The 14 Oakland County Parks contribute to the high quality of life that attracts businesses and
residents to its 62 communities. Since 1966, the Oakland County Parks system has grown to 6,700
acres, offering a wide variety of year-round recreation opportunities ranging from camping, hiking,
swimming, boating, golfing and picnicking to cross-country skiing, ice skating and ice fishing.
OaklandCountyParks.com M V
OAKLAND COUNTY PARKS AND RECREATION COMMISSION
Regular Monthly Meeting Agenda
Oakland County Parks Activity Center, 2800 Watkins Lake Rd, Waterford 48328
Wednesday, September 1, 2021 @ 2:00 p.m.
Gary McGillivray, Chairperson
PG #
Call Meeting to Order
Roll Call
Pledge of Allegiance
2-3
Approval of Agenda
8-14
Approval of Minutes
Meeting of August 4. 2021
Public Comment
13-16
PRESENTATIONS/RECOGNITIONS:
ACTION REOUIRED
17-18
NACPRO Marketing and Millage Awareness Award
Irfer�xatiexal
Informational
COMMUNICATIONS/REPORTS:
ACTION REOUIRED
19-20
A. Capital Improvement Expense Summary
Receive & File
CONSENT AGENDA:
ACTION REOUIRED
21-22
1 OCPR Monthly Revenue and Expenditure Budget to Actual Report for Month
Receive & File
Ending 07/31/2021 (FM 10 FY 21)
23
2 Monthly Revenue and Expenditure Comparison Report for Month Ending
Receive & File
07/31/2021 (FM 10 FY 21)
24-28
3 Monthly Revenue and Expenditure Report by Line Item for Month Ending
Receive & File
07/31/2021 (FM 10 FY 21)
29
4 Monthly Capital Equipment Report for Month Ending 06/30/2021 07/31/2021
Receive & File
(FM 10 FY 21)
30
5 Monthly Revenue and Expenditure Average Comparison Report for Month Ending
Receive & File
07/31/2021 (FM 10 FY 21)
31
6 Capital Improvement Projects Budget to Actual Report & Statement of Net
Receive & File
Position For Month Ending 07/31/2021 (FM 10 FY 21)
32
7 FY 2021 Fiscal Services 3rd Quarter Financial Forecast
Receive & File
33-36
8 FY 2021 Fiscal Services 3rd Quarter Facilities Maintenance Budget Amendments
Receive & File
37-38
9 Monthly Purchasing Reports for Month Ending 07/30/2021 (FM 10 FY 21)
Receive & File
39
10 Maintenance Management Plan Budget
Receive & File
40-43
11 Capital Improvement Program - Project Report
Receive & File
44-45
12 2021 3rd Quarter Contributions Report
Receive & File
REGULAR AGENDA:
ACTION REOUIRED
46-58
13 A. Final Approval of Proposed FY 2022-2024 OCPR Operating Budget
Approval & Fwd to BOC
B. Final Approval of Proposed FY 2022-2026 Capital Improvement Program Plan
Approval & Fwd to BOC
(CIP-Funded from Net Position)
Final Approval of Proposed FY 2022-2026 Maintenance Management Plan (MMP-
59-198
Funded in the Operating Budget)
Final Approval of Proposed FY 2022-2026 Natural Resources Management Plan
(NR-Funded in the Operating Budget)
199-206
C. Final Approval of Proposed FY2022 Capital Equipment Budget
Approval & Fwd to BOC
(Funded from Net Position)
207-280
14 Davisburg Mill Pond Dam Removal & Restoration Project -Construction
Approval
Documents & Bidding Phase
281-288
15 Michigan Department of Natural Resources - Fisheries Habitat Grant Program
Approval & Fwd to BOC
Grant Acceptance (Mill Pond Dam Removal/Restoration)
289-303
16 Electrify America Solar Vehicle Charging Station License Agreement - Holly Oaks
Approval
ORV Park
304-356
17 Updated Stormwater Standards
Approval
357-358
18 Request to Sell Alcohol on Commission Property - MI Antiques Festival
Approval
19 Request to Sell Alcohol on Commission Property - Clarkston State Bank Back
359-360
Roads Half Marathon
Approval
UNFINISHED BUSINESS: ACTION REOUIRED
PRESENTER(S) / PHONE #
Gary MeCillivovf / 09 W59
Sue Wells / 858-4634
PRESENTER(S) / PHONE #
Jeff Phelps / 858-5319
PRESENTER(S) / PHONE #
Jeff Phelps / 858-5319
Jeff Phelps / 858-5319
Jeff Phelps / 858-5319
Jeff Phelps / 858-5319
Jeff Phelps / 858-5319
Jeff Phelps / 858-5319
Jeff Phelps / 858-5319
Jeff Phelps / 858-5319
Phil Castonia / 858-0909
Mike Donnellon / 343-6290
Mike Donnellon / 343-6290
Melissa Prowse / 249-2801
PRESENTER(S) / PHONE #
Sue Wells / 858-4634
Mike Donnellon / 343-6290
Tom Hughes / 343-1011
Zachary Crane / 240-1079
Melissa Prowse / 249-2801
Melissa Prowse / 249-2801
Melissa Prowse / 249-2801
Jim Dunleavy / 343-6224
Jim Dunleavy / 343-6224
PRESENTER(S) / PHONE #
NEW & MISCELLANEOUS BUSINESS
361-370 20 Executive Officer Report
21 Executive Committee Update
ANNOUNCEMENTS
ADJOURNMENT TO OCTOBER 6, 2021 at 2:00 p.m. or the Call of the Chair
ACTION REOUIRED PRESENTER(S) / PHONE #
Receive & File Sue Wells / 858-4634
Informational Gary McGillivray / 709-0359
QAKLAND
COUNTY PARKS
Oakland County Parks and Recreation Commission
Aaenda Summary for Wednesday. September 1.
2021
The agenda is summarized below. Commission Members can contact persons listed for additional information.
:7*•9=1LlkIF 11ICLl11NX0101eiki111d107LII
• Robert Kostin-Long-time Parks Commissioner
• NACPRO Marketing and Millage Awareness Award
COMMUNICATIONS:
A. Capital Improvement Expense Summary
Communication item lists the capital project agenda items requiring approval and the financial impact on the
Amount Available for Capital Improvement and Capital Equipment.
Contact: J. Phelps 248-858-5319
CONSENT AGENDA:
1. Revenue and Expenditure Budget to Actual Report by Budget Center
Monthly comparison of budgeted vs. actual revenue and expense by budget center. Available after month -end
closing.
Contact: J. Phelps 248-858-5319
2. Revenue and Expenditure Comparison Report by Budaet Center
Monthly comparison of actual revenue and expense by budget center. Available after month -end closing.
Contact: J. Phelps 248-858-5319
3. Revenue and Expenditure Report by Line Item
Monthly actual revenue and expense for entire Parks & Recreation fund. Available after month -end closing.
Contact: J. Phelps 248-858-5319
4. Monthly Capital Equipment Report
Monthly comparison of budgeted vs. actual capital equipment purchases. Available after month -end closing.
Contact: J. Phelps 248-858-5319
5. Monthly Average Comparison Report
The `Monthly Average Comparison Report' compares monthly revenue and expense activity to a five-year
average.
Contact: J. Phelps 248-858-5319
3
6.
►I
8.
9.
10.
11.
12
Capital Improvement/Illustrative Net Position-Unrestricted/Planned Use of Balance
The Capital Improvement/Illustrative Net Position-Unrestricted/Planned Use of Balance' report presents a budget-
to- actual comparison of active capital improvement projects, an illustrative representation of the Net Position -
Unrestricted accounts reflective of the Parks and Recreation Commission's Net Position policy, the current year
adjustments made to the Planned Use of Balance account, and detail of operating enhancement projects.
Contact: J. Phelps 248-858-5319
FY 2021 Fiscal Services 31 Quarter Financial Forecast
A summary of financial activity variances as of June 30, 2021.
Contact: J. Phelps
248-858-5319
FY 2021 Fiscal Services 3rd Quarter Facilities Maintenance Budget Amendments
A summary of FY2021 3rd Quarter Budget Amendments.
Contact: J. Phelps
248-858-5319
Monthly Parks Purchasing Reports — July 2021 - Month Ending 0713012021 (FM 10, FY21)
Today staff will present a monthly status report on the Purchasing Activity from Month 10 of Fiscal Year
2021 (July 2021) for Parks and Recreation.
Monthly Purchasing Expenditure Report — July 2021
Contact: P. Castonia 248-858-0909 o/ 248-343-0368 c
Maintenance Management Plan Budaet - FY 2021
Monthly budget report for the FY2021 Maintenance Management Plan.
Contact: M. J. Donnellon, Jr. 248-343-6290
Pending Capital Improvement Program-Proiect Report
Monthly written project status report on OCPR Pending Capital Improvement Program Projects.
Contact: M. J. Donnellon, Jr. 248-343-6290
2021 3rd Quarter Contributions Report
Staff is recommending the Commission receive and file the FY2021 3rd Quarter Contributions Report.
Contact: M. Prowse
REGULAR AGENDA:
248-249-2801
13. A. Final Approval of Proposed FY 2022-2024 OCPR Operatina Budaet
Recommendation to approve the Fiscal Year 2022-2024 Oakland County Parks and Recreation Proposed
Operating Budget and adopt the Fiscal Year 2022 General Appropriations Act resolution balancing total
appropriations with available resources in the amount of $34,197,675; and approve FY 2022 Proposed Capital
Equipment Plan budget in the amount of $642,500; and approve the FY2022 Capital Improvement budget in the
amount of $4,406.000 and $1,860,796 for the Maintenance Management Plan.
Contact: J. Phelps/S. Wells
248-858-5319 / 248-858-4634
4
B. Final Approval of Proposed FY 2022-2026 Capital Improvement Proaram Plan
Proposed FY2022-FY2026 Asset Management Plans (Final Approval)
• Capital Improvement Proaram Plan (CIP) Net Position
• Maintenance Manaaement Plan (MMP) ODeratina Budaet
• Natural Resource Manaaement Plan (NR). ODeratina Budaet
This proposed Asset Management Plan has been developed by staff and Commission for capital improvement, facility
maintenance and natural resource management of over 230 Oakland County Parks and Recreation Commission
(OCPRC) assets, buildings, natural areas, and recreational features within 14 park locations, beginning the FY2022
budgetary review process. See Attachment A for the preliminary program/project lists and a preliminary 5-year forecast.
Commission Action: Approval
Budget Review History: January 2021
April 2021
June 2021
Staff Recommendation: Staff recommend approval for the FY2022 Proposed Asset Management Plans, in the total
amount of $5,956,800.
i. Capital Improvement Program subtotal $ 4,406,000
ii. Maintenance Management Plan subtotal $ 684,800
iii. Natural Resource Management Plan Subtotal $ 866,000
iv. TOTAL $ 5,956,800
Contact: M. J. Donnellon, Jr.
248-343-6290
C. Final Approval of Proposed FY 2022 Capital Equipment Budaet (Funded from Net Position)
The Oakland County Parks Operations staff is providing the proposed FY2022 Capital Equipment list for budget
approval. The proposed Capital Equipment consists of maintenance equipment, kitchen equipment and recreation
equipment over $5,000. The proposed Capital Equipment is for existing parks and does not include equipment that
would be necessary for potential future park developments or acquisitions
Commission Action: Budget Approval
Budget: $642,500
Approval History: Conceptual Approval 8/2021
Staff Recommendation: Proceed with the approval of the proposed FY2022 Capital Equipment Budget in the amount
of $642,500.
Contact: T. Hughes
248-343-1011
14. Davisburp Mill Pond Dam Removal & Restoration Proiect-Construction Documents and Bidding Phase
Staff is presenting 100% design plans and engineers' opinion of cost as part of the conceptual approval for the
Davisburg mill pond dam removal & restoration project.
Also, Staff recommends amendment to AECOM contract #5528 in the amount of $84,725 to proceed with final
construction drawings, specifications, permitting and bidding for the mill pond dam removal and restoration project,
pending Charter Township of Springfield Board approval at their September 9th, 2021 meeting.
Commission Action: Conceptual Approval
Budget: SAC Millpond Dam Removal & Restoration $825,000
Contact: Z. Crane 248-240-1079
5
15. Michipan Department of Natural Resources -Fisheries Habitat Grant Program Grant Acceptance (Mill Pond
Dam Removal/Restoration
Oakland County Parks and Recreation and Springfield Township share in the joint maintenance and repair of the Mill
Pond Dam as well as the maintenance of the Mill Pond in Springfield Township. This is due to OCPR and Springfield
Township being the majority landowners on either side of the Mill Pond and the dam. The Mill Pond is part of
Springfield Oaks Golf Course (it defines the north boundary of the golf course), and OCPR also owns Rotary Park on
the north side of the dam. Springfield Township owns and operates Mill Pond Park, to the north and east of the Mill
Pond.
Knowing the dam was reaching the end of its useful life and in need of repair, OCPR and the Township partnered in
2019 to conduct a feasibility study for the dam, contracting with AECOM to produce the plan, including significant public
involvement. The final report indicated that due to the crushed outlet pipe that is not repairable, the dam would need to
be fully replaced, or removed. Replacement of the dam was estimated between $1.2M - $1.3M. Removal of the dam
and restoration of the natural stream channel was estimated at $1.5 - $1.7M. However, there are multiple grant
opportunities associate with removal of the dam, and no grant opportunities associated with the replacement, therefore
removing the dam should be less out-of-pocket expense for OCPR and the Township than replacing the dam. There
are also significant ecological and environmental benefits associated with removing the dam, such as re -connecting the
natural stream channel to the benefit of many native species including rainbow darter, sunfishes, and state species of
concern including mudpuppy and rainbow mussels. The restoration of the impoundment back to prairie fen habitat will
also provide critical habitat and linkages for species such as the federally threatened eastern Massasauga rattlesnake.
Current Request: In February 2021 staff applied for a grant from the Michigan Department of Natural Resources
Fisheries Habitat Grant Program. We received notification of the grant award ($345,000) in May and received the
attached Project Agreement in July.
Staff Recommendation: Staff is recommending the Commission approve the acceptance of the grant of $345,000 from
the Michigan Department of Natural Resources Fisheries Habitat Grant Program for the Mill Pond Dam Removal and
Restoration Project and forward the grant agreement to the Oakland County Board of Commissioners for their approval.
Contact: M. Prowse 248-249-2801
16. Electrifv America Solar Vehicle Chaminp Station License Apreement-Holly Oaks ORV Park
Staff were approached by both JEEP and Electrify America about an opportunity to house a solar -powered electric
vehicle charging station at Holly Oaks ORV Park. JEEP has partnered with Electrify America to place these charging
stations at various high -profile off -road locations around the country. The charging station will be located in the Holly
Oaks ORV Park parking lot. Electrify America will cover all costs associated with installation of the charging station, as
well as all maintenance costs. In addition, Electrify America will pay Oakland County Parks and Recreation $100 per
month while the station is at Holly Oaks.
With the Holly Oaks parking lot Phase II construction pending for next year, Electrify America has offered to provide a
temporary unit to be installed this fall (ideally prior to the Detroit 4Fest taking place September 24-26). They will then, at
no expense to OCPRC, replace it with a semi -permanent charging station next year once the second phase of the
parking lot is complete, and staff can designate a permanent home for it.
At the time of agenda publication, the agreement was still being reviewed by Corporation Counsel. The
agreement will be e-mailed to Commissioners prior to the Commission meeting. The term of the license
agreement is through December 31, 2023. Staff feel that this is a unique and exciting way to provide electric vehicle
charging at the park while building our relationship with JEEP and aligning nicely with the direction and discussion of the
OCPR Sustainability Committee. Staff will promote and highlight the new charging station through a press release and
social media posts.
Staff Recommendation: Staff recommends the Commission approve the license agreement with Electrify America for
a solar -powered vehicle charging station to be located at Holly Oaks ORV Park through December 31, 2023.
Contact: M. Prowse 248-249-2801
A
17. Updated Stormwater Standards
Oakland County Parks and Recreation (OCPR) is required by law to manage stormwater runoff from parklands and
prevent pollution to local streams and lakes. The Clean Water Act mandates that discharge of stormwater from a
conveyance system — like a pipe, ditch, or channel - to tributaries of navigable waters must be done according to a
National Pollutant Discharge Elimination System (NPDES) Phase II permit obtained from the US Environmental
Protection Agency and the Michigan Department of Environment, Great Lakes and Energy. The Oakland County Water
Resources Commissioner's Office (WRC) holds the NPDES Phase II permit for Oakland County properties and OCPR
Natural Resources Management staff coordinate with WRC to implement permit requirements and best management
practices, track and monitor required stormwater infrastructure within the parks, and provide necessary data and
information for reporting purposes.
WRC has been working to develop an updated NPDES Phase II permit and as part of that process, developed new
Stormwater Engineering Design Standards in coordination with the Regional Stormwater Standards Coordination
Committee consisting of stormwater experts from Oakland, Macomb, Wayne, and Livingston Counties. The standards
impact water quality, water volume and flood control including, but not limited to, specific standards for Channel
Protection Volume Control (Infiltration), Channel Protection Rate Control (Extended Detention), and Operations and
Maintenance. These standards will apply to development and re -development projects that are greater than one acre in
size and will not require retrofitting of existing infrastructure or changes to existing parks maintenance practices.
Staff Recommendation: Staff recommends approval of the Oakland County -wide Stormwater Engineering Design
Standards as submitted by the Water Resources Commissioner's Office and for the Chairperson to sign the attached
Memorandum for Adoption of Oakland County Stormwater Engineering Design Standards for County Properties.
Contact: M. Prowse 248-249-2801
18. Reauest to Sell Alcohol on Commission Propertv-DRAW (Disaster Relief At Work. Inc.)
Staff is very excited to be working with the promoter of the Clarkston State Bank Back Roads Half Marathon. This will
the 91h year for this annual event. The race starts and ends at Independence Oaks County Park. We have recently
received a request for DRAW (Disaster Relief At Work, Inc.) to serve Alcohol at the Clarkston State Bank Back Road
Half Marathon in support of their Disaster Relief At Work Program, for November 14, 2021, DRAW is a 501(c) (3)
dedicated to providing relief services to communities hit by natural disasters. Per the Oakland County Parks and
Recreation rules and regulations, DRAW is requesting to sell alcohol at Independence Oaks County Park during the
Clarkston State Bank Back Roads Half Marathon.
Staff Recommendation: Staff recommends the Commission approve the temporary liquor license for DRAW (Disaster
Relief At Work, Inc.) to sell alcohol at the Back Roads Half Marathon, to be held at Independence Oaks County Park
November 14, 2021.
Contact: J. Dunleavy 248-343-6224
NEW & MISCELLANEOUS BUSINESS:
19. Interim Executive Officer Report
Update on current Oakland County Parks and Recreation matters by the Interim Executive Officer.
Contact: S. Wells 248-858-4634
20. Executive Committee Update
Update on discussions from the previous month's OCPR Commission Executive Committee meeting.
Contact: G. McGillivray 248-709-0359
UNFINISHED BUSINESS
01aL*111:1,1
7
Oakland County Parks and Recreation Commission
Regular Meeting
August 4, 2021
Chairman McGillivray called the Oakland County Parks and Recreation Commission meeting to order at 2:01 p.m.
in the Oakland County Parks and Recreation Administration Building Commission Meeting Room.
COMMISSION MEMBERS PRESENT:
Chairman Gary R. McGillivray, Vice Chairman J. David VanderVeen, Executive Committee Member Christine Long,
Yolanda Charles, Amanda Herzog, Andrea LaFontaine, Lance Stokes (7)
COMMISSION MEMBERS ABSENT:
Secretary Ebony Bagley, Jim Nash, Nancy Quarles (3)
ALSO PRESENT:
Parks and Recreation
OC Fiscal Services/P & R
OC Purchasing
Oakland County 4H Fair Assoc
OCPR Employee Retiree
APPROVAL OF AGENDA:
Susan M. Wells, Interim Executive Officer
Mike Boyd, Park Supervisor -Waterford Oaks Park
Phil Castonia, Chief —Business Operations
DJ Coffey, Park Supervisor-Groveland Oaks Park
Sarah Cook-Maylen, Natural Resources Project Coordinator
Mike Donnellon, Chief -Facilities Maintenance & Development
Sandy Dorey, Recreation Program Supervisor
Jim Dunleavy, Chief -Park Operations & Maint. - N. District
Colin Gibbs, Maintenance Supervisor II
Tom Hughes, Chief —Park Operations & Maint. - S. District
Melissa Prowse, Supervisor of Planning
Brandy Sotke-Boyd, Chief -Recreation Programs and Services
Jeff Phelps, Fiscal Services Coordinator
Andy Krumwiede, Buyer II
LC Scramlin, General Manager
Steve Dendler
Moved by Mr. Stokes, supported by Mr. VanderVeen to approve the agenda as submitted.
AYES: Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
NAYS: (0)
Motion passed on a unanimous voice vote.
APPROVAL OF MINUTES:
Moved by Ms. Charles, supported by Ms. Herzog to approve the minutes of the Oakland County Parks and
Recreation Commission Regular Meeting of July 7, 2021, as submitted.
AYES: Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
NAYS: (0)
Motion passed on a unanimous voice vote.
F-2
PUBLIC COMMENTS:
Oakland County 4H Fair Association General Manager LC Scramlin thanked the OCPR Commission and staff for all
the assistance and support with the 2021 Oakland County Fair. This year was the 50t" year the Oakland County Fair
has been held at Springfield Oaks County Park. Mr. Scramlin advised OCPR staff always goes the extra mile to assist
and make sure everything works so well. He also thanked Oakland County Parks and Recreation for being a sponsor
of the Fair for 2021.
Mr. Scramlin also serves on the board for the Michigan State Fair and advised the 2021 Michigan State Fair will be
held September 2-6, 2021 at Suburban Collection Showplace in Novi. He advised this is the only fair that is a private
entity and uses no tax dollars to support this fair.
Chairman McGillivray thanked Mr. Scramlin and the Oakland County 4H Fair Association for its leadership and all their
work on the Oakland County Fair and the Michigan State Fair.
Retired Skilled Maintenance Mechanic - Steven Dendler
Colin Gibbs, Maintenance Supervisor 11, presented a plaque to Steve Dendler in recognition for his many dedicated
years of service to Oakland County Parks and Recreation. Steve was an Automobile Mechanic 11 and recently retired
after more than 9 years of service to Oakland County Parks and Recreation.
Lonq-Term Part -Time Emplovee Chris Rodriquez
Waterford Oaks Park Supervisor Mike Boyd presented a plaque to Seasonal Program Specialist Chris Rodriquez,
in appreciation for his work as a part-time employee at Oakland County Parks and Recreation for 27 years. Chris
has driven county buses for programs and events; maintained the Recreation Programs and Services trucks and
mobile units; painted; set up and break down of the rentals at Waterford Oaks County Park and mobile unit
rentals; and was the DJ, playing music at monthly social events for individuals with disabilities.
The Commission thanked and congratulated Mr. Dendler and Mr. Rodrigues for their hard work, dedication, and
service to the residents of Oakland County.
NACo 2021 Awards
Achievement Award -Holly Oaks ORV Park: The Commission received the 2021 National Association of Counties
(NACo) Achievement Award Program for Holly Oaks ORV Park. Chief of Park Operations and Maintenance -North
District Jim Dunleavy thanked staff for all their hard work and dedication on the ORV Park improvements amenities.
NACo 2021 Achievement Award -Best in Class COVID-19 Memorial Walk: Brandy Sotke-Boyd, Chief of Recreation
Programs and Services, presented the Commission with the 2021 NACo — Best of Category — Civic Education and
Public Information Award. This award was for the OaklandTogether COVID-19 Tribute which was hosted at Waterford
Oaks County Park. This program paid tribute to the sacrifice and resilience of residents while honoring the collective
pain and loss that has touched our lives. The #OaklandTogether COVID-19 Tribute program included:
• Virtual Discussion and COVID-19 Update: County Executive David Coulter and Lt. Gov. Garlin Gilchrist participated in a
virtual discussion about COVID-19 and the inequities people of color faced when confronting the virus.
• Top County Officials Remember One Year of Living with COVID-19 video: Executive Coulter and other County officials
reflect on the pandemic and discuss the tragedies, suffering and heroism many experienced since March 10, 2020.
• Remembrance and Gratitude Story Maps: Crowdsourced story maps for stories and photos of those we have lost to
COVID-19 on the Remembrance Map as well as appreciation for acts of kindness for frontline workers and support for local
businesses on the Gratitude Map.
• #OaklandTogether COVID-19 Tribute Walk: A half -mile immersive light display that paid homage to those we've lost to
COVID-19, gave thanks to those who risked their lives to keep us safe, and expressed gratitude for those who have
helped us through the last year.
These NACo Awards were presented to Oakland County Parks and Recreation at the NACo Annual Conference and
Exposition held on July 11, 2021 in Prince George's County, Maryland.
4
COMMUNICATIONS/REPORTS:
Capital Improvement Expense Summary
OCPR Fiscal Services Coordinator Jeff Phelps advised there are three items on the agenda requiring Unrestricted Net
Position funding which total $52,637:
Water Road (Rose Township) Property Donation $ 25,000
CISMA Phragmites Treatments $ 18,345
Red Oaks Waterpark — Family Restroom $ 9,292
Total $ 52,637
In addition, the Consent Agenda includes an amendment to the operating budget for Budgeted Equity Adjustments
in the amount of $125,093 as part of the Accounts Receivable Write-off with Fuller Oak Management. The balance
of Unrestricted Net Position as of June 30, 2021 is $28,597,122 which is a decrease of $1,114,653 from the
May 31, 2021, balance of $29,711,775. The revised FY2021 Amended Budget as of June 30, 2021 is $33,480,279.
The Unrestricted Net Position policy sets a recommended balance of funds to be set at 50% of the operating budget.
The revised requirement of Unrestricted Net Position funds is $16,740,139. The Parks and Recreation fund is currently
$11,856,983 above the policy requirement.
Moved by Mrs. Long, supported by Ms. Herzog to receive and file the Communications/Capital Improvement
Expense Summary Report.
AYES: Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
NAYS: (0)
Motion passed on a roll call vote.
CONSENT AGENDA:
Moved by Mrs. Long, supported by Mr. VanderVeen to approve Items 1 through 13 under Consent
Agenda, as follows:
1. OCPR Monthly Revenue and Expenditure Budget to Actual Report for Month
Ending 06/30/2021 (FM 09 FY 21)
2. Monthly Revenue and Expenditure Comparison Report for Month Ending 06/30/2021
(FM 09 FY 21)
3. Monthly Revenue and Expenditure Report by Line Item for Month Ending 06/30/2021
(FM 09 FY 21)
4. Monthly Capital Equipment Report for Month Ending 06/30/2021 (FM 09 FY 21)
5. Monthly Revenue and Expenditure Average Comparison Report for Month Ending
06/30/2021 (FM 09 FY 21)
6. Capital Improvement Projects Budget to Actual Report & Statement of Net Position
For Month Ending 06/30/2021 (FM 09 FY 21)
7. Maintenance Management Plan Budget
8. Monthly Purchasing Reports for Month Ending 05/31/2021 (FM 08 FY 21)
9. Pending Capital Improvement Project Report
10. FY2022 Project Approval Schedule
11. Springfield Oaks Ellis Barn - Budget Amendment
10
AYES
NAYS:
12. Contracted Fall 2021 Phragmites Treatments
13. Fuller Oaks Management Account Receivable Write -Off Resolution
WHEREAS Oakland County and Fuller Oak Management, LLC entered into a contract (County
Contract #004048) for food and beverage services at Addison Oaks Conference Center and Glen
Oaks Conference Center and Grill Room (collectively "Facilities") with an effective of January 1, 2016
("Contract'), approved by Miscellaneous Resolution #14020; and
WHEREAS during the COVID-19 Pandemic, certain prohibitions/restrictions were placed on the use
of the Facilities and food and beverage services at the Facilities; and
WHEREAS because of these prohibitions/restrictions and the decrease in revenues, Oak
Management approached the Oakland County Parks and Recreation Commission requesting
forgiveness of certain fees under the Contract; and
WHEREAS the Oakland County Parks and Recreation Commission Chairperson created a Work
Group to examine this request; and
WHEREAS the Work Group had several meetings and with the assistance of the Department of
Corporation Counsel drafted the attached Contract Amendment to resolve the issue; and
WHEREAS because the attached Contract Amendment provides for forgiveness of certain fees
required by the Contract, Miscellaneous Resolution #93135 requires Oakland County Board of
Commissioners approval; and
WHEREAS the Oakland County Parks and Recreation Commission recommends the Oakland
County Board of Commissioners approve and authorize the execution (pursuant to Oakland County
Purchasing Policies and Procedures) of the attached Contract Amendment with Fuller Oak
Management to provide for debt forgiveness pursuant to Miscellaneous Resolution #93135.
NOW THEREFORE BE IT RESOLVED the Oakland County Board of Commissioners approves and
authorizes the execution (pursuant to Oakland County Purchasing Policies and Procedures) of the
attached Contract Amendment with Fuller Oak Management to provide for accounts receivable write-
off pursuant to Miscellaneous Resolution #93135.
BE IT FURTHER RESOLVED to write-off $41,932.80 in Fiscal Year 2020 for Glen Oaks Conference
Center and $55,585.35 in Fiscal Year 2020 for Addison Oaks Conference Center. Also, to write-off
$52,435.79 in Fiscal Year 2021 for Glen Oaks Conference Center and $69,507.90 in Fiscal Year
2021 for Addison Oaks Conference Center.
BE IT FURTHER RESOLVED the FY2021 budget is amended.
PARKS AND RECREATION FUND #50800
Expenses: FY2021
5060427-160044-732046 Uncollectible Accounts Receivable $ 94,369
5060417-160044-732046 Uncollectible Accounts Receivable 125,093
5060666-160666-796500 Budgeted Equity Adjustments (219,462)
$-0-
Chairperson, on behalf of the Legislative Affairs & Government Operations Committee, I move the
adoption of the foregoing resolution.
Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
(0)
Motion passed on a roll call vote.
REGULAR AGENDA:
11
Red Oaks Waterpark Familv Restroom - Budaet Amendment
Moved by Ms. LaFontaine, supported by Ms. Charles to approve the Red Oaks Waterpark Family Restroom
Construction contract amendment to CE Gleeson Constructors of Troy, Michigan, in the amount of $28,599
of staff authorized change orders, for a total project amount of $286,313.
Staff further recommends funding the additional $9,292.00 from Unrestricted Net Position as follows:
Net Position — Unrestricted
Net Position Unrestricted ($9,292)
50800-5060201-160900-740030 Capital Improvement Program $9,292
$-0-
AYES: Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
NAYS: (0)
Motion passed on a roll call vote.
OCPR Proposed 2022 Annual Vehicle Permit Fees
OCPR staff recommended maintaining the current Resident Annual Motor Vehicle Fees, Non -Resident Annual
Motor Vehicle fees and Non -Resident Senior Citizen/Adaptive/Active Military Annual Motor Vehicle fees for
2022 that were approved for 2021 for the following day -use and dog parks: Addison Oaks, Groveland Oaks,
Highland Oaks, Independence Oaks, Lyon Oaks, Orion Oaks, Red Oaks, Rose Oaks, and Waterford Oaks.
OCPR Staff contacted the staff at Huron -Clinton Metroparks and have been advised HCMA will also continue to keep
the same fees for 2022 that were approved for 2021.
Moved by Ms. Herzog, supported by Ms. Charles to approve the fees for the OCPR Resident
Annual Motor Vehicle, Non -Resident Senior Citizen/Adaptive/Active MilitaryAnnual MotorVehicle,
and Second Vehicle Discount Annual Motor Vehicle passes and non-resident Annual Vehicle
Passes for 2022 that were approved for 2021 for the following day -use and dog parks: Addison Oaks,
Groveland Oaks, Highland Oaks, Independence Oaks, Lyon Oaks, Orion Oaks, Red Oaks, Rose Oaks, and
Waterford Oaks, as listed below:
Revenue
Type of Vehicle Permit
2018 2019
2020
2021 Fee
Proposed 2022 Fee
Daily Motor Vehicle Permits
Regular (Non -Resident Rate)
$ 56,430
$ 55,49D
$ 4,5,156
$12/car/day
$12/car/day
Resident Discount
$ 171,826
$ 174,48D
$137,89❑
$5/carfday
$5/car/day
Annual Motor Vehicle Permit
Regular {Nan -Resident}
$ 16,D32 $12,240
$16,900
$48
$48
Regular {Non -Resident} 2nd Vehicle Discount
$ 380 $380
$418
$38
$38 1
Resident Discount
$ 234,221 $ 173,160
$ 223,622
$3o
$30 1
Resident 2nd Vehicle Discount
$ 17,152 $ 14,175
$ 14,550
S15
$15 1
Non -Resident Seniors/Military/Persons with Disabilities
$4,392 $3,008
$2,784
$32
$32 1
Non -Res Seniors/MilitaryfPersons with Disabilities 2nd Vehicle Discount $25 $175 $150 $25 $25
OCPRfHCMA Joint pass $ 132,986 $ 113,634 $109,032
$64
$54
Buses/Vans
Resident Buses/Vans
$1/person ($8 min)
$lfperson ($6 min)
Nan -Resident BusesiVans
$2/person ($Z
$2/person )$10 min)I
Buses/Vans seniors/Mllitaryf Perso is with Disabilities (12 passenger+)
$12/bus/van/da
$12/bus/van/day
Walk-ins/Bike-firs. at Day -Use Parks
Free
Free
Fourth of July Fireworks at Groveland Oaks with Annual Vehicle Pass
Freel
Fourth of July Fireworks at Groveland Oaks without Annual Vehicle Pass
$10 after p.m.1
(Oakland County Parks Days at the Oakland County Fair
Free
Freel
Vehicle Permit Group Discounts
Quantity
Price/Permit
25-ILOO
$25 1
101-250
$20 1
$251+
$15 1
12
And move to approve the agreement with Huron Clinton Metroparks Association (HCMA) to sell 2022 Joint
OCPR/HCMA Annual Vehicle Park Permit Passes.
AYES: Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
NAYS: (0)
Motion passed on a roll call vote.
Water Road (Rose Township) Property Donation Update and Request for Capital Proiect Creation
Supervisor of Planning Melissa Prowse advised the Commission the acceptance of the donation of 32 acres of
land along Water Road was approved at the April OCPR Commission meeting. Staff has been advised the
property owners will be contributing $15,000 toward the costs for the acquisition, which should bring the costs for
Oakland County Parks and Recreation between $4,000-$5,000. This property is located between Highland Oaks and
Rose Oaks county parks and is connected to the Michigan Nature Association Preserve. The estimated value of the
property is $330,000.
Moved by Ms. LaFontaine, supported by Mr. Stokes to approve the creation of a capital project in the amount
of $25,000 for the acquisition (via donation) of the Water Road property in Rose Township.
AYES: Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
NAYS: (0)
Motion passed on a roll call vote.
Appointment of New Parks & Recreation Director
Moved by Mr. Stokes, supported by Ms. Herzog to make a conditional offer of employment to
Lawrence Hemingway for the position of Oakland County Parks and Recreation Director, contingent upon the
satisfactory and successful completion of the pre -employment physical, passing a complete and thorough
background check, and approval of the appointment by the Oakland County Board of Commissioners.
AYES: Charles, Herzog, LaFontaine, Long, McGillivray, Stokes, VanderVeen (7)
NAYS: (0)
Motion passed on a roll call vote.
Commissioner LaFontaine requested moving forward that the Commission is being true to Oakland County Parks and
Recreation policy in monitoring employee behavior in order to protect the organization. Commissioner Charles
advised for future employment interviews with the OCPR Commission it would be appropriate to make sure the same
questions are asked of all candidates.
UNFINISHED BUSINESS:
There was no Unfinished Business.
NEW & MISCELLANEOUS BUSINESS:
Commissioner Herzog provided an update on the status of the Environmental Sustainability Committee. The
committee is working on creating short-term and long-term objectives and action items. Key focus areas will be public
education and engagement; 5-Year OCPR Master Plan; and how these will align with the countywide sustainability
plan. The next meeting will be August 12, 2021 at 2:00 p.m. via Zoom.
13
Commissioner Herzog also thanked OCPR staff for the two-day tour of the parks in the north and south districts that
was conducted for the new members of the OCPR Commission. The Commissioners were able to see the parks,
speak with staff, and hear some of the challenges staff is currently facing.
Executive Officer Report
In addition to the Executive Officer's Report filed in the agenda packet, Interim Executive Officer Susan Wells provided
an update on the following items:
• The next OCPR Commission meeting will be held in person on Wednesday, September 1, 2021 at
2:00 p.m. at the Oakland Parks and Recreation Commission Meeting Room, 2800 Watkins Lake Road,
Waterford, MI 48328
• The next OCPRC Executive Committee meeting is scheduled on Monday, August 16, 2021 at 1:00 p.m.
via teleconference
• OCPR Golf Revenues & Starts Comparison Report through July 31, 2021
• Storm damage and clean up at Glen Oaks Golf Course.
Interim Executive Officer Susan Wells thanked all staff that participated in the storm clean up at Glen Oaks Golf
Course for volunteering to assist, for clearing the damage and the 35 trees that were blown down during the storm,
and for getting it all done so quickly. The golf course was only closed one and one-half days due to power outages in
the area.
Executive Committee Update
Chairman McGillivray advised the discussion at the last OCPRC Executive Committee meeting included the
recommendation on the request from Fuller Oak Management LLC on its request to waive the outstanding debt for
past due utilities and contractual payments from the OCPR Conference Centers; OCPR waterparks and wave pools;
and OCPR golf courses. The next OCPRC Executive Committee meeting will be August 16, 2021 at 1:00 p.m. via
teleconference.
ANNOUNCEMENTS:
Commissioner Charles requested staff research if there could be additional areas in the southern section of Oakland
County to sell the OCPR Annual Vehicle Permits/Park Passes.
ADJOURNMENT:
Meeting adjourned at 2:47 p.m.
Ebony Bagley, Secretary
Vicky Valko, Recording Secretary
14
SEPTEMBER 1, 2021
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
Submitted: August 26, 2021
Subject: Recognition of OCPR Commissioner Robert E. Kostin
INTRODUCTION AND HISTORY
ADMINISTRATION
Gary R. McGillivray, Chairman of the Oakland County Parks and Recreation Commission, will be recognizing
Mr. Robert E. Kostin for his many dedicated years of service to the Oakland County Parks and Recreation
Commission at the meeting on August 4, 2021.
15
A
GAKLAND
4
COUNTY PARKS
Great Darks for Great (People
The Oakland County Parks and Recreation Commission and staff thank Robert Kostin for 12 years of service to the residents of Oakland County as a
citizen parks commissioner. During his tenure, he saw the approval of the first -ever increase for the parks millage as well as the opening of four parks
- Catalpa Oaks, Red Oaks Dog Park, Independence Oaks -North and Holly Oaks ORV Park; the installation of an Archery Range and Safety Path at
Independence Oaks; and OCP assuming management of the Oakland County Farmers Market and Red Oaks Nature Center. Along the way there were
numerous facility, natural resources, trail and accessibility improvements throughout the parks system. Mr. Kostin's support and dedication to the
parks system and programs has been truly appreciated by staff, and his contributions will be enjoyed by generations to come. We are thankful for his
leadership and grateful for his friendship.
September 2021
SEPTEMBER 1, 2021 ADMINISTRATION
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
Subject: NACPRO Marketing and Millage Awareness Award
INTRODUCTION AND HISTORY
Oakland County Parks has been selected to receive the 2021 National Association of County Parks and Recreation
Association (NACPRO) Award for their 2020 Millage Awareness Campaign.
17
NATIONAL ASSOCIATION
NACPRO
An Affiliate of the National Association of Counties
OF COUNTY PARR AND RECREATION OFFICIALS and National Recreation and Park Association
2021-22 Executive Board
President
Holli Browder
July 23, 2021
Director
Columbus Parks and Recreation, GA
Phone:706-225-4658
Susan Wells
hbrowder@columbusga.org
Oakland County Parks and Recreation
2800 Watkins Lake Rd
Past President
Waterford, MI 48328
Joe Roszak
Chief Operating Officer
Cleveland Metroparks, OH
Phone: 216-635-3218
Dear Ms. Wells:
jvr@clevelandmetroparks.com
President Elect
I would like to congratulate Oakland County Parks and Recreation for being
Monique Horton Odom
selected to receive a 2021 National Association of County Park and
Director
Metro Nashville Parks Department
Recreation Association (NACPRO) Award. These awards, decided upon by
Phone: 615-862-8400
your peers, leaders in county and regional park agencies, recognize
monique.odom@nashville.gov
excellence in programs, projects, facilities and individuals that move our
profession forward. The award nominations are shared with our national
Vice President
Aimee Vosper
membership to encourage other agencies to be creative and innovative
Deputy Director
leaders in parks and recreation.
Fairfax County Park Authority, VA
Phone: 703-324-8536
On behalf of the Board of Directors of NACPRO, I am pleased to present the
aimee.vosper@fairfaxcounty.gov
Marketing Award for your 2020 Mjllage Awareness Campaign. Your success
Secretary
is an example that we can all learn from. Your leadership, vision and
Jeff Perry
commitment enriches the communities you serve in Oakland County.
Director
Anoka County Parks & Recreation, MN
Sincerely,
Phone:763-324-3409
jeff.perry@co.anoka.mn.us
Treasurer
Eric Call
Director
Palm Beach County Parks & Recreation, FL
c
Phone: 561-966-6614
ecall@pbcgov.org
Holli Browder
Executive Director
NACPRO President
Brenda Adams-Weyant
PO Box 74
Marienville, PA 16239
Phone:814-927-8212
brendaaw@verizon.net
18
SEPTEMBER 1, 2021
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
Jeff Phelps, Parks and Recreation Fiscal Coordinator
AGENDA ITEM A
ADMINISTRATION
Subject: COMMUNICATION ITEM — Capital Improvement Expense and Budgeted Equity Adjustment
Summary and Unrestricted Net Position Projection Report
INTRODUCTION AND HISTORY
There are no FY2021 capital improvement or equipment items on today's agenda requiring Unrestricted Net Position
funding.
However, contained in the consent agenda is the Fiscal Services FY2021 V Quarter Financial Forecast which includes an
operating budget amendment reducing account #796500 Budgeted Equity Adjustments by ($91,695).
The balance of the Unrestricted Net Position account as of July 31, 2021, is $27,377,088. This is a decrease of
($1,220,034) from the June 30, 2021, balance of $28,597,122.
The FY2021 Amended Budget as of July 31, 2021, is $33,480,279. The Unrestricted Net Position policy sets a
recommended balance of funds to be set at 50% of the operating budget. The requirement of Unrestricted Net Position
funds is $16,740,139. The Parks and Recreation fund is currently $11,856,983 above the policy requirement.
19
Agenda Item A
Parks and Recreation Commission
FY2021 Unrestricted Net Position Forecast
As of July 31, 2021
Unrestricted Net Position Balance:
As of July 31, 2021
Adjust:
Unrestricted Net
Position
$ 27,377,088
Projected operating variance (July -September 2021)
$ (2,356,294)
Capital Improvement and Equipment
Budget
Expenses to Date Remaining
FY2021 Capital Equipment Budget
$
382,845 $
(373,920) $ 8,925
FY2018-FY2021 Active Capital Improvement Projects
$
3,680,946 $
(3,435,337) $ 245,609
$
4,063,791 $
(3,809,257) $ 254,534 $ (254,534)
Approved Amendments vet to be posted in People5oft:
Water Road (Rose Township) Property Donantion - exact amount to be determined
$
(25,000)
CISMA Phragmites Treatments
$
(18,345)
Red Oaks Waterpark - Family Restroom
$
(9,292)
$ (52,637)
Agenda Amendments to be approved at the August meeting:
None
Projected Net Position Unrestricted - September 30, 2021 $ 24,713,622
Prepared by Fiscal Services 8/24/2021 7 B Unrestricted Net Position 20
SEPTEMBER 1, 2021 CONSENT AGENDA ITEM NO. 1-6
FISCAL SERVICES - P&R ACCOUNTING
To: Chairman McGillivray and Commission Members
From: Sue Wells, Interim Executive Officer
Jennifer Adcock, Fiscal Services Supervisor II
Jeffrey Phelps, Fiscal Services Coordinator
Subject: OCPR Monthly Financial Reports (July 2021, FY2021)
1. REVENUE AND EXPENDITURE BUDGET TO ACTUAL REPORT BY BUDGET CENTER
July 2021 (FM 10, FY 2021)
2. REVENUE AND EXPENDITURE COMPARISON REPORT BY BUDGET CENTER
July 2021 (FM 10, FY 2021)
3. REVENUE AND EXPENDITURE REPORT BY LINE ITEM
July 2021 (FM 10, FY 2021)
4. CAPITAL EQUIPMENT REPORT
July 2021 (FM 10, FY 2021)
5. REVENUE AND EXPENDITURE AVERAGE COMPARISON REPORT
July 2021 (FM 10, FY 2021)
6. CAPITAL IMPROVEMENT PROJECTS BUDGET TO ACTUAL REPORT AND STATEMENT OF NET
POSITION
July 2021 (FM 10, FY 2021)
21
Agenda Item No. 1
OAKLAND COUNTY PARKS AND RECREATION COMMISSION
REVENUE AND EXPENSE BUDGET TO ACTUAL REPORT
FM 10 FY 2021
FOR MONTH ENDING 07/31/2021
2021
YEAR TO
(OVER)
% OF
REVENUE
BUDGET
DATE
UNDER BUDGET
BUDGET
ADMINISTRATIVE SERVICES: Millage Tax
21,611,300.00
21,564,747.73
46,552.27
99.8%
Capital Contributions
71,675.00
46,675.00
25,000.00
65.1 %
Other
746,154.00
609,261.48
136,892.52
81.7%
GLEN OAKS GOLF COURSE
816,700.00
768,647.96
48,052.04
94.1 %
LYON OAKS GOLF COURSE
1,202,000.00
1,064,422.25
137,577.75
88.6%
RED OAKS GOLF COURSE
350,000.00
322,093.21
27,906.79
92.0%
SPRINGFIELD OAKS GOLF COURSE
737,561.00
637,227.85
100,333.15
86.4%
WHITE LAKE OAKS GOLF COURSE
755,300.00
643,610.32
111,689.68
85.2%
ADDISON OAKS CONFERENCE CENTER
152,000.00
22,861.17
129,138.83
15.0%
GLEN OAKS CONFERENCE CENTER
128,145.00
27,474.58
100,670.42
21.4%
GROVELAND OAKS CONCESSIONS
58,500.00
1,471.53
57,028.47
2.5%
LYON OAKS CONFERENCE CENTER
43,000.00
1,074.82
41,925.18
2.5%
LYON OAKS RESTAURANT SVS
199,000.00
128,535.28
70,464.72
64.6%
RED OAKS WATERPARK CONCESSIONS
221,015.00
22,908.55
198,106.45
10.4%
SPRINGFIELD OAKS RESTAURANT SV
140,000.00
71,804.56
68,195.44
51.3%
WATERFORD OAKS WATERPARK CONCESSIONS
113,000.00
0.00
113,000.00
0.0%
WHITE LAKE OAKS CONFERENCE CENTER
78,000.00
0.00
78,000.00
0.0%
WHITE LAKE OAKS RESTAURANT SVS
140,500.00
69,906.33
70,593.67
49.8%
OAKLAND COUNTY MARKET
190,250.00
112,230.90
78,019.10
59.0%
ADDISON OAKS PARK
744,906.00
671,649.58
73,256.42
90.2%
GROVELAND OAKS PARK
1,170,968.00
918,345.78
252,622.22
78.4%
HIGHLAND OAKS PARK
12,550.00
7,535.00
5,015.00
60.0%
INDEPENDENCE OAKS PARK
303,346.00
242,928.84
60,417.16
80.1%
LYON OAKS PARK
165,000.00
82,451.50
82,548.50
50.0%
ORION OAKS PARK
136,200.00
64,912.00
71,288.00
47.7%
RED OAKS DOG PARK
48,000.00
43,340.00
4,660.00
90.3%
RED OAKS PARK
8,300.00
1,308.24
6,991.76
15.8%
ROSE OAKS PARK
6,600.00
0.00
6,600.00
0.0%
SPRINGFIELD OAKS PARK
232,000.00
143,993.63
88,006.37
62.1%
WATERFORD OAKS PARK
86,800.00
38,479.00
48,321.00
44.3%
HOLLY OAKS ORV PARK
573,000.00
221,247.00
351,753.00
38.6%
RECREATION PROGRAMS & SERVICES
315,000.00
78,965.76
236,034.24
25.1 %
CATALPA OAKS PARK
30,250.00
22,385.00
7,865.00
74.0%
RED OAKS WATERPARK
1,514,159.00
387,430.71
1,126,728.29
25.6%
WATERFORD OAKS BMX
500.00
4,371.00
(3,871.00)
874.2%
WATERFORD OAKS WATERPARK
378,600.00
0.00
378,600.00
0.0%
TOTAL REVENUE
33,480,279.00
29,044,296.56
4,435,982.44
86.8%
EXPENSE
ADMINISTRATIVE SERVICES
9,912,397.00
4,455,025.59
5,457,371.41
44.9%
PARKS PARTNERSHIP
797,570.00
0.00
797,570.00
0.0%
AUDITING
41,282.00
5,795.02
35,486.98
14.0%
FISCAL SERVICES ADMINISTRATION
149,335.00
119,338.58
29,996.42
79.9%
FISCAL SERVICES PARKS & REC
470,771.00
305,811.47
164,959.53
65.0%
GLEN OAKS GOLF COURSE
981,268.00
875,555.15
105,712.85
89.2%
LYON OAKS GOLF COURSE
1,448,050.00
1,191,587.63
256,462.37
82.3%
RED OAKS GOLF COURSE
624,169.00
503,464.53
120,704.47
80.7%
SPRINGFIELD OAKS GOLF COURSE
830,468.00
620,663.07
209,804.93
74.7%
WHITE LAKE OAKS GOLF COURSE
819,255.00
689,814.56
129,440.44
84.2%
ADDISON OAKS CONFERENCE CENTER
246,967.00
207,048.02
39,918.98
83.8%
GLEN OAKS CONFERENCE CENTER
269,300.00
165,640.78
103,659.22
61.5%
GROVELAND OAKS CONCESSIONS
81,884.00
8,226.53
73,657.47
10.0%
LYON OAKS CONFERENCE CENTER
216,456.00
186,351.07
30,104.93
86.1%
LYON OAKS RESTAURANT SVS
293,140.00
88,895.44
204,244.56
30.3%
RED OAKS WATERPARK CONCESSIONS
277,077.00
73,477.26
203,599.74
26.5%
SPRINGFIELD OAKS RESTAURANT SV
256,825.00
112,443.03
144,381.97
43.8%
WATERFORD OAKS WATERPARK CONCESSIONS
104,509.00
6,379.12
98,129.88
6.1%
WHITE LAKE OAKS CONFERENCE CENTER
198,968.00
166,900.16
32,067.84
83.9%
WHITE LAKE OAKS RESTAURANT SVS
270,550.00
117,079.33
153,470.67
43.3%
OAKLAND COUNTY MARKET
212,978.00
136,678.97
76,299.03
64.2%
ADDISON OAKS PARK
1,773,923.00
1,341,555.02
432,367.98
75.6%
GROVELAND OAKS PARK
1,620,226.00
1,158,716.78
461,509.22
71.5%
HIGHLAND OAKS PARK
82,580.00
63,653.80
18,926.20
77.1%
INDEPENDENCE OAKS PARK
1,281,156.00
853,075.76
428,080.24
66.6%
LYON OAKS PARK
341,532.00
256,508.77
85,023.23
75.1 %
ORION OAKS PARK
227,336.00
163,348.23
63,987.77
71.9%
RED OAKS DOG PARK
142,896.00
105,656.53
37,239.47
73.9%
RED OAKS PARK
211,510.00
146,267.38
65,242.62
69.2%
ROSE OAKS PARK
95,343.00
82,202.39
13,140.61
86.2%
SPRINGFIELD OAKS PARK
651,529.00
566,351.00
85,178.00
86.9%
WATERFORD OAKS PARK
746,362.00
597,163.50
149,198.50
80.0%
HOLLY OAKS ORV PARK
695,159.00
517,972.41
177,186.59
74.5%
RECREATION PROGRAMS & SERVICES
1,758,767.00
1,111,400.79
647,366.21
63.2%
CATALPA OAKS PARK
215,304.00
161,385.35
53,918.65
75.0%
RED OAKS WATERPARK
1,630,953.00
824,041.28
806,911.72
50.5%
WATERFORD OAKS BMX
19,387.00
21,508.85
(2,121.85)
110.9%
WATERFORD OAKS WATERPARK
717,821.00
254,638.00
463,183.00
35.5%
FACILITIES & MAINTENANCE
2,740,796.00
1,268,430.80
1,472,365.20
46.3%
INTERNAL FUND CHARGES *
0.00
0.00
0.00
N/A
TOTAL EXPENSE
33,455,799.00
19,530,051.95
13,925,747.05
58.4%
REVENUE OVER/(UNDER) EXPENSE
24,480.00 9,514,244.61
* Internal Fund YTD Expense: Internal Service and other funds payments in transit
22
Agenda Item No. 2
OAKLAND COUNTY PARKS AND RECREATION COMMISSION
REVENUE AND EXPENSE COMPARISON REPORT FOR MANAGEMENT PURPOSES ONLY
FM 10 FY 2021
FOR MONTH ENDING 07/31/2021
YEAR TO DATE
REVENUE OVER
YEAR TO DATE
YEAR TO DATE
REVENUE OVER
EXPENSE
(UNDER) EXPENSE
BUDGET CENTER
REVENUE
EXPENSE
(UNDER) EXPENSE
W/O DEPRECIATION
W/O DEPRECIATION
ADMINISTRATIVE SERVICES:
ADMINISTRATIVE SERVICES
22,220,684.21
4,455,025.59
17,765,658.62
4,437,531.89
17,783,152.32
PARKS PARTNERSHIP
0.00
0.00
0.00
0.00
0.00
AUDITING
0.00
5,795.02
(5,795.02)
5,795.02
(5,795.02)
FISCAL SERVICES ADMINISTRATION
0.00
119,338.58
(119,338.58)
119,338.58
(119,338.58)
FISCAL SERVICES PARKS & REC
0.00
305,811.47
(305,811.47)
305,811.47
(305,811.47)
ADMINISTRATIVE SERVICES SUB -TOTAL
22,220,684.21
4,885,970.66
17,334,713.55
4,868,476.96
17,352,207.25
GOLF:
GLEN OAKS GOLF COURSE
768,647.96
875,555.15
(106,907.19)
742,956.94
25,691.02
LYON OAKS GOLF COURSE
1,064,422.25
1,191,587.63
(127,165.38)
887,731.92
176,690.33
RED OAKS GOLF COURSE
322,093.21
503,464.53
(181,371.32)
384,746.72
(62,653.51)
SPRINGFIELD OAKS GOLF COURSE
637,227.85
620,663.07
16,564.78
544,233.07
92,994.78
WHITE LAKE OAKS GOLF COURSE
643,610.32
689,814.56
(46,204.24)
600,598.66
43,011.66
GOLF SUB -TOTAL
3,436,001.59
3,881,084.94
(445,083.35)
3,160,267.31
275,734.28
FOOD SERVICES:
ADDISON OAKS CONFERENCE CENTER
22,861.17
207,048.02
(184,186.85)
128,736.32
(105,875.15)
GLEN OAKS CONFERENCE CENTER
27,474.58
165,640.78
(138,166.20)
65,295.38
(37,820.80)
GROVELAND OAKS CONCESSIONS
1,471.53
8,226.53
(6,755.00)
3,886.23
(2,414.70)
LYON OAKS CONFERENCE CENTER
1,074.82
186,351.07
(185,276.25)
113,428.97
(112,354.15)
LYON OAKS RESTAURANT SVC
128,535.28
88,895.44
39,639.84
88,331.94
40,203.34
RED OAKS WATERPARK CONCESSIONS
22,908.55
73,477.26
(50,568.71)
70,485.66
(47,577.11)
SPRINGFIELD OAKS RESTAURANT SV
71,804.56
112,443.03
(40,638.47)
95,923.38
(24,118.82)
WATERFORD OAKS WATERPARK CONCESSIONS
0.00
6,379.12
(6,379.12)
3,419.42
(3,419.42)
WHITE LAKE OAKS CONFERENCE CENTER
0.00
166,900.16
(166,900.16)
97,589.06
(97,589.06)
WHITE LAKE OAKS RESTAURANT SVC
69,906.33
117,079.33
(47,173.00)
115,494.33
(45,588.00)
FOOD SERVICES SUB -TOTAL
346,036.82
1,132,440.74
(786,403.92)
782,590.69
(436,553.87)
COUNTY MARKET:
OAKLAND COUNTY MARKET
112,230.90
136,678.97
(24,448.07)
133,692.07
(21,461.17)
COUNTY MARKET SUB -TOTAL
112,230.90
136,678.97
(24,448.07)
133,692.07
(21,461.17)
PARKS:
ADDISON OAKS PARK
671,649.58
1,341,555.02
(669,905.44)
1,064,772.90
(393,123.32)
GROVELAND OAKS PARK
918,345.78
1,158,716.78
(240,371.00)
886,694.19
31,651.59
HIGHLAND OAKS PARK
7,535.00
63,653.80
(56,118.80)
32,401.30
(24,866.30)
INDEPENDENCE OAKS PARK
242,928.84
853,075.76
(610,146.92)
662,769.00
(419,840.16)
LYON OAKS PARK
82,451.50
256,508.77
(174,057.27)
200,917.97
(118,466.47)
ORION OAKS PARK
64,912.00
163,348.23
(98,436.23)
132,997.29
(68,085.29)
RED OAKS DOG PARK
43,340.00
105,656.53
(62,316.53)
82,790.73
(39,450.73)
RED OAKS PARK
1,308.24
146,267.38
(144,959.14)
134,357.07
(133,048.83)
ROSE OAKS PARK
0.00
82,202.39
(82,202.39)
52,821.59
(52,821.59)
SPRINGFIELD OAKS PARK
143,993.63
566,351.00
(422,357.37)
386,271.52
(242,277.89)
WATERFORD OAKS PARK
38,479.00
597,163.50
(558,684.50)
473,681.16
(435,202.16)
HOLLY OAKS ORV PARK
221,247.00
517,972.41
(296,725.41)
510,471.94
(289,224.94)
PARKS SUB -TOTAL
2,436,190.57
5,852,471.57
(3,416,281.00)
4,620,946.66
(2,184,756.09)
RECREATION:
RECREATION PROGRAMS & SERVICES
78,965.76
1,111,400.79
(1,032,435.03)
1,074,387.10
(995,421.34)
CATALPA OAKS PARK
22,385.00
161,385.35
(139,000.35)
83,767.43
(61,382.43)
RED OAKS WATERPARK
387,430.71
824,041.28
(436,610.57)
655,717.26
(268,286.55)
WATERFORD OAKS BMX
4,371.00
21,508.85
(17,137.85)
19,938.25
(15,567.25)
WATERFORD OAKS WATERPARK
0.00
254,638.00
(254,638.00)
204,931.80
(204,931.80)
RECREATION SUB -TOTAL
493,152.47
2,372,974.27
(1,879,821.80)
2,038,741.84
(1,545,589.37)
FACILITIES & MAINTENANCE:
FACILITIES & MAINTENANCE
0.00
1,268,430.80
(1,268,430.80)
1,220,219.46
(1,220,219.46)
FACILITIES & MAINTENANCE SUB -TOTAL
0.00
1,268,430.80
(1,268,430.80)
1,220,219.46
(1,220,219.46)
OTHER:
INTERNAL FUND CHARGES *
0.00
0.00
0.00
0.00
0.00
OTHER SUB -TOTAL
0.00
0.00
0.00
0.00
0.00
TOTAL
29,044,296.56
19,530,051.95
9,514,244.61
16,824,934.99
12,219,361.57
* Internal Fund YTD Expense: Internal Service and other funds payments in transit
See the Oakland County website's "Transparency in Government" monthly reports to view the latest monthly financial report detail by budget center:
1. Log on to www.oakgov.com/mcitbud/fiscal/Pages/info pub/parks.aspx
2. Click on each of the Parks and Recreation monthly financial reports you are interested in viewing
'Disclaimer: These columns are for management purposes only to show the budget center's status without depreciation. The
Parks & Recreation Fund is classified as an Enterprise fund. Enterprise funds are used to report any activity for which a fee is
charged to an external source for goods or services. Depreciation is a method of allocating the cost of a tangible asset over its
useful life and is a true operating expense.
23
Agenda Item No. 3
11 PARKS AND REC DEPART
Run On: 08/19/2021 at 02:26 PM
Account Account Title
REVENUES
TAXES
601208 Delinquent Tax Prior Years
601637 Property Tax Levy
TOTAL TAXES
SPECIAL ASSESSMENTS
TOTAL SPECIAL ASSESSMENTS
FEDERAL GRANTS
TOTAL FEDERAL GRANTS
STATE GRANTS
615572 State Capital Grants
TOTAL STATE GRANTS
OTHER INTERGOVERNMENTAL REVENUES
620573 Local Comm Stabilization Share
TOTAL OTHER INTERGOVERNMENTAL REVENUES
CHARGES FOR SERVICES
630084
Antenna Site Management
630301
Commission Contracts
630308
Commission Food Services
630469
Deck Tennis
630644
Entrance Fees Gen Admission
630651
Entrance Fees Swimming Class
630693
Fees Camping
630700
Fees Day Use
630707
Fees Driving Range
630847
Greens Fees
631001
Interest on Delinquent Taxes
631127
Maintenance Contracts
631253
Miscellaneous
631330
NSF Check Fees
631743
Refunds Miscellaneous
631771
Reimb 3rd Party
631799
Reimb Contracts
631911
Rent House
631918
Rental Equipment
631925
Rental Facilities
631932
Rental Golf Carts
631946
Rental Units or Events
632037
Sales Retail
632128
Special and Sanctioned Races
632135
Special Contracts
632261
Temporary Licenses
632443
Water Feature Ride
632471
Weekly Races
TOTAL CHARGES FOR SERVICES
EXT ISF CHARGES FOR SERVICES
TOTAL EXT ISF CHARGES FOR SERVICES
INDIRECT COST RECOVERY
TOTAL INDIRECT COST RECOVERY
CONTRIBUTIONS
650104 Contributions Operating
650105 Contributions -State Grants
COUNTY OF OAKLAND
July, Fiscal Year 2021 Monthly Report
REVENUE & EXPENDITURE REPORT
As of Date: 07/31/2021
Fund: 50800 - Parks and Recreation
2021
Adopted
Budget
25,000.00
13,740,000.00
13, 765, 000.00
2021
Amended
Budget
290,250.00
21,321,050.00
21, 611, 300.00
- 199,000.00
199,000.00
2021
YTD Actuals
684,721.45
20,880,026.28
21, 564, 747.73
Variance with
Amended
Budget
394,471.45
(441,023.72)
(46, 552.27)
(199,000.00)
(199, 000.00)
Percentage
235.91 %
97.93%
99.78%
0.00%
0.00%
0.00%
0.00%
250,000.00
250,000.00
327,988.66
77,988.66
131.20%
250, 000.00
250, 000.00
327, 988.66
77, 988.66
131.20 %
66,306.00
66,306.00
67,679.98
1,373.98
102.07%
40,750.00
40,750.00
15,801.05
(24,948.95)
38.78%
78,495.00
78,495.00
3,176.74
(75,318.26)
4.05%
4,000.00
4,000.00
7,210.00
3,210.00
180.25%
1,825,000.00
1,825,000.00
342,449.00
(1,482,551.00)
18.76%
13,000.00
13,000.00
-
(13,000.00)
0.00%
1,554,000.00
1,554,000.00
1,344,722.79
(209,277.21)
86.53%
1,092,100.00
1,092,100.00
739,829.00
(352,271.00)
67.74%
93,000.00
93,000.00
92,069.00
(931.00)
99.00%
2,436,500.00
2,436,500.00
2,286,408.85
(150,091.15)
93.84%
(1,000.00)
(1,000.00)
(259.48)
740.52
25.95%
8,000.00
8,000.00
14,257.18
6,257.18
178.21 %
3,815.00
3,815.00
4,897.58
1,082.58
128.38%
25.00
25.00
-
(25.00)
0.00%
4,900.00
4,900.00
2,524.62
(2,375.38)
51.52%
200.00
200.00
1,335.14
1,135.14
667.57%
278,100.00
278,100.00
55,844.43
(222,255.57)
20.08%
71,125.00
71,125.00
50,478.00
(20,647.00)
70.97%
79,400.00
79,400.00
31,011.00
(48,389.00)
39.06%
649,700.00
649,700.00
364,823.00
(284,877.00)
56.15%
1,152,000.00
1,152,000.00
904,535.10
(247,464.90)
78.52%
173,000.00
173,000.00
55,982.50
(117,017.50)
32.36%
1,095,500.00
1,095,500.00
452,082.96
(643,417.04)
41.27%
-
-
1,889.00
1,889.00
0.00%
172,500.00
172,500.00
28,459.00
(144,041.00)
16.50%
7,000.00
7,000.00
26,300.00
19,300.00
375.71 %
6,000.00
6,000.00
-
(6,000.00)
0.00%
-
-
2,392.00
2,392.00
0.00%
10,903,416.00
10,903,416.00
6,895,898.44
(4,007,517.56)
63.25%
-
-
-
-
0.00%
-
-
-
-
0.00%
800.00
2,844.00
6,225.00
3,381.00
218.88%
30,000.00
30,000.00
-
(30,000.00)
0.00%
24
11 PARKS AND REC DEPART
Run On: 08/19/2021 at 02:26 PM
COUNTY OF OAKLAND
July, Fiscal Year 2021 Monthly Report
REVENUE & EXPENDITURE REPORT
As of Date: 07/31/2021
Fund: 50800 - Parks and Recreation
2021
2021
Variance with
Adopted
Amended
2021
Amended
Account Account Title
Budget
Budget
YTD Actuals
Budget
Percentage
650305 Sponsorships
82,500.00
82,500.00
-
(82,500.00)
0.00%
TOTAL CONTRIBUTIONS
113,300.00
115,344.00
6,225.00
(109,119.00)
5.40%
INVESTMENT INCOME
655077 Accrued Interest Adjustments
40,000.00
20,000.00
(28,128.64)
(48,128.64)
-140.64%
655385 Income from Investments
400,000.00
238,000.00
177,768.81
(60,231.19)
74.69%
TOTAL INVESTMENT INCOME
440,000.00
258,000.00
149,640.17
(108,359.83)
58.00%
OTHER REVENUE
670114 Cash Overages
-
-
199.44
199.44
0.00%
670456 Prior Years Adjustments
-
43,559.00
43,563.89
4.89
100.01 %
670570 Refund Prior Years Expenditure
-
2,027.00
2,326.63
299.63
114.78%
670627 Sale of Equipment
-
-
1,100.33
1,100.33
0.00%
670741 Sale of Scrap
-
-
539.13
539.13
0.00%
TOTAL OTHER REVENUES
-
45,586.00
47,729.42
2,143.42
104.70%
GAIN(LOSS) EXCHANGE OF ASSETS
675356 Loss on Sale of Equipment
-
-
(31,448.76)
(31,448.76)
0.00%
675660 Gain on Sale of Vehicles
-
-
10,882.90
10,882.90
0.00%
TOTAL GAIN(LOSS) EXCHANGE OF ASSETS
-
-
(20,565.86)
(20,565.86)
0.00%
CAPITAL CONTRIBUTIONS
690189 Capital Asset Contributions
-
71,675.00
46,675.00
(25,000.00)
65.12%
TOTAL CAPITAL CONTRIBUTIONS
-
71,675.00
46,675.00
(25,000.00)
65.12%
INSURANCE RECOVERIES
TOTAL INSURANCE RECOVERIES
-
-
-
-
0.00%
PROCEEDS ISSUANCE OF BONDS
TOTAL PROCEEDS ISSUANCE OF BONDS
-
-
-
-
0.00%
TRANSFERS IN
695500 Transfers In
-
25,958.00
25,958.00
-
100.00%
TOTAL TRANSFERS IN
-
25,958.00
25,958.00
-
100.00%
PLANNED USE OF FUND BALANCE
665882 Planned Use of Balance
2,611,046.00
-
-
-
0.00%
TOTAL PLANNED USE OF FUND BALANCE
2,611,046.00
-
-
-
0.00%
TOTAL REVENUES
28,08Z 762. 00
33,480,279.00
29,044,296.56
(4,435,982.44)
EXPENDITURES
SALARIES
702010
Salaries Regular
10,773,462.00
11,525,829.00
6,671,895.03
4,853,933.97
57.89%
702030
Holiday
-
-
244,443.68
(244,443.68)
0.00%
702050
Annual Leave
-
-
245,162.31
(245,162.31)
0.00%
702073
Parental Leave
-
-
6,860.56
(6,860.56)
0.00%
702080
Sick Leave
-
-
103,432.25
(103,432.25)
0.00%
702100
Retroactive
-
-
802.44
(802.44)
0.00%
702110
Per Diem
9,500.00
9,500.00
6,840.00
2,660.00
72.00%
702140
Other Miscellaneous Salaries
-
-
44,062.53
(44,062.53)
0.00%
702190
Workers Compensation Pay
-
-
506.79
(506.79)
0.00%
702200
Death Leave
-
-
9,350.99
(9,350.99)
0.00%
702300
Disaster Non -Prod Salaries
-
-
37,126.43
(37,126.43)
0.00%
712020
Overtime
179,900.00
179,900.00
106,888.85
73,011.15
59.42%
712040
Holiday Overtime
1,000.00
1,000.00
8,373.28
(7,373.28)
837.33%
712090
On Call
30,300.00
30,300.00
57,216.99
(26,916.99)
188.83%
25
11 PARKS AND REC DEPART
Run On: 08/19/2021 at 02:26 PM
Account Account Title
TOTAL SALARIES
FRINGE BENEFITS
722740
Fringe Benefits
722750
Workers Compensation
722760
Group Life
722770
Retirement
722780
Hospitalization
722790
Social Security
722800
Dental
722810
Disability
722820
Unemployment Insurance
722850
Optical
722900
Fringe Benefit Adjustments
TOTAL FRINGE BENEFITS
TOTAL CONTROLLABLE PERSONNEL
CONTRACTUAL SERVICES
730037
Adj Prior Years Exp
730044
Adj Prior Years Revenue
730072
Advertising
730114
Auction Expense
730121
Bank Charges
730198
Building Maintenance Charges
730240
Cash Shortage
730247
Charge Card Fee
730373
Contracted Services
730429
Custodial Services
730562
Electrical Service
730611
Employees Medical Exams
730646
Equipment Maintenance
730653
Equipment Rental
730786
Garbage and Rubbish Disposal
730789
General Program Administration
730814
Grounds Maintenance
730926
Indirect Costs
731059
Laundry and Cleaning
731073
Legal Services
731115
Licenses and Permits
731136
Logos Trademarks Intellect Prp
731143
Mail Handling -Postage Svc
731213
Membership Dues
731241
Miscellaneous
731269
Natural Gas
731339
Periodicals Books Publ Sub
731346
Personal Mileage
731388
Printing
731500
Public Information
731577
Refund Prior Years Revenue
731626
Rent
731633
Rental Property Maintenance
731689
Security Expense
731780
Software Support Maintenance
731836
Sponsorship
731878
Sublet Repairs
731941
Training
732018
Travel and Conference
732020
Travel Employee Taxable Meals
732039
Twp and City Treas Bonds
732046
Uncollectable Accts Receivable
COUNTY OF OAKLAND
July, Fiscal Year 2021 Monthly Report
REVENUE & EXPENDITURE REPORT
As of Date: 07/31/2021
Fund: 50800 - Parks and Recreation
2021
Adopted
Budget
10, 994,162.00
3,842,419.00
5,656.00
3,848,075.00
14, 842, 237.00
105,000.00
5,000.00
556,450.00
161, 750.00
99,900.00
25,250.00
590, 750.00
1,170.00
460, 500.00
107,290.00
48, 900.00
918,450.00
1,069,550.00
1,023,000.00
16,895.00
500.00
33,275.00
5,025.00
18, 520.00
25,550.00
179,650.00
850.00
15,400.00
68,050.00
50,835.00
54,415.00
13,600.00
1,172,942.00
16,480.00
8,700.00
600.00
45,925.00
50, 500.00
600.00
2,500.00
2021
Amended
Budget
11,746,529.00
3,842,669.00
110,322.00
3, 952, 991.00
15, 699, 520.00
3,058.00
4,671.00
105,000.00
5,000.00
591, 735.00
161, 750.00
109,950.00
25,250.00
590,750.00
1,170.00
460,500.00
118,240.00
48,900.00
764, 095.00
1,360,113.00
1,023,000.00
16,895.00
500.00
33,275.00
5,025.00
18,520.00
25,675.00
179, 650.00
850.00
15,400.00
68,050.00
50,835.00
54,415.00
13,600.00
1,172,942.00
16,480.00
8,700.00
600.00
45,925.00
50,500.00
600.00
2,500.00
2021
YTD Actuals
7,542,962.13
149,133.31
9,637.08
1,298,846.11
746,089.61
392,014.85
73,256.28
71,168.16
7,494.24
6,995.62
2, 754, 635.26
10,297,597.39
6,448.51
4,670.92
53,482.45
284.54
2,377.68
465,074.59
587.50
138,546.31
106,065.30
11,538.73
350,620.71
504.96
338,871.62
158,246.36
24,998.55
1,129,983.61
656,893.50
10,355.88
1,016.99
25,489.19
5,146.60
265.48
10,400.27
9,945.30
120,554.19
166.66
4,453.14
26,054.33
16,803.79
35,600.00
3,888.26
849,268.90
11,430.82
2,500.00
16,327.26
4,658.25
3,663.24
695.00
Variance with
Amended
Budget
4,203,566.87
3,842,669.00
(149,133.31)
(9,637.08)
(1,298, 846.11)
(746,089.61)
(392,014.85)
(73,256.28)
(71,168.16)
(7,494.24)
(6,995.62)
110,322.00
1,198,355.74
5,401,922.61
(3,390.51)
0.08
51, 517.55
(284.54)
2,622.32
126,660.41
(587.50)
23,203.69
3,884.70
13,711.27
240,129.29
665.04
121, 628.38
(40,006.36)
23, 901.45
764, 095.00
230,129.39
366,106.50
6,539.12
(516.99)
7,785.81
(121.60)
(265.48)
8,119.73
15, 729.70
59,095.81
683.34
10, 946.86
41,995.67
34,031.21
(35,600.00)
54,415.00
9,711.74
323,673.10
5,049.18
6,200.00
600.00
29, 597.74
45,841.75
600.00
(1,163.24)
(695.00)
Percentage
64.21 %
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
69.68%
210.87%
100.00%
50.94%
0.00%
47.55%
78.60%
0.00%
85.65%
96.47%
45.70%
59.35%
43.16%
73.59%
133.83%
51.12%
0.00%
83.08%
64.21 %
61.30%
203.40%
76.60%
102.42%
0.00%
56.16%
38.74%
67.11 %
19.61 %
28.92%
38.29%
33.06%
0.00%
0.00%
28.59%
72.41 %
69.36%
28.74%
0.00%
35.55%
9.22%
0.00%
146.53%
0.00%
26
11 PARKS AND REC DEPART
Run On: 08/19/2021 at 02:26 PM
Account Account Title
732102 Water and Sewage Charges
732165 Workshops and Meeting
TOTAL CONTRACTUAL SERVICES
NON DEPARTMENTAL
TOTAL NON DEPARTMENTAL
COMMODITIES
750063 Custodial Supplies
750140 Employee Footwear
750154 Expendable Equipment
750287 Maintenance Supplies
750385 Merchandise
750392 Metered Postage
750399 Office Supplies
750448 Postage -Standard Mailing
750476 Recreation Supplies
750504 Small Tools
750511 Special Event Supplies
750581 Uniforms
TOTAL COMMODITIES
CAPITAL OUTLAY
TOTAL CAPITAL OUTLAY
DEPRECIATION
761042 Depreciation Park Improvements
761084 Depreciation Buildings
761121 Depreciation Equipment
761156 Depreciation Vehicles
TOTAL DEPRECIATION
INTERGOVERNMENTAL
762011 Transfer to Municipalities
TOTAL INTERGOVERNMENTAL
BENEFIT PAYMENTS - RETIREMENT
TOTAL BENEFIT PAYMENTS - RETIREMENT
PRINCIPAL PAYMENTS
TOTAL PRINCIPAL PAYMENTS
INTEREST ON DEBT
TOTAL INTEREST ON DEBT
PAYING AGENT FEES
TOTAL PAYING AGENT FEES
PYMT TO REFUND BOND ESCROW AGENT
TOTAL PYMT TO REFUND BOND ESCROW AGENT
DISCOUNT ON BONDS ISSUED
TOTAL DISCOUNT ON BONDS ISSUED
TOTAL CONTROLLABLE OPERATING
INTERNAL SERVICES
771639 Drain Equipment
773630 Info Tech Development
774636 Info Tech Operations
COUNTY OF OAKLAND
July, Fiscal Year 2021 Monthly Report
REVENUE & EXPENDITURE REPORT
As of Date: 07/31/2021
Fund: 50800 - Parks and Recreation
2021
2021
Variance with
Adopted
Amended
2021
Amended
Budget
Budget
YTD Actuals
Budget
Percentage
274,250.00
274,250.00
199,830.27
74,419.73
72.86%
1,750.00
1,750.00
156.08
1,593.92
8.92%
7, 229, 772.00
7,430,119.00
4, 807, 865.74
2, 622, 253.26
64.71 %
-
-
-
-
0.00%
79,550.00
79,550.00
35,961.28
43,588.72
45.21 %
7,140.00
7,140.00
3,541.99
3,598.01
49.61 %
134,400.00
133,077.00
79,123.39
53,953.61
59.46%
3,300.00
3,300.00
1,970.46
1,329.54
59.71 %
487,600.00
487,600.00
195,385.21
292,214.79
40.07%
8,000.00
8,000.00
3,806.92
4,193.08
47.59%
47,400.00
47,400.00
24,214.04
23,185.96
51.08%
-
-
44.00
(44.00)
0.00%
113,800.00
113,800.00
65,723.05
48,076.95
57.75%
119,975.00
119,975.00
66,934.39
53,040.61
55.79%
143,400.00
143,674.00
67,204.67
76,469.33
46.78%
68,850.00
68,850.00
38,061.47
30,788.53
55.28%
1,213,415.00
1,212,366.00
581,970.87
630,395.13
48.00%
0.00%
1,746,537.00
1,954,437.00
1,553,266.58
401,170.42
79.47%
841,250.00
901,150.00
800,928.40
100,221.60
88.88%
248,610.00
415,610.00
340,736.18
74,873.82
81.98%
38,400.00
18,100.00
10,185.80
7,914.20
56.28%
2, 874, 797.00
3, 289, 297.00
2, 705,116.96
584,180.04
82.24 %
276,320.00
797,570.00
-
797,570.00
0.00%
276,320.00
797,570.00
-
797,570.00
0.00%
-
-
-
-
0.00%
-
-
-
-
0.00%
-
-
-
-
0.00%
-
-
-
-
0.00%
-
-
-
-
0.00%
-
-
-
-
0.00%
11, 594, 304.00
12, 729, 352.00
8, 094, 953.57
4, 634, 398.43
27,000.00 27,000.00 21,445.90 5,554.10 79.43%
25,000.00 25,000.00 27,249.50 (2,249.50) 109.00%
573,327.00 573,327.00 407,055.86 166,271.14 71.00%
27
11 PARKS AND REC DEPART
Run On: 08/19/2021 at 02:26 PM
Account
Account Title
774637
Info Tech Managed Print Svcs
774677
Insurance Fund
775754
Maintenance Department Charges
776659
Motor Pool Fuel Charges
776661
Motor Pool
778675
Telephone Communications
TOTAL INTERNAL SERVICES
TOTAL INTERNAL SUPPORT
TRANSFERS OUT
788001 Transfers Out
TOTAL TRANSFERS OUT
BUDGETED EQUITY ADJUSTMENTS
796500 Budgeted Equity Adjustments
TOTAL BUDGETED EQUITY ADJUSTMENTS
TOTAL EXPENDITURES
COUNTY OF OAKLAND
July, Fiscal Year 2021 Monthly Report
REVENUE & EXPENDITURE REPORT
As of Date: 07/31/2021
Fund: 50800 - Parks and Recreation
2021
2021
Variance with
Adopted
Amended
2021
Amended
Budget
Budget
YTD Actuals
Budget
Percentage
28,950.00
28,950.00
11,347.03
17,602.97
39.20%
252,050.00
252,050.00
232,651.42
19,398.58
92.30%
78,500.00
78,500.00
25,979.97
52,520.03
33.10%
89,820.00
89,820.00
41,736.42
48,083.58
46.47%
410,754.00
410,754.00
261,757.53
148,996.47
63.73%
130,820.00
130,820.00
108,277.36
22,542.64
82.77%
1,616,221.00
1,616,221.00
1,137,500.99
478,720.01
70.38%
1,616,221.00
1,616,221.00
1,137,500.99
478,720.01
30,000.00
30,000.00
-
30,000.00
0.00%
30, 000.00
30, 000.00
-
30, 000.00
0.00%
-
3,405,186.00
-
3,405,186.00
0.00%
-
3,405,186.00
-
3,405,186.00
0.00%
28, 082, 762.00
33, 480, 279.00
19, 530, 051.95
13, 950, 227.05
28
Agenda Item No. 4
Date
Approved Qty.
06/03/20 1
06/03/20 1
07/01 /20 1
07/01 /20 1
06/03/20 1
06/03/20 1
06/03/20 1
06/03/20 1
06/03/20 1
06/03/20 1
06/03/20 1
06/03/20 1
06/03/20 1
03/03/21 1
06/03/20 1
06/03/20 1
05/05/21 1
06/03/20 1
06/03/20 1
06/03/20 1
OAKLAND COUNTY PARKS & RECREATION COMMISSION
Capital
Equipment Report
Fiscal Month 10, FY2021, as of 7/31/2021
Please inform Fiscal Services of
any planned changes in budgeted purchases
**
Budget
Actual Projected
(Over)/Under
Center
Item
Category
Budget
Expense Expense
Budget Comments
ADD
Zero Turn Mower
P_EQP
14,000.00
18,116.00
(4,116.00) V#1488914 Asset ID# 13384
ADD
Utility Vehicle
P_EQP
9,500.00
9,781.99
(281.99) V#1499915 Asset ID# 13433
ADD Total
23,500.00
279897.99 -
(4,397.99)
V#1479392 Asset lD#1 3346.
FM
Boat Wash Station
P_EQP
35,662.50
36,705.00
(1,042.50) V#1490227 Addition to asset (cover).
V#1479392 Asset lD#1 3365.
