance, operations, and marketing workplans, schedules and budgets ■ This step results in a Park Business Plan combining the park master plan, operations plan, marketing plan and financial forecasts ■ Implementation of design and construction of projects identified in the master plan is subject to the approval of the Parks Commission ■ With the necessary approvals in place, implementation of projects is generally a two-year process with design occurring in Year 1 and construction in Year 2 VI. Evaluation — tracking of outcomes of design and construction, documentation of performance metrics identified in the master plan, and reporting to the Parks Commission and the public Public Engagement In the 2010 Community -Wide Survey, the actions that respondents are most willing to fund with their County parks and recreation tax dollars is "fix-up/repair older buildings/shelters/playgrounds" (35%), "purchase land to preserve open space and protect the environment" (31%), "purchase land to develop walking and hiking trails" (27%), and 76 103 QAKLANDCOUNTYPARKS PLANNING REVIEW PLANNING AND RESOURCE DEVELOPMENT CIP/Maintenance Management Plans Updated: April 3, 2015: Page 3 of 5 "develop new hard surface walking and biking trails that connect to regional trails" (22%). (Leisure Vision (ETC), 2010) Drive -Time Service Area Planning and Resource Development is in the process of calculating drive -time service areas for all parks and facilities where the home zip codes of visitors have been collected (point of sale or surveys). By mapping the drive - time radius, we can determine if similar or complementary services are being provided by others in the same area for a better understanding of the facility's market position. We are providing this analysis for individual projects as it becomes available. Visitor Trends When available, three years of visitor trends are included for each project. Market Analysis Planning and Resource Development is in the process of developing market analyses for major facility -types provided by OCPR. When a completed market analysis is available, recommendations regarding identification of target markets are reported in the planning review. Facility Standards The facility standards and practices project is under development. Accessibility 2006 Accessibility Assessment The 2006 Accessibility Assessment was conducted by a consultant team in 2005-06 to inventory, analyze, develop options, and estimate costs for the needs of ... Oakland County Parks and Recreation Parks in regard to the specific requirements of the Americans with Disabilities Act. The recommendations generated by this assessment are reviewed as part of the planning review process for each project. (Straub, Pettitt, Yaste; Becket & Raeder; Michigan Protection & Advocacy Service, April 2006) Transition Planning As updated transition plans become available, those recommendations are incorporated into planning reviews for individual projects. Additional Recommendations Accessibility recommendations, based on regulations and/or best practices that are not included in existing planning documents, are reported in this section. Service Assessment Oakland County Parks' Service Assessment was conducted with the assistance of Green Play, using the Public Sector Services Assessment Matrix. The Matrix analyzes park and recreation services for: Fit, Financial Capacity, Market Position, and Alternative Coverage. Each of these factors acts as a lever, providing a provision strategy for the individual service based upon a series of questions regarding each factor. The planning review for individual 77 104 QAKLANDCOUNTYPARKS PLANNING REVIEW PLANNING AND RESOURCE DEVELOPMENT CIP/Maintenance Management Plans Updated: April 3, 2015: Page 4 of 5 projects will report the service assessment determinations for services provided at the park or facility where improvements are proposed. (GreenPlay LLC, June 2014) Service Portfolio The Service Inventory is a listing of park and recreation services that are provided by Oakland County Parks. It is a product of the Service Portfolio project and is the basis for further in-depth analyses generated by the Service Portfolio project. The