FM
Boat Wash Station
P_EQP
35,662.50
36,705.00
(1,042.50) V#1490227 Addition to asset (cover)
FM
Generator
P EQP
27,000.00
28,163.00
(1,163.00) V#1507016 Asset ID# 13484
FM Total
989325.00
1019573.00 -
(3,248.00)
CAT
Utility Vehicle w/top
P_EQP
12,000.00
12,814.36
(814.36) V#1499917 Asset ID# 13434
CAT Total
129000.00
129814.36 -
(814.36)
GLG
Utility Vehicle
P_EQP
9,500.00
7,828.55
1,671.45 V#1500579 Asset ID# 13440
GLG
Utility Vehicle
P_EQP
9,500.00
7,828.55
1,671.45 V#1500579 Asset ID# 13458
GLG
Turbine Blower
P EQP
8,000.00
7,964.66
35.34 V#1499918 Asset ID# 13435
GLG Total
279000.00
239621.76 -
3,378.24
GRV
Zero Turn Mower
P_EQP
14,000.00
13,629.00
371.00 V#1506140 Asset ID# 13473
GRV
Dump Trailer
P_EQP
9,000.00
7,201.00
1,799.00 V#1491490 Asset ID# 13396
GRV Total
23,000.00
20,830.00
2,170.00
LYG
Fairway Mower
P_EQP
58,000.00
62,074.68
(4,074.68) V#1507014 Asset ID# 13483
LYG
Greens Mower
P_EQP
38,000.00
38,944.91 -
(944.91) V# 1511794 Asset ID# 13509
LYG
ADA Golf Cart
P_EQP
12,323.00
- 12,323.10
(0.10)
LYG Total
96,000.00
101,019.59 -
(5,019.59)
ORN
Zero Turn Mower
P_EQP
14,000.00
13,127.00
873.00 V#1499920 Asset ID# 13436
ORN Total
14,000.00
13,127.00
873.00
REC
Trailer
P_EQP
11,000.00
7,014.00
3,986.00 V#1511168 Asset ID# 13506
REC
Movie Screen and Audio Transmitter P_EQP
16,697.00
16,697.00
- V#1535140 Asset ID# 13601
REC Total
279697.00
23,711.00 -
3,986.00
SPG
Turbine Blower
P EQP
8,000.00
7,964.66
35.34 V#1495975 Asset ID# 13412
SPG Total
89000.00
79964.66 -
35.34
WTR
Utility Vehicle
P_EQP
9,000.00
7,828.55
1,171.45 V#1535132 Asset ID# 13600
WTR Total
99000.00
79828.55 -
1,171.45
WLG
Greens Mower
P_EQP
32,000.00
33,532.42
(1,532.42) V# 1511788 Asset ID# 13508
WLG Total
329000.00
339532.42 -
(1,532.42)
Grand Total
382,845.00
373,920.33 12,323.10
(3,398.43)
W
Agenda Item No. 5
Oakland County Parks and Recreation Commission
Monthly Average Comparison Report
(Comparison of FY 2021 Actuals with 5-Year Average Actuals)
As of July 31, 2021
Unrestricted Net 12021 Arrended
Position 10/1/20 Budget Ocmber
I
November
December
January
February
March
April
May
June
July
August
September YEAR TO DATE
REVENUES:
5-YEAR AVERAGE REVENUE
$436,459
$161,009
$1,079,094
$7,393,102
$2,459,070
$1,876,231
$1,498,218
$1,329,199
$1,753,125
$1,983,312
$1,697,718
$1,544,654
Percentage of Total
1.88%
0.69%
4.65%
31.85%
10.59%
8.08%
6.45%
5.73%
7.55%
8.54%
7.31%
6.65%
Amended Budget/Alottment
$33,480,279 $629,557
$232,243
$1,556,507
$10,663.956
$3,547,011
$2,706,313
$2,161,059
$1,917,262
$2,528.743
$2,860,768
$2,448,822
$2,228,040 $33,480,279
Actual Revenues by Controllable Cate -
Taxes
$1,629
$2,067
$91,051
$9,512,453
$7,542,922
$2,653,728
$677,690
$389,566
$691,699
$1,943
$21,564,749
Intergovernmental Revenues
$0
$0
$0
$0
$0
$0
$140,126
$187,863
$0
$0
$327,999
Charges for Services
$552,943
$220,447
$94,934
$202,916
$132,365
$314,386
$1,096,917
$1,506,925
$1,348,462
$1,425,603
$6,895,898
Contributions and Capital Contributions
$0
$100
$1,500
$180
$46,675
$0
$20
$2,075
$0
$2,350
$52,900
Investment Income
$15,338
$12,830
$10,393
$9,726
$8,028
$10,820
$52,149
$6,471
$13,931
$9,954
$149,640
Other Revenue
$10,529
$2,032
$43,906
$885
$5
($8,805)
$16
$33
($21,604)
$167
$27,164
Transfers In
$0
$0
$0
$0
$25,958
$0
$0
$0
$0
$0
$25,958
Total Actuals
$580,439
$237,477
$241,784
$9,726,160
$7,755,953
$2,970,128
$1,966,918
$2,092,932
$2,032,488
$1,440,018
$0
$0 $29,044,297
Avg. Monthly Revenue Over/(Under)
($49117)
$5,234
($1,314,723)
($937,797)
$4,208,942
$263,815
($194,141)
$175,670
($496,255)
($1,420,750)
$240,879
EXPENSES:
5-YEAR AVERAGE EXPENSE
$1,553,168
$1,545,894
$1,853,026
$1,550,459
$1,433,759
$1,993,708
$1,790,165
$2,149,129
$2,881,255
$2,590,014
$2,586,843
$3,085,707
Percentage of Total
6.21%
6.18%
7.41%
6.20%
5.73%
7.97%
7.16%
8.59%
11.52%
10.35%
10.34%
12.34%
Amended Budget/Alottment
$33,480,279 $2,078,928
$2,069,192
$2,480,290
$2,075.302
$1.919,098
$2,668,595
$2,396,150
$2,876,627
$3,856.584
$3,466,756
$3,462,511
$4,130,245
33,480,279
Actual Exoenses by Controllable Cate -
Salaries
612,263.93
641,710.25
523,114.96
727,308.33
525,159.37
560,403.36
657,044.08
825,891.31
931,291.34 $
1,538,775.20
$7,542,962
Fringe Benefits
216,201.60
246,566.54
237,539.55
365,811.09
250,289.24
252,542.61
249,823.25
260,547.65
262,659.39
412,654.34
$2,754,635
Contractual Services
42,465.30
488,408.96
555,537.37
424,868.65
317,229.35
634,701.66
351,773.31
305,834.44
1,178,247.52
508,799.18
$4,807,866
Commodities
37,585.58
13,147.64
15,653.03
10,957.33
16,041.49
26,814.01
67,038.20
92,144.55
183,928.21
118,660.83
$581,971
Depreciation
273,070.30
273,070.29
273,651.27
278,317.65
282,037.60
211,154.73
278,514.31
278,514.31
279,767.99
277,018.51
$2,705,117
Internal Services
64,669.92
56,823.56
234,191.86
49,262.72
51,770.52
193,361.45
52,874.77
140,292.16
242,296.87
51,957.16
$1,137,501
Intergovernmental
-
-
$0
Transfers Out
$0
Actuals
$1,246,257
$1,719,727
$1,839,688
$1,856,526
$1,442,528
$1,878,978
$1,657,068
$1,903,224
$3,078,191
$2,907,865
$0
$0
$19,530,052
Avg. Monthly Expenses (Over)/Under
$832,671
$349,465
$640,602
$218,777
$476,571
$789,617
$739,092
$973,402
$778,393
$558,891
$6,357,471
Total Avg Monthly Favorability/(Unfavorability)
$783,554
$354,699
($674,120)
($719,020)
$4,685,513
$1,053,432
$544,942
$1,149,072
$282,138
($861,859)
$6,598,350
TOTALS:
Monthly Actual Revenue Over/(Under) Expenses
($665,817)
($1,482,251)
($1,597,904)
$7,869,634
$6,313,425
$1,091,150
$309,850
$189,708
($1,045,703)
($1,467,847)
$0
$0
$9,514,245
Cumulative Actual Revenue Over/(Under) Expenses
($665,817)
($2,148,068)
($3,745,972)
$4,123,662
$10,437,087
$11,528,238
$11,838,087
$12,027,795
$10,982,092
$9,514,245
Unrestricted Net Position $18,603,825
$ 18,130,809 $
16,549,558 $
14,242,676 $
22,085,747 $
28,321,404 $
29,211,373 $
29,372,594 $
29,711,775 $
28,597,122
$27,377,088
Projected Operating Variance -June through September
$
(1,013,689) $
(1,902,205) $
(2,915,894)
Add: Depreciation
$
279,800 $
279,800 $
559,600
Projected impact on net position from operations
$
(733,889) $
(1,622,405)
($2,356,294)
Prepared by Fiscal Services 8/24/2021 12 MACR Report Monthly Average Compari30
smmeport (MACR)
Agenda Item No. 6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Parks and Recreation Commission
ACTIVE CAPITAL IMPROVEMENT PROJECTS
BUDGET TO ACTUAL EXPENSE REPORT
(as of August 20, 2021)
Project ID
Description
Start Date
Last Transaction Date
Budget
Expenses to Date
Remaining Budget
Percentage Completion
100000003411
ADD Maint Yard Paving
3/19/2021
6/21/2021
$29,106.00
$26,392.00
$2,714.00
90.68%
100000002821
CAT Storage Electrical
7/12/2018
8/5/2021
$52,056.00
$41,484.77
$10,571.23
79.69%
100000003412
GRV Bball Court Paving
3/19/2021
3/19/2021
$14,652.00
$0.00
$14,652.00
0.00%
100000003071
GRV Ped Bridge Repl (150')
11/13/2019
10/19/2020
$18,352.00
$18,352.00
$0.00
100.00%
100000003527
HRV Bestop Air Station
8/16/2021
8/16/2021
$45,000.00
$0.00
$45,000.00
0.00%
100000003171
H RV Contact station
5/4/2020
3/31/2021
$20,000.00
$737.59
$19,262.41
3.69%
100000003526
HRV Mt. Magna - Phase II
8/16/2021
8/16/2021
$10,000.00
$0.00
$10,000.00
0.00%
100000003172
HRV Parking Lot Dev
5/4/2020
6/17/2021
$226,244.00
$234,316.49
($8,072.49)
103.57%
100000002915
IND Bailey House Conv Mitigat
11/30/2018
3/29/2021
$40,000.00
$66,449.36
($26,449.36)
166.12%
100000003168
IND Network Upgrade
5/4/2020
9/30/2020
$30,000.00
$30,000.00
$0.00
100.00%
100000003302
RDP Emergency HVAC Repl
11/13/2020
6/16/2021
$16,900.00
$14,062.00
$2,838.00
83.21%
100000002958
RWP Child Wtr Struct Repl
3/25/2019
8/11/2021
$1,599,540.00
$1,593,123.71
$6,416.29
99.60%
100000003160
RWP San. Pump Station
4/28/2020
6/15/2021
$268,464.00
$266,423.42
$2,G40.58
99.24%
100000003259
RWP Shade Structure
9/10/2020
2/19/2021
$39,357.00
$35,369.00
$3,988.00
8987%
100000003324
RWP Spl Pad Family Restroom
12/9/2020
8/11/2021
$277,021.00
$286,959.88
($9,938.88)
103.59%
100000003070
SAC HVAC Replacement
11/13/2019
8/2/2021
$433,785.00
$416,796.78
$16,988.22
96.08%
100000003128
SAC Millpond Dam Restoration
3/26/2020
7/15/2021
$228,240.00
$140,806.64
$87,433.36
61.69%
100000003227
SAC Network Upgrade
6/25/2020
6/30/2021
$15,000.00
$8,148.16
$6,851.84
54.32%
100000002959
SAC Stormwater Imp
3/25/2019
10/22/2019
$27,027.00
$24,789.00
$2,238.00
91.72%
100000003357
SAC Water System Well Replc
1/25/2021
8/11/2021
$223,202.00
$210,436.79
$12,765.21
94 28%
100000003363
SPG Park House Roof Rpl
1/27/2021
7/31/2021
$7,000.00
$5,688.95
$1,311.05
81 27%
100000003478
Troy Property Acquisition
7/3/2021
7/15/2021
$60,000.00
$15,000.00
$45,000.00
25.00%
$3,680,946.00
$3,435,336.54
$245,609.46
FY2021 Projects Closed to Date
Closed/Capitalized:
CIP Project #
Description
Amount
100000003093
ACC Electrical Improvements
$
368,376.34
100000003396
ADD Maint. Well Replacement
$
9,719.60
100000002754
CAT Perimeter Path
$
161,622.70
100000002755
CAT Sports Field Grading Irr
480,670.00
100000003170
HRV Mt Magna Dev
$
86,420.19
100000003414
IND Bailey House Boundary
$
7,120.00
100000003076
LYC Drain System Repl
$
10,108.60
100000003258
LYG Irrig. Well Replacement
$
34,506.64
100000002880
RWP Wave Pool Duct Rpl
$
18,915.00
100000002532
SAC Water quality Imp,
$
926,195.01
100000002853
SPG Roof Replacement
$
47,481.55
100000002856
SPR Roof Replacement
$
47,327.54
$2,198,463.17
Capital Improvement Total:
(as of August 20, 2021)
$5,633,799.71
Prepared by Fiscal Services: 8/25/2021 13 CIP Budget to Actual CIP - Budget to Actual Report i
Agenda Item No. 7
COUNTY OF OAKLAND
FY 2021 THIRD QUARTER REPORT
ENTERPRISE FUND
PARKS & RECREATION
ADOPTED AMENDED FY2021 VARIANCE
BUDGET BUDGET FORECAST FAV/(UNFAV) PERCENT
OAKLAND COUNTY PARKS & RECREATION COMMISSION
(50800)
OPERATING REVENUE $ 10,903,416.00 $ 10,903,416.00 $ 10,444,582.00 $ (458,834.00)
OPERATING EXPENSE
NET OPERATING INCOME (LOSS)
NON -OPERATING REVENUE (EXPENSE)
TOTAL INCOME BEFORE TRANSFERS
TRANSFERSIN
TOTAL NET INCOME/PLANNED USE OF BALANCE (LOSS)*
TOTAL NET POSITION - BEGINNING
TOTAL NET POSTION - ENDING
$ 28,082,762.00 $ 33,480,279.00 $ 33,153,276.00 $ 327,003.00
$ (17,179,346.00) $ (22,576,863.00) $ (22,708,694.00) $ (131,831.00)
$ 14,568,300.00 $ 22,576,863.00 $ 22,616,999.00 $ 40,136.00
EXPLANATION OF SIGNIFICANT VARIANCES
4.21 % Fay. Temporary Licenses $23,500 temporary use permits at Holly Oaks RV
park. Fay. Contributions Federal Grant $7,500 for US Forest Service
Reducing Runoff in the Rouge River AOC Grant, Fay. Weekly Races, $1,713
and Special and Sanctioned Races $1,666 related to unbudgeted activity at
Waterford BMX track. Unfay. Entrance Fees Gen Admission due to closure of
Waterford Oaks Waterpark, ($360,000), Entrance Fees Swimming Class
($13,000) and related concessions ($113,000). A budget amendment is
recommended. Unfay. Fees Day Use ($190,000) at the Holly Oaks Off -Road
Vehicle Park due to lower than anticipated activity.
0.98 % Fay. operating expenses due to closure of Waterford Oaks Waterpark
$382,000 and related concessions, $88,100; a budget amendment is
recommended to reflect operational savings. Unfay. Equipment Rental
($81,127) and Grounds Maintenance ($9,980) for heavy equipment rentals
and repairs needed due to poor road conditions the result of heavy rains at
the Holly Oaks RV park. Unfav Contracted Services ($13,000) related to new
contract with Manx Layne & Co. for sponsorship sales and management at
Holly Oaks RV park, approved by the Parks Commission at their September
2, 2020 meeting. Unfay. Refund Prior Years Revenue ($35,600) due to
cancelled events in FY2021 that were paid for in FY2020. Unfay. Adj Prior
Years Exp for ADA service call rental by Turner Sanitation, ($545), Dunns
Wildlife Control for sewer snake equipment, ($1,022), Thumb
Communications, ($600) and Metro Environmental Services monthly rate for
jet machine with operator, ($1,223).
-0.58
0.18 % Fay. Local Comm Stabilization Share $78,989 based on actual amount. Fay.
Gain on Sale of Vehicles $10,883 related to sale of 2008 Chevy Suburban
used by Recreation Programs and Services, and the sale of a 2008 GMC
Canyon used at Addison Oaks. Unfav Loss on Sale of Equipment related to
asset retirement for obsolete hippo (short, for "hippopotamus") inflatable
water slide, ($21,850) at Addison Oaks and disposal of an ice/water vending
kiosk ($9,599) which cannot be repaired due to lack of parts at Groveland
Oaks. Unfav Investment Income ($20,000) due to decreased interest rates
and associated investment loss. Recommended budget amendment includes
a decrease in the expense account Budgeted Equity Adjustments of
($91,165) to offset recommended revenue budget amendments.
$ (2,611,046.00) $ - $ (91,695.00) $ (91,695.00) 0.00%
$ (2,611,046.00) $ $ (91,695.00) $ (91,695.00)
$ 85.206 323.82
$ 85,114128.82
32
Agenda Item No. 8
OAKLAND COUNTY, MICHIGAN
FISCAL YEAR 2021 3rd QUARTER BUDGET AMENDMENTS
PROPRIETARY / SPECIAL REVENUE FUNDS
ACCOUNT NUMBER
PROPRIETARY / SPECIAL REVENUE FUNDS - SELF BALANCING AMENDMENTS
FY 2021
AMENDMENTS
Cost Center Dept ID
Program
Acct
Account Name
PARKS AND RECREATION
FUND (#50800)
Revenues
5060845
160210
632128
Special and Sanctioned Races
$
1,666 BMX activity
5060845
160210
632471
Weekly Races
$
1,713 BMX activity
5060722
160210
632261
Temporary Licenses
$
23,500 Holly Oaks RV
5060101
160000
620573
Local Comm Stabalization Share
$
78,989 Fay. actual amount received
5060735
160210
630644
Entrance Fees Gen Admission
$
(375,000) Waterford Oaks Waterpark Closure
5060735
160210
631295
Rental Facilities
$
(3,000) Waterford Oaks Waterpark Closure
5060735
160210
630301
Commission Contracts
$
(500) Waterford Oaks Waterpark Closure
5060437
160044
632037
Sales Retail
$
(113,000) Waterford Oaks Waterpark Closure
5060720
160070
675356
Loss on Sale of Equipment
$
(9,599) ice machine
5060715
160070
675356
Loss on Sale of Equipment
$
(21,850) Hippo inflatable
5060805
160210
675660
Gain on Sale of Vehicles
$
10,300 Chevy Suburban
5060720
160070
675660
Gain on Sale of Vehicles
$
583 GMC Canyon
5060101
160000
650106
Contributions -Federal Grants
$
7,500
5060101
160000
601208
Delinquent Tax Prior Years
393,500
5060101
160000
601637
Property Tax Levy
(393,500)
5060101
160000
655385
Income from Investments
$
(20,000)
Total Revenues
$
(418,698)
Expenses
5060735
160210
731689
Security Expense
(22,000) Waterford Oaks Waterpark Closure
5060735
160210
730562
Electrical Service
(12,000) Waterford Oaks Waterpark Closure
5060735
160210
731269
Natural Gas
(12,000) Waterford Oaks Waterpark Closure
5060735
160210
750476
Recreation Supplies
(10,000) Waterford Oaks Waterpark Closure
5060735
160210
732102
Water and Sewage Charges
(7,000) Waterford Oaks Waterpark Closure
5060735
160210
750581
Uniforms
(6,400) Waterford Oaks Waterpark Closure
5060735
160210
730814
Grounds Maintenance
(5,000) Waterford Oaks Waterpark Closure
5060735
160210
731941
Training
(5,000) Waterford Oaks Waterpark Closure
5060735
160210
750504
Small Tools
(5,000) Waterford Oaks Waterpark Closure
5060735
160210
730247
Charge Card Fee
(4,000) Waterford Oaks Waterpark Closure
5060735
160210
730646
Equipment Maintenance
(4,000) Waterford Oaks Waterpark Closure
5060735
160210
750063
Custodial Supplies
(3,500) Waterford Oaks Waterpark Closure
5060735
160210
774636
Info Tech Operations
(2,000) Waterford Oaks Waterpark Closure
5060735
160210
731388
Printing
(1,800) Waterford Oaks Waterpark Closure
5060735
160210
776661
Motor Pool
(1,300) Waterford Oaks Waterpark Closure
5060735
160210
730786
Garbage and Rubbish Disposal
(1,200) Waterford Oaks Waterpark Closure
5060735
160210
750154
Expendable Equipment
(1,000) Waterford Oaks Waterpark Closure
33
OAKLAND COUNTY, MICHIGAN
FISCAL YEAR 2021 3rd QUARTER BUDGET AMENDMENTS
PROPRIETARY / SPECIAL REVENUE FUNDS
ACCOUNT NUMBER
PROPRIETARY / SPECIAL REVENUE FUNDS - SELF BALANCING AMENDMENTS
FY 2021
AMENDMENTS
Cost Center Dept ID
Program
Acct
Account Name
PARKS AND RECREATION FUND 1#50800)
5060735
160210
776659
Motor Pool Fuel Charges
(1,000) Waterford Oaks Waterpark Closure
5060735
160210
731241
Miscellaneous
(800) Waterford Oaks Waterpark Closure
5060735
160210
778675
Telephone Communications
(800) Waterford Oaks Waterpark Closure
5060735
160210
775754
Maintenance Department Charges
(500) Waterford Oaks Waterpark Closure
5060735
160210
750399
Office Supplies
(400) Waterford Oaks Waterpark Closure
5060735
160210
731115
Licenses and Permits
(300) Waterford Oaks Waterpark Closure
5060735
160210
702010
Salaries Regular
(235,000) Waterford Oaks Waterpark Closure
5060735
160210
712020
Overtime
(5,000) Waterford Oaks Waterpark Closure
5060735
160210
722740
Fringe Benefits
(35,000) Waterford Oaks Waterpark Closure
5060437
160044
702010
Salaries Regular
(42,000) Waterford Oaks Waterpark Closure
5060437
160044
750385
Merchandise
(35,000) Waterford Oaks Waterpark Closure
5060437
160044
722740
Fringe Benefits
(3,500) Waterford Oaks Waterpark Closure
5060437
160044
731059
Laundry and Cleaning
(1,200) Waterford Oaks Waterpark Closure
5060437
160044
730198
Building Maintenance Charges
(1,000) Waterford Oaks Waterpark Closure
5060437
160044
730247
Charge Card Fee
(1,000) Waterford Oaks Waterpark Closure
5060437
160044
730429
Custodial Services
(1,000) Waterford Oaks Waterpark Closure
5060437
160044
774636
Info Tech Operations
(800) Waterford Oaks Waterpark Closure
5060437
160044
712020
Overtime
(500) Waterford Oaks Waterpark Closure
5060437
160044
731941
Training
(500) Waterford Oaks Waterpark Closure
5060437
160044
750063
Custodial Supplies
(500) Waterford Oaks Waterpark Closure
5060437
160044
750581
Uniforms
(500) Waterford Oaks Waterpark Closure
5060437
160044
731388
Printing
(300) Waterford Oaks Waterpark Closure
5060437
160044
731115
Licenses and Permits
(200) Waterford Oaks Waterpark Closure
5060437
160044
731241
Miscellaneous
(100) Waterford Oaks Waterpark Closure
5060720
160070
730037
Adj Prior Years Exp
545 Turner Sanitation County owned on call service rental ADA
5060735
160070
730037
Adj Prior Years Exp
1,022 Dunns wildlife control, Metro Enviornmental Services for Sewer snake equipment
5060101
160000
730037
Adj Prior Years Exp
600 Thumb Communications
5060735
160070
730037
Adj Prior Years Exp
1,223 Metro Environmental Services monthly rate for jet machine with operator
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
5060805
160210
731577
Refund Prior Years Revenue
550 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
5060837
160210
731577
Refund Prior Years Revenue
176 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
5060326
160010
731577
Refund Prior Years Revenue
138 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
5060330
160010
731577
Refund Prior Years Revenue
200 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
5060715
160070
731577
Refund Prior Years Revenue
401 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
34
OAKLAND COUNTY, MICHIGAN
FISCAL YEAR 2021 3rd QUARTER BUDGET AMENDMENTS
PROPRIETARY / SPECIAL REVENUE FUNDS
ACCOUNT NUMBER
PROPRIETARY / SPECIAL REVENUE FUNDS - SELF BALANCING AMENDMENTS
Cost Center Dept ID Program Acct Account Name
PARKS AND RECREATION FUND (#50800)
5060725 160070 731577 Refund Prior Years Revenue
5060732 160070 731577
5060735 160070 731577
5060805 160210 731577
5060831 160210 731577
5060720 160070 731577
5060732 160070 731577
5060805 160210 731577
5060831 160210 731577
5060837 160210 731577
5060725 160070 731577
5060732 160070 731577
5060831 160210 731577
5060722 160210 730814
5060722 160210 730653
5060722 160210 730373
5060102 160102 762011
5060101 160000 796500
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Refund Prior Years Revenue
Grounds Maintenance
Equipment Rental
Contracted Services
Transfer to Municipalaties
Budgeted Equity Adjustments
FY 2021
AMENDMENTS
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
350 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
24,590.00 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
2,265.00 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
625 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
112 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
144 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
3,000.00 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
550 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
1,492.00 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
220 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
475 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
200 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
TO RECLASS ACCOUNT ON VARIOUS FY2021 VOUCHERS FOR REFUND RECEIPTS. DUE TO STATE MANDATES/PANDEMIC, PATRONS CANCELLED
112 EVENTS IN FY2021, BUT WERE RESERVED AND PAID FOR IN FY2020.
9,980 Holly Oaks RV
81,127 MacAllister Machinery Co Inc rental at the Holly Oaks RV park
13,000 Contract with Marx Layne &Co. for Sponsorship Sales and Management, per 9-2-2020 commission meeting.
213,080
(304,775)
Total Expenses $ (418,698)
35
OAKLAND COUNTY, MICHIGAN
FISCAL YEAR 2021 3rd QUARTER BUDGET AMENDMENTS
PROPRIETARY / SPECIAL REVENUE FUNDS
FY 2021
ACCOUNT NUMBER AMENDMENTS
PROPRIETARY / SPECIAL REVENUE FUNDS - SELF BALANCING AMENDMENTS
Cost Center Dept ID Program Acct Account Name
PARKS AND RECREATION FUND (#50800)
WHEREAS; a Parks and Recreation Commission budget amendment is recommended to; adjust Delinquent Tax Prior Years and
Property Tax Levy reflecting current trend of delinquent tax payments, relfect closure of Waterford Oaks Waterpark and Concessions,
adjust for equipment and ground maintenance needed at Holly Oaks RV park relative to excessive rainfall, adjust BMX revenue for
recent activity, reflect additional funds from the State of Michigan for the Local Comm Stabilization Share, adjust for loss on sale of
equipment, unfavorable Investment Income, Adj Prior Years Exp for miscellaneous items, Refund Prior Years Revenue due to cancelled
events in FY2021 that were paid in FY2020, reflect a new contract for sponsorship sales and management at the Holly Oaks RV park,
reflect a grant acceptance from the US Forest Service for the Reducing Runoff in the Rouge River AOC Grant, adjust Transfer to
Muncipalities to reflect full invoice amount of $1,010,650 payment to the City of Royal Oak for completion of the Normandy Oaks park
development project, and adjust the expense account Budgeted Equity Adjustments to offset recommended revenue budget
amendments.
W
SEPTEMBER 1, 2021 CONSENT AGENDA ITEM NO. 9
ADMINISTRATION - BUSINESS OPERATIONS
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
Phil Castonia, Chief — P&R Business Operations
Subject: Monthly Purchasing Report — Receive & File
INTRODUCTION AND HISTORY
Today staff will present a monthly status report on the Purchasing Activity from Month 10 of Fiscal Year 2021
(July 2021) for Parks and Recreation.
ATTACHMENTS
- Monthly Purchasing Expenditure Report - July 2021
Monthly Contract Activity Log Expenditure Report - July 2 No Activity
STAFF RECOMMENDATION
Receive and File
37
Agenda Item No. 9
FM I Department Title
10 Addison Oaks Conference Ctr
10 Addison Oaks Park
10 Addison Oaks Park
10 Capital Improvement
10 Capital Improvement
10 Catalpa Oaks Park
10 Catalpa Oaks Park
10 Facilities and Maintenance
10 Glen Oaks Conference Center
10 Glen Oaks Golf
10 Groveland Oaks Park
10 Groveland Oaks Park
10 Groveland Oaks Park
10 Groveland Oaks Park
10 Groveland Oaks Park
10 Independence Oaks Park
10 Independence Oaks Park
10 Independence Oaks Park
10 Lyon Oaks Conference Center
10 Lyon Oaks Golf
10 Lyon Oaks Golf
10 Lyon Oaks Restaurant Svc
10 Off -Road Vehicle Park
10 Off -Road Vehicle Park
10 Rec Programs and Services
10 Rec Programs and Services
10 Red Oaks Golf
10 Red Oaks Golf
10 Red Oaks Waterpark
10 Red Oaks Waterpark
10 Red Oaks Wtrpk Concessions
10 Springfield Oaks Park
10 Springfield Oaks Park
10 Springfield Oaks Restaurant Sv
10 Waterford Oaks Park
10 Waterford Oaks Waterpark
10 White Lake Oaks Conf Center
10 White Lake Oaks Restaurant Svc
Account Title
Depreciation Buildings
Security Expense
Security Expense
Capital Improvement Program
Capital Improvement Program
Water and Sewage Charges
Depreciation Park Improvements
Motor Pool
Depreciation Buildings
Depreciation Park Improvements
Electrical Service
Security Expense
Security Expense
Depreciation Park Improvements
Depreciation Buildings
Grounds Maintenance
Depreciation Park Improvements
Depreciation Buildings
Depreciation Buildings
Merchandise
Depreciation Buildings
Merchandise
Grounds Maintenance
Grounds Maintenance
Special Event Supplies
Motor Pool
Water and Sewage Charges
Depreciation Park Improvements
Electrical Service
Natural Gas
Merchandise
Depreciation Park Improvements
Depreciation Buildings
Merchandise
Depreciation Park Improvements
Building Maintenance Charges
Depreciation Buildings
Merchandise
Trans. Amount
I Vendor Name
$ 7,554.86
Not Vendor Related
$ 6,415.36
Not Vendor Related
$ 6,440.42
Not Vendor Related
$ 7,597.76
AECOM Technical Services of Michigan Inc
$ 15,000.00
Six Rivers Land Conservancy
$ 9,935.43
City of Southfield
$ 6,987.26
Not Vendor Related
$ 9,890.08
Not Vendor Related
$ 7,277.31
Not Vendor Related
$ 7,076.36
Not Vendor Related
$ 7,338.65
Consumers Energy
$ 7,292.46
Not Vendor Related
$ 6,728.61
Not Vendor Related
$ 17,602.45
Not Vendor Related
$ 6,796.25
Not Vendor Related
$ 9,000.00
Allied Building Service Co of Detroit
$ 9,906.92
Not Vendor Related
$ 6,398.25
Not Vendor Related
$ 7,188.67
Not Vendor Related
$ 11,001.76
Not Vendor Related
$ 5,475.00
Not Vendor Related
$ 9,299.12
Not Vendor Related
$ 6,800.50
Bedrock Express Ltd
$ 8,607.18
Doublejack Electric Co Inc
$ 15,000.00
Arts Beats and Eats Foundation
$ 5,994.07
Not Vendor Related
$ 14,350.08
City of Madison Heights
$ 8,474.01
Not Vendor Related
$ 9,486.00
DTE Energy
$ 5,007.81
Consumers Energy
$ 6,641.63
Not Vendor Related
$ 14,066.46
Not Vendor Related
$ 5,010.74
Not Vendor Related
$ 5,480.84
Not Vendor Related
$ 9,948.93
Not Vendor Related
$ 10,222.27
Service Heating and Plumbing Corp
$ 6,650.03
Not Vendor Related
$ 5,781.41
Not Vendor Related
Page 1 of 1
I Additional Accounts Payable Info. II
CA Projects
CA Projects
Mill Pond Dam Removal and Rest
Monitoring, spot treatment, an
Expense Distribution
Motor Pool
Expense Distribution
CA Projects
CA Projects
Parks General Construction per
COGS Estimate July 2021
COGS Estimate July 2021
Bedrock Express Landscape Supp
Misc. Material percentage @ 10
EVENT SPONSORSHIP
Motor Pool
Expense Distribution
Expense Distribution
Expense Distribution
COGS Estimate July 2021
COGS Estimate July 2021
Administrative fee (+) 20% mat
COGS Estimate July 2021
0
Agenda Item No. 10
Oakland County Parks and Recreation Commission
FY2021 Maintenance Management Plan
BUDGET TO ACTUAL EXPENSE REPORT
As of August 16, 2021
Cost
Adopted
Adjusted
Expended
Budget -
Title
Center
Budget
Budget
Amount
Balance
ADM
ADA Maintenance Program
$20,000
$2,410
$0
$2,410
ADM
Fenceline Repair Program
$20,000
$20,000
$0
$20,000
ADM
Roof Repair Program
$20,000
$20,000
$16,752
$3,248
LYC
Conference Center Roof Repair
$423
$423
ACC
Emergency Fire Pump Rebuild/Repair
$18,000
$16,329
ADM
Asset Removal Program
$30,000
$59,796
$46,366
$13,430
IND
Oakhill Residence
$30,000
$14,138
WTR
Greenhouse Demolition
$8,850
$10,050
W LG
Rental Home Demoltion
$20,946
$22,178
ADM
Pavement Maintenance Program
$90,000
$46,242
$29,893
$16,349
ADD
Buhl Trail Asphalt Repairs
$6,600
$8,775
SPG
Cart Barn Asphalt Repairs
$13,365
GRV
Skate Park Resurfacing
$2,673
$3,120
GRV
Trail Asphalt Repairs
$15,422
$17,999
IND
River View/Hawks View Asphalt Repairs
$7,700
ADM
Contingency
$482
ADM
Signage Replacement Program
$15,000
$15,000
$0
$15,000
ADM
Arc Flash Compliance Program Phase IV
$50,000
$50,000
$0
$50,000
FM
NR Forestry Program
$125,000
$125,000
$105,525
$19,475
FM
NR Freshwater Stewardship Program
$40,000
$40,000
$8,083
$31,918
FM
NR Natural Area Stewardship Program
$280,000
$280,000
$146,795
$133,205
FM
NR Wildlife Management Program
$2,750
$2,750
$2,750
FM
NR Aerial Deer Survey (2021)
$0
$6,480
$6,480
$0
FM
NR CISMA
$0
$58,241
$5,005
$53,236
ACC
Conference Center Stucco Repair
$10,000
$10,000
$10,000
ADD
Adam's Lake Lodge Deck - Structural Inspection
$2,500
$2,500
$2,500
ADD
Disc Golf Course Upgrade
$30,000
$30,000
$30,000
GLC
Window and Door Replacement
$50,000
$50,000
$50,000
GRV
Cabin 5 - HVAC Replacement
$4,000
$4,000
$4,587
($587)
GRV
Matthews Island Bridge - Structural Inspection
$1,850
$1,850
$3,447
($1,597)
Paradise Island Long Span Bridge - Structural
GRV
Inspection/Repair
$2,350
$2,350
$3,557
($1,207)
IND
Maintenance Yard Screening and Landscaping
$20,000
$20,000
$20,000
IND
River Loop Bridge - Structural Inspection
$5,000
$5,000
$2,500
$2,500
ORN
Dog Wash Station - Concrete Expansion
$2,500
$2,500
$2,500
RWP
Waterpark Bridge - Structural Inspection
$10,000
$10,000
$5,200
$4,800
SAC
Ellis Barn Painting
$110,000
$110,000
$111,283
($1,283)
SAC
Rotary Park Bridge - Structural Inspection
$1,250
$1,250
$1,400
($150)
WCM
Market Pavilion - Structural Inspection
$5,000
$5,000
$3,200
$1,800
WTR
Lookout Lodge Deck - Structural Inspection
$2,500
$2,500
$2,500
$0
WWP
Waterpark Bridge - Structural Inspection
$2,500
$2,500
$3,100
($600)
Totals
$952,200
$920,648
$500,666
$426,463
Note: Program amounts may be allocated to multiple project locations.
39
SEPTEMBER 1, 2021 AGENDA ITEM NO. 11
FACILITIES MAINTENANCE & DEVELOPMENT
To: Chairman McGillivray and Commission Members
From: Susan Wells, Interim Executive Officer
Michael J. Donnellon, Jr, Chief of Park Facilities, Maintenance & Development
Subject: Capital Project Summary Report
EXECUTIVE SUMMARY
1. A report/listing of all Capital Improvement Program Projects indicating project titles, descriptions, and status, based
upon the most current Management & Budget Report of 'Projects — Budget to Actual Expense Report'
2. No funds requested with this report.
3. Receive and File
PLANNING OVERVIEW
1. Not Applicable
PROJECT OVERVIEW
1. Not Applicable
ATTACHMENTS
1. Attachment A — Pending Capital Project Summary Report
STAFF RECOMMENDATION
Staff recommends to receive and file the Capital Project Summary Report.
MOTION
Motion to receive and file
40
Agenda Item No. 11
CIP #
3128
Cost Center Description
Capital Improvement Program
Project Name
Springfield Oaks - Mill Pond Dam Removal &
Restoration (Engineering - $168,530)
Troy Property Acquistions
3478 FY2021- $45,000
Pending FY2017 - FY2021 Capital Project Summary
(Source; Budget to Actual Report Dated 8/16/2021)
Description of Project
Scope: Design, engineer and implement removal of
the Mill Pond Dam and restoration of the upstream
and downstream areas. Apply for identified grant
programs to off -set project costs. Project is in
collaboration with Springfield Township, pursuant to
existing inter -local agreement.
Need: Dam was re -constructed circa 1972, culvert
installed at that time is undersized for upstream flow,
requiring armoring of dam. Maintenance and
structural issues were identified in 2011, which led to
development of the interlocal agreement. Dam
cannot be repaired due to deformation of spillway
outlet pipe. Options were to replace or remove.
Township Board and OCPRC agreed on removal as
most appropriate action (and most likely to receive
grant funding).
As of May 2021, staff have received confirmation of
grant awards that total approximately 46% of our 50%
grant funding goal.
Project Status
Engineering Approval December 2019
Conceptual Approval - Sept 2020
Acqistion of approximately 80 acres of vacant land
previously owned by the Troy School District, known
as the Turtle Woods Property Commission Approved June 2021
Percent
Complete
20%
20%
8/25/2021
41
Cost Center Description
CIP # Capital Improvement Program
Project Name
Springfield Oaks Activity Center
Storm Water Improvements
2559 (FY2019 - $27,027)
(FY2020 - $100,000)
Groveland Oaks - Pedestrian Bridge Replacement
3071 (FY2020 - $15,000)
(FY2022 - $500,000)
Holly Oaks ORV Park - Parking Lot Development
Design/Engineering
3172 (FY2020 MDNR Funded - $41,490)
(FY2021 MDNR Funded - $199,000 Phase 1)
(FY2022) MDNR Funded - $200,000 Phase 11)
Pending FY2017 - FY2021 Capital Project Summary
(Source; Budget to Actual Report Dated 8/16/2021)
Description of Project
Project Status
Commission Approved
Scope; Create a Stormwater Management Master Plan for
Design/Engineering - March 2019
the entire Springfield Oaks Property.
Need: A stormwater management master plan is needed for
Postponed
both the SAC and SPG portions of Springfield Oaks. Major
p1
needs in SAC include addressing high volume storm volumes
and scouring at the N end of the property, extending into
the drainage ditches along Andersonville Rd, planning for
future paving requests by the OC Fair Board, animal waste
-
pollution prevention BMPs in the CBs associated with the
a
barns. Issues on the golf course side involve storm system
planning for clubhouse renovations, preventative and
reactionary culvert replacements,
Engineering/Design for the replacement of the existing
150' steel arch frame pedestrian bridge
Pedestrian bridge was installed in 1979; last inspected
in 2013 and 2018. Regular inspections have identified
structural issues with the existing steel frame and
concrete abuments that need to be addressed in the
near future. Refer to structural engineering report.
Structural inspections not needed until 15 years after
replacement is completed.
Design/Engineering for constrution of a gravel parking
lot located along the Dixie Hwy road frontage,
conforming to municipal site plan requirements, storm
water management and vehicle/pedestran circulation.
To provide a safe and secure parking area for guests
and visitors.
Engineering & Phase I Complete
Phase II scheduled for Spring 2022
Engineering Approval - January 2020
Percent
Complete
15%
10%
8/25/2021
42
Pending FY2017 - FY2021 Capital Project Summary
(Source; Budget to Actual Report Dated 8/16/2021)
Cost Center Description
CIP # Capital Improvement Program Description of Project
Project Name
CIP Project Names
Previously Reported Projects that are 100% complete and are in the process of closure.
3411 Addison Oaks Maintenance Yard Paving
2821 Catalpa Oaks - Storage & Electrical Pedestals
3412 Groveland Oaks Basketball Court Paving
3171 Holly Oaks Contact Station
2915 Independence Oaks Bailey House Mitigation
3414 Independence Oaks Boundary Fence
3168 Independence Oaks Network Upgrade
3302 Red Oaks Nature Center - Emergency HVAC Replacement
2958 Red Oaks Waterpark Childrens Water Structure Replacement (Splash Pad)
3160 Red Oaks Waterpark Sanitary Pump Station
3259 Red Oaks Waterpark Shade Structure
3324 Red Oaks Waterpark Family Restroom
3070 Springfield Oaks Activity Center HVAC Replacement
3357 Springfield Oaks Activity Center Well Replacement
3227 Springfield Oaks Activity Center - Network Upgrade
3363 Sprinfield Oaks Golf Course - Park House Roof Replacement
Previously Reported Projects that are postponed.
Percent
Project Status
Complete
8/25/2021
43
SEPTEMBER 1, 2021 AGENDA ITEM NO. 12
PLANNING &RESOURCE DEVELOPMENT
To: Chairman McGillivray and Commission Members
From: Sue Wells, Interim Executive Officer
Melissa Prowse, Supervisor of Planning & Resource Development
Subject: FY 2021 3rd Quarter Contributions Report
INTRODUCTION AND HISTORY
Attached is the FY 2021 3rd Quarter report for contributions received from April 1, 2021 through June 30, 2021.
ATTACHMENTS
FY 2021 3rd Quarter Contributions Report
STAFF RECOMMENDATION
Staff recommends the Commission receive and file the FY2021 3rd Quarter Contributions Report.
MOTION
Move to receive and file the FY 2021 3rd Quarter Contributions Report.
44
Agenda Item No. 12
OAKLAND COUNTY PARKS & RECREATION COMMISSION
FY 20213Q Report for Contributions (Donations) - April 1, 2021- June 30, 2021
RNC Contribution - General Nature Center
RNC Contribution - General Nature Center
RNC Contribution - General Nature Center
IND Contribution - General
ADM Oak Hill Round -About Payment
Silvia Enea $20.00
Park Patron $10.00
Park Patron $1.00
Red Oaks Nature Center -#w
Mark Whiting $ 20.00
Independence Oaks -Total
Road Commission for Oak. Co. $ 2,044.00
Administration Total
Grand Total
$20.00
$2,044.00
$2,095.00
45
SEPTEMBER 1, 2021
ADMINISTRATION
To: Chairman McGillivray and Commission Members
From: Sue Wells, Interim Director of Parks and Recreation
Jeff Phelps, Parks and Recreation Fiscal Coordinator
Subject: Final Approval of Proposed FY 2022-2024 Budget:
• FY 2022-FY2024 Operating Budget
• FY 2024 Capital Equipment Budget
• FY 2024 Capital Improvement Projects/Maintenance Management Plan Budget
The FY2022 Proposed Budqet compared to the FY2021 Amended Budqet as of June 30, 2021
The proposed FY2021 budget of $34,197,675 is decreased ($124,442) compared to the FY2021 Amended
Budget as of June 30, 2021 of $34,322,117. Revisions include:
FY 2022 DEPARTMENT REVENUES
Increase or (Decrease) compared to the FY 2021 Amended Budget:
• Property tax revenue increased $613,700 based on a projected increase in taxable value, Headlee rollback
factor, and anticipated collection rate.
• State grants decrease of ($199,000) due to one-time grant per MR#20655 Approval of FY2021 Michigan
Department of Natural Resources Off -road Vehicle Trail Improvement Fund Program Award (21-067).
• Other Intergovernmental Revenues for personal property tax loss reimbursement are increased $50,000
based on current trend.
• Overall Charges for Services increased $183,959 due to bringing the budget in -line with current trends
including: Greens Fees $154,300 due to golf course rate increase recommendations from golf consultant,
Fees Day Use $91,400, Rental Facilities $72,250, Fees Driving Range $17,000 based on current trends.
Partially offset by decreases in Sales Retail ($77,000), Commission Food Services ($26,100), Special
Contracts ($18,000), Rental Equipment ($12,000), Rent House ($9,541), Temporary Licenses ($7,000) and
Water Feature Ride ($6,000) based on current trends.
• Contributions overall increased $89,956. As $125,000 is budgeted for FY 2022 Contributions -State Grants;
$95,000 is anticipated for state grant contribution for invasive species management and a $30,000 state
grant for the Holly Oaks off -road vehicle park.
• Investments is increased $40,000 due to reduced FY2021 amended budget and projected investment
returns.
• Capital Contributions are reduced ($25,000) reflective of MR#21151 Saginaw Bay Watershed FY2021 grant
acceptance.
• Planned Use of Balance decreased ($806,513) due to M.R. #21203 Human Resources and Management
and Budget Amendment for the Salary Administration Plan (Compensation Study).
• Other Revenues are reduced to zero reflecting one-time budget amendments made in FY2021 for Prior Year
Adjustments ($43,559) and Refund Prior Years Expenditure ($2,027).
• Transfers In decreased overall $25,000 due to one-time occurrence in FY2021 for Re -Establishment of the
Oakland Native Plants Initiative, $25,958, M.R. #21053.
46
FY 2022 DEPARTMENT EXPENDITURES
Increase or (Decrease) compared to the FY 2021 Amended Budget:
• Controllable Personnel - FY 2022 reflects a general overall compensation increase of 2% and includes a
fringe benefit rate reduction based on availability equity within the Fringe Benefit Fund.
• Other Salary and Fringe Benefit changes are based on current usage of staff and an adjustment to fringe
benefits parkwide to reflect current trend and a parks commission recommendation to create four (4) PTNE
positions for Cooperative Invasive Species Management Areas (CISMA).
• Contractual Services increased $1,291,942 for General Program Administration, $879,362 reflecting the
creation of a natural resources cost center, Advertising $138,000, Contracted Services $133,200, Building
Maintenance Charges $61,800, Equipment Rental $54,800, Security Expense $17,700, Public Information
$16,215 and Charge Card Fee $14,550 bringing accounts in line with current trends. Partially offset by
decreases in Grounds Maintenance ($15,487), Water and Sewer Charges ($9,750), Electrical Service
($6,500) and Equipment Maintenance ($5,750) bringing accounts in line with historical trends.
• Overall Commodities increased $447,350 due to the anticipated Expendable Equipment purchase of golf
carts costing $444,900.
• Depreciation expense decreased ($69,750) based on the current level of depreciable assets.
• Intergovernmental overall increased $615,510. The FY 2022 budget for Transfer to Municipalities reflects
$1,200,000 for park partnership millage initiatives and a remaining appropriation of $213,080 per M.R.
#19042 agreement with the City of Royal Oak for the development of Normandy Oaks.
• Internal Services net increase of $123,649 reflect current trends for Info Tech Operations $49,580, Motor
Pool $18,669, Drain Equipment $14,000, and Telephone Communications $11,350 due to allocation and
usage adjustments. In addition, an increase in Insurance Fund $38,950 reflects an adjustment in the amount
allocated for the self-insurance charge to maintain the operations of the Building and Liability Fund and start
to rebuild adequate claim reserves that have depleted over the last several years (previous allocations were
inadequate to sustain the fund). Also, the allocation methodology has been updated from a 50% claims/50%
personnel exposure model to a 80% claims/20% personnel exposure model to more accurately reflect where
the costs are generated. Partially offset by decreased Maintenance Department Charges ($9,500).
• Transfers Out increased overall $5,000. The FY 2022 budget is $35,000 to reflect the anticipated purchase
of a vehicle for CISMA.
• Budgeted Equity Adjustments is decreased ($2,448,006) relative to increases in Property Tax revenue and
other revenue adjustments and offset by the operating expense variances explained above.
FY 2023 DEPARTMENT REVENUES
Increase or (Decrease) compared to the FY 2022 Recommended Budget:
Same as FY 2021 Recommended Revenue Budget except for these specific adjustments:
• Property Tax Levy currently increased $879,200 based on projected property tax values.
FY 2023 DEPARTMENT EXPENDITURES
Increase or (Decrease) compared to the FY 2022 Recommended Budget:
• Controllable Personnel increased due to a 2% compensation increase placeholder and associated fringe
benefits.
• Contractual Expenses is reduced ($55,104) based on adjustments to the General Program Administration
account based on scheduled operating maintenance projects.
• Commodities are reduced ($450,000) due to the one-time purchase of golf carts in FY 2022.
• Intergovernmental is reduced ($213,080) according to M.R. #19042 agreement with the City of Royal Oak
for the development of Normandy Oaks.
• Transfers Out decreased ($35,000) due to vehicle purchases in FY 2022.
• Budgeted Equity Adjustments is increased $1,343,134 relative to increases in Property Tax revenue and
offset by the operating expense variances explained above.
47
FY 2024 DEPARTMENT REVENUES
Increase or (Decrease) compared to the FY 2023 Recommended Budget:
• Property Tax Levy currently increased $776,700 based on projected property tax values.
FY 2024 DEPARTMENT EXPENDITURES
Increase or (Decrease) compared to the FY 2023 Recommended Budget:
• Controllable Personnel increased due to a 2% compensation increase placeholder and associated fringe
benefits.
• salary increase recommended by the County Executive.
• Budgeted Equity Adjustments is increased $482,150 relative to increased Property Tax revenue and offset
by general salary increase.
The FY2022-FY2024 Categorical Variance report is included for your review as well as a
proposed resolution for the Fiscal Year 2022 Budget — General Appropriations Act, and the Executive Officer's
message which provides a summary of the Proposed FY 2022 Budget expenditures and revenues.
If you have any questions, please feel free to contact us ahead of time so that we may provide you with
the response either before the meeting or at the meeting on September 1, 2021.
STAFF RECOMMENDATION
If all of the questions and concerns of the Commission regarding the Proposed Fiscal Year 2022-2024
Budget and the FY 2022-FY2025 4-Year CIP & Maintenance Management Plan have been addressed, it would
be appropriate to adopt the enclosed proposed resolution and approve the Fiscal Year 2022 General
Appropriations Act, balancing total appropriations with available resources at $34,197,675.
MOTION
Move to approve the Fiscal Year 2022-2024 Oakland County Parks and Recreation Proposed Operating
Budget and adopt the Fiscal Year 2022 General Appropriations Act resolution balancing total
appropriations with available resources in the amount of $34,197,675; and
Move to approve FY 2022, Proposed Capital Equipment Plan budget at $642,500; and
Move to approve the FY2022 Capital Improvement budget of $4,406,000 and $1,860,769 for the
Maintenance Management Plan (General Program Administration line -item, included in the operating
budget), and forward it to the Oakland County Board of Commissioners for inclusion in the Oakland
County Adopted FY2022-FY2024 budget.
48
Executive Officer's Adopted FY 2022 Budget Message
Oakland County Parks and Recreation Commission:
Executive Officer's Revised Financial Summary:
Revenue and Expense Budget
FY2022 - $34,197,675
FY2023 - $35,076,875
FY2024 - $35,853,575
Executive Officer's Message
FY2022 Unrestricted net position proiection:
Estimated unrestricted net position beginning of fiscal year
Add:
Deduct:
Operating revenues
Operating expenses, less depreciation
and budgeted equity adjustment
Deduct: Capital equipment budget
Estimated FY2022 capital improvement
expenses (75% of CIP budget of $4,406,000)
Projected unrestricted net position 9/30j2022
FY2022
23,534,047
34,197,675
(29,086,104)
(607,500)
(3,304,500)
24,733,618
Enclosed are the proposed budgets for operations, capital equipment and capital projects for the Oakland County Parks and Recreation Commission for
Fiscal Years 2022, 2023 and 2024.
Parks and Recreation staff and Fiscal Services staff have prepared these budgets using results from the county -wide survey, the history of revenues and
expenses, service demands, and outcomes from planning sessions with operational staff and the Commission. We continue to budget revenues on a
conservative basis and expenses on a realistic basis.
The Role of Strategic Planning
Based on the OCPRC mission statement and the vision of being recognized as a world class parks and recreation agency, 75+ full-time, 700+ part-time
staff and over 750 volunteers are committed to achieving the highest level of customer service using best practices. Initiatives are in place to provide
outstanding services to nearly two million annual visitors; and to continue the maintenance needed to meet visitor expectations for maintained,
accessible and safe facilities. Internal operation changes have increased efficiencies. For example, staff salary and fringe benefits have been reallocated
among budget units to reflect true costs for revenue pricing and cost recovery.
49
Executive Officer's Adopted FY 2022 Budget Message (continued)
Budget Year Cycles
• FY 2022 budget year will commence October 1, 2021 - September 30, 2022
• FY 2023 budget year will commence October 1, 2022 - September 30, 2023
• FY 2024 budget year will commence October 1, 2023 - September 30, 2024
Note: These dates coincide with the County of Oakland's fiscal years and its 3-year budget forecasting process.
FY 2022 Proposed Revenue
The recommended revenue budget is $34,197,675. This is a (.36%) decrease from the FY 2021 amended budget of $34,322,117. Budgets for FY 2022
through FY 2024 were developed from the FY 2020 Actuals and the FY 2021 Amended Budget. Overall revenues are decreased ($124,442) the result of
increased Property Taxes of $613,700, Charges for Services $183,959, Contributions $89,956, and Investment Income $40,000. Offsetting these
increases are a decrease in Planned Use of Balance ($806,513), State Grants ($199,000), Other Revenues ($45,586), Transfers In ($25,958), and Capital
Contributions ($25,000).
The FY 2022 revenue budget includes:
FY2022
Revenue
• Property taxes from the one -quarter Millage
$22,225,000
(64.99%)
• Other Intergovernmental Revenue
$300,000
(.88%)
0.60%
• Charges for Services
$11,087,375
(32.42%)
o o
0�88/°���1.11/°
■Property taxes (64.99%)
• Contributions
• Income on Investments & Other Revenue
$205,300
$380,000
(.60%)
(1.11%)
1b
■Charges for Services (32.42%)
$34,197,675
32.42/o a
Other Intergov't Revenues (.88%)
64.990 o
Contributions (.60%)
Investment Income (1.11%)
0
Executive Officer's Adopted FY 2022 Budget Message (continued)
FY 2022 Proposed Expense
The recommended operating expense budget is $34,197,675. This is a (.36%) decrease from the FY 2021 amended budget of $34,322,117.
The FY 2022 expense budget includes:
• Salaries $11,442,643 (33.46%) FY2022 ■Salaries(33.46%)
• Fringe Benefits $4,121,320 (12.05%) 5.09%% 5.53%% 0.10% ■ Fringe Benefits (12.05%)
• Contractual Services $8,673,526 (25.36%)
4.13% ■Contractual Services
• Commodities $1,660,765 (4.86%) (25.36%)
• Depreciation $3,219,547 (9.41%) ■ Commodities (4.86%)
• Intergovernmental $1 413 080 (4.13%) 9.41%� 33.46°/%
■Depreciation (9.41/0)
• Internal Services $1,739,770 (5.09%) 4.86% Intergovernmental (4.13%)
• Budgeted Equity Adjustments $1,892,024 (5.53%) 25.36% Internal services (5.09%)
• Transfers Out $ 35.000 (0.10%)
$34,197,675 12.05% Budgeted Equity
The proposed FY2022 expense budget of $34,197,675 is a decrease of $124,442 Adjustments (5.53%)
p p p g ( ) Transfers Out (.10%)
from the FY2021 amended budget of $34,322,117. The FY2022 recommended
expense budget includes $1,413,080 for an intergovernmental transfer for the
Normandy Oaks Park Partnership agreement and new Parks Partnerships with local communities. In addition, the FY2022 budget contains funding of
$1,804,514 for Natural Resources and $575,646 for Cooperative Invasive Species Management Areas (CISMA). Based on current activity levels, increases
in Contractual Services $1,291,942, Commodities $447,350 and Internal Services $123,549 are included in the operating budget. Salaries and Fringe
Benefits have been adjusted downward by ($90,037) reflecting a 2% general salary increase, the implementation of a salary compensation study and
salary and fringe adjustments based on current activity levels. Depreciation is decreased ($69,750) related to an increase in completed capital
improvement projects. An increase in year-end fund balance of $1,199,571 is currently anticipated. Of note, on November 3, 2020 the voters of Oakland
County approved a .35 millage which will run from 2020 thru 2029. The additional property tax revenue will be used to maintain existing park structures
and offer trails, partnerships, and natural resource funding to County municipalities.
A Fiscally Sound Budget Proposal
The Administrative Management Team, Fiscal/Operational staff and I firmly believe the enclosed budget shows our dedicated commitment to offer the
highest quality facilities, programs, and services to the residents of Oakland County for FY2022-FY2024.
Sincerely,
Sue Wells, Interim Executive Officer
51
MISCELLANEOUS RESOLUTION 20-XXX
IN RE: Oakland County Parks and Recreation Commission Fiscal Year 2022 Budget General
Appropriations Act
To the Oakland County Parks and Recreation Commission
Chairperson and Commission Members:
WHEREAS in accordance with the provisions of Public Act 261 of 1965, the County and Regional Parks Act,
and Public Act 621 of 1978 (as amended), the Uniform Budgeting and Accounting Act for Local Government,
and the By -Laws of the Oakland County Parks and Recreation Commission approved January 12, 2011, it is the
responsibility of the Oakland County Parks and Recreation Commission to amend and adopt the annual
Oakland County Parks and Recreation Commission Budget; and
WHEREAS the Parks and Recreation Executive Officer received budget requests from all Parks and Recreation
Budget Units, and the Parks and Recreation Executive Officer and his staff has prepared and submitted in detail
the Parks and Recreation Executive Officer's Fiscal Year 2022 Budget Recommendation to the Oakland County
Parks and Recreation Commission; and
WHEREAS the Oakland County Parks and Recreation Commission has reviewed in detail the Parks and
Recreation Executive Officer's Fiscal Year 2022 Budget Recommendation as shown on the attached line -item
budget report, hereby annexed and made part of the General Appropriations Act for Fiscal Year 2022; and
WHEREAS supplemental summaries and data contained herein are for informational purposes only, and are not
part of the General Appropriations Act for Fiscal Year 2022.
NOW THEREFORE BE IT RESOLVED the Oakland County Parks and Recreation Commission, after due
deliberation, does hereby amend and adopt the Fiscal Year 2022 General Appropriations Act balancing total
appropriations with available resources at $34,197,675.
BE IT FURTHER RESOLVED that as stated in the Commission By -Laws, appropriations accumulated within the
department will be deemed maximum authorization to incur expenditures. The Parks and Recreation Executive
Officer or his designated Fiscal Officer shall exercise supervision and control of all budgeted expenditures with
each Budget Unit, and at no time shall the expenditures exceed the total appropriation for the department as
originally amended or adopted by the Oakland County Parks and Recreation Commission.
Date: September 1, 2021
Moved by:
Supported by:
AYES:
NAYS:
52
Fund: I50800- Parks and Recreation OAKLAND COUNTY, MICHIGAN I
FY2022 AND FY2023 AND FY2024 County Executive Budget Recommendation - Categorical Variance
FY 2021 FY 2022 Inc./(Dec.) FY 2021 Amended to FY 2023 Inc./(Dec.) FY 2022 Rec. to FY 2024 Inc./(Dec.) FY 2023 Rec. to I
Adopted Amended County Exec. FY 2022 Co. Exec. Rec. County Exec. FY 2023 Co. Exec. Rec. County Exec. FY 2024 Co. Exec. Rec.
(Account Number/Description Budget I Budget I Recommended $ i % I Recommended $ i % I Recommended $ i
Revenues
Property taxes
13,765,000
21,611,300
22,225,000
613,700
2.84%
23,104,200
879,200
3.96%
23,880,900
776,700
3.36%
State Grants
0
199,000
0
(199,000)
-100.00%
0
0
0.00%
0
0
0.00%
Other Intergovern. Revenues
250,000
250,000
300,000
50,000
20.00%
300,000
0
0.00%
300,000
0
0.00%
Charges for Services
10,903,416
10,903,416
11,087,375
183,959
1.69%
11,087,375
0
0.00%
11,087,375
0
0.00%
Contributions
113,300
115,344
205,300
89,956
77.99%
205,300
0
0.00%
205,300
0
0.00%
Investment Income
440,000
340,000
380,000
40,000
11.76%
380,000
0
0.00%
380,000
0
0.00%
Planned Use of Fund Balance
2,611,046
806,513
0
(806,513)
-100.00%
0
0
0.00%
0
0
0.00%
Other Revenues
0
45,586
0
(45,586)
-100.00%
0
0
0.00%
0
0
0.00%
Capital Contributions
0
25,000
0
(25,000)
-100.00%
0
0
0.00%
0
0
0.00%
Transfers In
0
25,958
0
(25,958)
-100.00%
0
0
0.00%
0
0
0.00%
Grand Total Revenues
28,082,762
34,322,117
34,197,675
(124,442)
-0.36%
35,076,875
879,200
2.57%
35,853,575
776,700
2.21%
Expenditures
Salaries
10,994,162
11,712,984
11,442,643
(270,341)
-2.31%
11,671,643
229,000
2.00%
11,904,943
233,300
2.00%
Fringe Benefits
3,848,075
3,941,016
4,121,320
180,304
4.58%
4,181,570
60,250
1.46%
4,242,820
61,250
1.46%
Contractual Services
7,229,772
7,381,584
8,673,526
1,291,942
17.50%
8,618,422
(55,104)
-0.64%
8,618,422
0
0.00%
Commodities
1,213,415
1,213,415
1,660,765
447,350
36.87%
1,210,765
(450,000)
-27.10%
1,210,765
0
0.00%
Depreciation
2,874,797
3,289,297
3,219,547
(69,750)
-2.12%
3,219,547
0
0.00%
3,219,547
0
0.00%
Intergovernmental
276,320
797,570
1,413,080
615,510
77.17%
1,200,000
(213,080)
-15.08%
1,200,000
0
0.00%
Internal Services
1,616,221
1,616,221
1,739,770
123,549
7.64%
1,739,770
0
0.00%
1,739,770
0
0.00%
Transfers Out
30,000
30,000
35,000
5,000
16.67%
0
(35,000)
-100.00%
0
0
0.00%
Budgeted Equity Adjustment
0
4,340,030
1,892,024
(2,448,006)
-56.41%
3,235,158
1,343,134
70.99%
3,717,308
482,150
14.90%
Grand Total Expenditures
28,082,762
34,322,117
34,197,675
(124,442)
-0.36%
35,076,875
879,200
2.57%
35,853,575
776,700
2.21%
53
Fund: 50800 - Parks and Recreation OAKLAND COUNTY, MICHIGAN
FY2022 AND FY2023 AND FY2024 County Executive Budget Recommendation
FY 2021
I
I
Amended
I
Amended
I
Amended
I
Cou te
I
td
I
County Exec.
Number/Description
Actual)
Budge
Budget
Recommended
Recommended
e
Recommended
Revenues I
Revenue
Prooerty taxes
601208
Delinquent Tax Prior Years
423,203
25,000
25,000
25,000
25,000
525,000
525,000
525,000
601637
Property Tax Levy
13,312,247
13,740,000
21,586,300
14,088,500
14,088,500
21,700,000
22,579,200
23,355,900
13,735,450
13,765,000
21,611,300
14,113,500
14,113,500
22,225,000
23,104,200
23,880,900
State Grants
615572
State Capital Grants
0
0
199,000
0
0
0
0
0
0
0
199,000
0
0
0
0
0
Otherinteraovern. Revenues
620573
Local Comm Stabilization Share
301,929
250,000
250,000
250,000
250,000
300,000
300,000
300,000
301,929
250,000
250,000
250,000
250,000
300,000
300,000
300,000
Charaes for Services
630084
Antenna Site Management
65,709
66,306
66,306
66,306
66,306
68,306
68,306
68,306
630301
Commission Contracts
18,513
40,750
40,750
40,750
40,750
40,900
40,900
40,900
630308
Commission Food Services
26,502
78,495
78,495
78,495
78,495
52,395
52,395
52,395
630469
Deck Tennis
2,600
4,000
4,000
4,000
4,000
4,000
4,000
4,000
630644
Entrance Fees Gen Admission
2,112
1,825,000
1,825,000
1,825,000
1,825,000
1,825,000
1,825,000
1,825,000
630651
Entrance Fees Swimming Class
0
13,000
13,000
13,000
13,000
13,000
13,000
13,000
630693
Fees Camping
1,143,154
1,554,000
1,554,000
1,554,000
1,554,000
1,554,000
1,554,000
1,554,000
630700
Fees Day Use
690,329
1,092,100
1,092,100
1,092,100
1,092,100
1,183,500
1,183,500
1,183,500
630707
Fees Driving Range
92,958
93,000
93,000
93,000
93,000
110,000
110,000
110,000
630847
Greens Fees
2,098,363
2,436,500
2,436,500
2,436,500
2,436,500
2,590,800
2,590,800
2,590,800
631001
Interest on Delinquent Taxes
(137)
(1,000)
(1,000)
(1,000)
(1,000)
(1,000)
(1,000)
(1,000)
631127
Maintenance Contracts
44,391
8,000
8,000
8,000
8,000
8,000
8,000
8,000
631253
Miscellaneous
27,496
3,815
3,815
3,815
3,815
4,315
4,315
4,315
631330
NSF Check Fees
0
25
25
25
25
25
25
25
631743
Refunds Miscellaneous
14,159
4,900
4,900
4,900
4,900
6,900
6,900
6,900
631771
Reimb 3rd Party
0
200
200
200
200
200
200
200
631799
Reimb Contracts
252,599
278,100
278,100
278,100
278,100
278,100
278,100
278,100
631911
Rent House
66,872
71,125
71,125
71,125
71,125
61,584
61,584
61,584
631918
Rental Equipment
26,268
79,400
79,400
79,400
79,400
67,400
67,400
67,400
631925
Rental Facilities
345,940
649,700
649,700
649,700
649,700
721,950
721,950
721,950
631932
Rental Golf Carts
951,618
1,152,000
1,152,000
1,152,000
1,152,000
1,152,000
1,152,000
1,152,000
631946
Rental Units or Events
38,750
173,000
173,000
173,000
173,000
173,000
173,000
173,000
632037
Sales Retail
347,647
1,095,500
1,095,500
1,095,500
1,095,500
1,018,500
1,018,500
1,018,500
632128
Special and Sanctioned Races
6,782
0
0
0
0
0
0
0
632135
Special Contracts
42,340
172,500
172,500
172,500
172,500
154,500
154,500
154,500
632261
Temporary Licenses
24,000
7,000
7,000
7,000
7,000
0
0
0
632443
Water Feature Ride
0
6,000
6,000
6,000
6,000
0
0
0
632471
Weekly Races
5,046
0
0
0
0
0
0
0
6,334,009
10, 903,416
10,903,416
10, 903,416
10,903,416
11,087,375
11,087,375
11, 087, 375
54
Fund: 150800 - Parks and Recreation
Account Number/Description
Contributions
650104
Contributions Operating
650105
Contributions -State Grants
650305
Sponsorships
Investment Income
655077
Accrued Interest Adjustments
655385
Income from Investments
Planned Use of Fund Balance
665882
Planned Use of Balance
Other Revenues
670114
Cash Overages
670456
Prior Years Adjustments
670570
Refund Prior Years Expenditure
670627
Sale of Equipment
670741
Sale of Scrap
Revenue
Other Financina Sources
Capital Contributions
690189
Capital Asset Contributions
Transfers In
695500
Transfers In
Other Financing Sources
Grand Total Revenues
Expenditures I
Personnel
Salaries
702010
Salaries Regular
702030
Holiday
702050
Annual Leave
702073
Parental Leave
702080
Sick Leave
702100
Retroactive
702110
Per Diem
702140
Other Miscellaneous Salaries
702190
Workers Compensation Pay
702200
Death Leave
702300
Disaster Non -Prod Salaries
OAKLAND COUNTY, MICHIGAN
I
FY2022 AND FY2023 AND FY2024 County Executive Budget Recommendation
FY 2021
FY
Adopte
Amended
I
A men
I
Amended I
I
y Exec.
I
Couny Exec.
Actual
Actual
Budget
Planed
Plan
Re omtmended
Recommended
Re omtme nded
190,051
800
2,844
800
800
800
800
800
0
30,000
30,000
30,000
30,000
125,000
125,000
125,000
84,300
82,500
82,500
82,500
82,500
79,500
79,500
79,500
274,351
113,300
115,344
113,300
113,300
205,300
205,300
205,300
28,959
40,000
40,000
40,000
40,000
30,000
30,000
30,000
348,175
400,000
300,000
400,000
400,000
350,000
350,000
350,000
377,134
440,000
340,000
440,000
440,000
380,000
380,000
380,000
0
2,611,046
806,513
2,259,128
2,046,048
0
0
0
0
2,611,046
806,513
2,259,128
2,046,048
0
0
0
357
0
0
0
0
0
0
0
20,146
0
43,559
0
0
0
0
0
9,868
0
2,027
0
0
0
0
0
92
0
0
0
0
0
0
0
723
0
0
0
0
0
0
0
31,185
0
45,586
0
0
0
0
0
21,054,058
28,082,762
34,271,159
28,079,344
27,866,264
34,197,675
35,076,875
35,853,575
2,923
0
25,000
0
0
0
0
0
2,923
0
25,000
0
0
0
0
0
216,100
0
25,958
0
0
0
0
0
216,100
0
25,958
0
0
0
0
0
219,023
0
50,958
0
0
0
0
0
21,273,081
28,082,762
34,322,117
28,079,344
27,866,264
34,197,675
35,076,875
35,853,575
7,173,123
10,773,462
11,492,284
10,833,986
10,833,986
11,219,093
11,443,893
11, 672,993
239,160
0
0
0
0
0
0
0
233,406
0
0
0
0
0
0
0
15,977
0
0
0
0
0
0
0
100,324
0
0
0
0
0
0
0
6,702
0
0
0
0
0
0
0
7,881
9,500
9,500
9,500
9,500
9,500
9,500
9,500
21,700
0
0
0
0
0
0
0
1,875
0
0
0
0
0
0
0
8,864
0
0
0
0
0
0
0
268,910
0
0
0
0
0
0
0
55
(Fund: 150800 - Parks and Recreation
Account Number/Description
702320
Disaster Premium Salaries
712020
Overtime
712040
Holiday Overtime
712090
On Call
Frinae Benefits
722740
Fringe Benefits
722750
Workers Compensation
722760
Group Life
722770
Retirement
722780
Hospitalization
722790
Social Security
722800
Dental
722810
Disability
722820
Unemployment Insurance
722850
Optical
722900
Fringe Benefit Adjustments
Personnel
ODeratina Expenses
Contractual
Services
730037
Adj Prior Years Exp
730044
Adj Prior Years Revenue
730072
Advertising
730114
Auction Expense
730121
Bank Charges
730198
Building Maintenance Charges
730240
Cash Shortage
730247
Charge Card Fee
730373
Contracted Services
730429
Custodial Services
730520
Design Fees
730562
Electrical Service
730576
Employee In -Service Training
730611
Employees Medical Exams
730646
Equipment Maintenance
730653
Equipment Rental
730786
Garbage and Rubbish Disposal
730789
General Program Administration
730814
Grounds Maintenance
730926
Indirect Costs
731059
Laundry and Cleaning
731073
Legal Services
731115
Licenses and Permits
731136
Logos Trademarks Intellect Prp
731143
Mail Handling -Postage Svc
OAKLAND COUNTY, MICHIGAN
I
FY2022 AND FY2023 AND FY2024
County Executive Budget
Recommendation
FY
2021
FY
Adopte
Amended
I
A men
I
Amended I
y Exec.
I I
Couny Exec.
Actual
Actual
Budget
Planed
Plan
Re omtmended
Recommended
Re omtme nded
128,194
0
0
0
0
0
0
0
122,503
179,900
179,900
179,900
179,900
172,750
176,150
179,550
8,080
1,000
1,000
1,000
1,000
1,000
1,000
1,000
38,003
30,300
30,300
30,300
30,300
40,300
41,100
41,900
8,374,703
10,994,162
11,712,984
11,054,686
11,054,686
11,442,643
11,671,643
11, 904,943
0
3,842,419
3,842,669
3,877,019
3,877,019
4,120,466
4,180,716
4,241,966
221,050
0
0
0
0
0
0
0
11,561
0
0
0
0
0
0
0
1,513, 300
0
0
0
0
0
0
0
1,081,362
0
0
0
0
0
0
0
456,745
0
0
0
0
0
0
0
90,803
0
0
0
0
0
0
0
84,117
0
0
0
0
0
0
0
12,492
0
0
0
0
0
0
0
8,803
0
0
0
0
0
0
0
0
5,656
98,347
854
854
854
854
854
3,480,233
3,848,075
3,941,016
3,877,873
3,877,873
4,121,320
4,181,570
4,242,820
11, 854, 936
14, 842, 237
15, 654, 000
14, 932, 559
14, 932, 559
15, 563, 963
15, 853, 213
16,147, 763
6,303
0
3,058
0
0
0
0
0
474
0
0
0
0
0
0
0
46,547
105,000
105,000
105,000
105,000
243,000
243,000
243,000
16
0
0
0
0
500
500
500
1,948
5,000
5,000
5,000
5,000
5,000
5,000
5,000
482,958
556,450
556,450
556,450
556,450
618,250
618,250
618,250
594
0
0
0
0
0
0
0
135,134
161,750
161,750
161,750
161,750
176,300
176,300
176,300
111,909
99,900
99,900
99,900
99,900
233,100
233,100
233,100
23,501
25,250
25,250
25,250
25,250
24,000
24,000
24,000
20,092
0
0
0
0
0
0
0
442,545
590,750
590,750
590,750
590,750
584,250
584,250
584,250
0
0
0
0
0
2,000
2,000
2,000
332
1,170
1,170
1,170
1,170
1,095
1,095
1,095
358,144
460,500
460,500
460,000
460,000
454,750
454,750
454,750
77,658
107,290
117,900
107,290
107,290
172,700
172,700
172,700
31,612
48,900
48,900
48,900
48,900
49,250
49,250
49,250
0
918,450
981,407
918,450
918,450
1,860,769
1,805,665
1,805,665
1,286,726
1,069, 550
1,144,737
1,069, 550
1,069, 550
1,129,250
1,129,250
1,129,250
941,349
1,023,000
1,023,000
1,023,000
1,023,000
1,023,000
1,023,000
1,023,000
9,998
16,895
16,895
16,895
16,895
18,945
18,945
18,945
1,545
500
500
500
500
0
0
0
27,500
33,275
33,275
33,275
33,275
37,525
37,525
37,525
5,044
5,025
5,025
5,025
5,025
5,175
5,175
5,175
2,780
0
0
0
0
0
0
0
M.
Fund: 50800 - Parks and Recreation OAKLAND COUNTY, MICHIGAN
FY2022 AND FY2023 AND FY2024 County Executive Budget Recommendation
FY 2021
I
I
Ad
I
Amended
I
Amended
I
County Exec.
I
td
I
County Exec.
Number/Description
Actual)
Budge
Budget
Recommended
Recommended
e
Recommended
731213
Membership Dues
13,363
18,520
18,520
18,520
18,520
20,535
20,535
20,535
731241
Miscellaneous
6,161
25,550
25,550
25,550
25,550
27,500
27,500
27,500
731269
Natural Gas
131,445
179,650
179,650
179,650
179,650
177,850
177,850
177,850
731339
Periodicals Books Publ Sub
162
850
850
850
850
1,200
1,200
1,200
731346
Personal Mileage
8,368
15,400
15,400
15,400
15,400
16,100
16,100
16,100
731388
Printing
30,393
68,050
68,050
68,050
68,050
67,450
67,450
67,450
731458
Professional Services
0
0
0
0
0
4,000
4,000
4,000
731500
Public Information
149,379
50,835
50,835
50,835
50,835
67,050
67,050
67,050
731626
Rent
27,206
54,415
54,415
54,415
54,415
54,415
54,415
54,415
731633
Rental Property Maintenance
7,384
13,600
13,600
13,600
13,600
10,700
10,700
10,700
731689
Security Expense
988,270
1,172,942
1,172,942
1,172,942
1,172,942
1,190,642
1,190,642
1,190,642
731780
Software Support Maintenance
14,702
16,480
16,480
16,480
16,480
18,140
18,140
18,140
731836
Sponsorship
3,275
8,700
8,700
8,700
8,700
8,700
8,700
8,700
731878
Sublet Repairs
0
600
600
600
600
0
0
0
731941
Training
32,059
45,925
45,925
45,925
45,925
46,785
46,785
46,785
732018
Travel and Conference
18,795
50,500
50,500
50,500
50,500
53,500
53,500
53,500
732020
Travel Employee Taxable Meals
807
600
600
600
600
500
500
500
732039
Twp and City Treas Bonds
2,337
2,500
2,500
2,500
2,500
2,500
2,500
2,500
732046
Uncollectable Accts Receivable
55,360
0
0
0
0
0
0
0
732102
Water and Sewage Charges
235,709
274,250
274,250
274,250
274,250
264,500
264,500
264,500
732165
Workshops and Meeting
134
1,750
1,750
1,750
1,750
2,600
2,600
2,600
796500
Budgeted Equity Adjustments
0
0
4,340,030
0
0
1,892,024
3,235,158
3,717,308
5,740,016
7,229,772
11,721,614
7,229,272
7,229,272
10,565,550
11,853,580
12,335,730
Commodities
750063
Custodial Supplies
48,550
79,550
79,550
79,550
79,550
78,300
78,300
78,300
750140
Employee Footwear
2,441
7,140
7,140
7,140
7,140
7,800
7,800
7,800
750154
Expendable Equipment
65,612
134,400
134,400
134,400
134,400
579,300
129,300
129,300
750287
Maintenance Supplies
3,024
3,300
3,300
3,300
3,300
3,550
3,550
3,550
750385
Merchandise
200,677
487,600
487,600
487,600
487,600
442,600
442,600
442,600
750392
Metered Postage
4,290
8,000
8,000
8,000
8,000
6,500
6,500
6,500
750399
Office Supplies
60,506
47,400
47,400
47,400
47,400
51,600
51,600
51,600
750448
Postage -Standard Mailing
180
0
0
0
0
0
0
0
750476
Recreation Supplies
54,040
113,800
113,800
113,800
113,800
121,900
121,900
121,900
750504
Small Tools
79,813
119,975
119,975
119,975
119,975
122,665
122,665
122,665
750511
Special Event Supplies
59,902
143,400
143,400
143,400
143,400
177,100
177,100
177,100
750581
Uniforms
30,875
68,850
68,850
68,850
68,850
69,450
69,450
69,450
609,910
1,213,415
1,213,415
1,213,415
1,213,415
1,660,765
1,210,765
1,210,765
Depreciation
761042
Depreciation Park Improvements
1,917,727
1,746,537
1,954,437
1,746,537
1,746,537
1,936,187
1,936,187
1,936,187
761084
Depreciation Buildings
896,913
841,250
901,150
841,250
841,250
899,750
899,750
899,750
761121
Depreciation Equipment
403,213
248,610
415,610
248,610
248,610
373,910
373,910
373,910
761156
Depreciation Vehicles
17,948
38,400
18,100
38,400
38,400
9,700
9,700
9,700
3,235,801
2,874,797
3,289,297
2,874,797
2,874,797
3,219,547
3,219,547
3,219,547
57
Fund: 150800 - Parks and Recreation
Account Number/Description
Interaovernmental
762011 Transfer to Municipalities
Operating Expenses
Internal Support
Internal Services
770631 Bldg Space Cost Allocation
771639 Drain Equipment
773630 Info Tech Development
774636 Info Tech Operations
774637 Info Tech Managed Print Svcs
774677 Insurance Fund
775754 Maintenance Department Charges
776659 Motor Pool Fuel Charges
776661 Motor Pool
778675 Telephone Communications
Internal Support
Transfers/Other Sources (Uses).
Transfers Out
788001 Transfers Out
Transfers/Other Sources (Uses)
Grand Total Expenditures
OAKLAND COUNTY, MICHIGAN
I
FY2022 AND FY2023 AND FY2024 County Executive Budget Recommendation
F Y 2021
FY
Amended
I
Amended
I
Amended
CounI
I
I
Actualtual
Budget
Plan
Recommended
Recommended
Recommended
0
276,320
797,570
213,080
0
1,413,080
1,200,000
1,200,000
0
276,320
797,570
213,080
0
1,413,080
1,200,000
1,200,000
9,585,727
11,594,304
17,021,896
11,530,564
11,317,484
16,858,942
17,483,892
17,966,042
26,034
0
0
0
0
0
0
0
8,240
27,000
27,000
27,000
27,000
41,000
41,000
41,000
27,720
25,000
25,000
25,000
25,000
25,000
25,000
25,000
628,396
573,327
573,327
573,327
573,327
622,907
622,907
622,907
21,383
28,950
28,950
28,950
28,950
27,450
27,450
27,450
308,168
252,050
252,050
252,050
252,050
291,000
291,000
291,000
56,338
78,500
78,500
78,500
78,500
69,000
69,000
69,000
41,919
89,820
89,820
89,820
89,820
91,820
91,820
91,820
356,295
410,754
410,754
410,754
410,754
429,423
429,423
429,423
131,618
130,820
130,820
130,820
130,820
142,170
142,170
142,170
1,606,111
1,616,221
1,616,221
1,616,221
1,616,221
1,739,770
1,739,770
1,739,770
1,606,111
1,616,221
1,616,221
1,616,221
1,616,221
1,739,770
1,739,770
1,739,770
104,577
30,000
30,000
0
0
35,000
0
0
104,577
30,000
30,000
0
0
35,000
0
0
104,577
30,000
30,000
0
0
35,000
0
0
23,151,350
28,082,762
34,322,117
28,079,344
27,866,264
34,197,675
35,076,875
35,853,575
9.1
SEPTEMBER 1, 2021 AGENDA ITEM NO. 13 B
FACILITIES MAINTENANCE & DEVELOPMENT
To: Chairman McGillivray and Commission Members
From: Susan Wells, Interim Executive Officer
Michael J. Donnellon, Jr., Chief of Park Facilities Maintenance & Development
Donna Folland, Senior Planner
Subject: Proposed FY2022-FY2026 Asset Management Plans (Final Approval)
• Capital Improvement Program Plan (CIP) Net Position
• Maintenance Management Plan (MMP) Operating Budget
• Natural Resource Management Plan (NR), Operating Budget
PROJECT CATEGORIES
Agenda Type: Consent Agenda Regular Agenda ✓ Reports
Approval Type: Conceptual Approval Construction Approval General Approval ✓
Project Type: Capital Improvement ✓ Maintenance ✓ Receive & File
SUMMARY
1. Proposed FY2022-FY2026 Asset Management Plans:
a. This proposed Asset Management Plan has been developed by staff and Commission for capital
improvement, facility maintenance and natural resource management of over 230 Oakland County
Parks and Recreation Commission (OCPRC) assets, buildings, natural areas, and recreational
features within 14 park locations, beginning the FY2022 budgetary review process. See Attachment
A for the preliminary program/project lists and a preliminary 5-year forecast.
i. Beginning in FY2022, the NR program will be separated from the MMP.
This proposed plan and forecast are guided by the following Strategic Action Plan goal to manage
assets and infrastructure: Sustainably reinvest in existing assets and infrastructure, make new
investments when supported by fiscal resources, recreational trends, public engagement, and
usage data'.
i. The list represents a 100% reinvestment in existing assets and facilities
ii. Park system assets have an estimated total replacement value of $119,814,3301.
Calculated reinvestment rate in FY2022 is 4.97%.3
c. Past budget constraints have resulted in deferral of reinvestment in existing assets.
i. A minimum of $26,325,228 in deferred asset management reinvestments have been identified.
ii. Condition assessments of existing assets and facilities to quantify needed reinvestment is a
continuing process.
' The Strategic Action Plan was approved by OCPRC on 1/10/2018 and adopted by OC Board of Commissioners on 1/2/2018 as part
of the Parks and Recreation Master Plan 2018-2022.
2 Oakland County Parks' Annual Dashboard and Data Book for Fiscal Year 2020, page 25.
3 According to both the "National Research Council — Building Research Committee", and the "Association of Physical Plant
Administrators (APPA), Capital Renewal and Deferred Maintenance Programs Report, 2009, Harvey Kaiser", an estimated 2% - 4%
reinvestment (capital renewal) of the current replacement value of facilities is recommended.
59
iii. With the passage of the 2020 millage, the preliminary FY2022 program/project lists begin to
address this deferred reinvestment.
d. The proposed FY2022 Asset Management Plan budget recommended amounts include:
i. Capital Improvement Program subtotal $ 4,406,000
ii. Maintenance Management Plan subtotal $ 684,800
iii. Natural Resource Management Plan Subtotal $ 866,000
iv. TOTAL $ 5,956,800
ATTACHMENTS
Attachment A — Proposed FY2022-FY2026 Asset Management Plans
STAFF RECOMMENDATION
Staff recommend approval for the FY2022 Proposed Asset Management Plans, in the total amount of
$5,956,800, to be submitted to the Oakland County Board of Commissioners budget review and approval
process, as follows:
i. Capital Improvement Program subtotal $ 4,406,000
ii. Maintenance Management Plan subtotal $ 684,800
iii. Natural Resource Management Plan Subtotal $ 866,000
iv. TOTAL $ 5,956,800
MOTION
Move to approve the FY2022 Proposed Asset Management Plans, in the total amount of $5,956,800, to
be submitted to the Oakland County Board of Commissioners budget review and approval process, as
follows:
i. Capital Improvement Program subtotal $ 4,406,000
ii. Maintenance Management Plan subtotal $ 684,800
iii. Natural Resource Management Plan subtotal $ 866,000
iv. TOTAL $ 5,956,800
r0l,
�iAKLAND
COUNTY PARKS
FY2022- FY2026 Asset Management Plans
Capital Improvement Program (CIP)
Maintenance Management Plan (MMP)
Natural Resources Management Plan (NR)
Contents
I.Introduction.......................................................................................................................................3
Parks Commission Memo June 2, 2021.....................................................................................................................4
II.General Information..........................................................................................................................7
Asset Management Plans Development Timeline....................................................................................................7
Definitions.................................................................................................................................................................8
ProgramDescriptions..............................................................................................................................................14
PlanningReview......................................................................................................................................................18
Park Planning and Project Workflow.......................................................................................................................22
BudgetCenter Abbreviations..................................................................................................................................23
UnitDescriptions.....................................................................................................................................................24
III.Fiscal Information..........................................................................................................................25
Investmentin Assets...............................................................................................................................................25
Reinvestment in Existing Assets..............................................................................................................................25
Historical Reinvestment in Existing Assets..............................................................................................................26
ProjectPriorities......................................................................................................................................................27
IV.Capital Improvement Program........................................................................................................29
FY2022 Capital Improvement Program Project List................................................................................................30
FY2022-FY2026 Capital Improvement Program Forecast.......................................................................................33
V.Maintenance Management Plan.......................................................................................................41
FY2022 Maintenance Management Plan Project List.............................................................................................42
FY2022-FY2026 Maintenance Management Plan Forecast....................................................................................44
VI.Natural Resources Management Plan..............................................................................................49
FY2022 Natural Resources Management Project List.............................................................................................50
FY2022-FY2026 Natural Resources Management Forecast....................................................................................52
FY2022-FY2026 Natural Resources Management Outline......................................................................................54
VII.Project Scopes..............................................................................................................................61
FY2022-FY2026 Project Scopes...............................................................................................................................61
61
II. General Information
Asset Management Plans Development Timeline
The Asset Management Plans comprise proposed projects for the Capital Improvement Program (CIP),
Maintenance Management (MMP), and Natural Resources Management (NR) over five years.
Development of the Asset Management Plans is a collaborative process with involvement from both
Oakland County Parks and Recreation (OCPR) staff and the Oakland County Parks and Recreation
Commission (Parks Commission). The annual process follows a timeline that is coordinated with the
annual budget process.
Table 1: Asset Management Plans Development Timeline
Month(s)
Actions (Parks Commission actions in bold type)
August and
Conduct asset management meetings to review current project lists with each park
September
operational chief, supervisor; including any additional full-time (FTE) and part-time (PTNE)
staff as indicated
September and
Revise and review list of projects for the next fiscal year with the Administrative
October
Management Team (AMT), including consideration for grant application opportunities
November
Submit list of proposed projects to the Parks Commission for receive and file at the
December Commission Meeting
December
Parks Commission receives and files list of proposed projects
December—
Refine list of proposed projects with staff and Executive Committee
February
March
Special budgetary workshop for Parks Commission review
Finalize proposed project lists for the funded and forecasted years
April
Deadline to submit grant applications to the Michigan Department of Natural Resources
May
Submit proposed project lists for Parks Commission for conceptual approval in June
June
Parks Commission conceptual approval of proposed project lists
Finalize project list, 5-year forecast and scopes into the proposed Asset Management Plans
June —August
Begin to create project implementation schedules, assignments and plans for the proposed
funded projects.
June —
September
Oakland County Board of Commissioners' budget review and approval process
Submit conceptually approved and adjusted Asset Management Plans to the Parks
August
Commission for approval in September
Parks Commission approves the funding for Year 1 of the Asset Management Plans.
September
Parks Commission receives and files the forecast for Years 2-5 of the Asset Management
Plans.
RVA
Definitions
Americans with Disabilities Act (ADA)
The Americans with Disabilities Act of 1990 prohibits discrimination based on disability, defined as "a
physical or mental impairment that substantially limits a major life activity".
Assets
The Asset Management Plans are concerned specifically with land, buildings, and park improvements, as
well as capital equipment and vehicles.' These types of assets have economic value and are reported on
the balance sheet. They have been bought or are created to benefit the operation of the park system.
For descriptions of specific types of assets, see also Facility, Infrastructure; Natural Resources; Structure.
Asset Management and Investment
This refers to reinvestment and new investment in capital assets by the Oakland County Parks and
Recreation Commission, funded by either capital (net position) or operational investment. The priorities
for investment are guided by the Strategic Action Plan's strategic goal for managing assets and
infrastructure: "Sustainably reinvest in existing assets and infrastructure, make new investments when
supported by fiscal resources, recreational trends, public engagement, and usage data'."
We identify two types of investment — new investment and reinvestment; and further identify that the
reinvestment will either consist of projects that manage the asset on schedule or projects that resolve
asset management that has been deferred. See the detailed definitions below:
NEW — New Investment in Assets: As stated in the Strategic Action Plan, Oakland County Parks and
Recreation (OCPR) has prioritized sustainable reinvestment in existing facilities, investing in new assets
only when supported by fiscal resources, recreational trends, public engagement, and usage data.
Reinvestment in Assets: Reinvestment in existing assets is identified as a higher priority than new
investment. This reinvestment has two types: Regular and Deferred asset management:
o RM — Regular Asset Management projects: Regular management (RM) is conducted in a timely
manner, including routine inspections and servicing, replacement of components when they
reach end of their useful life, as well as other investments that increase the efficiency and
improve the performance of existing assets. Projects may be funded as Capital or Operational
investments.
DM — Projects to resolve Deferred Asset Management: Deferred management (DM) is the
postponement of asset upkeep due to lack of funds. This can result in minor repair needs
evolving into more serious conditions and backlog of deferred management. Projects to resolve
deferred management may be funded as Capital or Operational investments. See Deferred Asset
Management Assessment.
Capital Improvement Program (CIP)
A plan to manage capital investments over a 5-year period. The CIP is one component of the Asset
Management Plans. See Capital Investment.
Capital Investment
Capital investments are funded from unrestricted net position. Oakland County Fiscal Services defines a
capital investment as any investment over $5,000 that improves, replaces and/or extends the lifecycle of
all or a portion of a capital asset or that creates a new asset. Projects to be funded by capital investment
1 These assets are referred to by Oakland County Fiscal Services as "capital assets". Currently, the Asset Management Plans do
not include capital equipment and vehicles.
z Strategic Action Plan mission and goals from OCPR's 5-Year Parks and Recreation Plan, approved 2/1/2018.
63
are identified and forecast in the Capital Improvement Program. See Capital Improvement Program;
Operational Investment.
Construction
To implement, install or build infrastructure, facility, or structure, including any required Park
Commission approval of the scope of work.
Cooperative Invasive Species Management Area (CISMA)
The Oakland County Cooperative Invasive Species Management Area (OC CISMA) was founded in 2014
as a collaboration between city, village and township (CVT) representatives, local non -profits and
universities to address the growing threat of invasive species in Oakland County. Invasive species often
spread across jurisdiction boundaries and are most effectively managed with a collaborative approach.
CISMAs, such as the one in Oakland County, were formed across the state of Michigan with assistance
from the Michigan Department of Natural Resources (MDNR).
All communities in Oakland County are invited to participate in the OC CISMA and the OC CISMA has
grown to 45 partners that meet monthly to discuss invasive species related issues and plan community
treatments. With the OCPR millage passed in December 2020, funds are identified annually to invest
into continued staffing of the CISMA, outreach resources and county -wide community treatments and
restoration. In addition to millage funding, the Road Commission of Oakland County (RCOC) provides
annual funding for cooperative treatment of Phragmites australis across the entire county on RCOC
roads and the MDNR provides supplemental funding for staffing and treatments.
Deferred Asset Management (DM) Assessment
To support the goal of sustainable reinvestment in existing facilities, it is important to understand the
amount of deferred asset management in the park system and create a plan for resolving it. Staff has
launched an effort to assess deferred asset management.
Project -Based Assessment: This preliminary assessment is based on identified projects and includes
projects where assets have reached the end of their lifecycle or have other maintenance needs, but the
project to replace the asset or make repairs is postponed to a future year or has not been scheduled. For
this preliminary assessment, staff used the following criteria to identify deferred asset management:
Will NOT
doing the
project Yes: DM[doing
ll NOT
Is the project No NOW the Yes: DMscheduled and adversely roject
funded in the affect park Nocrease No:
current budget operations? tenance
Yes: s in the Not DMyear? ture?
Not DM
■ Asset -Based Assessment: The initial project -based assessment is followed with an internal evaluation of
the condition of assets and maintenance needs based on inspection reports and staff knowledge, which
will result in a more comprehensive snapshot of OCPR's deferred maintenance status. As needed, the
internal assessment will be supplemented with Facility Condition Assessments conducted by professional
consultants. See Facility Condition Assessment.
64
Design Process
A phased eight step process to complete plans for a defined scope of work, including any required scope
adjustments, budget reviews and commission approvals. May also be referred to as
"'Design/Engineering.'
■ Pre -design phase: may also be called the programming phase or site analysis phase; to collect, review,
analyze data and learn about the design intent for a scope of work, including surveying, environmental
assessments, identification of existing elements, federal/state/local laws, codes and or zoning
requirements.
■ Schematic design phase: to compile information from the pre -design phase and scope intent into a
schematic plan, including sketches, drawings, renderings, site/building plans and budgets to be reviewed
by staff and consultants.
■ Design development phase: may also be known as the conceptual design phase; a refinement of the
schematic design and budget by other design and construction professionals to create conceptual design
plans and budgets for Commission review and approval. This phase may require additional municipal
approvals depending on the scope of work.
■ Construction document phase; the creation of a series of construction plans, details and material
specifications for permitting, bidding and procurement by civil, architectural, mechanical, electrical and
other related design professionals, including park professional staff.
■ Permitting phase: Completion and submission of all required pre -construction and environmental
permits, as well as any other permitting required by the scope of work. This phase may require additional
municipal reviews and approvals, depending on the scope of work.
■ Bidding and Procurement phase: through Oakland County Purchasing, releasing the construction
documents for qualifications base bidding and contract negotiations, including vendor interviews,
reference checks and other research for the recommendation to approve by the Commission and enter
into a contract with a qualified vendor
■ Construction administration phase: review, inspect and approve construction progress, methods, shop -
drawings, pay applications and other items to ensure the vendor is executing the project according to the
contract and construction documents.
■ Post construction phase: constructive review of consultant and vendor performances, review and filing
of all recorded construction documentation, as-builts, building, site, and restoration, including any project
issues and/or concerns for future reference.
Facility
An asset (or group of assets) that is designed, built, or installed, that serves a specific function and
provides a convenience or service.
Facility Condition Assessment (FCA)
A facility condition assessment is a process that analyzes the physical condition of a facility and its assets
and equipment. The assessment takes several factors into account including building age, design, assets,
materials used, and more.
Improvement
A change or addition that enhances the function or increases the capacity of an existing infrastructure,
facility or structure. This reinvestment in existing assets may be funded as a capital or operational
investment. For specific types of improvements, see Remodelina or Renovation; Upgrade.
Infrastructure
Fundamental systems supporting a park facility or structure.
Maintenance Management Plan (MMP)
Maintenance is the continuous process of improving the availability, safety, reliability and longevity of
physical assets. The Maintenance Management Plan identifies operational investment for projects and
65
programs to maintain buildings and park improvements within Oakland County parks. See Maintenance
Management Plan for details. See also Operational Investment.
Management Plan
A budgetary process, which results in a document that forecasts projects and programs over a 5-year
period. Three types of management plans are identified. The Capital Improvement Program is funded as
a capital investment. The Maintenance Management Plan and Natural Resource Management Plan are
funded as operational investments. These three management plans are compiled into the Asset
Management Plans.
Natural Resources
Natural resources are the fundamental components of life including water, air, land, and plant and
animal life. Natural resources are utilized and valued by humans for a variety of purposes including
clean air and water, agriculture and food production, carbon sequestration, aesthetic value, cultural and
spiritual practices and for recreation. OCPR manages over 4,700 acres of undeveloped natural areas that
serve as regional hubs of biodiversity and are part of the larger green infrastructure network in Oakland
County. These resources contribute not only to the parks where they are found but also to the ecologic
and economic prosperity of the entire county. Oakland County Parks manages natural resources for
optimal ecosystem function and institutes environmentally sustainable practices throughout the park
system.
Natural Resources Management Plan (NR)
The Natural Resources Management Plan identifies funding for projects and programs that protect and
restore ecosystems within Oakland County parks. The priorities for investment in natural resources are
guided by the Strategic Action Plan's mission and strategic goal for managing natural resources: 3
Mission: The Oakland County Parks and Recreation Commission is dedicated to providing quality
recreation experiences that encourage healthy lifestyles, support economic prosperity, and
promote the protection of natural resources.
Goal — Protect Natural Resources: Increase land dedicated to protection of natural resources,
preserve existing high -quality ecosystems, and improve ecological communities that are
fragmented or degraded.
See Natural Resources Management Plan for details.
Operational Investment
Investment in projects or programs that are not typically defined as capital yet may result in large
expenditures within the annual operations budget. The Maintenance Management Plan and Natural
Resources Management Plan are funded with operational investment. See also Capital Investment.
Park Planning
Process for determining an overall 10-year vision for a park and concepts for facility development that
are informed by OCPR and public policy, staff knowledge, public input, recreational and demographic
trends, best practices, and OCPR budgetary conditions.
Planning Review
The planning review is a compilation of background information and an in-depth analysis of the
anticipated outcomes of a planned project.
3 Strategic Action Plan mission and goals from OCPR's 5-Year Parks and Recreation Plan, approved 2/1/2018.
Program
A budgetary plan of action to accomplish a specified end (such as resolving non-compliance with ADA) or
to manage reinvestment into a specific type of asset (such as repair of roofs, replacement of fencelines,
and management of freshwater resources) on a park system -wide basis. Programs are identified within
the Capital Improvement Program, Maintenance Management Plan and Natural Resources Management
Plan. See Program Descriptions.
Project Priority
Each project is assigned an initial priority category. The primary purpose of these categories is to
establish and communicate each project's importance for budgetary approval purposes. Additionally,
these priority categories assist management to assign Active Projects (see Proiect Status) and create
project schedules, which are regularly reported to the Commission. The priority levels are as follows:
■ Priority #1— Health and Safety:
o Completion of a project is important to protect patrons and staff from physical injury or harm.
o Completion of a project is important to protect patrons and staff against the transmission of
biological disease.
■ Priority #2 — Regulatory:
o Completion of a project is needed for compliance with local, state or federal laws, ordinances
and regulations.
o Completion of a project is needed for compliance with public or private sponsorship, or other
funding arrangements.
■ Priority #3 — Customer Service — Efficiency and Operational Savings:
o Completion of project may decrease annual operational costs for facilities or budget centers.
■ Priority #4 — Customer Service — Revenue Generation:
o Completion of project may enhance annual revenue to a facility or budget center from patron
pay per use fees.
■ Priority #5 — Customer Service — Facility Enhancement:
o Completion of a project may clearly increase customer satisfaction or significantly enhance the
experience of patrons.
o Completion of a project may enhance the natural, aesthetic, structural quality or the useful life of
a facility.
Project Status
Projects will be described relative to funding and scheduling, including:
Active Proiects are new and/or previously forecasted projects that will become ACTIVE and managed
according to the Commission Approval Workflow once approved in the proposed funded fiscal year.
Active management of these projects typically will begin October 1st of the proposed fiscal year.
Pendins Proiects are new and/or previously forecasted projects that are PENDING approval of funding
sources from grants, partnerships, sponsorships, etc. within the proposed funded fiscal year or future
unfunded fiscal years. Commission approval is required for a pending project to become active.
Unscheduled Proiects are new and/or previously forecasted projects that are being considered for
funding but are not scheduled or have not been prioritized within the current forecast window.
Remodeling or Renovation
Improvement of an existing infrastructure, facility or structure that also enhances and renews the
aesthetics.
67
Replacement
Replacement of an existing infrastructure, facility or structure with a new infrastructure, facility or
structure that has the same function and similar characteristics.
Scope
Description of a project that identifies the type of infrastructure, facility or structure planned, its
location and overall purpose, materials and dimensions.
Structure
An asset that is built or constructed, as a building, bridge, or dam.
Upgrade
Improvement of infrastructure, facility, or structure that brings it up to more current standards,
materials and/or technology.
.:
Program Descriptions
Park assets are managed through inventory, evaluation, routine maintenance, inspections by staff and
qualified professionals, repairs and/or replacement of specific assets. This systematic asset management
always results in greater knowledge about the status and condition of our assets and may also result in
the implementation of system -wide programs to manage specific asset types or the scheduling of
projects to repair or replace an individual asset. These actions are a direct implementation of the
strategic goal identified in OCPR's Parks and Recreation Master Plan 2018-2022 to sustainably reinvest
in existing assets and infrastructure. The table below identifies the various system -wide asset programs
that are in place and if Capital Improvement Program (CIP), Maintenance Management Plan (MMP) or
Natural Resource Management Plan (NR) projects or programs are included in these Asset Management
Plans. Management responsibility is designated for each program and, in several cases, indicates
multiple staff units. Where the primary responsibility falls will depend on the scope of work for
individual projects.
Table 2: List of programs
Focus
Area
Program Description
C M
Management I M
Responsibility P P NR
OCPR is required to comply with the Americans with Disabilities Act (ADA).
Transition plans for each park identify actions to update facilities to meet
o
ADA standards. Actions include continued management of ADA Transition
Accessibility ✓ ✓
Q v
Plans, replacement of existing building and grounds fixtures with ADA-
Work Group
Qcompliant
fixtures and improvement of routes between parking areas and
park amenities and facilities to be accessible to persons of all abilities.
u
The updated National Electric Code (NEC) requires evaluation and Arc Flash
ra M
_Q
Hazard and Safety Equipment labeling of all existing electrical panels. This 5
Facilities
U
year engineering analysis program is based on the updated NEC to evaluate
✓
Maintenance
oc o
and Arc Flash Hazard and Safety Equipment label all existing electrical
Q u
panels located throughout the park system.
'o
When replacement or renovation is not feasible, park assets that are at the
Property
p Y
E
end of their useful life may need to be removed and the asset site restored.
Acquisition and
Actions include legal and compliance review, asset removal, and site
✓
Management
v
restoration in accordance with Oakland County Board of Commissioners
Work Group
Q(BOC)
policy and all applicable federal, state and local regulations.
Analysis of more than 700 various heating, ventilation and air conditioning
U0_ Q)
systems such as furnaces, boilers, hot water heaters and water softeners
Preventative
was conducted in 2015. Using this information, staff has prioritized and
Maintenance ✓ ✓
_Q
m
forecast individual replacement projects and continues to periodically
Unit
LU
inspect, service, repair and update the building equipment inventory.
Analysis of more than 230 building roofs was conducted in 2015. Using this
oinformation, staff has prioritized and forecast individual replacement Project
° projects and continues to periodically inspect, service, repair and update
Management ✓ ✓
m� p l p Y� p p
the building roof inventory. Group
We
Focus
Area
Program Description
C
Management I
Responsibility P
Inspections of structures such as bridges, docks, dams, and towers are
conducted by a qualified engineer to monitor structural integrity and
v identify potential maintenance and safety issues. Inspections commence 15-
'� 25 years after construction and are repeated every 5 years. More frequent Project
Management
ins inspections, re air and orre lacement will be scheduled based on results
c-n Group
U
c of the inspection report. Inspections of infrastructure such as water systems
and septic fields are conducted by a qualified professional in accordance
with the requirements of the relevant regulatory agency.
M
M
P
Analysis or more than 320,000 lineal feet (60 miles) of various perimeter
v and interior fencing types has resulted in prioritization and forecast of
individual replacement projects, as well as a maintenance program to Project
v Management ✓ ✓
vreplace fenceline components including posts, fabric and wires. Staff Group
,L continues to periodically inspect, service, repair and update the fenceline
inventory.
Forest resources are being degraded by diseases, age, forest pests and
natural disturbances. Protection of high -quality native trees, maintenance
i of hazardous trees and planting of new trees is needed to preserve natural Natural
vcommunities, ensure the safety of park patrons, protect built infrastructure Resources
and beautify the park system. Actions include maintenance and operational Management
support for removal of hazardous trees, oak wilt (and other tree disease)
management, and tree plantings.
Freshwater resources (lakes, rivers, streams) and the animals that inhabit
.�
them are being degraded by poor water quality and aquatic invasive
Ospecies.
Protection of high -quality freshwater resources is necessary for
Natural
C_ M
native plants and animals, regional water quality and preservation of park
Resources
v W
recreational opportunities such as fishing and kayaking. Actions include
Management
v,
maintenance and operational support for contractual control of high priority
aquatic invasive species and water quality monitoring.
v
Inventory and analysis of potentially historically significant assets is
" " E
underway for the purpose of building an information base and management
Planning and
o w
recommendations in advance of the need to make decisions about specific
Resource
cf c
assets and that are focused on enhancing the park experience.
Development
Habitat improvements are needed to restore biodiversity and native species
v populations to degraded natural areas and to protect intact high -quality
v natural communities. Restoration will also encourage recreational Natural
C-
ru
Resuces
J M opportunities such as hiking and biking. Actions include restoration of Manao erment
M natural plant communities through prescribed burning, seeding and g
> mowing.
_0 Staff annually inspects and reviews all facilities to identify, prioritize and
u
budget individual projects within the various budget center's Building Facilities
W
.
Maintenance Line Item, including the interior/exterior of all building and Maintenance ✓
'�
o
park components, including signs and playgrounds, based on standard and Park
U
facility or park colors and all surfaces requiring painting, staining or other Operations
a
coatings.
NR
✓ ✓
✓ ✓
70
C M
Focus
Program Description
Management
I M
Area
Responsibility
P P NR
Pavement analysis of over one million square yards of various paving
Facilities
materials including asphalt, concrete and paver units, focusing on vehicle
Maintenance;
v
circulation and parking to various park facilities was conducted in 2015.
Project
E
Using this information, staff has prioritized and forecast individual
Management
✓ ✓
replacement projects and continues to periodically inspect, service, repair
Group;
and update the pavement inventory. Repairs are prioritized by safety issues,
Park
condition and age.
Operations
LA
Playgrounds are inspected monthly by staff who are certified playground
Facilities
I
inspectors. Playground inspections result in routine repairs and
Maintenance
maintenance and forecast of playground replacement based on the
and Project
✓ ✓
>_
condition and age of the asset.
Management
a
Group
Ln
°Q'
Park system -wide program to contract with various professional disciplines
v
that are not within the professional capabilities or resource availability of
N
staff. Contractors will assist with the completion of small operations
Project
C
projects and with scope and budget development of larger projects.
Management
✓
'°
Professional disciplines include but are not limited to mechanical, electrical,
Group
Ln
civil, architectural and estimating. Funding will be managed by staff through
o
L
annual contracts.
Park system has more than 2,500 vehicle and pedestrian wayfinding and
v operational signs. Much of the signage is inconsistent or outdated and does
ru not meet current sign and branding standards. The goal of the program is to Wayfinding ✓ ✓
increase clarity, eliminate sign pollution, and comply with OCPR brand Work Group
standards. Actions include evaluation, removal and replacement as
indicated.
Stormwater infrastructure within the parks is aging rapidly and annual
v
proactive maintenance is necessary to ensure functioning stormwater
�C
management systems. Actions are intended to ensure compliance with the Natural
Ln c
Department of Environment, Great Lakes & Energy (EGLE) Storm Water ✓ ✓ ✓
Resources
E
Pollution Prevention Initiative, including inspection and maintenance of
Management
o
stormwater systems and associated maintenance and may include
`n
identification of projects to improve and/or replace stormwater
management systems.
Park system -wide program to focus on enhancement of existing trails. The
°J program includes ongoing surveys of existing trail conditions and
v development of a phased strategic maintenance plan. Plans to upgrade Trails Work ✓
r- high -priority trails within the park system include regrading, re -alignment Group
and other trail surface improvements.
w
71
Focus
Program Description
Management
Area
Responsibility
Native wildlife resources (birds, mammals, fish, reptiles, amphibians,
c
v
invertebrates) are being negatively impacted resulting in the need for
E
surveying and proactive management to ensure healthy, diverse
Upopulations
that encourage recreational opportunities such as hiking and
Natural
C
bird watching. Additional management is necessary for nuisance wildlife
ru
2
that create negative interactions with park patrons and wildlife with high
Resources
0)
population levels (deer, beaver) that impact natural resources. Actions
Management
include management of unsustainable populations of native wildlife (deer,
geese, beaver), populations of non-native wildlife (mute swans) and
surveying and habitat restoration of native wildlife populations.
co
Staff annually inspects and reviews all windows and doors to identify,
Facilities
L
prioritize and budget individual replacement projects within the various cost
0 °o
center's Building Maintenance Line Item, including interior and exterior
g g
Maintenance
and Park
window and doors. Door types include decorative doors, utility doors,
overhead doors and hardware replacement.
Operations
C M
I M
P P NIR
✓ ✓
72
Planning Review
The Planning Review is an overview of potential outcomes for projects that are proposed for funding by
the Oakland County Parks and Recreation Commission (Parks Commission). The potential outcomes are
related to existing plans, best practices, demographic and recreational trends, and other supporting
documentation and data. The intent of the Planning Review is to inform the proposed project in a way
that will improve outcomes and provide critical information to the Parks Commission regarding the
project's relevance to the goals and objectives of Oakland County Parks. This section is an overview of
the information provided by the Planning Review to support project development by staff and review by
the Parks Commission.
Project Identification
In this initial section we identify the asset (or assets) and the location by park and budget center. The
project is identified by name and reference by Project ID to the Asset Management Database. It also
tracks the dates for creation and update of the Planning Review and the names of staff responsible for
the Planning Review.
Staff Recommendation
The recommendation is the result of the research in the Planning Review and reflects staff's
recommendation for the project's next steps and whether to continue with the project.
Project Description
The project description documents the current conditions and the need for the project. The project
scope describes the actions that comprise the proposed project and a schedule is proposed for those
actions. A photo of the location is provided in this section. Funding considerations are discussed, i.e.
grant opportunities.
For more expensive or complex projects, it may be necessary to consider alternatives and the
consequences of each alternative. With more routine projects, such as replacement of a fenceline, roof,
or building equipment, there is no need to consider alternatives. In many cases, a simple list of
alternatives and budget implications can be provided. Alternatives may be a simple yes/no, i.e. doing
the project or not doing the project, or may compare multiple design options. In cases where options
have more complex implications for public perception, revenue generation, impact on operations, etc., a
detailed study of alternatives should be conducted and attached to the Planning Review.
Project Implementation Plans
This section explores actions that need to be planned in association with the proposed project and other
considerations and impacts.
Park Operations and Facilities Maintenance
The park operations staff has an opportunity to review and comment on the project and provide their
recommendations regarding the following questions. What impacts are expected on attendance,
revenue, and cost recovery? Will there be an impact on the annual operations budget, and will
additional staffing be required? What will be the effect on long-term maintenance of the asset or
facility?
Natural Resources Management (NR)
Natural Resources Management staff provides comment on potential natural resources impacts and
recommendations to avoid negative impacts. NR recommendations may impact the scheduling of a
73
project in order to avoid spreading invasive species or tree diseases (such as oak wilt) or harming wildlife
in a vulnerable stage of lifecycle. NR will provide recommendations for equipment staging, site
restoration and long-term maintenance.
Access and Inclusion
This section will reference any requirements for accessibility updates that have been identified in the
Americans with Disabilities Act (ADA) Transition Plan and provide recommendations for actions to
comply with ADA and meet best practices for Universal Access and inclusion.
Public Engagement
Most projects, such as repairs and replacements, do not change the function or capacity of a facility and
entail actions that do not require public engagement. Larger and more complex projects will require
public engagement to ensure the investment of public funds is aligned with public recreational need.
The Planning Unit will prepare a Public Engagement Plan (PEP) that will be summarized in this section.
Examples of public engagement include online and on -site surveys, design charettes, and public
meetings.
Communications and Marketing
Projects may require communication with the public and facility users, especially if the project will cause
temporary closure of a park or facility or to let the public know about changes in the function or capacity
of a facility. Communications and Marketing Unit actions will coordinate with the Public Engagement
Plan. Examples of Communication and Marketing actions include social media, signage, press releases,
and events celebrating the opening of a facility.
Recreation Programming
Changes to assets and facilities may affect the delivery of recreational programs. Project design needs to
consider the design of any associated programming. Input from Recreational Programs and Services Unit
is needed to ensure that projects enhance the ability to provide programs or at least do not negatively
impact programming. Coordination of project schedules with programming schedules is especially
important.
Compliance and Permitting Reviews
Environmental Regulations
This section is completed by Natural Resources Management staff and includes a checklist of
environmental regulations and permits that may apply to the project and recommendations for
compliance. The checklist, at a minimum, includes US Fish and Wildlife Service (USFWS) Eastern
Massasauga Rattlesnake implementation Plan (EMRIP), Michigan Department of Environment, Great
Lakes and Energy (EGLE) wetland regulations, Road Commission of Oakland County (RCOC) right of way
permitting, and the Oakland County Water Resources Commission (WRC) soil erosion and sedimentation
control (SESC) permitting.
Building Regulations
Project Management Unit staff provides a list of codes and regulations that apply to the project and
recommendations for compliance.
Grant Compliance
Planning Unit staff review the project and determine if there are any grant agreements related to the
asset or facility, such as Michigan Natural Features Trust Fund (MNRTF) or Land and Water Conservation
74
Fund (LWCF) grants. If there are associated agreements, Planning Unit staff will determine if the project
complies with the grant agreement (i.e. the project does not impact the recreational purpose of the
grant -funded land or facility) or if further review is required. Planning staff will consult with granting
agencies as required and update this section as needed.
Other Property Restrictions
In addition to grant agreements, Planning Unit staff will review the project to determine if there are any
other known property restrictions or encumbrances in place that relate to the asset. Examples include
utility easements, conservation easements, and deed restrictions. Planning Unit or Project Management
Unit staff will follow up with easement holders as required and update this section as needed.
Standards and Practices
The Asset Management Plans align with the following national standards (CAPRA, 2014):
■ CAPRA 7.5.2: PREVENTATIVE MAINTENANCE PLAN
There shall be a comprehensive preventative maintenance plan to provide periodic, scheduled
inspections, assessment and repair, and replacement of infrastructure, systems and assets. This includes
certifying, checking or testing for optimum operation based on applicable industry standards, local
guidelines, city requirements and/or manufacturer's recommendation for maintenance and replacement
of parks, with the intent to ensure that park assets are maintained for optimum use and safety and have
the ability to reach or extend its full life cycle and expected return on investment.
■ CAPRA 7.11: CAPITAL ASSET DEPRECIATION AND REPLACEMENT SCHEDULE
The agency shall have an established depreciation and replacement schedule for all park and recreation
capital assets including buildings, facilities, and equipment that have predictable life cycles. Schedules
should identify the useful life of each element and the associated costs of replacement. Capital asset
depreciation and replacement schedules, including projected costs of replacement, should be reflected in
the agency's financial plan.
Other standards may apply to individual projects and will be documented in this section as appropriate.
Planning Background
5-Year Park Statistics
The 5-year history of park or budget center operation is provided to show trends in attendance, revenue
and expense, and capital investment.
Planning History
The Oakland County Parks and Recreation Master Plan 2018-2022 ("Rec Plan") identifies overarching
strategic goals that provide a framework for the design and implementation of the Asset Management
Plans (OCPRC, 2/1/2018, p. 9.3).
■ GOAL: MANAGE ASSETS AND INFRASTRUCTURE
Sustainably reinvest in existing assets and infrastructure, make new investments when supported by fiscal
resources, recreational trends, public engagement, and usage data
■ GOAL: BE FISCALLY SUSTAINABLE
Operate in a manner that ensures out long-term ability to provide high -quality parks, recreation facilities and
programs to the residents of Oakland County
■ GOAL: PROTECT NATURAL RESOURCES
Increase land dedicated to protection of natural resources, preserve existing high -quality ecosystems, and
improve ecological communities that are fragmented or degraded
The following objectives from the Strategic Action Plan within the Rec Plan provide further guidance on
development of the Asset Management Plans (OCPRC, 2/1/2018, pp. 9.4-5).
75
■ OBJECTIVE 2: ACCESSIBILITY AND INCLUSION
Implement best practices to provide recreational facilities and programs that comply with accessibility
regulations and guidelines and, to the extent possible, are usable by people of all abilities
■ OBJECTIVE 3: ASSET AND INFRASTRUCTURE MANAGEMENT
Design, construct, and maintain park system assets and infrastructure to enhance function and aesthetics of
assets with the efficient use of resources
■ OBJECTIVE 4: BUDGET AND FINANCE
Mange finances to ensure the long-term provision of quality recreational services
■ OBJECTIVE 8: NATURAL RESOURCE MANAGEMENT
Proactively manage the ecological integrity of Oakland County Parks' natural resources in perpetuity
■ OBJECTIVES 11: PARKS AND FACILITIES — NEW INVESTMENTS IN ASSETS AND INFRASTRUCTURE
OBJECTIVE 12: PARKS AND FACILITIES— REINVESTMENT IN ASSETS AND INFRASTRUCTURE
Operate, maintain and improve parks to increase attendance and improve their sustainability within the park
system
■ OBJECTIVE 13: PLANNING
Support the development and management of sustainable facilities and programs with relevant data and best
practices
■ OBJECTIVE 17: TRAIL MANAGEMENT AND DEVELOPMENT
Develop and maintain park trails that serve a variety of trail users and connect regionally
Historical Significance
OCPR maintains a list of assets that are older than 50 years. For these assets and if significant changes
are proposed, the Planning Unit will complete and attach an Asset Future Determination (AFD) report,
which includes an evaluation of the asset's historical significance per National Park Service standards. If
the asset is determined to be historically significant, recommendations will be provided.
Public Engagement History
The 2017 Oakland County Community Needs Assessment Survey asked residents their level of support
for having Oakland County Parks and Recreation use tax dollars for various improvements (Q17) (ETC,
September 2017). The top three choices were:
1. Fix up & repair older structures & playgrounds (76% supportive)
2. Fix up & repair roads & parking lots (75% supportive)
3. Make facilities more accessible for everyone (68% supportive)
For individual projects, the history of park or facility -specific will be provided.
Other Service Providers
When a project adds new recreational services, it is important to determine that the need for this
service is not already being met by other providers, public or private. The Planning Unit will provide a list
or table of service providers within Oakland County or within an appropriate drive -time radius and a
map as needed.
References
CAPRA. (2014). Commission for Accreditation of Park and Recreation Agencies National Accreditation
Standards. Washington DC: National Recreation and Parks Association.
ETC. (September 2017). Oakland County Parks and Recreation Community Needs Assessment Survey.
Waterford MI: Oakland County Parks and Recreation Commission.
OCPRC. (2/1/2018). Oakland County 5-Year Parks and Recreation Master Plan 2018-2022. Waterford MI:
Oakland County Parks and Recreation Commission.
76
Park Planning and Project Workflow
Table 3: Project planning and implementation workflow
WORKFLOW
PHASE TASKS
0
m
z
CW
C
a
O
W
W
a
W
v
m
D
O
Ln
W
W
oif
c7
z
z
z
g
a
(D
z
UJ
W
c7
0
m
Compile Information:
I. Pre-
Natural resources,
Planning
recreational services, market
data, trends, history
Analyze: Park -user
II. Inventory
characteristics, perceptions
and Analysis
and needs, community need,
accessibility of park facilities
PUBLIC
ENGAGEMENT PRODUCTS
Review of Baseline Park Analysis
existing and
on -going public planning Map Set
engagement
Targeted public
Public Engagement
engagement as
Reports
indicated;
stakeholder
ADA Accessibility
communication
Transition Plan
COMMISSION
RESOLUTIONS
Draft: Park vision, objectives,
III. Concept
performance metrics, facility
Park Vision and
Development
Facility Concepts
concepts
Conduct: Additional research,
IV. Concept review by staff, Commission
Refinement and stakeholders, revise and
update documents
Forecast: Capital budgets
based on unit costs and past
V. Forecasting projects and operational
budget impacts
Conduct: Design process for
VI. Project
pre -design, schematic and
Conceptual
design development phases,
Design
including the planning review
report for Workflow phases I
- IV
VII. Project
Conduct; Design Process for
Construction
Construction documents,
Documents
permitting bidding and
procurement phases.
Final Park Plan
(Baseline, Map Set
and Vision/Concepts)
Asset Management
Plans
Receive and file park
plans; Approve
incorporation into 5-
Year Parks and
Recreation Master
Plan
Approve total budget
amount and selection
of design and
construction projects
within funded fiscal
vear
Targeted Refined Project Scope
facility -specific & Budget Approval of
public conceptual design
engagement as planning Review program and budget
indicated
Final Project Scope &
Budget
Approval to proceed
with construction
implementation as
outlined in
Commission Memo
Vill. Project
Implement: Construction
Final Project Report
Construction
administration phase
Post -Construction
Evaluation
Evaluate: Performance
Annual updates to
IX. Evaluation
metrics identified in park
Park Plan
77
Budget Center Abbreviations
A budget center is defined as a segment of a business for which revenues and expenses are separately
calculated. Within Oakland County Parks, each budget center is a distinctly identifiable division of the
agency whose managers are responsible for all its associated revenues and expenses and for ensuring
adherence to its budgets.
Table 4: Budget Center List
Abbrev.
Dept. / Budget Center Description
Chief / Other
ACC
Addison Oaks Conference Center
Tom Hughes
ADD
Addison Oaks Park
Tom Hughes
ADM
Administrative Services
Dan Stencil/Sue Wells
AUD
Auditing
Pam Weipert
CAT
Catalpa Oaks Park
Tom Hughes
FM
Facilities Maintenance & Development
Mike Donnellon
FSA
Fiscal Services —Administration
Gaia Piir
FSP
Fiscal Services — Parks & Rec
Holly Conforti
GLC
Glen Oaks Conference Center
Tom Hughes
GLG
Glen Oaks Golf Course
Tom Hughes
GRC
Groveland Oaks Concessions
Jim Dunleavy
GRV
Groveland Oaks Park
Jim Dunleavy
HGH
Highland Oaks Park
Jim Dunleavy
HRV
Holly Oaks ORV Park
Jim Dunleavy
IND
Independence Oaks Park
Jim Dunleavy
LYC
Lyon Oaks Conference Center
Tom Hughes
LYG
Lyon Oaks Golf Course
Tom Hughes
LYP
Lyon Oaks Park
Tom Hughes
LYR
Lyon Oaks Restaurant Svc
Tom Hughes
NR
Natural Resource/CISMA
Mike Donnellon
ORN
Orion Oaks Park
Jim Dunleavy
RDD
Red Oaks Dog Park
Tom Hughes
RDG
Red Oaks Golf Course
Tom Hughes
RDP
Red Oaks Park
Tom Hughes
REC
Recreation Programs & Services
Brandy Sotke-Boyd
RSE
Rose Oaks Park
Jim Dunleavy
RWC
Red Oaks Waterpark Concessions
Tom Hughes
RWP
Red Oaks Waterpark
Tom Hughes
SAC
Springfield Oaks Activity Center /Park
Jim Dunleavy
SPG
Springfield Oaks Golf Course
Jim Dunleavy
SPR
Springfield Oaks Restaurant
Jim Dunleavy
WBX
Waterford Oaks BMX
Jim Dunleavy
WCM
Oakland County Market
Jim Dunleavy
WLC
White Lake Oaks Conference Center
Tom Hughes
WLG
White Lake Oaks Golf Course
Tom Hughes
WLR
White Lake Oaks Restaurant Svc
Tom Hughes
WTR
Waterford Oaks Activity Center /Park
Jim Dunleavy
WWC
Waterford Waterpark Concessions
Jim Dunleavy
WWP
Waterford Oaks Waterpark
Jim Dunleavy
Additional account
numbers:
CIPxxxx
I CIP Projects (XXXX = CIP project number)
Mike Donnellon
78
Unit Descriptions
Table 5: List of Units
Unit ID
Unit Name
Unit Description
Unit Calculation
Surface Area of a facility or land mass
AC
Acre
regardless of depth or elevation
43,560 SF
Volume measurement of materials for a
CF
Cubic Foot
facility
Volume measurement of materials for a
CYD
Cubic Yard
facility
3'X3'X3' = 27 CF
EA
Each
Cost for Individual elements of a facility
Cost for individual elements of a facility, in
FLD
Field(s)
particular to recreational fields
Cost of individual elements of a facility, in
FTR
Feature(s)
particular to Waterparks
GAL
Gallon
Volume measurement in US Gallons
Cost for Individual elements of a facility, in
HOLE
Golf Hole(s)
particular to Golf Courses
Linear measurement of a facility regardless
LF
Linear Foot
of width
Overall cost of facilities, based on prior
LS
Lump Sum
projects or experience
Linear measurement of a facility regardless
M
Linear Mile
of width
5,280 LF
PCT
Percentage
Percentage of facility costs.
Surface Area of a facility or land mass
SF
Square Foot
regardless of depth or elevation
Vertical surface area of a facility or wall
SFF
Square Face Foot
(Length x Ave. Height)
LF X Avg. Height
Cost for individual elements of a facility, in
SITE
Site(s)
particular to Camp Grounds
Surface Area of a facility or land mass
SM
Square Mile
regardless of depth or elevation
640 AC
SPC
Space(s)
Cost for individual elements of a facility
Surface Area of a facility or land mass
SY
Square Yard
regardless of depth or elevation
3'x3' = 9 SF
Weight measurement of materials for a
TON
Tonnage
facility
2,000 LBS
Linear measurement of a facility regardless
YD
Linear Yard
of width
3 LF
All other units to determine initial project
Other
Other
budgets
79
III. Fiscal Information
Investment in Assets
Investment goals
The current year's project list is guided by the following Strategic Action Plan goal to manage assets and
infrastructure: Sustainably reinvest in existing assets and infrastructure, make new investments when
supported by fiscal resources, recreational trends, public engagement, and usage data 4. Two types of
investment in assets are identified — new investment and reinvestment; and further identify that the
reinvestment will either consist of projects that manage the asset on schedule or projects that resolve
asset management that has been deferred. See Definitions section for details on each project priority
level.
Reinvestment in Existing Assets
The current year's project list represents a 100% reinvestment in existing assets and facilities, with 18%
consisting of regular asset management projects and 82% consisting of projects to resolve deferred
asset management. The park system assets have an estimate total replacement value of $119,814,3305.
Calculated reinvestment rate in FY2022 is 4.97%.6
Figure A: FY2022 Asset Management Percentages — Investment in Existing Assets
0%
■ DM - Projects to resolve Deferred Asset
Management
■ RM - Regular Asset Management projects
■ New - New Investment in Assets
Table 6: FY2022 Asset Management Totals — Investment in Existing Assets
Capital
Improvement
Program
DM - Projects to resolve Deferred Asset Mgt 4,286,000
RM - Regular Asset Management projects 120,000
New - New Investment in Assets -
Totals 4,406,000
Natural
Maintenance
Resources
Management
Management
Plan
Plan
Totals
557,000
15,000
4,858,000
127,800
851,000
1,098,800
684,800
866,000
5,956,800
4 The Strategic Action Plan was approved by OCPRC on 1/10/2018 and adopted by OC Board of Commissioners on 1/2/2018 as
part of the Parks and Recreation Master Plan 2018-2022.
5 Oakland County Parks' Annual Dashboard and Data Book for Fiscal Year 2020.
6 According to both the "National Research Council — Building Research Committee", and the "Association of Physical Plant
Administrators (APPA), Capital Renewal and Deferred Maintenance Programs Report, 2009, Harvey Kaiser", an estimated 2%-
4% reinvestment (capital renewal) of the current replacement value of facilities is recommended.
Historical Reinvestment in Existing Assets
Figure B: Reinvestment history FY2013-FY2022
120%
96% 100% 100% 100% 100%
100% y� io
80% 72V- 69%
60 59% 57%
40%
20%
0%
2013 2014 2015 2016 2017 2018 2019 2020 2021 DRAFT
2022
0 2013 0 2014 0 2015 0 2016 0 2017 0 2018 0 2019 0 2020 0 2021 0 DRAFT 2022
Table 7: Reinvestment history FY2013-FY2022
Capital
7
Fiscal
Improvement Maintenance Natural Resources
% Investment in
% Reinvestment
Year Program Management Plan Management Plan
New Assets
in Existing Assets
2013 $6,138,785 $1,601,000
37%
73%
2014 $11,075,518 $1,283,400
41%
59%
2015 $6,674,335 $1,482,500
43%
57%
2016 $1,500,000 $515,000
10%
90%
2017 $1,500,000 $680,500
31%
69%
2018 $2,094,000 $1,166,500
4%
96%
2019 $2,623,500 $1,059,000
0%
100%
2020 $2,033,000 $1,054,450
0%
100%
2021 $1,722,750 $952,200
0%
100%
DRAFT
$4,406,000 $684,800 $866,000
0%
100%
2022
Budget Comments:
2013-2014: First year of 15-year forecast, uncompleted prior year CIP
Projects rolled into current year
2015: First year of 10-year forecast, uncompleted prior year CIP Projects
rolled into current
year
2016-2022: First year of 5-year forecast, no rollover of prior year CIP
Projects
2022: The Natural Resources Management Plan, formerly a part of the Maintenance Management Plan,
is a separate budget starting in 2022.
81
Project Priorities
Each project is assigned an initial priority category. The primary purpose of these categories is to
establish and communicate each project's importance for budgetary approval purposes. Additionally,
these priority categories assist management to assign projects and create project schedules, which are
regularly reported to the Commission. See Definitions section for details on each project priority level.
Figure C: FY2022 Project Priority Percentages — all projects'
1.02%— 9.13%
% ■ 1- Health & Safety
■ 2 -Regulatory
Figure D: FY2022 Project Priority Percentages for each budget
Capital Improvement
Program
1.02
9.76%
I 1.48%
FIAA
87.7
4%
■ 3 - Customer Service - Operational
Efficiency
■ 4 - Customer Service - Revenue Generation
■ 5 - Customer Service - Facility
Enhancement
Maintenance Management
Plan
2.341___
23.36%
57.68%
i
Table 8: FY2022 Project Priority Totals — all projects
Capital
Improvement
Program
1 - Health & Safety 430,000
2 - Regulatory 65,000
3 - Customer Service - Operational Efficiency 3,866,000
4 - Customer Service - Revenue Generation 45,000
5 - Customer Service - Facility Enhancement -
Totals 4,406,000
Natural Resources
Management Plan
0.00%
0.00% 1 0.58%
99.4
2%
Maintenance Natural
Management Resources
Plan
Mgt Plan
Totals
113,800
-
543,800
160,000
5,000
230,000
395,000
861,000
5,122,000
16,000
-
61,000
684,800
866,000
5,956,800
' No projects in FY2022 are identified at Priority Level 5 (Customer Service — Facility Enhancement)
RVA
IV. Capital Improvement Program
The Capital Improvement Program is a plan to manage capital investments over a 5-year
period. Capital investments are funded from unrestricted net position. Oakland County
Fiscal Services defines a capital investment as any investment over $5,000 that improves,
replaces and/or extends the lifecycle of all or a portion of a capital asset or that creates a
new asset. Projects to be funded by capital investment are identified and forecast in the
Capital Improvement Program.
83
FY2022 Capital Improvement Program Project List
The project list identifies projects or programs to be funded and implemented within the
identified fiscal year. The total budget for the fiscal year is approved by the Parks
Commission as part of the annual budget process. Individual projects are brought to the
Parks Commission as appropriate.
84
OUNTLAN
Yp"Ks FY2022 Capital Improvement Program Project List
Budget Project Project
Center ID Asset Name: Project Name Priority FY2022
Capital Projects
Park System Programs
ADM
123 Accessibility
Addison Oaks
ACC
3 Conference Center
ACC
5 Conference Center
ADD
281 Addison Playgrounds
ADD
1819 House 1480 W Romeo Road
ADD
17 Maintenance Building
ADD
1735 Site and Grounds
Glen Oaks
GLC, GLG
1616 Clubhouse
GLC, GLG
1809 Clubhouse
GLG
34 Golf Course Irrigation System
Groveland Oaks
GRV
153 Cabins
GRV
160 Firewood Shed
GRV
1034 Group Area 1 Pavilion
GRV
1035 Group Area 10 and 11 Pavilion
GRV
1036 Group Area 12 and 13 Pavilion
GRV
1037 Group Area 2 and 3 Pavilion
GRV
1038 Group Area 4 and 5 Pavilion
GRV
1039 Group Area 6 and 7 Pavilion
GRV
1040 Group Area 8 and 9 Pavilion
GRV
157 Park House 6000 Grange Hall
GRV
1224 Pines Playground
Holly Oaks
HRV
1936 Proposed New
HRV
1937 Proposed New
Independence
Oaks
IND
161 Boathouse
IND
163 Concession and Bathhouse
IND
53 Dock and Boardwalk
IND
1058 Lakepoint Pavilion
IND
56 Moraine Knoll Playground
IND
1980 Park Entrance Boulevard
IND
1979 Park Entrance Road
IND
1982 Park Road North
IND
1983 Park Road South
Red Oaks
ADA Transition Program
1
41406,000
50,000
Garden Room AC Replacement
3
12,000
Restroom Furnace Replacement
3
10,000
Improvements
1
80,000
Conversion to Park Offices
3
75,000
Water Softener Replacement
3
15,000
Group Area 3 & 4 Repurposing
4
45,000
Electrical Improvements
1
140,000
Roof Replacement Shingle
3
42,500
Upgrade Phase II
3
500,000
Decking Replacements
3
84,000
Replacement
3
15,000
Roof Replacement Shingle
3
5,000
Roof Replacement Shingle
3
6,000
Roof Replacement Shingle
3
6,000
Roof Replacement Shingle
3
6,000
Roof Replacement Shingle
3
6,000
Roof Replacement Shingle
3
6,000
Roof Replacement Shingle
3
6,000
Roof Replacement Shingle
3
17,000
Replacement
1
80,000
Parking Lot
3
200,000
Parking Lot Grant Reimbursement
3
-200,000
Roof Replacement Shingle
3
18,500
Site and Building Improvements
3
25,000
Replacements
3
200,000
Roof Replacement Shingle
3
6,000
Replacement
1
80,000
Paving
3
287,500
Paving
3
438,000
Paving
3
487,500
Paving
3
337,500
Project Priority Legend
1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022 Capital Improvement Program Project List
85
Budget Project
'enter
ID Asset Name:
Capital Projects
Red Oaks
RDP 1315 Nature Center
RDP 1917 Nature Center
RWP 181
Waterpark Bathhouse
RWP 825
Waterpark Maintenance
Building
RWP 187
Waterpark Pavilion
RWP 79
Waterpark River Ride
Springfield Oaks
SPG 100
Maintenance Building North
Waterford Oaks
ADM 105
Administration Building
ADM 108
Facilities Maintenance Building
WTR 110
Paradise Peninsula Landing
Building
WTR 112
Platform Tennis Courts (2)
White Lake Oaks
WLG 1179 Golf Course Irrigation System
Capital Projects Budget Target
Project Name
Project
Priority FY2022
4,406,000
Site and Landscape Improvements
3
40,000
Site and Landscape Improvements Reimbursement
3
-17,500
Roof Replacement Metal
3
120,000
Main Wave Pool Boiler Replacement
3
100,000
Roof Replacement Metal
3
200,000
ADA Entrance Railing
2
65,000
HVAC Replacement
3
15,000
Boiler Replacement
3
462,000
HVAC Replacement
3
100,000
Boiler Replacement
3
10,000
Tube Heater Replacements
3
5,000
Replacements Phase II
3
220,000
-4,358,300
1750 Budget Target Capital Improvement Program
Grand Total (Amount over (<0) or under (>0) Budget Target)
-4, 358, 300
47,700
Project Priority Legend
1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022 Capital Improvement Program Project List
FY2022-FY2026 Capital Improvement Program Forecast
In addition to the current year's project list, the forecast identifies projects and programs
over the following four years. This provides a snapshot of the needs and anticipated
actions required to manage OCPR's assets over a 5-year period. The total budgets for the
current year are approved by the Parks Commission as part of the annual budget process
and the four years of forecast projects and programs are received and filed.
87
CAKLAND
FY2022-FY2026 Capital Improvement Program Forecast
COUNTYPARKS
Budget Project
Project
Center ID Asset Name:
Project Name
Priority
FY2022 FY2023 FY2024
FY2025 FY2026
Capital Projects
4,406,000 4,960,500
5,143,920 4,559,800
Park System Programs
-EL4,407,500
ADM 123 Accessibility
ADA Transition Program
1
50,000 50,000 50,000
50,000 50,000
Addison Oaks
ACC 1 Conference Center
Boiler Replacement
3
126,000
ACC 2 Conference Center
Deck Replacement
1
53,000
ACC 3 Conference Center
ACC 5 Conference Center
ACC 8
Conference Center
Garden and Entrance
ACC 1655
Conference Center
Parking Lot North
ACC 1656
Conference Center
Parking Lot South
ADD 1638
Adams Lake Lodge
ADD 281
Addison Playgrounds
ADD 141
Buhl Lake Boathouse
ADD 1642
Cabin 5
ADD 1643
Cabin 6
ADD 1819
House 1480 W Romeo
Road
ADD 17
Maintenance Building
ADD 145 Maintenance Yard and
Parking Lot
ADD 144 Park Entrance Drive
ADD 1658 Section C Restroom
ADD 1735 Site and Grounds
ADD 142 Site and Grounds
ADD 1720 Yurt 1 North
ADD 1721 Yurt 2 South
Catalpa Oaks
Garden Room AC 3
Replacement
Restroom Furnace 3
Replacement
Renovation 5
Improvements 3
Improvements 3
Air Conditioning 4
Improvements 1
Restroom Construction 3
Improvements 3
Improvements 3
Conversion to Park Offices 3
Water Softener 3
Replacement
Maintenance Yard 3
Improvements
Dump Station Road 3
Realignment
Water Softener Installation 3
Group Area 3 & 4 4
Repurposing
Section A Campsite 4
Concrete Pads
HVAC/Ductless Split 4
Replacement
HVAC/Ductless Split 4
Replacement
12,000
10,000
175,000
200,000
200,000
25,000
80,000
70,000
10,000
10,000
75,000
15,000
104,400
100,000
15,000
45,000
75,000
6,000
6,000
CAT 147 Pavement and Drainage Parking Lot and Storm 2 1,000,000
Water Improvements
CAT 22 Playground North (1-5 yrs Relocation and Landscape 3
age) Improvement
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Capital Improvement Program Forecast
30,000
Budget Project
Center ID Asset Name:
Capital Projects
Glen Oaks
GLC 26 Clubhouse
GLC 29 Clubhouse
GLC, GLG
1616
Clubhouse
GLC, GLG
1809
Clubhouse
GLC, GLG
30
Main Entrance
GLG
1808
Clubhouse
GLG
33
Fenceline
GLG
150
Golf Course Irrigation
Pond
GLG
34
Golf Course Irrigation
System
Project
Project Name Priority FY2022 FY2023 FY2024 FY2025 FY2026
4,406,000 4,407,500 4,960,500 5,143,920 4,559,800
Deck Replacement
3
Grill Room Patio
3
Renovation
Electrical Improvements
1 140,000
Roof Replacement Shingle
3 42,500
Sign Replacement
5
ProShop HVAC
3
Replacement
3
Irrigation Pond Relocation
3
Upgrade Phase II
3 500,000
GLG
272
Maintenance Building
Maintenance Heater 3
Replacement
GLG
149
Maintenance Chemical
Replacement 3
Mixing
Groveland Oaks
GRV
152
Proposed New
Dumpstation Queuing 3
Road and Trailer Parking
GRV
153
Cabins
Decking Replacements 3
GRV
1578
Concession
Air Conditioner Installation 3
GRV
1579
Concession
Generator Installation 3
GRV
1821
Concession
Utility Enclosure 3
GRV
242
Contact Station
Update or Replacement 3
GRV
160
Firewood Shed
Replacement 3
GRV
1034
Group Area 1 Pavilion
Roof Replacement Shingle 3
GRV
1035
Group Area 10 and 11
Roof Replacement Shingle 3
Pavilion
GRV
1036
Group Area 12 and 13
Roof Replacement Shingle 3
Pavilion
GRV
1037
Group Area 2 and 3
Roof Replacement Shingle 3
Pavilion
GRV
1038
Group Area 4 and 5
Roof Replacement Shingle 3
Pavilion
GRV
1039
Group Area 6 and 7
Roof Replacement Shingle 3
Pavilion
GRV
1040
Group Area 8 and 9
Roof Replacement Shingle 3
Pavilion
GRV
1527
Mathews Island Bridge
Replacement 1
GRV
1526
Paradise Island Long Span Replacement 1
Bridge
GRV
1584
Park House 6000 Grange
Air Conditioner Installation
Hall
40,000
80,000
20,000
40,000
15,000
25,000
152,000
84,000
25,000
25,000
20,000
170,000
15,000
5,000
6,000
6,000
6,000
6,000
6,000
6,000
90,000
500,000
25,000
50,000
224,400
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Capital Improvement Program Forecast
Budget Project
Project
Center ID
Asset Name:
Project Name Priority
FY2022
FY2023 FY2024 FY2025 FY2026
Capital
Projects
4,406,000
4,407,500 4,960,500 5,143,920 4,559,800
Groveland Oaks
GRV
157
Park House 6000 Grange
Roof Replacement Shingle
3
17,000
Hall
GRV
1585
Park House 6000 Grange
Water Supply Generator
3
15,000
Hall
GRV
1577
Pavement and Drainage
Entrance Drive Repair or
3
140,000
Replacement
GRV
1224
Pines Playground
Replacement
1
80,000
GRV
155
Recreation Pavilion
Roof Replacement Shingle
3
40,500
GRV
158
Section A Restroom
Interior Renovation
3
330,000
GRV
1927
Septic Field
Parkwide Sanitary
3
1,500,000
Improvements
Holly Oaks
HRV
1936
Proposed New
Parking Lot
3
200,000
HRV
1937
Proposed New
Parking Lot Grant
3
-200,000
Reimbursement
Independence
Oaks
IND
161
Boathouse
Roof Replacement Shingle
3
18,500
IND
1623
Camp Wilderness Pavilion
Roof Replacement
3
6,000
1 North
IND
1624
Camp Wilderness Pavilion
Roof Replacement
3
6,000
2 South
IND
163
Concession and
Site and Building
3
25,000
Bathhouse
Improvements
IND
53
Dock and Boardwalk
Replacements
3
200,000
IND
1058
Lakepoint Pavilion
Roof Replacement Shingle
3
6,000
IND
54
Maintenance Cold
Pole Barn Addition
3
132,000
IND
1630
Maintenance Cold
Roof Replacement
3
23,000
IND
56
Moraine Knoll Playground
Replacement
1
80,000
IND
1980
Park Entrance Boulevard
Paving
3
287,500
IND
1979
Park Entrance Road
Paving
3
438,000
IND
49
Park House 9489
HVAC Replacement
3
10,000
Sashabaw
IND
1982
Park Road North
Paving
3
487,500
IND
1983
Park Road South
Paving
3
337,500
IND
58
Pine Grove Playground
Replacement
1
80,000
IND
59
Sensory Garden and Pond
Improvements
3
20,000
IND
376
Twin Chimneys Pavilion
Roof Replacement Shingle
3
21,770
IND
1071
Twin Chimneys Restroom
Roof Replacement Shingle
3
6,650
IND
1230
Waters Edge Playground
Replacement
1
80,000
Lyon Oaks
so
LYC, LYG
60
Clubhouse
Interior Renovation
3
180,000
LYC, LYG
63
Pavement and Drainage
Parking Lot Replacement
3
924,000
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Capital Improvement Program Forecast
M
Budget Project
Center
ID
Asset Name:
Project Name
Capital
Projects
Lyon Oaks
LYC, LYG,
61
Pavement and Drainage
Entrance Drive
LYP
Replacement
LYG
404
Golf Driving Range
Improvements
LYG
164
Hole #11 Boardwalk
Replacement
LYG
62
Hole #17 Boardwalk
Replacement
LYP
166
Pavement and Drainage
Sports Field Parking Lot
Expansion
LYP
165
Proposed New
Dog Park and Sports Field
Restroom
LYP
1535
Woods Edge Playground
Replacement
Orion Oaks
ORN
1636
Boundaries
Boundary Fence
Replacement (ROW)
ORN
170
Entrance Signs (3)
Replacement
ORN
65
Lake 16 Boat Ramp and
Replacement
Dock
ORN
168
Lake 16 Fishing Pier
Replacement
ORN
223
Maintenance Yard
Cold Storage Design
ORN
1550
Utilities and Infrastructure
Water and Electrical to
Maintenance Shed
Project
Priority FY2022 FY2023 FY2024 FY2025 FY2026
4,406,000 4,407,500 4,960,500 5,143,920 4,559,800
Red Oaks
RDD
711
Dog Park Contact Station
Replacement
Shed
RDG
1683
Boundaries
Golf Netting Replacement
RDG
171
Golf Cart Barn
Expansion
RDG
69
Golf Cart Tunnel
Replacement
RDG
172
Golf Course Irrigation
Irrigation Improvements
System
RDG
173
Park Maintenance
Cold storage expansion
Building
RDG RDP
694
Park Maintenance
Network update
RWP
Building
RDG RDP
174
Park Maintenance Yard
Expansion and
RWP
Improvement
RDP
333
Proposed New
Pavilion at Tent Site
RDP
177
Boundaries
Fenceline Management
RDP
1918
Boundaries
Fenceline Management
Reimbursement
RDP
71
Nature Center
HVAC replacement
RDP
1730
Nature Center
HVAC Replacement
Reimbursement
RDP
1315
Nature Center
Site and Landscape
Improvements
3 556,000
4 25,000
3 70,000
3 75,000
3 165,000
5 275,000
1 80,000
3 351,500
5
3
3
3
3
3
3
3
3
3
3
3
3
4
3
3
3
3
3
45,000
25,000
190,000
10,000
30,000
25,000
30,000
110,000
100,000
90,000
242,000
25,000
407,000
75,000
170,000
-82,500
348,000
-171,500
40,000
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Capital Improvement Program Forecast
91
Budget Project
Project
Center ID Asset Name:
Project Name
Priority
FY2022 FY2023 FY2024 FY2025 FY2026
Capital
Projects
4,406,000 4,407,500 4,960,500 5,143,920 4,559,800
Red Oaks
RDP
1917 Nature Center
Site and Landscape
3
-17,500
Improvements
Reimbursement
RDP
179 Nature Center Parking Lot Improvements
3
300,000
RDP
1731 Nature Center Parking Lot Improvements
3
-147,500
Reimbursement
RDP
176 Signs
Hales Street Monument
3
50,000
Sign Replacement
RDP
1732 Signs
Hales Street Monument
3
-22,500
Sign Replacement
Reimbursement
RDP
175 Vernal Pond Deck
Replacement
3
10,000
RDP
1916 Vernal Pond Deck
Replacement
3
-2,500
Reimbursement
RWC
1813 Waterpark Concession
Improvements
3
188,000
RWP
186 Proposed New
Pavilions (4)
4
160,000
RWP
182 Boundaries
Berm Security Fencing
1
40,000
RWP
75 Boundaries
Replacement
3
90,000
RWP
184 Signs
Sign Replacement
5
50,000
RWP
384 Site and Grounds
Waterpark Irrigation
3
144,000
System Replacement
RWP
1678 Waterpark Bathhouse
Exterior Renovation
3
85,000
RWP
181 Waterpark Bathhouse
Roof Replacement Metal
3
120,000
RWP
185 Waterpark Former
Improvements
3
20,000
Entrance
RWP
825 Waterpark Maintenance
Main Wave Pool Boiler
3
100,000
Building
Replacement
RWP
189 Waterpark Maintenance
Roof and Storage Extension 3
130,000
Building
RWP
1106 Waterpark Maintenance
Roof Replacement
3
30,000
Building
RWP
187 Waterpark Pavilion
Roof Replacement Metal
3
200,000
RWP
79 Waterpark River Ride
ADA Entrance Railing
2
65,000
RWP
1173 Waterpark Wave Pool
Wavepool Improvements
3
150,000
and Waterslide
Springfield
Oaks
SAC
1528 Activity Center
EMS Upgrade
1
50,000
SAC
194 Activity Center
Siding Replacement
3
240,000
SAC
84 Barn Pavement and
Replacement
3
100,000
Storm Sewer
SAC
85 Barns
Siding Replacement
3
60,000
SAC
1607 Goat Barn
Siding Replacement
3
15,000
SAC
197 Modular Restrooms (2)
Replacements
3
825,000
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Capital Improvement Program Forecast
92
Budget Project
Project
Center
ID
Asset Name:
Project Name Priority
FY2022 FY2023 FY2024 FY2025 FY2026
Capital Projects
4,406,000 4,407,500 4,960,500 5,143,920 4,559,800
Springfield Oaks
SAC
1314
Stormwater Management Improvements Phase 1
2
560,000
System
SPG
98
Fenceline
Replacement
3
104,000
SPG
201
Golf Cart Barn
Building Expansion
3
80,000
SPG
202
Golf Course Drainage
Replacement
3
75,000
System
SPG
99
Golf Course Irrigation
Replacement
3
280,000
System
SPG
100
Maintenance Building
HVAC Replacement
3
15,000
North
SPG, SPR
200
Clubhouse
Area and Parking Lot Site
3
605,000
Improvements
SPG, SPR
96
Clubhouse
Renovation
3
550,000
Waterford Oaks
ADM
105
Administration Building
Boiler Replacement
3
462,000
ADM
1555
Administration Building
Deck Replacement
3
15,000
ADM
108
Facilities Maintenance
HVAC Replacement
3
100,000
Building
ADM
1004
Facilities Maintenance
Roof Replacement North
3
33,000
Building
Shingle
WCM
969
Proposed New
EOB to Market Pathway
5
75,000
WCM
204
Market Building
Market Building and
3
1,754,000
Pavilion Improvements
WCM
205
Site and Grounds
Market Site Improvements
3
640,000
WTR
106
Activity Center
Boiler Replacement
3
40,000
WTR
206
House 1580 Scott Lake
Roof Replacement Shingle
3
15,000
(Ernst)
WTR
367
House and Shed 2896
Roof Replacement Shingle
3
13,000
Watkins Lake Road
WTR
110
Paradise Peninsula
Boiler Replacement
3
10,000
Landing Building
WTR
500
Paradise Peninsula
Shade Structures
5
75,000
Playground
WTR
1151
Park Storage Shed North
Roof Replacement West
3
2,000
WTR
1149
Park Storage Shelter West Roof Replacement Shingle
3
10,500
WTR
112
Platform Tennis Courts (2)
Tube Heater Replacements
3
5,000
White Lake Oaks
WLC
1155
Clubhouse
Roof Replacement PVC
3
36,000
WLC/WLG
1170
Pavement and Drainage
North Parking Lot
3
250,000
Replacement and
Expansion
WLG
1675
Employee Parking Lot
Maintenance Parking
3
110,000
Improvements
WLG
120
Fenceline
Replacement
3
52,000
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Capital Improvement Program Forecast
93
Budget Project
Project
Center ID Asset Name:
Project Name
Priority
FY2022
FY2023
FY2024 FY2025 FY2026
Capital Projects
4,406,000
4,407,500
4,960,500 5,143,920 4,559,800
White Lake Oaks
WLG 1663 Golf Cart Barn
Siding Repairs
3
20,000
WLG 1179 Golf Course Irrigation
Replacements Phase II
3
220,000
System
WLG 472 Hole #13 Fairway Culvert
Replacement
1
40,000
WLG 470 Hole #18 Fairway Culvert
Replacement
1
85,000
WLG 1529 Hole #18 Pond
Dredge and Drain Cleanout
1
30,000
WLG 269 Hole #18 Pond Culvert
Replacement
1
75,000
WLG 471 Hole #9 Culvert
Replacement
3
50,000
WLG 121 Maintenance Building
HVAC Replacement
3
9,500
WLG 1530 Maintenance Culvert
Replacement
1
11,000
WLG 1676 Site and Grounds
First Tee Renovation
5
125,000
Capital Projects Budget Target
-4,358,300
-4,402,466
-4,447,515-4,493,466-4,540,335
1750 Budget Target
Capital Improvement
-4,358,300
-4,402,466
-4,447,515-4,493,466-4,540,335
Program
Grand Total (Amount over (<0) or under (>0) Budget Target)
47,700
5,034
512,985 650,454 19,465
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Capital Improvement Program Forecast
94
V. Maintenance Management Plan
Maintenance is the continuous process of improving the availability, safety, reliability
and longevity of physical assets. The Maintenance Management Plan identifies
operational investment for projects and programs to maintain buildings and park
improvements within Oakland County parks.
95
FY2022 Maintenance Management Plan Project List
The project list identifies projects or programs to be funded and implemented within the
identified fiscal year. The total budget for the fiscal year is approved by the Parks
Commission as part of the annual budget process. Individual projects are brought to the
Parks Commission as appropriate.
0.
WKLAND
FY2022 Maintenance Management Plan Project List
COUNTYPARKS
Budget Project
Center ID Asset Name:
Maintenance Projects
Park System Programs
ADM
122 Accessibility
ADM
126 Boundaries
ADM
1531 Building Roofs
ADM
1923 Park Assets
ADM
1524 Park Assets
ADM
125 Pavement and Drainage
ADM
127 Signs
ADM
124 Utilities and Infrastructure
Addison Oaks
ACC
6 Conference Center
ADD
1820 Cabin 1
Glen Oaks
GLC
25 Clubhouse
GLG
959 Northeast Steel Bridge
GLG
960 Northwest Steel Bridge
GLG
32 Southeast Steel Bridge
GLG
958 Southwest Steel Bridge
GLG
961 Wood Pedestrian Bridge
Groveland Oaks
GRV
38 Cabin 5
GRV
41 Cottage Island Bridge
GRV
45 Mathews Island Bridge
GRV
42 Paradise Island Long Span Bridge
Independence Oaks
IND
1201 Nature Center Bridge
IND
1511 Trail G Habitat Trail
Waterford Oaks
WTR
1517 Activity Center
WTR
1534 Fridge Toboggan Tower
WWP
228 Waterpark Bridge
Maintenance Projects Budget Target
Project
Project Name Priority FY2022
684,800
ADA Maintenance Program
2
50,000
Fenceline Repair Program
3
33,000
Roof Repair Program
3
33,000
Professional Services Program
3
50,000
Removal Program
3
50,000
Pavement Maintenance Program
3
150,000
Signage Replacement Program
3
50,000
ARC Flash Compliance Program
2
60,000
Stucco Repair
3
10,000
HVAC Installation
4
4,500
Exterior Stone Repair
3
10,000
Structural Inspection
1
1,850
Structural Inspection
1
1,850
Structural Inspection
1
1,850
Structural Inspection
1
2,350
Structural Inspection
1
2,350
HVAC Replacement
3
4,500
Structural Inspection
1
1,850
Structural Inspection
1
1,850
Structural Inspection
1
2,350
Repair
1
30,000
Improvements
2
50,000
Flooring Replacement
4
16,000
Stair Tower Removal
1
65,000
Structural Inspection
1
2,500
-690,700
1751 Budget Target Maintenance Management Plan
Grand Total (Amount over (<0) or under (>0) Budget Target)
-690,700
-5,900
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022 Maintenance Management Plan Project List
97
FY2022-FY2026 Maintenance Management Plan Forecast
In addition to the current year's project list, the forecast identifies projects and programs
over the following four years. This provides a snapshot of the needs and anticipated
actions required to manage OCPR's assets over a 5-year period. The total budgets for the
current year are approved by the Parks Commission as part of the annual budget process
and the four years of forecast projects and programs are received and filed.
GAKLAND FY2022-FY2026
COUNTYPARKS
Maintenance
Management
Plan Forecast
Budget Project
Project
Center ID Asset Name:
Project Name Priority
FY2022
FY2023
FY2024 FY2025 FY2026
Maintenance Projects
684,800
704,050
645,200 608,338 703,250
Park System Programs
ADM 122
Accessibility
ADA Maintenance Program
2
50,000
50,000
50,000 50,000 50,000
ADM 126
Boundaries
Fenceline Repair Program
3
33,000
34,000
34,000 35,000 36,000
ADM 1531
Building Roofs
Roof Repair Program
3
33,000
34,000
34,000 35,000 36,000
ADM 1923
Park Assets
Professional Services
3
50,000
50,000
50,000 50,000 50,000
Program
ADM 1524
Park Assets
Removal Program
3
50,000
50,000
51,000 53,000 54,000
ADM 125
Pavement and Drainage
Pavement Maintenance
3
150,000
151,000
154,000 158,000 161,000
Program
ADM 127
Signs
Signage Replacement
3
50,000
50,000
50,000 10,000 10,000
Program
ADM 124
Utilities and InfrastructureARC
Flash Compliance
2
60,000
Program
Addison Oaks
ACC 6
Conference Center
Stucco Repair
3
10,000
10,000
10,000 10,000 10,000
ADD 14
Adams Lake Bridge
Structural Inspection
1
1,500
ADD 13
Adams Lake Dam
Structural Inspection
1
2,500
ADD 1192
Adams Lake Lodge Deck
Structural Inspection
1
2,500
ADD 956
Buhl Lake Dam
Structural Inspection
1
1,500
ADD 957
Buhl Lake Steel Bridge
Structural Inspection
1
3,500
ADD 1820
Cabin 1
HVAC Installation
4
4,500
ADD 1920
Cabin 2
HVAC Installation
4
4,500
ADD 1921
Cabin 3
HVAC Installation
4,500
ADD 1922
Cabin 4
HVAC Installation
4,500
ADD 1532
Sewage Lagoon
Liner Inspection (7 years)
3
3,500
ADD 301
Water Tower
Structural Inspection
1
5,000
Glen Oaks
GLC 25
Clubhouse
Exterior Stone Repair
3
10,000
10,000
10,000 10,000 10,000
GLG 959
Northeast Steel Bridge
Structural Inspection
1
1,850
GLG 960
Northwest Steel Bridge
Structural Inspection
1
1,850
GLG 32
Southeast Steel Bridge
Structural Inspection
1
1,850
GLG 958
Southwest Steel Bridge
Structural Inspection
1
2,350
GLG 961
Wood Pedestrian Bridge
Structural Inspection
1
2,350
Groveland Oaks
GRV 38
Cabin 5
HVAC Replacement
3
4,500
GRV 40
Cabin 7
HVAC Replacement
3
4,500
GRV 946
Cabin 8
HVAC Replacement
3
4,500
GRV 41
Cottage Island Bridge
Structural Inspection
1
1,850
GRV 45
Mathews Island Bridge
Structural Inspection
1
1,850
1,850
1,850 1,850
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Maintenance Management Plan Forecast
Budget Project
Project
Center ID Asset Name:
Project Name Priority
FY2022 FY2023 FY2024 FY2025 FY2026
Maintenance Projects
684,800 704,050 645,200 608,338 703,250
Groveland Oaks
GRV 42
Paradise Island Long Span Structural Inspection
1
2,350 2,350 2,350 2,350
Bridge
GRV 43
Paradise Island Short
Structural Inspection
1
1,850
Span Bridge
GRV 46
Septic Field
Inspection
2
5,000
Independence Oaks
IND 277
Camp Wilderness Bridge
Structural Inspection
1
3,000
IND 275
Hidden Springs Dam
Structural Inspection
1
3,000
IND 217
Hidden Springs Parking
Storm Sewer Maintenance
3
4,500
Lot
IND 1201
Nature Center Bridge
Repair
1
30,000
IND 276
Nature Center Bridge
Structural Inspection
1
3,000
IND 218
River Loop East Bridge
Structural Inspection
1
5,000
IND 1511
Trail G Habitat Trail
Improvements
2
50,000
Lyon Oaks
LYG 221
Golf Restrooms
Floor Resurfacing
3
10,000
Orion Oaks
ORN 245
Trail D Dragon Loop
Accessibility Enhancements
5
190,000
Red Oaks
Ak-
RDD 1692
Utilities and Infrastructure
Drinking Fountains
3
4,500
RDG 817
Park Maintenance
HVAC Replacement with
6,000
Building
Split System
RDG 818
Park Maintenance
Water heater replacement
1,500
Building
RWP 1814
Utilities and Infrastructure
Drinking Fountain
7,500
Replacements
RWP 1190
Waterpark Bridge
Structural Inspection
1
10,000
RWP 80
Waterpark River Ride
Repair and Painting
3
125,000
Springfield Oaks
SAC 1202
Activity Center
Siding Painting
3
120,000
SAC 226
Ellis Barn
Painting
3
135,000
SAC 1193
Rotary Park Bridge
Structural Inspection
1
1,250
SAC 92
Water Tower
Inspection
1
5,000
Waterford Oaks
ADM 1499
Administration Building
Carpet Replacement
5
46,138
WCM 493
Market Pavilion
Structural Inspection
1
5,000
WTR 1517
Activity Center
Flooring Replacement
4
16,000
WTR 1534
Fridge Toboggan Tower
Stair Tower Removal
1
65,000
WTR 235
House 1580 Scott Lake
Window Replacements
3
40,000
(Ernst)
WTR 1194
Lookout Lodge
Deck Structural Inspection
1
2,500
WTR 265
Trail A Loop
Improvements
5
150,000
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Maintenance Management Plan Forecast
100
Budget Project
Project
Center ID Asset Name:
Project Name
Priority
FY2022
FY2023
FY2024 FY2025
FY2026
Maintenance Projects
I
684,800
704,050
645,200 608,338
703,250
Waterford Oaks
WWP 228 Waterpark Bridge
Structural Inspection
1
2,500
2,500
2,5007
2,500
WWP 273 Waterpark Children's
Structural Inspection
1
3,500
Play Structure
Maintenance Projects Budget Target
-690,70-686,634
-681,807-676,223-671,88
1751 Budget Target
Maintenance Management
-690,700
-686,634 I
-681,807-676,223
-671,888
Plan
Grand Total (Amount over (<0) or under (>0) Budget Target)
It -5,900
17,416
-36,60Z-67,885
31,362
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Maintenance Management Plan Forecast
101
VI. Natural Resources Management Plan
Natural resources are the fundamental components of life including water, air, land, and
plant and animal life. Natural resources are utilized and valued by humans for a variety
of purposes including clean air and water, agriculture and food production, carbon
sequestration, aesthetic value, cultural and spiritual practices and for recreation. OCPR
manages over 4,700 acres of undeveloped natural areas that serve as regional hubs of
biodiversity and are part of the larger green infrastructure network in Oakland County.
These resources contribute not only to the parks where they are found but also to the
ecologic and economic prosperity of the entire county. Oakland County Parks manages
natural resources for optimal ecosystem function and institutes environmentally
sustainable practices throughout the park system.
The priorities for investment are guided by the Strategic Action Plan's mission and
strategic goal for managing natural resources: 8
Mission: The Oakland County Parks and Recreation Commission is dedicated to
providing quality recreation experiences that encourage healthy lifestyles, support
economic prosperity, and promote the protection of natural resources.
Goal — Protect Natural Resources: Increase land dedicated to protection of natural
resources, preserve existing high -quality ecosystems, and improve ecological
communities that are fragmented or degraded.
The Natural Resources Management Plan identifies funding for projects and programs
that protect and restore ecosystems within Oakland County parks.
8 Strategic Action Plan mission and goals from OCPR's 5-Year Parks and Recreation Plan, approved 2/1/2018.
102
FY2022 Natural Resources Management Project List
The project list identifies projects or programs to be funded and implemented within the
identified fiscal year. The total budget for the fiscal year is approved by the Parks
Commission as part of the annual budget process. Individual projects are brought to the
Parks Commission as appropriate.
103
ONKLAND
FY2022 Natural Resources Management Project List
COUNTYPARKS
Budget Project
Center ID Asset Name:
Natural Resources Projects
Park System Programs
FM 1199 Natural Resources
FM 130 Natural Resources
FM 1198 Natural Resources
FM 134 Natural Resources
FM 138 Natural Resources
FM 137 Natural Resources
Natural Resources Projects Budget Target
Project Name
Forestry Program
Freshwater Stewardship Program
Land Management Program
Storm Sewer Maintenance Program
Trail Enhancement Program
Wildlife Management Program
1830 Budget Target Natural Resources Management
Grand Total (Amount over (<0) or under (>0) Budget Target)
Project
Priority FY2022
I 866,000
3 232,000
3 98,000
3 501,000
2 5,000
3 10,000
3 20,000
-866,000
-866,000
0
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022 Natural Resources Management Project List
104
FY2O22-FY2026 Natural Resources Management Forecast
In addition to the current year's project list, the forecast identifies projects and programs
over the following four years. This provides a snapshot of the needs and anticipated
actions required to manage OCPR's assets over a 5-year period. The total budgets for the
current year are approved by the Parks Commission as part of the annual budget process
and the four years of forecast projects and programs are received and filed.
105
GAKLAND
FY2022-FY2026 Natural Resources Management Forecast
COUNTYPARKS
Budget Project Project
Center ID Asset Name:
Project Name Priority FY2022
FY2023
FY2024
FY2025
FY2026
Natural Resources Projects
866,000
882,000
899,000
917,000
934,000
Park System Programs
FM 1199 Natural Resources
Forestry Program 3 232,000
160,000
198,000
170,000
107,000
FM 130 Natural Resources
Freshwater Stewardship 3 98,000
208,000
80,000
89,000
100,000
Program
FM 1198 Natural Resources
Land Management 3
FM 134 Natural Resources
Storm Sewer Maintenance 2
Program
FM 138 Natural Resources
Trail Enhancement Program 3
FM 137 Natural Resources
Wildlife Management 3
Program
Natural Resources Projects Budget Target
1830 Budget Target Natural Resources
Management
Grand Total (Amount over (<0) or under (>0) Budget Target)
501,000 471,000 564,000 621,000 694,000
5,000 5,000 35,000 15,000 10,000
10,000 10,000 10,000 10,000 10,000
20,000 28,000 12,000 12,000 13,000
-866,000-882,000-899,000-917,000-934,000
-866,000-882,000-899,000-917,000-934,000
0 0 0 0 0
Project Priority Legend
1= Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
FY2022-FY2026 Natural Resources Management Forecast
106
FY2022-FY2026 Natural Resources Management Outline
Natural resources management is administered through a set of programs that are
funded by the Parks Commission. See Program Descriptions for Forestrv, Freshwater
Stewardship, Land Manaaement, Storm Sewer Maintenance, Trail Enhancement, and
Wildlife Manaaement. Within these programs, a series of actions are identified for the
natural resources in each park. The following report, which identifies these actions, is a
snapshot of the needs and scope of work for natural resources management in each park.
Budgets are not provided for individual actions, because the programs are administered
by Natural Resources Management staff across the entire park system.
107
CAKLAN
D FY2022-FY2026 Natural Resources Management Outline
COUNTYPARPark
Natural Resources Management Program
Action Project ID
Addison Oaks
Forestry
Campground Tree Maintenance and Removals
1832
Campground Tree Planting
1833
Estate and Playground Tree Maintenance and Removals
1834
Estate and Playground Tree Planting
1835
Forest Management Plan
1836
Freshwater Stewardship
Buhl Lake Wetland Edge Shrub Removal and Nature Plan Installation
1837
Vernal Pools Restoration
1757
Water Quality Assessment of Buhl Lake, Adams Lake, pond and streams
1755
Land Management
Estate and Campground Nature Plan Conversion
1840
Invasive Shrub Control and Restoration of NW Corner
1839
MNFI Natural Community Assessments
1841
Mountain Bike Trail Invasive Species Control
1888
Old Fields Restoration
1754
Old Fields Restoration East
1753
Prairie Fen Restoration
1752
Storm Sewer Maintenance
Stormwater Infrastructure Assessment
1838
Wildlife Management
Eastern Massasauga Rattlesnake Habitat Improvement
1758
Management of White -Tailed Deer Population and Impacts
1842
Non -Native Waterfowl Control
1893
Catalpa Oaks
Forestry
Tree Planting 1807
Glen Oaks
Forestry
Golf Course Tree Maintenance and Removals 1760
Golf Course Tree Planting 1878
Freshwater Stewardship
Pebble Creek Stream Bottom Restoration and Shoreline Habitat Improvements 1907
Water Quality Assessment of Pebble Creek 1759
Land Management
Invasive Shrub Removal and Non -Native Grass Treatment 1898
Native Seed and Native Landscaping Conversion 1899
Water Feature Swale Maintenance 1843
Storm Sewer Maintenance
Stormwater Infrastructure Assessment 1904
Groveland Oaks
FY2022-FY2026 Natural Resources Management Plan Outline
108
Park
Natural Resources Management Program
Action Project ID
Groveland Oaks
Forestry
Campground Tree Maintenance and Removals 1879
Campground Tree Planting 1844
Forest Management Plan 1845
Freshwater Stewardship
Stewart Lake Shoreline Restoration 1764
Water Quality Assessment of Stewart Lake and Thread Creek 1762
Land Management
Former Golf Course Restoration
1761
MNFI Natural Community Assessments
1847
Native Landscaping Conversion
1900
Thread Creek Invasive Plant Removal
1846
Storm Sewer Maintenance
Stormwater Infrastructure Assessment
1908
Highland Oaks
Forestry
Forest Management Plan
1849
Freshwater Stewardship
Water Quality Assessment of Spring Lake and Streams
1884
Land Management
MNFI Natural Community Assessments
1848
Oak Knob Preservation
1769
Oak Savannah Restoration
1770
Old Fields Restoration North
1767
Old Fields Restoration South
1768
Wildlife Management
Eastern Massassauga Rattlesnake Habitat Improvement
1894
Independence Oaks
Forestry
Forest Management Plan
1850
North Park Scots Pine Removal and Replacement
1779
Tree Maintenance and Removals
1880
Tree Planting - Main Park
1851
Freshwater Stewardship
Clinton River Phragmites, Cattail and Reed Canary Grass Control
1852
Crooked Lake Shoreline Restoration
1777
Water Quality Assessment of Crooked Lake, Upper Bushman Lake, Clinton River and Streams
1774
Land Management
Bog Invasive Shrub Removal
1773
MNFI Natural Community Assessments
1853
Old Fields Restoration North
1778
Prairie Fen Restoration
1776
Storm Sewer Maintenance
Stormwater Infrastructure Assessment
1909
FY2022-FY2026 Natural Resources Management Plan Outline
109
Park
Natural Resources Management Program
Action
Independence Oaks
Wildlife Management
Fish Population Study
Lyon Oaks
Forestry
Forest Management Plan
Golf Course Tree Maintenance and Removals
Golf Course Tree Planting
Tree Maintenance and Removal
Tree Planting
Wetland Mitigation Area Aspen Removal
Freshwater Stewardship
Water Quality Assessment of Norton Drain
Land Management
Golf Course Phragmites Removal
MNFI Natural Community Assessments
Native Landscaping Conversion - Clubhouse
Old Fields Restoration
Storm Sewer Maintenance
Stormwater Infrastructure Assessment
Orion Oaks
Forestry
Forest Management Plan
Tree Maintenance and Removals
Tree Planting
Freshwater Stewardship
Lake Sixteen Wetland Edge Shrub Removal
Water Quality Assessment of Lake Sixteen
Land Management
Lake Sixteen Phragmites Removal
MNFI Natural Community Assessments
Old Fields Restoration
Oriental Bittersweet Control
Wetland Shrub Removal
Wildlife Management
Eastern Massasauga Rattlesnake Habitat Structure Installation
Fish Population Study
Red Oaks
Forestry
Dog Park Tree Maintenance and Planting
Forest Management Plan
Nature Center Tree Maintenance and Removals
Perimeter Trimming
Freshwater Stewardship
Vernal Pool Assessment and Restoration
FY2022-FY2026 Natural Resources Management Plan Outline
Project ID
1854
1855
1881
1895
1856
1857
1784
1780
1783
1858
1911
1781
1910
1859
1896
1897
1860
1885
1861
1862
1786
1863
1889
1787
1892
1864
1866
1865
1919
1788
110
Park
Natural Resources Management Program
Action Project ID
Red Oaks
Land Management
Native Landscaping Conversion and Demonstration Site 1790
Nature Center Shrub Assessment and Bird Study 1789
Storm Sewer Maintenance
Stormwater Infrastructure Assessment 1905
Rose Oaks
Forestry
Forest Management Plan
1867
Invasive Black Locust Clone Removal and Restoration
1796
Freshwater Stewardship
All Lakes Wetland Edge Shrub Removal and Native Plant Installation
1868
Water Quality Assessment of Lakes and Streams
1886
Land Management
Eastern Old Fields Restoration
1792
Enbridge Cut Restoration
1794
Holly Schools Property Restoration
1793
MNFI Natural Community Assessments
1869
Prairie Fen Restoration
1870
South End Restoration
1791
Springfield Oaks
Forestry
Forest Management Plan
1872
Golf Course Tree Maintenance and Removals
1871
Golf Course Tree Planting
1882
Land Management
Invasive Shrub Removal and Non -Native Grass Treatment
1912
Native Seed and Native Landscaping Conversion
1913
Water Feature Swale Maintenance
1890
Waterford Oaks
Forestry
Forest Management Plan
1873
Tree Maintenance and Removals
1874
Tree Planting
1875
Land Management
Buckthorn Removal
1800
MNFI Natural Community Assessments
1903
Old Fields Restoration North
1891
White Lake Oaks
Forestry
Golf Course Tree Maintenance and Removals 1883
Golf Course Tree Planting 1876
Freshwater Stewardship
Water Quality Assessment of Huron River, Irrigation Pond and Streams 1887
Land Management
FY2022-FY2026 Natural Resources Management Plan Outline
111
Park
Natural Resources Management Program
Action Project ID
White Lake Oaks
Land Management
Invasive Shrub Removal and Non -Native Grass Treatment
1901
MNFI Natural Community Assessments
1877
Native Seed and Native Landscaping
1914
Water Feature Swale Maintenance
1902
Storm Sewer Maintenance
Stormwater Infrastructure Assessment 1906
FY2022-FY2026 Natural Resources Management Plan Outline
112
V11. Project Scopes
FY2022-FY2026 Project Scopes
The scope of a project identifies the planned action, as well as the type of infrastructure,
facility or structure and its location and overall purpose, materials and dimensions. In
addition to scope, the following section identifies the need for each project, which may
include information about the history and current condition of the asset and a summary
of regulatory compliance requirements. Each project has a budget amount that is
scheduled in one or more of the next five fiscal years. The following is also identified:
Project Type (Capital Projects, Maintenance Projects, or Natural Resources Projects),
Proiect Prioritv (levels 1 through 5), and the Asset Management Type (RM — Regular Asset
Management, DM — Deferred Asset Management, or New — New Asset).
113
CAKLAND
FY2022-FY2026 Project Scopes
MUM MKS
Budget Center Asset Name Project Name
Park System Programs
ADM Accessibility ADA Maintenance Program
r
SCHEDULE
FY2022 $50,000
FY2023 $50,000
FY2024 $50,000
FY2025 $50,000
FY2026 $50,000
A
Project Type: Maintenance Projects
Project Priority: 2 Asset Mgt Type: DM
Accessibilit
r 1 SCHEDULE
FY2022
$50,000
FY2023
$50,000
FY2024
$50,000
FY2025
$50,000
FY2026
$50,000
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
SCHEDULE
FY2022
$33,000
FY2023 $34,000
FY2024 $34,000
FY2025 $35,000
FY2026 $36,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
SCOPE
Park system -wide program to comply
with the Americans with Disabilities
Act (ADA) by providing ADA-compliant
components. Components may include
fixtures such as faucets or mirrors, or
equipment such as accessible beach
chairs. Program is managed by the
staff Accessibility Work Group.
ADA Transition Program
SCOPE
Park system -wide program to comply
with the Americans with Disabilities
Act by implementing capital
improvement -scale improvements to
address the ADA Transition Plan and
provide accessibility to persons of all
abilities. Program is managed by the
staff Accessibility Work Group.
Fenceline Repair Program
SCOPE
Park system -wide program to replace
fenceline components, including posts,
fabric, and wires. Program is managed
by district chiefs of park operations
and chief of park facilities
maintenance and development.
Project ID
122
NEED
OCPR is required to comply with the
Americans with Disabilities Act (ADA)
for facilities and programs. Transition
plans for each park identify needs
within each park to update facilities to
meet standards.
123
NEED
OCPR is required to comply with the
Americans with Disabilities Act (ADA)
for facilities and programs. Transition
plans for each park identify needs
within each park to update facilities to
meet standards.