planning review for individual projects will report service portfolio determinations for the park or facility, including category of service and recommended target cost recovery rate. (GreenPlay LLC, June 2014) Operational Considerations This section of the planning review forecasts the effect of the proposed project on the operations and maintenance of the park or facility, including impacts to revenue generation and operating expenses. The addition of depreciation expense that will be generated by the proposed project will be considered here. Agreements and Restrictions The planning review for individual projects will report on documented restrictions to the property, such as grant agreements, conservation easements, utility easements and other documents. Other agreements, such as leases, management agreements, and partnership agreements, will be reported. Other Planning In addition to Parks Commission approvals, implementation of projects identified in the Capital Improvement and Maintenance Management Plans may also require approvals on the federal and/or state level and may be subject to site plan and other review by local Boards and Commissions. Careful review of zoning, environmental, and other regulations is an important aspect of the design process. Costs for permitting and review will be anticipated in project budgets. References GreenPlay LLC. (June 2014). Service Portfolio Project. Waterford, Michigan: Oakland County Parks and Recreation Commission. Leisure Vision (ETC). (2010). Community Survey Final Report. Waterford, MI: Oakland County Parks and Recreation Commission. OCPRC. (February 2013). Chapter 9: Strategic Action Plan. In Five -Year Parks and Recreation Master Plan. Waterford, Michigan: Oakland County Parks and Recreation Commission. OCPRC. (Sept 2014). FY2015-2025 Capital Improvement Management Plan. Waterford, Michigan: Oakland County Parks and Recreation Commission. PROS Consulting. (April 2008). Oakland County Parks Strategic Plan Summary Report. Waterford, Michigan: Oakland County Parks and Recreation Commission. 78 105 QAKLANDCOUNTYPARKS PLANNING REVIEW PLANNING AND RESOURCE DEVELOPMENT CIP/Maintenance Management Plans Updated: April 3, 2015: Page 5 of 5 Straub, Pettitt, Yaste; Becket & Raeder; Michigan Protection & Advocacy Service. (April 2006). Oakland County Parks and Recreation Americans with Disabihities Act (ADA) Assessmesnt and Master Plan. Waterford, Michigan: Oakland County Parks and Recreation Commission. 79 106 OAKLAND COUNTY PARKS RECREATION COMMISSION AGENDA APRIL 29, 2015 AGENDA ITEM NO. G Cr4 PARK OPERATIONS To: Chairman Fisher and Commission Members From: Daniel J. Stencil, Executive Officer James C. Dunleavy, Chief of Parks Operations— North District Thomas J. Hughes, Chief of Park Operations -- South District Submitted: April 23, 2015 Subject: Proposed FY 2016 Capital Equipment Plan INTRODUCTION AND HISTORY The Oakland County Parks staff has developed a 10-year capital equipment plan to help forecast the future of our existing equipment. The 10-year capital equipment plan has been a useful tool in determining what equipment needs to be replaced, both long and short term. This plan also gives us an opportunity to review inventory of park capital equipment and how long equipment is kept in service. Each budget year this plan is revised by Parks staff to determine the importance of what is needed to be replaced. A historical analysis of Capital Equipment expenditures for FY 2011-2015 and the proposed Capital Equipment expenditures for FY 2016 are included in the attached PowerPoint presentation. ATTACHMENTS - Capital Equipment Program PowerPoint Presentation 107 MI M WLAI NIL Proposed FY log 2016 Capital Equipment Plan 108 Summary Staff has developed a 10 year capital equipment plan to help project into the future to identify equipment that needs to be replaced. This plan is reviewed on an annual basis and will be adjusted as needed based on the condition of each piece of equipment. A 3 Year equipment forecast has also been developed by staff to more accurately identify equipment needs in the near future and has been provided. Staff has submitted a historical summary of Capital Equipment purchased for FY 2011- FY 2015 along with the proposed FY 2016 Equipment. A complete list of Proposed FY2016 Capital Equipment with replacement justification has also been provided. 