126
NEED
Fences in the parks system are subject
to aging, damage, and ordinary wear
and tear. Repairs are prioritized by
condition and age.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
114
Budget Center Asset Name Project Name Project ID
Building Roofs
SCHEDULE
FY2022 $33,000
FY2023 $34,000
FY2024 $34,000
FY2025 $35,000
FY2026 $36,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
��FarkAssetlsmlw
a
� �I SCHEDULE
FY2022 $50,000
FY2023 $50,000
FY2024 $50,000
FY2025 $50,000
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RIM
Park Assets
I=, —
SCHEDULE
FY2022
$50,000
$50,000
FY2023
$50,000
FY2024
$51,000
FY2025
$53,000
FY2026 $54,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RIM
Roof Repair Program
SCOPE
Park system -wide program to repair
and replace building roofing and
associated components. Roofing
materials vary by building and include
asphalt shingles, metal and EPDM
(rubber). Roofing components include
wood sheathing, underlayment,
insulation, gutters and downspouts.
Professional Services Program
SCOPE
Park system -wide program to contract
with various professional disciplines
that are not within the professional
capabilities or resource availability of
staff. Contractors will assist with the
completion of small operations
projects and with scope and budget
development of larger projects.
Professional disciplines include but are
not limited to mechanical, electrical,
civil, architectural and estimating.
Funding will be managed by staff
through annual contracts.
Removal Program
SCOPE
Park system -wide program to remove
assets and restore the site in
accordance with Oakland County
Board of Commissioners policy and all
applicable federal, state and local
regulations. Program is managed by
the staff Property Acquisition and
Management (PAM) Work Group.
1531
NEED
Building roofs in the parks system are
subject to aging, damage, and ordinary
wear and tear. Repairs are prioritized
by condition and age.
1923
NEED
Smaller operational projects and
development of scopes and budgets
for larger projects often require
professional expertise not available
from existing staff resources. Use of
annual contracts to complement staff
expertise will improve the accuracy of
budget forecasting prior to submitting
budgets for approval.
1524
NEED
When replacement or renovation is
not feasible, park assets that are at the
end of their useful life may need to be
removed and the asset site restored.
The manner of disposal is regulated by
Oakland County Board of
Commissioners policy. Permitting
review is needed to ensure compliance
with county policy, as well as
applicable laws and regulations and
that required permits are obtained in
advance.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
115
Budget Center Asset Name
ADM Pavement and Drainage
SCHEDULE
FY2022 $150,000
FY2023 $151,000
FY2024 $154,000
FY2025 $158,000
FY2026 $161,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022 $50,000
BUS DROP OFF , _ T
PLAYSCAPE 1P
ON 1 _SLEDDING HILL T
PLATFORM TENN6 T
FY2023 $50,000
FY2024 $50,000
FY2025 $10,000
FY2026 $10,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
tilities and Infrastructure
rArcFlash and Shock Hazardropriate PPE Required
SCHEDULE
FY2022 $60,000
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 2 Asset Mgt Type: DM
Project Name
Pavement Maintenance Program
SCOPE
Park system -wide program for repair
of existing concrete and asphalt
surfaces. Program is managed by
district chiefs of park operations and
chief of park facilities maintenance
and development.
Project ID
125
NEED
Pavement in the parks system is
subject to aging, damage, and ordinary
wear and tear. Repairs are prioritized
by safety issues, condition and age.
Signage Replacement Program
SCOPE
Park system -wide program to evaluate
signage and replace or remove signs as
indicated. The goal of the program is
to increase clarity, eliminate sign
pollution, and comply with OCPR
brand standards. Program is managed
by the Wayfinding Work Group with
an initial emphasis on trail signage.
127
NEED
Park system has more than 2,500
vehicle and pedestrian wayfinding and
operational signs. Much of the signage
is inconsistent or outdated and does
not meet current sign and branding
standards.
ARC Flash Compliance Program
SCOPE
5-year engineering analysis program,
based on the updated NEC for the
evaluation and Arc Flash Hazard and
Safety Equipment labeling of all
existing electrical panels located
throughout the park system. White
Lake, Orion, and Independence
scheduled in 2020; Springfield and
Lyon scheduled in 2021; remaining
Waterford facilities scheduled in 2022.
124
NEED
The updated National Electric Code
(NEC) requires evaluation and Arc
Flash Hazard and Safety Equipment
labeling of all existing electrical panels.
Groveland, Waterford Waterpark and
Admin Building completed in 2017;
Red and Catalpa completed in 2018;
Addison and Glen completed in 2019.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
116
Budget Center Asset Name Project Name Project ID
Park System Programs-
-
FM Natural Resources
SCHEDULE
FY2022 $232,000
FY2023 $160,000
FY2024 $198,000
FY2025 $170,000
FY2026 $107,000
Project Type: Natural Resources Projects
Project Priority: 3 Asset Mgt Type: RM
latural Resources
SCHEDULE
FY2022
$98,000
FY2023 $208,000
FY2024 $80,000
FY2025 $89,000
FY2026 $100,000
Project Type: Natural Resources Projects
Project Priority: 3 Asset Mgt Type: RM
vp�Nat
SCHEDULE
FY2022 $501,000
FY2023 $471,000
FY2024 $564,000
FY2025 $621,000
FY2026 $694,000
Project Type: Natural Resources Projects
Project Priority: 3 Asset Mgt Type: RM
Forestry Program
SCOPE
Annual natural resource management
program to protect, preserve, restore
and promote our parks' forest
resources and recreational
opportunities. The program provides
maintenance and operational support
for removal of hazardous trees, oak
wilt (and other tree disease)
management, and tree plantings.
1199
NEED
Forest resources are being degraded
by diseases, age, forest pests and
natural disturbances. Protection of
high -quality native trees, maintenance
of hazardous trees and planting of new
trees is needed to preserve natural
communities, ensure the safety of park
patrons, protect built infrastructure
and beautify the park system.
Freshwater Stewardship Program
SCOPE
Annual natural resource management
program to protect, preserve, restore
and promote our parks' freshwater
resources and recreational
opportunities. The program provides
maintenance and operational support
for contractual control of high priority
aquatic invasive species and water
quality monitoring.
Land Management Program
SCOPE
Annual natural resource management
program to protect, preserve, restore,
and promote our parks' unique natural
communities and recreational
opportunities. The program includes
restoration of natural plant
communities through prescribed
burning, seeding and mowing.
130
NEED
Freshwater resources (lakes, rivers,
streams) and the animals that inhabit
them are being degraded by poor
water quality and aquatic invasive
species. Protection of high quality
freshwater resources is necessary for
native plants and animals, regional
water quality and preservation of park
recreational opportunities such as
fishing and kayaking.
1198
NEED
Habitat improvements are needed to
restore biodiversity and native species
populations to degraded natural areas
and to protect intact high -quality
natural communities. Restoration will
also encourage recreational
opportunities such as hiking and biking.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
117
Budget Center Asset Name
FM Natural Resources
SCHEDULE
FY2022 $5,000
FY2023 $5,000
FY2024 $35,000
FY2025 $15,000
FY2026 $10,000
Project Type: Natural Resources Projects
Project Priority: 2 Asset Mgt Type: DM
Natural Resources
_MWF
SCHEDULE
FY2022 $10,000
FY2023 $10,000
FY2024 $10,000
FY2025 $10,000
FY2026 $10,000
Project Type: Natural Resources Projects
Project Priority: 3 Asset Mgt Type: DM
Natu
SCHEDULE
FY2022 $20,000
FY2023 $28,000
FY2024 $12,000
FY2025 $12,000
FY2026 $13,000
Project Type: Natural Resources Projects
Project Priority: 3 Asset Mgt Type: RM
Project Name Project ID
Storm Sewer Maintenance Program 134
SCOPE
Annual natural resource management
program to ensure compliance with
the Department of Environment, Great
Lakes & Energy (EGLE) Storm Water
Pollution Prevention Initiative,
including inspection and maintenance
of stormwater systems and associated
maintenance.
Trail Enhancement Program
SCOPE
Park system -wide program to focus on
enhancement of existing trails. The
program includes ongoing surveys of
existing trail conditions and
development of a phased strategic
maintenance plan. Plans to upgrade
high -priority trails within the park
system include regrading, re -alignment
and other trail surface improvements.
Program is managed by the staff Trails
Work Group.
NEED
Storm water infrastructure within the
parks is aging rapidly and annual
proactive maintenance is necessary to
ensure functioning stormwater
management systems.
138
NEED
This program was cancelled after the
FY2019 program due to budget
constraints. The program included
ongoing surveys of existing trail
conditions and development of a
phased strategic maintenance plan.
Plans to upgrade high -priority trails
within the park system included
regrading, re -alignment and other trail
surface improvements. Program was
managed by the staff Trails Work
Group.
Wildlife Management Program
SCOPE
Annual natural resource management
program to protect, preserve, restore,
and promote our parks' unique native
wildlife and recreational opportunities.
The program includes management of
unsustainable populations of native
wildlife (deer, geese, beaver),
populations of non-native wildlife
(mute swans) and surveying and
habitat restoration of native wildlife
populations.
137
NEED
Native wildlife resources (birds,
mammals, fish, reptiles, amphibians,
invertebrates) are being negatively
impacted resulting in the need for
surveying and proactive management
to ensure healthy, diverse populations
that encourage recreational
opportunities such as hiking and bird
watching. Additional management is
necessary for nuisance wildlife that
create negative interactions with park
patrons and wildlife with high
population levels (deer, beaver) that
impact natural resources.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
118
Budget Center Asset Name
ACC Conference Center
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $126,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
onference Center=
SCHEDULE
FY2022
FY2023 $53,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
SCHEDULE
FY2022 $12,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name Project ID
Boiler Replacement 1
SCOPE NEED
Replace the two (2) 1,010,000 BTU Project is part of the park system -wide
boilers and related equipment management of building equipment.
installed in 1992 used for building heat. Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Deck Replacement
SCOPE
Replace existing 2,600 square foot
conference center wood decking and
railings, including the necessary
staining, sealing and structural
modifications.
NEED
Deck is deteriorating. Replacement is
intended to improve appearance and
reduce maintenance needs.
Garden Room AC Replacement
SCOPE
Replace the AC System (Air handler,
6.5 ton condenser unit and related
equipment) installed in 1998 used for
cooling the garden room.
2
3
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
119
Budget Center Asset Name
ACC Conference Center
SCHEDULE
FY2022 $10,000
FY2023
FY2024
FY2025
t
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
onference CenteMr
69,
WL.1mrSCHEDULE FY2022
FY2023
FY2024
FY2025
FY2026
$10, 000
$10, 000
$10, 000
$10, 000
$10, 000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
onference Center Garden and Entrance
SCHEDULE
FY2022
FY2023
FY2024 $175,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: DM
Project Name Project ID
Restroom Furnace Replacement 5
SCOPE
Replace the 75,000 BTU furnace
installed in 1989 used for heating the
large meeting room restrooms.
Stucco Repair
SCOPE
Implement annual repairs and
replacement of building fagade stucco,
repair of heavy timber accents, and
chimney repairs.
Renovation
SCOPE
Complete landscape planting bed
renovation of the existing entrance,
courtyard and garden areas, including
irrigation, lighting, drainage, brick
paver reinstallations (entrance
courtyard area), and step
refurbishment. Garden wall
replacement will focus on west and
south portions. Phase I: Design; Phase
II: Construction
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
6
NEED
Structure was built in 1927. Ongoing
repair of building surfaces is needed
because the materials absorb moisture
and condensate, which results in
cracking and breaking away.
8
NEED
Update of walls and walkway is
needed for structural integrity and
safety and is intended to improve the
appearance for weddings and other
events. Garden brick pavers are newer,
installed circa 2006. Trellis was
replaced in 2019.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
120
Budget Center Asset Name
ACC Conference Center Parking Lot North
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $200,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
onference Center Parking Lot South
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $200,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
lff dams Lake Bridg W
Project Name Project ID
Improvements 1655
SCOPE
Mill and replace existing 108 space
(40,000sf) north asphalt parking lot,
including any necessary base
preparation, storm tile repairs, striping
and restoration.
Improvements
SCOPE
Mill and replace existing 92 space
(35,000sf) north asphalt parking lot,
including any necessary base
preparation, storm tile repairs, striping
and restoration.
Structural Inspection
SCHEDULE
SCOPE
FY2022
Complete inspection and report by a
qualified engineer every 5 years.
FY2023
$1,500
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
NEED
Existing asphalt pavement was last
replaced over 20 years ago and
requires constant annual repairs to
maintian a safe parking surface.
1656
NEED
Existing asphalt pavement was last
replaced over 20 years ago and
requires constant annual repairs to
maintian a safe parking surface.
14
NEED
24' pedestrian bridge crosses the dam
between Adams Lake and Buhl Lake.
Bridge was installed in 1981; last
inspected in 2013 and 2018. Inspection
is part of the park system -wide
management to monitor structural
integrity and identify potential
maintenance and safety issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
121
Budget Center Asset Name
ADD Adams Lake Dam
SCHEDULE
FY2022
FY2023 $2,500
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
dams Lake Lodge
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $25,000
FY2026
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: New
dams Lake Lodge Deck
' t,, ' SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $2,500
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Project Name
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Air Conditioning Installation
SCOPE
Installation of a new air conditioning
system for the 3,500 square foot
Adams Lake Lodge rental facility.
Structural Inspection
SCOPE
Complete inspection and report by
qualified engineer every 5 years.
Project ID
13
NEED
Dam controls water flow from Adams
Lake into Buhl Lake. Dam was installed
in 1977; last inspected in 2012 and
2018. Inspection is part of a park
system -wide management of bridges,
towers, and dams to monitor
structural integrity and identify
potential maintenance and safety
issues.
1638
NEED
It is anticipated that conditioning this
currently unconditions facility will
attract new facility rentals and
increase revenues.
1192
NEED
Deck was constructed as part of the
building's construction in 1973, with
upgrades in 2014. Inspection is part of
the park system -wide management to
monitor structural integrity and
identify potential maintenance and
safety issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
122
Budget Center Asset Name
ADD Addison Playgrounds
SCHEDULE
"M EM-1m
FY2022 $80,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Buhl Lake Boathouse
Project Name Project ID
Improvements 281
SCOPE
NEED
Evaluate playground needs throughout
Adams Lake Playground was
the park and develop an overall plan
completed in 2019, replacing the old
that establishes the Adams Lake
beach playground. Additional features
Playground as a destination for both
are proposed to increase the draw of
day use and camping visitors and
the Adams Lake Playground and
resolves the safety and accessibility
establish it as a parkwide destination.
issues at the Campground Playground.
Campground Playground play
Restroom Construction
SCHEDULE
SCOPE
FY2022
Install the previously designed public
restroom within the Buhl Lake
FY2023
Boathouse, including required utility
FY2024
connections and equipment.
FY2025
FY2026 $70,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
Buhl Lake Dam
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Structural Inspection
structure was installed in 2003 and is
outdated and not compliant with
accessibility or current safety
guidelines. It is located in a damp,
shaded area and there are multiple
areas of rotting wood at grade level.
NEED
Buhl Lake Boathouse constructed in
2019 included design for later addition
of a public restroom. Public
engagement indicates a preference for
restrooms over portable toilets.
956
SCOPE NEED
Complete inspection and report by Inspection is part of the park system-
$1,500 qualified engineer every 5 years. wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
123
Budget Center Asset Name
"r s • • ,
ADD Buhl Lake Steel Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 4 Asset Mgt Type: RM
Cabin 2
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 4 Asset Mgt Type: RM
$3,500
$4,500
$4, 500
Project Name
Structural Inspection
SCOPE
Complete inspection and report by
qualified engineer every 5 years.
HVAC Installation
Project ID
_M
957
NEED
SCOPE
Installation of a new split system
heating and air conditioning system for
the 2 and 4 person cabins, similar to
the system at the 6 person cabins and
yu rts.
HVAC Installatio
SCOPE
Installation of a new split system
heating and air conditioning system for
the 2 and 4 person cabins, similar to
the system at the 6 person cabins and
yu rts.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
NEED
It is anticipated that providing heat
and air conditioning for this currently
unconditions cabin will attract new
facility rentals and increase revenues.
NEED
It is anticipated that providing heat
and air conditioning for this currently
unconditions cabin will attract new
facility rentals and increase revenues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
124
Budget Center Asset Name
ADD Cabin 3
Project Name Project ID
HVAC Installation
1921
SCHEDULE
SCOPE
NEED
FY2022
Installation of a new split system
It is anticipated that providing heat
heating and air conditioning system for
and air conditioning for this currently
FY2023
the 2 and 4 person cabins, similar to
unconditions cabin will attract new
FY2024
$4,500 the system at the 6 person cabins and
facility rentals and increase revenues.
FY2025
yurts.
FY2026
Project Type: Maintenance Projects
Project Priority: Asset Mgt Type: RM
HVAC Installation
1922
SCHEDULE
SCOPE
NEED
FY2022
Installation of a new split system
It is anticipated that providing heat
heating and air conditioning system for
and air conditioning for this currently
FY2023
the 2 and 4 person cabins, similar to
unconditions cabin will attract new
FY2024
the system at the 6 person cabins and
facility rentals and increase revenues.
FY2025
$4,500 yurts.
FY2026
Project Type: Maintenance Projects
Project Priority: Asset Mgt Type: RM
abin 5
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Improvements
SCOPE
Removal and replacement of the
$10,000 existing cabin floor and structural
components of the facility, including
the improvements for the prevention
of insects and rodent damage.
1642
NEED
Existing cabin floor and substructure is
continually subjected to insect and
rodent damage and requires complete
removal.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
125
Budget Center Asset Name
ADD Cabin 6
SCHEDULE
FY2022
FY2023 $10,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
House 1480 W Romeo Road
SCHEDULE
FY2022 $75,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Maintenance Building
SCHEDULE
FY2022 $15,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name Project ID
R
Improvements 1643
SCOPE
Removal and replacement of the
existing cabin floor and structural
components of the facility, including
the improvements for the prevention
of insects and rodent damage.
Conversion to Park Offices
SCOPE
Design/engineering and construction
for the improvements and/or
modifications of the existing
caretakers house to allow the facility
to be used as the main park office,
including site modifications required
for ADA compliance.
Water Softener Replacement
SCOPE
Replace the undersized water softener
with a correctly -sized water softener
to service entire building. Located in
the maintenance building basement.
NEED
Existing cabin floor and substructure is
continually subjected to insect and
rodent damage and requires complete
removal.
1819
NEED
Due to the existing small park office
space, it's hard to find location within
the existing maintenance facility and
since the caretakers house is no longer
a rental facility, locating the park office
within this more prominent location of
the park will better facility customer
service and provide needed office
space.
17
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
126
Budget Center Asset Name
ADD Maintenance Yard and Parking Lot
SCHEDULE
FY2022
WRIN&NM FY2023
.J FY2024
FY2025
} FY2026 $104,400
w
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
ark Entrance Drivel
SCHEDULE
FY2022
FY2023 $100,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024 $15,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Project Name
Maintenance Yard Improvements
SCOPE
Design and implement improvements
to Maintenance Yard. Phase III:
increase capacity of employee parking
areas.
Project ID
145
NEED
Maintenance Building has insufficient
capacity to park all employee vehicles
during the peak operating season,
resulting in random vehicle lawn
parking along the conference center
drive.
Dump Station Road Realignment
SCOPE
Realign a portion of Addison
Boulevard, easterly to the Dump
Station, to effectively separate road
traffic from Dump Station traffic.
Water Softener Installation
SCOPE
Restroom does not currently have a
water softener. Adding a water
softener is expected to reduce mineral
buildup in pipes and increase visitor
comfort.
144
NEED
Parked recreational vehicles being
serviced by the sanitary systems at the
Dump Station interfere with traffic on
Addison Boulevard.
NEED
Installation of water softener.
1658
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
127
Budget Center Asset Name
ADD Sewage Lagoon
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RM
ite and Grounds
SCHEDULE
FY2022
FY2023
FY2024
FY2025
A
FY2026
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: RM
Site and Grounds in
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: RM
Project Name Project ID
Liner Inspection (7 years) 1532
SCOPE NEED
Work with a qualified engineer to Lagoon liners were in stalled in 1992,
conduct inspection of the lagoon liners with the useful life of HDPE being 25-
every 7 years. 30 years; last inspected in YEAR.
Inspect lagoon liners to evaluate the
condition, and the anticipated life of
the liners at the Addison Oaks
$3,500 wastewater treatment plant.
Group Area 3 & 4 Repurposing 1735
SCOPE NEED
$45,000 Upgrade sites within the existing Group campsites are underused and
Group Area 3 & 4 with gravel pads and additional individual RV campsites are
use existing electrical pedestals to needed at the park.
create 30 new individual campsites.
Section A Campsite Concrete Pads 142
SCOPE NEED
Install twenty one (21) 14' x 35' Concrete pads have been installed for
concrete pads at each campsite within the inner loop of campsites in Section
the outer loop of Section A. A. Continued development of concrete
pads would provide an opportunity to
$75,000
increase revenue and visitor comfort,
while reducing operating costs.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
128
Budget Center Asset Name
ADD Water Tower
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: RM
urt 2 Sout�
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: RM
$5,000
$6,000
$6,000
Project Name
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Project ID
301
NEED
Water tower was constructed in 1927
and is not in use; last inspected in
2013. Inspection is part of the park
system -wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
HVAC/Ductless Split Replacement 1720
SCOPE NEED
Replacement of the existing HVAC Original HVAC system requires
system within the yurts. replacement due to it's age and life -
cycle.
HVAC/Ductless Split Replacement 1721
SCOPE NEED
Replacement of the existing HVAC Original HVAC system requires
system within the yurts. replacement due to it's age and life -
cycle.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
129
Budget Center Asset Name
=or
CAT Pavement and Drainage
3 SCHEDULE
FY2022
FY2023
FY2024 $1,000,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 2 Asset Mgt Type: DM
Playground North (1-5 yrs age)
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $30,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Project Name
Parking Lot and Storm Water Improvements
SCOPE
Renovate 160-space gravel parking lot
and implement storm water
improvements. Incorporate the
appropriate number and location of
accessible and van -accessible parking
spaces and signage.
Project ID
147
NEED
The existing lot predates OCPR
management of the property (pre-
2008). Current parking lot and
stormwater management do not
comply with Southfield city ordinances.
Relocation and Landscape Improvement
SCOPE
Relocate small playground (designed
for 5-12 year old children) to separate
it from the pavilion and create a
landscaped buffer space between the
pavilion and the restroom building.
22
NEED
Playground was constructed in 2014.
Due to current placement between the
pavilion and restroom building, public
use of this playground while the
pavilion is rented by a private party
results in a conflict between day use
and rental use.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
130
Budget Center Asset Name
Glen •
GLC Clubhouse
SCHEDULE
FY2022
FY2023 $40,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Clubhouse
s
SCHEDULE
FY2022
$10,000
FY2023 $10,000
FY2024 $10,000
FY2025 $10,000
FY2026 $10,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023 $80,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Deck Replacement
SCOPE
Design and replace clubhouse decking
with composite decking material.
Exterior Stone Repair
SCOPE
Annual repair and replacement of
cultured and real stone elements of
building facade, with a focus on
window lintels and sills.
Grill Room Patio Renovation
SCOPE
Design and construct an update to grill
room outdoor patio, creating a
refreshment center and outdoor grill
area.
Project ID
26
NEED
Deck was installed as part of a
conference center addition to the
original 1930 building in 1999. The
wooden decking requires annual
scraping and staining of wood
surfaces. Replacement with composite
decking is intended to eliminate this
need and reduce maintenance needs.
25
NEED
Building was constructed in 1930, with
additions in 1982 and 1999. Masonry
absorbs moisture and is subject to
freezing and thawing. Routine
maintenance includes tuck pointing
and stone replacement.
29
NEED
Grill room and pro shop are part of the
original 1930 building; awning and
pavers were installed in 2005.
Renovation is intended to provide a
more interesting space for guests to
eat, drink and socialize and encourage
greater use of grill room.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
131
Budget Center Asset Name
Glen •
GLC, GLG Clubhouse
SCHEDULE
FY2022 $140,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
GLC, GLGClubhouse
- -�
SCHEDULE
`
FY2022
'
FY2023
'
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Electrical Improvements
SCOPE
Upgrade and improve the aged
electrical panels, circuits and breakers
to meet codes and electrical supply.
Roof Replacement Shingle
SCOPE
$42,500 Replacement of approximately 4600
square feet of asphalt shingles over
the 1998 banquet center addition.
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $50,000
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: RM
Sign Replacement
SCOPE
Install new sign at the Glen Oaks main
entrance that meets brand standards.
Consider incorporation of LED
marquee to promote golf and
conference center activities. Design
project in coordination with
Wayfinding Work Group.
Project ID
1616
NEED
Upon completing the Arc -Flash study,
various code issues were discovered
that require correction.
1809
NEED
Replacement is required due to age
and continual annual maintenance and
repairs of this roof.
30
NEED
Sign was installed in 1986 and does
not conform to OCPR brand standards.
Update of the sign will identify Glen
Oaks as part of the OCPR brand.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
132
Budget Center Asset Name
Glen •
GLG Clubhouse
SCHEDULE
FY2022
FY2023
FY2024 $20,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
enceline
SCHEDULE
FY2022
FY2023
FY2024 $40,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
��Wlf Course Irrigation Pond
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $224,400
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
ProShop HVAC
SCOPE
Replacement of the 25 ton Aaon Roof
Top Unit (RTU) for the heating,
ventilation and air conditioning of the
pro -shop and grill room.
Replacement
SCOPE
Replace 6' chain -link fence between
the bag drop and the maintenance
building.
Irrigation Pond Relocation
SCOPE
Relocate pond to north side of existing
pump house outside the creek's flow,
creating a water hazard and new water
source for irrigation.
Project ID
1808
NEED
Replacement of the RTU is based on
life -cycle and annual maintenance
costs for repairs.
33
NEED
Golf coursing fenceline was installed in
1982 and 1988. Existing 6' green vinyl -
coated fencing has been repaired
numerous times, to the point that it
detracts from the overall front line
appearance of the facility.
150
NEED
Existing pond is within Pebble Creek
water course and receives road
contaminants and sedimentation from
upstream. The pond requires dredging
approximately every 8-10 years (last
dredged in 2019). Redesign and
relocation of pond would be intended
to reduce maintenance needs and
dredging, improve water quality and
create a water hazard for golf course.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
133
Budget Center Asset Name
Glen •
GLG Golf Course Irrigation System
0
SCHEDULE
FY2022 $500,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Maintenance Building
SCHEDULE
FY2022
FY2023 $15,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Maintenance Chemical Mixing
SCHEDULE
FY2022
FY2023 $25,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Upgrade Phase II
SCOPE
Upgrades to mainline pipe and
isolation valves. Replace existing 4",
6", and 8" mainline pipe with HDPE,
DR 11 from pumpstation to all holes as
identified on the plans. Holes 3 and 4.
Route new mainline pipe and empty
conduit across bridge. New pipe and
conduit are to be HDPE, DR 11. Pipe to
be 4", conduit 2". Strap both to bridge
structure. Abandon existing pipe
through pond.
Project ID
34
NEED
Irrigation system was installed in 1983,
1987 and 1991; automated in 1999.
System was partially replaced in 2016.
Replacement is intended to reduce
maintenance needs and costs.
Maintenance Heater Replacement
SCOPE
Replace three (3) 75,000 BTU tube
heaters that are over 33 years old and
located in the maintenance garage.
Replacement
SCOPE
Replace current structure with a new
300-square foot pole barn sturcture
that meets state requirements and has
a chemical mixing pad and sufficient
secure storage space.
272
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
149
NEED
Current chemical building is a
temporary storage shed in poor
condition and without adequate clear
space for filling spray equipment.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
134
Budget Center Asset Name
Glen •
GLG Northeast Steel Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Northwest Steel Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
outheast Steel Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Project Name
Structural Inspection
SCOPE
$1,850 Complete inspection and report by a
qualified engineer every 5 years.
Structural Inspection
SCOPE
$1,850 Complete inspection and report by a
qualified engineer every 5 years.
Structural Inspection
SCOPE
$1,850 Complete inspection and report by a
qualified engineer every 5 years.
Project ID
959
NEED
31' steel pedestrian bridge was
constructed in 1994; last inspected in
2013 and 2018. Inspection is part of
the park system -wide management to
monitor structural integrity and
identify potential maintenance and
safety issues.
960
NEED
24' steel pedestrian bridge was
constructed in 1994; last inspected in
2013 and 2018. Inspection is part of
the park system -wide management to
monitor structural integrity and
identify potential maintenance and
safety issues.
32
NEED
40' steel pedestrian bridge was
constructed in 1991; last inspected in
2013 and 2018. Inspection is part of
the park system -wide management to
monitor structural integrity and
identify potential maintenance and
safety issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
135
Budget Center Asset Name
Glen •
GLG Southwest Steel Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Wood Pedestrian Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
$2,350
$2,350
Project Name
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Project ID
958
NEED
70' steel pedestrian bridge was
constructed in 1991; last inspected in
2013 and 2018. Inspection is part of
the park system -wide management to
monitor structural integrity and
identify potential maintenance and
safety issues.
961
NEED
81' wood pedestrian bridge was
constructed in 1991; last inspected in
2013 and 2018. Inspection is part of
the park system -wide management to
monitor structural integrity and
identify potential maintenance and
safety issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
136
Budget Center Asset Name
8MEM=W
GRV Proposed New
SCHEDULE
FY2022
FY2023 $152,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
ab
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RM
Cabi
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RM
$4,500
$4,500
Project Name
Dumpstation Queuing Road and Trailer Parking
SCOPE
Create a one-way gravel loop road into
adjacent field from dump station road.
Evaluate need and capacity for
additional dump station. Consider
construction of a gravel ORV parking
areas as part of the queuing road.
HVAC Replacement
SCOPE
Replace the window -type HVAC unit
installed in 2010 with a ductless split
system for higher efficiency and longer
lasting equipment.
HVAC Replacement
SCOPE
Replace the window -type HVAC unit
installed in 2012 with a ductless split
system for higher efficiency and longer
lasting equipment.
Project ID
152
NEED
During peak recreation vehicle sanitary
dumping, queuing of vehicles blocks
other pedestrian and vehicle traffic
resulting in safety and customer
service issues. Need for accessibility
updates have been identified in the
Transition Plan.
38
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
40
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
137
Budget Center Asset Name
GRV Cabin 8
SCHEDULE
FY2022
FY2023
FY2024 $4,500
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RM
Project Name Project ID
HVAC Replacement 946
SCOPE NEED
Replace the window -type HVAC unit Project is part of the park system -wide
installed in 2012 with a ductless split management of building equipment.
system for higher efficiency and longer Replacement is scheduled when
lasting equipment. warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Decking Replacements
153
SCHEDULE
SCOPE
NEED
FY2022 $84,000
Replace 300-400 square feet of
Eight cabins were constructed in 1996
existing wood deck at each cabin. Do
and 2002. Wood decks of cabins are
FY2023
replacements at the four 400 SF cabins
deteriorating and require frequent
FY2024
first; followed by four 300 SF cabins.
replacement of boards.
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
Air Conditioner Installation
1578
SCOPE NEED
Design/engineering and installation of Installation of an air conditioning
an new air conditioning system for the system will improve worker
unconditioned kitchen and concession productivity and health.
$25,000 space.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
138
Budget Center Asset Name
Groveland Oaks
GRV Concession
SCHEDULE
FY2022
FY2023
FY2024 $25,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
Concession
SCHEDULE
FY2022
FY2023 $20,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
4000kritact Station_'W
SCHEDULE
FY2022
FY2023 $170,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Project Name
Generator Installation
SCOPE
Engineering, sizing and installation of a
new electrical generator at the
Concession/Restroom/Shower facility.
Utility Enclosure
SCOPE
Design/engineering of a pemanent
roof structure/enclosure over the
existing outdoor utility equipment for
water supply and softning systems.
Update or Replacement
SCOPE
Update or replace contact station to
provide employee restrooms, increase
employee workspace and provide safe
and universally accessible pedestrian
access. Phase I: Design; Phase II:
Construction
Project ID
1579
NEED
Installation is required due to frequent
power outages to prevent food
spoilage at the concession and allow
the restroom/shower facility to remain
open during park operations.
1821
NEED
Roof structure/enclosure will increase
expected life -cycle of the utility
equipment and lower annual
maintenance costs.
242
NEED
Facility does not meet the needs of the
current capacity of the park and
campground. Accessibility issues have
been identified in the transition plan.
Employees must cross traffic to use
the restroom. If the ORV park is
developed, the anticipated longer
season and increased usage will cause
additional issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
139
Budget Center Asset Name Project Name
GRV Cottage Island Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Firewood ANWIll
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
roup Area 1 Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Structural Inspection
SCOPE
$1,850 Complete inspection and report by a
qualified engineer every five 5 years.
Project ID
41
NEED
Bridge was installed in 1979; last
inspected in 2012 and 2018.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
Replacement 160
SCOPE NEED
$15,000 Replace existing shed with enclosed Current wood storage shed does not
pole barn type building, approximately have sufficient capacity to serve
24' x 18', with cement floor and roll -up campers needs, provide dry storage, or
garage door that will accommodate facility inventory of stock.
entry of tractor to stack firewood.
Roof Replacement Shingle
SCOPE
$5,000 Removal and replacement of
approximately 6 Squares (100SF/Sq) of
asphalt shingle roofing, not including
any structural or wood deck
replacements.
1034
NEED
Original asphalt shingle roofs were
install as part the 2003 Campground
Renovation project and have an
approximate life -cycle of 20 years.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
140
Budget Center Asset Name
8MEM=W
GRV Group Area 10 and 11 Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
ROMEO
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
roup Area 12 and 13 Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
roup Area 2 and 3 Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
$6,000
$6,000
$6,000
Project Name
Roof Replacement Shingle
SCOPE
Removal and replacement of
approximately 6 Squares (100SF/Sq) of
asphalt shingle roofing, not including
any structural or wood deck
replacements.
Roof Replacement Shingle
SCOPE
Removal and replacement of
approximately 6 Squares (100SF/Sq) of
asphalt shingle roofing, not including
any structural or wood deck
replacements.
Roof Replacement Shingle
SCOPE
Removal and replacement of
approximately 6 Squares (100SF/Sq) of
asphalt shingle roofing, not including
any structural or wood deck
replacements.
Project ID
1035
NEED
Original asphalt shingle roofs were
install as part the 2003 Campground
Renovation project and have an
approximate life -cycle of 20 years.
1036
NEED
Original asphalt shingle roofs were
install as part the 2003 Campground
Renovation project and have an
approximate life -cycle of 20 years.
1037
NEED
Original asphalt shingle roofs were
install as part the 2003 Campground
Renovation project and have an
approximate life -cycle of 20 years.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
141
Budget Center Asset Name
8MEM=W
GRV Group Area 4 and 5 Pavilion
f SCHEDULE
:'
r FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
roup Area 6 and 7 Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
I
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
roup Area 8 and 9 Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
$6,000
$6,000
$6,000
Project Name
Roof Replacement Shingle
SCOPE
Removal and replacement of
approximately 6 Squares (100SF/Sq) of
asphalt shingle roofing, not including
any structural or wood deck
replacements.
Roof Replacement Shingle
SCOPE
Removal and replacement of
approximately 6 Squares (100SF/Sq) of
asphalt shingle roofing, not including
any structural or wood deck
replacements.
Roof Replacement Shingle
SCOPE
Removal and replacement of
approximately 6 Squares (100SF/Sq) of
asphalt shingle roofing, not including
any structural or wood deck
replacements.
Project ID
1038
NEED
Original asphalt shingle roofs were
install as part the 2003 Campground
Renovation project and have an
approximate life -cycle of 20 years.
1039
NEED
Original asphalt shingle roofs were
install as part the 2003 Campground
Renovation project and have an
approximate life -cycle of 20 years.
1040
NEED
Original asphalt shingle roofs were
install as part the 2003 Campground
Renovation project and have an
approximate life -cycle of 20 years.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
142
Budget Center Asset Name
8MEM=W
GRV Mathews Island Bridge
SCHEDULE
FY2022
FY2023
FY2024 $90,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Mathews Island Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Name
Replacement
SCOPE
Replace bridge.
Structural Inspection
SCOPE
$1,850
Complete inspection and report by a
$1,850
qualified engineer every year until
bridge is replaced. Commence
$1,850
inspections again 15 years after
$1,850
replacement.
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Paradise Island Long Span Bridge
SCHEDULE
FY2022
FY2023
FY2024 $500,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Replacement
SCOPE
Replace bridge and abutments. Bridge
is closed due to concrete abutment
issues and will remain closed for 2020
operating season. Temporary shoring
to be implemented in late 2019.
Project ID
1527
NEED
50' pedestrian bridge was installed in
1979; last inspected in 2013 and 2018.
Regular inspections have identified
structural issues with the existing
bridge the need to be addressed in the
near future. Refer to structural
engineering report. Structural
inspections not needed until 15 years
after replacement is completed.
45
NEED
50' pedestrian bridge was installed in
1979; last inspected in 2013 and 2018.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
1526
NEED
150' steel arch frame pedestrian
bridge was installed in 1979; last
inspected in 2013 and 2018. Regular
inspections have identified structural
issues with the existing steel frame
and concrete abutments that need to
be addressed in the near future. Refer
to structural engineering report.
Structural inspections not needed until
15 years after replacement is
completed.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
143
Budget Center Asset Name
GRV Paradise Island Long Span Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Name
Structural Inspection
SCOPE
$2,350 Complete inspection and report by a
$2,350 qualified engineer every year until
replacement of bridge is completed.
$2,350
$2,350
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Paradise Island Short Span Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
ark House 6000 Grange Hall
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: Asset Mgt Type: New
$1,850
$25,000
Structural Inspection
SCOPE
Complete inspection and report with a
qualified engineer every 5 years.
Air Conditioner Installation
SCOPE
Replace existing 1970s installed boiler
heating system with central heating,
ventilation and cooling system,
including demolition of existing radiant
heat coils and plumbing and
installation of new duct distribution
system.
Project ID
42
NEED
150' pedestrian bridge was installed in
1979; last inspected in 2012 and 2018.
Need for annual inspection until
replacement is made was identified in
2018 structural inspection report.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues. Inspection schedule should
recommence 15 years after
replacement is made.
43
NEED
50' pedestrian bridge was installed in
1979; last inspected in 2013 and 2018.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
1584
NEED
Due to the age, inefficency and
condensation issues of the existing
boiler system, the system could be
replaced with a more effiecient central
HVAC system
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
144
Budget Center Asset Name
8MEM=V
GRV Park House 6000 Grange Hall
SCHEDULE
FY2022 $17,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Park House 6000 Grange Hall
SCHEDULE
FY2022
FY2023 $15,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
���avement and Drainage
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $140,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Roof Replacement Shingle
SCOPE
Remove and replace the 2,150-square
foot asphalt shingle roof with the
standard 30-year architectural asphalt
shingle, including any necessary roof
sheathing repacement or repairs.
Water Supply Generator
SCOPE
Install a new generator for the park
house.
Project ID
157
NEED
House was constructed in 1980.
Project is part of the park system -wide
management of building roofs.
Replacement is scheduled when
warranted by the age and condition of
roofing materials and structural
elements and is intended to reduce
need for repairs.
1585
NEED
Due to frequent power outages and
the water supply well for the
maintenance yard is feed from the
residential well, providing the
alternate power to the residence will
maintain power for the existing well to
supply the maintenance the required
water supply for proper park
operations.
Entrance Drive Repair or Replacement
SCOPE
Full depth milling of existing 1,000
entrance boulevard from Dixie
Highway to and around the existing
contact station.
1577
NEED
Original entrance boulevard installed
in the early 1980s is over 35 years old,
with no history of replacement or
repaving. Average life -cycle of asphalt
pavment is approximately 20 years.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
145
Budget Center Asset Name
3MEM=W
GRV Pines Playground
SCHEDULE
FY2022 $80,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Recreation Pavilio
SCHEDULE
FY2022
r
FY2023
FY2024
FY2025 $40,500
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
��ffection A Restroom
SCHEDULE
FY2022
FY2023 $330,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Replacement
SCOPE
Replacement and update of the
existing 2003 installed playground
Roof Replacement Shingle
SCOPE
Remove and replace the 5,240-square
foot asphalt shingle roof with the
standard 30-year architectural asphalt
shingle, including any necessary roof
sheathing repacement or repairs.
Interior Renovation
SCOPE
Renovate interior to update
deteriorated materials and fixtures
and to comply with accessibility
standards.
Project ID
NEED
Replacement is required to remain
current with all applicable public
playground safety standards and
trends.
1224
155
NEED
Structure was constructed in 1985.
Project is part of the park system -wide
management of building roofs.
Replacement is scheduled when
warranted by the age and condition of
roofing materials and structural
elements and is intended to reduce
need for repairs.
158
NEED
Restroom was constructed in 1972.
Ceramic tiles and drop ceiling are in
poor condition. Need for accessibility
updates was identified in the
Transition Plan.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
146
Budget Center Asset Name
8MEM=V
GRV Septic Field
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 2 Asset Mgt Type: RM
Septic Field
>,d� SCHEDULE
Project Name
Inspection
SCOPE
Work with a qualified geological
engineer to conduct inspection of the
$5,000 septic field every five (5) years.
FY2022
FY2023
FY2024
FY2025 $1,500,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project ID
46
NEED
Septic field was installed in 1993;
expanded in 2003; inspected in 2012
and 2018. Inspections are scheduled
every 5 years, as required by Oakland
County Health Department, and are
intended to ensure proper function of
system.
Parkwide Sanitary Improvements
SCOPE
Connect all internal park facilities into
a new collection system of
underground sanitary mains, in
anticipation of the construction for the
new NW Oakland Sanitary Interceptor
from Genesee County.
1927
NEED
As part of the Holly and Groveland
Township's request to extend sanitary
sewers for Genessee County into
Oakland County, particularly to Grange
Hall Road and Dixie Highway, the
Water Resource Commissioner's study
has estimated 114 Residential
Equivalent Units for the Groveland
Oaks Campground. This consideration
is based in part by EGLE's
recommendation for Parks to study
alternative sanitary disposal systems
for the (5) aging septic fields located at
the campground and site.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
147
Budget Center Asset Name Project Name Project ID
Mwar IF
HRV Proposed New Parking Lot
SCHEDULE
SCOPE NEED
FY2022 $200,000
All earthwork and grading necessary to Earthwork and grading required by site
complete the second phase installation plan review and for noise control.
FY2023
of the previously designed/engineered
FY2024
220,000 square foot southern asphalt
FY2025
millings parking lot and park entrance,
along the Dixie Hwy property line,
FY2026
according to site plan requirements
1
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
Proposed New Parking Lot Grant Reimbursement
SCHEDULE SCOPE h.
FY2022 ($200,000) Project funding from the Michigan
FY2023 Department of Natural Resources.
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
148
Budget Center Asset Name
IN D Boathouse
Project Name
Project ID
Roof Replacement Shingle
161
SCHEDULE
SCOPE
NEED
FY2022 $18,500
Remove and replace the 2,355-square
Building was constructed in 1978 and
FY2023
foot asphalt shingle roof with standard
updated in 2001. Project is part of the
30-year architectural asphalt shingle,
park system -wide management of
FY2024
including any necessary roof sheathing
building roofs. Replacement is
FY2025
repacement or repairs.
scheduled when warranted by the age
and condition of roofing materials and
FY2026
structural elements and is intended to
reduce need for repairs.
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Camp Wilderness Bridge
SCHEDULE
FY2022
FY2023
FY2024 $3,000
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Camp Wilderness Pavilion 1 North
SCHEDULE
FY2022
FY2023
FY2024 $6,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Roof Replacement
SCOPE
Replacement of the 1100-square foot
asphalt shingle roof.
277
NEED
Timber bridge was constructed in
YEAR; last inspected in 2018.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
1623
NEED
Requires replacement due to age and
existing condition.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
149
Budget Center Asset Name
IND Camp Wilderness Pavilion 2 South
4 SCHEDULE
FY2022
FY2023
FY2024 $6,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Concession and Bathhouse
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
ock and Boardwalk
SCHEDULE
FY2022
FY2023
f,
FY2024
b
FY2025
,. FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Roof Replacement
SCOPE
Replacement of the 1100-square foot
asphalt shingle roof.
Project ID
1624
NEED
Requires replacement due to age and
existing condition.
Site and Building Improvements 163
SCOPE
NEED
$25,000 Develop concepts to improve beach
Concession and bathhouse were built
area, beach buildings and to meet
in 1986. Beach area is very popular
accessibility guidelines, accomplishing
and in need of updates to retain
universal access to the extent possible.
current users and attract new visitors.
Develop overall plan to update or
Circulation in lake needs to be
replace original park structures and
increased, bathhouse is subject to
implement phased improvements.
leaking and mildew, concession
building is unused, landscaping needs
to be assessed and upgraded.
$200,000
Replacements
SCOPE
Evaluate access points on Crooked
Lake and develop an overall lake
access plan to comply with ADA
standards; identify and prioritize
replacements that meet public need
53
NEED
Boardwalks and docks are maintained
regularly. Specific docks have been
identified that have failed members
and require replacement to ensure
safety of trail users.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
150
Budget Center Asset Name Project Name Project ID
IND Hidden Springs Dam
Structural Inspection
SCHEDULE
SCOPE
FY2022
Complete inspection and report by a
qualified engineer every five years.
FY2023
FY2024
$3,000
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Hidden Springs Parking Lot
� SCHEDULE
FY2022
` FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RM
REMELke oint Pavil
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
$4,500
Storm Sewer Maintenance
SCOPE
Vacuum drains in Hidden Springs
parking lot every 5 years.
Roof Replacement Shingle
275
NEED
Dam is located on the south side of
Hidden Springs Beach; last inspected in
2018. Inspection is part of the park
system -wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
217
NEED
Paved parking lot has multiple drains
that drain into wetland south of
beach. Oakland County Water
Resources Commissioner's office
conducted inspection in 2017 and
recommended to vacuum drains every
5 years. Drains were vacuumed last in
1058
SCOPE NEED
$6,000 Replacement of the 1100-square foot Requires replacement due to age and
asphalt shingle roof. existing condition.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
151
Budget Center Asset Name
IND Maintenance Cold Storage
SCHEDULE
FY2022
FY2023
i FY2024
FY2025
FY2026
$132,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
Maintenance Cold Storage
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
q000ko.raine Knoll Playground
SCHEDULE
FY2022
FY2023
le � �� FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
$23,000
$80,000
Project Name
Pole Barn Addition
SCOPE
Design of an enclosed 1,800 square
foot pole barn structure off the
existing cold storage building,
including the necessary earthwork,
concrete slab and restoration.
Roof Replacement
SCOPE
Replacement of the 3,380square foot
asphalt shingle roof.
Replacement
SCOPE
Replace playground with a similar -
sized accessible playground compliant
with Consumer Products Safety
Commission public playground
guidelines.
Project ID
54
NEED
Tractor implements are currently
stored outside unprotected from the
weather; pole barn addition would
provide for cold storage and improved
maintenance of this equipment.
1630
NEED
Requires replacement due to age and
existing condition.
56
NEED
Play structure was installed in 1998
and is outdated and not compliant
with accessibility or current safety
guidelines.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
152
Budget Center Asset Name Project Name Project ID
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: DM
IN Nature Center Bridge
Repair
SCOPE
Remove deck planks and railings;
thoroughly clean steel components via
abrasive blasting and cover structural
steel components with an appropriate
corrosion resistant coating. Install new
deck planks with appropriately sized
gaps between them. Install deck
fasteners no closer to edges than
specified by the "National Design
Specification for Wood Construction".
Structural Inspection
SCHEDULE
SCOPE
FY2022
Complete inspection and report by a
qualified engineer every 5 years.
FY2023
FY2024
$3,000
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
rk Entrance Boulevard
SCHEDULE
FY2022 $287,500
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Paving
SCOPE
1-1/2" milling and paving of the main
1,550 linear foot, 4-lane park entrance
boulevard, from Sashabaw Road to a
point west of the entrance boulvard,
where the 2-lane park entrance road
begins, including all paved parking lot
approaches.
1201
NEED
Need for bridge repairs identified in
the structural inspection performed in
October 2018.
276
NEED
Timber bridge was last inspected in
2018. Inspection is part of the park
system -wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
1980
NEED
Original asphalt entrance was installed
in 1970's and requires annual
pavement maintenance for removing
portions of the road and paving (cut
and Patch) to filling pavement crack.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
153
Budget Center Asset Name
IND Park Entrance Road
SCHEDULE
FY2022 $438,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Park House 9489 Sashabaw
SCHEDULE
FY2022
FY2023 $10,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022 $487,500
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Paving
SCOPE
1-1/2" milling and paving of the main
2.920 linear foot, 2-lane park entrance
road, from the a point west of the
entrance boulvard to the T-
intersection, including all paved
parking lot approaches.
HVAC Replacement
SCOPE
Replace the 40,000 BTU, 40 gallon
water heater installed prior to our
purchase of the facility.
Paving
SCOPE
1-1/2" milling and paving of the 3,250
linear foot, 2-lane park road, from the
T-intersection to the Nature center
parking lot, including all paved parking
lot approaches.
Project ID
1979
NEED
Original asphalt road was installed in
1998 and requires annual pavement
maintenance for removing portions of
the road and paving (cut and patch) to
filling pavement crack.
49
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
1982
NEED
Original asphalt road was installed in
1998 and requires annual pavement
maintenance for removing portions of
the road and paving (cut and patch) to
filling pavement crack.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
154
Budget Center Asset Name
IND Park Road South
SCHEDULE
FY2022 $337,500
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
ine Grove Playground
SCHEDULE
FY2022
FY2023 $80,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
iver Loop East Bridge
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $5,000
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Project Name
Paving
SCOPE
1-1/2" milling and paving of the 3,250
linear foot, 2-lane park road, from the
T-intersection to the Nature center
parking lot, including all paved parking
lot approaches.
Replacement
SCOPE
Replace playground with a similar -
sized accessible playground compliant
with Consumer Products Safety
Commission public playground
guidelines.
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Project ID
1983
NEED
Original asphalt road was installed in
1998 and requires annual pavement
maintenance for removing portions of
the road and paving (cut and patch) to
filling pavement crack.
NEED
Play structure was installed in 1997
and is outdated and not compliant
with accessibility or current safety
guidelines.
58
218
NEED
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
155
Budget Center Asset Name
IND Sensory Garden and Pond
SCHEDULE
FY2022
FY2023 $20,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
rail G Habitat TraiM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 2 Asset Mgt Type: DM
win Chimneys Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
$50,000
$21,770
Project Name
Improvements
SCOPE
Replace sensory garden interpretative
pond and trellis.
Improvements
SCOPE
Evaluate 0.6-mile Habitat Trail and its
connector with the Nature Center
entrance. Design and implement
improvements that will meet
accessibility guidelines and improve
usability as a teaching trail.
Roof Replacement Shingle
SCOPE
Replacement of the 3,300-square foot
asphalt shingle roof.
Project ID
59
NEED
Pond and trellis located near Wint
Nature Center were installed in 2000.
Pond and has developed leaks in the
pond liner and trellis is failing. The
project is intended to reduce the need
for maintenance and repairs.
1511
NEED
Habitat Trail and connector to Nature
Center building does not meet ADA
guidelines.
376
NEED
Requires replacement due to age and
existing condition.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
156
Budget Center Asset Name
IND Twin Chimneys Restroom
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Waters Edge Playground
SCHEDULE
ow FY2022
FY2023 $80,000
FY2024
FY2025
FY2026
Project Name
JRoof Replacement Shingle
SCOPE
Replacement of the 1,500-square foot
asphalt shingle roof.
$6,650
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
SCOPE
Replace playground with a similar -
sized accessible playground compliant
with Consumer Products Safety
Commission public playground
guidelines.
Project ID
. 1071
NEED
Requires replacement due to age and
existing condition.
f 1
L A
NEED
Play structure is outdated and not
compliant with accessibility or current
safety guidelines.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
157
Budget Center Asset Name
Lyon •.
LYC, LYG Clubhouse
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $180,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
LYC, LYG avement and Drainage
SCHEDULE
FY2022
FY2023 $924,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
���avement and Drainage
SCHEDULE
FY2022
FY2023 $556,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Interior Renovation
SCOPE
Renovate conference center, grill room
and other public spaces within the
clubhouse, including installation of
partitions in the conference center
main room to divide area into three
rooms. Phase I: carpet replacement
(LYC operating budget in FY2018);
Phase II: design and installation of
room partitioning systems
Parking Lot Replacement
SCOPE
Replace two existing parking lots,
including any necessary gravel base
repairs. East Parking Lot - LYG
allocation (81,000 square feet); West
parking lot - LYC allocation (86,000
square feet).
Entrance Drive Replacement
SCOPE
Replace entrance drive to conference
center and golf course. Consider new
lighting and installation of bar gate as
part of the project.
Project ID
60
NEED
Carpet and fixtures were installed
when the facility was constructed in
2001 and are worn. Conference center
main room is too large for intimate
gatherings or smaller meetings —
providing partitions would be intended
to make the facility attractive to rent
for more types of groups and events.
NEED
Asphalt and base are failing and
requires frequent patching.
Replacement will improve
attractiveness of the facility and
reduce maintenance needs.
63
61
NEED
Construction of existing roads in 2000
were built on heavy clay soils with
minimal under -drainage and gravel
base resulting in poor asphalt
conditions. Pavement, especially next
to the shoulders, is failing. Gravel
shoulders are difficult to maintain due
to snow removal in winter.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
158
Budget Center Asset Name Project Name
Lyon •.
LYG Golf Driving Range
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
$25,000
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: RM
olf Restroom
Ill W SCHEDULE
FY2022
FY2023
FY2024
FY2025 $10,000
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
ole #11 Boardwalk
SCHEDULE
FY2022
FY2023
FY2024
FY2025
`. FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Improvements
SCOPE
Consider installing Driving Range
targets that give feedback and
guidance on skill levels. Consider
adding chipping area.
Floor Resurfacing
SCOPE
Epoxy floors. Consider adding grit to
make slip proof.
Replacement
Project ID
404
NEED
Driving Range improvements are an
opportunity to increase visitor
satisfaction and potential revenue.
NEED
The two on -course restrooms are in
good shape. Floors need to be
refinished.
221
164
SCOPE NEED
Remove and replace 350' of 10' wide Boardwalk at Hole #11 was installed in
$70,000 boardwalk. 2002 as part of original golf course
construction. Boardwalk is damaged
by frost and heaving.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
159
Budget Center Asset Name
Lyon •.
LYG Hole #17 Boardwalk
SCHEDULE
FY2022
FY2023 $75,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Pavement and Drainage
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $165,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Proposed New =
Project Name
Replacement
SCOPE
Replace approximately 100' of golf cart
boardwalk, including the widening of
deck from 10' to 14' for two-lane
traffic and access for emergency
vehicles.
Project ID
62
NEED
Boardwalk at Hole #17 was installed in
2002 as part of original golf course
construction. Inadequate base post
construction resulted in irregular frost
heaving of the deck. Widening of the
boardwalk is needed to accommodate
emergency vehicles.
Sports Field Parking Lot Expansion
SCOPE
Grade area and expand gravel parking
lot to accommodate 60-80 vehicles for
various sports events.
166
NEED
Existing overflow lawn parking area
has continual muddy and slippery
conditions. Conversion to a gravel lot
would be intended to make the lot
usable year-round, reduce
maintenance needs, and increase level
of customer service at revenue -
generating facilities.
Dog Park and Sports Field Restroom
SCHEDULE
SCOPE
FY2022
Design and construct approximately
1,000 square foot permanent restroom
FY2023
for use by dog park and sports field
FY2024
visitors. Determine location based on
FY2025
available access to existing septic field
and convenience between dog park
FY2026 $275,000
and sports fields.
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: New
165
NEED
Portable toilet currently in place does
not serve the needs of both Dog Park
and Sport Field users.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
160
Budget Center Asset Name
Lyon •.
LYP Woods Edge Playground
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Project Name
Replacement
SCOPE
Replace playground at Woods Edge
$80,000 Pavilion with a similar -sized accessible
playground compliant with Consumer
Products Safety Commission public
playground guidelines.
Project ID
1535
NEED
Play structure was installed in 2003
and is outdated and not compliant
with accessibility or current safety
guidelines.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
161
Budget Center Asset Name
ORN
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Entrance Signs (3)
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: RM
ake 16 Boat Ramp and Dock
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Project ID
AM=
Boundary Fence Replacement (ROW) 1636,
SCOPE
Replacement of approximately 16,000
LF existing 6' chain -link boundary
fence adjacent to the existing road
rights of way. (Baldwin, Clarkston and
Joslyn Roads)
SCOPE
Design and install entrance signs that
comply with sign and brand standards
Coordinate project with Wayfinding
$45,000 Work Group.
$25,000
SCOPE
Replace 30' x 12' x 8" thickness
concrete ramp and 40' x 8' floating
dock. Widen concrete launch so the
skid pier sits on the concrete planks.
NEED
Replacement is required due to age,
condition and continual annual
maintenance.
NEED
Orion Oaks has four entrances. None
of the entrances comply with sign or
brand standards.
■ ■
NEED
Concrete ramp and floating dock are
failing. Replacement would be
intended to improve visitor safety and
experience and accessibility.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
162
Budget Center Asset Name
SEMM"
ORN Lake 16 Fishing Pier
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $190,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
aintenance Yard
SCHEDULE
FY2022
FY2023 $10,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
ail D Draeon Loop
SCHEDULE
FY2022
FY2023 $190,000
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 5 Asset Mgt Type: DM
Project Name
Replacement
SCOPE
Design and construct approximately
450' universally accessible fishing pier
to replace existing structure. Include
approximately 160' access route and
accessible parking improvements.
Cold Storage Design
SCOPE
Design cold storage facility using two
purchased shipping containers, adding
a roof and utilities.
Accessibility Enhancements
SCOPE
Implement Dragon Loop trail
improvements to the Dog Park from
section completed in FY2018 to the
Dog Park.
Project ID
168
NEED
Floats are failing on fishing pier.
Fishing pier is 25 years old, requires
frequent maintenance and continues
to deteriorate.
NEED
Portable garage is in place now for
equipment, but most equipment is
stored in the open. Need increased
capacity for cold storage and
replacement of current temporary
building.
223
245
NEED
Trail surface does not meet
accessibility guidelines. Phase I of this
project was approved as part of the
FY2018 Trail Enhancements program.
3,408 linear feet of the Dragon Loop
between markers #13 and #30 were
improved to specification. Phase II was
cancelled due to budget constraints.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
163
Budget Center Asset Name
• • 1 • . EMPF
ORN Utilities and Infr
Project Name
astructure Water and Electrical to Maintenance Shed
SCHEDULE SCOPE NEED
FY2022 Establish utility lines to maintenance Heat, water and electrical are needed
FY2023 $30,000 shed, including water and electrical. for staff to use the maintenance shed
in four seasons.
Project ID
FY2024
FY2025
FY2026
Project Type. Capital Projects
Project Priority: 3 Asset Mgt Type: New
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
164
Budget Center Asset Name
-• Oaks J -a -M
RDD Dog Park Contact Station Shed
SCHEDULE
a
FY2022
FY2023 $25,000
FY2024
i
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Utilities and Infrastructure
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
$4,500
$30,000
Project Name
Replacement
SCOPE
Replace existing ticket booth with a
100 SF contact station, with HVAC and
POS network capabililties. Install
security cameras.
Drinking Fountains
SCOPE
Replace the existing dog bowl filling
hose bib with an appropriate
accessible water fountain for both
humans and dogs.
Golf Netting Replacement
SCOPE
Replacement of approximately 375 LF
of 50' high golf netting along the
fairway of hole #2.
Project ID
711
NEED
Existing contact station is a temporary
structure that is inadequate for
required functions and for employee
comfort and safety.
1692
NEED
There is no water fountain for the dog
park guests.
1683
NEED
Replacement is required to prevent
property damage and ensure the
safety of the neighboring residential
structures and families.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
165
Budget Center Asset Name
• •
RDG Golf Cart Barn
Project Name Project ID
Expansion 171
SCHEDULE
SCOPE NEED
FY2022
Design and construct expansion to cart Cart barn is too small for current
barn. operation. Barn is unheated, which
FY2023
affects life of golf cart batteries.
FY2024
FY2025
FY2026 $110,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Golf Cart Tunnel
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $100,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
ELolf Course Irrigation System
SCHEDULE
FY2022
FY2023
FY2024 $90,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Replacement
SCOPE
Design and replace of the existing
corrugated metal structured tunnel.
Include increased size to
accommodate maintenance vehicles
Work with local partners to identify
need for pathway and potential cost
share.
Irrigation Improvements
SCOPE
Upgrade irrigation controllers and
satellites.
69
NEED
Tunnel is a culvert and is deteriorating.
Pathway over tunnel is fenced on both
sides, dividing the golf course and
connecting the neighborhood with the
school. Fencing is needed to keep
pedestrians safe from golf balls.
172
NEED
Irrigation controllers and satellites are
outdated.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
166
Budget Center Asset Name
• •.
RDG Park Maintenance Building
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Park Maintenance Building
SCHEDULE
FY2022
FY2023
. _ FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: Asset Mgt Type: DM
Park Maintenance Building
SCHEDULE
FY2022
y , FY2023
FY2024
\� FY2025
�e FY2026
Project Type: Maintenance Projects
Project Priority: Asset Mgt Type: DM
$242,000
$6,000
$1,500
Project Name
Cold storage expansion
SCOPE
Expand Maintenance Building, adding
2,500 square feet, to provide cold
storage for equipment and to free up
space in building for work, meeting
and office areas.
Project ID
173
NEED
Maintenance Building was built to
support golf course and smaller
waterpark and does not meet needs of
current park operation with 5 separate
facilities and increased maintenance
staffing. Current equipment storage is
insufficient, resulting in equipment
stored outside during operational
months resulting in shorter equipment
life. This project need to be assessed
as part of the FY2021-23 golf operation
review.
HVAC Replacement with Split System
SCOPE
Replace and install a new HVAC system
for the maintenance building offices
and break room.
Water heater replacement
SCOPE
Preventative replacement of the
existing 20+ year old water heater in
the maintenance building.
817
NEED
Existing 20+ year old heating system
beyond it's manufacturer
recommended life cycle. Air
Conditioning is recommended not only
for employee comfort, but to keep the
required computer and electronic
control system cooler during the
summer months.
818
NEED
Existing 20+ year old water heater is
beyond it's manufacturer
recommended life cycle.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
167
Budget Center Asset Name
• Oaks J
RDG RDP RWP Park Maintenance Building
7--- I JU,
SCHEDUL
FY2022
Project Name
Network update
E SCOPE
FY2023
FY2024
FY2025
FY2026 $25,000
Install fiber optic cable to the existing
maintenance building.
Project ID
NEED
Current network is cellular based, not
connected to the County intranet and
is insufficent for network based
control systems.
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Park Maintenance Yard Expansion and Improvement
.,. Wr SCHEDULE SCOPE NEED
FY2022
FY2023
. _ FY2024
FY2025
FY2026 $407,000
Awl
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
41111Wroposed New
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $75,000
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: New
Redesign, expand and update
Maintenance Yard to meet operational
need, incorporate forecast for future
needs.
Pavilion at Tent Site
SCOPE
Replace the existing 40'x20' canvas
tent with a wooden post and
laminated arched beam pavilion kit
with electrical and lighting, including
concrete paved pad.
174
Maintenance Yard does not meet need
of current park operation. Parking and
vehicle turning radiuss for
maintenance staff and equipment is
insufficient. Entrance apron is too
short between street and gate, which
creates a problem with delivery trucks
entering blocking road. This project
need to be assessed as part of the
FY2021-23 golf operation review.
NEED
Replacement of tent with permanent
structure is an opportunity to increase
facility usage and lower maintenance
costs.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
168
Budget Center Asset Name
RDP Boundaries
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $170,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Boundaries
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 ($82,500)
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
��Wt��Wr
SCHEDULE
FY2022
FY2023 $348,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Fenceline Management
SCOPE
Inventory and prioritize fence repair
and replacement needs and phase
implementation over 3 years. 50% cost
share by City of Madison Heights
anticipated.
Dimensions: east property line =
2,800'; south property line and
southern two thirds of west property
line = 2,300'; north property line and
northern one third of west property
line = 1,800'.
Project ID
NEED
Sections of fence and gates are
damaged or deteriorating.
177
Fenceline Management Reimbursement 1918
SCOPE NEED
Reimbursement by Madison Heights See Project ID 177.
per lease agreement.
HVAC replacement 71
SCOPE
Replacement of inefficient and
undersized heating, ventilation and air
conditioning (HVAC) system. Project is
in coordination with City of Madison
Heights Capital Improvement Plan.
50% cost share by City of Madison
Heights is anticipated.
NEED
Structure was built in 1996 and
expanded in 2001; HVAC system was
installed in 1996. Project is part of the
park system -wide management of
building equipment. Replacement is
scheduled when warranted by the age
and condition of equipment and is
intended to reduce unscheduled
replacement and increase efficiencies.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
169
Budget Center Asset Name Project Name
Red Oaks J -1.1 �=` A
RDP Nature Center HVAC Replacement Reimbursement
SCHEDULE SCOPE NEED
Y FY2022 Reimbursement by Madison Heights See Project ID 71.
FY2023 ($171,500) per lease agreement.
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
ature Center
SCHEDULE
a FY2022
FY2023
FY2024
n FY2025
--
�- FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project ID
1730
Site and Landscape Improvements 1315
SCOPE
NEED
$40,000 Evaluate and improve landscape and
Deck, pond and other areas
amenities surrounding the Nature
surrounding the Nature Center are
Center; including wood decking,
deteriorated and in need of update.
concrete walk, garage asphalt
The need to upgrade the exterior of
approach and landscaping around
the Nature Center was identified as
building. 50% cost share by City of
part of the Exhibit Remodeling project
Madison Heights is anticipated.
(#70).
Site and Landscape Improvements Reimbursement
SCOPE NEED
($17,500) Reimbursement by Madison Heights See Project ID 1315.
per lease agreement.
1917
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
170
Budget Center Asset Name
-• •.
RDP Nature Center Parking Lot
SCHEDULE
FY2022
FY2023
FY2024 $300,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Nature Center Parkin
' SCHEDULE
FY2022
FY2023
FY2024 ($147,500)
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Project ID
Improvements 179
SCOPE NEED
Update design to improve parking lot Nature Center has significant capacity
and entrance drive to improve
issues due to lack of parking and
pedestrian circulation for operations
inability for buses to easily access, park
and programming. Include additional
and exit the site. Traffic flow conflicts
parking, safer pedestrian routes, wider
with pedestrian flow. When lot is full,
drive widths and turning radii, storm
visitors park on neighborhood streets
water swales and improved lighting.
and walk in, which presents potential
Revisit 2015 design documents. 50%
safety issues and loss of revenue.
cost share by City of Madison Heights
Design for project was done in 2015
is anticipated.
and construction estimated received
from construction manager, instructed
by Commission not to proceed with
final construction documents and
bidding.
Improvements Reimbursement
1731
SCOPE
NEED
Reimbursement by Madison Heights See Project ID 179.
per lease agreement.
Hales Street Monument Sign Replacement
SCHEDULE
SCOPE
FY2022
Design and install replacement of
�� �..w° FY2023
entrance sign that complies with sign
g p g
and brand standards. Consider
FY2024
incorporation of LED sign to increase
00
visibility and awareness of events and
FY2025
'°'°°"°'°°"°°°
activities. Coordinate with Wayfinding
FY2026 $50,000
Work Group. 50% cost share by City of
Madison Heights anticipated.
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
176
NEED
Update to entrance sign would be
intended to comply with sign and
brand standards and increase visibility
of waterpark.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
171
Budget Center Asset Name
RDP Signs
SCHEDULE
FY2022
IN QAKLAND
(..... FMRS FY2023
LRED FY2024
NATURE CENTER
SUAREZ FRIENDSHIP WOODS FY2025
es Roatl
FY2026 ($22,500)
Project Name Project ID
Hales Street Monument Sign Replacement Reimbursement 1732
SCOPE NEED
Reimbursement by Madison Heights See Project ID 176.
per lease agreement.
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: New
ernal Pond Deck
SCHEDULE SCOPE NEED
FY2022 Replace 300 square foot deck. 50% Vernal pond overlook deck is
FY2023 cost share by City of Madison Heights deteriorating.
anticipated.
FY2024 $10,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024 ($2,500)
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Replacement Reimbursement 191
SCOPE NEED
Reimbursement by Madison Heights See Project ID 175.
per lease agreement.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
172
Budget Center Asset Name
• •
RWC Waterpark Concession
SCHEDULE
FY2022
FY2023 $188,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Proposed New
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $160,000
Project Type: Capital Projects
Project Priority: 4 Asset Mgt Type: New
Boundaries
SCHEDULE
FY2022
FY2023
FY2024 $40,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: RM
Project Name
Improvements
SCOPE
Remodel approximately 1,880-square
foot concession kitchen and service
area, within existing building footprint,
including design engineering by a
professional kitchen consultant.
Pavilions (4)
SCOPE
Design and construct four (4) 20'x30'
permanent picnic pavilions to replace
tents. Phases I -IV: Construct one
pavilion per year.
Berm Security Fencing
SCOPE
Replace approximately 1,010 LF of
fence; review fence location and
update planting plan.
Project ID
1813
NEED
Waterpark concession building was
constructed in 1987 with a remodel in
2015 and a walk-in freezer installed in
2018. Improvements are needed to
provided an improved workflow and
environment for staff, as well as
improved customer service.
186
NEED
Temporary tents are in use and rented
to groups. Replacement with
permanent structures would be
intended to improve customer service
and decrease maintenance needs
(erecting and taking down tents,
periodic replacement of tents).
182
NEED
Sections of fence are deteriorated or
damaged.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
173
Budget Center Asset Name Project Name Project ID
RWP Boundaries
SCHEDULE
FY2022
FY2023
FY2024 $90,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
ign
SCHEDULE
FY2022
FY2023
• FY2024
FY2025
FY2026 $50,000
� ci--
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: New
Site and Grounds V
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $144,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Replacement
SCOPE
Inventory and prioritize fence repair
and replacement needs and phase
implementation over 3 years.
Sign Replacement
SCOPE
Design and install replacement of
entrance sign that complies with sign
and brand standards. Consider
incorporation of LED sign to increase
visibility and awareness of events and
activities. Coordinate project with
Wayfinding Work Group.
75
NEED
Fence is more than 30 years old.
Several sections of fence are damaged
or falling down. Replacement is
needed for safety and security and to
improve the appearance of the
waterpark.
184
NEED
Update to entrance sign would be
intended to comply with sign and
brand standards and increase visibility
of waterpark.
Waterpark Irrigation System Replacement 384
SCOPE NEED
Design and replacement of the 1980s Replacement is required due to age,
installed residential type irrigation condition and annual maintenance to
system within and around the existing ensure the system maintains high
waterpark. traffic lawn areas, in and around the
waterpark.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
174
Budget Center Asset Name
-• •.
RWP Utilities and Infrastructure
SCHEDULE
FY2022
FY2023
FY2024 $7,500
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: Asset Mgt Type: RM
Waterpark Bathhouse
SCHEDULE
FY2022
FY2023
FY2024 $85,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
REMEM
LaterLark Bathhouse
SCHEDULE
FY2022 $120,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name Project ID
Drinking Fountain Replacements 1814
SCOPE
Replacement of (2) exisitng water
coolers located at the bathhouse and
concessions building with a new
accessible water/jug filler cooler.
Exterior Renovation
SCOPE
Design/engineering for the 1991
installed park group entrance
renovation, including the
removal/reconditioning of the
entrance structure, replacement of
masonry and glass block, concrete
walkways and site restoration.
Roof Replacement Metal
SCOPE
Remove and replace the 4,850-square
foot standing seam metal roof with the
same material and install gutters,
including any necessary structure
repacement or repairs.
NEED
Allow guests the option to bring and
fill their water bottles, while reduceing
recycling needs for disposable plastic
water bottles.
1678
NEED
Renovation is required due to age,
condition of masonry and steel
materials, group entrance function and
staff use of the existing breezeway.
181
NEED
Bathhouse is original to waterpark
construction in 1988. Project is part of
the park system -wide management of
building roofs. Replacement is
scheduled when warranted by the age
and condition of roofing materials and
structural elements and is intended to
reduce need for repairs.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
175
Budget Center Asset Name Project Name
• •.
RWP Waterpark Bridge
SCHEDULE SCOPE
Structural Inspection
Project ID
J10=011911
NEED
FY2022
Work with a qualified structural
Bridge was constructred in YEAR.
FY2023
engineer to conduct inspection of
Inspection is part of the park system -
concrete bridge leading to the
wide management to monitor
FY2024
children's area.
structural integrity and identify
FY2025
potential maintenance and safety
issues.
FY2026
$10,000
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Waterpark Former Entrance
SCHEDULE
FY2022
FY2023 $20,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Waterpark Maintenance Building
SCHEDULE
FY2022 $100,000
FY2023
FY2024
9
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Improvements '
SCOPE
Design and implement improvements
that reduce size of existing structure,
improving visibility and security.
NEED
Entrance is original to waterpark
construction in 1988. it is no longer in
use and needs adjustment to make
area secure and more attractive.
Main Wave Pool Boiler Replacement
SCOPE NEED
Replace existing 1986 installed, Replacement required due to age and
4,000,000 BTU Ray Pac wave pool annual maintenance.
boiler, including the consideration to
relocate the boiler to the open exterior
location, adjacent to the river and slide
boilers.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
176
Budget Center Asset Name
• •
RWP Waterpark Maintenance Building
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $130,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Waterpark Maintenance Building
SCHEDULE
FY2022
FY2023
FY2024 $30,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
401"& aterpark PaviliornW
SCHEDULE
FY2022 $200,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Roof and Storage Extension
SCOPE
Design and construct approximately
800 square feet of covered storage
adjacent to the wave pool mechanical
building.
Roof Replacement
SCOPE
Replacement of approximatey 3,700
square feet of standing seam metal
roof, including underlayment, facia,
soffit and gutters.
Roof Replacement Metal
SCOPE
Remove and replace the 2,010-square
foot plastic roof with the same
material, including any necessary
substrate repacement or repairs.
Repair or redesign gutter; evaluate
need for further drainage
improvement.
Project ID
189
NEED
Two areas adjacent to the Mechanical
Building are uncovered, leaving
equipment open to the elements.
Boilers for the wave pool and river ride
are located on the north side and
equipment storage located on the
west side. Construction of covered
storage would reduce the need to
replace parts due to exposure to
weather.
1106
NEED
Original 1980's installed standing seam
roof is developing holes and beginning
to leak. The roof has been repaired
and repainted several times.
187
NEED
Pavilion is is original to waterpark
construction in 1988. Project is part of
the park system -wide management of
building roofs. Replacement is
scheduled when warranted by the age
and condition of roofing materials and
structural elements and is intended to
reduce need for repairs.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
177
Budget Center Asset Name
• •
RWP Waterpark River Ride
SCH
FY
FY
FY
FY
FY
EDULE
2022 $65,000
2023
2024
2025
2026
Project Type: Capital Projects
Project Priority: 2 Asset Mgt Type: DM
Waterpark River Ride
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $125,000
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RIM
aterpark Wave Pool and Waterslide
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $150,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RIM
Project Name
ADA Entrance Railing
SCOPE
Install an ADA-compliant stainless steel
railing system at the zero -depth river
ride entrance with tube corral and
improved circulation.
Repair and Painting
SCOPE
Paint structure, including stripping and
repair of bottom surface with epoxy
paint.
Wavepool Improvements
SCOPE
Remove existing concrete deck
adjacent to pool wall and install edge
drain, remove and replace existing 350
linear feet of pool edge coping
stones/gutters, 175 linear feel of entry
steps, 350 linear feet of safety
cables/posts, (3) life guard stands and
restore concrete decking.
Project ID
79
NEED
River ride was installed in 2003. Zero -
depth entrance is a wide area and
installation of a railing will make the
area safer for entry by persons of all
abilities. Project will also create a
corral for patrons to pick-up and drop-
off river ride tubes.
80
NEED
River Ride and Children's Area were
installed in 2003. Maintenance of the
pool bottom is necessary to provide a
safe and non -slip surface for guests.
Project will reduce frequency of need
to repaint.
1173
NEED
All listed scope items, original to the
1991 constructed wavepool, have
been repaired, patch or painted
several times and now required full
removal and replacement.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
178
Budget Center Asset Name
Springfield •
SAC Activity Center
Project Name
Project ID
SCHEDULE SCOPE NEED
FY2022 Upgrade Energy Management System. Existing system does not comply with
FY2023 current standards.
FY2024
FY2025
FY2026 $50,000
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: RM
Activity Center Siding Painting
SCHEDULE SCOPE
FY2022 Paint T-111 siding.
FY2023
FY2024
FY2025
FY2026 $120,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024 $240,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCOPE
Replace approximately 14,000 SF of
wood siding that is original to building
construction in 1972 with metal siding.
NEED
Painting is needed as part of ongoing
repairs to the Activity Center siding.
194
NEED
The Activity Center was constructed in
1972. The wood siding is original to
construction. It is in poor condition
and areas have been repaired and
replaced. Replacement of the siding is
recommended as the long-term
solution.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
179
Budget Center Asset Name
Springfield •
SAC Barn Pavement and Storm Sewer
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $100,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Barns
SCHEDULE
FY2022
FY2023 $60,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $135,000
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: RM
Project Name
]I �mi�
Replacement
SCOPE
Replace asphalt pavement and storm
sewer between the existing fairground
barns. Project partnership with
Oakland County Fair Board is
anticipated. Coordinate with
Springfield Oaks Stormwater
Improvements (#1314).
Siding Replacement
SCOPE
Phased removal and replacement of
the existing wood siding on existing
barns with metal siding.
Painting
SCOPE
Paint exterior, including coordination
with operational schedule, surface
preparation following EPA Lead Base
Paint preparation guidelines, exterior
white latex painting, intumescent
white paint as required by fire code
near the intersection of the Stallion
Barn and the main structure and all
site clean-up and material disposal.
Replace field identified decayed wood
siding, trim and exterior building
components.
Project ID
84
NEED
Pavement was installed over a number
of years in the 1980s and 1990s. Both
pavement and storm sewers are failing.
85
NEED
Replacement of wood siding with
metal is intended to eliminate need of
continual painting and improve
appearance of barns.
226
NEED
The Ellis Barn was originally repainted
in 2006 as part of the overall barn
relocation project and was
professionally repainted again in
2014. Since then, the barn was last
touched up and painted approximately
2 years ago by staff as part of regular
painting maintenance. Currently the
paint is peeling in many locations,
exposing the untreated wood
members below the paint surface.
With the proper surface preparation
and as part of regular maintenance,
staff anticipate another 6 to 8 years
before we would require exterior
painting of the barn.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
180
Budget Center Asset Name
Springfield •
SAC Goat Barn
SCHEDULE
FY2022
FY2023 $15,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
odular Restrooms (2)
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $825,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $1,250
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Project Name
Siding Replacement
SCOPE
Phased removal and replacement of
the existing wood siding on existing
barns with metal siding.
Replacements
SCOPE
Develop design concepts, determine
optimal locations for permanent
restroom and shower building or
buildings. Evaluate trends in facility
usage and capacity of current septic
system.
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Project ID
1607
NEED
Replacement of wood siding with
metal is intended to eliminate need of
continual painting and improve
appearance of barns.
197
NEED
Two modular restroom and shower
buildings were installed in 1980s.
Framing and flooring are deteriorated.
Replacement of temporary buildings
could consider more strategic
locations to better serve both
campgrounds and Ellis Barn and could
be a benefit as use and rental of these
areas increases. Any increase in
capacity would need to be supported
1193
NEED
Bridge was replaced in 2011.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
181
Budget Center Asset Name
Springfield •
SAC Stormwater Management System
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $560,000
FY2026
Project Type: Capital Projects
Project Priority: 2 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024 $5,000
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
SCHEDULE
FY2022
FY2023 $104,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Improvements Phase I
SCOPE
Implement components of the
Springfield Oaks Activity Center DRAFT
Stormwater Management Plan that
comply with federal, state and local
standards and regulations.
Project ID
1314
NEED
The Springfield Oaks DRAFT
Stormwater Management Plan
proposed design solutions to improve
management of stormwater and meet
Oakland County Water Resources
Commissioner standards as well as
local standards and pertinent federal,
state and local stormwater
regulations. The Management Plan
also provides recommendations for
funding sources to increase capacity to
implement projects. Initial project
emphasis will be on hydraulically
connected rain gardens to manage
runoff adjacent to Andersonville Road.
Inspection
SCOPE NEED
Commence structural inspections in
FY2024.
Replacement
SCOPE
Replace approximately $1,925 LF of 6'
chain -link fence along Andersonville
Road, including staking and vegetation
clearing.
92
Improvements to water tower were
identified in the engineering reports
conducted in 2007 and 2013.
Improvements in FY2018 included
permitting, lead base paint abatement,
over -coating, installation of safety
equipment, and a water chlorination
system. Inspection is part of the park
system -wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
98
NEED
Fence is old and deteriorating.
Replacement will reduce need for
repairs and improve appearance of
park property.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
182
Budget Center Asset Name
Springfield •
SPG Golf Cart Barn
Project Name Project ID
Building Expansion 201
SCHEDULE SCOPE NEED
FY2022 Expand the existing 40' wide pole barn Existing cart barn tightly fit all existing
FY2023 structure approximately 20 feet to the carts, with the exception of the food
west, including building access and site service cart, into the barn for nightly
FY2024 improvements. storage and leaves no room for
FY2025 manuvering, cleaning and disinfecting.
FY2026 $80,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Golf Course Drainage System
SCHEDULE
FY2022
FY2023 $75,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
olf Course Irrigation System
SCHEDULE
FY2022
FY2023 $280,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Replacement
SCOPE
Replace drainage system. Phase
project and construct with in-house
resources.
Replacement
SCOPE
Replace golf course irrigation system
Phase II: Replace back nine irrigation
mains and system controls.
202
NEED
Underground drainage system needs
to be replaced. Pooling is seen in areas
and sinkholes have occurred in two
areas.
99
NEED
Irrigation was installed with golf
course development in 1976. Front
nine irrigation mains and system
controls were replaced in 2016.
Replacement is based on lifecycle of
the system and is intended to reduce
need for system repairs.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
183
Budget Center Asset Name
Springfield •
SPG Maintenance Building North
Project Name Project ID
HVAC Replacement 100
SCHEDULE
SCOPE
FY2022 $15,000
The 75,000 BTU Furnace installed in
1992 is used for heating the offices
FY2023
and restroom located in the golf
FY2024
course maintenance building with an
FY2025
HVAC system.
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Clubhouse
"4° F ` _ SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $605,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $550,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Area and Parking Lot Site Improvements
SCOPE
Design site improvements that enlarge
circular drive, improve existing parking
spaces, include accessible and van -
accessible spaces and acces aisles;
relocate dumpster and provide
concrete pad and screeing. Include
stormwater management and
increased capacity as indicated.
Consider combining with rear
employee parking area.
Phase I: Design; Phase II: Construction.
Renovation
SCOPE
This is the first phase of an overall
update to the clubhouse; concepts are
being developed and individual
projects will be identified and
confirmed with the Commission. Phase
I (FY2018): Architectural design and
replacement of selected windows and
areas of siding: Phases II -III: to be
determined by planning in previous
phase.
200
NEED
Existing 122-space parking lot is
inadequate and does not provide for
accessible parking. As improvements
to the Clubhouse are planned and
potentially increase capacity,
associated increase in parking capacity
will be required by ordinance. Location
and setting for dumpster needs to be
evaluated. Topography surrounding
Clubhouse is steep and may need
accomodation for accessibility to move
from parking lot to Clubhouse.
96
NEED
Building was constructed in 1973, with
improvements in 1990 and new roof in
2015. Updates will help improve
marketability of the facility. Potential
improvements include replacement of
windows and siding, installation of a
deck, interior renovation; installation
of direct vent fireplace, updates to
kitchen, bar, and pro shop.
Accessibility (ADA) improvements will
be incorporated and increased need
for parking and external circulation will
need to be considered.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
184
Budget Center Asset Name
ADM Administration Building
*+ SCHEDULE
o FY2022
iw5
-e FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Administration Building
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 5 Asset Mgt Type: DM
dministration Building
SCHEDULE
♦ FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
$462,000
$46,138
$15, 000
Project Name
Boiler Replacement
SCOPE
Replace the 401,000 BTU boiler and
related equipment installed in 1988
used for building heat at the
Administration Building.
Carpet Replacement
SCOPE
Replace carpeting throughout the
building with carpet tile.
Deck Replacement
SCOPE
Removal and replacement of the 1991
installed exterior wood deck, located
off the existing employee break room.
Project ID
105
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
1499
NEED
Carpeting is showing significant signs
of wear.
1555
NEED
Replacement is required due to the
age and annual maintenance to keep
the deck safe for employee use.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
185
Budget Center Asset Name
ADM Facilities Maintenance Building
SCHEDULE
FY2022 $100,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Facilities Maintenance Building
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $33,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name Project ID
HVAC Replacement 108
SCOPE
Replace the air handler, 10 ton
condenser unit and related equipment
installed in 1990 used for the office
space heating, cooling and ventilation
located in the facilities maintenance
building.
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Roof Replacement North Shingle 1004
SCOPE NEED
Replace 4,160-square foot roof with At the north end of the Facilities
asphalt shingles. Maintenance Building, the roof over
garage is in poor condition, is leaking,
and needs to be replaced soon.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
186
Budget Center Asset Name
WCM Proposed New
Project Name Project ID
EOB to Market Pathway
969
SCHEDULE
SCOPE
NEED
FY2022
Design and construct an accessible
Recreational need, environmental
FY2023
trail that links the Oakland that
feasibility, project specifications, and
Oakland County Executive Office
maintenance requirements to be
FY2024
Building with the Farmers Market and
determined per OCPR Trail Standards.
FY2025
complies with OCPR Trail Standards,
Project has been suggested as an
federal accessibility guidelines, state
opportunity to create an internal
FY2026 $75,000
wetland regulations and US Fish and
pathway that links the Oakland County
Wildlife restrictions. Communicate
Executive Office Building with the
with Road Commission for Oakland
Farmers Market.
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: New
WCM Market Building
SCHEDULE
FY2022
FY2023
FY2024 $1,754,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
County (RCOC) regarding potentially
locating segments within RCOC
property, avoiding utilities in road
ROW. Coordinate planning and
implementation with Trails Work
Group. Trail specifications and
dimensions to be developed. Cost
share with Oakland County General
Fund is anticipated.
arket Building and Pavilion Improvements 204
SCOPE NEED
Site has many complex needs on a
small site - implementation of any one
element needs to fit into a larger
overall plan. Evaluate entire site and
its structures, identifying program
elements and creating an overall site
design. Elements may include building
improvements, updated vendor spaces
with utility updates, updates to
restrooms, addition of covered vendor
areas at ends of market building,
adding curtain system to market
canopy, and addition of storage and
event structures. Implement
accessibility updates. Conduct public
engagement to confirm public need
and guide design.
Market building and vendor pavilion
were constructed in 1953. Need for
accessibility updates to all areas of
market were identified in Transition
Plan.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
187
Budget Center Asset Name
WCM Market Pavilion
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $5,000
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
INORWite and Grounds
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $640,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024 $40,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every five years.
Market Site Improvements
SCOPE
Redesign, improve and expand parking
lot.
Boiler Replacement
SCOPE
Replace the 780,000 BTU boiler and
related equipment installed in 1989
used for building heat located in the
Activities Center.
Project ID
493
NEED
Market pavilion was last inspected in
2018. Inspection is part of the park
system -wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
205
NEED
Parking lot surface needs repair. Lot
layout needs redesign to provide
better access to overflow parking,
improve traffic flow and pedestrian
safety and manage stormwater on the
site. Need for accessibility
improvements was identified in
Transition Plan.
106
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
188
Budget Center Asset Name
WTR Activity Center
SCHEDULE
FY2022 $16,000
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 4 Asset Mgt Type: DM
Fridge Toboggan Tower
Project Name
Flooring Replacement
SCOPE
Remove and replace aproximately
5715 sq/ft of existing tile. Remove and
replace approximately 480 sq/ft of
wallbase. See quote.
Stair Tower Removal
SCHEDULE SCOPE
FY2022 $65,000 Remove stair tower and restore site
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: DM
ouse 1580Sctt Lake (Ernst)
SCHEDULE
FY2022
FY2023 $15,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Roof Replacement Shingle
SCOPE
Remove and replace the 1830-square
foot asphalt shingle roof with the
standard 30-year architectural asphalt
shingle, including any necessary roof
sheathing repacement or repairs.
Project ID
1517
NEED
Replace the floor at the WTR activity
center. It is around 20-25 years old
and is getting beyond repair, last year
the Activity Center had 199 events
according to RecTrac.
1534
NEED
Stair tower needs to be removed per
engineer evaluation in 2019.
206
NEED
Project is part of the park system -wide
management of building roofs.
Replacement is scheduled when
warranted by the age and condition of
roofing materials and structural
elements and is intended to reduce
need for repairs.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
189
Budget Center Asset Name
WTR House 1580 Scott Lake (Ernst)
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 3 Asset Mgt Type: DM
$40,000
ouse and Shed 2896 Watkins Lake Road
SCHEDULE
FY2022
FY2023 $13,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
-dbw SCHEDULE
AMP FY2022
FY2023
FY2024
FY2025
FY2026 $2,500
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Project Name
Window Replacements
SCOPE
Evaluate windows for replacement.
Consult with historical archictectural
specialist through Oakland County
Economic Development to ensure
appropriate replacement.
Roof Replacement Shingle
SCOPE
Remove and replace the 1687-square
foot asphalt shingle roof with the
standard 30-year architectural asphalt
shingle, including any necessary roof
sheathing repacement or repairs.
Deck Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
Project ID
235
NEED
Per lease agreement, OCPR is
responsible for maintain roof,
windows, siding and plumbing in the
residence. Need for window
replacements are anticipated.
367
NEED
Roof is in poor condition. Project is
part of the park system -wide
management of building roofs.
Replacement is scheduled when
warranted by the age and condition of
roofing materials and structural
elements and is intended to reduce
need for repairs.
1194
NEED
Building with deck was constructed in
1996. Inspection is part of the park
system -wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
190
Budget Center Asset Name
WTR Paradise Peninsula Landing Building
SCHEDULE
FY2022 $10,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
aradise Peninsula Playground
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $75,000
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: New
rk Storaae Shed North
Project Name
Boiler Replacement
SCOPE
Replace the 100,000 BTU boiler and
related equipment installed in 1994
used for building heat.
Shade Structures
SCOPE
Purchase and installation of the
previously designed shade structures
over the play feature/elements,
including the consideration for water
misting elements to the playground.
Roof Replacement
SCHEDULE
SCOPE
FY2022
Replacement of the existing 1990s
installed, 300 square foot asphalt
FY2023
shingle storage roof shed.
FY2024
$2,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project ID
110
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
500
NEED
As originally intended, this playground
was designed and engineered to be
fully universally accessible for persons
with all disabilities, including skin
sensitivities. At the time of
construction in 2006, the project
budget did not support the purchase
and installation of the shade
structure. Installation of the shade
structure would complete the intent of
the playground.
1151
NEED
Replacement required due to age and
condition.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
191
Budget Center Asset Name
WTR Park Storage Shelter West
SCHEDULE
FY2022
FY2023 $10,500
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Platform Tennis Courts (2)
SCHEDULE
FY2022 $5,000
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
SCHEDULE
FY2022
FY2023
FY2024 $150,000
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 5 Asset Mgt Type: DM
Project Name
Roof Replacement Shingle
SCOPE
Replacement of the existing.1990's
installed, 1,300 sf asphalt shingle
storage roof shed.
Tube Heater Replacements
SCOPE
Replace the four (4) 75-300,000 BTU
LP Tube heaters and related
equipment installed in 1994 used for
drying the decks of the platform tennis
courts.
Improvements
SCOPE
Evaluate trail surfaces and routes and
make improvements, including
accessibility updates, as needed;
inventory trail wayfinding signage and
update as needed. Trail enhancements
shall comply with OCPR Trail Standards
as well as federal accessibility
guidelines, state wetland regulations
and US Fish and Wildlife restrictions.
Coordinate planning and
implementation with Trails Work
Group.
Project ID
1149
NEED
Replacement required due to age and
condition.
112
NEED
Project is part of the park system -wide
management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
265
NEED
Need for accessibility improvements to
existing routes has been identified in
the ADA Transition Plan. Need for
signage indicating trail conditions has
been identified in the park plans.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
192
Budget Center Asset Name Project Name Project ID
WWP Waterpark Bridge Structural Inspection
SCHEDULE
SCOPE
FY2022
$2,500
Complete inspection and report by a
'
qualified engineer every year.
FY2023
$2,500
FY2024
$2,500
FY2025
$2,500
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type: RM
Waterpark Children's Play Structure
SCHEDULE
FY2022
FY2023 $3,500
FY2024
FY2025
FY2026
Project Type: Maintenance Projects
Project Priority: 1 Asset Mgt Type RM
,W Structural Inspection
SCOPE
Complete inspection and report by a
qualified engineer every 5 years.
NEED
Bridge was constructed in 1998; last
inspected in 2019. 2019 inspection
indicated need for annual inspection.
Inspection is part of the park system-
wide management to monitor
structural integrity and identify
potential maintenance and safety
issues.
NEED
Feature was constructed in 1998; last
inspected in 2018. Inspection is part of
the park system -wide management to
monitor structural integrity and
identify potential maintenance and
safety issues.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
193
Budget Center Asset Name
White Lake •
WLC Clubhouse
SCHEDULE
FY2022
FY2023
FY2024 $36,000
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: RM
Pavement and Drainage
SCHEDULE
FY2022
FY2023
FY2024
FY2025 $250,000
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
mployee Parking Lot
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026 $110,000
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Roof Replacement PVC
SCOPE
Replacement of the existing 6,500-
square foot PVC membrane flat roof
area of the clubhouse.
Project ID
1155
NEED
Clubhouse was constructed in 2005.
PVC membrane flat roof needs
replacement due to age and wear.
North Parking Lot Replacement and Expansion
SCOPE
Design/engineering and construction
for the expansion of the existing 156
space, norther parking lot with
approximately 64 additional parking
spaces, including any and all necessary
storm water drainage improvements.
1170
NEED
Pursuant township site plan standards,
the building occupancy is limited to
the number of available parking
spaces. Additionally, the existing 20+
year old asphalt parking lot require
continued annual maintenance and
repair. Completion of the expansion
and paving of the existing parking may
increase revenue and lower annual
maintenance expenses.
Maintenance Parking Improvements
SCOPE
1-1/2" Asphalt mill and capping of the
existing 21,500 square foot
maintenance drive and parking area
from Pontiac Lake Road to the
maintenance facility.
1675
NEED
Due to continual maintenance and
repair of the 20+ year old maintenance
drive and parking, mill and capping will
reduce annual maintenance costs.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
194
Budget Center Asset Name
White Lake •
WLG Fenceline
Project Name Project ID
Replacement 120
SCHEDULE SCOPE NEED
FY2022 Replace approximately 2,000' of 6' Fenceline was installed in 1977 and
FY2023 $52,000 chain -link boundary fence along 1995. Fence has deteriorated.
Williams Lake Road. Include vegetation Maintenance of the fenceline is
FY2024 and tree removal and vehicle gate intended to decrease maintenance
FY2025 replacement. needs and improve attractiveness of
the golf course.
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Golf Cart Barn
'1
SCHEDULE
FY2022
FY2023 $20,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
olf Course Irrigation System
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Siding Repairs
SCOPE
Remove and replace portions of the
existing 1980's T-111 siding with
plywood and enclose building exterior
in metal siding.
Replacements Phase II
SCOPE
$220,000 Installation of eleven new 40-station
rainbird satellites, including all
necessary wiring and programming.
Project will install wiring for future
replacement of green and tee
sprinklers.
1663
NEED
Existing T-111 wood siding continually
requires maintenance, repair and
painting. Enclosing the building
exterior reduces annal maintenance
labor and material expenses.
1179
NEED
Project is part of the ongoing upgrade
to the 2006-installed irrigation system.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
195
Budget Center Asset Name
White Lake •
WLG Hole #13 Fairway Culvert
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Hole #18 Fairway Culvert
Project Name Project ID
JlF110M
Weplacement 472
SCOPE NEED
Remove and dispose of existing 18" Golf course drainage system has failing
$40,000 culvert and replace with four new 24" culverts and accumulated sediment.
HDPE pipe x 1001. See "C" on drainage map.
SCHEDULE
FY2022
FY2023 $85,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Ada
SCHEDULE
FY2022
FY2023 $30,000
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
SCOPE
Remove and dispose of existing 18"
culvert and replace with four new 24"
HDPE pipe x 2001. Identified by Zach
as project D.
Dredge and Drain Cleanout
SCOPE
Excavate approximately 350 CY of
spoils and transport from site. Clean
out existing turf drains and restore
spoils stockpile area and access route.
DEQ/SESC permit is required.
470
NEED
Golf course drainage system has failing
culverts and accumulated sediment.
See "D" on drainage map
NEED
Golf course drainage system has failing
culverts and accumulated sediment.
See "A" on drainage map.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
196
Budget Center Asset Name
White Lake Oak.,.-j
WLG Hole #18 Pond Culvert
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
Hole #9 Culvert
SCHEDULE
FY2022
FY2023
FY2024
r
s FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Maintenance Building
SCHEDULE
FY2022
FY2023
FY2024
FY2025
FY2026
Project Type: Capital Projects
Project Priority: 3 Asset Mgt Type: DM
Project Name
Replacement
SCOPE
Replace an approximately 150' section
$75,000 of culvert/ restore proper grade for
drainage; include associated
earthwork and restoration.
Replacement
Project ID
269
NEED
Golf course drainage system has failing
culverts and accumulated sediment.
Culvert is not aligned properly, most
likely due to freeze -thaw heaving.
Currently still draining to wetland but
will need to be reset. See "F" located
north of "A" on drainage map.
471
SCOPE NEED
Remove and dispose of existing 12" Golf course drainage system has failing
$50,000 culvert and replace with four new 24" culverts and accumulated sediment.
HDPE pipe x 110'L. See "E" on drainage map.
HVAC Replacement 121
SCOPE NEED
Replace HVAC unit. Project is part of the park system -wide
$9,500 management of building equipment.
Replacement is scheduled when
warranted by the age and condition of
equipment and is intended to reduce
unscheduled replacement and increase
efficiencies.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
197
Budget Center Asset Name
White Lake •
WLG Maintenance Culvert
Project Name
Replacement
SCHEDULE SCOPE
FY2022
FY2023 $11,000
FY2024
FY2025
FY2026
Project ID
JMFV�1530
NEED
Remove and dispose of existing 12" Golf course drainage system has failing
culvert and replace with four new 24" culverts and accumulated sediment.
HDPE pipe x 1101. See "B" on drainage map.
Project Type: Capital Projects
Project Priority: 1 Asset Mgt Type: DM
WLG-'WSite and Grounds
A�� SCHEDULE SCOPE
First Tee Renovation
NEED
FY2022 Design/engineering and completion of
FY2023 earthwork, paving and restoration to
downsize the existing 4500 square foot
FY2024 #1 tee box.
FY2025
FY2026 $125,000
Project Type: Capital Projects
Project Priority: 5 Asset Mgt Type: DM
Reducing the size of the tee box will
create space for improved golf cart
staging and relieve congestion around
the clubhouse and proshop.
Project Priority Legend: 1 = Health and Safety; 2 = Regulatory; 3 = Efficiency and Operational Savings; 4 = Revenue Generation; 5 = Facility Enhancement
Asset Mgt Type Legend: RM = Regular Asset Management; DM = Deferred Asset Management; New = New Asset
FY2022-FY2026 Project Scopes
198
SEPTEMBER 1, 2021
To: Chairman McGillivray and Commission Members
AGENDA ITEM NO. 13 C
PARK OPERATIONS
From: Susan M. Wells, Interim Executive Officer
Thomas J. Hughes, Chief of Park Operations and Maintenance — South District
Subject: Motion - Approval of Fiscal Year 2022 Proposed Capital Equipment Budget
INTRODUCTION AND HISTORY
The Oakland County Parks Operations staff is providing the proposed FY2022 Capital Equipment list. Capital
Equipment consists of maintenance equipment, kitchen equipment and recreation equipment over $5,000. The
proposed Capital Equipment is for existing parks and does not include equipment that would be necessary for
potential future park developments or acquisitions. One addition to the Capital Equipment since the last
approval is the Video Broadcast Equipment for the Parks Commission Room for Parks Administration (ADM).
The Video Broadcast Equipment would allow for the broadcast of Commission Meetings and also give staff the
ability to conduct virtual meetings in the commission room. Neither of these options are currently available.
The updated Proposed Capital Equipment budget for FY2022 is $642,500
ATTACHMENTS
- FY2022 Proposed Capital Equipment List
- Information and quote for the added Video Broadcast Equipment for Administration
STAFF RECOMMENDATION
Staff recommends approving the proposed FY2022 Capital Equipment Budget in the amount of $642,500
MOTION
Move to approve the proposed FY2022 Capital Equipment Budget in the amount of $642,500
199
Agenda Item No. 13 C
BUDGET CENTER
Addison Oaks Park
Addison Oaks Park
Administration
Facilities Maintenance
Facilities Maintenance - NR
Glen Oaks Golf Course
Groveland Oaks Park
Groveland Oaks Concessions
Lyon Oaks Golf Course
Orion Oaks
Recreation Section
Red Oaks Golf Course
Red Oaks Waterpark
Springfield Oaks Golf Course
Springfield Oaks Golf Course
Waterford Oaks Park
White Lake Oaks Golf Course
EXISTING EQUIPMENT
ADD Zero Turn Mower
ADD Utility Vehicle (2)
ADM
FM Loader
PROPOSED EQUIPMENT
Zero Turn Mower $
Utility Vehicle (2) $
Video Broadcast Equipment $
Loader $
FM
Dump Trailer
Dump Trailer
GLG
Toro Sidewinder
Surrounds Mower
GRV
Utility Vehicle (2)
Utility Vehicle (2)
GRC
Taylor Ice Cream Machine
Ice Cream Machine
LYG
Rough Mower
Rough Mower
ORN
Truckster / Club Car Cart
Utility Vehicle - Light Duty
REC
Stage
Stage
RDG
Fairway Mower
Fairway Mower
RWP
John Deere Gator
Utility Vehicle - Light Duty
SPG
Greens Mower
Greens Mower
SPG EZGO
WTR Zero Turn Mower
WLG Greensmower
Beverage Cart
Zero Turn Mower
Roller
TOTAL $
ESTIMATED COST
19,000
18,000
35,000
125,000
8,000
35,000
18,000
17,000
68,000
13,000
130,000
62,000
12,500
33,000
15,000
15,000
19,000
642,500
200
Agenda Item No. 13 C
Parks and Racs Broadcast Equipment
Oakland County
C O U N T Y
Presented By:
new
THIRD COAST
TECH
M I C H I G A N
Third Coast Tech, LLC.
4514 Pontiac Lake Rd.
Waterford, Michigan 48328
800-828-9517
www.thirdcoasttech.com
Modified: 8/10/2021
Revision: 0
201
11111111011r:
�A=Unassigned
1 TCT
3-Year Warranty
1 TCT
Shipping
Price Includes Accessories
Presented By: Third Coast Tech, LLC.
Project Name: Parks and Racs Broadcast Equipment
$1,318.24
$144.00
Unassigned Equipment Total: $0.00
Labor Total: $1,462.24
Total: $1,462.24
8/10/2021
Project No.: TCT-0749 Page 2 of 6
202
Boardroom
TCT will install video broadcast system in Park and Rec's Boardroom. System will
include two cameras, table top gooseneck microphones, digital sound processor, and
streaming encoder. Additionally, there will be conferencing sound bar with integrated
camera and mic array for web conferencing.
Features:
* web conferencing sound bar with integrated camera and microphone array
* 10 tabletop wireless gooseneck microphones
* Digital sound processor
* Two PTZ Cameras
* Control processor
* all in one streaming encoder with picture in picture / split screen capability.
5 Audio Technica $6,853.00
The System 10 PRO Rack -Mount Digital Wireless System from Audio-Technica includes
an receiver chassis with rack -mount adapters, two receiver units with corresponding
receiver unit mounting brackets, a joining plate, one cable, one AC adapter, and two
Wireless transmitter basis
10 Audio Technica $2,145.00
Ideal for conference centers, boardrooms, courtrooms, houses of worship, and other
installed applications, the U857Q is designed to plug directly into a panel- or desk -
mounted XLRF-type connector. This cardioid condenser quick -mount gooseneck
microphone offers unsurpassed immunity from radio frequency interference thanks to
Audio-Technicas UniGuard innovations. The 14.47 long microphone features an ultra -
flexible small -diameter gooseneck and accepts interchangeable elements, available in
cardioid, hypercardioid, omnidirectional and UniLine line cardioid polar patterns. Equipped
with self-contained electronics, the phantom -powered microphone also offers an 80 Hz
low-cut UniSteep filter that reduces pickup of low -frequency ambient noise.
Biamp $2,518.80
The TesiraFORTE is a digital audio server with 12 analog inputs and 8 analog outputs,
and includes Acoustic Echo Cancellation (AEC) technology on all 12 inputs. It includes up
to 8 channels of configurable USB audio, a 2-channel VoIP interface, a standard FXO
telephone interface, and Dante digital audio networking.
Blackmagic Design $97.50
Blackmagic Design Micro Converter - BiDirectional SDI/HDMI with Power Supply
Price Includes Accessories
Presented By: Third Coast Tech, LLC.
Project Name: Parks and Racs Broadcast Equipment Project No.: TCT-0749
8/10/2021
Page 3 of 6
203
Crestron $700.00
The Crestron RMC3 is a compact and cost-effective 3-Series Control System designed to
provide control and monitoring for a single display device, a small AV system, lighting and
shading, climate control, security, energy management, and many other specialized
applications. Its tiny form factor allows it to be placed just about anywhere with the option
to attach it to a flat surface or DIN rail using the mounting bracket provided. It can fit easily
behind a video display or above a projector, and provides enough control ports to control
the display device along with a screen or lift. Cresnet and Ethernet connectivity provides
full support for the full line of Crestron touch screens, keypads, dimmers, shades,
thermostats, and other peripherals. Featuring the 3-Series control engine, the RMC3
provides a robust, feature -packed controller that's ideal for mass deployment across
college campuses, corporate office buildings, museums, MDUs, hotels, and convention
centers.
Crestron Electronics $840.00
All in one incredible front -of -room device, the Crestron UC Video Conference Smart
Sound Bar & Camera (UC-SB1-CAM) facilitates effortless conferencing without any other
microphones, speakers, or camera to install. Mounted on the wall or placed on a
credenza beneath the main room display(s), the smart sound bar looks great and sounds
even better in any small to medium-sized meeting space.
High-powered stereo speakers, adaptive beamforming microphone, and advanced digital
signal processing deliver exceptional full -duplex speakerphone performance with highly
intelligible, echo -free voice clarity. A perfect view of the room is achieved through the built-
in, high -end conferencing camera featuring HD 1080p video resolution, ultra -wide 150
diagonal field of view, and Genius Framing digital autozoom. Its compact, all -in -one
design reduces clutter on the conference table, and even accommodates rooms with no
table at all.
1 EPIPHAN $5,967.00
Recorder / Streamer
1 EPIPHAN $3,438.00
Record, stream and switch up to three full HD video inputs from HDMITM, SDI, and USB
sources. Epiphan Pearl Min iTM takes your video production to the next level.
2 HuddleCamHD $187.20
Universal wall mount small
2 PTZOptics $3,325.92
1080p Video conferencing camera with SDI support, 12X optical zoom, gray
Price Includes Accessories
Presented By: Third Coast Tech, LLC. 8/10/2021
Project Name: Parks and Racs Broadcast Equipment Project No.: TCT-0749 Page 4 of 6
204
1 TCT
Designed for professional SMPTE video applications, this 3G SDI 4x1 Switch allows you
to determine which of two connected SDI video sources will be displayed on the SDI
monitor. This switch supports bit rates up to 2.970 Gbps and supports SD -SDI, HD -SDI,
and 3G-SDI video signals.
1 TCT
Quoted at $49/Hour as per service contract
1 TCT
Cabling & Hardware
1 TCT
Quoted at $95/Hour as per G2G Contract
1 TCT
USB 2.0 Extender ove CAT6 PN: X001Z70WNN
Boardroom Equipment Total
Labor Total
Total
Project Equipment Subtotal:
Project Labor Subtotal:
Project Subtotal:
$172.50
$3,920.00
$540.00
$1,800.00
$120.00
$26,904.92
$5,720.00
$32,624.92
$26,904.92
$7,182.24
$34,087.16
Price Includes Accessories
Presented By: Third Coast Tech, LLC. 8/10/2021
Project Name: Parks and Racs Broadcast Equipment Project No.: TCT-0749 Page 5 of 6
205
Project Summary
Equipment:
Labor:
Grand Total:
Client: Phil Castonia
Contractor: Third Coast Tech, LLC.
Price Includes Accessories
Presented By: Third Coast Tech, LLC.
Project Name: Parks and Racs Broadcast Equipment Project No.: TCT-0749
Date
Date
$26,904.92
$7,182.24
$34,087.16
8/10/2021
Page 6 of 6
206
SEPTEMBER 1, 2021 AGENDA ITEM NO. 14
FACILITIES MAINTENANCE & DEVELOPMENT
To: Chairman McGillivray and Commission Members
From: Sue Wells, Interim Executive Officer
Michael J. Donnellon, Jr., Chief of Park Facilities Maintenance & Development
Zach Crane, Project Manager
Subject: Springfield Oaks - Davisburg Mill Pond Dam — Removal & Restoration — Conceptual Approval
PROJECT CATEGORIES
Agenda Type:
Approval Type
Project Type:
EXECUTIVE SUMMARY
Consent Agenda
✓ Conceptual Approval
✓ Capital Improvement
✓ Regular Agenda
Construction Approval
Maintenance
General Approval
Enhancement
Staff is presenting 100% Design plans and engineer's opinion of cost and approval to proceed with final
construction drawings, specifications, permitting and bidding for the mill pond dam removal and restoration
project, pending the Charter Township of Springfield board approval on September 9th 2021.
INTRODUCTION AND HISTORY
Oakland County Parks and Recreation Commission (OCPRC) owns and jointly manages the
Davisburg/Mill Pond Dam with the Charter Township of Springfield (CTS). The agreement, executed in
July 2015, calls for cost -sharing between the two parties for repair and maintenance of the dam. OCPRC
is responsible for fifty-five percent (55%) of the financial obligation, and CTS is responsible for forty-five
percent (45%). Rotary Park, located on the outfall side of the dam is owned, operated and maintained by
OCPRC while the Mill Pond Park located upstream from the dam is owned, operated and maintained by
CTS. Information from previous studies and inspections indicate a need for a significant investment into
the dam, based on deficiencies and associated safety/liability issues.
In October 2018 the Commission awarded a contract to AECOM to complete the Davisburg Mill Pond
Dam Feasibility Study for the purpose to develop a recommendation for the future of the Davisburg Mill
Pond Dam — replacement or removal, which concluded on July 10, 2019 with CTS and the Commission's
conceptual approval to remove the dam and restore the area. Copies of the Feasibility Study can be
found at htti)://www.sr)rinafield-twr).us/our communitv/mill pond dam/index.r)hq
In November 2019 the commission awarded a change order to the AECOM contract to complete the
preliminary design, engineering, grant writing, public outreach and conceptual park design for the
removal and restoration of the mill pond dam. A design committee was formed with OCPR and CTS staff
to continue this phase II design work with AECOM.
An online public outreach presentation was conducted on January 191h 2021, which allowed public
comment on the 50% Conceptual plans. Public comment was collected through online survey. This Public
207
engagement report was provided to the commission at the April 7th 2021 commission meeting. A public
outreach meeting is scheduled for August 31st 2021 for presentation on the 100% plan set. Staff will
report back on outcomes of this presentation at a future commission meeting.
Below is the list of awarded grant funding to date;
MDNR Fisheries Habitat (2020 Design/Engineering) $121,300
MDNR Fisheries Habitat (2021 Construction) $350,000
SEMI Resilience Fund $207,472
National Fish Passage Partnership $197,363
Saginaw Bay Water Initiative Network $25,000
Current Total Grant Funding $901,135
General Scope of Work: (See Attachment A; 2.1 Construction Sequence; for detailed breakdown)
o Dewatering of the Davisburg impoundment
o Excavation and relocation or disposal of soils and materials within the limits of excavation
o Removal of the existing spillway
o Removal and disposal of fill/sediment materials
o Construction of open bottom culvert under road
o Reconstruction of Davisburg Road
o construction of instream habitat in the restored river, restoration of the riverbank and floodplain
areas.
2. Review and approval history
Date Description
Oct 2018 Phase I - Dam Feasibility Study Approval - AECOM
Sept 2019 Design/engineering budget approved within the FY2020 Capital Improvement
Program
Nov 2019 Phase II — Preliminary Design/Engineering Approval - AECOM Contract Change
Order
July 2020 Proposed Land Transfer Plan Discussion
Sept 2020 Construction/Grant budget approved within the FY2021 Capital Improvement
Program
Oct 2020 Conceptual Approval — 50% preliminary pans and engineer opinion of cost
April 2021 Phase II - AECOM Contract Change Order — Davisburg Road Engineering Design
1. Funding
a. FY2019 Operational Investment (COMPLETED)
i. AECOM Phase I — Dam Feasibility Study
$ 65,000
b. FY2020 CIP Investment
i. AECOM Phase II — Preliminary Design/Engineering
$168,530
ii. AECOM RCOC Road Work Change Order
$59,710
iii. AECOM Phase III — Final CD's/Bidding/Contract Admin
$84,725
(1) Total AECOM Contract Amount
$377,965
a. CTS Reimbursement only
($56,010)
b. Less awarded grant funding
($121.300)
c. Total Design Split Amount
$200,655
(2) According to the existing Interlocal Agreement OCPRC is responsible for $110,360.25 (55%)
and CTS is responsible for $90,294.75 (45%).
c. FY2021 CIP BUDGETED amount:
$1,650,000
i. Natural Area Restoration Grant (TBD)
($ 825,000)
a. Sub -total of budget
$ 825,000
d. CURRENT conceptual construction amount:
i. 100% Engineering Opinion of Costs
$2,055,566
(1) Please note this cost estimate carries a 15% contingency.
208
(2) Please note this cost estimate includes $367,500 that OCPRC is not responsible for under
the existing Interlocal Agreement for road reconstruction line item.
e. OVERALL PROJECT FUNDING SUMMARY
i. AECOM Design/Engineering $
377,965
ii. Engineer Opinion of Construction Costs $ 2,055,566
(1) Total project costs
$ 2,433,531
(2) Less CTS 100% Reimbursement — Road Construction
($ 367,500)
(3) Less CTS 100% Reimbursement — Road Design
($ 56,010)
(4) Less Grant funding
($ 901,135)
a. Estimated required project funding
$ 1,108,886
(5) According to the existing Interlocal Agreement OCPRC is responsible for $609,887 (55%) and
CTS is responsible for $498,999 (45%).
2. Tentative Project Schedule:
a. 50% review OCPR Commission Meeting — Conceptual Approval
October 7 2020
b. 50% review CTS Board Meeting — Conceptual Approval
October 8 2020
c. 50% Public Comment/Community Outreach/Education (Online)
January 19 2021
d. 100% Design Complete
July 2021
e. 100% Public Comment/Community Outreach/Education
August 31 2021
f. OCPR Commission Meeting
September 1 2021
i. Approval to proceed with CD's/Specifications/Bidding
g. Construction Contract Approval
TBD
i. Contingent upon obtaining 50% construction costs in grants
ATTACHMENTS
• Attachment A — AECOM 100% Design Executive Summary
• Attachment B — 100% Design/Engineer Concept Plans
• Attachment C — Engineer Cost Estimate
• Attachment D - AECOM contract amendment breakdown
STAFF RECOMMENDATION
Staff recommend conceptual approval of the 100% design engineering drawings, engineer's opinion of cost and
proceed with final construction drawings, specifications, permitting and bidding for the mill pond dam removal
and restoration project.
Staff recommends amendment to AECOM contract #5528 in the amount of $84,725 to proceed with final
construction drawings, specifications, permitting and bidding for the mill pond dam removal and restoration
project, pending Charter Township of Springfield Board approval at their September 9th 2021 meeting.
MOTION
Move to conceptually approve the 100% design engineering drawings, engineer's opinion of cost and
proceed with final construction drawings, specifications, permitting and bidding for the mill pond dam
removal and restoration project.
Move to amend AECOM contract #5528 in the amount of $84,725 to proceed with final construction
drawings, specifications, permitting and bidding for the mill pond dam removal and restoration project,
pending Charter Township of Springfield Board approval at their September 9112021 meeting.
209
ACoM AECOM
27777 Franklin Road
Southfield, MI 48034
aecom.com
Project name:
Mill Pond Dam Removal and
Restoration
Project ref: 60594641
To:
Oakland County Parks and Recreation From:
Commission
2800 Watkins Lake Road Troy en McDerNaperala,mott,
of
Waterford, MI 48328 Janeen McDermott, PE
Kate Bailey
CC: Charter Township of Springfield
Date:
July 30, 2021
Memo
Subject: 100% Design Executive Summary
1. Introduction
The Mill Pond Dam, which is jointly managed by Oakland County Parks and Recreation Commission
and Springfield Township, consists of a 370-foot-long earthen embankment and a steel and concrete
drop inlet spillway. The structural height of the dam is 16 feet. Water discharges through a 4-foot-wide
drop inlet into a pipe outlet and over a 10-foot-long water feature and water wheel, before dropping 5 to
6 feet and discharging into the downstream Shiawassee River (see Figure 1). Davisburg Road sits on
top of the earthen embankment at approximately elevation 960'.
A 2011 preliminary dam evaluation conducted by Soil and Materials Engineers, Inc. found several
potential deficiencies with the dam's earthen embankment and spillway:
• Erosion and deterioration were noted along the concrete discharge channel. The
evaluation suggested removing and replacing the discharge channel.
• A deflection or sag within the outflow pipe. The evaluation also noted that the outflow pipe
dates back to at least the early 1980s and is likely at the end of its recommended service
life.
• Inadequate spillway capacity. The evaluation notes that currently the road and grouted
riprap slope act as the overflow spillway and will overtop during the 100-year event.
Overtopping occurred in 1975, 1981, and possibly 1982.
• "Spongy areas" or "springs" in Rotary Park, downstream of the dam embankment.
210
Cracks and voids in the grouted cobbles and boulders that comprise the downstream
slope armoring. Undermining of the grouted cobbles and boulders has occurred along the
embankment and at the toe of the slope.
The presence of trees on the upstream slope of the dam.
A video inspection was done by Oakland County in 2015, confirming that the pipe was close to the end
of its service life. The dam is classified as a low hazard dam by EGLE and accordingly must be able to
pass a 100-year storm event to meet EGLE regulations. The existing spillway system does not have
that capacity.
A feasibility study was completed on August 7, 2019 which considered eight different options ranging
from replacing the existing spillway, constructing a new bridge over a new spillway, or removing the
dam. Eight factors (community impact, property values, recreational benefits, historical significance,
ecological and environmental impact, dam safety, and cost) were used to evaluate each alternative. A
decision matrix listing the factors indicated that the preferred alternative was to remove the dam and
restore the river corridor with an open -bottom arch culvert at the Davisburg Road crossing.
The following sections document the design basis for the Mill Pond dam Removal and Restoration
design. All elevations within this report refer to the North American Vertical Datum 1988 (NAVD 88).
T�n
Figure 1. Existing Mill Pond Dam Diagram
-oncrete water
water wheel
211
2. Basis of Design
2.1 Construction Sequence
The construction sequence for the Mill Pond dam removal and restoration project was drafted to
provide for a safe and economical dewatering and culvert replacement while accommodating
flexibility in water level control for sediment management purposes. All normal summer river flows
can be accommodated by the bypass pumping system. The general sequence is as follows:
1. Mobilize to the site.
2. Fully open sluice gate to invert at 955.5; WSE = 956.1 at existing conditions.
3. Install SESC measures around access routes and equipment/material storage areas.
4. Construct access route along west/south side of Mill Pond Park.
5. Construct engineered riffle at the existing upstream railroad bridge.
6. Stage 1: Construct sediment trap immediately upstream of outlet. Monitor and empty
sediment trap as needed to manage sediment transport downstream.
7. Incrementally demolish the sluice gate frame/ sheet pile to approx. 950.51; WSE = 951.28.
Or bypass pump into existing 36" culvert.
8. As water level lowers in the pond, start excavation of restored channel in the proposed
alignment, working from upstream to downstream.
9. Install engineered riffles to maintain channel grades and prevent head cutting upstream,
working from upstream to downstream.
10. Place excavated material in designated areas.
11. Stage 2: place detour signage, close Davisburg Road, and start construction of cofferdam
upstream of existing dam. Begin removal of road surface to top of existing outlet culvert
(approx. 954').
12. Construct downstream energy dissipation structure for bypass pumping outlet.
13. Construct pump intake structure in the impoundment.
14. Stage 3: monitor weather forecast for five day forecast of less than 0.25" of rainfall.
15. Begin 24-hr operation. Set up and start bypass pumping over Davisburg Road.
16. Complete cofferdam construction (to be designed by contractor) (all flow via bypass
pumping now) and continue incremental dewatering to approximate elevation 944. Upon
dewatering below elevation 950, begin demolition of existing dam structure. Continue
excavation of earthen embankment and removal of existing dam structure.
17. Complete excavation for open bottom culvert and footings. Coordinate geotechnical
investigation for culvert footings with AECOM and designated subcontractor.
18. Prepare for wingwall footings and pour proposed culvert footings and wingwalls.
212
19. Install permanent restored river channel through Davisburg Road and tie into channel
downstream in Rotary Park as indicated in the plans.
20. Upon adequate concrete strength tests per specification, place precast bridge structure.
21. Stage 4: once culvert is installed and water surface elevation lowered to approximately 944,
remove cofferdam to open flow through proposed/ restored river channel.
22. Remove bypass pumping system.
23. Backfill and reconstruct roadway.
24. Final restoration: restore dam embankment site.
25. Complete installation of river features including large wood, riffle materials, and riprap bank
protection.
26. Complete restoration of impoundment including final grading and seeding.
27. Restore equipment/ material storage areas and remove access route and restore.
28. Demobilize.
2.2 Dam Breaching
The dam breaching operation is planned for in the location of the existing outlet structure which
coincides with the location of the proposed open bottom arched culvert. The breaching operation
will occur in four stages.
Breach Stage 1: During stage 1 the existing sluice gate will be fully opened in order to dewater
Mill Pond to the extent practicable using the existing structure. As the impoundment begins to
lower, an access route will be constructed along the east side of the pond, providing the Contractor
access tothe upper impoundment where the grade control riffle near the existing upstream railroad
bridge can be constructed prior to extensive dewatering occurring. During this stage the
Contractor will begin maintenance of a sediment trap near the sluice gate and can begin channel
excavation in the upper impoundment as water levels lower.
Breach Stage 2: During this stage Davisburg Road will be closed in order to facilitate installation
of a cofferdam upstream of the existing dam. The existing roadway within the earthwork footprint
required to construct the proposed open bottom culvert will be removed to the top of the existing
outlet culvert elevation (Approx. El. 954'). The Contractor will construct the downstream energy
dissipation structure for the bypass pumping operation and construct the pump intake structure in
the impoundment, set up the pumps and prepare for bypass pumping.
Breach Stage 3: The bypass pumping operation begins; the cofferdam is completed, putting all
river flow through the pumping operation. Contractor to continue excavation of the earthen
embankment and removal of the existing dam structure down to the proposed river elevation and
required culvert footer elevations. The culvert wingwall and footer foundations will be prepared
and poured, and the restored river channel constructed through the former dam embankment.
Upon achieving adequate strength tests on the concrete, the precast culvert will be placed on top
of the footers.
Breach Stage 4: Once culvert and wingwalls are installed and water surface has been dewatered
to approximately 944', the cofferdam will be removed to open flow through the newly constructed
culvert and restored river channel. The bypass pumping system can then be removed and
Davisburg Road fully reconstructed.
213
2.2.1 Flood Hydrology
The Michigan Department of Environment, Great Lakes, and Energy maintains a flood
discharge database for all major streams within the state.
Flow data representing peak flows during low flow conditions, the 10-year flood event, the
50-year flood event, and the 100-year flood event were obtained from the Michigan EGLE
flood flow database. These estimates for the Shiawassee River were supplemented by
AECOM by collecting base flow measurements in the field and survey observations through
the river reach of bankfull elevations. The survey data were then used in HEC-RAS and
assessed with the Manning's equation and regional curve data to estimate bankfull flows in
this part of the Shiawassee River. Table 1 present the flows at Mill Pond Dam used for the
hydraulic model.
Table 1. Flood Discharge and Volume Estimates for Shiawassee River at Mill Pond Dam.
Discharge
Frequency (%)
Return Period
(years)
Discharge (cfs)
BaseFlow Bankfull 10%
10
3 30 200
2% 1%
50 100
360 440
The bypass pumping operation consists of one electric baseflow 2500gpm (5.5 cfs) pump,
one backup engine driven (diesel) baseflow 2500gpm (5.5 cfs) pump, and one 500gpm (1
cfs) electric dewatering pump. The bypass pumping operation is intended to be utilized
during a short time, while the contractor demolishes the existing structure, excavates down
to proposed grade for the proposed culvert, and installs the culvert wingwalls and footers
during 24hr operations. Prior to switching to the bypass pumping operation, the Contractor
must have an approved weather forecast of less than 0.25" of rainfall. The temporary
cofferdam structure, protecting the dam breach area is designed to the 10yr storm event.
2.2.2. Sediment Management
By utilizing a pumping operation, sediment transport downstream will be minimized to the
maximum extent practicable. Dewatering rates will be limited to less than 1 ftiday or as
prescribed by EGLE permit requirements. Sediment traps at the sluice gate outlet and
pumping system inlet as well as placed as needed throughout the impoundment will aid in
capturing sediments as the water surface within Mill Pond is lowered.
2.3. River Restoration
2.3.1. Channel and Floodplain Hydraulics
Cross Section dimensions for the proposed channel within Mill Pond were based on
surveyed reference reaches, regional curve data for southeastern Michigan, Manning's
equation analysis, and Rosgen Type C5 stream channel values (Table 2). Bankfull widths
vary between 11 and 13 feet with 1 to 2 foot high banks. In this reach, the channel features
both deep pools (2.5-3 feet at bankfull) and shallow riffles (1.25 ft) and runs (2 ft). The
overall slope along the reach is 0.56%. Based on refusal depth, bathymetric surveys, and
existing structures book ending the project area, channel slopes vary through the
impoundment to provide bedform and habitat diversity as well as grade control structures
and stable slopes tying into the railroad crossing elevations.
214
Table 2. Rosgen Channel Type C5 Recommended Values
ROSGEN C5 CHANNEL
RATIOS
Low
High
Vbkf (ft/s)
3.5
5
Bankfull Mean Velocity (ft/s)
Width to Depth Ratio (mean
W/D
9
14
depth)
Dmax/Dbkf
1.1
1.4
Riffle Max Depth Ratio
Dtob/Dbkf
1
1.1
Bank Height Ratio
Lm/Wbkf
7
14
Meander Length Ratio
RC/Wbkf
2
3
Radius of Curvature Ratio
Wblt/Wbkf
3.5
8
Meander Width Ratio
K
1.2
1.5
Sinuosity
Sval
0.002
0.01
Valley Slope (ft/ft)
Srif/Schan
1.1
1.2
Riffle Slope Ratio
Srun/Srif
0.5
0.8
Run Slope Ration
Sglide/Schan
0.3
0.5
Glide Slope Ratio
Spool/Schan
0
0.2
Pool Slope Ratio
Dmaxpool/Dbkf
1.2
2.5
Max Pool Depth Ratio
Wpool/Wbkf
1.1
1.7
Pool Width Ratio
Lps/Wbkf
3.5
7
Pool to Pool Spacinq Ratio
Bankfull flows in the surveyed cross sections in the reach were between 20 cfs and 30 cfs.
The average estimated bankfull flow was 28 cfs.
Floodplains serve a dual purpose in a river system, including dissipating flood energy and
providing important ecological habitat. One bankfull width of floodplain per each side of the
river was included in the design, to balance flood dissipation, habitat, and earthwork/cost.
This sums to a total of 24 ft of floodplain, at a 0%-1 % slope to support infiltration, vegetation
and wetland formation along the riparian corridor.
The designed channel geometry will include 1-2 foot bank heights and a 12 foot top width.
The width to depth ratio for the channel will be approximately 9, which is within the range
typically observed for channels of this slope and river type, and consistent with surveyed
reference reaches.
2.3.2. Bed and Bank Stabilization
Given the elevation constraints at the upstream and downstream railroad and road
crossings, a restored channel through parts of the Mill Pond impoundment will not reach
the parent bed material in all locations. These portions of the restored channel will require
engineered materials for the channel bed and additional slope stability considerations.
The proposed channel bed and banks will be stabilized in multiple locations where grade
control is required and meander bends in the channel alignment occur, to prevent migration
of the channel. The stone for the riffles was sized to remain immobile at all floods up to the
100-yr flood event.
215
Large wood will be used to stabilize banks and provide opportunity for in -stream habitat
and channel bed variety with these structures facilitating the formation of pools in the river
bends. See plan set for locations.
2.4. Davisburg Road
With the removal of the dam, there was an opportunity to review the current road geometrics and
configuration and to study whether a re -alignment or upgrades were desirable at this location.
Existing Conditions
Davisburg Road is a two-lane road with a S-curve alignment in the vicinity of the dam. The
lanes are 11-12' wide with minimal or no shoulders. The area near the existing dam has steep
side slopes with guardrail on both sides. The guardrail on the WB lane is 1' from the edge of
pavement while the guardrail on the EB lane is 24from the edge of pavement. The first curve
has a radius of approximately 345'. The max cross slope on the EB lane is approximately 6%
while the cross slope on the WB lane remains adverse varying from 3% to1 % as it transitions
to the east. The second curve has a radius of approximately 380'. The max cross slope EB
lane is 7% while the max cross slope on the WB lane is 12%. There is approximately 65' of
tangent between the curves. The superelevation has a standard delta percent rate, however
the tangent is shorter than required for a standard one third/two thirds distribution. The
transition appears to be distributed based on the eastern curve. The existing S curve alignment
does not meet current Road Commission for Oakland County (RCOC) design standards.
The vertical alignment appears to meet the design speed of 30 mph. The profile is relatively
flat, approximately 0.2% to 0.3% at the east end, then runs 4% down to the existing dam and
back up at 5% and then flattens as it approaches the railroad. The vertical curve K values
meet 30 mph design standards, however the length of the shorter vertical curves may be less
than 3V. The vertical alignment does not meet current RCOC design standards
The crash history for this segment of Davisburg Road was reviewed for the last four calendar
years, 2016 thru 2019. There was only one crash, in Sept 2018, coded as an "Other" crash
type, about 100 feet west of the railroad overpass. No injuries were reported. Looking back
further, there were wo crashes from 2012 thru 2015, totaling three crashes in eight years.
Based on this data there does not appear to be a crash pattern at this location.
Potential Improvements
1. The first option considered was to maintain existing conditions as there is not a crash
history in this location. The western curve has substandard superelevation, while the western
curve has a superelevation above the required amount.
2. The second option considered was to utilize the existing alignment but revise the
superelevation to a maximum 4% or 6% superelevation, and add 4-5' shoulders on both sides
with guardrail at those locations. Curb and gutter would be added as well to catch the water
and direct the runoff via sewer or downspouts to decrease run-off from the roadway and
potential erosion issues.
Michigan Department of Transportation (MDOT) Straight Line Superelevation (Chapter 3 of the
MDOT Road Design Manual) requires a 4% superelevation for a design speed of 30 mph and
a radius of 345'. The existing radii meet this requirement. The superelevation distribution
would need to be substandard, with approximately 43% within the curves. The hinge points
along this stretch would be wider than existing and with a minimum of a 1:2 fill slope, the tie
down points would extend 10' — 20' father out than existing. The open bottom culvert may
need to be extended. This option opens up the roadway, increasing sight distances and
216
meeting most standards. The superelevation transition into the western curve could be
challenging with parking on the north and driveways on the south.
3. The third option includes the improvements from the previous option (2), but it slightly
re -aligns the road using 360' and 380' radii, but increasing the tangent between them to allow
for a standard 1/3 — 2/3 superelevation transition distribution. This option can be seen in the
attached graphic. The western curve is shifted slightly south while the eastern curve is shifted
slightly north. The tie down points in those locations would extend further out than Option 2.
After reviewing the project with RCOC and the Township it was decided that the project would
move forward with option 3 to improve both the horizontal and vertical alignments to meet
RCOC design standards. Although there is not a crash pattern for this section of road, it was
agreed that improving the road to meet current RCOC standards will decrease the likelihood of
accidents and improve commercial traffic flow through the s-curve. Improvements to the S-
curve, vertical curves, and guard rail have been developed based on a 35 mph design speed
and in accordance with AASHTO Low Speed Urban Design. The posted speed limit through
this section of road is 25 mph. It is standard practice to design to a speed above the posted
speed as a factor of safety. The design speed of 35 mph is RCOC's minimum speed to use for
design. Specific road design and work extents can be seen in the planset.
2.5. Site Restoration
Removing the Mill Pond Dam will restore the Shiawassee River to a free -flowing condition and
provide passage for fish and other aquatic species, which is considered a natural enhancement.
Dam removal will include active sediment management measures for impounded sediment and
formation of a restored river channel and floodplain. Active restoration includes the active
construction in -place of a restored channel and floodplain following dam removal, as well as
seeding and planting to establish vegetation communities intended to manage erosion and
provide habitat and aesthetic value. A restored channel will also take a sinuous form through the
former impoundment increasing the overall proposed channel length. Areas outside of the
channel and floodplain corridor will largely be left ungraded to provide topographical
heterogeneity which will promote off -channel wetland and habitat formation.
As the impoundment drains, seeps and tributaries will be uncovered at various locations that
cannot necessarily be predicted at present. There are various wetland areas and at least one golf
course drainage outlet on the south side of the impoundment. The contractor will be responsible
for properly stabilizing these tributaries and providing erosion protection as needed, with approval
from the owner and engineer.
Much of the area in the drained impoundment, along the restored channel, is expected to revert
to wetland, given the drainage patterns, grading, and high number of seeps and springs. A prairie
fen habitat will likely re-establish in parts of the riparian zone adjacent to the Shiawassee stream
channel. Prairie fens are unique to the glaciated Midwest, fed by calcium -rich groundwater,
comprised primarily of grasses, sedges, rushes and wild -flowers and provide habitat for
numerous species of animals. Post -project restoration efforts will include application of topsoil,
wetland/floodplain seeding, and erosion mats in the floodplain areas, as well as slope/upland
seeding in disturbed areas and live stakes along portions of the riverbanks. Post -project
monitoring and invasive species management will be conducted per developed maintenance
plan. Subsequent park efforts (not part of this project) will likely include planting of native species
from adjacent habitats to promote wetland and prairie fen formation. This restoration will provide
landscape connectivity for plants and animals between natural areas upstream and downstream
of Mill Pond Park.
217
fi0com
I%*
JANEEN McDERMOTT,PE
PROJECT MANAGER
CIVIL & HYDRAULICS
SHEETS T-1.1, T-2.1, T-3.0, B-0.1 -
B-6.1, R-0.1 - R-2.5, S-0.1 - S-1.1
DAVISBURG MILL POND DAM
REMOVAL AND RIVER RESTORATION
AARON HUMPHREY, PE
GEOTECHNICAL
SHEETS T-2.0, B-1.1 - B-6.1
STATE LOCATION MAP
OAKLAND COUNTY
NORTH
i- 100cr 2O o'
SHEETINDEX
Sheet Sheet Title
Number
TITLE & GENERAL PLANS
T-1.1 TITLE & INDEX
T-1.2 GENERAL NOTES
T-2.0 SOIL BORINGS LOCATION MAP
T-3.0 MAINTENANCE OF TRAFFIC PLAN
T-3.1 MAINTENANCE OF TRAFFIC PLAN
DAVISBURG ROAD
RD-1.1
GENERAL NOTES
RD-1.2
GENERAL NOTES
RD-1.3
GENERAL NOTES
RD-1.4
LEGEND
RD-1.5
DAVISBURG ROAD ALIGNMENT SHEET
RD-1.6
DAVISBURG ROAD TYPICAL CROSS SECTIONS
RD-1.7
DAVISBURG ROAD TYPICAL CROSS SECTIONS
RD-1.8
PAVEMENT CORES AND SOIL BORINGS
RD-1.9
DAVISBURG ROAD REMOVAL SHEET
RD-1.10
DAVISBURG ROAD CONSTRUCTION SHEET
RD-1.11
DAVISBURG ROAD PROFILE SHEET
RD-1.12
DAVISBURG ROAD CROSS SECTION SHEET
RD-1.13
DAVISBURG ROAD CROSS SECTION SHEET
RD-1.14
DAVISBURG ROAD CROSS SECTION SHEET
BREACHING PLANS
B-0.1
EXISTING SITE TOPOGRAPHY
B-1.1
GENERAL SITE PLAN
B-1.2
EROSION PLAN
B-1.3
SOIL EROSION DETAILS
B-2.1
DAM BREACHING PLAN VIEW - STAGE 1
B-2.2
DAM BREACHING PROFILE VIEW - STAGE 1
B-3.1
DAM BREACHING PLAN VIEW - STAGE 2
B-3.2
DAM BREACHING STAGE 2 DETAIL
B-4.1
DAM BREACHING PLAN VIEW - STAGE 3
B-4.2
DAM BREACHING PROFILE VIEW - STAGE 3
B-5.1
DAM BREACHING PLAN VIEW - STAGE 4
B-5.2
PROPOSED CULVERT VIEWS
B-6.1
FINAL RESTORATION
RESTORATION PLANS
R-0.1
SITE OVERVIEW
R-1.1
CHANNEL GRADING & PROFILE 1 OF 4
R-1.2
CHANNEL GRADING & PROFILE 2 OF 4
R-1.3
CHANNEL GRADING & PROFILE 3 OF 4
R-1.4
CHANNEL GRADING & PROFILE 4 OF 4
R-2.1
CONSTRUCTION CROSS SECTIONS 1 OF 5
R-2.2
CONSTRUCTION CROSS SECTIONS 2 OF 5
R-2.3
CONSTRUCTION CROSS SECTIONS 3 OF 5
R-2.4
CONSTRUCTION CROSS SECTIONS 4 OF 5
R-2.5
CONSTRUCTION CROSS SECTIONS 5 OF 5
R-2.6
RIFFLE DETAILS
R-2.7
CHANNEL DETAILS
STRUCTURAL DEMOLITION
S-0.1 STRUCTURAL SITE OVERVIEW
S-1.1 EXISTING STRUCTURE REMOVALS
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD �)AKINVO
WATERFORD, MI 48328 AKI 1)
248.858.0906 TEL
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248,846,6558 TEL 248,846,6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
W_ aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100 % DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
TITLE & INDEX
SHEET NUMBER _
cIG
T-1.1
Lu
.E
a)
E
0)
m
c
co
0
.IN
n
n
cD
z
Q
ry
p
N
0
0
0
Q
U
0
m
cD
p
Q
U
0
0
m
L
>
Q
p
It
m
LO
0
co
U
w
0
Irr
In
a'
o0
oU
w
N
C)p
N
-67
20
ow
aQ
00
ow
J >
ry
p
ow
"' z
r--o
o-
�z
N w
N r'
z�w
10��
ry -
�_
.0
�co
=w
U co
�;,D
�U
J ILL
CIVIL ABBREVIATIONS
BTM.
BOTTOM
CB
STORM CATCH BASIN
C & G
CURB & GUTTER
CL
CENTER LINE
C.O.
CLEAN OUT
CONC.
CONCRETE
C.P.
CONTROL POINT WITH NUMBER
C.Y.
CUBIC YARDS
DIA.
DIAMETER
E
EASTING
ELEC.
ELECTRICAL
ELEV./EL.
ELEVATION
EX./EXIST.
EXISTING
FES
FABRIC ENCAPSULATED SOIL
F.F.E.
FINISH FLOOR ELEVATION
FRP
FIBER REINFORCED PIPE
FT.
FOOT
GAL.
GALLON
HYD.
HYDRANT
INV
INVERT
I.E./INV.
INVERT ELEVATION
LB
STORM LEACH BASIN
LF
LINEAR FOOT
MECH.
MECHANICAL
M H
MANHOLE (ANY UTILITY)
N
NORTHING
PP
POWER POLE
PR./PROP.
PROPOSED
PVC
POLYVINYL CHLORIDE
PVMT.
PAVEMENT
P.0.B
POINT OF BEGINNING
RCP
REINFORCED CONCRETE PIPE
S.B.
SOIL BORING
SN
SANITARY SYSTEM
SPW
TEMPORARY SHEET PILE WALL
S.S.
STAINLESS STEEL
STM
STORM SYSTEM
S.Y.
SQUARE YARDS
T.P.
TOP OF PIPE
TYP.
TYPICAL
Y.D.
STORM YARD DRAIN
W/L
WATER LINE
WM
WATER MAIN
WSE
WATER SURFACE ELEVATION
SURVEY GENERAL NOTES
COORDINATE SYSTEM
ZONE:
ELLIPSOID:
HORIZONTAL DATUM:
VERTICAL DATUM:
GEOID:
UNITS:
BENCHMARKS
BENCHMARKS SET
1. BM 500 N 457587.89
STATE PLANE
MICHIGAN SOUTH 2113
GRS 80
NAD 83 (CORS 2011)
NAVD 88
GEOID 12A
INTERNATIONAL FEET
E 13345976.74 Z 964.90
NAIL ON TOP OF WOODEN GUARD RAIL POST
2. BM 501 N 457542.22 E 13345604.21 Z 965.83
NAIL ON TOP OF WOODEN GUARD RAIL POST
GENERAL NOTES
1. THE CONTRACTOR SHALL HAVE SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY.
2. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL
SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY
RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND
FEDERAL HEALTH AND SAFETY STANDARDS, LAWS, AND
REGULATIONS.
3. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT AND MAINTAIN ANY EXISTING UTILITY
SERVICES SHOWN ON THESE PLANS AND ANY OTHERS NOT OF
RECORD OR NOT SHOWN ON THESE PLANS. THE UTILITIES SHOWN
ON THE PLANS ARE APPROXIMATE LOCATIONS AND SHOULD BE
INTERPRETED AS SUCH. THE CONTRACTOR IS REQUIRED TO
PROVIDE A MARK -OUT OF ALL UTILITIES WITHIN THE AREA OF
WORK PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR TO
CALL MISS DIG (1-800-482-7171) TO OBTAIN A MARK -OUT OF
PUBLIC UNDERGROUND UTILITIES. THE CONTRACTOR SHALL
CONTACT THE PRIVATE UTILITIES LISTED ON THIS SHEET TO
ARRANGE FOR MARK -OUT OF PRIVATE UTILITIES NOT LOCATED BY
THE MISS DIG SYSTEM. CONTRACTOR SHALL BE AWARE OF
HIGH -VOLTAGE OVERHEAD ELECTRIC LINES. THE CONTRACTOR IS
RESPONSIBLE FOR ALL DAMAGE TO EXISTING UTILITIES AND ALL
COSTS TO REPAIR DAMAGE TO ANY UTILITY (SEWERS, WATER, GAS,
ELECTRICAL, CABLE, UNDERDRAIN SYSTEMS, & SPRINKLER SYSTEMS,
ETC.) KNOWN, OR OTHERWISE, SHALL BE BORNE SOLELY BY THE
CONTRACTOR. ACCEPTANCE & APPROVAL OF SAID REPAIRS SHALL
BE PER THE OWNER OF THE DAMAGED UTILITY.
4. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO
ENSURE ALL UTILITY SERVICES WILL REMAIN FUNCTIONAL DURING
THE CONSTRUCTION PERIOD.
5. THE CONTRACTOR SHALL HAVE A FULL SIZE SET OF THE MOST
RECENTLY APPROVED FINAL PLANS MARKED "FOR CONSTRUCTION"
ON THE JOB SITE AT ALL TIMES.
6. UPON COMPLETION OF EACH DAYS WORK, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR LEAVING THE WORK AREA SECURED
AND FREE OF HAZARDS AND SHALL PROVIDE ALL NECESSARY
TEMPORARY SIGNS, WARNING DEVICES, AND BARRICADES.
7. THE CONTRACTOR SHALL KEEP ACCURATE AND LEGIBLE RECORDS OF ALL
CHANGES OF WORK THAT OCCUR DURING CONSTRUCTION AND INFORMATION
ON "AS -BUILT" CONDITIONS. DOCUMENTATION OF CHANGES AND AS -BUILT
INFORMATION SHALL BE RECORDED ON AN APPROVED SET OF FULL SIZE FINAL
PROJECT PLANS AND DELIVERED WITHIN 90 DAYS AFTER COMPLETION OF
WORK.
8. THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO PROTECT THE
PROJECT AND ADJACENT PROPERTY, STRUCTURES, UTILITIES AND
LANDSCAPING FROM ANY DAMAGE, EROSION AND SILTATION THAT RESULTS
FROM THE CONSTRUCTION BY APPROPRIATE MEANS (SAND BAGS, HAY BALES,
SILT FENCE, DIKES, ETC.) UNTIL SUCH TIME THE PROJECT IS COMPLETED AND
ACCEPTED BY THE OWNER.
9. THE CONTRACTOR SHALL REFER TO SPECIFICATION SECTION 01 11 00
SUMMARY OF WORK FOR ALL PERMIT REQUIREMENTS AND GUIDANCE IN
OBTAINING THE APPLICABLE PERMITS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR CONFORMANCE WITH ALL APPLICABLE PERMIT
REQUIREMENTS DURING THE EXECUTION OF THE WORK AND PRIOR TO FINAL
ACCEPTANCE. ADDITIONAL DETAILS ON CONTRACTOR RESPONSIBILITIES ARE
PROVIDED IN THE SPECIFICATIONS.
10. ALL NON -PAVED DISTURBED AREAS SHALL BE RESTORED AS SHOWN ON THE
PLANS.
11. THE CONTRACTOR SHALL ACCESS THE WORK AREAS USING THE PUBLIC
RIGHT-OF-WAY AND EXISTING EASEMENTS ONLY. CROSSING PRIVATE
PROPERTY TO ACCESS THESE AREAS WITHOUT WRITTEN PERMISSION FROM
THE PROPERTY OWNER IS PROHIBITED.
12. TOPOGRAPHY SHOWN HERE REPRESENTS CONDITIONS EXISTING AT THE TIME
THE FIELD SURVEY WAS MADE (MARCH 2O19).
13. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR
MAKING A DETERMINATION OF WATER LEVELS THAT MAY EXIST DURING
CONSTRUCTION.
14. MEASURES SHALL BE TAKEN TO PREVENT DEBRIS FROM FALLING FROM THE
EXISTING STRUCTURES AND BEING TRANSPORTED DOWNSTREAM.
16. ALL WORK FOR THE CONDITIONS SHOWN AS "PROPOSED", "FINISH", AND
"NEW" IS REQUIRED UNDER THIS CONTRACT.
ELECTRONIC FILES
AFTER BIDS HAVE BEEN SUBMITTED AND A SELECTION IS MADE, ELECTRONIC FILES
WILL BE PROVIDED TO THE CONTRACTOR FOR LOCATING KEY DESIGN ITEMS.
SPECIAL NOTES
1. PROTECTION OF WORK
DURING THE EXECUTION OF THE WORK SHOWN ON THESE PLANS, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR PROTECTION OF THE WORK AREA AND EQUIPMENT
FROM FLOODS AND DAMAGE OR DELAYS DUE TO FLOODS. NO EQUIPMENT SHALL BE
LEFT IN CHANNEL AFTER WORK HOURS.
2. BREACHING SAFETY
IN THE CASE OF AN UNEXPECTED BREACH THROUGH THE DAM THE CONTRACTOR
SHALL HAVE A STOCKPILE OF RIPRAP NEARBY FOR EMERGENCY PLACEMENT. ALSO
THE CONTRACTOR IS REQUIRED TO HAVE EXTRA SAND BAGS AVAILABLE.
CONTRACTOR SHALL PREPARE SITE SPECIFIC HEALTH & SAFETY PLAN, INCLUDING AN
EMERGENCY ACTION PLAN. THIS EMERGENCY ACTION PLAN SHALL BE REVIEWED
AND COORDINATED WITH THE OAKLAND COUNTY CHIEF OF EMERGENCY
MANAGEMENT, KEVIN SCHEID (248-858-1724).
3. REMOVAL OF THIRD PARTY OWNED EQUIPMENT
CONTRACTOR IS REQUIRED TO COORDINATE THE REMOVAL OF THIRD PARTY OWNED
EQUIPMENT PER SECTION 02 4116.
ENGINEER'S STATEMENT
THE PURPOSE OF THE WORK SHOWN ON THESE PLANS IS THE DEWATERING OF THE
DAVISBURG IMPOUNDMENT, EXCAVATION AND RELOCATION OR DISPOSAL OF SOILS
AND MATERIALS WITHIN THE LIMITS OF EXCAVATION, REMOVAL OF THE EXISTING
SPILLWAY, AND APPURTENANCES, AND RESTORATION OF THE SHIAWASSEE RIVER.
THE WORK GENERALLY INCLUDES, BUT IS NOT LIMITED TO, CONCRETE REMOVAL,
REMOVAL AND DISPOSAL OF FILL/SEDIMENT MATERIALS, CONSTRUCTION OF OPEN
BOTTOM CULVERT UNDER ROAD, RECONSTRUCTION OF DAVISBURG ROAD,
CONSTRUCTION OF INSTREAM HABITAT IN THE RESTORED RIVER, AND RESTORATION
OF THE RIVER BANK AND FLOODPLAIN AREAS. THIS WORK WILL BE CONDUCTED
WHILE CONTRACTOR ACTIVELY MANAGES WATER LEVELS IN MILL POND AND FLOW
OVER DAVISBURG DAM WITHIN THE CONSTRAINTS SPECIFIED IN THESE PLANS.
THE EGLE HYDROLOGIC STUDIES UNIT PROVIDED THE FOLLOWING HYDROLOGY
INFORMATION FOR THE SHIAWASSEE RIVER AT THE LOCATION OF DAVISBURG DAM:
TOTAL DRAINAGE AREA OF 7.79 SQUARE MILES AND CONTRIBUTING DRAINAGE AREA
OF 6.85 SQUARE MILES
PRECONSTRUCTION MEETING
CONTRACTOR SHALL COORDINATE AND ARRANGE FOR A PRECONSTRUCTION MEETING
AT THE SITE PRIOR TO THE START OF CONSTRUCTION TO BE ATTENDED BY THE
OAKLAND COUNTY, SPRINGFIELD TOWNSHIP, CONTRACTOR, AND OWNER'S
REPRESENTATIVE PRIOR TO THE TIME OF THE PRECONSTRUCTION MEETING, THE
CONTRACTOR SHALL HAVE THE LIMITS OF THE WORK (GRADING AND TEMPORARY
ACCESS ROAD) STAKED AND THE LOCATIONS OF EXISTING UTILITIES MARKED OUT.
THE PURPOSE OF THIS IS TO CONFIRM THE PROPOSED WORK WILL NOT CONFLICT
WITH THE ADJACENT SITES. IF A CONFLICT IS IDENTIFIED AT THAT TIME, THE
CONTRACTOR SHALL REQUEST DIRECTION FROM THE OWNER PER THE CONTRACT.
EGLE 50 % FREQUENCY DISCHARGE VALUES (HALF OF FLOWS ARE GREATER AND
HALF ARE LESS) FOR THE SUMMER MONTHS DURING WHICH CONSTRUCTION WILL
TAKE PLACE:
MAY 5.7 CFS
JUNE 4.0 CFS
JULY 3.2 CFS
AUG 2.9 CFS
SEPT 2.8 CFS
OCT 3.3 CFS
NOV 4.3 CFS
DEC 4.8 CFS
EGLE PROVIDED ANNUAL PEAK FLOOD DISCHARGE VALUES:
50% (2 YEAR)
80 CFS
10% (10 YEAR)
200 CFS
2% (50 YEAR)
360 CFS
1% (100 YEAR)
440 CFS
0.5% (200 YEAR)
500 CFS
0.2% (500 YEAR)
650 CFS
THE DESIGN DISCHARGE FOR THE DAM BREACHING PORTION OF THIS PROJECT IS
THE 10% (10 YEAR) FLOOD (200 CFS).
TO COMPLY WITH THE MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES,
AND ENERGY REGULATION OF A MAXIMUM DEWATERING RATE OF 1 FT/DAY
SHALL BE MAINTAINED AT ALL TIMES FOR DAVISBURG IMPOUNDMENT.
CONTRACTOR SHALL SURVEY WATER SURFACE ELEVATION AT THE DAM EVERY 12
HOURS, TO VERIFY THIS REQUIREMENT IS BEING MET.
SPECIFIC SEQUENCES AND REQUIREMENTS RELATED TO DEMOLITION OF THE DAM
ARE PROVIDED HEREIN AND HAVE BEEN EVALUATED BY THE ENGINEER TO ALLOW
PASSAGE OF FLOWS THROUGH THE DAM UNDER A 10-YEAR FLOW SCENARIO.
CONTRACTOR TO PROVIDE COFFERDAM DESIGN FOR APPROVAL.
PUBLIC UTILITIES
THE EXISTING UTILITIES LISTED BELOW AND SHOWN ON THESE PLANS REPRESENT
THE BEST INFORMATION AVAILABLE AS OBTAINED ON OUR SURVEYS. THIS
INFORMATION DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO BE
SATISFIED AS TO IT'S ACCURACY AND THE LOCATION OF EXISTING UTILITIES.
NAME OF OWNER TYPE OF UTILITY
AT&T
ATTENTION: MICHAEL BIAZ
ENGINEER
54 N. MILL ST.
PONTIAC, MI 48342
MB1269@ATT.COM
810-768-0109
CENTURY LINK
200 GALLERIA OFFICENTRE #219
SOUTHFIELD, MI 48034
DTE ENERGY
ATTENTION: SARA KIPP
ASSOCIATE FACILITATOR
SARA.FORCE@DTEENERGY.COM
CO M CAST
ATTENTION: COLETTE HORNYAK
27096 OAKMEAD DRIVE
PERRYSBURG, OH 43551
419-874-9262
CN:
ATTENTION: THOMAS BRASSEUR
700 PERSHING RD
PONTIAC, MI 48340
248-452-4854
THOMAS. BRASSEU R@CN.CA
TELECOM
TELECOM
I��x•>tr:�r•J
TELECOM
ICL\IICZi7_lWE
SUGGESTED CONSTRUCTION SEQUENCING
1. MOBILIZE TO THE SITE.
2. FULLY OPEN SLUICE GATE TO IT'S LOWEST INVERT (-955.5) TO BEGIN
DRAWDOWN EXISTING WATER SURFACE ELEVATION IS
APPROXIMATELY 956.1.
3. CONSTRUCT ACCESS ROUTE ALONG SOUTH SIDE OF MILL POND PARK.
4. INSTALL SESC MEASURES AROUND ACCESS ROUTES AND
EQUIPMENT/MATERIAL STORAGE AREAS.
5. CONSTRUCT ENGINEERED RIFFLE AT THE EXISTING RAILROAD BRIDGE.
STAGE 1:
6. CONSTRUCT SEDIMENT TRAP IMMEDIATELY UPSTREAM OF OUTLET.
MONITOR AND EMPTY SEDIMENT TRAP AS NEEDED TO MANAGE
SEDIMENT TRANSPORT DOWNSTREAM.
7. INCREMENTALLY DEMO THE SLUICE GATE FRAME/ SHEET PILE TO
APPROX. 950.51; WSE = 951.28. OR BYPASS PUMP INTO THE EXISTING
36" CULVERT.
8. AS WATER LEVEL LOWERS IN THE POND, START EXCAVATION OF
RESTORED CHANNEL IN THE PROPOSED ALIGNMENT, WORKING FROM
UPSTREAM TO DOWNSTREAM.
9. INSTALL ENGINEERED RIFFLES TO MAINTAIN CHANNEL GRADES AND
PREVENT HEADCUTTING UPSTREAM.
10. PLACE EXCAVATED MATERIAL IN DESIGNATED AREAS.
STAGE 2:
11. PLACE DETOUR SIGNAGE, CLOSE DAVISBURG ROAD, AND START
CONSTRUCTION OF COFFERDAM UPSTREAM OF EXISTING DAM. BEGIN
REMOVAL OF ROAD SURFACE TO TOP OF EXISTING OUTLET CULVERT
(APPROX. 954).
12. CONSTRUCT DOWNSTREAM ENERGY DISSIPATION STRUCTURE FOR
BYPASS PUMPING OUTLET.
13. CONSTRUCT PUMP INTAKE STRUCTURE IN THE IMPOUNDMENT.
STAGE 3:
14. MONITOR WEATHER FORECAST FOR FIVE DAY FORECAST OF LESS THAN
0.25" OF RAINFALL.
15. BEGIN 24-HR OPERATION. SET UP AND START BYPASS PUMPING OVER
DAVISBURG ROAD.
16. COMPLETE COFFERDAM CONSTRUCTION (ALL FLOW VIA BYPASS
PUMPING NOW) AND CONTINUE INCREMENTAL DEWATERING TO
APPROXIMATE ELEVATION 944.
17. UPON DEWATERING BELOW ELEVATION 950, BEGIN DEMOLITION OF
EXISTING DAM STRUCTURE. CONTINUE EXCAVATION OF EARTHEN
EMBANKMENT AND REMOVAL OF EXISTING DAM STRUCTURE.
18. COMPLETE EXCAVATION FOR 36 FT OPEN BOTTOM CULVERT AND
FOOTINGS.
19. PREPARE FOR WINGWALL FOOTINGS AND POUR PROPOSED CULVERT
FOOTINGS AND WINGWALLS.
20. INSTALL PERMANENT RESTORED RIVER CHANNEL THROUGH
DAVISBURG ROAD.
21. UPON ADEQUATE CONCRETE STRENGTH TESTS PER SPECIFICATION,
PLACE PRECAST BRIDGE STRUCTURE.
STAGE 4:
22. ONCE CULVERT IS INSTALLED AND WATER SURFACE ELEVATION
LOWERED TO APPROXIMATELY 944, REMOVE COFFERDAM TO OPEN
FLOW THROUGH PROPOSED/ RESTORED RIVER CHANNEL.
23. REMOVE BYPASS PUMPING SYSTEM.
24. BACKFILL AND RECONSTRUCT ROADWAY.
FINAL RESTORATION:
25. RESTORE DAM EMBANKMENT SITE.
26. COMPLETE INSTALLATION OF RIVER FEATURES INCLUDING LARGE
WOOD, RIFFLE MATERIALS, ETC.
27. COMPLETE RESTORATION OF IMPOUNDMENT INCLUDING FINAL
GRADING AND SEEDING.
28. RESTORE EQUIPMENT/ MATERIAL STORAGE AREAS AND REMOVE
ACCESS ROUTE AND RESTORE.
29. DEMOBILIZE.
Know what's below.
Call before you dig.
LCOM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328
248.858.0906 TEL
CHARTER TOWNSHIP
OF SPRINGFIELD 0
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX ..�,
'KINC,1-IELU
ARTIER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
GENERAL NOTES
SHEET NUMBER
T-1.2
219
W
m
.E
c
W
0)
M
c
M
U
O
0
11
0
0
n
Q
z
O
Q
U
O
J
(D
Z
ry
O
m
J_
O
U)
O
N
U)
0
Z
a
ry
n
N
O
O
Q
U
O
M
(D
r)
Q
U
O
O
O
0
(Y
Do
U)
Q
O r)
M �I
o't
N 0-)
O )
N O
CO
N ry
_O
0- U)
�; U
M W
J �
ry
N IL
,U)
�U
O 0
N
O O
Z J
WU
!Y U)
z
U J
� W
2
UJ
U
_Q fV
O Uj
C E
to
_J LL
LL_
O
p � W
0
0
o Q
SHEET
p� AREA
IP
II
U qto DAVISBURG ROA�
HIAW . SEE TROUT
RIVER
POND
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC
EXISTING MAJOR
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
FENCE LINE
EDGE OF TREE AND/
OR SHRUB LINE
�� soil and materials engineers, inc.
IMmichigan, ohio and indiana
BORING B1
PAGE 1 OF 1
PROJECT NAME: Davisburg Dam Spillway Repairs
PROJECT NUMBER: PD63302
CLIENT: Oakland County Parks & Recreation
PROJECT LOCATION: Springfield Township, Michigan
DATE STARTED: 5/24/11 COMPLETED:
5/24/11
BORING METHOD: Hollow -stem Augers
DRILLER: RM RIG NO.: ATV
LOGGED BY: SB CHECKED BY: CGN
DRY DENSITY 0 HAND PENETROMETER
w
w
(PCf) -- ■ ® TORVANE SHEAR
LL
o
90 100 110 120 O UNCONFINED
ZO LL Lu O
z
a
OfN-VALUE
COMPRESSION
-- O MOISTURE & O VANE SHEAR (PEAK)
w
Q 7-O �
>
w¢
LL w
a-
ATTERBERG
LIMITS (%) X VANESHEAR(REMOLDED)
> COair
SURFACE ELEVATION: 960 FT
cz.1
3: z
O
PL MC LL ®TRIAXIAL (UU)
w o >_ a
¢
X
I�� SHEAR STRENGTH (KSF)
PROFILE DESCRIPTION
V) z
m n
10 20 30 40 10 20 30 40 1 2 3 4 REMARKS
Fine to Medium Sand- Some Silt-
Trace to Some Gravel- Trace
1.5 Roots & Grass- Dark Brown-
958.5
T ss1
2
2
a
Moist- Very Loose (SM/Topsoil)
Fine to Coarse Sand- Trace to
.5 Some Silt & Gravel- Brown-
956.5
1
Q Moist- Very Loose (SP-SM/Fill)
T
2
3
Clayey Fine to Coarse Sand-
SS2
1
.
-955 5 Some Silt- Trace to Some Gravel-
2
Brown- Moist to Wet- Very Loose
(SC/Fill,
s5a.o
1 :15:
D Sandy Clay- Some Silt- Trace
953 o SS3
9
17
Gravel- Brown- Very Stiff (CL/Fill)
T
3
n8
3S4
4
a
3
7:
01 .
-950 10
Fine to Coarse Sand- Some Silt-
SS5
15
30
�>
Trace to Some Gravel- Frequent
12
j-'
Silty Clay Layers from 14.5 to 18
feet- Gray- Wet- Loose to Dense
(SM/Fill)
5
SS6
5-
- 945 15
I
SS7
5
5
5
112
18.5
941.5
:1
1
�/ �_ � Amorphic Peat- Trace Roots-
SS8
3
4
'
11 20
»
-sa0 Zo--"\ Occasional Sand Seams- Black
(Pt)
�22.0
938.0 SS9
3
5
8 82
»w
3
Q
Fine Sand- Some Silt- Trace
1
Gravel- Gray- Wet- Loose (SM)
2
SS10
3
O
-935-Ll 25.0
935.0
END OF BORING AT 25.0 FEET.
-930-3i
GROUNDWATER & BACKFILL INFORMATION NOTES:
1. The indicated stratification lines area approximate. In situ the transition between materials may be gradual.
PP Y
DEPTH (FT) ELEV (FT)
2. Observation
well W 1 was constructed in the borehole upon completion of drilling. The well was backfilled
with filter sand to
-10'± and grouted to the surface above.
SZ DURING BORING: 4.0 956.0
1 AT END OF BORING: 11.0 949.0
BACKFILL METHOD: Note 2
0
N
N
WETLAND AREA
OHE
onr)
SOIL BORING
x
fYWY'WYY-,
soil and materials engineers, inc.
IMmichigan, ohio and indiana
r
NORTH
0 30 60'
BORING B3
PAGE 1 OF 1
PROJECT NAME: Davisburg Dam Spillway Repairs
PROJECT NUMBER: PD63302
CLIENT: Oakland County Parks & Recreation
PROJECT LOCATION: Springfield Township, Michigan
DATE STARTED: 5/24/11 COMPLETED:
5/24/11
BORING METHOD: Hollow -stem Augers
DRILLER: RM RIG NO.: ATV
LOGGED BY: SB CHECKED BY: CGN
DRY DENSITY V HAND PENETROMETER
w
w
(PCf) -- ■ ® TORVANE SHEAR
i
o
90 100 110 120 O UNCONFINED
p LL O
z
a
or U)
COMPRESSION
N-VALUE -- O MOISTURE & O VANE SHEAR (PEAK)
w
= O
>
w¢
W w
ATTERBERG
LIMITS(%) X VANE SHEAR (REMOLDED)
m
SURFACE ELEVATION: 947 FT
air
cz.1
3: z
O
PL MC LL ®TRIAXIAL (UU)
w o >_ a
¢
x
I�� SHEAR STRENGTH (KSF)
PROFILE DESCRIPTION
n z
on
REMARKS
10 20 30 40 10 20 30 40 1 2 3 4
.�
Clayey Fine to Medium Sand-
- Some Silt- Trace Gravel &
Organics- Dark Brown- Moist-
ss1
i
3 23 '
-945 25 Very Loose (SC/Topsoil)
944.5
2
Q
Amorphic Peat- Some Sand-
12
I
: 91
Trace to Some Gravel-
ssz
1
5 Occasional Brick Fragments -
Black (Pt/Fill)
I
940 '0
940.0 SS3
1
2 : :»*
1
Silty Fine to Medium Sand- Trace
t
to Some Organics- Trace Gravel
3
& Roots- Gray- Wet- Very Loose
ss4
4
10 to Loose (SM/Fill)
T
11.5
935.5
3
8
-935
SS5
4
Fine to Medium Sand- Trace Silt
t
& Gravel- Gray- Wet- Loose to
5
I
Medium Dense (SP)
ssfi
e
715
n13
• 16.0
931.0
I
-930
SS7
5
5
5
10
Fine to Coarse Sand- Trace Silt &
Gravel- Gray- Wet- Medium
I
Dense (SP)
I
-
SS8
410
e
q
2C 20.0
927.0
END OF BORING AT 20.0 FEET.
- 925
= 25-
- 920 =
3C
GROUNDWATER & BACKFILL INFORMATION NOTES:
1. The indicated stratification lines are approximate. In situ, the transition between materials may be gradual.
DEPTH (FT) ELEV (FT)
2. Driller reported 6
feet of artisian water head upon completion of drilling.
SZ DURING BORING: 3.0 944.0
1 AT END OF BORING: Note 2
BACKFILL METHOD: Cement & Bentonite Grout
a
N
N
L=Com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAN D COUNTY
PARKS
2800 WATKINS LAKE ROAD
OAKL ND
WATERFORD, MI 48328
COUNTY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
r
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
SOIL BORING LOCATION MAP
SHEET NUMBER
T-2.0 220
O
0
z
Q
J
d
U
H
LL
Q
ry
LL
O
W
U
Z
Q
Z
W
Z_
Q
75
0
M
z
Q
fy
0
N
O
0
0
Q
U
O
rn
U)
O
0
Q
U
O
0
m
CD
ry
D
m
co
Q
0
Lo
0
0
U
w
O
w
orr
c� O
oU
�w
N
O
N
_0 75
20
_O W
d Q
c� W
J >
rr
..❑
O W
Z
�O
o�
�z
N W
O Q'
N iY
z<
w
�C6
r_
Qry
3:=
uU
�ry
=w
U U)
�D
�U
a
co m
s=
J L.L
Md
TY
PL
AN
Sl(
I - VVLU-J IJUU r I ) ������� UUINJ 1 rxuu 1 IUIN HKtH �� /// uHvio- FULLUR
BURG RD DETOUR DAVISR-M FU
13 — SPECIAL SIGN #1 Ts TRAFFIC SIGNAL CLOSED R
2 — SPECIAL SIGN #2 PLACE 2-PCMS AS DIRECTED BY THE ENGINEER
MESSAGE TC BE APPROVED BY THE ENGINEER
I
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKL NfD
WATERFORD, MI 48328 COUNTY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
• ',did
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
MAINTENANCE OF
TRAFFIC PLAN
SHEET NUMBER
T-3.0
221
rl
DAV s5u� G FD
F4,27)t( 24,24 �� 4-->�-5,22�4,27
a
4
a
1.50" R�dlus, 0075" Border, Black on Orc�nge9
"DRVISBURG RD", C9
Table of widths end spoces
D A V I S B U R G
4.27 2019 0.67 2050 0.23 2043 0068 0056 0.85 2018 0.84 2019 0.84 2019 0.84 2019 0.68 2.18
R D
4.00 2019 0.84 2019 4.27
0
z
Q
J
d
U
H
Q
ry
0
W
U
z
Q
z
W
z
Q
75
0
M
0
z
Q
re
0
N
O
O
0
Q
U
O
U)
0
Q
U
O
0
cD
ry
D
m
co
Q
0
It
LO
0
cn
U
W
0
ry
o_
ory
c� 0
oU
W
o�
N
-0 75
20
_O W
d Q
c� W
J >
rr
..❑
O W
z
�0
o�
�z
N W
O Q'
N ry
z�W
Q�C6
r_
Qry
3:=
ujU
�U)
=w
U U)
�D
�U
a
c'o E
�m
J L.L
9u
<--804 37.1 )r4 rf 38.1
15.9 T 3005 4 )r 29.7
18.7 29.5 I3I 26.1 T
19.0 T 44 )j3r-9.4 Jr
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
0.4-> MICHIGAN
1509
18.7
19.0 CLIENT
[DAV FD
C-OSF[D A -- AD
-0--ow -D---Ou
S- Ak-- \G XX XX XX
-I I [3USI =SS - S 0-1-N
I,( ) 14oG )°(4 48.3
2.6
300" Radius, 1.0" Border, Black on Orc�nge9
"DRVISBURG D9 "RO"9 D9 "CLOSED D9 "RHERD
"DETOUR D, "STORTING D9 "XX/XX/XX D9
300" Radius, 100" Border, Blcnck on Orc�nge9
CD
Ln
-47
CD
Lq co
c9
(mil
Ln
co
CD
A
W CO
/ co
--4 1909 ,�
2.6
D9 7OLLOW"9 D9
"ALL" D9 "BUSINESSES", D;
"OPEN", Dg
Table of
widths
and
spaces
D
A
V
I
S
B
U R
G
19.8 40z
1,1 5,0
0,4 405
1,1 1,0
1,4 4,0
104 4,0
1,4
4,1 1,4 4,0
1,1 401
R
D
3,0
4,0 1,4
4,0 19,8
C
L
0
S
E
D
18.7 4.z
1.1 3J
1.1 4.2
1.1 4.1
1.4 3.6
1.2 4.0
A
H
E
A
D
300
5az 1,1
4a1 1,4
3,6 0.8
5.z 1,1
4,0 18,7
F
0
L
L
0
W
15.9 3e6
1e1 4.3
1e4 3e6
1e1 3e7
1.1 4e2
1e2 5e2
D
E
T
0
U
R
4e0
4e1 1e4
3.6 0e8
3e6 1e1
4e3 1e4
4e0 1e4
4e0
15e9
S
T
A
R
T
I
N
G
8,4 4,0 1.1
3,7 Z,4 5,0 1,1
4,0 1,2
3,6 1,1
1,z 1,4
4,0
1,4 4,1
X
X
/
X
X
/
X
X
4.0
4.0 1.1
4.� �.4
4.6 �.3 4.1 1.1
4.� �.4
4.6
�.3 4.1 1.1
4.Z 8.4
A
L
L
2,6 500 1,2
306
1,2 3,6
B
U
S
I
N
E
S
S E S
4e0
4e�1 1e4
4e1 1e4
4e0 1e4
lei 1e4
4ez 1e4
3.7
1e1 4e0 1e1
4e1 1e4 3e6 1e2 4.0
P
E
N
4eJ0
4e2 1e4
4eJ 1e5
3e6 let
4e1 2e6
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD �AKL NfD
WATERFORD, MI 48328 p
248.858.0906 TEL �' �-1 G A y
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
MAINTENANCE OF
TRAFFIC PLAN
SHEET NUMBER
T-3.1
222
M
x
N
0
2
U
ry
Q
i
n
n
I
H
0
ry
6
CD
z_
Q
fy
0
N
0
0
0
Q
U
0
rn
U)
0
Q
U
0
0
M
cD
ry
D
m
co
>
Q
c�
rn
LO
0
0
W
U
w
0
ry
w
o>_
�rr
00
NU
ow
N �
00
0-U
_�6w
M Q
J
w
>
orr
M
r--w
oz
�0
oz
N w
wry
ry
J Q
w
0
UC6
zry
>_
.0
=w
U U)
�U
0
c'o E
�M
J L.L
GENERAL PROVISIONS
THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT
OF TRANSPORTATION (MDOT) 2020 STANDARD SPECIFICATIONS FOR HIGHWAY
CONSTRUCTION EXCEPT AS NOTED HEREIN AND IN THE PROPOSAL BOOK.
THE TERM "ROAD COMMISSION" WHEN USED IN THE PROPOSAL AND THE PLANS SHALL MEAN
THE BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF OAKLAND (RCOC).
CONTRACT PLANS FOR THE PROJECT HAVE BEEN DEVELOPED AND PREPARED BY THE ROAD
COMMISSION AND AECOM. IMMEDIATE PROJECT SUPERVISION AND INSPECTION WILL BE
PERFORMED BY THE ROAD COMMISSION.
DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL NOT PERFORM WORK BY
PRIVATE AGREEMENT WITH PROPERTY OWNERS ADJACENT TO THE PROJECT. WORK MAY
BE ALLOWED WHEN REQUESTED BY LOCAL MUNICIPALITIES, BUT ONLY WITH THE WRITTEN
CONSENT OF THE ENGINEER.
THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS IN SUCH A MANNER TO COMPLY WITH
ALL FEDERAL, STATE, AND LOCAL CODES FOR NOISE LEVELS, VIBRATIONS, OR ANY OTHER
RESTRICTIONS WHILE REMOVING PAVEMENT OR FOR ANY OTHER CONSTRUCTION
OPERATIONS WITHIN THIS CONTRACT TO BE INCLUDED IN THE RESPECTIVE ITEM OF WORK.
IF THE WORK EXTENDS BEYOND THE SEASONAL SHUTDOWN IN THE ABSENCE OF ANY
APPROVED EXTENSION OF TIME, NO COMPENSATION WILL BE DUE TO THE CONTRACTOR
FOR ANY WINTER PROTECTION MEASURES THAT MAY BE REQUIRED BY THE ENGINEER.