109 FY2011 - FY2016 Capital Equipment Purchased $800,000 $700,000 $600,000 $500,000 $400,000 $300,000 $200,000 $100"000 9.9 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 w0perating Equipment Purchased $13,356 $207,318 $289,991 $447,000 ...... ..... $472,500 .. . ... ... N Recreation Equipment $211,000 ....... .. .. .. ......... I ..... .. .. . $231,500 $97,070 bTotal Capital Equipment $13,356 $207,318 $500,991 $678,500 $569,570 Proposed FY 2016 $383,000 $15,000 $398,000 110 3 Year Equipment Replacement Forecast Budget Center Equipment to be Replaced Estimated Replacement Cost 2017 ADD 2007 Turbine Debris Blower $7,000 ADD 2008 Kubota RTV1100 Utility Vehicle $17,000 GLG 1996 Toro Pro Core Green - Tee Aerator $23,500 GRV 2007 Jacobsen 5111 $40,000 GRV 2005 Honey Wagon $10,000 FM 2003 Large Tow Master Equipment Trailor $15,000 FM 1995 Dump Truck $60,000 FM 2002 Power Buggy Concrete $8,000 LYG 2000 Toro Rake-O-Vac $30,000 MR 1998 Wells Cargo Trailer (special events) $15,000 MR 2004 Thomas Com. Bus (*04-901) $130,000 ORN 1984 JD Tractor w/bucket, 42 pto H.P. $32,000 RDG 2003 Toro 72" Rotary Mower $20,000 SPG 2004 Toro Mulitpro 1250 Sprayer $25,000 WLG 2003 Jacobson Trim Mower $35,000 WTR 2007 Kubota UTV $13,000 WTR 2009 Kubota 60" $15,000 WWP 2012 Manual Pool Vac $5,000 $500,500 2018 ADD 2005 JD 4320 Tractor $29,000 CAT Toro HDX 4WD Utility Cart $18,598 GLG 2006 Toro Grounds Master 4500-D Rough Mower $51,330 GLG 2005 Toro Greens Master 3150 $26,468 GRV 2008 Kubota 1100 RTV $17,000 FM 1990 JD Loader $80,000 IND 1991 Bandit Chipper 6", 20 hp $10,000 LYG 2000 Toro Grounds Master 4500-D $16,700 LYG 2001 Sand Pro 5040 $30,000 LYG 2008 Jacobsen IV Plus Greensmower $29,000 MR 1994In-Line Skate/InFlatTrailer $10,000 RDG 1991 4WD Utility Tractor w/ Snow Blower $51,330 RDG 2003 Toro 5410 Fairway Mower $42,763 SPG 2005 Toro Grounds Master 4500-D $29,000 SPG 2006 Jacobsen IV Plus Greensmower $29,000 WLG 2005 Jacobsen IV Plus Greensmower $29,000 $499,189 2019 ADD 2005 Arctic Cat Snowmobile $7,400 ADD 2010 G2 Tracksetter Snow Groomer $8,000 GLG 2002 Toro 72" 4WD Rotary Mower $26,468 GRV 1990 Generator (Pines Restroom) $10,000 FM 1991 Boom Truck w/Bucket $100,000 IND 2003 Excel Hustler Tractorw/72" mower $26,000 IND 2002 Ventrac tractor w/cab $34,000 IND 1997 Ski Doo Skandic snowmobile $11,000 IND 1998 Hahn Spray pro 160 s/p sprayer $18,000 LYG 2010 Toro Greens Master 3150 $26,468 LYP 2008 Toro 3500 Trim Mower $35,000 MR 1995 Mobile Stage (Show V) $105,862 ORN 2005 Exmark 72" Mower $6,000 RWP Ultramax Pool Vac $5,000 SPG 2006 Toro Reelmaster 5410 $38,000 WLG 2008 Toro Reelmaster 5410 $38,000 WWP Ultramax Pool Vac $5,000 $500,198 III 2016 PROPOSED CAPITAL EQUIPMENT SUMMARY Budg_ Replacement or New Center et Existing Equipment Equipment Description Estimated Cost Cent ADD 2002 Kawasaki Mule Kubota $18,000 �GLG 2003 3500D Toro 3500D $35,000 �GRV 1989 John Deere Tractor 4044 John Deere Tractor $36,000 �IND 2007 Ventrac Ventrac $34,000 �LYG 2003 Greensking IV Jacobsen Greensking IV Plus $29,000 �MR _ Star Lab $15,000 �RDG 2003 Greensking IV Toro Greensmower $29,000 �RWP Pool Vac Maxi Sweep Pool Vac $7,000 �SPG 2005 Toro Reelmaster Fairway 5010 Toro Fairway Mower $51,000 SAC 2002 72" Rotary Deck Mower 72" Rotary Mower $25,000 WLG 2005 Toro Grounds Master 4500-D Toro Grounds Master 4500-D $60,000 �WLG 2004 Greensking IV Jacobsen Greensking IV Plus $29,000 �WTR 1994 Sweeper Sweeper $30,000 Total $398,000 112 2016 Kubota 1100 RTV Addison Oaks $18,000 Addison Oaks is replacing their 2002 Kawasaki Mule with a 2016 Kubota 1100 RTV, The Kubota will be used for trail maintenance, parking lot maintenance, and fence line repair, The Kubota 1100 RTV is an all weather utility vehicle and will be used in summer and winter operations. The 2002 Kawasaki Mule will be sent to the County Auction. 