THE CONTRACTOR AND/OR HIS SUBCONTRACTOR SHALL NOTIFY "MISS DIG", THE ROAD
COMMISSION AND THE MUNICIPALITY'S, FIRE, POLICE, AND PUBLIC WORKS DEPARTMENTS 3
WORKING DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION. IN ADDITION, 48 HOURS
ADVANCED NOTIFICATION IS REQUIRED FOR ANY ROAD CLOSURES OR CHANGES IN
CONSTRUCTION STAGING.
NO USE OF PRIVATE PROPERTY BY THE CONTRACTOR OR ANY SUBCONTRACTORS SHALL
OCCUR BEFORE THE PROJECT ENGINEER HAS WRITTEN AGREEMENT BETWEEN THE
PROPERTY OWNER AND THE CONTRACTOR. THIS AGREEMENT MUST BE PROVIDED BY THE
CONTRACTOR AND MUST BE NOTARIZED BY A PUBLIC NOTARY. IF SUCH USE DOES OCCUR
BEFORE THE PROJECT ENGINEER HAS POSSESSION OF THE NOTARIZED AGREEMENT, THE
PROJECT ENGINEER WILL ISSUE A NOTICE OF NON-COMPLIANCE SUSPENDING ALL WORK
IMMEDIATELY UNTIL SUCH TIME AS A COPY OF THE WRITTEN, NOTARIZED PERMISSION IS
SUBMITTED OR THE PROPERTY IN QUESTION HAS BEEN VACATED BY THE CONTRACTOR, OR
ANY SUBCONTRACTORS, AND RESTORED TO ITS ORIGINAL CONDITION, WITH NO EXTENSION
OF TIME OR ADDITIONAL COST FOR IDLE EQUIPMENT, DOWNTIME, ETC. TO THE ROAD
COMMISSION FOR OAKLAND COUNTY.
UTILITIES
THE UTILITIES AND THEIR LOCATIONS SHOWN ON THE PLANS ARE DEEMED ACCURATE BUT
NOT GUARANTEED.
ALL WORK REQUIRED FOR LOCATING EXISTING UTILITIES IN ACCORDANCE WITH MICHIGAN
PUBLIC ACT 174 OF 2013 SHALL NOT BE PAID FOR SEPARATELY.
THE CONTRACTOR SHALL LOCATE ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO
STARTING WORK AND SHALL CONDUCT HIS OPERATIONS IN SUCH A MANNER AS TO ENSURE
THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE DISTURBED.
CONCRETE, GRADE S2, SHALL BE USED TO ENCASE UTILITIES THAT ARE IN CLOSE
PROXIMITY TO THE PROPOSED STORM SEWER CONSTRUCTION AS DIRECTED BY THE
ENGINEER INCLUDED IN STORM SEWER PAY ITEMS.
ALL STRUCTURES ARE TO BE OPENED BY THE CONTRACTOR FOR INSPECTION BY THE
ENGINEER AND UTILITY REPRESENTATIVES FOR CONFIRMATION AND/OR CHANGE OF
ADJUSTMENT AND RECONSTRUCTION QUANTITIES PRIOR TO BEGINNING ANY WORK.
PAYMENT FOR INSPECTION OF STRUCTURES SHALL BE PAID AS PART OF THE STRUCTURE
ADJUSTMENT ITEMS. WHEN WORK IS BEING PERFORMED, THE CONTRACTOR SHALL NOTIFY
THE ENGINEER AND UTILITY OWNER (UTILITY, CITY, OCWRC, ETC.) FOR INSPECTION. WORK
SHALL NOT BE ACCEPTED UNTIL WRITTEN ACCEPTANCE IS RECEIVED FROM UTILITY OWNER.
UNSOUND PORTIONS OF EXISTING STRUCTURES SHALL BE REPAIRED TO MAINTAIN
STRUCTURAL INTEGRITY AND SHALL BE PAID FOR AS PUBLIC UTILITY STRUCTURE, ADJ, ADD
DEPTH (FT).
IF THE PLANS INDICATE AN EXISTING UNDERGROUND UTILITY IS OR WILL BE OUT OF
SERVICE WITHIN THE LIMITS OF THIS CONTRACT, THE CONTRACTOR IS CAUTIONED TO
TREAT SUCH A LINE AS IF IT WERE STILL IN SERVICE AND NOTIFY "MISS DIG" WHEN WORKING
IN THE AREA OF THE OUT OF SERVICE FACILITY.
ALL UTILITY STRUCTURE COVERS SHALL BE REPLACED WITHIN THE
RECONSTRUCTION/REHABILITATION SECTIONS AND SHALL BE SUPPLIED BY THE UTILITY
COMPANIES OR MUNICIPALITIES. THE CONTRACTOR SHALL CONTACT SPECIFIC UTILITY
COMPANIES OR MUNICIPALITIES TO ARRANGE NEW STRUCTURE COVERS.
THE FOLLOWING UTILITY COMPANIES HAVE FACILITIES WITHIN THE PROJECT LIMITS AND
MAY BE RELOCATING OR REPLACING FACILITIES, WHICH MAY OR MAY NOT BE SHOWN ON
THE PLANS IN CONJUNCTION WITH THE PROPOSED ROADWORK. THE CONTRACTOR OR
SUBCONTRACTOR MAY BE REQUIRED TO COORDINATE THEIR OPERATIONS WITH THESE
AND/OR OTHER UTILITIES AS DIRECTED BY THE ENGINEER. NO ADDITIONAL PAYMENT OF
COMPENSATION WILL BE ALLOWED FOR THIS ACTIVITY.
GAS
CONSUMERS ENERGY
ERNEST MARTYNIUK
4600 COOLIDGE HWY.
ROYAL OAK, MICHIGAN 48073
(248) 433-5868
CONSUMERS ENERGY
CHERIPAYNE
14500 DIXIE HWY.
HOLLY, MICHIGAN 48442
(248) 497-5771
CONSUMERS ENERGY
CHRIS SCHNEIDER
11801 FARMINGTON ROAD
LIVONIA, MI 48150
(734) 513-6277
CONSUMERS ENERGY
BOB MCLACHLAN
1000 GRAND OAKS DRIVE
HOWELL, MI 48843
(517)545-8737
FOR EMERGENCIES, CALL 1-800-477-5050
NOTE: GAS FACILITIES SHALL BE PROTECTED AND SUPPORTED PER THE FACILITIES OWNER
STANDARDS.
DTE GAS
DAVE ORZEL
ONE ENERGY PLAZA
DETROIT, MI 48826
(313 )235-1135
ENBRIDGE ENERGY
BRANDON WAGNER
9185 PARSHALLVILLE RD.
FENTON, MI 48430
(810) 629-1461
BUCKEYE PARTNERS, L.P.
TIM NEWMAN
TNEWMAN(cDBUCKEYE.COM
ONE GREENWAY PLAZA, SUITE 600
HOUSTON, TX 77046
(832) 615-8600
TELECOMMUNICATIONS
AT&T
MATT SLIWA
MS6913@ATT.COM
54 N. MILL ST
PONTIAC, MICHIGAN 48342
BUS: (248) 456-0829
CELL: (248) 877-0762
FOR EMERGENCIES, CALL 1-800-515-7272
NOTE: AT&T STRUCTURES WILL BE ADJUSTED BY OTHERS. THE CONTRACTOR
SHALL COORDINATE THEIR WORK WITH AT&T.
CHARTER COMMUNICATIONS
JOHN TOTH
7273 DAVISON RD
DAVISON, MI 48423
(810) 658-5145
CENTURYLINK
DAVE HUCKFELDT
DAVE.HUCKFELDT(c)LUMEN.COM
100 S. CINCINATTI AVE., SUITE 1200
TULSA, OK 74103
(517) 812-2592
FIBERLINK
JOEL JARVIS
P.O BOX 701
LAPEER, MI 48446
(810) 667-2891
VERIZON
MICHAEL BRUNING
MICHAEL.BRUNING@VERIZONWIRELESS.COM
1366 DUBLIN ROAD
COLUMBUS, OH 43215
BUS: (614) 921-8636
CELL: (248) 794-7906
COMCAST CABLE
MIKE MARLOW
25626 TELEGRAPH ROAD
SOUTHFIELD, MICHIGAN 48033
(313) 304-9996
OAKLAND COUNTY DEPARTMENT OF INFORMATION TECHNOLOGY
TROY DEATHERAGE, DEPUTY DIRECTOR
1200 N. TELEGRAPH ROAD
BLDG. 49 WEST
PONTIAC, MICHIGAN 48341-0421
(248) 585-5269
COUNTY DRAIN, WATER, AND SEWERAGE
OFFICE OF THE OAKLAND COUNTY WATER RESOURCE COMMISSIONER
BRIAN BENNETT, P.E.
1 PUBLIC WORKS DRIVE
WATERFORD, MICHIGAN 48328
MAIN: (248) 858-0958
DIRECT: (248) 452-9194
NOTE: WATER SHUTOFFS, OTHER THAN SHUTOFFS INCLUDED IN HYDRANT RELOCATIONS,
SHALL BE LOCATED OR ABANDONED BY THE APPROPRIATE MUNICIPALITY'S DEPARTMENT OF
PUBLIC WORKS (DPW).
SANITARY HOUSE LEADS NEED TO BE VERIFIED IN THE FIELD. AS BUILT INFORMATION DOES
NOT INCLUDE HOUSE LEADS.
CONSTRUCT SANITARY SEWER ACCORDING TO OAKLAND COUNTY WATER RESOURCES
COMMISSIONER SPECIFICATIONS AND DETAILS.
SALVAGE EXISTING SANITARY SEWER STRUCTURE COVERS.
WATER
DETROIT WATER AND SEWER DEPARTMENT
DALE ECHOLS, ESS RTA
NORTH ADMINISTRATION BUILDING
CENTRAL SERVICES FACILITY - CSF, DWSD ENGINEERING 1ST FLOOR
6425 HUBER ST.
DETROIT, MI 48213
(313) 267-4857
SOUTHEASTERN OAKLAND COUNTY WATER AUTHORITY (SOCWA)
BOB JACKOVICH
3910 W. WEBSTER
ROYAL OAK, M 148073
MAIN: (248) 288-5150
CELL: (248) 229-9815
FAX: (248) 288-7527
NOTE: SOCWA WILL PROVIDE NEW COVERS FOR THEIR STRUCTURES. THE
Know what's
below.
Call
before you dig.
CONTRACTOR SHALL NOTIFY THE SOCWA REPRESENTATIVE TO OBTAIN THE COVERS AND
REPLACE STRUCTURE COVERS BEING ADJUSTED WITHIN THE PROJECT LIMITS.
ELECTRIC
DTE ENERGY
CARL FORD
2000 SECOND AVE. - RM. 518 S.B.
DETROIT, MICHIGAN 48226
(248) 427-2937
FOR EMERGENCIES, CALL 1-800-477-5050
NOTE: EXISTING STREET LIGHTS WILL BE REMOVED OR RELOCATED BY OTHERS.
THE ENGINEER SHALL COORDINATE THE REMOVAL WITH DETROIT EDISON COMPANY AND
THE APPROPRIATE MUNICIPALITY PRIOR TO CONSTRUCTION OF THE PROJECT.
TRAFFIC SIGNALS
ROAD COMMISSION FOR OAKLAND COUNTY TRAFFIC OPERATIONS CENTER
STEVE WHEELER
1200 N. TELEGRAPH, WEST 49
PONTIAC, MI 48341
(248) 858-7250
PERMITS AND FEES
UTILITIES
THE COUNTY & TOWNSHIP HAVE APPLIED FOR ALL NECESSARY PERMITS. THE CONTRACTOR
SHALL BE REQUIRED TO FULFILL ANY/ALL REQUIREMENTS TO OBTAIN THE NECESSARY
PERMITS PRIOR TO WORK ON FACILITIES AS OUTLINED IN THE SPECIAL PROVISION "PERMIT
AND INSPECTION FEES." PRIOR TO WORK ON FACILITIES BELONGING TO THE PERMIT
AGENCIES, A MINIMUM OF 72 HOUR NOTICE MUST BE GIVEN IN ORDER TO INSURE PROPER
INSPECTION BY THE RESPECTIVE AGENCIES.
THE CONTRACTOR SHALL BE REQUIRED TO OBTAIN ALL NECESSARY PERMITS PRIOR TO
WORK ON THE FOLLOWING:
AT&T
COMCAST
DTE ENERGY ELECTRIC
MUNICIPALITIES
CHARTER TOWNSHIP OF SPRINGFIELD
ROAD COMMISSION OF OAKLAND COUNTY
MDOT
RAILROAD
CANADIAN NATIONAL RAILWAY
Attn: Thomas Brasseur, Manager of Public Works
thomas.brasseur@cn.ca
1-800-465-9239
RIGHT-OF-WAY / REAL ESTATE
ROAD RIGHT-OF-WAY SHOWN ON THE PLANS ARE FROM OAKLAND COUNTY'S INFORMATION
TECHNOLOGY DEPARTMENT, GEOGRAPHICAL INFORMATION SYSTEM (GIS) UNIT AND
DEEMED ACCURATE BUT NOT GUARANTEED.
TRAFFIC SAFETY
TEMPORARY (CONSTRUCTION) TRAFFIC CONTROL
CLOSED TO THROUGH TRAFFIC
TRAFFIC WILL BE CLOSED TO THROUGH TRAFFIC IN ACCORDANCE WITH THE CONSTRUCTION
SIGNING DIAGRAM AND THE ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION
FOR "MAINTAINING TRAFFIC" IN THE PROPOSAL.
THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS IN SUCH A MANNER THAT LOCAL
TRAFFIC AND EMERGENCY VEHICLES SHALL HAVE ACCESS WITHIN THE PROJECT AT ALL
TIMES IN A MANNER APPROVED BY THE ENGINEER. THIS SHALL BE INCLUDED IN THE COST
OF THE PROJECT.
ADDITIONAL SIGNS AND BARRICADES NECESSARY TO PROTECT TRAFFIC, AS DIRECTED BY
THE ENGINEER, SHALL BE PAID FOR BY THEIR APPROPRIATE PAY ITEM. HOWEVER,
ADDITIONAL DEVICES FOR CONTRACTOR CONVENIENCE, AS DETERMINED BY THE ENGINEER,
WILL NOT BE PAID FOR.
THE CONTRACTOR SHALL PLACE AND MAINTAIN THE REQUIRED BARRELS, BARRICADES,
AND/OR CHANNELIZATION DEVICES AT ALL PAVEMENT EDGE DROP-OFFS GREATER THAN 2
INCHES TO PROTECT TRAFFIC AND THE WORK PER APPLICABLE MDOT STANDARD DETAILS
AS DIRECTED BY ENGINEER.
LC0
M
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS0114irij,61. _T1
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUN'IY
248.858.0906 TEL M C "' G ^ "
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
.. ,
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
GENERAL NOTES
SHEET NUMBER
RD-1 .1 223
❑
Q'
C�
z_
Q
fy
❑
N
0
0
0
Q
U
0
rn
U)
Q
U
0
0
m
CD
ry
D
m
co
>
Q
❑
c�
It
rn
LO
0
0
W
U
w
0
ry
w
orr
00
NU
oW
00
0-U
_�6w
m Q
J
w
>
orr
ow
z
�0
oz
N w
wry
ry
J Q
w>>
0
UC6
zry
>_
.0
=w
U U)
�U
0
c'o E
cnm
J L.L
w
co
cYi
N
0
co
U)
w
0
z
J
Q
ry
w
z
w
C3
U
0
U
ry
M
0
MAINTAINING TRAFFIC SHALL BE INCLUDED IN THE COST OF TRAFFIC CONTROL ITEMS
DURING CONSTRUCTION OF THE PROJECT. THE FOLLOWING TRAFFIC CONTROL MEASURES
HAVE BEEN INCORPORATED IN THIS PROJECT AS PAY ITEMS AS DIRECTED BY THE
ENGINEER.
MAINTENANCE GRAVEL (TON)
BARRICADE, TYPE III, HIGH INTENSITY, DOUBLE SIDED, LIGHTED, FURN (EA)
BARRICADE, TYPE III, HIGH INTENSITY, DOUBLE SIDED, LIGHTED, OPER (EA)
DUST PALLIATIVE, APPLIED (TON)
MINOR TRAF DEVICES (LSUM)
PLASTIC DRUM, FLUORESCENT, FURN (EA)
PLASTIC DRUM, FLUORESCENT, OPER (EA)
SIGN, TYPE B, TEMP, PRISMATIC, FURN (SFT)
SIGN, TYPE B, TEMP, PRISMATIC, OPER (SFT)
SIGN, TYPE B, TEMP, PRISMATIC, SPECIAL, FURN (SFT)
SIGN, TYPE B, TEMP, PRISMATIC, SPECIAL, OPER (SFT)
PEDESTRIAN TYPE II BARRICADE, TEMP (EA)
SIGN, PORTABLE, CHANGEABLE MESSAGE, FURN (EA)
SIGN, PORTABLE, CHANGEABLE MESSAGE, OPER (EA)
MAINTENANCE GRAVEL (TON) HAS BEEN INCLUDED IN THE PROJECT TO BE USED AS
DIRECTED BY THE ENGINEER TO MAINTAIN VEHICULAR AND PEDESTRIAN TRAFFIC WITHIN
THE PROJECT.
DUST PALLIATIVE, APPLIED (TON) HAS BEEN INCLUDED IN THE PROJECT TO BE USED AS
DIRECTED BY THE ENGINEER TO CONTROL DUST WITHIN THE PROJECT LIMITS.
TO MAINTAIN STREET APPROACH ACCESS, CONSTRUCT TEMPORARY HMA RAMP WHEN
DIRECTED BY ENGINEER TO MAINTAIN A SMOOTH RIDE QUALITY. REFER TO DETAIL IN THE
PLANS FOR ITEMS OF WORK AND PAY ITEMS.
VARIATION 1
PART -WIDTH CONSTRUCTION OR PAVEMENT GAPPING AT COMMERCIAL/RESIDENTIAL
DRIVEWAYS AND SIDE STREET APPROACHES TO MAINTAIN ACCESS SHALL BE INCLUDED IN
THE COST PAVING PAY ITEMS.
PERMANENT TRAFFIC CONTROL
THE PAY ITEM, "SINUSOIDAL CORRUGATIONS, MILLED, HMA CENTERLINE, RCOC (FOOT)" OR
"SINUSOIDAL CORRUGATIONS, MILLED, CONC CENTERLINE, RCOC (FOOT)" IS INCLUDED IN
THIS PROJECT. CENTERLINE CORRUGATIONS ARE TO BE CONSTRUCTED IN ACCORDANCE
WITH THE PROPOSAL AND MDOT STANDARD PLAN SERIES R-112 AS DIRECTED BY THE
ENGINEER, EXCEPT THAT CENTERLINE CORRUGATIONS SHALL BE CONSTRUCTED ALONG
PORTIONS OF THE ROADWAY WHERE THE POSTED SPEED OF THE ROADWAY IS 45 MILES
PER HOUR OR GREATER. CENTERLINE CORRUGATIONS SHALL NOT BE CONSTRUCTED
WHERE THE POSTED SPEED OF THE ROADWAY IS 40 MILES PER HOUR OR LESS.
EARTHWORK
PEAT EXCAVATION
IN EXCAVATION, PEAT (CYD) AREAS (METHOD A-1) NOT REQUIRING FABRIC APPLICATIONS,
THE CONTRACTOR MAY ELECT TO FILL BETWEEN EXISTING GROUND ELEVATION AND THE
PROPOSED EARTH GRADE WITH SUITABLE EXCAVATED SURPLUS MATERIALS AS APPROVED
BY THE ENGINEER.
VARIATION 1
THESE SURPLUS MATERIALS INCORPORATED INTO MAKING EXCAVATION, PEAT FILLS SHALL
NOT BE PAID FOR AS BACKFILL, SWAMP (CYD) BUT SHALL BE INCLUDED IN EXCAVATION,
EARTH (CYD). THE ADJUSTMENT IN THE CONTRACT WILL BE ALLOWED FOR INCREASES OR
DECREASES IN PLAN QUANTITIES.
VARIATION 2
THESE SURPLUS MATERIALS INCORPORATED INTO MAKING GRADE SHALL BE PAID AS PART
OF EMBANKMENT, CIP (CYD). NO ADJUSTMENT IN THE CONTRACT WILL BE ALLOWED FOR
INCREASES OR DECREASES IN PLAN QUANTITIES.
BACKFILL, SWAMP (CYD) IS SET UP AS A SEPARATE PAY ITEM AND IS TO BE USED IN ALL
AREAS OF EXCAVATION, PEAT (CYD) THAT REQUIRES FABRIC APPLICATION. BACKFILL,
SWAMP (CYD) SHALL BE UTILIZED TO AN ELEVATION OF 2.0 FEET ABOVE EXISTING GRADE.
BACKFILL BEYOND THIS 2.0 FOOT LIMIT SHALL BE PAID AS EMBANKMENT, CIP (CYD).
THE CONTRACTOR SHALL DISPOSE OF ALL EXCAVATED PEAT AT AN UPLAND SITE OUTSIDE
OF THE PROJECT LIMITS, AS APPROVED BY THE ENGINEER. NO SEPARATE PAYMENT WILL
BE MADE FOR LOADING, HAULING, OR DISPOSING OF THE EXCAVATED UNSUITABLE
MATERIALS, BUT SHALL BE INCLUDED IN THE COST OF EXCAVATION, PEAT (CYD)
GRADING
ALL NATURAL SOIL LEFT IN PLACE, IN CUT SECTIONS, SHALL BE COMPACTED TO NOT LESS
THAN 95 PERCENT OF MAXIMUM UNIT WEIGHT TO A MINIMUM DEPTH OF 12 INCHES.
THE LIMIT OF EARTH DISTURBANCE SHALL BE THE SLOPE STAKE LINE UNLESS OTHERWISE
DIRECTED BY THE ENGINEER.
ALL SLOPES SHALL BE CLASS A SLOPES.
AREAS DISTURBED BY THE CONTRACTOR OR SUBCONTRACTOR SHALL BE RESTORED AS
SPECIFIED IN THE SOIL EROSION AND SEDIMENTATION CONTROL PLANS OR DIRECTED BY
THE ENGINEER. NO ADDITIONAL PAYMENT OR COMPENSATION WILL BE ALLOWED FOR
AREAS DISTURBED OUTSIDE THE SLOPE STAKE LINE.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE PROPERTY BEYOND
THE SLOPE STAKE LINE, INCLUDING EXISTING FENCING, LAWN, TREES, SHRUBBERY,
PAVEMENT AND SIDEWALKS.
AGGREGATES
WATER REQUIRED FOR COMPACTION SHALL BE INCLUDED IN THE COST OF EARTHWORK PAY
ITEMS.
CURB AND PAVEMENT REMOVAL
THE REMOVAL OF INTEGRAL CURB AND GUTTER SHALL BE PAID FOR AS PAVT, REM (SYD).
SAWING FOR PAVEMENT REMOVAL TO THE DEPTH REQUIRED FOR NEAT REMOVAL OF
PAVEMENTS OR CURBS SHALL BE INCLUDED IN THE REMOVAL ITEM. SAWING DEPTH SHALL
BE ADEQUATE TO PREVENT SPALLING, CHIPPING OR DAMAGE TO EXISTING PAVEMENT
EDGES LEFT IN PLACE AS DIRECTED BY THE ENGINEER.
THE LOCATION OF ALL CURB REMOVAL, PROPOSED CURB, AND CURB DROPS SHOWN ON
THE PLANS ARE TO BE VERIFIED IN THE FIELD BY THE ENGINEER PRIOR TO CONSTRUCTION.
SUBGRADE UNDERCUTTING
FINAL QUANTITY AND LOCATIONS FOR SUBGRADE UNDERCUTTING, OF ALL TYPES, IS AN
ESTIMATED QUANTITY AND WILL BE DETERMINED DURING CONSTRUCTION BY THE
ENGINEER.
THE SOIL REPORT SHOWS THAT THERE IS BURIED TOP SOIL THAT MAY IMPACT THE
ROADWAY FOUNDATION AND UNDERCUTTING OF THE SUBGRADE MAY BE REQUIRED. AS
DIRECTED BY THE ENGINEER, THIS MATERIAL IS TO BE EXCAVATED BY UNDERCUTTING PAY
ITEMS.
=1LTA I-T_1►INLh1=1►k1
EMBANKMENT REQUIRED FOR SIDEWALK CONSTRUCTION IS INCLUDED IN THE COST OF
EXCAVATION, EARTH, RCOC (SYD). EMBANKMENT REQUIRED FOR ROADWAY CONSTRUCTION,
INCLUDING BUT NOT LIMITED TO BACKFILL BEHIND BACK OF CURB AND NEW SUBGRADE, IS
PAID FOR SEPARATELY AS EMBANKMENT, CIP (CYD).
EARTH EXCAVATION
WHEN THE PROJECT IS OPEN TO THROUGH TRAFFIC, ROADWAY EXCAVATION ON BOTH
SIDES OF THE ROAD AT THE SAME TIME WILL NOT BE PERMITTED. THE CONTRACTOR SHALL
BRING ONE SIDE UP TO THE EXISTING EDGE WITH PAVING MATERIALS PRIOR TO BEGINNING
EXCAVATION OPERATIONS ON THE OTHER SIDE. PART WIDTH CONSTRUCTION WILL NOT BE
PAID FOR SEPARATELY.
EXCAVATION DROP-OFFS GREATER THAN 8 INCHES SHALL BE PROTECTED BY 4 FT TALL
ORANGE PLASTIC SAFETY FENCE (SNOW FENCE) SECURELY ATTACHED TO GROUND DRIVEN
STAKES WHEN LEFT OVERNIGHT. SAFETY FENCING SHALL BE MAINTAINED UNTIL AREA IS
WITHIN 8 INCHES OF ADJACENT GRADE. PAYMENT FOR THIS WORK IS INCLUDED IN MINOR
TRAF DEVICES (LS).
EXCAVATION, EARTH, RCOC (SYD) QUANTITY IS USED FOR DRIVEWAYS, SIDE STREETS,
SIDEWALK CONSTRUCTION AND OTHER AREAS DESIGNATED ON THE PLANS. THIS PAY ITEM
INCLUDES EMBANKMENT, AND ALL COSTS ASSOCIATED WITH IT. THE EXCAVATION, EARTH
(CYD) QUANTITY IS USED FOR ROADWAY CONSTRUCTION AS SHOWN ON THE TYPICAL
CROSS SECTIONS.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TEMPORARY STORAGE
AREAS FOR EXCAVATION, EARTH, RCOC (SYD) OR EXCAVATION, EARTH (CYD) WHICH MAY BE
USED AS EMBANKMENT MATERIAL IN OTHER AREAS IF IT IS SUITABLE MATERIAL AS
DETERMINED BY THE ENGINEER. ANY EXTRA HANDLING OF EXCAVATED MATERIAL IS
CONSIDERED INCLUDED IN THE THESE PAY ITEMS.
WHERE EMBANKMENT, CIP (CYD) IS PLACED, ALL VEGETATION AND TOPSOIL WILL BE
REMOVED PRIOR TO PLACEMENT. THE REMOVAL WILL BE PAID FOR AS EXCAVATION, EARTH
(CYD). A QUANTITY, BASED UPON AN ASSUMED REMOVAL DEPTH OF 6 INCHES, HAS BEEN
INCLUDED IN THE PLAN QUANTITY FOR EXCAVATION, EARTH (CYD). IF THE DEPTH IS
PREDOMINANTLY LESS THAN 6 INCHES, PLAN QUANTITY WILL NOT BE CHANGED. IF THE
DEPTH IS PREDOMINANTLY MORE THAN 6 INCHES, CHANGES WILL BE MADE IN ACCORDANCE
WITH SECTION 109.01.A.
ILl1V_1;+'iV/=11WUx01I=9291=[0%]zkr1Llri11►/_11IIQi!
TO PREVENT THE SPREAD OF INVASIVE SPECIES THROUGHOUT THE PROJECT AREA, ALL
EQUIPMENT AND PERSONAL PROTECTIVE EQUIPMENT MUST BE WASHED FOLLOWING THE
MICHIGAN DEPARTMENT OF NATURAL RESOURCES (MDNR) QUALITY OF LIFE (QOL) POLICY
AND PROCEDURE FOR INVASIVE SPECIES DECONTAMINATION FOR FIELD OPERATIONS
(QOL-2-2014). EQUIPMENT MUST BE WASHED PRIOR TO THE START OF THE PROJECT; AND
IMMEDIATELY AFTER ENCOUNTERING INVASIVE SPECIES ALONG THE PROJECT CORRIDOR.
THIS WORK WILL BE PAID FOR AS PART OF MOBILIZATION, MAX. _ (LSUM).
SEE THE FOLLOWING LINK FOR MORE INFORMATION:
HTTPS://WWW.M ICHIGAN.GOV/DOCUMENTS/DEQ/QOL-
WRD-POLICY-INVASIVE-SPECIES-DECONTAMINATION 476846 7.PDF
SOIL BORINGS AND PAVEMENT CORES
THE SOIL BORINGS LOGS DEPICT POINT LOCATIONS AND DO NOT INFER THAT THE SURFACE
OR SUBSURFACE CONDITIONS ARE THE SAME IN OTHER AREAS. BORINGS AND PAVEMENT
CORES LOCATIONS ARE SHOWN ON THE PLANS. SOIL AND CORE LOGS ARE INCLUDED IN
THE SPECIFICATIONS.
SOIL BORINGS AND PAVEMENT CORES BY: SOMAT ENGINEERING, INC. PROJECT NUMBER
2021053A, TAKEN ON 6/28/2021 & 710112021
GUARDRAIL
POSTS PLACED WITHIN 3' OF EXISTING CULVERTS SHALL BE CONSTRUCTED IN HAND
AUGURED HOLES AND SHALL NOT BE DRIVEN TO PREVENT DAMAGE TO CULVERTS.
PAVING
NEW OR ADJUSTED STRUCTURES WITHIN THE HMA OR CONCRETE ROADWAY SHALL BE
BACKFILLED WITH GRANULAR MATERIAL CLASS II UP TO THE SUBGRADE ELEVATION, OR TO
AN ELEVATION DETERMINED BY THE ENGINEER. AFTER FINAL ADJUSTMENT OF THE
STRUCTURE TO THE PROPOSED ELEVATION, THE VOID AREA AROUND THE STRUCTURE
SHALL BE COMPLETELY BACKFILLED WITH CONCRETE MIXTURE AS DIRECTED BY THE
ENGINEER, TO PROVIDE A STABLE BASE AROUND THE STRUCTURE WHICH SHALL BE
INCLUDED IN THE COST OF THE NEW OR ADJUSTMENT ITEM. A MINIMUM 24 HOURS CURE
TIME SHALL BE PROVIDED PRIOR TO BEGINNING PAVING OPERATIONS IN THESE AREAS.
IF EXISTING REINFORCING STEEL, TIE BARS, OR OTHER STEEL IS ENCOUNTERED DURING
THE MILLING OF THE EXISTING PAVEMENT, IT SHALL BE REMOVED BY THE CONTRACTOR AS
DIRECTED BY THE ENGINEER AND THE COST OF REMOVAL SHALL NOT BE PAID FOR
SEPARATELY, BUT SHALL BE INCLUDED IN THE COST OF MILLING.
HMA PAVING
ALL LONGITUDINAL JOINTS SHALL BE CONSTRUCTED WITH THE USE OF A JOINT MATCHING
SHOE.
QUANTITY FOR PAVED SHOULDERS IS INCLUDED IN MAINLINE HMA PAVING PAY ITEMS.
CONSTRUCTION JOINTS AT EXISTING SURFACES SHALL BE BUTT JOINTS.
VARIATION 1
FEATHERED JOINTS WILL NOT BE ALLOWED WHEN CONSTRUCTING DRIVE APPROACHES.
VARIATION 2
FEATHERED JOINTS ARE ALLOWED WHEN CONSTRUCTING DRIVE APPROACHES.
REMOVING HMA PATCHES THAT MAY COMPROMISE THE PERFORMANCE OF THE OVERLAY
(501.03.C.7), THAT ARE NOT OTHERWISE CALLED OUT ON THE PLANS, SHALL BE DIRECTED TO
BE DONE AS DIRECTED BY THE ENGINEER AND BE REMOVED AND PAID FOR AS COLD
MILLING HMA SURFACE (SYD).
THE INSTALLATION OF INLET PROTECTION DEVICES FOR PROTECTION OF DRAINAGE
STRUCTURES DURING CONSTRUCTION IN ACCORDANCE WITH SECTION 208 (403.03.A.9) IS
NOT REQUIRED FOR MILLING OR HMA OPERATIONS.
HMA FOR AUXILIARY, TAPER LANES, AND RADIAL SURFACES WITHIN CROSSROADS SHALL BE
CONSIDERED AS PART OF MAINLINE PAVEMENT QUANTITIES AS SHOWN ON PLANS. SEE HMA
APPLICATION ESTIMATE AND DETAILS FOR MORE INFORMATION.
HMA FOR RADIAL SURFACES (SPRING LINE TO SPRING LINE) AT DRIVEWAYS, AND SIDE
STREETS ARE PAID FOR AS PART OF DRIVEWAYS AND SIDE STREETS QUANTITIES AS SHOWN
ON PLANS. SEE HMA APPLICATION ESTIMATE AND DETAILS FOR MORE INFORMATION.
TO THE GREATEST EXTENT POSSIBLE, AND TO MINIMIZE THE TRAPPING OF WATER BETWEEN
SURFACE ELEVATION DIFFERENTIALS, THE STAGING OF THE PAVEMENT MILLING OPERATION
SHALL START ON THE OUTER LANES AND PROGRESS TO CONTIGUOUS LANES TOWARD THE
CONSTRUCTION CENTERLINE. FURTHERMORE, THE HMA PAVING WIDTH PLACED IN
MULTIPLE PASSES, SHALL PROGRESS FROM THE CONSTRUCTION CENTERLINE TOWARD THE
OUTER LANES.
THE ENGINEER MAY DIRECT THAT DRIVEWAYS, CULVERTS, SEWERS, OR OTHER
CONSTRUCTION BE CONSTRUCTED PART -WIDTH AT A TIME TO MAINTAIN TRAFFIC OR
PEDESTRIAN ACCESS. THIS SHALL NOT BE A BASIS FOR ANY ADDITIONAL COMPENSATION
OR EXTENSION OF TIME.
CONCRETE PAVING
THE CONTRACTOR SHALL NOT BE PERMITTED TO SUBSTITUTE INTEGRAL CURB AND GUTTER
FOR SEPARATE CURB AND GUTTER WHEN SPECIFIED ON THE PLANS.
REPLACEMENT CURB TO BE EXPANSION ANCHOR TIED TO ADJACENT EXISTING CURB OR A
FIBER JOINT PLACED AS DIRECTED BY THE ENGINEER PER ADJACENT EXISTING JOINT
Know what's
below.
Call
before you dig.
PATTERN.
ANY RANDOM, IRREGULARLY CRACKED NEW CONCRETE PAVEMENT OR CONCRETE CURB
AND GUTTER THAT OCCURS BEFORE THE PAVEMENT IS OPENED TO TRAFFIC SHALL BE
REMOVED AND REPLACED AT THE SOLE EXPENSE OF THE CONTRACTOR PRIOR TO OPENING
THE PAVEMENT TO TRAFFIC.
TIME OF APPLICATION OF CURING COMPOUND
PLACE THE CURING COMPOUND WITHIN 30 MINUTES OF SCREEDING AND FLOATING THE
FRESH CONCRETE PAVEMENT SURFACE OR WITHIN 15 MINUTES AFTER THE SHEEN FROM
BLEED WATER HAS DISSIPATED, WHICHEVER IS GREATER. WHERE APPLICABLE, APPLY THE
SECOND COAT AFTER THE FIRST COAT DRIES, BUT DO NOT ALLOW MORE THAN 2
HOURS BETWEEN COATS. TEMPORARILY SUSPEND PAVING OPERATIONS IF IT IS
OBSERVED THAT THE MAXIMUM TIME LIMITATIONS BETWEEN FINISHING AND CURING,
DESCRIBED ABOVE, HAVE BEEN EXCEEDED. PLACE THE CURING COMPOUND ON THE
EDGES WITHIN 30 MINUTES AFTER PERMANENT REMOVAL OF CURING BLANKETS. IF
FIXED -FORMS ARE REMOVED WITHIN 7 DAYS AFTER CONCRETE PLACEMENT, COAT THE
SIDES OF THE PAVEMENT WITH CURING COMPOUND AFTER REMOVING THE FORMS.
MANUALLY OPERATED PRESSURE -TYPE SPRAYERS MAY BE USED TO COAT THE SIDES OF
FORMED PAVEMENT WITH CURING COMPOUND, AS APPROVED BY THE ENGINEER.
DRAINAGE FEATURES
GENERAL
IF AND WHEN STORM DRAINAGE SYSTEM A, B, C, ETC. ARE REFERENCED IN THESE PLANS OR
OTHER CONTRACT DOCUMENTS, IT REFERENCES THE ENTIRE SYSTEM OF STRUCTURES AND
PIPES THAT ARE PREFIXED WITH THE CORRESPONDING LETTER.
FOR EXAMPLE, A2, A2.1, AND A2.1W ARE ALL STRUCTURES THAT ARE PART OF "DRAINAGE
SYSTEM A."
THE CONTRACTOR IS TO EXERCISE CARE TO AVOID SILTING OF WATERS OF THE STATE
DURING CONSTRUCTION, PROVISIONS WILL BE MADE FOR CONTROL OF EROSION ON
SHOULDERS AND SLOPES BY MEANS OF SEEDING, SODDING OR OTHER ACCEPTABLE
METHODS ALLOWED BY MDEQ PERMITS.
WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING
HIS OWN DETERMINATION OF WATER LEVELS THAT EXIST DURING CONSTRUCTION.
EXCAVATED MATERIAL SHALL NOT BE TEMPORARILY STORED IN THE 100 YEAR FLOOD PLAIN
OR WETLAND. EXCAVATED MATERIAL MUST NOT BE ALLOWED TO ERODE INTO THE RIVER.
THE CONTRACTOR SHALL NOT STORE EXCAVATED MATERIAL WITHIN THE CONSTRUCTION
AREA.
PROPOSED CULVERTS SHALL BE MEASURED IN THE FIELD BY THE CONTRACTOR TO VERIFY
PROPOSED CULVERT SIZE LENGTH AND TYPE BEFORE ORDERING CULVERTS FOR THE
PROJECT.
PIPE CULVERTS AND STORM SEWERS
ALL STORM SEWER PIPES SHALL BE REINFORCED CONCRETE PIPE (RCP) WITH THE SIZE AND
CLASS AS SHOWN IN THE PLANS.
ALL SEWER TRENCHES SHALL BE BACKFILLED OR OTHERWISE PROTECTED BY THE END OF
THE WORK DAY TO PROTECT LOCAL TRAFFIC AND PEDESTRIANS AS DIRECTED BY THE
ENGINEER WHICH SHALL BE INCLUDED IN THE SEWER CONSTRUCTION.
INCREASED OR DECREASED WORK REQUIRED BY CHANGES IN SEWER OR CULVERT
ELEVATIONS OF TWO FEET OR LESS WILL NOT BE CONSIDERED AS A BASIS FOR AN
ADJUSTMENT IN CONTRACT UNIT PRICE.
WHEN END SECTIONS ARE SHOWN ON CULVERTS AND SEWER STUBS; STATION, OUT AND
INVERTS ARE GIVEN AT END SECTION LIP. THE CALLOUT FOR PIPE LENGTH AND PIPE GRADE
ON PLAN OR PROFILE INCLUDES THE LENGTH OF THE END SECTION PER MDOT STANDARD
PLANS. HOWEVER, ACTUAL PIPE PAY LENGTH SHALL DEDUCT THE "L" LENGTH OF END
SECTION IN ACCORDANCE WITH MDOT STANDARD PLANS R-88 SERIES FOR STEEL END
SECTION OR THE "D" LENGTH OF END SECTION IN ACCORDANCE WITH MDOT STANDARD
PLAN R-86 FOR PRECAST CONCRETE END SECTION FOR PIPE CULVERT.
LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS SHALL BE
VERIFIED BY THE CONTRACTOR WITH THE UTILITY OWNERS, AND MAY REQUIRE EXPOSING
THE UTILITY. EXPLORATION FOR EXISTING UTILITIES SHALL BE INCLUDED IN THE COST OF
CONSTRUCTION OF THE RELATED PAY ITEMS.
STRUCTURES (MAINLY DR. STRUCTURES)
FINAL ADJUSTMENTS OF ALL STRUCTURES BOTH NEW AND EXISTING SHALL BE MADE PRIOR
TO PLACING THE FINAL SURFACE COURSE OF HMA. STRUCTURE RIM SHALL BE WITHIN 0.25
INCHES OF FINAL ELEVATION OF HMA OR CONCRETE PAVEMENT USING THE 10 FOOT
STRAIGHT EDGE METHOD. CORRECTIONS TO MEET THIS TOLERANCE ARE AT THE
CONTRACTOR'S COST.
WHEN EXCAVATING FOR UTILITY CONSTRUCTION IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO:
LC0
m
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS 0114i4jl� 2800 WATKINS LAKE ROAD I
WATERFORD, MI 48328 OAKLAND
COUN" I Y
248.858.0906 TEL M C "' G ^ "
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
.. ,
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
GENERAL NOTES
SHEET NUMBER
RD-1 .2 224
M
x
N
0
2
U
ry
Q
C�
z_
Q
ry
0
N
0
0
0
Q
U
0
rn
U)
O
0
Q
U
0
0
m
CD
ry
D
m
co
Q
c�
LO
0
0
W
U
w
0
ry
w
o�
�ry
00
CIA
N C'
00
0-U
_�6w
m Q
J
w
>
ry
I? M
i
ow
z
�0
N
oz
w
wry
ry
J Q
w>>
0
UC6
zry
>=
.0
=w
U U)
�U
0
c'o E
�m
J L.L
w
co
&i
N
0
co
U)
w
0
z
J
Q
0,
w
z
w
C3
U
0
U
M
0
BEFORE EACH DAYS WORK, OR WHEN MOVING TO A NEW AREA OF WORK, DETERMINE AND
EVALUATE THE LOCATION OF ALL UNDERGROUND FACILITIES IN THE AREA. IF LOCATION
STAKES HAVE BEEN REMOVED OR DO NOT APPEAR CORRECT, THE CONTRACTOR SHALL
NOT EXCAVATE UNTIL ALL UTILITIES HAVE HAD AN OPPORTUNITY TO CHECK THEIR
LOCATIONS. ANY DELAYS INCURRED, DUE TO CHECKING OR RESTAKING OF UTILITIES, SHALL
NOT BE A BASIS FOR ADDITIONAL COMPENSATION OR TIME.
WHEN EXCAVATING FOR UTILITY CONSTRUCTION, THE CONTRACTOR SHALL TAKE ALL
NECESSARY PRECAUTIONS TO PROTECT THE EXISTING GAS, WATER AND SANITARY
FACILITIES, BY THE USE OF SHEETING OR OTHER METHODS AS APPROVED BY THE
ENGINEER, INCLUDED IN THE SEWER CONSTRUCTION.
UNSOUND PORTIONS OF EXISTING STRUCTURES SHALL BE REPAIRED TO MAINTAIN
STRUCTURAL INTEGRITY AND SHALL BE PAID FOR AS PUBLIC UTILITY STRUCTURE, ADJ, ADD
DEPTH (FT).
SUMP DEPTH IS FROM LOWEST EXISTING OR PROPOSED INVERT. CATCH BASIN (CB) MEANS
2 FT SUMP INCLUDED IN DRAINAGE STRUCTURE PAY ITEM. INLETS (INL) AND MANHOLES (MH)
DO NOT HAVE A SUMP. SEDIMENT TRAP CATCH BASIS HAVE A 4 FT SUMP OR AS OTHERWISE
SHOWN ON PLANS. LEACHING BASINS WHERE CALLED FOR ON THE PLANS ARE INCLUDED IN
THE DRAINAGE STRUCTURE PAY ITEM.
NON -MOTORIZED FACILITIES
SIDEWALK
STRIPPING AND EXCAVATION, EARTH FOR SIDEWALK CONSTRUCTION WILL BE PAID AT THE
CONTRACT UNIT PRICE FOR EXCAVATION, EARTH, RCOC (SYD) (USE WHEN PATH IS NOT
CONSTRUCTED ALONG WITH ROADWAY EARTHWORK)
OR EXCAVATION, EARTH (CYD) (USE WHEN PATH IS CONSTRUCTED ALONG WITH ROADWAY
EARTHWORK).
EMBANKMENT WHERE REQUIRED SHALL BE APPROVED MATERIAL OR GRANULAR MATERIAL,
CL II AND IS INCLUDED IN THE CONTRACT UNIT PRICE FOR EXCAVATION, EARTH, RCOC (SYD)
(USE WHEN PATH IS NOT CONSTRUCTED ALONG WITH ROADWAY EARTHWORK)
OR EMBANKMENT, CIP (CYD) (USE WHEN PATH IS CONSTRUCTED ALONG WITH ROADWAY
EARTHWORK). GRADE PREPARATION, FINAL TRIM, AND CLEANUP SHALL BE INCLUDED AS A
PART OF SIDEWALK CONSTRUCTION.
SIDEWALK IS SUSCEPTIBLE TO CRACKING. THEREFORE, ONCE IT HAS BEEN PLACED, OR IF IT
IS EXISTING SIDEWALK, THE CONTRACTOR SHALL NOT PUT ANY EQUIPMENT OF ANY KIND ON
IT, FOR ANY REASON, EVEN FOR TURF ESTABLISHMENT OR RESTORATION WORK OUTSIDE
THE SIDEWALK. THE CONTRACTOR SHALL PLAN AND STAGE NECESSARY WORK OUTSIDE
THE SIDEWALK TO PREVENT THE PLACEMENT OF ANY EQUIPMENT ON THE SIDEWALK,
EXISTING OR NEW. CRACKED, CHIPPED, SPALLED, OR DAMAGED SIDEWALK, NEW OR
EXISTING, SHALL NOT BE ACCEPTED AND SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
SIDEWALK SHALL BE DELINEATED WITH JOINTS THROUGH ALL APPROACHES, EXCEPT AT
SIDE STREETS OR INTERSECTIONS. SIDEWALK SHALL BE STAKED AND THE MAXIMUM
CROSS -SLOPE (TRANSVERSE) SLOPE OF SIDEWALKS, FOR THEIR FULL WIDTH, THROUGH ALL
APPROACHES, EXCEPT AT SIDE STREETS AND INTERSECTIONS, SHALL BE 2% MAXIMUM. IF
ATTAINING THESE REQUIREMENTS NECESSITATES PLACING SIDEWALK THROUGH THE DRIVE
INDEPENDENT OF THE REST OF THE APPROACH, THEN THE CONTRACTOR SHALL PERFORM
THE WORK PER THE PROJECT ENGINEER. CONCRETE WITHIN AN APPROACH THAT IS ALSO
SIDEWALK SHALL BE PAID ONLY AS SIDEWALK. PAYMENT SHALL INCLUDE JOINTING, TOOLED
OR SAWED.
FAILURE TO PROVIDE THE PROPER DELINEATION OR CROSS -SLOPE FOR THE FULL WIDTH OF
THE SIDEWALK, ON THE PROPER LINE, SHALL RESULT IN REMOVAL AND REPLACEMENT OF
THE APPROACH AND/OR SIDEWALK AT THE CONTRACTOR'S EXPENSE.
HMA SIDEWALK FOR THIS PROJECT IS LESS THAN 10 FOOT IN WIDTH AND WILL BE PAID AS
"SHARED USE PATH, HMA (TON)"
DRAWING NOTES
PLANS SHEETS
THE EXISTING RIGHT-OF-WAY LABELS ARE BASED ON THE DISTANCE FROM THE CENTER OF
RIGHT-OF-WAY.
TAPER LENGTHS ARE BASED ALONG CENTERLINE ALIGNMENT.
RADII GIVEN FOR CURB RETURNS ARE TO THE EDGE OF METAL (E/M) WHEN SEPARATE
CONCRETE PAVEMENT IS USED. IF INTEGRAL CURB AND GUTTER CONCRETE PAVEMENT IS
BEING USED OR HMA PAVEMENT WITH CONCRETE CURB AND GUTTER THEN RADII ARE TO
THE BACK OF CURB (B/C).
PROFILE NOTES
EDGE OF PAVEMENT (E/P) GRADES ARE GIVEN FOR CURB AND GUTTER SECTIONS AND
PAVED SHOULDER SECTIONS. FOR CURB AND GUTTER SECTIONS (E/P) IS THE SAME AS EDGE
OF METAL (E/M). CURB AND GUTTER ENDINGS WILL RECEIVE CURB DROPS AS DETAILED IN
THE PLANS.
WHEN END SECTIONS ARE SHOWN ON CULVERTS AND SEWER STUBS; STATION, OUT, AND
INVERTS ARE GIVEN AT END SECTION LIP. THE CALL OUT FOR PIPE LENGTH AND PIPE GRADE
ON PLAN OR PROFILE INCLUDES THE LENGTH OF THE END SECTION PER MDOT STANDARD
PLANS. HOWEVER, ACTUAL PIPE PAY LENGTH SHALL DEDUCT THE "L" LENGTH OF END
SECTION IN ACCORDANCE WITH MDOT STANDARD PLANS R-88 SERIES FOR STEEL END
SECTION OR THE "D" LENGTH OF END SECTION IN ACCORDANCE WITH MDOT STANDARD
PLAN R-86 SERIES FOR PRECAST CONCRETE ENDS SECTION FOR PIPE CULVERT.
STATION AND OFFSET OF ALL DRAINAGE STRUCTURES ARE CALLED OUT AT CENTER OF
COVER PER MDOT STANDARD PLAN OF COVER. ADJUST LOCATION OF BASE OF 48 INCH AND
LARGER DIAMETER STRUCTURES TO HAVE CENTER OF TOP OF ECCENTRIC CONE AT
PROPER LOCATION TO RECEIVE COVER AT STATION AND OUT SHOWN ON PLANS.
PROPOSED COVER ELEVATION ON EXISTING OR PROPOSED B AND G TYPE COVERS AS
SHOWN OR DIRECTED BY THE ENGINEER TO MATCH ADJACENT PAVEMENT OR GROUND.
DRAINAGE STRUCTURES
STRUCTURE COVER ELEVATIONS ON THE PLANS REFERENCE THE LOWEST POINT FROM THE
EDGE OF PAVEMENT (E/P) AND THE OFFSETS ARE ADJUSTED FROM THE E/P TO DEPICT THE
CENTER OF THE STRUCTURE.
VARIOUS COVER TYPES, ELEVATION ADJUSTMENTS FROM E/P TO THE LOW POINT, AND
OFFSET ADJUSTMENTS, AS PER MDOT STANDARD DETAILS ARE AS FOLLOWS, AND ARE FOR
INFO ONLY:
COVER TYPEA ELEVATION (FEET)A OFFSET (FEET)TYPE C-0.111.25TYPE D-0.041.00TYPE
J-0.131.29TYPE K FOR C5, C6, F5, AND F6*-0.111.53TYPE K FOR C3,C4, F3, AND F4-0.111.03*6
INCHES OF CURB ARE IN FRONT OF FLANGE.NOTE: ROUND STRUCTURE COVERS (I.E. TYPE B,
G AND E) DO NOT HAVE ANY OFFSET ADJUSTMENT AND THE ELEVATIONS ARE TO THE RIM.
MISCELLANEOUS PAY ITEMS
THE FOLLOWING ITEMS OF WORK WILL NOT BE PAID FOR SEPARATELY AND ARE INCLUDED IN
OTHER ITEMS OF WORK AND SHALL BE DONE AS REQUIRED BY THE ENGINEER.
INCLUDED IN EXCAVATION, EARTH:
- REMOVING TREES LESS THAN 3 INCH DIAMETER
- REMOVING SHRUBS AND BUSHES
- REMOVING HMA CURBS
- REMOVING EDGEDRAIN, UNDERDRAIN, FRENCH DRAINS, OR DRAINAGE TILE
- REMOVING, RESETTING, OR DISPOSING OF CONCRETE BUMPER BLOCKS OR
WOODEN/CONCRETE RAILROAD TIES
- RELOCATING ORNAMENTAL ROCKS AND BOULDERS TO THE RIGHT-OF-WAY LINE
- REMOVING ABANDONED UTILITY CONDUIT AND INTERNAL COMPONENTS
- REMOVING GAS MAIN
- REMOVING GEOTEXTILE FABRIC
- REMOVING GEOGRID
- EXCAVATION, ROCK
- PROJECT CLEANUP
- CLEARING
INCLUDED IN HMA PAY ITEMS:
- HMA BOND COAT
- SWEEPING PAVEMENT
- PAVT, CLEANING
INCLUDED IN PAVEMENT OR CURB REMOVAL ITEMS:
- SAWING, FOR PAVEMENT AND CURB REMOVAL
INCLUDED IN CONCRETE ITEMS:
- CONCRETE ADMIXTURES
THE FOLLOWING ITEMS OF WORK SHALL BE DONE AS THEY APPLY THROUGHOUT THE
PROJECT OR AS DIRECTED BY THE ENGINEER. THESE ITEMS ARE NOT DETAILED OR
INCLUDED ELSEWHERE ON THE PLANS.
MOBILIZATION, MAX. _ (LSUM)
HMA PATCH, REM (SYD)
JOINT AND CRACK, CLEANOUT (FT)
PAVT JOINT AND CRACK REPR, DET 7 (FT)
PAVT JOINT AND CRACK REPR, DET 8 (FT)
HAND PATCHING (TON)
_PAVT, CLEANING, RCOC (LSUM)
_POST, FLEXIBLE, DELINEATOR, RCOC (EA)
_EXPLORATION FOR UTILITY LOCATION (CYD)
DR STRUCTURE, ADJ, ADD DEPTH (FT)
SUBGRADE UNDERCUTTING, TYPE II (CYD)
_SUBGRADE UNDERCUTTING, 21AA (CYD)
_SUBGRADE UNDERCUTTING, 3 BY 1 (CYD)
_GEOTEXTILE FABRIC, TYPE NW 8 (SYD)
_BIAXIAL GEOGRID (SYD)
_COLD WEATHER PROTECTION, PAVEMENT (SYD)
_COLD WEATHER PROTECTION, CURB (FT)
_SEEDING MIXTURE CR (LB)
_SEEDING MIXTURE ES, RCOC (LB)
MULCH BLANKET, HIGH VELOCITY (SYD)
_MULCH BLANKET, TEMP, RCOC (SYD)
DUST PALLIATIVE, APPLIED (TON)
_SPRINKLER LINE (FT)
_SPRINKLER HEAD, RELOCATE (EA)
_SPRINKLER HEAD, REPLACE (EA)
VIDEO TAPING SEWER AND CULV PIPE (FT)
TRENCH UNDERCUTTING AND BACKFILL (CYD)
MONUMENT PRESERVATION
WORK ASSOCIATED WITH MONUMENT PRESERVATION AND PROTECT CORNERS SHALL BE
THE RESPONSIBILITY OF THE ROAD COMMISSION FOR OAKLAND COUNTY (RCOC). THE RCOC
OR ITS ASSIGNS SHALL PERPETUATE BY WITNESSING ALL PUBLIC LAND SURVEY CORNERS
AND PROPERTY CONTROLLING CORNERS AND THEIR WITNESSES LOCATED WITHIN THE
CONSTRUCTION AREA THAT ARE EXPECTED TO BE DISTURBED BY THE CONSTRUCTION
PROCESS. THE RCOC OR ITS ASSIGNS WILL RE-ESTABLISH ALL CORNERS DISTURBED BY
THE CONSTRUCTION.
IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER
A MINIMUM OF 10 WORKING DAYS PRIOR TO STARTING WORK WHICH IS EXPECTED TO
DISTURB SAID CORNERS AND/OR THEIR WITNESSES. THE CONTRACTOR SHALL NOT
COMMENCE ANY CONSTRUCTION THAT WOULD POTENTIALLY DISTURB EXISTING SAID
CORNERS OR THEIR WITNESSES UNTIL AUTHORIZED IN WRITING BY THE ENGINEER.
CONTACT:
JOSEPH C. KAPELCZAK, P. S.
OAKLAND COUNTY PLAT ENGINEER
OAKLAND COUNTY REGISTER'S OFFICE
1200 NORTH TELEGRAPH ROAD
PONTIAC, MI 48341
CELL: (248) 939-2049
FAX: (248) 363-1646
EMAIL: JKAPELCZAK@JCKINC.COM
USER NOTE: LABEL MONUMENT CORNERS/POINTS ON THE PLANS AS EITHER "PROTECT"
OR "PRESERVE" AS OUTLINED IN SPEC BOOK.
PROTECTION AND RESTORATION OF PRIVATE PROPERTY
MAILBOXES
POST, MAILBOX (EA) IS ESTIMATED BY COUNTING EACH MAILBOX REGARDLESS OF HOW IT IS
SUPPORTED. THIS PAY ITEM WILL ONLY BE PAID ONCE PER EACH MAILBOX REGARDLESS TO
HOW MANY TIMES IT IS MOVED.
MAILBOX ASSEMBLIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH LOCAL POSTAL
REGULATIONS.
CONTRACTOR MUST REPAIR OR REPLACE MAILBOXES AND/OR POSTS THE CONTRACTOR
MAY DAMAGE. THIS WORK SHALL BE DONE AS DIRECTED BY THE ENGINEER AND NO
ADDITIONAL COMPENSATION WILL BE PAID.
IRRIGATION SYSTEMS/SPRINKLERS
SPRINKLER SYSTEMS WITHIN THE PROJECT LIMITS, OR IMPACTED BY THE WORK OF THIS
CONTRACT, SHALL BE REPAIRED WITH AT LEAST EQUAL QUALITY MATERIALS AND
WORKMANSHIP, TO A FUNCTIONING CONDITION AT LEAST AS GOOD AS EXISTED PRIOR TO
THE BEGINNING OF THE PROJECT.
FOR THE CONTRACTOR TO BE REIMBURSED FOR IRRIGATION/SPRINKLER SYSTEM REPAIRS,
BEFORE ANY CONTRACT WORK BEGINS, CONTRACTOR SHALL ARRANGE A WALK-THROUGH
Know what's
below.
Call
before you d'
WITH THE PROPERTY OWNER OR DESIGNATED REPRESENTATIVE, ACCOMPANIE BY THE
PROJECT ENGINEER OR INSPECTOR, FOR EACH ADJACENT PROPERTY, FOR THE PURPOSE
OF DETERMINING AND EVALUATING THE EXISTING SPRINKLER SYSTEM DESIGN (LOCATION
AND TYPES OF LINES, HEADS, VALVES, CONTROLLERS) AND IT'S FUNCTIONALITY AND
INTEGRITY.
IRRIGATION/SPRINKLER SYSTEM DESIGN INFORMATION SHALL BE DOCUMENTED BY THE
CONTRACTOR WITH SKETCHES, DRAWINGS AND NARRATIVE, AND SHALL BE SUBMITTED TO
AND USED BY THE PROJECT ENGINEER TO VERIFY NEED AND APPROVE ANY REPAIRS TO
THE SYSTEM AND SUBSEQUENT PAYMENT.
NO PAYMENT SHALL BE MADE FOR REPAIRS NOT DEEMED NECESSARY AND APPROVED BY
THE PROJECT ENGINEER AS A RESULT OF THIS WALK-THROUGH AND EVALUATION PROCESS.
FAILURE OF THE CONTRACTOR TO FULFILL THESE REQUIREMENTS WILL CAUSE THE
PROJECT ENGINEER TO MAKE THE REPAIRS AND CHARGE THE FULL COST TO THE
CONTRACTOR AS A CONTRACT ADJUSTMENT.
SPRINKLER HEADS SHALL NOT BE COVERED WHEN PLACING TOPSOIL AND SOD.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED BY THE
CONTRACTOR OR CONTRACTOR OPERATIONS TO SPRINKLER SYSTEMS OUTSIDE THE
PROJECT LIMITS OR SLOPE STAKE LINE.
OTHER
THE CONTRACTOR SHALL RELOCATE ORNAMENTAL OBJECTS OR PERSONAL PROPERTY
(ROCKS, BRICK PAVERS, LANDSCAPE TIMBERS, ETC.) TO THE RIGHT-OF-WAY LINE OR AS
DIRECTED BY ENGINEER. NO ADDITIONAL PAYMENT WILL BE MADE FOR THIS ACTIVITY.
WHEN PRIVATE PERSONAL PROPERTY IS LOCATED IN THE RIGHT-OF-WAY AND SPECIFIED ON
THE PLANS TO BE REMOVED OR RELOCATED BY OTHERS AND HAS NOT BEEN REMOVED,
THEN THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE ITEMS AS A PART OF
EXCAVATION, EARTH (CYD) WHEN DIRECTED BY THE ENGINEER.
LC0
m
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUN'tY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
GENERAL NOTES
SHEET NUMBER
RD-1.3 225
co
C0
X
N
❑
2
U
ry
Q
C�
0
0
z
w
(D
w
J
U
0
U
ry
It
ry
U)
0
z
Q
ry
N
0
0
0
Q
U
0
C')
U)
C�
❑
Q
U
0
0
rn
Q
ry
m
U)
>
Q
0
,It
rn
LO
0
W
I—
U
w
0
ry
w
CM >-
0ry
0
o
0 Lug
O
O
0-
� w
U) Q
J �
w
>
N
0 0
,z
N C\IO
w
Z ry
J Q
w3:
0(6
z ry
>. U
=w
U U)
�0
> E
a�
c—
J LL
WATER & SEWER SYMBOLS
❑ CB Square #
OStorm MH #
OInlet Round #
• Sprinkler Head
0 Meter Pit
0 Septic Tank
WM Water Meter
Water Tower
O Pump Sta Ent MH #
Sanitary Flag
so Water Stop Box
OUnknown Manhole
C B CB Round #
OSan MH #
F-1
Inlet Square #
UTILITY SYMBOLS
J
Power Tele & Light
OPower & Tele Pole
Telephone Pole
w Camera Pole
FGasM Meter
FT-1 Telephone Riser
0 Warning Siren Pole
OGas Tank
Fx-1 Gas Test Station
© Gas Riser
Gas Blowoff
V
Water Valve
Fire Hydrant
Water Faucet
O Monitoring Well
Water Main Flag
Storm Sewer Flag
W Gate Well #
Power Pole
6
D
Power & Light Pole
O
0 Telephone & Light Pole
OUtility MH #
DGas Vent
© Cable TV Riser
w
Communication Flag
Gas Flag
Electric Flag
❑
Electrical Outlet
GSO
Gas Stop Box
oval
Gas Valve
0 Underground Marker Gas
• 40,, Tree, Deciduous, 37 inch or larger
• 20" Oak Tree, Deciduous, 19-36 inch
• 12" Tree, Deciduous, 6-18 inch
4 ) 04" Map Tree, Deciduous, 0-5 inch
Multi -Stem, Deciduous, _ 0-5" _ 6-18" _ 19-36" _ 37" or larger, Type
Tree, Dead
000 Multi -Stem, Coniferous, _ 0-5" _ 6-18" _ 19-36" _ 37" or larger, Type
• 40" Cedar Tree, Coniferous, 37 inch or larger
• 20" Pine Tree, Coniferous, 19-36 inch
• 12" Spruce Tree, Coniferous, 6-18 inch
04" Pine Tree, Coniferous, 0-5 inch
-1 Fm B Mail Box
Call Box
Flag Pole
O
School Speed Limit
Cross Cut Fd
Bldg Corner
0 Fence Corner
Wood Stake Fd
�O\ Light Pole Wood
I
c� Clean Out
Down Spout
FEElectric Riser
Stump
• Tree, Ornamental
Deciduous Shrub 6'x6'
Coniferous Shrub 6'x6'
O Flood Light
Ornamental Light
Bus Stop Sign
O Highway Delineator
sPv Sprinkler Valve Box
End Section
Guy Pole
Guy Anchor
U Sign Post
v v
Sign Post (double)
IS]
Sewer Riser
©
Cistern
Hand Hole Round Plas
Hand Hole Square Met
Gas Pump
Controller Box
Soil Boring #
x
Building Number_
O
Post 6 Wood
Guard Post 8" Metal
Column 12" Conc
Pole Base Rnd
Satellite Dish
O
Piling
❑
Square Post 4" Wood
❑
Phone Booth
Trans Tower Base
®
Antenna
Parking Meter
Monument Box ReMon Cap#
USGS Cap Fd Cap#
• TP #
rlvl�
• BM #
Rock
Conc Mon Fd Cap#
OPinched Pipe Fd Cap#
Tee Iron Fd Cap#
Mag Nail Fd
Iron Road Fd Cap#
Iron Pipe Fd Cap#
Drill Hole Dist
Railroad Spike Dist#
Nail & Tag Fd Cap#
ReMon Witness Fd Tag#
FuCircuit
Breaker Panel
Fountain
gLawn
Ornament
AC
Air Conditioning Unit
®
Heat Pump
Basketball Post
Newspaper Box
EM
Electric Meter
0
0 o
Fill Port
®
Electrical Trans Pad
XSemaphore
R
Crossing Gate
�C
RI R
Crossing Signal
®
Electrical Trans Tower
Battery Box
SIndicator
Post -Valve
x
Floor Elevation
Span Strain Signal Pole
w
Span Strain Signal Pole Wood
Mast Arm Signal Pole
Pedestrian Ped Both
O
Crossing Push Button Post
Drainage Course
Centerline of Road
Centerline of Drive
Centerline of Ditch
Centerline of Stream
Centerline of Dam
Centerline of Track
Ex Edge of Gravel
Ex Edge of Gravel Shoulder
Ex Edge of Concrete
Ex Edge of Asphalt
Ex Back of Curb Concrete
Ex Back of Curb Asphalt
Ex Edge of Walk
Ex Edge of Boardwalk
Ex Edge of Suspended Walkway
Ex Edge of Foot Bridge
Ex Edge of Cross Walk
Pr Edge of Concrete
Pr Edge of Asphalt
Pr Back of Curb Concrete
Pr Back of Curb Asphalt
Pr Face of Curb Concrete
Edge of Brush (light)
Edge of Brush (medium)
Edge of Brush (heavy)
alp %6Edge of Wetland
Edge of Woods (light)
Edge of Woods (medium)
Edge of Woods (heavy)
Z Z Z Z Z Z Z Z Z Z Z Z Face of Building
Hedge
Berm
Toe of Berm
Top of Berm
Toe of Ridge
Top of Rail
Ditch Bank
Toe of Ditch
Top of Ditch
-----—----—---- — ----— — Edge of Water
— — — Toe of Stream Bank
Top of Stream Bank
Fence Chain Link
Fence Chain Link w/barbed wire
11 Fence Board
Fence Farm
Fence Metal
Fence Plastic
Fence Post and Rail
Slope Stake Line (SSL)
Wall
Headwall
Rip Rap
Gabion
— — —EX ROW— Existing Right of Way
CURB AND GUTTER, REM
SEWER OR CULV, REM
DR STRUCTURE, REM
LINE STYLES
Fence Gate
Edge of Landscaping
Edge of Planted Area
Unspecified Line
Landscape Timber
Planter Box
Stair
Ramp
Deck/Porch
Patio
Crack in Road
Paint Stripe
Road Divider
Bumper Block
Billboard
Advertisement Sign
Bench
Pasture
— —ST
Existing Storm Sewer
—SAN-
Existing Sanitary Sewer
- - WM
Existing Water Main
- - TELE
Existing Telecommunications
- - - GAS
Existing Gas
- --ELEC
Existing Electrical
- - �O
Existing Fiber Optic
Proposed Storm Sewer
PAVT, REM (SYD) KM
SIDEWALK, REM (SYD)
+++
HMA SURFACE, REM (SYD) + + +
COLD MILLING HMA SURFACE (SYD)
,,,,,,,,,,,,,
PROPOSED HMA PAVEMENT (OVERLAY)
PROPOSED HMA PAVEMENT (FULL DEPTH) K11111A
PROPOSED CONCRETE PAVEMENT L L L L L L I
�LLLLLL
PROPOSECONCRETE SIDEWALK
PROPOSED GRAVEL SHOULDER
PROPOSED RIP -RAP
ABBREVIATION LIST
ABBREVATION
DEFINITION
B/C
BACK OF CURB
BOTT
BOTTOM
C
COMBINED SANITARY AND STORM
CB
CATCH BASIN STRUCTURE WITH 2 FT SUMP
CJ
CONSTRUCITON JOINT
D
DRAINAGE, STORM
ELEV
ELEVATION
EG
EXISTING GRADE
E/G
EDGE OF GRAVEL
EGSP
EDGE GRADE SHOULDER POINT
E/M
EDGE OF METAL
E/P
EDGE OF PAVEMENT
EQU
EQUAL
ERECT
ERECTION
EXP JT
EXPANSION JOINT
FDN
FOUNDATION
FG
FINISHED GRADE
FURN
FURNISHED
INL
INLET STRUCTURE WITH NO SUMP
JPW
JOINT WATERPROOFING
JWPE
JOINT WATERPROOFING, EXPANSION
LB
LEACHING BASIN
ILL
LANE LINE
LSC
LANSCAPING
MH
MANHOLE STRUCTURE WITHOUT 2 FT SUMP
R
REMOVE
REL-BO
RELOCATE BY OTHERS
S
SANITARY SEWAGE
SPA
SPACE
SSL
SLOPE STAKE LINE
T/C
TOP OF CURB
THK
THICKNESS
W
WATERMAIN
LC0
M
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
OAKLAND
WATERFORD, MI 48328
COUNTY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
-i
DAVISBURG, MI 48350
• `,
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
LEGEND
SHEET NUMBER
R D-1.4
226
Qo
(M
X
N
❑
2
U
ry
Q
616 BROADWAY ROAD 610 BROADWAY ROAD
DAVISBURG, MI48350 DAVISBURG, MI48350
PIN:07-17-178-006 PIN:07-17-178-007
624 BROADWAY ROAD
DAVISBURG, MI48350
PIN. 07 17 178 004 620 BROADWAYROAD
DAVISBURG, MI48350
634 BROADWAY ROAD
PIN: 07-17 178 005
DAVISBURG, MI48350
PIN: 07-17-178-016 / EX ROW
odo
co
0
r)
z
W
z
0
J
Q
U
O
U
ry
,
❑
ry
U)
C3
z_
a
ry
N
O
O
❑
Q
U
0
rn
C�
❑
Q
U
0
0
rn
Q
ry
m
Q
v
rn
0
cm
U
W
O
ry
w
(M i
ry
C0
U
OW
N
-6
25
00
0-U
� w
U) Q
J �
W
N ❑
O W
,z
N -
Oz
w
wry
J Q
W >>
O
U
zry,
>. U
=w
U U)
�U
0
a E
(n a)
c—
J LL
—_-- UANAD/AN _--�—_ �w
NA T/ONA4 RAIL �i >00-,40w A y - _ NO
— BENCHMARK #3 �xROV�
— — STATION=16+50.56
586 BROADWAY ROAD — /
DAVISBURG, MI48350 _ OFFSET=17.06E
NO ADDRESS PIN: 07-17-178-013 BENCHMARK #2 — — NORTH ING=457587.76 /
DAVISBURG, MI48350 STATION=12+52.16 _ EASTING=13345977.17
PIN: 07-17-178 012 — _ ELEV=964.925' /
OFFSET=17.80L NO ADDRESS —
NORTH ING-457542 48 DAVISBURG, MI48350 — —
A0+00 L:4
R:_4.
0 .4 i C1•
M 9k00 °P o. 00
"E ) N CO
09 P.O.B. o
147 234 9g STA. 9+35.0 i
0 O �Zy
S
� EX ROW
589BROADWAYROAD
/ DAVISBURG, MI48350
PIN: 07-17-181-001
i
643 BROADWAY ROAD 627 BROADWAY ROAD
DAVISBURG, MI48350 DAVISBURG, MI48350
PIN:07-17-180-008 PIN:07-17-180-014
11+00 p=27.7878
L=17 9.9 31
R=371.000
EASTING=13345604.09
ELEV=965.869'
ONO
M
\ +
c+) i
+pp � bm #2
L:4.00%"��, a
R:-4.00%
S78o 1�108.90,
, 2.83„E�13+0(0
N O
O
0
n N �j _
� CI
Z W
569 BROADWAY ROAD
DAVISBURG, MI48350
PIN: 07-17-181-002
PIN: 07-17-178-011
r�
T1\o
M
w
P1
Lo
--- EX ROW I
L:-4.00° 1400 A=36.1559
/0 L=239.795
R:4.00% R=380.000
A
--�—EX ROW
15+00 c
FZ �`
BROADWAY (DAVISBURG RD)
66' ROW
MILL POND
NO ADDRESS
DAVISBURG, M148350
PIN: 07-17-253-003
BENCHMARK #1
STATION=16+23.43
OFFSET=34.05R
NORTH I N G=457530.00
EASTING=13345973.56
ELEV=962.524'
0 P.O.E. /
STA. 17+50.0 -
BM
95 �
—
BM #1
495 BROAD WA Y ROAD
DAVISBURG, MI48350
PIN: 07-17-253-004
BENCHMARKS:
BENCH MARK #1
N: 457530.00
E: 13345973.56
ELEV: 962.52
RR SPIKE ON NORTH SIDE OF POWER POLE ON SOUTH SIDE OF ROAD, APPROX.
185' EAST OF DAVISBURG DAM
BENCH MARK #2
N: 457542.48
E: 13345604.09
ELEV: 965.87
PK NAIL W/PINK RIBBON ON TOP OF WOOD GUARD RAIL POST ON NORTH SIDE OF
ROAD, APPROX. 195' WEST OF DAVISBURG DAM
BENCH MARK #3
N: 457587.76
E: 13345977.17
ELEV: 964.93
PK NAIL W/PINK RIBBON ON TOP OF WOOD GUARD RAIL POST ON NORTH SIDE OF
ROAD, APPROX. 210' EAST OF DAVISBURG DAM
Know what's below.
Call before you dig.
N
SCALE: 1" = 40'
LC0
m
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD ND
WATERFORD, MI 48328 OAKIAAKLA Y
248.858.0906 TEL COUNI'M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX 1 �
WWI,
,
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAVISBURG ROAD
ALIGNMENT SHEET
SHEET NUMBER
R D-1 .5 227
0
C6
z
0
U
w
co
co
co
0
ry
U
U
0
U
IY
0
m
❑
ry
i
U
0
z_
a
ry
❑
CV
0
O
n
Q
U
O
rn
U
❑
Q
U
0
O
rn
(D
ry
00
U
Q
O
Lo
O
CO
U
U
w
0
ry
w
(M i
ry
00
U
Ow
N
- ❑
25
00
0-U
�w
co Q
J �
w
oQ�
M ❑
I-
,z
oz
Fl W
w ry
J Q
W >>
O
U�
z0�
>. U
=w
U co
�U
0
a E
0 co
a�
co
J U-
w
z_
IY
J
R/W WIDTH VARIES
VARIES 11.5' 11.5'
WESTBOUND LANE EASTBOUND LANE
VARIES
w w
z z_
J J
EXISTING
CENTERLINE
2% ±
- - - - - - - - - '+ - - - - - - - - - - - - - - Ed /
L_
EXISTING 23' WIDE
7" TO 9" ± ASPHALT OVER EX FILL SOILS
HMA SURFACE, REM (SYD)
EXISTING PAVEMENT SECTION A
8.00' 2.0'
AGGREGATE SURFACE F4
CSE, 6 INCH (SYD) m CURB w
2' TO 35'
TURF ESTABLISHMENT,
THM SEED, REGULAR MULCH,
PERFORMANCE, RCOC (SYD)
f
1.5 INCH, HMA, 5E3 (TON)SILT FENCE PER DAM UNDERDRAIN, SUBGRADE, J d 1.5 INCH, HMA, 5E3 (TON)
REMOVAL & CULVERT OPEN -GRADED, 6 INCH, RCOC (FT) w 3.0 INCH, HMA, 3E3 (TON) COMPACT EX SUBGRADE AS
OVERALL SESC PLAN xAPPROVED BY ENGINEER,
Lu
EMBANKMENT, CIP (CYD)
EMBANKMENT, CIP (CYD)
1.0%
s
PROPOSED
EXISTING
HMA APPLICATION CHART
PAY ITEM
MIX ESTIMATED RATE OF
FINAL
PERFORMANCE
APPLICATION
THICKNESS
GRADE
HMA, 5E3
5E1 165 LBS/SYD
1.5"
70-22P
HMA, 5E3
5E1 165 LBS/SYD
1.5"
70-22P
HMA, 3E3 3E1 330 LBS/SYD 3.0" 64-22
HMA APPROACH
(RESIDENTIAL) 5E1 165 LBS/SYD 3.0" 64-22
1.0'
APPLIES: STA 9+35 TO 12+70
R/W WIDTH VARIES
12.0'
WESTBOUND LANE
LIMITS OF HMA SURFACE, REM (SYD)
CONSTRUCTION
r GnITGR1 Mir:
12.0' TO 18.5' 2.0' 3.10'
EASTBOUND LANE F4
w CURB m
5' TO 17'
TURF ESTABLISHMENT, THM SEED,
REGULAR MULCH, PERFORMANCE, RCOC (SYD)
RATE OF SUPERELEVATION
4% MAX FG PER PROFILE -
1� gN �.
EXCACATION, EARTH (CYD)
EMBANKMENT, CIP (CYD)
EXCACATION, EARTH (CYD) O 1.0,
WHERE EMBANKMENT, CIP (CYD) IS TO BE PLACED, ALL AGGREGATE BASE, INCLUDED AS PART OF
VEGETATION AND TOPSOIL WILL BE REMOVED PRIOR TO 10 INCH, 21AA, RCOC (SYD) EXCAVATION, EARH (CYD) w
PLACEMENT. THE REMOVAL WILL BE PAID FOR AS EXCAVATION x
EARTH (CYD). A QUANTITY BASED UPON AN ASSUMED REMOVAL SUBBASE, CIP (CYD) w UNDERDRAIN, SUBGRADE, _
- DEPTH OF 6 INCHES HAS BEEN INCLUDED IN THE PLAN QUNTITY 12 INCH, MDOT CLASS II OPEN -GRADED, 6 INCH, RCOC (FT)
FOR EXCAVATION EARTH (CYD). IF THE DEPTH IS PREDOMINANTLY
LESS THAN 6 INCHES, PLAN QUANTITY WILL NOT BE CHANGED. IF _ EXISTING HMA PAVEMENT
THE DEPTH IS PREDOMINANTLY MORE THAN 6 INCHES, CHANGES
WILL BE MADE IN ACCORDANCE WITH SECTION 109.01.A (TYP)
LIMITS OF EXCAVATION, EARTH (CYD) AND EMBANKMENT, CIP (CYD) 'APPLIES OUTSIDE THE LIMITS OF CULVERT EXCAVATION
REMARKS
HMA PAVEMENT TOP COURSE (AWI=260)
HMA PAVEMENT LEVELING COURSE
HMA PAVEMENT BASE COURSE
DRIVEWAY HMA PAVEMENT TOP/LEVELING COURSE
TYPICAL PAVEMENT SECTION A
APPLIES: STA 9+35 TO 12+70
RATE OF SUPERELEVATION TABLE
CURVE #1
POINT
OF ROTATION = CENTERLINE
STATION
LEFT LANE SLOPE
RIGHT LANE SLOPE
9+45
-2.0%
-2.0%
9+83
0.0%
-2.0%
10+22
2.0%
-2.0%
10+61
4.0%
-4.0%
11+89
4.0%
-4.0%
12+28
2.0%
-2.0%
12+70
0.0%
0.0%
SILT FENCE PER DAM REMOVAL
& CULVERT OVERALL SESC PLAN
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUN"IY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD 0
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
51'FiINC,FIf:LU
CHARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAVISBURG ROAD TYPICAL
CROSS SECTIONS
SHEET NUMBER
R D -1.6 228
(D
❑
uj
z
0
U
w
co
co
co
0
Ir
U
D_
U
0
U
IY
,
0
CO
❑
IY
U)
U
z
Q
IY
N
0
0
Q
U
0
O
U)
U
Q
U
0
O
rn
C�
Ir
00
U)
Q
r9
v
O
0
(fl
U)
U
w
0
ry
w
(M i
ry
00
U
Ow
N
00
0-U
Uw
co Q
J �
W
o �
M ❑
O W
,z
N —
oz
w
w �
J Q
W >>
O
U
zry,
>. U
=w
U co
�U
0
a E
0 co
a�
co
J U-
SILT FENCE PER DAM REMOVAL
& CULVERT OVERALL SESC PLAN
VARIES
11.5'
WESTBOUND LANE
66 FT ROW
11.5'
EASTBOUND LANE
VARIES
EXISTING
z GUARDRAIL
EXISTING EXISTING
CENTERLINE GUARDRAIL V
I
X
EXISTING
FENCE
I
X
K
V 10%=
_ 6%±
MILL POND
i
i
EXISTING 23' WIDE
7"
TO 9" ± ASPHALT OVER EX FILL SOILS
HMA SURFACE, REM (SYD)
W
z_
>J
5' TO 40'
TURF ESTABLISHMENT, THM SEED, REGULAR MULCH, PERFORMANCE, RCOC (SYD)
EXISTING PAVEMENT SECTION B
0.77'
2.33' F20' 12.0' TO 18.5'
F4 WESTBOUND LANE
m CURB w
GUARDRAIL TYPE MGS-8 (FT)
EMBANKMENT, CIP (CYD)
4.0%
1.U' 0 0-
EMBANKMENT, CIP (CYD) UNDERDRAIN SUBGRADE x<�' �� w
OPEN -GRADED, 6 INCH, RCOC (FT)
PROPOSED
WHERE EMBANKMENT, CIP (CYD) IS TO BE PLACED, ALL
EXISTING VEGETATION AND TOPSOIL WILL BE REMOVED PRIOR TO
APPLIES: STA 12+70 TO 17+50
66 FT ROW
LIMITS OF HMA SURFACE, REM (SYD)
CONSTRUCTION
CENTERLINE
RATE OF SUPERELEVATION
4% MAX
0.77'
12.0' 2.0' I L.33'
EASTBOUND LANE F4
w CURB m
FG PER PROFILE
1.5 INCH, HMA, 5E3 (TON) l -
COMPACT EX SUBGRADE AS
1.5 INCH, HMA, 5E3 (TON)
APPROVED BY ENGINEER,
3.0 INCH, HMA, 3E3 (TON)
INCLUDED AS PART OF
EXCAVATION, EARH (CYD)
AGGREGATE BASE, 10 INCH, 21AA, RCOC (SYD)
d
w
SUBBASE, CIP (CYD)
x
w
12 INCH, MDOT CLASS II
EXISTING HMA PAVEMENT
' PLACEMENT. THE REMOVAL WILL BE PAID FOR AS EXCAVATION TYPICAL PAVEMENT SECTION B
EARTH (CYD). A QUANTITY BASED UPON AN ASSUMED REMOVAL
DEPTH OF 6 INCHES HAS BEEN INCLUDED IN THE PLAN QUNTITY
FOR EXCAVATION EARTH (CYD). IF THE DEPTH IS PREDOMINANTLY
LESS THAN 6 INCHES, PLAN QUANTITY WILL NOT BE CHANGED. IF
THE DEPTH IS PREDOMINANTLY MORE THAN 6 INCHES, CHANGES
WILL BE MADE IN ACCORDANCE WITH SECTION 109.01.A (TYP)
APPLIES: STA 12+70 TO 17+50
LIMITS OF EXCAVATION, EARTH (CYD) AND EMBANKMENT, CIP (CYD) "APPLIES OUTSIDE THE LIMITS OF CULVERT EXCAVATION
5' TO 40'
TURF ESTABLISHMENT, THM SEED, REGULAR MULCH, PERFORMANCE, RCOC (SYD)
GUARDRAIL TYPE MGS-8 (FT)
EMBANKMENT, CIP (CYD)
4.0%�
—� EMBANKMENT, CIP (CYD)
l
UNDERDRAIN, SUBGRADE,
OPEN -GRADED, 6 INCH, RCOC (FT)
W
z_
>J
J
vi
SILT FENCE PER DAM REMOVAL
& CULVERT OVERALL SESC PLAN
RATE OF SUPERELEVATION TABLE
CURVE #2
POINT
OF ROTATION = CENTERLINE
STATION
LEFT LANE SLOPE
RIGHT LANE SLOPE
12+70
0.0%
0.0%
13+11
-2.0%
2.0%
13+50
-4.0%
4.0%
15+38
-4.0%
4.0%
15+77
-2.0%
2.0%
16+15
-2.0%
0.0%
- 16+54
-2.0%
-2.0%
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUN"IY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
V.
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX 1 �
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
DAVISBURG ROAD TYPICAL
CROSS SECTIONS
SHEET NUMBER
R D-1 .7 229
co
M
X
N
❑
2
U
iY
Q
❑
iY
U)
0
z
a
ry
N
O
O
❑
Q
U
0
rn
C�
❑
Q
U
0
0
rn
CD
ry
m
cn
Q
,It
rn
m
O
cm
W
F-
U
w
O
iY
IL
CM i
t` ry
00
F_
U
Ow
N
00
�U
Uw
c� Q
J �
W
o�
N
O �
,z
N
oz
w
w �
J Q
W >>
O
U
zry,
>. U
=w
U c/)
�0
0
a E
U)co
a�
c-
J LL
TEST HOLE NO. HA-01
LOCATION: DAVISBURG ROAD NORTH ROW
PHYSICAL REFERENCE: 75 FEET EAST OF WEST END OF GUARDRAIL
PHYSICAL OFFSET: 3 FEET NORTH OF GUARDRAIL
BORING DATE: 6/28/21
GROUND SURFACE ELEVATION: 0.0 FT
0.0
4 INCHES OF TOPSOIL
-0.3
-2.0
NORTHING: 457527
EASTING: 13345672
POORLY GRADED FINE TO COARSE SAND WITH SILT,
WITH GRAVEL, TRACE CLAY, TRACE ROOTS, DARK
BROWN, WET (SP-SM)
POORLY GRADED FINE TO MEDIUM SAND WITH SILT,
TRACE GRAVEL, BROWN WITH POCKETS OF DARK
BROWN, WET (SP-SM)
-4.8 E.O.B. 4.8 FEET
(HAND AUGER TERMINATED ON OBSTRUCTION)
NOTES:
GROUNDWATER LEVEL DURING DRILLING: 1 FEET
GROUNDWATER LEVEL UPON COMPLETION: 1.2 FEET
LOGGED BY: S. PANETTA (SOMAT)
CHECKED BY: J. SCHMITZER (SOMAT)
- COORDINATES ESTIMATED WITH HANDHELD GPS
1st 6 in
0 2nd 6 in
0 3rd 6 in
0 4th 6 in
LE
NUMBERS IN CIRCLES DENOTE NUMBER OF BLOWS
REQUIRED TO DRIVE A 2" O.D. X 1.5' I.D. SPLIT
SPOON SAMPLER 3 OR 4 SUCCESSIVE 6" INCREMENTS
USING A 140 LB HAMMER FALLING 30".
TEST HOLE NO. HA-02
TEST HOLE NO. RB-01
TEST HOLE NO. RB-02
TEST HOLE NO. RB-03
TEST HOLE NO. RB-04
LOCATION: DAVISBURG ROAD NORTH ROW
LOCATION: DAVISBURG ROAD WB DRIVING LANE
LOCATION: DAVISBURG ROAD EB DRIVING LANE
LOCATION: DAVISBURG ROAD WB DRIVING LANE
LOCATION: DAVISBURG ROAD EB DRIVING LANE
PHYSICAL REFERENCE: 75 FEET WEST OF EAST END OF GUARDRAIL
PHYSICAL REFERENCE: 110 FEET WEST OF WEST END OF GUARDRAIL
PHYSICAL REFERENCE: 90 FEET WEST OF EAST END OF GUARDRAIL AT SPILLWAY
PHYSICAL REFERENCE: 140 FEET WEST OF EAST END OF GUARDRAIL
PHYSICAL REFERENCE: 20 FEET WEST OF EAST END OF GUARDRAIL
PHYSICAL OFFSET: 3 FEET NORTH OF GUARDRAIL
PHYSICAL OFFSET: 3 FEET SOUTH OF SHOULDER EDGE
PHYSICAL OFFSET: 3 FEET NORTH OF SHOULDER EDGE
PHYSICAL OFFSET: 3 FEET SOUTH OF SHOULDER EDGE
PHYSICAL OFFSET: 3 FEET NORTH OF SHOULDER EDGE
APPROX. STATION 12+00
APPROX. STATION 14+20
APPROX. STATION 15+75
APPROX. STATION 16+65
BORING DATE: 6/28/21 NORTHING: 457562
BORING DATE: 7/1/21 NORTHING: 457549
BORING DATE: 7/1/21 NORTHING: 457498
BORING DATE: 7/1/21 NORTHING: 457532
BORING DATE: 7/1/21 NORTHING: 457550
GROUND SURFACE ELEVATION: 0.0 FT EASTING: 13345912
GROUND SURFACE ELEVATION: 0.0 FT EASTING: 13345491
GROUND SURFACE ELEVATION: 0.0 FT EASTING: 13345693
GROUND SURFACE ELEVATION: 0.0 FT EASTING: 13345856
GROUND SURFACE ELEVATION: 0.0 FT EASTING: 13345948
0.0
0.0
PP MC 0.0
0.0
0.0
-0.4
-0.7
-5.0
5 INCHES OF TOPSOIL
CLAYEY FINE SAND, TRACE ROUTS, TRACE GRAVEL,
DARK BROWN, MOIST (SC)
SILTY FINE SAND, FEW GRAVEL, TRACE CLAY, TRACE
ROOTS, BROWN AND DARK BROWN, MOIST (SM)
E.O.B. 5 FEET
NOTES:
GROUNDWATER LEVEL DURING DRILLING: NONE
GROUNDWATER LEVEL UPON COMPLETION: NONE
LOGGED BY: S. PANETTA (SOMAT)
CHECKED BY: J. SCHMITZER (SOMAT)
COORDINATES ESTIMATED WITH HANDHELD GPS
5 INCHES OF ASPHALTIC CEMENT CONCRETE
-0.4 FIELD ENGINEER REPURI ED 2 INCHES OF
-0.6 BROKEN ASPHALTIC CEMENT CONCRETE
-1.0 5
FILL - VERY STIFF LEAN, TRACE SAND, TRACE
GRAVEL, FREQUENT SILT LAYERS, BROWN
(CL)
-2.5
-3.5 10
MEDIUM DENSE SANDY SILT, OCCASIONAL
SILTY FINE SAND LAYERS, BROWN, WET (ML)
-5.0 E.O.B. 5 FEET
NOTES:
GROUNDWATER LEVEL DURING DRILLING: 3 FEET
GROUNDWATER LEVEL UPON COMPLETION: 2 FEET
LOGGED BY: A. AL AQEELI (SOMAT)
CHECKED BY: J. SCHMITZER (SOMAT)
DRILL RIG: CME 55 (Rig 404185); METHOD: 2 1/4 INCH HSA
COORDINATES ESTIMATED WITH HANDHELD GPS
PP = POCKET PENETROMETER, UNCONFINED COMPRESSIVE STRENGTH - TONS/SQ.FT (TSF)
UCS = LAB DETERMINED UNCONFINED COMPRESSIVE STRENGTH - TONS/SQ.FT (TSF)
TV = TORVANE SHEAR TEST, SHEAR STRENGTH - TONS/SQ.FT (TSF)
MC = MOISTURE CONTENT - (%)
DID = DRY DENSITY - LBS/CU.FT (PCF)
9 INCHES OF ASPHALTIC CEMENT CONCRETE 9 INCHES OF ASPHALTIC CEMENT CONCRETE 7.5 INCHES OF ASPHALTIC CEMENT CONCRETE
-0.6
-0.8
3 19 -1.0 �10 \ -1.0 18 -1.0 5
FILL - MEDIUM DENSE WELL -GRADED MEDIUM TO
COARSE SAND WITH SILT, WITH GRAVEL, OCCASIONAL
SILTY FINE SAND LAYERS, BROWN, WET (SW-SM)
FILL - DENSE POORLY GRADED COARSE GRAVEL,
TRACE SILT, OCCASIONAL SANDY LEAN CLAY LAYERS,
BROWN, MOIST TO WET (GP)
-5.0 E.O.B. 5 FEET
NOTES:
GROUNDWATER LEVEL DURING DRILLING: 3 FEET
GROUNDWATER LEVEL UPON COMPLETION: 2 FEET
LOGGED BY: A. AL AQEELI (SOMAT)
CHECKED BY: J. SCHMITZER (SOMAT)
DRILL RIG: CME 55 (Rig 404185); METHOD: 2 1/4 INCH HSA
COORDINATES ESTIMATED WITH HANDHELD GPS
NO SCALE FILE: LOGS OF BORINGS.dgn
-3.5 4
FILL -MEDIUM DENSE WELL -GRADED FINE TO COARSE
SAND WITH SILT, WITH GRAVEL, BROWN, MOIST
(SW-SM)
-5.5 4
-7.0
E.O.B. 7 FEET
NOTES:
GROUNDWATER LEVEL DURING DRILLING: 7 FEET
GROUNDWATER LEVEL UPON COMPLETION: 6 FEET
LOGGED BY: A. AL AQEELI (SOMAT)
CHECKED BY: J. SCHMITZER (SOMAT)
DRILL RIG: CME 55 (Rig 404185); METHOD: 21/4 INCH HSA
COORDINATES ESTIMATED WITH HANDHELD GPS
CONSISTENCY DETERMINED BY INSPECTION OF SAMPLES AND BY SOIL RESISTANCE TO PENETRATION BY JET ROD AND
CASING OR AUGER. UNIFIED SOIL CLASSIFICATION SYSTEM (USCS) GROUP SYMBOL DETERMINED PER (ASTM)
VISUAL -MANUAL PROCEDURES.
COORDINATES FROM HANDHELD GPS. GROUND SURFACE ELEVATIONS NOT DETERMINED FOR THIS PROJECT,
DATE: 07/15/2021
FILL - MEDIUM DENSE SILTY FINE SAND, FEW GRAVEL,
OCCASIONAL SANDY LEAN CLAY LAYERS, DARK GRAY,
MOIST (SM)
-2.5
10
-3.5 10 FILL - MEDIUM DENSE WELL -GRADED FINE TO COARSE
GRAVEL WITH SAND, TRACE ASPHALT PIECES,
OCCASIONAL SILTY FINE SAND LAYERS, DARK
BROWN/GRAY, WET (GW)
(FOREIGN ODOR DETECTED)
-5.0
E.O.B. 5 FEET
NOTES:
GROUNDWATER LEVEL DURING DRILLING: 2.5 FEET
GROUNDWATER LEVEL UPON COMPLETION: 2 FEET
LOGGED BY: A. AL AQEELI (SOMAT)
CHECKED BY: J. SCHMITZER (SOMAT)
DRILL RIG: CME 55 (Rig 404185); METHOD: 21/4 INCH HSA
- COORDINATES ESTIMATED WITH HANDHELD GPS
GROUNDWATER LEVELS REPRESENT THE CONDITIONS AT THE TIME THE MEASUREMENTS WERE OBTAINED AND SHOULD BE
EXPECTED TO FLUCTUATE THROUGHOUT THE YEAR. GROUNDWATER LEVELS MAY ALSO BE INFLUENCED BY RESIDUAL
BORING WATER.
THE BORING LOGS REPRESENT POINT INFORMATION. PRESENTATION OF THIS INFORMATION IN NO WAY IMPLIES THAT THE
SUBSURFACE CONDITIONS ARE THE SAME AT LOCATIONS OTHER THAN THE EXACT LOCATION OF THE BORING.
LOGS OF BORINGS DRAWING SHEET
DAVISBURG/BROADWAY RD. PAVEMENT RECONSTRUCTION of
DAVISBURG, MICHIGAN 1
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS9444111L.
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUN"IY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD 0
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
5PFJNGFILLU
CHARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
PAVEMENT CORES AND
SOIL BORINGS
SHEET NUMBER
R D -1.8 230
co
M
X
N
❑
2
U
ry
Q
ry
U)
0
z_
a
ry
N
CD
0
0
Q
U
CD
U
0
Q
U
0
0
rn
0
ry
D
m
U
Q
0
v
rn
Ln
0
(m
U
W
0
ry
IL
(M i
P; ry
00
U
ow
N
a) ❑
00
�U
LU
co
Q
J
W
o�
M
oLU
,z
0 o
Fl W
Z ry
W ry
w�
O
U�
zry
>. U
=w
U U
Z)
�0
0
c E
�co
�c
cn a)
c—
J 11
W
U w
o a
J °
w 0
W 2 J
H W
U W U
Y Z
U N O Q Z M
z 7k of
W Y U Q W Y
W LLI W � J z (n W a cn U
w o OJ0 m o o O a w ww w w� o a O Lu
LA1 a a s = 00 a U W W W W z Z 2 a O Z W = a
H H U o Z W Wa U H Of Z U
= Z= co = z° �� a aZ = W z ° Z z
io O Q O _ � cj "t ifl 80 w C� m C7 = W 0
J cn J U > J (n a N N m J L.L Cn a m (n
J J J J J Z J J J J J J J J J J J J J J J
CO L� — r O U 00 7 M Co 7 7 L� N (O N W M O) 11
co -It M- 1 tO p Z (O (M coW 7 7 cocoCo 0) Co 00 M — (o M InLo I
_ 00 a2 c2 ?2o a_� r I b�
I- V COO 00O _mFIB M M M M ON M VN F/B � �
_ Ln r- N N
— F M L co co p0 _ co 117 117 L co O N O N _ L O M
IB + + ++ +� + + + + ++ + ++ + + + + + +
Fo-- o0 o�w -FIE? 7 7 CANAD/ Fa_� �
L6-FIB-- FIB
ANNAT/ONA� R �F1B
—FIB FIB_ >00-Ro'A, AI�wA y
FIE? — — FIB Vv FIE? /
OH— FI OH FIB _ _ FIB
OHE OHE FIB FIB_
ONE / FIB —FIB —Oki FIB_ COORDINATE WITH RAILROAD
ONE —FIB �— FIB_ FOR WORK WITHIN 25 FT OF RAILS F gRONN
—FI —� FIBS
/ 586 BROADWAY ROAD B — _ 0 0 i
ONE DAVISBURG, YROA0 —FIB =� CURB AND GUTTER, REM �� P.O.E.
/ PIN: UR 178013 —FI — IB F\g� STA.17+50.0
ONE NO ADDRESS B _ i
DAB MCI 48350
0\�� 616 BROADWAYROAD 610BROADWAYROAD PIN:07-17-178-0f2'B / V
RIPRAP, GROUTED, REM NO ADDRESS O° F ELEC _�`� —\g �� �xGRP�� '� ♦ ♦ ♦
DAVISBURG, MI 48350 DAVISBURG, MI48350 `FIB
/ PIN:07-17-178-007 CURB AND GUTTER, REM DAVISBURG, MI48350 — 'S'F'----- �'
/ ONE PIN:07-17-178-006 COLD MILLING HMA _F/gl PIN:07-17-178-011 r, =______ ---- -- ---
EXGRAVEL �(\8 ELEC �� �' ♦
I j ® GUARDRAIL, REM _ �g-+ 3� + 0�
SURFACE (SYD) � _ I B r� F\8 Oh ��+ rt ELEC
624 BROADWAY ROAD 0" TO 2" WEDGING —I # + + -F —
DAVISBURG, MI 48350 AS REQUIRED FIB ELEC /�� .� iIB F\8 Fc FIB
PIN.' 07-17 178 004 EX— — \ HA- 2 (0-
- —
620BROADWAYROAD Rq� FIBFIB L B
DAVISBURG, MI 48350 — — — _ FIB- _ — — — �j 4 RB-04 O - FIB
634 BROADWAY ROAD PIN:07-17-178-005 ESE iiiiiiiiiiiiii iiiiiiill«-ij�-"-r--�—T_ FIB ----�� — B— f + + ♦ ♦_' 1
DAVISBURG, MI 48350 / ��r���� ������������� �1 RB 01
PIN:07-17-178016 C i RO 11+ + + ♦ + + +
w ���������������������� 12
EL �EX �iiiiiiiiiiiiiiiiil�-� + + + + t + ���� FI - EXROW + + + +1�
1 HMA SURFACE, REM + + + + _ + _ + + ♦ + + r� ♦ I (' #
41� ♦ ♦ ♦ + rsri7 -� + + }�•1GJ + +
,P.O.B. \���,�.%�-` + + 11...i -r `�� +� +\ + - - - - - - + }
+� `\ % �1% CURB AND GUTTER, REM
STA. 9+35.0 \ + + + w---L--�` + — + + 14 + + +
' ♦ + + i� •� �— {_ + + + + + + HMA SURFACE, REM
9 \ —
+\ +-r? lev"I— ♦ - + _+ +
!;%\ \ \\ FENCE, REM B 4956ROADWAYROAD
X ROW \�
E—
•';' DAVISBURG, MI 48350
$ O \ : ` ; ;:: ":',r \ �` \ -- --�— GUARDRAIL, REM PIN: 0717253004
Ow
2" COLD MILLING �
PAVT, REM \ HMA SURFACE
'� CURB, REM 589 BROADWAY ROAD (SYD)
COLD MILLING HMA DAVISBURG, MI 48350
SURFACE (SYD) — PIN:07-17-181-001 BROADWAY (DAVISBURG RD)
— ELEC 0" TO 2" WEDGING
66' ROW
AS REQUIRED MILLPOND
i
NO ADDRESS
643 BROADWAY ROAD 627BROADWAYROAD DAVISBURG, MI 48350
DAVISBURG, MI 48350 DAVISBURG, MI 48350 569 BROADWAY ROAD PIN: 07-17-253-003
PIN: 07-17-180-008 PIN: 07-17-180-014 DAVISBURG, MI 48350
PIN: 07-17-181-002
U 0 w O 0 W U' U a
a a s H m U Zm W �U �a a wJ �
W Z W J W W J J Q W O J Q 0 O 00 O J w a = nQ co M ° LO zQ a LL 2 a 0 2 F co N a n a (D = U
_m v = ao H= 00 = o = U d w CD d O Q = L°°n L0°n 2 w Q W z w Fn Q
a o? a 9 @a ui(D x � � 0 � O ° U � H rnrn �� � p� �Z�
N V M J M W J Ln Q O J U Z co Q H Z a' Z) Q >> Z 0 D = O EO Z)
(1') O X U > J M W a' (.D Ci Z Z W a a X a
M M O z CV W
N M
Mm ON
OUa
0�UU(0 N m M CD a) CD 0
00 h co 0') JN M n L1 CO U U M co C6 +prn_ - o M p+ 00 + C 't� a + co + �poLn �-
00 m (0 (o + m m
+ �O LLJ+Ncn
a) +�
w + z + �pO+� co> + > +�� + (°
w LO
+ W w
co LEGENDa
U Uj
> o
a w + o w
Q o o 0 PAVT, REM (SYD)
vo W 0 w o SIDEWALK, REM (SYD)
J W W
W
a'
MAINLINE QUANTITIES — THIS SHEET ONLY
PAY ITEM
QTY
UNIT
TREE, REM, 19 INCH TO 36 INCH
3
EA
CURB AND GUTTER, REM
182
FT
CURB, REM
57
FT
FENCE, REM
435
FT
GUARDRAIL, REM
725
FT
_LIGHT POLE, RELOCATE
2
EA
PAVT, REM
70
SYD
EXCAVATION, EARTH
1900
CYD
COLD MILLING HMA SURFACE
660
SYD
HMA SURFACE, REM
2,360
SYD
SIGN, RELOCATE
4
EA
_MAILBOX, RELOCATE
6
EA
RIPRAP, GROUTED, REM
788
SYD
HMA SURFACE, REM (SYD)
COLD MILLING HMA SURFACE (SYD)
PROPOSED HMA PAVEMENT (OVERLAY)
Know what's below.
Call before you dig.
fi"=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328
248.858.0906 TEL
94ii,.—TM
t
OMLAAND
COUNTY
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
-i
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
SCALE: 1" = 40' CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
+ + +
i
PROPOSED HMA PAVEMENT (FULL DEPTH) K11111A
PROPOSED CONCRETE PAVEMENT
PROPOSED CONCRETE SIDEWALK
PROPOSED GRAVEL SHOULDER
PROPOSED RIP -RAP
L_ L_ L_ L_ L_ L-
L- L- L- L- L- L_
a a
e
as a
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAVISBURG ROAD
REMOVAL SHEET
SHEET NUMBER
R D-1.9 231
M
x
N
0
2
U
ry
Q
0
L0
0
(fl
U
W
0
a
o}
r*-W
00
U
C:) LU
N rY
0 r)
a
2�
00
aU
�W
ca Q
J
W
o�
CM r)
oW
z
040
N �
o LU
wry
J Q
W >>
O
��
z Of
>_
.0
=w
U (n
�U
a>
c'o E
�C
cz cn N
J LL
W
U W
O Q
J U
W
w � O
w
U W 0
Z
(Dc N o a Z c,
z_ � �* Of
W Y U_ Q W Y
J LU W J < J D < J H d � U
W 0 Oa 00 w a O W WW W LU O a O 2 WW
W d d 2 U W W W W z Z 2 d O Z L,LJ = d
H - U o H z Of W W U H z U
H 2 Z= H rn = Z U H HH dz 2 W Z O Z Z
O U' Q ( U= V NV (fl N W C m U = W U
J Cn J U % J (n d N N m J LL Cn d m (n
J J J J J Z J J J J J J J J J J J J J J J
- S O U 00 14: M 00 z� 7 F_ N (O N W M b r N
W 'T (O O O Z (O M W 00 6) 06 064 M M (6 M Uf
r� r � Lp
Lp
I� V CO O 6) O M M M M 6) N M V N L r N N
M I� N 00 a0 M LP) LP) I� r- 00 O 7 N O N I� 6) M
0 0 0 0 o W W 7 7 7 7 77 04� m m
FIB � FIB
—
�FIB—_F18 CANADIA NNgTjpNAL �FIB
—FIB -- _FIB_ ,OD,R pw RAILI4iq y F0
FIB
—FIB FIR_ 20 SYD - RIPRAP, PLAIN REFER TO BREACHING PLANS, RESTORATION PLANS, AND
—
FIE_
OHE � 26 FT -SEWER, CL C, 12 INCH, TR DET B
OHE -- STRUCTURAL DEMOLITION PLANS
/ OHE 1 EA - DR STRUCTURE COVER, TYPE K _ FOR PEDESTRIAN BRIDGE AND GRAVEL \1�
8 FT - DR ONE STRUCTURE, ADD DEPTH OF 48 INCH DIA, 8 FOOT TO 15 FOOT FIB PATH IMPROVEMENTS P.O.E.
2" MILL & OVERLAY 1 EA - DR STRUCTURE, 48 INCH DIA Flg_ N STA. 17+50.0- - F gRO�
HMA APPROACH (TON) ONE RIM:959.69- OHE FIB
i
CONC PAVT, MISC, NONREINF, 6 INCH (SYD) 586BROADWAYROAD 12 N IE: 943.72
WEDGING REQUIRED DAVISBURG, MI48350 12" W IE: 955.94 FIB —_� Q�Ft 0
1 EA - DR STRUCTURE TAP, 6 INCH (EA) NO ADDRESS PIN: 07-17-178-013 6" S IE: 957.19 —F/B_ — F _-\ = ,- F\gl� S 17+50.0 /
DA MI 48350
���� AGGREGATE SURFACE
ONE 16 6 BROADWAYROAD 610 BROADWAYROAD PIN: 07-17-178-0�2'B � /
DAVISBURG, MI48350 CSE, 6 INCH SYD 100, NO ADDRESS O ELEC N F� F\8 EX r?
DAVISBURG, MI 48350 ` ( ) y TAPER DAVISBURG, MI 48350
PIN 07 17 178 007 - -
ONE
PIN:07-17178006
—FIB
PIN: 0717178011
��� __ ________
EX GRAVEL _ vo ELEC
-_-_-
/
�NE
I /B
.A SLOPE STAKE LINE
i�
FIB
624 BROADWAY ROAD
1
— F/
FIB
L
I
QB
12" I E: 943.2 3
/ \8
_/ �FC�
DAVISBURG, MI 48350
E\,EC
\
+
PIN: 07-17-178-004
620BROADWAY ROAD
MI 48350
_
������������� --�
iiiiiiiii .
_�
FI
N - �
B
HA-
F\6
16
DAVISBURG,
E
FIB
--�
/
634BROADWAY ROAD
PIN:07-17-178005
iiiiiiiiiiiiiii
iiii ii
--
DAVISBURG, MI 48350
PIN:07-17-178-016
C
/.
�' ROW ����
�'� B 1
N
�2
--
FIB
_r
E�
EX
�
00
p--
_ EX ROW �
P.O.B.
_STA. 9+35.0
STA. 9+3.12
cp
1 G �(ok% EX PO Ap0 P \ - --1 cn
- A cr 1 O, TAPER
I 589 BROADWAY ROAD
2" MILL & OVERLAY J DAVISBURG, MI48350 2 MILL & OVERLAY
/ HMA APPROACH (TON) ' PIN: UR MI481 WEDGING REQUIRED
' WEDGING REQUIRED HMA APPROACH (TON)
ELEC -
CONC PAVT, MISC, NONREINF, 6 INCH (SYD)
66 FT -CURB, CONC, DET E2 1 EA - DR STRUCTURE, ADJ, CASE 1 (EA)
643BROADWAYROAD 627BROADWAYROAD 1 EA - DR STRUCTURE TAP, 6 INCH (EA)
DAVISBURG, MI 48350 DAVISBURG, MI 48350 -11-1,....,,....,,-
PIN: 07-17-180-008 PIN: 07-17-180-014 DAVISBURG, MI 48350
PIN: 07-17-181-002
v
�� — — EX ROW
UNDERDRAIN,
SUBGRADE, OPEN
GRADED, 6 INCH,
RCOC (FT) BROAD DAVISBURG RD)
162 FT - SEWER, CL C, 12 INCH, TR DET B 66' ROW
MILL POND
1 EA - DR STRUCTURE COVER, TYPE K
NO ADDRESS
_ 1 EA - DR STRUCTURE, 24 INCH DIA DAVISBURG, MI 48350
RIM: 963.12 PIN: 07-17-253-003
12" E IE: 959.37
6" W IE: 960.62
FA
REFER TO BREACHING PLANS,
RESTORATION PLANS, AND
STRUCTURAL DEMOLITION PLANS
FOR DAM REMOVAL, CHANNEL
IMPROVEMENTS, AND CULVERT
SLOPE STAKE LINE
F _
O FIB —
FI
\\
HMA APPROACH (TON)
5'
� 495 BROADWAY ROAD
\ DAVISBURG, MI 48350
PIN: 07-17-253-004
7 FT - SEWER, CL C, 12 INCH, TR DET B
1 EA - DR STRUCTURE COVER, TYPE K
1 EA - DR STRUCTURE, 24 INCH DIA
RIM: 963.87
12" S IE: 959.00
6" N IE: 961.37
1 EA - DR STRUCTURE TAP, 12 INCH
12" TAP IE: 958.30
i
W W
W z
W
W
W
J
W
W
(O W
LL J
LU
W
Z
W
J
(7
Q
(D
z
W
LU
0 0
z Q
W
LU
(D
z
() of Z W �
z O J O
� d
W O
W J�
J Q O
a
H
H
O
0-
�
H
00
0-
H
Q
m
O
0-
J
LL
�
H
W
0
O
H
= Q M M Y O =
U m M N 0' O_ U
(� H
[n
O z=
d 0 U
co 00
'v
=
00
Ll _
2 0
2
U
Q
o
O ui
o
Q
O z= � L0 W z
Q W Q
Q.
LU Z
j cn z
Q
\ LW
of
°)
'
U
L0
Ur
ui —
U (h
H (0
Ur
EE
CL
0
M
W
U�
M
a.
O
d' U 61 O=
U H 0
z (D
0—
U'
z
J
W J
Q 6)
U
J
U
LU
Z
(O
Q H
Z
�' Q %� Z O
U Z Z
_
O—
L1� M
M
(6
M
�
L�
N
X
O;
N
i
� Z
(V
J
LU
Z
M
N
W (O
d (v)
_
N
Z
�' U uJ d U
d' X d d m W W
d
W M
a_ C,) U
W O W
M
N
m N
6) N}
W
U)
Z �'
c3
U)
O E co �' (O N
� M (O 06
M M
a; C)
+
00 00
O
�
6)
O
+
Or
mMQ
U
Vcl)
O
N
U'
(nco
+
F_
�ODU
C M O N
(f) �
6)
((0Cy)
(
cq
a)
Lf) O
W
(O b m
+
L(0
O+
O-
0
� n
C
+
%
m
co�
�m
O
W
F-
Q
00
W
O
LU
W
M
v
00
O
W
U
w
+ >
0
w
+
LU
LU
2
F-
w
Q
O
O
U
O
2'
C)O
_
W
O
W
J
w
U
MAINLINE QUANTITIES - THIS SHEET ONLY
PAY ITEM
QTY
UNIT
EMBANKMENT, CIP
2000
CYD
AGGREGATE SURFACE CSE, 6 INCH
151
SYD
AGGREGATE BASE, 10 INCH, CIP, 21AA, RCOC
3325
SYD
SUBBASE, CIP
1219
CYD
HMA, 3E3
491
TON
HMA, 5E3
491
TON
HMA APPROACH
140
TON
CONC PAVT, MISC, NONREINF, 6 INCH
15
SYD
CURB, CONC, DET E2
66
FT
CURB AND GUTTER, CONC, DET F4
1224
FT
DR STRUCTURE, TAP, 6 INCH
2
EA
DR STRUCTURE, TAP, 12 INCH
1
EA
UNDERDRAIN, SUBGRADE, OPEN -GRADED, 6 INCH, RCOC
1665
FT
GUARDRAIL, TYPE MGS-8
691
FT
GUARDRAIL APPROACH TERMINAL, TYPE 2M
2
EA
GUARDRAIL DEPARTING, TERMINAL, TYPE MGS
2
EA
TURF ESTABLISHMENT, THM SEED, REGULAR MULCH,
3100
PERFORMANCE, RCOC
SYD
LEGEND
PAVT, REM (SYD)
SIDEWALK, REM (SYD)
HMA SURFACE, REM (SYD)
COLD MILLING HMA SURFACE (SYD)
Know what's below.
Call before you dig.
PROPOSED HMA PAVEMENT (OVERLAY)
A=COM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAN D COUNTY
PARKS
04.
2800 WATKINS LAKE ROAD
T
WATERFORD, MI 48328
COUAND
COUNTY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
ail
248.846.6558 TEL 248.846.6557 FAX
SCALE: 1" = 40' CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
+ + +
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I I I/R DATE DESCRIPTION
KEY PLAN
PROPOSED HMA PAVEMENT (FULL DEPTH) K11111A
PROPOSED CONCRETE PAVEMENT L L L L L L
LL. LL. LL.
PROPOSED CONCRETE SIDEWALK
<a o
PROJECT NUMBER
PROPOSED GRAVEL SHOULDER o� off` 60594641
PROPOSED RIP -RAP
SHEET TITLE
DAVISBURG ROAD
CONSTRUCTION SHEET
SHEET NUMBER
R D-1.10 232
Last saved by: JESSICA.LANCE LLE(2021-07-30) Last Plotted: 2021-07-30
Filename: C:\USERS\CHRIS.WARREN\ONEDRIVE - AECOM DIRECTORY\PROJECTS\60594641 DAVISBURG\900 CAD GIS\910 CAD\002 DRAWINGS\RD-1.11 TO RD-1.14 - RCOC 3D BASE.DWG
ARCH D 24" x 36"
RIGHT - PROPOSED EDGE OF PAVEMENT
AND SLOPE STAKE LINE
01 m
CD01
w E.G.974.20
o F.G.
c+n E.G.972.81
O F.G.
E.G.970.52
o F.G.
c+n E.G.968.28
O F.G.968.06
o E.G.966.60
o F.G.966.26
+ E.G.965.73
o F.G.964.91
E.G. 965.62
o F.G.964.46
+ E.G.965.74
o F.G.964.62
E.G.965.54
o F.G.964.24
+ E.G.964.20
o F.G.963.39
E.G.961.78
o F.G.962.24
c+n E.G.960.31
O F.G.961.52
m
x
0
X
O
E.G.959.45 z
o F.G.961.02 z
m
E.G.959.22
c++
O F.G. 961.01
0
0
04
mcn
cn m
cn
cn E.G. 959.44
0 -
r
o F.G.961.51
c++ E.G.959.72
O F.G.962.44
rn E.G.960.82
o F.G.963.63
+ E.G.962.63
o F.G.964.86
E.G.965.13
o F.G.965.83
+ E.G. 966.57
o F.G.966.33
w E.G.966.83
o F.G.
00 E.G.
o F.G.
4 cn
0 cil
00 E.G.974.20
o F.G.
c++ E.G.972.81
O F.G.
Qc)
E.G.970.52
o
F.G.
E.G.968.28
+
o
F.G.968.32
o
E.G.966.60
J
I
o
F.G.966.58
+
E.G.965.73
I
o
F.G. 965.5E
1
E.G. 965.62
\
o
F.G.965.20
I
1
+
E.G.965.74
1
o
F.G. 965.3E
I
N
/
E.G.965.54
\
+
o
F.G.964.87
+
E.G.964.20
/
o
F.G. 963.5E
/
+
E.G.961.78
EXISTING GROUNDLINE AND
PROPOSED PLAN GRADE
LEFT - PROPOSED EDGE OF PAVEMENT
AND SLOPE STAKE LINE
m m � -4 01 01 m m
o � o � c) cn c) cn c)cn
BVCE: �,68.74
BVCS: 4+40.15
r r
O
m
< <
M
m
w m D
mD
�rn<11
< 1
O (0 O
(O +
O � NJUi
�rn
v,
O�0
EVCE: '�-65.29
EVCS: ' 1 +25.15
o
F.G.962.05
/
E.G.960.31
c++
O
F.G.961.04
f
I
I 0
I
�
E.G.E.G.959.45
A
J
o
F.G.960.54
z
I I /
o I
r
i
i
i
i
i
i
�1
i
=
0
=
o
�
m
m
C
m
<"
O
IV
PI)
N
c
z
i/n
�
m
n
y
D
O
o
O
t
c
00
Z
m
o
o
m
<
0
00
C
m
c
N)
Wo
cn
m
�
cn
�
m
o
C)
Z
o
=�
go8-0
0
o
mQ
m
0
D
�U)
v
Z�z
<
m
m
Q
-n
W
W
r
m
z Im
+ E.G. 959.22 \
O F.G.960.54
0 co
c I
0
O�
m c I(cn m
cn
+ E.G.959.44
o F.G.961.04
I
+ E.G.959.72
Cn
O F.G.962.04
m
0
v
O
U)
m
O
m
E.G.974.20
00
O
F.G.
+
E.G.972.81
M
CDF.G.
E.G.970.52
o
F.G.
GRADE BREAK
STA = 9+35.00
w ELEV = 968.96E
/4°
+
E.G.968.28
o
F.G.968.1'
o
E.G.966.60
I
F
O
F.G.966.69
I
I
BVCS:11+,:5.26
fBVCE: 965.29
m�
m •
< m�
n r �
mcn
NmD
m D
N m <
(D
©o�M
N
O O
+ E.G.965.73
o F.G. 965.9E
E.G. 965.62
i
o F.G.965.68
+ E.G.965.74
o F.G.965.84
E.G.965.54
o F.G.965.28
B`E�lESt21e�6 + E.G. 964.20
B`E(9 9 3�,� o F.G. 963.6E I
r r-
Zip
n�m
rn -
i
D
rr i D
w o <
cn
<
O o (.0
C Cn
N (.0
a' -14
rn E.G. 960.82
U' EVCS: 16+00.29
+
o F.G.963.54
_
BVGE: 963. 2 \
0o
EVCE:963.55
BVCS:16+05.3�
°
+ E.G. 962.63
T -
O F.G. 965.07
r L- -
\
n .r-�
D
N O < �
\
N (.0O
O O O +
O Ul �
\
a)
Ln
i E.G. 965.13
o F.G.966.07
' EVCE:966.11
\
EVCS: 17+,,0.35
O
o
GRACE BREAK
+ E.G. 966.57
STA = 17+50.00
o F.G. 966.57
J
I
ELEV = 966.566
w E.G.966.83
I
o F.G.
00 E.G.
\
o F.G.
;u
mcn
0
O
W
Z
Z
Z
U)O
C
-n
C�
O
O
Z
w E.G.961.78
i
o F.G.961.80 /
I
+ E.G.960.31 I
o F.G.960.3C I
m
/ x
a 0 m
/
z
m
E.G.959.45 I m
o F.G.959.80 1
0;
� J
Ocn
cn + E.G.959.
o F.G .959.8
1
I
cn E.G.959.44 1
i
o F.G.960.29
I
I
+ E.G.959.72
o F.G.961.3�
rn E.G.960.82
o F.G.963.21
+ E.G.962.63 \
o F.G.964.8'
E.G.965.13
o F.G.965.83 `\
+ E.G. 966.57
o F.G.966.31 J
I
0 E.G.966.83 I
o F.G. \
0o E.G.
cn
O F.G.
g �cncnm>
n
N CZ�-4n
O
vOgm�O
2
Z
cn
(D N -n
3 0 r- O Z
��
r
o
r Z
00
0
��O
N
O
0
x
�0 co �oo,O-n > > m=
m
6)
c> n D 0-;D z
()cC)
r
CT
N � �
m-� m mar Z
r O r D
00
w Z oo 0
m
0 O > P00 OO
`j
�-0 o O
z
z
U
x
• � 3`J
II
- a D
O
D
OC)O
Z
�
L.
zmM
oo
�o>C
0
Z
z�u
m
0,
0 m
�
O
0
O
r
r
Qo
(M
X
N
❑
2
U
ry
Q
ry
U)
(D
z_
Q
ry
N
O
O
Q
U
O
rn
U)
C�
❑
Q
U
O
O
rn
CD
ry
m
U)
Q
v
rn
m
O
U)
U
W
O
ry
O�
ry
LO
N U
O W
N
m ❑
O 0
IL
wQm
J ,
W
M
I� ❑
O W
'Z
NO
O �
N Z
W ry
Ill
J ry
U3:
Z
J ry
Q=
UU
U)ry
LUU)
�Z)
�U
m E
�m
a�
J LL
10+00.00
980
980
975
I
I
975
970
�' s
cop
970
co ((per
I 0)m
(oO
a) oID
N co
(ON co
Cy� Lo
n R7Ro _9
nn o (moo N
965
— —
965
w
MILL &
r�
I
w
OILL &
�_
960
OVERLAP
I
p
O /ERLAY
I
960
U
� J
U
955
0
955
Ul
950
fi
950
-60 -55 -50 -45
-40 -35 -30 -25 -20 -15 -10
-5 0 5
10 15 20 25 30 35 40 45
50 55 60
9+50.00
980
980
975
I
I
975
970
N � O N
� A `° �
N
M
co
° ° co oo
970
� ��
Mc
�
O)L� (06i
� -n ('F°/. -1 74` /
-9 nn°u
�} 45%
965
U
I
O
965
MILL &
MILL 8 �—
w
OVERLAP
OVERLY
I
960
z
960
U
D J
� U
955
(n
0
955
U
950
fi
950
-60 -55 -50 -45
-40 -35 -30 -25 -20 -15 -10 -5
0 5
10 15 20 25 30 35
40 45 50
55 60
9+35.00
980
980
975
I
I
975
970
OR N 7 p O 7
WLo n p p n O N
W r W N O p W q cl
CON `° a)o `° N m J
970
n!d9% -1 8514 rn C'i
965
O
Of MILL & MILL &
AV —OVERLAY
O
O
965
OVERLAY
i
i
960
z
960
U
D J
� U
955
0
955
U
950
fi
950
-60 -55 -50 -45
-40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35
40 45 50
55 60
11+50.00
980
980
975
975
970
: p
M
o� o
O
P.
co
co
co
e N O° O W
970
�N
Lno
�
N O
Do� n n ON
V
1A
965
o
I
�
965
I
960
z
0
960
U
� J
� U
955
0
955
U
950
950
-60 -55
-50 -45 -40 -35
-30 -25 -20
-15 -10 -5
0 5
10 15 20 25 30
35
40 45 50 55 60
11+00.00
980
980
975 I
975
I
970
970
I (4 co p
UC L O CD
CD
(O
(D co�
'500
V CD O
965
� �!_�,
COOo
965
w
I
w
I MILL &
960 ~� JwEFLid
Z
MILL 4L
960
U
OVERLAY
D J
� U
955
(n
0
955
U
950
950
-60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10
-5 0 5 10
15 20 25 30 35 40 45 50
55 60
10+50.00
980
980
975
I
I
975
970
I
I
N _ (4 O
O?
V
�
G
I
I
970
Li) Lo N
M
L6 O
O p'K L'
l) R
O
1 13°(��
m 0
aa�
(o�
a
965
'
_ _ _R 44,1
nn°i
0
965
w
' 1
w
I
MILL &
~�
0
I
960
0VKnL
960
U
D J
� U
955
0
955
U
950
950
-60 -55
-50 -45 -40
-35 -30 -25 -20 -15 -10
-5 0 5 10
15 20
25 30 35
40 45 50
55 60
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
OAKLAAKIAND
WATERFORD, MI 48328
�
248.858.0906 TEL
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
s
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAVISBURG ROAD CROSS
SECTION SHEET
SHEET NUMBER
RD-1.12 234
Qo
(M
X
N
❑
2
U
ry
Q
ry
U)
(D
z_
Q
ry
N
O
O
Q
U
0
rn
U)
C�
❑
Q
U
O
O
rn
CD
ry
00
v
rn
0
cm
U
W
O
ry
O�
ry
IO
N ()
O W
N
m ❑
O 0
IL
wQm
J ,
w
M
I� ❑
O W
'Z
NO
O �
N Z
W ry
Ill
J ry
U3:
Z
J ry
Q=
UU
U)ry
LUU)
�Z)
�U
m E
�m
a�
J LL
� 13+00.00 �
970
I
970
965
°� In
N lSl
In
o O
N
04
N
N f
965
to
rn o
(o
rnG
I
°
960
°
960
I
N00
955
955
w
w
950
z
o
I 950
U
� U
945
0
945
Ul
940
fi
940
-60
-55 -50 -45 -40 -35 -30
-25 -20 -15 -10 -5
0
5 10 15
20 25
30 35 40 45 50 55 60
12+50.00
975
975
970
M
970
I
o I
M ^;
C, co
O
7 L�
—o
o
'n
o
06
O) W N O N m N
M N�j N 7 M o
M �o °° 2
965
-
CIO
�T •p
965
I
") L.I
°
_ ^ ck,'
- F
I
I
960
r
960
x
w
x
w
955
I
I
Z
I
I
955
U
D J
� U
950
U)
0
950
L)
945
fi
945
-60 -55 -50 -45
-40 -35
-30 -25
-20 -15 -10 -5
0 5 10
15 20 25 30 35 40 45
50 55 60
12+00.00
980
980
975
I
I 975
970
M 0
I 970
N VNO
co
7 O cO
�N s��N
O p o O
4O
O O
NO�:N o
N
965
/
�. _, ., ���
� �
...,1•;
N
m �J � p � 965
x
w
w
960
I
I
Z�
I 960
D J
� U
955
0
955
Ul
950
fi
950
-60 -55 -50 -45
-40 -35 -30
-25 -20 -15 -10 -5
0 5 10
15 20 25 30 35 40 45 50 55 60
14+50.00
970 970
CAUTION: GUARDRP IL POST
DEP TH OF BUFY = 3'4'
965 a° oLa To To' o_ l,JOT �
�Ln0 p
I
965
357.67 T/P.RPHET a rn°)
0) rno
960 956.1 7 SEMI -CZ TOP
OF,TRUCT 960_
\
955 —w - — —� ��_ 955
zz REFER TO SHEET B-5.2 FOR
950 LD JJL\9G;fYVVAL I 950
TOP OF B ' NK U
945 CHANNELBOTTOM 0 945
940
940.00 SEMI -CI CL 940
T/ DN
935 � 935
-60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60
14+00.00
970
970
965
965
In ,,
v
CD
I
p J� Lo
O y� °0
CD p
O) O
N�
Q) �
960
I
-
I 960
955
955
x
w
x
w
950
I
z
o
I
I 950
U
D J
� U
945
U)
0
945
U
940
940
-60 -55
-50 -45 -40 -35 -30 -25 -20 -15
-10 -5 0
5 10 15
20 25 30 35 40 45 50 55 60
13+50.00
970 I 970
965 10 0 0 0 (n I 965
04 260) Imo - °) O Z r.n°i, r °
960 - - - • • _ - I - 960
I / I
955 x 955
w w
I Z I
950 I I 950
D J
of U
945 0 945
U
940 940
-60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS _
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328 COUNTOAKLAND
OUN"IY
248.858.0906TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX -,q
am
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAVISBURG ROAD CROSS
SECTION SHEET
SHEET NUMBER
R D -1.13 235
Qo
(M
X
N
❑
2
U
ry
Q
❑
uj
U)
Q
m
m
U
O
U
(
0
O
ry
U)
(D
z_
Q
ry
N
O
O
Q
U
O
rn
U)
C�
❑
Q
U
O
O
rn
CD
ry
m
U)
Q
m
O
(.
U)
U
W
O
ry
O�
ry
(O
N C)
O W
N
m ❑
O 0
IL
wQm
J ,
W
M
I� ❑
O W
'Z
NO
O �
N Z
W ry
J ry
U3:
Z
J ry
Q=
UU
U)ry
LUU)
�Z)
�U
m E
�m
a�
J LL
� 16+00.00 �
970 I 970
(O �2N �2 11) .0 V N
965 ° �2 f' ° � ° N � 965
0)o
0% 9 on°i
�co�I
1 1 \ (O N
6)
960 960
955 Of Of 955
w w
I z I
950 I o I 950
L J
� U
945 0 945
Ul
940 fi 940
-60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60
15+50.00
975 975
970 I I 970
N
965 I h N o �o I 965
_ 0
aND
0)O 6)O O) o
960 — 960
w
I Z I
955 � I/ � I 955
D J
� U
u)
950 0 950
U
945 fi 945
-60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60
15+00.00
970
970
965
,n
v
Lo o�
965
I )O O
O (jM c
0
O
ON
v
I
co (JO 00
rn
o
O O
-ann°i
a rn°i-
960
I
—'--- —
I 960
955
� 955
w /
w
950
I
Iz
I 950
D J
� U
945
0
945
Ul
940
T
940
-60 -55 -50 -45
-40 -35 -30 -25 -20 -15 -10 -5
0
5 10 15 20 25
30 35 40 45 50 55 60
17+00.00
980
980
975
I
I 975
970
I
I ; �M
Do0
N
I
L I 970
9 0
CO Q) D —Lo
� �O N
O 00 0
(O 0 6 O
to O
00 C0
6 (n
(D00
V nj C"
co N
OO m
O N
°
965
= —
'--
��= 965
X
w
1 1 <
Lu
960
I
I
z
o
I
I 960
L J
� U
955
co
0
955
Ul
950
T
950
-60 -55
-50 -45 -40 -35 -30 -25 -20 -15 -10 -5
0 5 10 15
20 25 30 35 40 45 50 55 60
16+85.26
980
980
975
I
I 975
970
I
off;
I
970
o
O
00 m 0
'� O L6 0
coN
°
0
965
v �9Q
O i
965
_�
960
I
I
Z
I
I 960
D J
O U
955
U)
0
955
U
950
950
-60 -55
-50 -45 -40 -35 -30 -25 -20 -15 -10 -5
0 5 10 15
20 25 30 35 40 45 50 55 60
16+50.00
975
975
970
970
N o)�
O �10
O O
I�
Lo
00 O O V
coN (o
I�
rn �cD
0)0
co) ON
°
965
w
-9 nn°i
�,
I �a°i .°(. ^-aQ°
r
Ql s
965
N
�
;
°
O 7
960
�
�
960
w
w
955
I
I
Z
o
I
I
955
D J
� U
950
co
0
950
U
945
945
-60 -55
-50 -45 -40 -35 -30 -25 -20
-15 -10 -5
0
5 10 15 20 25
30 35 40 45 50
55 60
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKT I_A
WATERFORD, MI 48328 COUNlY
248.858.0906TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350 •
248.846.6558 TEL 248.846.6557 FAX
5PKINUItLU,
CHARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAVISBURG ROAD CROSS
SECTION SHEET
SHEET NUMBER
R D -1.14 236
C
Its
r� Ili l if >\ ( / / I I I L-_I J 1 I I\\\
I\ ` \\ \ ` \ I / l I / / / `\ ` 1 1 l l l • �
\ \� \ \ � l I I J I I III \ \ \ \ I / ,� I / // /\ # / 1 / // :•
r� \�. �• 11 ill // , �l/� , . , -• •
J1Soong
. �`'\I I I\ \ \ \ \� \ - -- •-^v\ _-__- / Jl �l I 1 I I\I III I \—\\ I�II�1
1 I I I I I I II I \ \ \ \\ \ \ \ \\ \ \ -• - � � / / / / � I � \ I / I\ � / \\ 1 '` I � � � J � l\ I, � .. /,
I,j
or
\\ l// JI I
Ilk
\ \ \ \ \ \ \ IJ1.\GAZEE14
I
\\ �\\ \\�\\\\ \ 1 / / / ----\\\\ \\\\\\\\ \ I III • // /• I I - - I -_� / \
\ �\ \\ \ I I I 1 / / / / I \\ \\\\\ \ \ \� 1 \II • - f // / // - - <\ 1 1 \ \ \\ I I
is
EXISTING WATER LF
\°\ \ \ \ \ ••III ( // i_-� / / / I I I 1\\ \ - � \\\\ (/ \ // // � s/ // // / /I \1 \ I I I 1 I \\ \ 1
\\ \ \ \ 1 \\\ \\ .\\�
I
/ 1 1 .\ \ J _-- i - `�\\`\�' = •• � •• � ,--___ I I // � itGRADED WETLANDI
1 Ill 1 I`NOTES') I
1 OWNER SHALL MARK OR APPURTENANCES TO THE CONTRACTOR FOR SALVAGE OR
REMOVAL. SALVAGED MATERIALS ARE TO BE THE PROPERTY
\\�_"� OF THE
STOCKPILED•-• , SHALL AGREED'- DELIVERED TO
THEIR FACILITY -LATER
/i/// I 1 1 \ I
2. SEEPS AND TRIBUTARIES WILL BE ENCOUNTERED AT
I IUNKNOWN LOCATIONSAS D• PROCEEDS./
- ------ CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SUCH
`` L �_LJ� —=1 \ _ r rr ��•�—=_i — -- — --��� \ \ \ l — __��= �_— �\\1 / �J//J JAI I I / // / / lDRAINAGES ■A ■ ■■A■ PER APPRO/
I — — — — — — — — — — -- r ENGINEER, AND FOR PROVIDING TEMPORARY CROSSING OF
r r—� =1\\ \ \ / \--�� / /kaSUCH AREAS ■ COMPLETION ■■ /
_jJOJECT
� l \ I ( _�/ // / / \'—��—___=�—�—r ! / I �/ i/ / / 1.
WORK/ FINAL GRADING
o 2021 MicrosoftCorporationo DTi ,Q/
RTER TOWNSHIP
NUT FOR
7NSTRl1CT1C7
L=com
U)
(1)
0
.E
E
aD
0
m
c
m
U
O
0
a
cD
0
z
J
d
w
J
ry
w
Z
w
O
m
cn
(D
z
Q
0
N
O
O
r)
Q
U
O
rn
U)
cD
0
Q
U
0
0
rn
C�
m
U)
Q
0
It
rn
0
(0
U)
U
w
O
IL
00
ow
o�
N
m0
_O
d Q
J >
0
ow
M z
,
O Oi
�Z
w
N 0'
ry
z�w
�uj
�_
�U
�U)
ry
= w
U c)
_U
a
C E
c/)co
J w
Z
O
p � W
0
0
o Q
SHEET
p� AREA
I /
0
Q\ DAVISBURG ROAU�
HIAW . SEE
/ RIVER TROUT
POND
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC OHE
EXISTING MAJOR
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
FENCE LINE
EDGE OF TREE AND/
OR SHRUB LINE
WETLAND AREA
NORTH
RIP RAP
EQUIPMENT �\\\��\y o so' 120'
STAGING/ MATERIAL y
STORAGE AREA
CONSTRUCTION
LIMITS
TEMPORARY
CONSTRUCTION
FENCE
— � — Fig= � � / � _ � � p r � — SOIL BORING
J— FIB EQUIPMENT STAGING/ _
MATERIAL STORAGE'-
-FI AREA —�FIg - PEDESTRIAN BRIDGE
—F'g FI Ig — — PARCEL #
_ - 07 17-252 003
o PARCEL#FI PARCEL # 07-17-252-005
CHEFIB Fe J \07 17 252-016 y
FIB y yy y y y
— Fes_ ' / / PARCEL # r j /' y y/ y y y \ y y
y
07-17-252-004 ` �/ / y r y y y
� R\\\ _. �� �,.�� � � \ \ J L — �� / ( i // y /y y /d• y y y y y
�- PAVILION \ F g VO p O / �_
B3 FI
Fli3- �9 - w l y y y y i� y
FIB —FIB
FI I� _ / �FI� \ l� ) ` / w w w I w �i y y y y y y
B JSOO� y y y y y y
—FIB
O 4IR
r
UP 'G ROAD / i �� FIB j
DA FIB
BASKETBALL PICNIC -- -
0 - EXISTING I �• \ 1 COURT �— FIBS y y y y y y y y
i- - COO 0 / ,<, 1r AREA VOLLEYS
SPILLWAY `. / 1 COURT LL
I I _ --
— r HO SHOE—
\ � AREA
�I
/
l 1 1 — — AREA TO BE
� , - - �
PARKING PROTECTED BY
,'I 1 o LOT _ 1 CONTRACTOR
/ �I1
I� SHUFFLEBOARD c I _ y y y y y y y y y
COURTS SEPTIC o
/ / \
FIELD 1 Co ` ` \ _ 1 \ y y y y y y y
\ \ w\
4,
-— O
FIB>\96o� I yz o yw �yW 6� GAZEBO TO BE DEMOLISHED
yyy�wy
yyy
L6 OR MOVED BY CONTRACTOR \ y y y y y y
I C° C7
°° I TO LOCATION DESIGNATED BY y y V y y y y yr y
y y y y y I y
HART -14- OWNER y y y y y y
y y RESTROOMS COMMUNITY I TENNIS y \y y y y y y y
` \_ y y Jr y y y y y y y 1 \ y y y y y y
��� \ CENTER
COURTS O
SEPTIC FIELD - /D y y y y y y
y y - y y __'Novy�I / \\ I AREA TO BE I °'
I/ y y y y y y y y y y y ". ' \ PROTECTED BY
'� / I CONTRACTOR
-w--y w w w y-�y�y w I w �. I w \I `, \ \ Q 5 00 I �►, \ EQUPMENT STAGING/ 1 1 w I w w w w w w
S — y y y y y y y y y
94 � � PARCEL # � �
�\ °� \ \\� U7-17-253-004 \/ MATERIAL STORAGE
s° L_ p0 I AREA y y y y y y y y
y y y y y y l y y y y y y y :• y 'O � y
°� \ \960 \ GARAGE I w I y y y y y
y y y y y y y y y y y y y y y I I
°-Y � C �
� _� - `� � i t/� \ J i / w w •: y y w I w y w w y y y y y y y y 1 y y y y y J, ` �\ \ �' 1 ;\\ `,\ y J, J, \ / y y ✓ y y y y y y y
# IV
P
,to, y y y y y y y' __'• w ^.� y 4� y y` 41 1 ---.
9 �— ��_� / / y y y y y y y y y y
w y y y y y y y y y y y y y y y �07-17-253-003 \ \\ SO ._ -- / !!^^00 I\y y y y y y y y y y -
y y y y y yl y y y y y_ y y l y y ` y y \ \ \ \ \ 00 \ / .._! / 40 / y, y y y y y y y y y r
\ y y y y y y y y y y y y `�6'° y y y \ \ l \ \ \ ` / / y/ y y y y y IV y y y
\y y IV IVy yl y y y y y y y �° y y y y y_y � y �
y y y y yy y y yy\ — __IVy IV IVy Vv
y y y y\ y y y y y` \ \ .O y y✓ -_
\ y y y y y y y y y y y y y y l IVy y y y \ \ \ �'9 W / IV�1�
\ V \
\ y y y yl y y y y y y y y y y y y y y y�00 y
IVy y y y y � �\ 1 \ O y y yO
0 \ y-96� O w w w w I �y /y w y IV �50 0/ ' y y
\ y y y l IV IV y Q y y y y y y y y \ y y
l \ y y y IL y y y y y y �y y L 1• •�• =L- - L - - - \ y
y
= y y y Y Y IV IV IV 1A, IV y y y y y y y y IY
y I y y \y y y _
\ \ y y y ,
y y y y y y y —�' � y y y y y y y y y—y \y �w y —950.00
y w W -"�/ w y w v y IL
\\ \ I � \ y y y y y y y y y y y y y y y y y y y y y y y �� � y
y y y y y y y W y y y y
............
—....
\\ � �\�\ � \ I\ •� y y y y y y y y y y y y y y y y y y y y y y y /y .-\w� y �\ .�✓'��' ��� �\ \_ -- —� / � '�� J � I (
y
\ � � y y y y y y y y y y y y y y y y y y y y y y y y y � y � � ._ y y • � � \
w-
- -- = i
� .� y y y � y y y y y y y y y y y y y
J
1 � - - _ _ � - --�-- _ � y y y �. � y y y y y y y _ �•- =
\ y y 3 y y _ �� \
i
\ I
�I
_FIB — — \ DAM BREACHING AREA
PROPOSED M E N N E N
ACCESS ROAD
RAILROAD I I I I I I I I I
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAN D COUNTY
PARKS
2800 WATKINS LAKE ROAD
OAKI.. ND
WATERFORD, MI 48328
COUNTY
248.858.0906 TEL
M' c "' G ^ "
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
J
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
GENERAL SITE PLAN
SHEET NUMBER
B -1.1 238
co
x
N
U
ry
Q
1,
a�
0
Lu
E
m
c
co
a0
0
.11
m
W
z
Q
ry
0
N
O
O
0
Q
U
O
0
0
O
rn
0
m
Q
0
L0
O
U
w
O
rr
w
ry
00
ow
o�
N
�U
aQ
J >
ry
0
ow
"' z
i
O Oi
�z
N n'
Q'
z�w
ry
ryCo
�U
�ry
=w
U co
s�
�U
a�
m> E
J L.L
EROSION CONTROL NOTES�--
1. THE CONTRACTOR SHALL COMPLY WITH OAKLAND COUNTY RULES &
REGULATIONS FOR SOIL CONTROL AND SUBMIT A SCHEDULE OF SOIL l \ \
l /
EROSION ACTIVITIES TO THE LOCAL ENFORCING AGENCY PRIOR TO ANY I _
EARTH CHANGE AND AFTER RECEIVING A NOTICE OF COVERAGE AND \ `
COMPLIANCE. \ j
2. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE \\ /
CATEGORIZED AS INITIAL, INTERIM, AND FINAL MEASURES. INITIAL
MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY MAJOR SOIL
DISTURBANCE ON THE SITE, AND SHALL BE LOCATED AT AND ADJACENT
TO AREAS THAT WILL BE DISTURBED AT THE START OF CONSTRUCTION —
I
(TEMPORARY ACCESS ROADS, ACCESS ROAD ENTRANCE/EXIT POINT
FROM THE SITE, AND DOWNSLOPE OF THE EXCAVATIONS AT THE DAM).
INTERIM MEASURES SHALL BE APPLIED TO AREAS THAT WILL BE
DISTURBED AS CONSTRUCTION PROGRESSES (DOWNSLOPE OF SOIL
DISPOSAL AREAS, STOCKPILE PERIMETERS). FINAL MEASURES SHALL BE
\ I I
APPLIED UPON COMPLETION OF CONSTRUCTION, AND MAY CONSIST OF
MAINTENANCE AND UPGRADES OF PREVIOUSLY PLACED INITIAL OR I I
INTERIM MEASURES.
3. ALL INITIAL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ARE TO
BE INSTALLED PRIOIR TO ANY MAJOR SOIL DISTURBANCE, AND IN THEIR
PROPER SEQUENCE, AND MAINTAINED UNTIL PERMANENT PROTECTION \ \ \ ? IIJ
IS ESTABLISHED. %
4. ANY DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN 30 1
1
DAYS, AND NOT SUBJECT TO CONSTRUCTION TRAFFIC, WILL
IMMEDIATELY RECEIVE TEMPORARY SEEDING AS SPECIFIED IN �� A1
SPECIFICATION SECTION 32 90 00. IF THE SEASON PREVENTS THE
ESTABLISHMENT OF TEMPORARY COVER THE DISTURBED AREAS SHALL I '
BE MULCHED WITH STRAW, OR EQUIVALENT MATERIAL, AT A RATE OF 2 FIB_ EQUIPMENT STAGING/
TO 2.5 TONS PER ACRE. _ FIB_ �� �� - MATERIAL STORAGE \
l —FIB= AREA 1
5. THE CONTRACTOR SHALL INSPECT ALL TEMPORARY & PERMANENT e /
EROSION CONTROL MEASURES WEEKLY & IMMEDIATELY (WITHIN 24
HOURS) AFTER A SIGNIFICANT RAINFALL EVENT ALL MEASURES
� z
O
O Q
p � w
0
� o
o �
o a
DAVISBURG ROAD
SHEET HIAWA SEE
RIVER TROUT
AREA C-� POND
I �
I
i
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC
EXISTING MAJOR
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
SILT FENCING
EDGE OF TREE AND/
OR SHRUB LINE
PROPOSED
ACCESS ROAD
RAILROAD
WETLAND AREA
OHE
EQUIPMENT
\\\\\\`I
STAGING/ MATERIAL
- — — — — — — — - STORAGE AREA
........ CONSTRUCTION
oU oU o
ENTRANCE
J-- l
IB \000
REQUIRING MAINTENANCE REPAIR OR REPLACEMENT SHALL BE FI
CORRECTED IMMEDIATELY AT NO ADDITIONAL COST TO THE F/g
GOVERNMENT.
6. IF UNFORSEEN EROSION OR SEDIMENTATION PROBLEMS ARE 1 1
IDENTIFIED; THE CONTRACTOR SHALL TAKE IMMEDIATE MEASURES TO 11 1
STABILIZE THE AREA AND CONTROL THE PROBLEM. THE CONTRACTOR 1
SHALL ALSO NOTIFY SPRINGFIELD TOWNSHIP. THE CONTRACTOR SHALL 1
IMPLEMENT ANY ADDITIONAL MEASURES REQUIRED BY SPRINGFIELD
TOWNSHIP. F113_
_FIg� _FIB
7. ALL SUBGRADE SLOPES SHALL BE TRACKED PERPENDICULAR TO THE —�Flg
SLOPE TO AID IN EROSION CONTROL OF SLOPED AREAS.
FIB.
—FIB—F J
�B
8. CONTRACTOR SHALL FENCE OFF AND PROTECT TREES/AREAS — — L /�� o �►�
DESIGNATED BY SPRINGFIELD TOWNSHIP. '
G ROAD W� 1 � � -FIB
9. THE LOCATION OF ANY STOCKPILES SHALL BE DESIGNATED BY
SPRINGFIELD TOWNSHIP PRIOR TO CONSTRUCTION. THIS AREA SHALL
BE ENCLOSED BY SILT FENCE A REASONABLE DISTANCE FROM THE TOE
OF SLOPE UNTIL SUCH TIME IS USED.
10. A CRUSHED STONE, STABILIZED CONSTRUCTION ACCESS PAD WILL BE
INSTALLED WHEREVER A CONSTRUCTION ACCESS ROAD INTERSECTS A
PAVED ROADWAY. SAID PAD WILL MEET THE REQUIREMENTS OF THE
TEMPORARY CONSTRUCTION ENTRANCE DETAIL ON SHEET B-1.3.
11. STREET SWEEPING AND DUST CONTROL SHALL BE THE CONTRACTOR'S
RESPONSIBILITY AS DESCRIBED IN THE SPECIFICATION.
12. ALL DRAINAGE DITCHES ARE TO BE STABILIZED WITH EROSION
CONTROL BLANKET; DRAINAGE DITCHES STEEPER THAN 3% ARE TO BE
SODDED.
13. SLOPES STEEPER THAN 1VAH (25%) LOCATED WITHIN THE DAM
BREACHING AREA ARE TO BE STABILIZED WITH EROSION CONTROL
BLANKETS PER SECTION 3140 00.
14. ALL WETLANDS NOT LOCATED WITHIN LIMITS OF DISTURBANCE SHALL
BE PROTECTED WITH SILT FENCE AND SHALL NOT BE DISTURBED.
15. CONCRETE RUBBLE MAY BE SALVAGED AND USED FOR TEMPORARY
EROSION CONTROL, BUT ALL METAL SHALL BE CUT FLUSH AND
DISPOSED OF OFF -SITE.
16. FINAL SOIL EROSION CONTROL MEASURES, PLANTINGS & SEEDMIX FOR
ALL SLOPES, WETLANDS, OR DISTURBED LAND AREA SHALL BE
COMPLETED WITHIN FIFTEEN (15) CALENDAR DAYS AFTER FINAL
GRADING OR FINAL EARTH CHANGE HAS BEEN COMPLETED. SEEDING,
COMPOST, AND MULCHING REQUIREMENTS AND SPECIFICATIONS ARE
PROVIDED IN SPECIFICATION SECTIONS 32 90 00.
17. AT COMPLETION OF CONSTRUCTION ACTIVITIES OR UPON REQUEST FOR
REVIEW, SUBMIT INSPECTION LOG BOOK TO THE COUNTY AND
SPRINGFIELD TOWNSHIP.
NORTH
0 60' 120'
- _�`�1 \gam
�F - CONSTRUCTION ENTRANCE (SP-9)
F _\� Flg_
11_j_
\ O V\18 O IP
1S0
�--
pAVISBpR I 1 l 1 BASKETBALL FIB
_ l
00 z EXISTING 1 I \ COURT PICNIC Flg
SPILLWAY 1 I % lr AREA VOLLEYBALL-
// COURT HORSESHOE _
AREA
/ G
SILT FENCE (SP-2) \ `\G \ '
i `s /
0) AREA TO BE
DSO 1 �, PARKING PROTECTED BY — _
I .00 `I LOT CONTRACTOR L /
�` SHUFFLEBOARD o I
- / I COURTS SEPTIC O
O FIELD °
`I rn ♦ \\ \\ FIB21 `96'0
\ ♦ ) I 0) 'O
�0� (
\\l 9 o O
00
I
` \ ♦ cfl I
♦♦ \; I HART I TENNIS
�� 1 ♦\\� COMMUNITY I l COURTS
W W W W W W W W W W �\ ♦ CENTER I \
945
Ow
I1W �Y �Y �Y �Y �Y �Y �Y �Y � •Y �Y �Y �Y �Y �Y �Y y \ I OOO � `` ` \ O \ y /�
9S �_ _ _ \ 960 GARAGE
y y y y y y y y y y y y y y y
\
I s \ , \ \ 00
00\ \� \
1
\ \—
�.y ,
00*
w w w wL w w w w w\ \ O00
aim OWN
SILT FENCE SP-2
Y Y Y IV IV IV IV lY Y Y Y Y Y Y Y Y Y \ \ \ \ Q \ \
\ I
\ \ s I
O l \
\ \ \ o
L Y 1Y 1Y 1Y 1Y S00
` O \
141,
EQUPMENT STAGING/
MATERIAL STORAGE
AREA
P"=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUNTY
248.858.0906 TEL M c H i G A "'
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX �
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
SOIL EROSION AND SEDIMENTATION
CONTROL PLAN
SHEET NUMBER
B —1 . ` 239
c�
0
J
Q
w
z
0
U)
0
ry
w
J
0
U)
CO
co
(3
z
Q
ry
❑
N
O
O
❑
Q
U
O
rn
U)
0
❑
Q
U
O
O
m
cD
ry
D
m
co
>
Q
❑
O
U
w
0
ry
w
O�
?�
c0
O�-
c U
Ow
N �
_o
2�
60
o_ U
} w
cnQ
J
w
orr
N ❑
w
oz
�0
N �
z
N w
ory,
zry
Q
03:
wu�
�ry
U
ow
Qw
FU)
�U
c'o E
J L.L
6" MIN. OF MDOT 21 AA
AGGREGATE OR SIMILAR
6"
MIN
SE50
MATCH ELEVATION -
OF TOP PAQFE FDIFING
PAVEMING
ENT
NON —WOVEN GEOTEXTILE
FABRIC
20'-_
CROSS SLOPE
3% OR FLATTED
Nq oo ioob oho �°O
SECTION A -A ORIGINAE
GROUND
TEMPORARY
CONSTRUCTION ACCESS
NOT TO SCALE
ATP2H ED: 1 V S
FILL AS NECESSARY
BETWEEN AGGREGATE
AND GEOTEXTILE
NOTE: CONTRACTOR TO INSTALL
TEMPORARY
CULVERTS AS NECESSARY TO
ACCOMMODATE
SEAPS AND TRIBUTARIES.
SLOPE AWAY FROM ROAD FOR 5'
NON —WOVEN GEOTEXTILE FABRIC
10 6" MIN. OF 1 "-3" CLEAN WASHED STONE
pR
OR
c'cR& 0 O Uq
12" MIN.
JOIN DETAIL
EXCAVATE TO CONFORM
TO PAVEMENT OR CURB,
JOIN DETAIL
ROADWAY
TAPER AT ALL EDGES
C7
00 L-) O O `-'Oc-
00000��0 ,
D°�_Oo�
PERSPECTIVE
6" MIN. OF 1 "-3" CLEAN WASHED STONE
12"
TYrr
o0
6" MIN. 1 "-3" CLEAN WASHED STONE
oc Oo020' RADI M/
N
O ) 6 BERM 8
00Pb-lHEIGHT BY 36"
°G WIDTH
v0U oo vv
o °
000 00000
�00D 0 D
D OOOo \0,�
O r10O° 0 C 1
NON -WOVEN GEOTEXTILE
FABRIC
06 0V_)0
6"
MIN
TA E 2 EDGES
AT V
CROSS SLOPE
3% OR FLATTER —�
0 00 00�0� �°On
/w\ / D\
SECTION A -A ORIGINAL
GROUND
TEMPORARY
SE50 CONSTRUCTION ENTRANCE
NOT TO SCALE
Io,
ftftft
I.
—I I 1=1 � �-` •
'�-111—III EROSION CONTROL
—ii—
BLANKETS
TOE —IN BLANKET 8" STAPLING PATTERN PER
MIN. AT TOP (TYP. MANUF.
BOTH SIDES) �`.%RECOMMENDATIONS
SOIL EROSION CONTROL
SE48 / EROSION CONTROL BLANKETS
A NOT TO SCALE
—
1
G EOTEXTI LE
FILTER
SILT FENCE JOINT, FABRIC
REFER TO VIEW B—B
COMPACTED
7 EARTH
=1 � I-III=III=III=III-1TI=Ti:
�!11=III— IT ITI—�TI�IT
(UNDISTURBED
VEGETATION
PLAN VIEW
wGEOTEXTILE FILTER
= I FABRIC
U',L` FASTENED ON UPHILL RIDGE OF COMPACTED
SIDE EARTH
TOWARDS EARTH ON UPHILL SIDE OF
lill� III IIIITIIII���III� III'=IIII�IIII�'ll DISRUPTION 1 I GEOTEXTILE
T, FILTER FABRIC
FENCE UNDISTURBED
POST A r
VEGETATION
REFER TO M.D.O.T. SOIL EROSION Bc
SPACING PER MANUF. SSEDI6MENNTATION CONTROL MEASURES
FRONT VIEW
SOIL EROSION CONTROL
SE26 GEOTEXTILE SILT FENCING
NOT TO SCALE
INSPECTION AND MAINTENANCE:
SEDIMENT BARRIERS:
1. SILT FENCE SHALL BE INSPECTED AND REPAIRED IMMEDIATELY FOLLOWING ANY
SIGNIFICANT RAINFALL (EQUAL TO OR GREATER THAN 0.5 INCHES/24HR) AND DAILY DURING
PROLONGED RAINFALL. OTHERWISE, INSPECTION SHALL BE WEEKLY, AT A MINIMUM.
2. SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM FACE OF THE SEDIMENT BARRIER
WHEN IT HAS REACHED A 1/3 DEPTH OF THE BARRIER HEIGHT.
3. REPAIR OR REPLACE BARRIER (FABRIC, POSTS, BALES, ETC.) WHEN DAMAGED.
4. IF THE SILT FENCE DRIFTS FROM ITS INSTALLED LOCATION OR BECOMES PARTIALLY
SUBMERGED, REPAIR SHOULD BE IMMEDIATELY UNDERTAKEN.
5. REGULARLY REMOVE ANY COLLECTED DEBRIS THAT IMPEDES THE FUNCTION OF THE FENCE.
I \�x\��\\ _ 6„X 6„
ANCHORING
TRENCH
SECTION A —A
SILT FENCE B
SILT FENCE AQEI
GEOTEXTILE FABRIC
SHALL
BE WRAPPED AROUND
EACH
VIEW B—B FENCE POST
SILT FENCE JOINT
STABILIZED CONSTRUCTION ACCESS:
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOWING OF SEDIMENT ONTO PAVEMENT. THIS MAY REQUIRE PERIODIC
TOP DRESSING WITH ADDITIONAL STONE OR ADDITIONAL LENGTH AS CONDITIONS
DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO ROADWAYS (PUBLIC OR
PRIVATE) OR OTHER IMPERVIOUS SURFACES MUST BE REMOVED IMMEDIATELY.
2. WHERE ACCUMULATION OF DUST/SEDIMENT IS INADEQUATELY CLEANED OR
REMOVED BY CONVENTIONAL METHODS, A POWER BROOM OR STREET SWEEPER WILL BE
REQUIRED TO CLEAN PAVED OR IMPERVIOUS SURFACES. ACCESS POINTS TO THE WORK
AREA SHALL BE CONTROLLED.
LC0
m
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328
248.858.0906 TEL
41TI
OAKLAND
0��
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
SOIL EROSION DETAILS
SHEET NUMBER
B-1.3
240
co
M
X
N
U
ry
Q
0
0-
a
Q
Y
U
a)
U
c
27)
a)
0
(0
c
a>
m
0)
ca
c
co
0
w
c�
U)
w
z
Q
J
n
(7
z
U
Q
w
m
Q
0
N
co
U)
0
z
Q
ry
0
04
O
O
r)
Q
U
O
U)
0
Q
U
O
0
rn
ry
m
Q
0
Lo
O
U
w
0
ry
IL
Ory
ow
N
O
N
�o
ow
IL ;J
M Lu
,z
o0
�z
�w
N ry
ry
z�w
�C6
Qry
3:=
ujU
�C/)
=w
U c/)
�?
�U
cE
�co
J LL
\ t�
FIR
W
0
FIB
O \
\ \ — c6 9KI RBY LAKE
_ - SHEET _
p� AREA
0
DAVISBURG ROA'
HIAWASSEE
RIVET\ TROUT
POND
LEGEND
PAVEMENT BOUNDARY WETLAND AREA
OVERHEAD ELECTRIC OHE
EXISTING MAJOR EXISTING
CONTOUR LINE RIP RAP
EXISTING MINOR
CONTOUR LINE PROPOSED MAJOR ow
FENCE LINE CONTOUR LINE
PROPOSED
EDGE OF TREE AND/ CONTOUR L NIE OR
NORTH
0 20' 40'
�FIg_ v OR SHRUB LINE
FIBS --FIg_ o TEMPORARY
_ p ° RAILROAD CONSTRUCTION
FIB I \ a FENCE
-F16� — _ I I I — — _ J EXISTING GUARDRAIL " " " ^ °
FIB UTILITY LINE FIB
OHF IIB\ I I D
OHE a
- F/B OHE
OHE _ FIB \
\ _FIB- OHE _� -_ _Fi6- � / /
FIB OHE
\ I F\0� /
-FIB- OHE Oil I , _F/B
\ \ FIB�� OHS �H_ FIB /
t -- `OHE _FIB ' F\g/ /
E FIB
I� \ OHE _ FIB F\8
v- \ I
g
SIDEWALK CLOSED
—FIB \ �F � oI oyF � F\0'� F/B� /��O
�..._ --
\ \ FIB i .....
/ \ O , —FIB � � ..----- _
\ \ \ F\e to EXISTING EROSION PROTECTION �o /B� FIB ' o�
SIDEWALK CLOSED 1 I 1 REFER TO SHEET B-2.2 / %\ �� �F/g\ F1B—
dQsI FOR SECTION B B h'F -FIBS �
�Flg \ -O- F\ate \ s FIB --FIB— - F�IB FIE?
\ -FI6-
\ \ FIB
-FIB- \ IB IE ID FIB- - o F!B ,�V�✓CCC , F / —FIB- F► g_
—
FIB ONE
F/B 00
--F - ��,,.� - FI 6<�
IB FI
/ CONSTRUCTION FENCING 0
\ URG OPD / [�
I
EXISTING 36" /X _
CMP CULVERT �X— — — — — — \ �__ CONSTRUCTION ACCESS \
—DEWATER THROUGH �� _ - - ROUTE
EXISTING CULVERT
X
% / -_-. --
�— _ / FULLY OPEN SLUICE GATE.
j — �. INVERT WILL BEAT 955.50' �
i J7 '
APPROXIMATE STARTING WSE I
AT BEGINNING OF BREACHING
OPERATION. WSE=-956.10'/r
' 1
r
f I
fi
�I
REFER TO SHEET B-2.2 \ \
FOR SECTION A -A
SELECTIVE DEMOLITION OF \
EXISTING INTAKE STRUCTURE \
TO DEWATER IMPOUNDMENT
TO FACILITY PROPOSED CHANNEL
CONSTRUCITON. MAXIMUM \
DEWATERING RATE ALLOWED
IS 1.00' PER DAY
\
�9`So
00
1 \
1 \
l \
�DAM BREACHING SEQUENCE
STAGE 1:
1. FULLY OPEN SLUICE GATE = INVERT AT 955.5'
2. CONSTRUCT ACCESS ROUTE ALONG SOUTH/ WEST SIDE OF MILL POND
PARK, PER PLANS.
3. INSTALL SESC MEASURES AROUND ACCESS ROUTES AND
EQUIPMENT/MATERIAL STORAGE AREAS.
4. CONSTRUCT ENGINEERED RIFFLE AT THE EXISTING RAILROAD BRIDGE.
SEE SHEET R-1.4.
5. INCREMENTALLY DEMO THE SLUICE GATE FRAME/SHEET PILE TO
APPROX. 950.51
\ 6. CONSTRUCT SEDIMENT TRAP IMMEDIATELY UPSTREAM OF OUTLET.
7. AS WATER LEVEL LOWERS IN THE POND, START EXCAVATION OF
\ RESTORED CHANNEL IN THE PROPOSED ALIGNMENT, WORKING FROM
UPSTREAM TO DOWNSTREAM.
8. MONITOR AND EMPTY SEDIMENT TRAP AS NEEDED TO MANAGE
SEDIMENT TRANSPORT DOWNSTREAM.
9. WORKING FROM UPSTREAM TO DOWNSTREAM, INSTALL ENGINEERED
RIFFLES TO MAINTAIN CHANNEL GRADES AND PREVENT HEADCUTTING
UPSTREAM. SEE SHEETS R-1.1- R-1.4.
10. PLACE EXCAVATED MATERIAL IN DESIGNATED AREAS.
Az=mCOM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
OIL -T
WATERFORD, MI 48328
COUNTY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAM BREACHING PLAN VIEW
STAGE 1
SHEET NUMBER
B_2. 1 241
Q0
(M
X
N
❑
2
U
ry
>
p
a
X
w
c�
U)
w
>
w
J
u-
0
ry
(D
z_
U
<
w
m
<
N
N
m
U)
0
z
<
a'
N
0
0
0
<
U
0
U)
❑
<
U
0
0
Q
ry
D
m
>
<
0
cm
W
U
W
0
ry
o_
o�
I? ry
11-O
o�--
N w
O 0�
05
00
5= U
— Lu
U<
co
J
W
p
I� W
O z
�0
N
N W
❑ ry
z ry,
(D3;
W U)
U
Oco
<w
�co
�U
a) 6
a E
ns
��
cn 2
co
J LL
SHEETPILE AND CONCRETE
<
Q
r+
O
960 STARTING WSE _—956.1' )
STAGE 1
TOP OF GRATING
CONCRETE WALLS
_ SELECTIVELY DEMOLISH INTAKE
STRUCTURE DURING INCREMENTAL
DRAWDOWN STAGE 1
0
O
>
O
W
SHEETPILE AND CONCRETE
RT = 950.45'
WSE = 950.45' ACHIEVED
DURING INCREMEMTAL
DRAWDOWN STAGE 1
SECTION A -A
EXISTING PROFILE THROUGH INTAKE STRUCTURE
(REFER TO B-2.1 FOR PLAN VIEW)
H/VRATIO =5:1
O
<
Q
r+
O
970
SLIDE GATE
STARTING
WSE =—956.1'
STAGE1
r WSE = 950.45' ACHIEVED
1 DURING INCREMEMTAL
DRAWDOWN STAGE 1
950
940
—0+30
0+00
TOP OF CONCRETE WALL
— ROAD
\ � SPILLWAY
36" CMP
INVERT OF 36" CMP (EL. 948.20')
RIP RAP
INVERT OF 36" CMP (EL. 950.45')
1 +00
1rolwo
SECTION B-B
EXISTING PROFILE THROUGH DAM
(REFER TO B-2.1 FOR PLAN VIEW)
H/V RATIO = 5:1
LEGEND
EXISTING GROUND SURFACE
CONCRETE BOUNDARIES
INITIAL DEMOLITION TO
ELEVATION 950.5' [STAGE 11
970
950
940
1 +50
Lv
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328�UN iy
248.858.0906 TEL I G A F
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAM PROFILE VIEWS
SHEET NUMBER
B-2.2
242
El
IN
T
.E
E
c�
c
c�
U
a)
0
0
N
W
U
Q
co
W
z
Q
J
n
Z
U
Q
w
ry
m
Q
0
m
cD
z
Q
fy
0
N
O
O
0
Q
U
O
rn
U)
O
0
Q
U
O
0
m
CD
ry
D
m
co
Q
0
0
0
U
w
O
ry
w
orr
c� O
oU
�w
N
O
N
_0 75
�O
_O W
d Q
c� W
J >
rr
� W
N z
�O
O �
�z
N W
O Q'
N ry
z<
w
�C6
r_
Qry
3:=
ujU
�0
=w
U U)
�D
�U
a
co E
J L.L
■inxI■mINrEvil AWil0r wr
PUMP INTAKE SUMP
TYPICAL DETAIL
NOT TO SCALE
%TER ELEVATION IN IMPOUNDMENT
IDE SLOPE OPTIONAL
TONE
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUNTY
248.858.0906 TEL M" C "' G ^ "
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI48350
248.846.6558 TEL 248.846.6557 FAX rq
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
DAM BREACHING STAGE 2
DETAIL
SHEET NUMBER
B_3.2 243
co
M
X
N
U
ry
Q
IN
a >
c
0
cn
a)
0
n3
c
E
a)
cm
ca
c
m
U
a�
0
o_
C�
0
N
w
c�
w
>
z
Q
J
o_
C�
z
U
Q
w
no
75
Q
0
LM
m
U)
0
z
Q
ry
0
N
O
O
Q
U
O
C�
0
Q
U
0
0
rn
C�
ry
m
Q
Nt
O
L0
(.0
cn
U
w
O
ry
w
ry
C?O
ow
N �
O
N
Lu
IL
c; J
0
N w
,z
o0
�z
ory
Fll�ry
z�w
�C6
=
ujU
�cl)
=w
U co
�?
�U
ca
f�co
c
cn ns 2
J LL
FIR_ - /
FIB
FIBS
F,B
I \
_.. /
_ f7B -- --
C7
Z
0
w
KIRBY LAKE
�-
SHEET
p� AREA
Pie I v
::zpl B� -
FI ❑
\ \ FIB
0
'FIB— 0 - ��� FIB —_FIB 0 OIL ® FIB \
_FIB_ \ I I I
FIB- OF-E—
\ F18OH-- FIB
_FIe_
\ - / � F I �\ ,,� � ONE � OFF FIB
BYPASS PUMPS
(1) 2500 GPM BASE FLOW PUMP (ELECTRIC) Fi,
B� (1) 2500 GPM BACKUP PUMP (ENGINE DRIVEN)
\ Jl fi ��� -F(1) 500 GPM DEWATERING PUMP (ELECTRIC)
\ y
RIPRAP ENERGY 0-FIE3�—
\ \
DISSIPATOR FOR �i
BYPASS PUMPING
\ \ F\8
- SIDEWALK CLOSED j
REFER TO SHEET B-2.2 O F\gam
�FFOR SECTION B
�p F\g/
o
\ FI8 FIB \ O� FIB- IB FIB—�/��,
IB ID
0
DAVISBURG R(
HIAWASSEE
RIVER TROUT
POND
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC
EXISTING MAJOR
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
FENCE LINE
EDGE OF TREE AND/
OR SHRUB LINE
RAILROAD
EXISTING GUARDRAIL
FIB UTILITY LINE
WETLAND AREA
OHE
RIP RAP
......n,
iiiiiiiii
n n n n p
SIDEWALK CLOSED
_FIB i
/F\8 i
- USE A GLOBAL PUMP /
191:3
TEMPORARY
CONSTRUCTION
FENCE
DAM BREACHING SEQUENCE
STAGE 2:
NORTH
0 20' 40'
1. CLOSE DAVISBURG ROAD AND START CONSTRUCTION OF COFFERDAM
UPSTREAM OF EXISTING DAM. BEGIN REMOVAL OF ROAD SURFACE TO
TOP OF EXISTING OUTLET CULVERT (APPROX. 954).
2. CONSTRUCT DOWNSTREAM ENERGY DISSIPATION STRUCTURE FOR
BYPASS PUMPING OUTLET.
3. CONSTRUCT PUMP INTAKE STRUCTURE IN THE IMPOUNDMENT. INTAKE
LINES TO BE ADEQUATELY PROTECTED OR COVERED TO ALLOW FOR
CONSTRUCTION TRAFFIC.
SOUNDGUARD ENCLOSURE
UQ FOR NOISE REDUCTION .......
� FHB
1100,�...
O FIBS p
,ems ;Ie� Fie
FFie
IB—k 6w�',.A
-
9ss, \ — EXISTING EROSION
_
FIB Y O
� �p PROTECTION
FIB
FI B �__ 0
IBA__ FI _`�'
. g x� 959.48
<
xq 960.46 x� 959.55
\ --o6�`p0
INSTALL SHEET PILES
APPROXIMATE STARTING WSE UPSTREAM OF
/ fAT BEGINNING OF THIS STAGE I EXISTING
WSE=-951.3' '�� I STRUCTURE
__/r I I
I I
I
REMOVE EARTHEN EMBANKMENT TO Xy y
ELEVATION 954', JUST ABOVE EXISTING
36" CMP. y y y j
959.05\-
REFER TO SHEET B-2.2
_ FOR SECTION A -A
` RIPRAPSUMP FOR BYPASS \
PUMPING SEE SHEET B-3.2 \
APPROXIMATE STARTING WSE \ \ \ o
AT BEGINNING OF THIS STAGE ` s'
WSE=-951.3' \
° \
I \
CLOSE DAVISBURG ROAD 113- FI _E1e
AND BEGIN REMOVAL OF ROAD ®
SURFACE AND EARTH ABOVE F►e—
/ FIB.
EXISTING STRUCTURE
1
l�
l�
�I
`... _ i_ _
=coM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD �-
OAKLANi)
WATERFORD, MI 48328 COUN"iY
248.858.0906 TEL M I C H G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAM BREACHING
STAGE 2 PLAN VIEW
SHEET NUMBER
B-3.1 244
co
M
X
N
❑
U
ry
Q
I -
a
Q
a�
Y
U
a)
U
c
27)
cn
a)
to
(0
c
E
(1)
an
az
c
co
2
0
o_
c�
0
w
0
U
w
z
Q
J
n
(D
z
_
U
Q
w
m
Q
❑
IT
i
m
i)
0
z
a
ry
N
O
O
0
Q
U
O
U)
c�
❑
Q
U
O
0
rn
(D
ry
D
m
W
Q
O
Lo
0
W
U
W
O
ry
w
0ry
ow
N �
O ❑
N
�o
W
IQ
�
>
J
❑
�w
N z
ti
o0
�z
�w
No Q_'
ry
z�W
�C6
Qry
3:=
ujU
�W
=w
U c/)
�0
c E
�co
J LL
\\�LL.n \
FIR �LEGEND
\ ----
0
FIB � � �
° PAVEMENT BOUNDARY WETLAND AREA
FIB OVERHEAD ELECTRIC oHE
` ( RIP RAP
O F "RIVER
AR EXISTING MAJOR
LINE
SHEET EXISTING MINOR PROPOSED MAJOR 900
CONTOUR LINE
TROUT CONTOUR LINE
p� AREA POND FENCE LINE PROPOSED MINOR
� - SIB_ CONTOUR LINE
-
\ EDGE OF TREE AND/
OR SHRUB LINE
— _ —_ TEMPORARY
F1B Fp RAILROAD CONSTRUCTION
FENCE
FIB _
F113 — _ �� EXISTING GUARDRAIL " " " °
\—Fj J
— _ ��� -18 - ❑ FIB UTILITY LINE FIB
'FIB—F B0 p
� \ _
FIB 01� ® FIB_
FIB-- ONE —I FIg
� FIBS FIB
OHE
FIB
\\
FIB_r SIDEWALK CLOSED F\B
\�. —FIB—\ /VO
COMPLETE EXCAVATION FOR -
\ 35' OPEN BOTTOM CULVERT
\ \ \ \ AND FOOTINGS F\e - :—� �—
NORTH
0 20' 40'
I I I
I
r
r \
O
EXISTING SPILLWAY -FIB
\ \ \\ (TO BE REMOVED)MO
�- �i c FIB. o`
-- SIDEWALK CLOSED 1 j� �' \0 a �cD :IBA\FIg FIB FIB
FIB \ % / I F\`d/ 0 FIBS --FIB -- FIB— FIE/ B- —--------
\ FIBS \ �� _ I �113
0 \ �✓ O ' �' / �B
\ FIB FID FIB--F C J _ FIB�—
IB — FID FIDFIB I O - r FIg
F1B —�ss�
i
r /
RG ROp.D / ! / o%\
00
1 I C REFER TO SHEET B-4.2
FOR SECTION C-C - -
��— � RESTORED RIVER \ \ \ I y
/ RESTORED RIVER / \ CHANNEL BOTTOM ` \
CHANNEL TOP OF BANK , ` \
WSE AT START OF THIS STAGE y \ \ \
APPROXIMATELY 951.30'
I DAM BREACHING SEQUENCE
STAGE 3:
/ \ 1. MONITOR WEATHER FORECAST FOR FIVE DAY FORECAST OF LESS
\ \ \ \ \ THAN 0.25 OF RAINFALL.