113 2016 Toro Groundsmaster 3500-D Glen Oaks Golf Course $35fOOO The 2016 Toro Grounds Master will replace the 2003 Toro 3500- D. The existing 3500-D has logged over 5500 hours of operation mowing tee, green and bunker surrounds at the golf course. According to our maintenance logs and equipment mechanics, the average life expectancy of most of our equipment is 4,000 hours. The 2002 Toro 3500-D will be sent to the County Auction. 114 2016 John Deere Tractor Groveland Oaks $36,000 Groveland Oaks is replacing their 1989 John Deere Tractor with a 2016 John Deere Tractor and Front End Loader. The tractor will be used for maintenance tasks all season. The tractor will also be used at other parks to assist in trail maintenance. The existing tractor is in need of repair and will be sent to County Auction. 115 2016 Ventrac 4200 Tractor Independence Oaks $34,000 Independence Oaks is replacing their 1998 Steiner Tractor with a 2016 Ventrac 4200 Tractor. The tractor will be used for maintenance tasks all seasons. All current attachments can be used on the new equipment. The existing tractor is in need of repair and will be sent to auction. 116 2016 Jacobsen Greensking IV Lyon Oaks Golf Course $29,000 White Lake Oaks will be replacing the 2003 Jacobsen Greensking IV with a 2016 Jacobsen Greensking IV Plus. The new mower will be used for mowing greens. All greens mowers are cycled through different applications (Tees, Collars, Verticutting and Rolling) until they reach the end of their life cycle. The existing mower will be sent to the County Auction. 117 2016 Star Lab Recreation Section $15,000 The Star Lab will be used at the Red Oaks Nature Center for educational programs. The Star Lab is a portable unit and will also be used for other events and programs throughout the county. 118 2016 Toro 3150 Greensmower Red Oaks Golf Course $291,000 Red Oaks will be replacing the 2003 Jacobsen Greensking IV with a 2015 Toro 3150 Greensmaster, The new mower will be used or mowing greens. All greens mowers are cycled through different applications (Tees, Collars, Verticutting and Rolling) until they reach the end of their life cycle. The existing mower will be sent to the County Auction. 119 2016 Maxi Sweep Pool Vacuum Red Oaks Water Park $7,000 The Maxi Sweep pool vacuum is used for daily maintenance of Red Oaks Wave Pool and River Ride. The existing pool vacuum has been repaired multiple times and has } reached the point where it can no longer be repaired. The existing pool vacuum will be sent to the County Auction. 1A 120 2016 Toro 5010 Reelmaster Fairway Mower Springfield Oaks Golf Course $51,000 The 2016 Toro Fairway Mower will replace the 2004 Toro Reelmaster Fairway Mower. The Reelmaster will be used to mow fairways at the golf course. The existing fairway mower has over 5500 hours of operation and has exceeded the average life expectancy of 4000 hours. The existing mower will be sent to the County Auction. 121 2016 John Deere 72" Deck Mower Springfield Oaks Park $25,000 The 2016 72" John Deere Rotary Deck Mower will replace the 2002 Toro 72" Deck Mower. The John Deere mower will be used to mow grounds throughout the park that cannot be accessed by the larger mowers. The 2002 72" Toro will be sent to the County Auction. 122 2016 Smithco Sweepstar Sweeper Waterford Oaks $30f 000 The Sweepstar 48H will replace the Olathe Sweeper. The SweepStar sweeper will be used to pick up leaves and other debris throughout the trails and park. The Olathe sweeper will be sent to the County Auction. 123 2016 Toro Groundsmaster 4500-D White Lake Oaks Golf Course $60,000 The 2016 Toro Grounds Master will replace the 2005 Toro Grounds Master. The 2005 has logged over 5,000 hours of operation mowing roughs on the golf course. According to our maintenance logs and equipment mechanics, the average life expectancy of most of our equipment is 4,000 hours. The 2005 Toro will be transferred to another park to use as a backup or sent to auction. 124 2016 Jacobsen Greensking IV White Lake Oaks $29,000 White Lake Oaks will be replacing the 2004 Jacobsen Greensking IV with a 2016 Jacobsen Greensking IV Plus. The new mower will be used for mowing greens. All greens mowers are cycled through different applications (Tees, Collars, Verticutting and Rolling) until they reach the end of their life cycle. The existing mower will be sent to the County Auction. 125