/ ! / 2. BEGIN 24-HR OPERATION UPON CLEAR WEATHER FORECAST. START
BYPASS PUMPING OVER DAVISBURG ROAD.
I / 3. COMPLETE COFFERDAM CONSTRUCTION (ALL FLOW VIA BYPASS
PUMPING NOW) AND CONTINUE INCREMENTAL DEWATERING TO
APPROXIMATE ELEVATION 944.
°o 4. CONTINUE EXCAVATION OF EARTHEN EMBANKMENT AND REMOVAL
OF EXISTING DAM STRUCTURE.
5. UPON DEWATERING BELOW ELEVATION 950, BEGIN DEMOLITION OF
- I EXISTING DAM STRUCTURE
6 INSTALL PERMANENT RESTORED RIVER CHANNEL THROUGH
DAVISBURG ROAD.
7. CONTINUE EARTH REMOVAL AND REMOVE EXISTING 36" CMP
8. COMPLETE EXCAVATION FOR 35FT OPEN BOTTOM CULVERT AND
I �\ FOOTINGS.
9. PREPARE FOR AND POUR PROPOSED CULVERT FOOTINGS AND
/ / \ WINGWALLS.
I I \ \ 10. CONSTRUCT RESTORED CHANNEL THROUGH DAM EMBANKMENT.
11. UPON ADEQUATE CONCRETE STRENGTH TESTS PER SPECIFICATION,
PLACE PRECAST BRIDGE STRUCTURE.
Az=mCOM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
*4441&7-
2800 WATKINS LAKE ROAD
OAKLANi)
WATERFORD, MI 48328
COUN"iY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAM BREACHING PLAN VIEW
STAGE 3
SHEET NUMBER
B -4.1 245
Q0
(M
X
N
2
U
ry
LC0
m
X
c
0)
ca
c
co
U
a)
O
c�
0
W
c�
U)
W
>
W
J_
LL
0
ry
z
U
<
W
no
75
<
0
N
IT
00
U)
0
z
Q
ry
0
N
0
0
0
<
U
0
U)
U
<
U
0
0
0
ry
00
<
0
0
W
U
u1
0
ry
o_
o�
I? ry
11-0
o�--
N w
O 0�
05
00
5= U
— W
U<
co
J
W
O �
N Q
� W
O z
�0
N
N W
0 ry
z ry,
03;
W U)
U
Oco
<w
�co
�0
a) 6
a E
ns
��
co
c 2J LL
<
Q
r+
O
D
970
950
SLIDE GATE TOP OF CONCRETE WALL
STARTING
WSE = —958' F-- TOP OF GRATING _ ROAD
STAGE 1
SPILLWAY
APPROX. WSE = 942.50'
--- STAGE S--
940
—0+30 0+00
36" CMP
INVERT OF 36" CMP (EL. 948.20')
RIP RAP
C
INVERT OF 36" CMP (EL. 950.45')
Station
SECTION B-B
EXISTING PROFILE THROUGH DAM
(REFER TO B-3.1 FOR PLAN VIEW)
H/VRATIO =5:1
1 +00
970
950
940
1 +50
W
<
Q
0
970
960 -
1=01�1
• I ,
936
0+00
'1STING GROUND
1 +00
Station
kNNEL BOTTOM
SECTION C-C
EXISTING PROFILE THROUGH EXISTING DAM AREA
(REFER TO B-4.1 FOR PLAN VIEW)
H/V RATIO = 5:1
LEGEND
EXISTING GROUND SURFACE —
CONCRETE BOUNDARIES
DEMOLITION TO 942.5'
[STAGE 3]
970
950
936
1 +50
LLJ
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328�UN iy
248.858.0906 TEL I G A F
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
PROPOSED CULVERT
PROFILE VIEWS
SHEET NUMBER
246
co
M
X
N
❑
U
ry
Q
IN
23)
n3
E
m
ca
c
co
a)
0
o_
C�
0
w
C�
U
w
z
in
J
(D
z
U
Q
w
m
Q
❑
m
U)
z
a
ry
N
O
O
Q
U
O
U)
❑
Q
U
O
O
rn
CD
ry
m
Q
Lo
O
U
w
O
ry
ry
C?O
ow
N �
O ❑
N
�o
0
IQ
_j
J >
N Lu
,z
Os
�z
ory
F\�ry
z�w
�C6
Qry
3:=
ujU
�C/)
=w
U c/)
�U
c E
�co
a�
c—
J LL
\F-T-i- f/B
Z
0
p GW
0
0
oa
SHEET
p� AREA 1 J-i
0
\ DAVISBURG ROA�
HIAWASSEE
RIVER TROUT
POND
LEGEND
PAVEMENT BOUNDARY WETLAND AREA l \1,
OVERHEAD ELECTRIC oHE
EXISTING MAJOR RIP RAP
CONTOUR LINE
EXISTING MINOR PROPOSED MAJOR ow
CONTOUR LINE CONTOUR LINE
FENCE LINE PROPOSED MINOR
EDGE OF TREE AND/ CONTOUR LINE
0 20' 40'
OR SHRUB LINE TEMPORARY
CONSTRUCTION
PIS
\ � — p RAILROAD FENCE
\ — F\_ - - — _ EXISTING GUARDRAIL °
FIB UTILITY LINE FIB
OHE
B—
—
HE
\
FIB -0HF _ G— \ \
FIB HE �
\ J FIB— O�E OHE ^ \—FIR_
\ / FI B �` Ok#� FIBS \ /
F
IOHE Lam_
FIB_\g/
FIB
SIDEWALK CLOSED F0 '
_Ij/ \ I /
oe
ZL2s OtiF\e REMOVE BYPASS PUMPS °
—����Q — AFTER REMOVAL OF
SHEETPILE
\0—�1B
-- SIDEWALK CLOSED I \ 7 � �g.G � .i-�_ �� a / � IB\\— — — FIB /
\ \ � 1 � �- � FIB-
FI Ig
�F \ I l i ` l B—FIB1B- FIBr�EJB-
\ \ 'O �i c9 \ I F\g O I E
_ \�F \ _
\ �C �I
\ \ \ \ \ FIB \ \ — O� IB _FID FIB / pO-� FIB
IB \ \ I E
�FID \ \ PROPOSED OPEN BOTTOM°N / —
��EiB �� \ X00 CULVERT (B-5.2) / ` 0*r E x
FIB FIB
\ — — — �— \ / / /
/ /
FIB 0 � �
BACKFILL AND RECONSTRUCT
ROADWAY / \ I I o
PID
001— lit
16,
/ _Z7 I / / MAINTAIN SEDIMENT MANAGEMENT
REMOVE SHEET PILES � / // AND OPEN FLOW PATH TO BYPASS
/ / r
PUMPING INTAKES UNTIL DEWATERING \ \ 1 \
COMPLETE AND CHANNEL CONSTRUCTION
THROUGH NEW CULVERT COMPLETE.
EDGE OF FLOODPLAIN
/r
EDGE OF FLOODPLAIN
RESTORED RIVER , \
CHANNEL TOP 0F BANK \ \ \ \ \ \ \ \ \
\ 1\ \
I \ DAM BREACHING SEQUENCE
I i RESTORED RIVER \ STAGE 4:
CHANNEL BOTTOM \ \ \ \ \
1. ONCE CULVERT IS INSTALLED AND WATER SURFACE ELEVATION LOWERED
TO APPROXIMATELY 944 REMOVE COFFERDAM TO OPEN FLOW THROUGH
PROPOSED/RESTORED RIVER CHANNEL.
2. REMOVE BYPASS PUMPING SYSTEM.
I \ \ \ \ \ \ 3. BACKFILL AND RECONSTRUCT ROADWAY.
Az=mCOM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD *4441&7-
OAKLAND
WATERFORD, MI 48328 COUN"iY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
DAM BREACHING PLAN VIEW
STAGE 4
SHEET NUMBER
B-5.1 247
Q0
(M
X
N
❑
_
U
ry
Q
❑
w
w
J
U
Lu
U)
O
IL
O
ry
0-
N
In
m
U)
0
z_
a
ry
N
O
O
0
Q
U
0
rn
cn
0
Q
U
0
0
0')
0
ry
D
m
r�
Q
0
v
rn
L0
0
c0
U
w
O
ry
w
0ry
oU
�w
N �
O ❑
N
mO
oU
IQ
�w
J >
❑
M w
,z
�O
o�
�z
�w
ory
F\�ry
z�w
�C6
Qry
3:=
ujU
�cf)
=w
U cf)
Z)
�0
c E
�co
a�
co LL
26' WING WALL SLOPED AT 2:1
BOTH SIDES
970
965
PROPOSED CENTERLINE OF ROAD
� 35'-92"' SPAN
VIEW OF UPSTREAM FACE OF PROPOSED CULVERT
NOT TO SCALE
I.
3
— BOTTOM OF FOOTING EL. 938.00'
1
T/ WALL EL. 957.17
2'
i CREST EL. 955.17'
11'-2"
EL. 944.00'
4' RISE
1 EL. 940.00'
26' V� ING WALL SLOPED AT 2:1
960 D+DTI I OIDED
955
PROPOSED (PEN BOTTOM PRE 3AST CULVERT \
SPAN: 35'-02"
TOTAL RISE OVER CHANNEL INVERT: 13-11"
TOTAL RISE OVER FOOTERS 15-2"
950 LENGTH: 80'
FLOW PROPOSED TOP OF BANK
945 PROFOSED CHANNEL INVERT
940
935
-60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50
PROPOSED PROFILE THROUGH DAM
(REFER TO B-3.1 FOR PLAN VIEW)
SCALE 1" = 5'
55
970
965
•m
955
950
945
940
935
60
P"=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328
248.858.0906 TEL
ATM
OAKLAND
COUN"IY
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD M
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX al,
'KINGf-ILLC
ARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
PROPOSED CULVERT
VIEWS
SHEET NUMBER
B-5.2
248
A=COM
El
-41
c
2)
m
I)
Lu
.E
E
c
N
0
co
(D
z
Q
Ir
I]
N
0
0
0
Q
U
0
rn
C�
I]
Q
U
0
0
rn
C�
Z)
m
Q
0
It
Cn
L0
0
c9
U
w
O
Ir
Ir
00
�w
N
op
N
20
a Q
m
>
J
iY
0
ow
"' z
O �
�z
cN w
N r'
rr
z�w
Ir -
�U
�cl)
=w
U co
�U
N Qj
> E
U�
J L.L
�J
FIB \\� �\ \\� 1 1 I \\\\ \VJNl \ ( / lzz
/ //-rl r�==r
—FIB J
___-_- r�` _
l L FIB
L�///// I I I I /l /rJ// ��////�� 964, g63�\/�!
(
Fes= 5/���� r r
_ =—
19
6�— \ _ _ _I 961 _\— 9— \ \
4 OtIE L 1 O _ _ I 961- - 962 _ \ 4, \8 J7 f \ \ \ \OBE\
FIB
r _ \\ \ \ \ \ \ \ \ \ \\ 1 I I 1� / -�— — \/ —
�� Fo J d�� / l F�h965
68 \ \ \ ��\ ` \ \ F III / \ / //`i �� \ �\ , - Fy6_
z
O
• � 0
o �
o Q
Q "E
DAVISBURG ROAD
SHEET 4AW\A-vSEE RIVER TROUT
AREA C_�� POND
I /
0
IF
I
IN
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC oHE
MAJOR
CONTOUR LINE
MINOR
CONTOUR LINE
GRADED AND
SEEDED
REPAIR OF I J J
PAVEMENT/TRAIL !r r I
AS NECESSARY
NORTH
0 60' 120'
\\\ �—--`� I - - —_ _ ==--1� �/ I II \ Ills
Fie���e _ \\
oi� / 965 \ -96 - --- 966--- FIB- V �_ - f = ham- =�i �`1 r
—��'\ _ r`� - — ,g58, 5i 5- __—\ I \ BASKETBALL—\—_—Lg
I I 1 \ — - 9�g5 — PICNIC s , - - - - _ _ _ _ _ I r \1 1
\ \ s \ ( AREA LLEY ss, - f ! 962 _ - = _ I �n111 _
;954 g53 \ \ I \ / COURT
U RT I/Q `
BALL /- --__�,�- -_:9 -968-
-959- — -g5� f g5� \ \ \ \\ % COURT_ — HORSESHOE / / �/ / � 958. BO. O��bj� \ 56--
- - 956 �� \ s2 \ l i �� / / _ a
J-°�1%� 957
- 957 - _ \ \ \ \ \ \ \ 1 AREA J i / / 56- \ 963` 964
95g =
957 /\
I / / / l l / / ,°�/ XIt
( \ \ \ �` \ \�, _ / J , J 6 Oxo` 956 \ \ w
/ I l l ` J J 1 / I l / I \ \ \ \ ,c• _ , 965 - - /I I r 5 / / ��
e / ./%� o� > v I
/ 957 95966`'�: ..11 l` I-@
ass °o�! / , , / / y -wo0; -- -I_ss4_ L _I- -� -I
� \ \ \ \ \ \ -_---- 4, / AREA TO BE / / — \\ �- =
O, '� o 03 � �1,1 \ \ so 1 \ � \ / \ 958
�= \
- ,958- r' /I \ `� �` PARKING r - - 196s / PROTECTED BY / / 95857
/ \ / g5g r/ w I I \ \ \ \ \ �\ \ L- I \ I /^ / / s I _
I I �� \ \ \ \ \ \ \ \ \ LOT \ I - \ I I CONTRACTOR / l / / / s� �`' ,
/ �� 96
/ — r r l 1 I I I ��A I \ \ \ \ d SHUFFLEBOARD \ \. 1 1 1 �/ \ �95453 � / �� 9s
957 I / 1 I I ,p s+0o1 ` \ \ \ \ ��, COURTS — \ / lqu)
P111C /rn / I I I �l \ \ \ \ 25+00 24+00 \ 23x
� I /"II//� °09 I\\/ / III \\� — \� \ ( \
/ \ 96I co I -J I ` -// // / \` \\ --- -956=\g5�957956 =_�_ - 7A> / s
_ _
�\, / \ \ \ \ \\ �� 9Sq \s\ �IL_- \ I war l9� \-- _--// \ \ \ �;_-----J -959 `�� / s
`! 00• —�1\\ 966—` S \ \_-------960 --—� _ 1 1 1 \ l�'-JI —
\ \ \ \ 9 ' \ \ \ \ / \ \ \ ) \ 961
9 �1 c\
94s \_ \961 \\ \ \\ \ \\ \ �/ / I �— \ \ \ 6�`�1J1 r / �'
l \ —
l\Q \\ \\\\\ �948\\\ col\ \946\--\�\ \\ 1\�\� \ \ I I \ 11
959
\ \ 46 1 �n \ ,r, co �0 9' - 958 - -
\ \\ 9s 1 \9 947-_\\\ \ \ l�l \ \ III I ` �, o� I I / I I \ I I1�1
\ e �'�� h�
\ss2 \ \ / / 1 \ \\ \s °' HART I rn a I \ /
1I / 1I ,1 TENNIS
_946 SEPTIC FIELDCENTER
19, COURTS
957_ \- `°\1'
PROTECTED BY 4�
94- CONTRACTOR
\I \ \
\
/ —960 -_\ �s\\\\\sxoa10
�a / I I I I I L 96�I I III\ I' II \ r - \ -
%\ \ 1s \ \ \ \ \ °� I \ J�\ \ \ / r 962 -
\ ,- - - - - 961
45.
r \ 1 1 I \ \\\ \\ \
\ \ \ 9r rn /
\ \ \ -=940949,9yy9S7� 64 ` l / .a6 0n / g - 956 \�� =_- 6/ f / h
- � —_� — erg, 5 � —5 `�` / I /
\ \ \ \ \ So \ 9 \ / g+00 . _ sz \ \ 9 9 / — GARAGE o 9 \ / I I I / I I /
v �--= - ,ice A'9 �� VA - 59 0, A
96 > I - \ ys \ \6 \ \ \ 944 �� \ \ G�_ �6 ---�- /g0 l Cg51 9
- 962-_ _ 2, \
cp
959,
g959 r—955
4
6/-963S -954 9
-960- 947 958 56 56
J te/J /r
/
\- t
rn g48/qb
9/
r
-\ 964-I \ - \ \ 966 \ \ \ �\ 49•\ Op0 0 1 \\ g55, , �� �� / / /- )
\ \ \ \ 9�/\ \ \ p\ \\ \\` // \\ gSA ��I / �r / — 958—_ice �-% f ch lin
960 \ \ \ \ \ \ \_ _ S0 \ \ _ — i— co cCD
o
962--\\9 950,\ \ \ 11+00 9s� \\ / 952 I �g�3t\ / I°j I 4?\ /g59_iJJ
\ s \\ \ \ \ _ / i i
965 -\ - \ -� \ \ \ \ 1 \\ \ \ \ 9S \ /\ _� _� I ,' 0 I ��f -
r 963-- 2_= - -//_
_--.9 --963\ \ \\ \\\ \ �� \�� \�\\\ \__--52> \\ \\ \\ 1 952_ / 953-/��/�I 949 ��949 / / �� rk —_ = 965____ 96�
\ \ \ \ 952 -7
II 959— l / 9 - �`<�/ / ���//// ��
\ ( _
� \ - 954 _ \
\I \ ` \ 6S\ \ 1 \ \ \ 9s1_j - --969
\ \ l \\ 965- 950
960 \ \ \ \ \ / III \
\ \ 962- \ --_ ll� 6 \ \� 9 _� -949 sx / 1 \ \\ \ \ ` I
\ I \ \ \ \\ \� 96\ 96\\ \�\ - 00 I 6/ / 9 \ _ /
\ I 1 r I 6j \ \ \ - - 963 �\ \\_- _ _ _958 _ - \ - \\ 9 --
o -- L 9 \ --96 = 959 = �\ ��\\�--9 �\ D1 --- - // \\
\�>,69-11 I \ � .c> \-/ \�---- - -n62 _�\�� �s�_ 9^^�\\\ 9\� +00 D1-- - / /
\ \ - - 964 _ - 96 S6
\�9\\ \ \ I I �_ 963 _ \_\\ s9s?\\ 13 ° e - -\\ I / J
\\96o / l l �
\�\���\� �\�_\\\\�`J \\_ J- -�-\ /�/-'- 967 I l ` \1�957, \ \ \\ �-_\ , / � I� I1\\\ 1\ \ �
\\ \o > e 952; '� / / / / / / III \ rn i
\\\-9) \��/1\ 966��\ \\—__ _ \,`' \\ / -ham // / I I I I I I \ 1 \ I
\\\�\�� s\ \\ \\, o `_-- �� \ \ � \ ems\ 9 \ _— -- 111)Illlli` 1\\\�\ \ \ 1 `\ \\\\\\ 1 ss\\—---__—� 952 / /
^ J / s \\ \ \ \ 9
5 3- \ � � 1 \ I \ \ �
\-
- ss �
- 955 - _ 4 _ - / / I \ \ 00 I \
\\\\ \\ \ rn I 96 i
-957^ _ _ —_—__ 1 / \ /
_ _
_�~\�-- --956 95 ----- - �/ /! o�j��r \ \ \\\J/ ///// /l / �) �% �J �\ l\l g6g��� I� I LIto
96 - s6 s - - 6957- --_ 5 I I I \ \ //
6_-_ ________ _968- \ III ( \ \\)-\ 11 _ !-- --I --- 95 '�/ / / ( / __= 9j \\� o
_ s \
-----_ — -969------_ - 69 - - \ II % \ ��_� _I_96� _ -I 956 ��/ I I 1 1 / / / // / (f / / \ �_
\ \ _=�- ��\�\ gj=__-_ ��/� _-_---_--- _--__ ^�" �� - ( / I ! _�`= ��_ '959_----957a�1/��
_ I `I,L L �1 =����1��`9�==981=-= ��_�� ==.974=_--/-- _- _ 94_\� -�\ \ / / --t-=��9f964_ ` \- J I IJ Ill f I
�r I ��` — \ J J ___--\_ - __��� \ \ \ I / 11 �' --- s _=-62=,\\_ \`— �95�1 1 963 I
L \982 �r �_-1\`1� 976 �� ---- --=n\ \ \ I / I rn-�7 \960� _9
_L I I I L L I l=���----_-=__= 979\\ \ I II I I /=968-961
qk-`_ \�� 5g
-7 - ��� ���=s8� ��iiJ�i-= r - L =_l 182.\\ l� l\ \ I 6�l \ -�/ / /O�o�� l \ '96g-���`_ 9Fg67-'=968r ! l \� \ /�g6 DAM BREACHING SEQUENCE
2 9a =_ — �I I I 1� l I I 1 �11 I // / / \ _ 9 /
J g1 1 ---- J oo \\g64 FINAL RESTORATION:
\
— -- —1. RESTORE DAM EMBANKMENT SITE.
I I� ----
r�
\ \ 1J III I I 1 \ \ \ \
- 969 - - \\ I / / - - - 971L - \ _ I
// I I \ I — — — \ 968_ J rg67- — 2. COMPLETE INSTALLATION OF RIVER FEATURES INCLUDING LARGE WOOD,
//// / // 1 1 1 \ J971 \\ \ / / \ — — — RIFFLE MATERIALS, ETC.
� 1 — — — — _ — — — — — — — 3. COMPLETE RESTORATION OF IMPOUNDMENT INCLUDING FINAL GRADING
�/ I I I I III / /l(► I) _ \ �/ / �--972----
I/lllf \ ----- _ ----- 69 --
/I—,�731�973--- -- \-971-\_ 9 _ AND SEEDING.
Imo--974 -\ - _
_ — � — -970- — — — — _ 4. RESTORE EQUIPMENT/MATERIAL STORAGE AREAS AND REMOVE ACCESS
\ \ \\\ _- /i%%/ /// 1 \\ \ \ \\ CN
J /--_---- - 974-_ 1 _ ----� \---- \ /
ROUTE AND RESTORE.
J �— �\ � �1�\)l\l�\ ✓ -\(J\\\\\\\\���\\-_i�jj/i/j// l / l �/i96 \ \ )/ //i _----_=-_s75 _973_____ 5. DEMOBILIZE.
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAN D COUNTY
PARKS
2800 WATKINS LAKE ROAD
OAKLAND
WATERFORD, MI 48328 COUNTY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX �
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30
2020-07-24
I/R DATE
KEY PLAN
100% DESIGN REVIEW
50% DESIGN REVIEW
DESCRIPTION
PROJECT NUMBER
60594641
SHEET TITLE
FINAL RESTORATION
SHEET NUMBER
B-6.1 249
0
CD
Z
Q
ry
0
N
0
0
0
Q
U
0
rn
CD
0
Q
U
0
0
rn
C�
m
Q
0
It
Cn
0
c9
U
LLI
O
rr
w
ory
?w
N
op
N
-67
20
J >
ry
o0
Z
-Z o
�z
N rr
rr
z�w
rr rrC0
rr
�U
�cf)
=w
U co
�U
co
U)Q)
m-
J L.L
LEGEND
\ 0
11) -J)/
962,
r '964 \ \ > -I I
PAVEMENT BOUNDARY PROPOSED�963 o
RIPRAP
OVERHEAD ELECTRIC oHE
ss
=_CFI 5-
e EXISTING MAJOR
= _ I
\ \ } \ \- \ - \ / ��, CONTOUR LINE
_ _=��\ ---- / /- F� 1 1 1 I 1 \ %� -- /i/ EXISTING MINOR
—Fib\o`\ \ 1 \ \ / ��%
/- - - \��-'IB //l / �� �` ` / �� \� I I 1 \ ----%- /�CONTOUR LINE
I
_ _ _ \ \ \ ( PROPOSED
MENNEN
962 ACCESS ROAD
/l �- y = - \\\`\ ` l\ ROOTWAD
_FIB
_ ;=— 1���� /��\ I I_JJI ��\�� \�\_ ///1(1(/ SPOILS AREA
r
< < \ / 1 ( \ of �� \ r`
�11�-965L-= L=`=�
FIBBj \-, ___-_� - _ - -� =_ _,�\`�_ =- =_-I J J I I III LIMITS OF
_Flg \ \ v - CONSTRUCTION
965 - -
� 965 _ Ili`
�-F) \�\\ `FIB.\ \���/� �1 //7 F\e ���'/�//// � / \�� �8--��F/13
NORTH
0 50' 100,
� FIB
•FIB l — — _ —\;��� — ' �•� r-i �
-965-965---FIB
/ 965 \ - ss6- - - FHB ` FI - _ - - - =I �I �I ��� ENGINEERED RIFFLE
o \ / \ e _ SEE DETAIL E 1 SHEET R 2.4
BASKETBALL v_—�rll — \----
'�_ —g COURT PICNIC ` — — / Csss- — — _ — — — — - _ _ \ I�I�jl�1,1�>)= = r \ — I J 1
o f = a.g53= \ \ o I RIPRAP BANK PROTECTION — =s63= ` L N I
- --96 ` , ; / g5 \ �� I I ,�, AREA VOLLEY - - \
/ \ \ \ \ \ \ \\ I �� IJ BALL _ - - SEE DETAIL D-3 SHEET R-2.4 -� - l96a s — = ` 1= -(
- ENGINEERED RIFFLE ,951 \ \ �s \ \ �` ) ! COURT / _ - - - g6R _ / / ��a`�°�� \ s - L�j
f 956 \ �' \ `� \ ' i - i \ - 59 - - -
SEE DETAIL E-1 SHEET R-2.4 o \ I \ \ \ \ \ \ } I HORSESHOE / / / r� ; i / - �. \ / 963% N 9
\\k\� J AREA ROOTWADS/ POOL
' 965SEE DETAIL D-4 SHEET R-2.4
66_ / / // ( / sow r1 96 \
�\\
sss _
\��\ 4 , AREA TO BE /\ f I I I �� h �. \ \\\(PARKING — — _ \ / / 958 - - ,� RIPRAP BANK PROTECTION- - PROTECTED BYJ- °\ \1 LOT ' 96S / / ' \ 95895� SEE DETAIL D-3 SHEET R-2.4 �= - - -
I v, �,
I � CONTRACTOR / / 5r \ � \,1
\
qj.
SHUFFLEBOARD
(I / / -153 - \\ �\ \ SE�TIC
I-2a
ROOTWA
DS/ POOL
9 \ COURTS FILD I 25 00 24+00
\ - / ,xoo SEE DETAIL D 4 SHE
ET R 2.4
ROOTWADS/ POOL /
SEE DETAIL D-4 SHEET R-2.4 —
Al \ \\ \$cG" \ \\ \ �s \�� \9s� r --I-_� I\I I \ \-� _/// / // l \ \�\ \---, ----- —\ ��95� _ _ram— .�a -' / \II-j
\ \ ` \ \ \ \ .9S4 J —FIB ) \ — _—_ / / \--------, — I v
�IL' -959 \ �\ _' \
ROOTWADS/ POOL \ \\ \\ \ \\9� �\ \�� �\\\ \��\ �-\ > 66-- -}--
\ \ s \ \ / / �' I l 1 1 961 ENGINEERED RIFFLE '�\ \ \
SEE DETAIL D-4 SHEET R-2.4 \ \ \ \ \ \ o \ I _ \\\ \ \ \ / / \ o, I r , \ ` \ 9\
-s4s, �s \\\\ \ SEPTIC FIELD = < \ \ L — — — — — — — SEE DETAIL E-1 SHEET R-2.4 s� / \
\L\ \ \ \ \ 8\ \ 9 ROOTWADS/ POOL \ \\\\ \ \ AREA TO BE
\\\ \ \ \ \ o \ 1 I SEE DETAIL D-4 SHEET R-2.4 � \\ \ \\�1 \ \ PROTECTED BY
\
1 I \ \ \ \ \\\ \ \\ CONTRACTOR
\ s, \ I 94s - _ \ \\ �\ �, HA 1 SPOILS AREA ^
\\\ \ 9s \ \ \\ I 1 � TENNIS \� �� I 1 958- - \
\o �\ I o _ �\ \ \�\\\ l I I I�' COMMUNITY I I / / � Jr'
\ \ \o s� \ \ 1 1 I li I \ \ _ _ - - \\\ \ \ \ \ \ \ \ \ 1 1 I I I CEfJTER I I I COURTS _Lo Lc)
\ �9SA ^1J/ /rl Ir,/
-_9559S
\957 sROOTWADS/ POOL 1k
�SEE DETAIL D-4 SHEET R-24
\
E R-1.4
945 j /oo
9aa �xoo\�
sow \\ os \ \ \\ \ \ \ \ 6xoo�a� j / I I I I I I I �\ l\\\l �- �) - I _ r -�� - ---- ��- Jyi / °><°°
�- ti �� ENGINEERED RIFFLE
� 9 / / I_ \ \\\ \ \ / / - / _ -- - � (' I / l f � o / / / I / SEE DETAIL E-1 SHEET R-2.4
\ I \\ \ \ \ \ v8 - 951 \ I / / / \
\\
\ \ \ \ \ 9Q�
9 956��•y.,64
�9i5 \ \\\ 9 \\ / ✓ \�952�\\\ \�9 \96 / �/ /'0%g5i\�\
\ ! \ 9s \ 9 _ S � �F2'� g6 / <` � 51 J � \ \ / /} o'h
i \ \ S�. \ \ \ �� \\ \ \\ \\ ���\�� _ -GARAGE / 956- - -
- 959 - \ r \ \ `9S r
`-q9�`\ \\ \\ �`\ �xo I 46 \\\ \\ \ \ \ \ \\9--_=_ ==J = I - J _ -J/ \' 60
6�ry \\\ \ \ I \ AS\ \ \ s9= -958=-. �-g51i .��_y7
\ \ \ \ \ - - - 957 = _ _ - \ h° / Al / _95
_ - -
s4948 0 1 \ \\ \\\ \ \\ \ //, \ v 5'//////I // Lc)
rl
_ - - - ENGINEERED RIFFLE ass \ \ \ \ s, \ 9�9 \ o \ \ \ \ 955 _ / /' \ /
\ \ \ 9b4 I I / / / / - --958' --/
\ SEE DETAIL E-1 SHEET R-2.4 \ \ss —
__
_-962 --+o0 9s \
\ 7- / \ ' / / / / yOy1-� \ c�7T — i
\ \ N / of I I' } / 6�
\ _ - _ 9 _ 963_
--963-\ 9S2 \\ \ \ \ `952- �_�' 953 �' �949 y 194 // j -965
96¢\ \\ \\ I ( co� \\ \\\\ \\ -953 \ \\\ \ \ \ 1 \ \ 952V//� /-68
- -- _------'
LJ.I - - 954
\ 1 I a)I \ 9 9 ss\ LJJ \ \ \ \ 1 \ \ \ ` 951 95°
° / �/ ENGINEERED RIFFLE - �r
\ I 1 1 \ I ROOTWADS/ POOL \ y - - _ _ - _ \`\ \ -4/ o _
\ 965- \ \ \ _ ��\ 1 \ \ 950/ / / �xo SEE DETAIL E-1 SHEET R-2.4 L J JI
SEE DETAIL D-4 SHEET R-2.4
\ \ 1 ! \
\ss \\ -'.\ / I`- ROOTWADS/POOL
— — - gad_ /
962-- \\°� `-- --9so \\\\� -.49_ �sX' / / \ SEE DETAIL D-4 SHEET R-2.4 I /
\ \ — — _
\ -- —963 —�� \\\�= —� 9S� -�� \\\\\ \�\\ ' \ \ _ �0 I - //o,�/ ,°9 / '\ r, \
_ _
--- \� \�\\`964------- /—_��=-s6jYs58 9\` = ENGINEERED RIFFLE \��ss0 ���r °NA // //' /%1 \ \ �1`
95 --- \ } /
\-/ \\---- �964 = _--963962- SEE DETAIL E-1 SHEETR-2.4960
�ssss,��+oo °�1-_- --\ / / / �i� I � I 11 I �\ \ I
I 1 / (/ /
\\\ \ J \\✓l \� -J -`s67J -I 1 ��\� \\\\ \ \\\\-- - -------95sso S0\/ / / / N I / / I III\ \\ \\ \ 1\ \ I / (j 9s�
- -\ I �\`I \Il 957 \ \ \\ \ --_ / / 1 I l ) I 1 \ \ \ 1 a I 1
968 / / - 5 y-
\\-- 96�\ / ,sss��\\\\ \ \_--__� - -952
ENGINEERED RI % SEE DETAILSHEET R-2.4955 /
`ems � __oo
Lo
\ r r- \\ �\\ �9 \� \ ss7�--_--_-_ - ---/ / �' °�`°� I I \ 1 \ \\ `9so 1
`� �l � 6., \-- -956 __- ---_-- --- _- / / 6�6%�
9- - s-�60 957
NOTES: 957--- -- __ 955
968
-
l� _I\ll l �_9 � --_-� -1 \I - _ -sss /i�� I ( I 1 1 I I /// ( _- \\971` �\ \
--- ___---__-�,_�� ��� _ 959--I �-957r-cN'////
1. FINE GRADING OF CHANNEL BED THROUGH DIG AND — —_— —_— _——__—_—_—_ — \ I \ ` _ _ — _ — — _— _— _— _— — — l r r
PITCH ACTIVITY ESTIMATED TO RESULT IN =_ ___ __ _ _ _—_— — — s7 \ \ I \ \ \ I I /967— — — — — I I c,1
----0 4�\ \ 1 I / rn�_--- 6964 963�62 �\�\ \J /i��O�J% J I I I I I I
_ _ _ -_o � _ _-- 9
BALANCED CUT AND FILL AFTER EXCAVATION OF — _ — \\ \ \ \ \ 1 I I 1 I / I I \ �' / _ _— �\� = 60� = s5g = S�_ 959 ���/j/
CHANNEL AND FLOODPLAIN TO LINES AND ( r r — — — ^ \�\ \ \ \ \ \ 4\ I ) 1 I
GRADES SHOWN ON DRAWINGS, MODIFIED AS _ = J — —I = =_=1J I \I \ / / / erg: J - - -969\ _ �____=96964=
---_ _ / / / �) \ f 967=-_- 7 / I 1 \ \ \ i' i/ i965 /' r / I \ \ I
REQUIRED PER INDICATORS OF PRE -DAM %_ _ _ _ _ _ _ �I�l \l \\I\� l 1 I \ \ \ III I I r I 9_ �\ l /
CHANNEL WITH ASSISTANCE OF ENGINEER. ALSO
SEE SPECIFICATIONS. �� o
I I I I J 967-
\\ ! / - \_J l I (- - ----r J I
\ J l J 11 I I I I 969 - v I I / / - - 971' \ \ \ / \ s68 _ ` \
970
a��- ' \\\.\\ �} i 1-__ �_ _-- \• \\\_ ---_ --`,\ _--J ---- /i _� _------
P"=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAN D COUNTY
PARKS
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328
248.858.0906 TEL
all
�TM
O KLANND
COUNTY
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
it-48.846.6558 TEL 248.846.6557 FAX
PRINGFIELD
I.HARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
SITE OVERVIEW
SHEET NUMBER
R-0.1 250
co
M
X
N
U
ry
Q
w
J
LL
O
ry
z
Q
Z
ry
c�
J
w
Z
z
Q
U
U)
CD
z
Q
ry
N
O
O
Q
U
O
U)
C�
Q
U
C)
0
rn
CD
ry
D
m
Q
0
O
O
CO
U
w
O
ry
IL
0ry
O W
N 2�
O
N
�0
�w
IL Q
�
>
J
M w
�z
�O
o�
�z
�w
ory
N r'
z�w
�C6
Qry
3:=
ujU
��
=w
U cf)
Z)
�U
ca ;_
�co
�a
c—
J LL
NOTES:
1. FINE GRADING OF CHANNEL BED THROUGH DIG AND PITCH ACTIVITY ESTIMATED TO RESULT IN BALANCED CUT AND
FILL AFTER EXCAVATION OF CHANNEL AND FLOODPLAIN TO LINES AND GRADES SHOWN ON DRAWINGS, MODIFIED
AS REQUIRED PER INDICATORS OF PRE -DAM CHANNEL WITH ASSISTANCE OF ENGINEER. ALSO SEE SPECIFICATIONS.
0 20' 40'
--— —
— 952 — -- -- - - ---- - -
4�\/� _� I\ / /I I I O/-------------------950
rr �\ / / I I
f ✓, / �/ �_\ / I/ I I I I I I I (D
949
948
U) I 947
/� AI I I I I > I I I IIIII / / — ---
III III I a III _ 946
945
PROPOSED CULVERT
X
94y4 / / I
43 / // // � I
— / l� I
Lo
19�
/ � I I
�
\\\ �1111�i
�If
%i i'� \ \\ II I I I� 1+00 I / III I I I I I I �6 _ co
/ \\J�II��� III I I I 9��, g s� \\ 1 II
/// j/� \�\��v\s\I IIIII \\ I I I
<�i��r,/(
If
ppp
V/
/ A I \\—��'-- R2.1
/ I ' ENGINEERED ---- RIFFLE /// // // I I I \ \\ \ / —
/ - — /
cu
R I I \ \ \ \ \ \ _ 944947
945
--_948
949'
—950
960 —Al 960
rn
O
+ /
O
II II Q
Q v) Lo \
c~n N N co / Q N \ — EXISTING GROUND
LEGEND 950 �o Q" , Wm 950
Q� w� m
�rn m m _
PAVEMENT BOUNDARY w II w �� / Q>
< i � J
OVERHEAD ELECTRIC OHE J 9c,w CD w
_ ��
MAJOR w
CONTOUR LINE � I \ � 0.30�
MINOR �1.00% 1.00Z0.30�
CONTOUR LINE 940 - ' 940
PROPOSED MENNEN PROPOSED CHANNEL BOTTOM FLOW
ACCESS ROAD
— ENGINEERED RIFFLE
ROOTWAD
--
SPOILS AREA
LIMITS OF — — 930co rn 0) 0) nIt nr- to too LoM �� LoM
CONSTRUCTION �� �o �� iT vice N NCB N
Lo 4
rn O rn CA rn O rn CD rn 0) rn 0 rn m rn m
PROPOSED y9w" wW� w� w� W� w� w� w
RIPRAP�
m m m m m m
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY 97
PARKS
2800 WATKINS LAKE ROAD
!"""'M
ML
ANIyD
WATERFORD, MI 48328
CO
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CHANNEL GRADING & PROFILE 1 OF 2
SHEET NUMBER
R-1.1 251
co
M
X
N
❑
U
ry
Q
IN
c
27)
m
w
ca
E
0)
ca
c
m
U
O
0
N
LL
O
N
w
I
LL
O
ry
a_
z
Q
0
z
0
ry
0
J
w
z
z
Q
_
U
N
U)
cD
z
Q
ry
N
O
O
❑
Q
U
0
rn
U)
C�
❑
Q
U
C)
0
rn
CD
ry
D
m
Q
0
c0
U
w
O
ry
IL
0ry
oU
�w
N 2�
C) ❑
0
0
IQ
�
>
J
(Y
M Lu
,z
�O
o�
�z
�w
ory
N r'
z�w
�C6
�ry
ujU
��
=w
U (l)
Z)
�U
caco
c—
J LL
NOTES:
1. FINE GRADING OF CHANNEL BED THROUGH DIG AND PITCH ACTIVITY ESTIMATED TO RESULT IN BALANCED CUT AND
FILL AFTER EXCAVATION OF CHANNEL AND FLOODPLAIN TO LINES AND GRADES SHOWN ON DRAWINGS, MODIFIED
AS REQUIRED PER INDICATORS OF PRE -DAM CHANNEL WITH ASSISTANCE OF ENGINEER. ALSO SEE SPECIFICATIONS.
959 \\ \\ \\ \ \\ I �g65
963
_960_`
\ \ \/---------956------------ —---------- ---- � � / �
955----------------------------- --- --- 956----- � �/' /� /,OIL
\ - — — — — — — — --------------
1 \\ \ \ \ \ \\ \ 0 / — — — — — — — — —— — — — — — - 952 - — — — — — — — -----954
NJ 00 1 \ \ \ / 1-1— --
N1 `9s, \ \ / / /—------051--- — — — — — — ���--_--_— // / 9y2 ------ J/
9
1 \\ \ \ �71� // /// // /----- '150�
949
A g48— 949
9 /
- --- --- - - - -
ENGINEERED RIFFLE
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC OHE
MAJOR
CONTOUR LINE
MINOR
CONTOUR LINE
PROPOSED M E N N E N
ACCESS ROAD
ROOTWAD
SPOILS AREA
LIMITS OF
CONSTRUCTION
.E
0 20' 40'
T
cy`/�Fsrq.
14'`p0
I/ /
OZ
X
-------------------
ENGINEERED RIFFLE
949 /
ENGINEERED RIFFLE
06
91952
— _-- \ �----------� __—���—
5
/
— — — — — — — — — — — — — — — —
----- —— — — — — — — — — — — — — ----
/ _ ——-- — — — — — — — — — — — — —
/ 956-------- — — — — — — — — — — — — — — — — — — — — —
__956
p /
970
960
950
rn
M +
+ I�
II II
O Y ffj
Ld� �
f 0-)m
m w II
w II C)>
J C.0 Lu
U w
i
1.007., a
EXISTING GROUND
I
I
v
0.307.
O
0�
O
O
00
00
o
rn
+
+
I
O
o
II
I I
II
Q
Q
~
(nOV
L0
Y�
Q
Y
Q
Ld
L
LL]ac
m v)
m
m
m
w II
w��
❑>
Ld
Q>
❑,
<Lj
LLJ
�w
LT
<'J
�-i
cr)w
1.00%
n.55%
FLOW
w
W "
o>
� W
CD UJ
L ENGINEERED RIFFLE (TYP.)
970
960
950
0.55%
940 940
— PROPOSED CHANNEL BOTTOM
_ 935
Lo CD cq N-t oN r O N co o N O Lo 00
cy N co 'i r�i L6 ao
-t� -t -t 4
w w w w Ld w w w
w
7+00 8+00 9+00 10+00 11 +00 12+00 13+00 14+00
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
OIL'D
WATERFORD, MI 48328
COUNTY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD J
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CHANNEL GRADING & PROFILE 2 OF 4
SHEET NUMBER
R-1.2 252
co
M
X
N
U
ry
Q
0
0-
a
Q
a�
Y
U
a)
L
U
m
c
27)
0)
0
10
c
m
0)
ca
c
co
c�
0
4
LL
0
M
w
I
LL
0
ry
0
z
Q
Z
ry
c�
J
w
z
z
Q
2
U
M
I
U)
CD
z
ry
N
O
O
Q
U
0
U)
C�
Q
U
0
0
rn
CD
ry
D
m
Cn
Q
0
rn
0
c0
U
w
0
a'
IL
ry
o0
ow
N �
0p
N
0
O w
IQ
� >J
M Lu
Iz
�0
o�
�z
�w
ory
N r'
z�w
�C6
D: —
�=
ujU
Q' (n
=w
U cl)
Z)
�U
�co
c
J LL
NOTES:
1. FINE GRADING OF CHANNEL BED THROUGH DIG AND PITCH ACTIVITY ESTIMATED TO RESULT IN BALANCED CUT AND
FILL AFTER EXCAVATION OF CHANNEL AND FLOODPLAIN TO LINES AND GRADES SHOWN ON DRAWINGS, MODIFIED
AS REQUIRED PER INDICATORS OF PRE -DAM CHANNEL WITH ASSISTANCE OF ENGINEER. ALSO SEE SPECIFICATIONS.
'�Loo
0 20' 40'
955
\ — 954—_ \ \�
i
41
-957
—
I — \ \ f ` 956 -�\��
\ \ \ —= ---- =--_ ti— ----957 ---�
\ \ \ -----------957---
951
i
v vv —956----- -- �
95Z�\\ �� 9SS\-------- I 'F'
---
CNI
/
--- _ ---- • -- --- ------ ----- - ---------- - Q
\
14+00 2 0 + 0 0 — b - .. 21 +00
D ---
c�
r_
Z
m
U)
D
-P
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC 0HE
MAJOR
CONTOUR LINE
MINOR
CONTOUR LINE
PROPOSED M E N N E N
ACCESS ROAD
ROOTWAD
SPOILS AREA
LIMITS OF
CONSTRUCTION
. .... s ITIMg�g��!���
Z
Q5
/ 953 U
952
953
CC
I C
954
950 ---- -- pO / i 954
ENGINEERED RIFFLE
spy -- __ -- N
4��
— ENGINEERED RIFFLE
960 CD
X J
19
i
o \
— 953
ENGINEERED
i
ENGINEERED RIFFLE
L — /
— — — 956
--957---�/
959
970 970
Ln
Ln N
O �
cn N N Lq (r) +
00 �' N + + CD
N
Ln Lo
I I Q
II II Q Q H-
960 " II
uj 960
Qo
Y Lo
� N
�a �� Cna Y� Q� w�
�U-) Yr Q� <" u'� m
Qr w� ujc �� m m w II
�� ry m m _ _ II w II o�
m II o o aUl
EXISTING GROUND m II w II o� � > � —(w
Lj
�-II Caw C�uJ
- CD w c� LEI 0.55% 9 5 0
950 �_ 0.55% 1.00% - —
0.55% 1.00%--C�.`'��
1.00%� ;ter �^ rr FLOW
_ C
PROPOSED CHANNEL BOTTOM — ENGINEERED RIFFLE (TYP.)
940 0 ro o 0 co � � 40
V) Lo n 00 m m O (D 00 N n O
I� O O 00Lq N O N
q- L Lo -It Lo Lo 0 L-0
Cn O) rn rn Cn Cy) rn 0 (3) rn rncy) rn rn rn rn
w w w w w w w w
14+00 15+00 16+00 17+00 18+00 19+00 20+00 21 +00
P"=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUNTY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI48350
248.846.6558 TEL 248.846.6557 FAX vo -4
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CHANNEL GRADING & PROFILE 3 OF 4
SHEET NUMBER
R-1.3 253
co
M
X
N
❑
U
ry
Q
IN
n3
E
0)
a3
c
co
U
0
c�
0
4
LL
O
w
I
LL
O
ry
❑
z
Q
c�
z
0
ry
c�
J
W
z
z
Q
U
U)
U
z
Q
ry
N
O
0
Q
U
O
rn
U)
c�
❑
Q
U
C)
0
rn
CD
ry
D
m
Q
rn
0
c0
U
W
O
ry
IL
0ry
O W
c)
N ❑
a� O
ow
IQ
—U)
J >
❑
M w
,z
�O
o�
�z
�w
ory
N r'
z�w
�C6
�ry
ujU
��
2 W
U cf)
�?
�U
cE
co
c
cn aJ
c
J LL
NOTES:
1. FINE GRADING OF CHANNEL BED THROUGH DIG AND PITCH ACTIVITY ESTIMATED TO RESULT IN BALANCED CUT AND
FILL AFTER EXCAVATION OF CHANNEL AND FLOODPLAIN TO LINES AND GRADES SHOWN ON DRAWINGS, MODIFIED
AS REQUIRED PER INDICATORS OF PRE -DAM CHANNEL WITH ASSISTANCE OF ENGINEER. ALSO SEE SPECIFICATIONS.
LEGEND
PAVEMENT BOUNDARY
OVERHEAD ELECTRIC
MAJOR
CONTOUR LINE
MINOR
CONTOUR LINE
PROPOSED
ACCESS ROAD
ROOTWAD
SPOILS AREA
LIMITS OF
CONSTRUCTION
PROPOSED
RIPRAP
NM
�c&
NF
42 i
� O /
sr
�oR-0
0 20' 40'
\ /\
� I \
11,
� ENGINEERED RIFFLE
h
k /
s � \
956 —
2g+Op
ENGINEERED RIFFLE
6Z
957=
\ \ 957
1
I
970
0')
_
Lo
r
Lo
rn
m
+
+
±
04
N
N
N
II
II
II
Q
Q
r_
�
v) rn
o
Cn O
N
Ln
Y
Y N
� uJ
960 Y�cy)
QLi Lo
�
��
v,
m
m
m
I I II
W II
w II
o>
M>
Q W
Q>
I C J
�J
OLU
�
I
950 �
94C -
r� 00
�0
N
0
w m
21+00
0.55% 1.00%_
— PROPOSED CHANNEL BOTTOM
Me
1
S•Z
L
/
/
4110
/
/
\ - ///�
ENGINEERED RIFFLE
zz
>
,lAr
00 00
o o
IN +
+ p 970
+ N
N N II II
I I Q <
Q H U) 0') N�
� (/) rn Y L6 Q ci
tn� YL6 QL wLo
�M m wll wll
m II II �Lu J60
< j �J �w caw
(•11.I
0.
%--- 0.43 �— O
).55%97!
1.00%
I — ENGINEERED RIFFLE
00
ro
N
0�
fi
� Lo
I�
Lo 0
0 U)
Lo Ln
r Lo
Lo Ln
rn
rn
rn
rn
rn 0)
rn a7
O)
w
w
w
0-
w
w
w w
w
ILw
w
w
w
22+00
23+00
24+00
25+00
26+00
27+00
28+00
950
w �
W
28+30.97
P"=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328
248.858.0906 TEL
OMLAND
COUNTY
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD J
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CHANNEL GRADING & PROFILE 4 OF 4
SHEET NUMBER
R-1.4 254
Qo
(M
X
N
❑
U
ry
Q
C�
❑
LL
O
U)
z
O
U
w
U)
U)
U)
O
U
z
O
U
ry
U
z
O
U
N
r'
U)
z_
a
ry
N
0
0
0
Q
U
0
rn
/U)
V
❑
Q
U
0
0
rn
CD
ry
m
Q
v
rn
0
cm
U
LLJ
O
ry
w
C) ry
C? O
C)
N 0�
0 ❑
N
0
OLu
I Q
J
❑
ow
M z
ti
o0
�z
�w
ory
N r'
z�w
Qry
3:=
ujU
�cl)
=w
U cl)
>?
�U
c E
�co
a�
c—
J LL
950
940 50
960 — --
950
WA
\ 950
EXISTING SURFACE
IV
—40 —30 —20 —10 0 10 20 30 40 50940
1 CROSS SECTION
R-1.1 STA.00+00.00
EXISTING SURFACE 960
PROPOSED CULVERT
II
II
- PROPOSED SURFACE
I I
935 50 —40 —30 —20 —10 0 10 20 30 40
2 CROSS SECTION
R-1.1 STA. 1 +00.00
EXISTING SURFACE
950 950
PROPOSED SURFACE
940 70 —60 —50 —40 —30 —20 —10 0 10 20 30 40940
QR-1.1
CROSS SECTION
STA.2+00.00
950
ME
50935
SCALE:
HORIZONTAL = 1" = 10'
VERTICAL = 1" = 5'
950 950
EXISTING SURFACE
\ \ PROPOSED SURFACE
940 30 -20 -10 0 10 20 30 40940
DSTA4 CROSS SECTION
R-1.1
.3+00.00
EXISTING SURFACE
950 � - - _ 950
PROPOSED SURFACE
I
940 50 -40 -30 -20 -10 0 10 20 30 40 50940
D5 CROSS SECTION
R-1.1 STA.4+00.00
950
940 50
��Z�1
940 50
—40 —30 —20
950
-
—10 0 10
QR-1.1
CROSS SECTION
STA.5+00.00
20 30 40 50940
EXISTING SURFACE
950
i
— — — \ PROPOSED SURFACE
—30 —20 —10 0 10 20 30 40 50940
0-1.1
CROSS SECTION
STA.6+00.00
Az=mCOM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD L. OAKIA T
WATERFORD, MI 48328 COUN"IY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
SPKIN(,FILLU,
CHARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CONSTRUCTION CROSS SECTIONS
1 OF 5
SHEET NUMBER
R_2. 1 255
Qo
(M
X
N
❑
_
U
ry
Q
U
z
O
U
w
U)
U)
rn
O
U
z
O
U
ry
U)
z
O
U
N
N
i
D_'
U)
cD
z_
a
ry
N
0
0
0
Q
U
0
rn
U)
C�
❑
Q
U
0
0
rn
CD
ry
D
m
U)
Q
v
rn
0
cm
U
LLJ
O
ry
w
ory
C?O
oU
�w
N �
O ❑
N
mO
U
ow
IQ
�
>
J
M w
�z
�O
o�
�z
�w
ory
N r'
z�w
�C6
D: —
Qry
3:=
ujU
�cl)
=w
U cl)
Z)
�U
c E
�co
a�
c—
J LL
41610,
EXISTING SURFACE
PROPOSED SURFACE
940 50 —40 —30 —20 — 0 0 10 20 30 40 50
U-1.1
CROSS SECTION
STA.7+00.00
EXISTING SURFACE
950
— PROPOSED SURFACE
1
—50 —40 —30 —20 —10 0 10 20 30g40
Q9 CROSS SECTION
R-1.2 STA.8+00.00
950
940 50 —40 —30 —20 —10 0
QR-1.2
CROSS SECTION
STA.9+00.00
EXISTING SURFACE
/ 950
PROPOSED SURFACE
10 20 30 40 50940
950
940 50
—40 —30 —20 —10 0
950 \ �
940 50
950 _ _
940 50
—40 —30 —20
i
—30 —20
QR-1.2
CROSS SECTION
STA.10+00.00
—10 0
QR-1.2
CROSS SECTION
STA. 11 +00.00
—10 0
QR-1.2
CROSS SECTION
STA.12+00.00
PROPOSED SURFACE
950
I
EXISTING SURFACE
10 20 30
10
10
20
PROPOSED SURFACE
I
EXISTING SURFACE J
m
30 40
EXISTING SURFACE
PROPOSED SURFACE
20 30 40
50940
950
50940
950
50940
SCALE: Az=mCOM
HORIZONTAL = 1" = 5'
VERTICAL = 1" = 5' PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
*4441&7-
2800 WATKINS LAKE ROAD
OAKLAND
WATERFORD, MI 48328
COUN"iY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
J.
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CONSTRUCTION CROSS SECTIONS
20F5
SHEET NUMBER
R-2.1 256
Qo
(M
X
N
❑
_
U
ry
Q
C�
❑
Sri
LL
O
co
co
z
O
U
w
O
U
z
O
U
ry
z
O
U
N
ry
U)
cD
z
a
ry
N
O
O
❑
Q
U
0
rn
U)
C�
❑
Q
U
0
0
rn
CD
ry
D
m
Q
0
cm
U
w
O
ry
w
a'
00
oU
�w
N �
O ❑
N
mO
U
0Lu
I Q
� w
J >
❑
M w
�z
o0
�z
�w
ory
N r'
z�w
�C6
D: —
Qry
3:=
ujU
�cl)
=w
U cl)
Z)
�U
c E
�co
a�
c—
J LL
EXISTING SURFACE
950 — — — 950
PROPOSED SURFACE
['IiI97
950 —
940 50 —40 —30 —20 —10 0 10 20 30 40 50940 940 50
14 CROSS SECTION
R-1.2 STA.13+00.00
960
EXISTING SURFACE
' 950
950 � — — -- � -950
PROPOSED SURFACE
940 50
940 50 —40 —30 —20 —10 0 10 20 30 40 50940
D15 CROSS SECTION
R-1.2 STA.14+00.00
F EXISTING SURFACE
950
PROPOSED SURFACE
940 50 —40 —30 —20 —10 0 10
9R-1.3
CROSS SECTION
STA.15+00.00
20 30
•.e
— --950
40 50940
—40 —30 —20 —10 0
917 CROSS SECTION
R-1.3 STA.16+00.00
EXISTING SURFACE
PROPOSED SURFACE
10 20 30 40
—40 —30 —20 —10 0 10
QR-1.3
CROSS SECTION
STA.17+00.00
—50 —40 —30 —20 —10 0
Q19 CROSS SECTION
R-1.3 STA.18+00.00
10
SCALE:
HORIZONTAL = 1" = 10'
VERTICAL = 1" = 5'
Aloe 7
11r-111
50940
ti •
EXISTING SURFACE
950
PROPOSED SURFACE
20 30 40 50940
nnn
EXISTING SURFACE
I
n C(l
PROPOSED SURFACE
20 30945
Az=mCOM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUN'IY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
SPKINC;F-ILLU,
CHARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CONSTRUCTION CROSS SECTIONS
30F5
SHEET NUMBER
R-2.3 257
Qo
co
X
N
❑
U
ry
Q
C�
❑
Sri
LL
O
co
z
O
U
w
rn
0
U
Z
O
U
ry
U)
z
O
U
N
r'
U)
0
Z
ry
N
O
O
Q
U
O
rn
U)
C�
❑
Q
U
0
0
rn
CD
ry
D
m
cn
>
Q
0
cm
cn
U
Lu
O
ry
w
ory
C? O
OU
�w
N
O ❑
N
75
mO
oU
ILQ
� w
J >
M w
�Z
�O
o�
�z
�w
ory
N r'
z<
w
0�C6
D: —
Qry,
uU
�co
=w
U c)
�U
a E
�co
N co 2
J LL
•••
950
945 50
—40 —30 —20 —10 0 10
20 CROSS SECTION
R-1.3 STA.19+00.00
•.s
r EXISTING SURFACE
950
PROPOSED SURFACE
20 30 40
-- —� _ EXISTING SURFACE
950
PROPOSED SURFACE
945 50 —40 —30 —20 —10 0 10 20 30
21 CROSS SECTION
R-1.3 STA.20+00.00
irZ:Y�7
EXISTING SURFACE
I
PROPOSED SURFACE
950
945 50 —40 —30 —20 —10 0 10 20 30
23 CROSS SECTION
R-1.4 STA. 21 +00.00
50945
[ 11<17
50945
950
50945
EXISTING SURFACE
-�
PROPOSED SURFACE
950
945 50 —40 —30 —20
EXISTING SURFACE
PROPOSED SURFACE
950
945 50 —40 —30 —20
EXISTING SURFACE
1
PROPOSED SURFACE
950
945 50 —40 —30 —20
—10 0 10
22 CROSS SECTION
R-1.3 STA.22+00.00
—10 0 10
24 CROSS SECTION
R-1.4 STA.23+00.00
—10 0 10
®R-1.4
CROSS SECTION
STA.24+00.00
20
SCALE:
HORIZONTAL = 1" = 10'
VERTICAL = 1" = 5'
30 40
20 30 40
20 30 40
950
50945
960
950
50945
950
50945
AzwCOM
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD OAKLAND
WATERFORD, MI 48328 COUN'IY
248.858.0906 TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX al,
SPKIN(;FILLU,
CHARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CONSTRUCTION CROSS SECTIONS
40F5
SHEET NUMBER
R-2.4 258
Qo
(M
X
N
❑
U
ry
Q
c�
❑
LL
O
Lo
co
z
O
U
w
U)
cn
O
U
z
O
U
ry
z
O
U
N
r'
U)
cD
z
Q
ry
N
0
0
0
Q
U
0
rn
U)
❑
Q
U
O
0
rn
CD
ry
D
m
U)
Q
0
v
rn
0
cm
U
LLJ
O
a'
w
C) ry
C? O
oU
�w
N
O ❑
N
�O
�U
ow
IQ
� w
J >
❑
M w
�z
�O
o�
�z
�w
o ry
N r'
z�w
�C6
D: —
Qry
3:=
ujU
�C/)
=w
U C/)
Z)
�U
c E
�co
a�
c—
J LL
960
950 50
—40 —30 —20 —10 0
26 CROSS SECTION
R-1.4 STA.25+00.00
10 20
)kOPOSED SURFACE
:XISTING SURFACE
30 40 50950
960 960
PROPOSED SURFACE
EXISTING SURFACE
950 50 —40 —30 —20 —10 0 10 20 310 40 50950
27 CROSS SECTION
R-1.4 STA.26+00.00
960 PROPOSED SURFACE 960
EXISTING SURFACE
950 50 —40 —30 —20 —10 0 10 20 30 40 50950
28 CROSS SECTION
R-1.4
DSTA.27+00.00
SCALE:
HORIZONTAL = 1" = 1'
VERTICAL = 1" = 5'
PROPOSED SURFACE
960
\� EXISTING SURFACE
950 50 —40 —30 —20 —10 0 10 20 30 40
9R-1.4
CROSS SECTION
STA.28+00.00
970
50950
ti
/
960 / - / 960
� 1 I
/ / I
i
i
PROPOSED SURFACE
EXISTING CHANNEL UNDER RR BRIDGE
950 50 —40 —30 —20 —10 0 10 20 30 40 50950
30 CROSS SECTION
R-1.4 STA.28+25.00
P"=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
*4441&7-
2800 WATKINS LAKE ROAD
OAKLAND
WATERFORD, MI 48328
COUN"iY
248.858.0906 TEL
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CONSTRUCTION CROSS SECTIONS
50F5
SHEET NUMBER
R-2.5 259
Qo
(M
X
N
❑
_
U
ry
Q
O
0
uj
J
Q
W
W
J
LL
LL
ry
N
ry
U)
(D
z
Q
ry
N
O
O
Q
U
0
rn
U)
C�
❑
Q
U
0
0
rn
CD
ry
m
Q
v )
rn
0
cm
U
w
O
ry
w
ory
C? O
ow
N
0 ❑
N
mO
�U
ow
5_ Q
� w
J >
❑
N w
�z
�O
o�
�z
�w
ory
F\r'
z<
w
0�
�—
Qry
3:=
ujU
�C/)
=w
U c/)
Z)
�U
c E
�co
a�
co LL
BANKFULL FLOW
BASE FLOW
SPACING SHALL BE
DETERMINED DURING
CONSTRUCTION
BY ENGINEER
BASE FLOW
BANKFULL FLOW
NON -WOVEN
'n Dp GEOTEXTILE FABRIC
_ VARIES
/ 'TOTAL LENGTH
PLAN VIEW
ELEV. PER PROFILE
SOIL WRAP
BASE FLOW
BANKFULL FLOW
6" TOPSOIL
SOIL WRAP
-SOIL WRAP
DEAD STOUT STAKE TO SECURE
GEOTEXTILE FABRIC
D-1
ENGINEERED RIFFLE DETAIL
NOT TO SCALE
6" TOPSOIL
6"BOULDERS
- REFER TO PLANS
SECTION A -A
FINISHED GRADE
SECTION B-B
VLV I IVIY V V
ELEV. PER PROFILE
f—SUBGRADE
P RAP
:OTEXTILE
BRIC
V-3" STONE VOIDS WELL GRADED
FILLED WITH SMALLER ROCK
MATERIAL WASHED IN 1' THICK
ELEV. PER PROFILE
BASE FLOW
//—BANKFULL FLOW
6" TOPSOIL
SOIL WRAP
SECTIOND—D O 1 "'"` VV UO WELL """"""
FILLED WITH SMALLER ROCK
MATERIAL WASHED IN 1' THICK
""� I URAL
OTEXTILE
kBRIC
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
7
2800 WATKINS LAKE ROAD 0411.
OAKLAND
WATERFORD, MI 48328 COUNTY
248.858.0906TEL M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
RIFFLE DETAILS
SHEET NUMBER
R-2.6
260
Qo
C0
X
N
2
U
ry
Q
0
0-
a
Q
a)
`1
U
a)
U
c
2)
Cn
m
0
w
c
a)
E
a3
c
co
U
0
Rennoye side branches Optional sealant
Sharpen end. paint
STEP 1
Obtain Willow or dogwood adventitiously rootable stock. Material should be from an area With similar soil,
climate, and location relative to the stream. The material shall be at least two years old and free of
disease, rot, or insect infestation. Material shall be harvested While dormant and soaked (1 to 14 days)
before installation.
2 ft
min
1
Note: A Waterjet (hydrod(ll) may
be used to create the pilot hole
in silt, loam, and some clay
soils. It does not Work Well in
large gravels and cobbles.
STEP 2
Create a pilot hole that is perpendicular to the ground surface and deep enough to reach the lowest water
table of the year. The hole shall be to the length of the live pole.
— 6"min.
y y Y
Note: If pilot hole is made With
a Water jet (hydro drill),
backfilling With Water soil slurry
may not be necessary.
y
STEP 3
Tamp live poles into hole. Top of cutting shall be above competing vegetation. Back fill hole With Water and
soil mix to achieve good soil to stem contact. Space stakes in a 1 to 3 foot random pattern.
D-1 LIVE STAKE DETAIL
C�
0
C/i_ 6" TOPSOIL
Q
~
w TIE IN TO GRADE, TRENCH IN MIN. V AND SECURE WITH STOUT STAKE
0
J
w
z
z COMMON FILL ON TOP OF ROOTWAD
U
ao �
N
r'
U)
0
z
Q BURY ROOTWAD IN STREAMBANK
ry
0
N
O
0
0
Q
U
Q
U
oI MIN 3 OF TRUNK LENGTH
EMBEDDED IN BANKS
CD
ry
D
m
SECTION A -A'
o
\ \ '°`
\\
o
\\
\ \�
�
U
\U
JI
O
r
\
oUUJI
75
m0
ow
IL Q
W ,
C w
J >
�o
N w
r z
�O
o�
�z
�w
o lY
F\r'
z�w
1 �;
�-
Qry,
UU
�ry
=w
U <n
�U
a E
to
f >_
in a)
J LL
ROOT WAD TRUNK
(MIN 3-6" DIA.)
EXCAVATE TRENCH LINE, WITH
NON WOVEN GEOTEXTILE,
BACKFILL WITH CLEAN GRAVEL
AND COMPACT
B'
�( PLAN VIEW
MIN. 1' OVERLAP WHEN CLUSTERED
D-4 ROOTWAD DETAIL
NOT TO SCALE
GUYING WIRES
REINFORCED HOSE
TREES SHALL BEAR SAME
RELATION TO FINISH GRADE AS
IN NURSERY
>
GUY TREES OVER 5'-0" HIGH
`
DO NOT PRUNE CONIFERS
12 GAUGE GALV. DOUBLE
/0
STRAND TWISTED GUYING WIRE,
3 GUYS PER TREE 120 DEG,
APART
3" MULCH
3" SAUCER
2"X2"X30" GUYING HA
STAKE
REMOVE BURLAP FROM TOP 1/ OF
BALL. REMOVE ALL PLASTIC AND ROT
PROOF RAP
SCARIFY SEITI G BED
TO 3 DEPTH
FERTILIZER TABLET, 1
PER SHRUB
4" LAYER OF BARK
MULCH BETWEEN SHRUBS
D
c
e D
0
900 GRAM WOVEN COIR FABRIC
ANCHOR COIR FABRIC MIN 1'
INTO BANK
1 I\/r nTAI/r tll ALITIAI/". (+
INTO STREAM BED
2 PLY REINFORCED RUBBER HOSE,
POSITIONED DIRECTLY ABOVE TREE
BRANCH
TURNBUCKLE AND
SURVEYORS FLAGGING TAPE
(WHITE)
PLANTING MIXTURE
SET BALL ON 6"
i i-i i i iTi-iTi- i i i-iTi-T�
- = -' -'"-"' COMPACTED TOPSOIL
2"
Ao
D
1�
D� o�
q
ROOT oos"
oa 5ALL j%p
o � —
o
IT- -
_ `%
ELIMINATE INDIVIDUAL
PLANTING WELLS FOR
MASS PLANTING OF
SHRUBS
SHRUB PLANTING DETAIL
D-2
N
� 1-
4" LAYER OF BARK
MULCH TYP.
PLANTINGS OCCUR ABOVE
THE OHWM AND EXTEND
TO THE TOP OF RIPRAP
PROTECTION,
MAX 2:1
ALUM. EDGING, SEE PLAN VARIES ACROSS BANK
FOR LOCATIONS (AVERAGE FT)
2" SAUCER TYP,
PLANTING SOIL MIXTURE r
2" WELL COMPACTED
PLANTING SOIL MIXTURE
VARIES, SEE PLANS
FLOOD PLAIN BENCH
NOTES
MAX. BANK FULL DEPTH 1.25-2.0'
THALWEG VARIES DEPENDING ON
CHANNEL PATTERN,
VARIES, SEE PLANS
FLOOD PLAIN BENCH
APPROX.
4 50—YR WSE
EXTEND RIPRAP MINIMUM (VARIES)
1' ABOVE 50-Y1R EVENT LEVEL
1 OHWM
`a RIPRAP (D50=6")
PLACED 15" THICK
\ APPROX. CHANNEL
III = BOTTOM
IE] (VARIES)
2'
EXISTING GROUND ��LI11, �{
�2.0'---m-
RIPRAP BANK PROTECTION
9
NOT TO SCALE
TOTAL WIDTH 36'
13'
BANK FULL WIDTH
TYPICAL POOL CROSS SECTION
VARIES 12-13'
BANK FULL WIDTH
6-7'
BOTTOM WIDTH
RIVER CHANNEL
CHANNEL LOW POI
TYPICAL CHANNEL CROSS SECTION
KEY -IN RIPRAP
BELOW CHANNEL 2'
FOR SCOUR DEPTH
VARIES, SEE PLANS
FLOOD PLAIN BENCH
_ VARIES, SEE PLANS
FLOOD PLAIN BENCH
OTES
MAX. BANK FULL DEPTH 1.25'-2.0'
THALWEG VARIES DEPENDING ON
CHANNEL PATTERN.
I
I I
3-
r_
LC0
M
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
Paw:]
2800 WATKINS LAKE ROAD
OAKLAND
WATERFORD, MI 48328
COUNTY
248.858.0906TEL
MICHIGAN
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
CHANNEL DETAILS
SHEET NUMBER
R-2.7
261
Qo
(M
X
N
❑
2
U
ry
Q
X
c
23)
cn
a)
i6
a)
E
a)
0)
ca
c
co
a)
a
c�
0
w
ry
w
O
w
W
O
7
w
ry
J
ry
U
Z)
ry
U)
0
u)
U)
U
z
a
ry
N
0
0
0
Q
U
0
rn
U)
0
Q
U
0
0
0
ry
D
00
Q
L0
0
cm
U
w
O
ry
w
�ry
ow
N �
O ❑
N
�o
�w
IL Q
�
>
J
N Lu
,z
o0
�z
ory
ry
z�w
�C6
� =
ujU
�cl)
=w
U cl)
Z)
�U
c E
�co
a)
co LL
v�-:�`\lI LEGEND
_FIB \\\— \�\ \ \\ \ \ \ \ \ \ \\ \\ \— I\\ \\�_ _ --� I / > 1 / I I •
---- FIB\\\ �\ \\ \ \\ \ \ \ \\ \\ \\ ��--- \�\\ �- —�� j{h��= �I I / I PROPERTY LINE -
- — --_ FIB — \ \ \ \ \ \ \\\ \ \ \ \ \ \ / / `_ti� PAVEMENT BOUNDARY RIP RAP NORTH
_ MATERIAL
\ OVERHEAD ELECTRIC oHE
�1\\\\\\\\\l / / /
_____—\�\\\ --- / / DAVISBURGRO
1 _ _ _ _ — — — — _ _ � ~\ — — � / I I I � 11\IIII / � / SHEET WATER SURFACE ---------- —
f---- — --- --� _II /� /� EXISTING MAJOR ELEVATION
�J HIAW SEE TROUT CONTOUR LINE
— RIVER
/,���� Fie I 1 r , / / / AREA
B —\\ �O POND EXISTING MINOR REMOVAL
I_ I l 1— I ( CONTOUR LINE
FENCE LINE x
FIB
\ \ _ --
EDGE OF TREE AND/
—_-- --- --_—_ 0 OR SHRUB LINE
—J FIB_
— __ _ FI ❑ > a LIMITS OF —
_ _ _ 1 — DISTURBANCE
\_F \ --__— — ---_ --_r— ��_ _------ ----
IB r
FIB
—FI OHE—�-----/�\\ \\\---- -- B_— _\ ---_ -- �\ \ ----
__ B 1 In
—011pre,— \ _ FI —
_
FIB HE OHE _--- — �\ FI e� _///��\\ — --_� ----- —� I 961--
-F --_ —--
IB ��IE o —_
H----- /
\ \ FIB E / \ �i= _ =_CFI$ \ —1 I I 1 I 1 rPIN,
FIB OHE ^I Il\961 _/��62
� � FIB I I III oHE�� � I
--- r �/ ll I --- -- ---- F\g
Jl��HE\1��1 \ FIB= I \\ l —_— / �
//// I /
\ _ —/////Ilp I-1_I � I I�\ll I I Fie �\I \
-- _ —/ �r� —_; ��///%�I III RHE III10 1II -- -- — -- - ---- - --
-- —
\\ ///IIIIIP I 1� OHE 11IIIIII / FIB / tjjll�/l
///I I lA
\\\� _ ��\\ Ilr��rl
IL FIB7 ��— —
\ OVERTOPPING RIPRAP — — —
— —
TO BE REMOVED
I--\-�—`\ -- FIB
\g B --
\\ F�J! --�\
FIB\ 1 --71 \J \
REMOVE AND REPLACE ROAD —
\—Fie
% I \ \\\\\\��\\/^I ��\ \ /F\g —\\ oy—FV
FIB
FIB, \ \ I I I ij \ \\\\\\\\� I F�8 _ _ \ ! FID (' FIB i ->T� FIE
FIB FI
--OVA v v v \ FIE V � \ FIE FIB _ A l
__�\\\\\ �\ \\ \\ \ FIB----F-F7 \— \\ \\ FIE\, \B \ \\ \
—1 fB \ID \ \ \ I \\ \ ONE
O
I \
�y� oN )
___ te_-__— —/ — FII? UP
Lj
V2
REMOVE FENCE LJ\\ I / \
—, — — WAIN I A116
/ / �/ / 1 li / — --- — — — — — — — — REMOVE FENCE
— CULVERT AND DAM REMOVAL
— -959--
(CHAIN LINK) .95i \ SEE SHEET S-1.1
— — — — — — — — — — — ---- % —
—__ 957
/ — INTAKE REMOVAL SEE SHEET S-1.1 \
SHEET PILE REMOVAL SEE SHEET B-4.1
,--
\\
`os
\9& \\
—958
� I I I I 1 1 1 \ \
w 1 1 \ \ \ \ \ \ `J \ \ \ \co') \ \
r I I I I I I 1 \ \ \ \ \ \ \ \ \ \
\6kI\� \ \\
L=com
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAND COUNTY
PARKS
2800 WATKINS LAKE ROAD
WATERFORD, MI 48328
248.858.0906 TEL
�TM
OAKLAND
M I C H I G A N
CHARTER TOWNSHIP
OF SPRINGFIELD 0
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAXi.�,,,
dHNGFIELC
ARTER TOWNSHIP
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
STRUCTURAL REMOVAL
SITE OVERVIEW
SHEET NUMBER
S-0.1
262
LC0
m
M
X
N
2
U
Q
5CALE I'- 20'
AwRox LoCATtON
' M gT U C . C.^ LSE
SxZ7 %
f
N1 FAt2K1N& 5"
(YYP
4- 5TF=E L GOARD VAI L
W/ WCOD HasT
5rpI 2-5
r
W
0
C6
J
0
75
W
75
Q
r]
U)
U
Z_
Q
0
N
0
O
i)
Q
U
0
o
0
U)
U
W
0
IL
o�
M
r— 0
o�
N W
o�
�o
00
�w
U)Q
M ,
J
W
_>
N W
N Q
r-- W
o Z
�0
N
Z
oW
ow
zry
Q
Q
W U)
�Fy
T-
o
U
U)
aw
D
-U
a) ai
>M E
�M
J LL
2aS' 1' ALNIJT
C-0m57RIJCT SI LTA-TtnW TRAP
eroa.s-Z
Co` I-11 CHPJN LINK ~FENCE x
t
KEMOvF- � REPLACE CIJAKD FAIL i SEA >DEi'r°.fL
AQD FEAJCE FOR ACCE55 Sa L F EACH TNI5 SHEET
FOz 0U`TLET�p
-15"FLE
Gd2 2 PIPE 15rR UCTLI I�
T = �5
WOODEN $Rini 4
p ZrcYJE- ILL
a
C-•� VENT
D ROCK �
APPRCx LCCAi ION
6" µP r.as rviAlt•! � `` � -
1 t, 2' SP L 17 f�AI L t
❑METAL
1�
STarz-L
-- W/
1
l
c.�,TC-
IN�
C
INC-
�.�9T3 � �C�h' WARE 1 �Sr11
*a � max— 6`HI C►L+llfy LINK 10"CMP
fEwCE
V
r -
TWIN G" L0005T
STEEL SHEETING W/
ANGLE [RON Top
�S6p:t
MILL_ TlDNc I
�' FLAN VIEW '
a�o. -42" x 3'p" 5L I DE. C, AT E
WAT�i2 ELEV 9E S. 35 (!4 22 -EN4
IATE LIMIT5 OF EAFTH GbF
FMr�ATErALJtu �51EiZG5CC E
As
f�E4L1 !
s
�I
K)
W
aj
-VF C)f= Cc"-- WALL .'
1` Lr V �� o
TOP CF C4RATI W=
5UMMER LC—VE L
ELEV g a
Wu•rrE-M LEVEi-
E
FULL OPEM P051TIOKUw55/6-0 X-x
1A1 AdZr. lx`X
'E EVISTIN4 SLLICE C,ATEtIINSTALL xx
TED 42" x 3G" -C— ' I' �� NUMIA1
[,ATE, SELF COA1TA IIJED. 86LT
4E -OF EXrSTINCI CfEMIPJCn IM X
DAMCE WITH MFEF. g-comMEmDwrpm. }
OPENIA 4.1 IF IeEO'D. TO '554 a
i
f1
&=MTOM aF FEAMF-
9S3.O J
z CU CYDS. COVC. YCAL
yr E
EKI�TINC� 5L e* THICKNESS
LNKNOWN
SECTi O N - �
XJ4> 55GAL E
Ft7N D
950
r
I "c'HAmf=4ER -Typ
ffOR RETAINING WALL
Ex1 Sr. Ge-Am
7t41s � t2"c
e—w.
12' M 11U.
Ex15TING 5TONE i NtwTAR
HEADWALL. A:oWNO 36 GI1 p
Tn aF—= Rj=MajED - CoN5T1zW
NEW YL" CONCRETE MLL.
POIX COWCCETE A4AIFJ5T
EXIST0J,11 e--jK76 J1uD.
��..e.
SFECTiON -A
HC)Kz .
SITE REMOVAL LEGEND
Kxx1DENOTES REMOVAL
WORK
NOTES:
1. PLAN IS NOT TO SCALE
2. SHEET IS FOR REFERENCE.
INFORMATION SHOULD BE VERIFIED BY
CONTRACTOR.
Know what's below.
Call before you dig.
PROJECT
DAVISBURG MILL
POND DAM REMOVAL
PART OF SECTION 17, T4N-R8E
SPRINGFIELD TWP., OAKLAND CO.
MICHIGAN
CLIENT
OAKLAN D COUNTY
PARKS _
2800 WATKINS LAKE ROAD ,`T.
WATERFORD, MI 48328 COUN-1OUNTD
CY
248.858.0906TEL MICHIGAN
CHARTER TOWNSHIP
OF SPRINGFIELD
12000 DAVISBURG ROAD
DAVISBURG, MI 48350
248.846.6558 TEL 248.846.6557 FAX
CONSULTANT
AECOM
27777 FRANKLIN ROAD
SUITE 2000
SOUTHFIELD, MI 48034
248.204.5900 TEL 248.204.5901 FAX
www.aecom.com
NOT FOR
CONSTRUCTION
REGISTRATION
ISSUE/REVISION
2021-07-30 100% DESIGN REVIEW
2020-07-24 50% DESIGN REVIEW
I/R DATE DESCRIPTION
KEY PLAN
PROJECT NUMBER
60594641
SHEET TITLE
EXISTING STRUCTURE REMOVALS
SHEET NUMBER
263
Davisburg Mill Pond Dam Removal and River Restoration
100% Design Engineer's Opinion of Probable Cost
18/2/2021
Item Descriptions
Site Preparation
Mobilization/Demobilization
Site Clearing
Haul Road
ISignage
Relocation of Park Features
Erosion Control/Sediment Traps/Erosion Control Blanket
(Dam Removal
Concrete demolition
Grouted Riprap Removal
Sluice Gate Removal
Grate Removal
136" Culvert Removal
JDam material disposal
Embankment Excavation
Flow Diversion (Bypass Pumping)
Traffic Management
Contingency Fund for Well Adjustments
Road Crossing Replacement
Precast Three -Sided Culvert with wingwalls and knee walls
113ackfill Structure CIP
Road Reconstruction
Form Liner on face of culvert wingwalls/headwalls
River Restoration and Sediment Management
Impound Excavation
Engineered Riffle
IRiprap Bank Protection
Channel Bed Materials
Habitat Boulders
Topsoil 6"
Live Stakes
Plants (Bare Root Stock)
Wetland Seeding in Floodplain
Upland Seeding
Erosion Mat on Floodplain
IFES Lift
Small Wood Rootwads
Contingency Fund for Tributary Stabilization
(Trail Replacement (Rotary Park)
Estimated Construction Cost
Contingency Cost
Estimated Project TOTAL
FINAL DESIGN
Unit Price
Quantity
SubTotal
$
236,000.00
Lsum
$
150,000.00
1
$
150,000.00
Acre
$
4,000.00
3
$
12,000.00
LF
$
20.00
950
$
19,000.00
LSUM
$
15,000.00
1
$
15,000.00
LSUM
$
15,000.00
1
$
15,000.00
LSum
$
25,000.00
1
$
25,000.00
$
219,171.17
CYD
$
20.00
55
$
1,100.00
SYD
$
6.00
777.778
$
4,666.67
EA
$
1,500.00
1
$
1,500.00
Lsum
$
1,000.00
1
$
1,000.00
EA
$
900.00
1
$
900.00
Ton
$
10.00
111.65
$
1,116.50
CYD
$
8.00
4861
$
38,888.00
Lsum
$
120,000.00
1
$
120,000.00
Lsum
$
20,000.00
1
$
20,000.00
Lsum
$
30,000.00
1
$
30,000.00
$
865,621.93
Ft
$
5,000.00
80
$
400,000.00
CYD
$
25.00
1458
$
36,457.50
LSUM
$
423,164.43
1
$
423,164.43
SFT
$
10.00
600
$
6,000.00
$
466,656.00
CYD
$
10.00
8700
$
87,000.00
SYD
$
80.00
450
$
36,000.00
CYD
$
101.00
180
$
18,180.00
Ton
$
71.00
84
$
5,964.00
Ea
$
125.00
50
$
6,250.00
SYD
$
2.70
24000
$
64,800.00
Ea
$
5.02
475
$
2,384.50
Ea
$
25.11
250
$
6,277.50
Acre
$
5,980.00
10
$
59,800.00
acre
$
3,000.00
2.5
$
7,500.00
$
3.00
18000
$
54,000.00
LFT
$
30.00
450
$
13,500.00
EA
$700
100
$
70,000.00
LSUM
$20,000
1
$
20,000.00
LSum
$
15,000.00
1
$
15,000.00
$
1,787,449.10
15%
$
268,117.36
$
2,055,566.46
1
08/02/2oJf4
AECOM
27777 Franklin Road
Suite 2000
Southfield, Michigan 48034
www.aecom.com
October 15, 2019
Mr. Andy Krumwiede
Oakland County Purchasing Unit
Executive Office Building 41 W-Lower Level
2100 Pontiac Lake Road
Waterford, Michigan 48328
248.204.5900 tel
Re: AECOM Contract #5528; Change Order #1 for Phase II of Mill Pond Dam Removal
and Restoration Design/Engineering Services
Dear Mr. Krumwiede:
This letter is in response the Change Order Request #1 for the Phase II of the Mill Pond Dam
Removal and Restoration Design/Engineering Services. Oakland County Parks and Recreation
Commission provided a scope of work that continues the work of the feasibility study
completed previously. AECOM has reviewed the scope of work and has provided a cost
estimate to complete the tasks according to the schedule provided.
Included with this submittal are the following attachments:
1. Resumes and project descriptions of our landscape architecture team that will
develop the conceptual park designs.
2. Cost estimate for completing the scope of work.
3. Comments on the proposed schedule.
4. Annotated scope of work with Task numbers corresponding to AECOM budget table.
5. List of assumptions and clarifications to scope of work
We look forward to working with Oakland County and Charter Township of Springfield to
complete this project. Please do not hesitate to contact me if you have any questions
regarding our cost estimate for this change order. We look forward to continuing our working
relationship on the Mill Pond Dam Engineering and Restoration Design.
Sincerely,
AECOM
Troy Naperala, PE
Project Director
265
AEOOM Contract #5528; Change Order #1; Phase 11 of Nall Paid Dam Removal and Restoration DesigrVEngirieering Services October 15, 2019
Attachment 1: Resumes and project descriptions of our landscape architecture team that
will develop the conceptual park designs.
This attachment includes resumes for tom Evans, Christian Lynn, and Matt Busa. These are
the key staff for the conceptual park plan task. Also included are project descriptions for the
FishPass project in Traverse City, MI; Poseyville Riverside Park in Midland, MI; Ash Pond
Wetland Restoration in Midland, MI; and Orchard Hills Park and Ecological Restoration in
Chester Township, OH.
266
,4=YOM
Education
BS, Landscape Architecture, The Ohio
State University, 1976
Years of Experience
With AECOM 30
With Other Firms 10
Registration/Certification
1979/1-andscape Architect/Ohio
2009 Project Manager Certification
2009 LEED AP Certification.
Areas of Expertise
Park Design
Stream Restoration
Stream Mitigation
Stormwater Wetlands
Wetland Restoration
Aquatic Habitat Restoration
Green Infrastructure
Urban Watershed Restoration
Storm Water Management
Grant Assistance
Thomas, M. Evans, ASLA, LEED AP
Green Infrastructure Design Services Director
Senior Project Manager
Mr. Evans has over 30 years' experience directing multidiscipline teams on
dozens of Parks, Stream and Wetland restoration, and Green Infrastructure
projects. Mr. Evans has extensive experience in the planning and design
of Parks which incorporate wetland and stream restoration, which
effectively provide flood relief and enhance water quality, as well as provide
other cobenefits such as trails, habitat restoration, and enhance community
aesthetics.
He recently authored a Chapter in the Water Environment Federation
Manual on Green Infrastructure Implementation on projects which provide
multiple benefits.
He has extensive Grant Assistance experience working with neighborhood
groups, municipalities and regional agencies. His track record of grant
assistance for watershed restoration projects is now over $10 million.
PROJECT EXPERIENCE
STREAMS/STORMWATER/WATERSHED
Union Street Dam FishPass Traverse City, Michigan: Directed
restoration planning and design for $16M dam replacement, river
restoration, and riverside park on the Boardman River in downtown
Traverse City. The project incorporates Dam replacement, Experimental
channel, Nature like channel, pedestrian bridge, kayak portage, research
building, park amenities, riparian revegetation, and educational signage.
Kid's Creek Restoration, Traverse City, Michigan: Directed restoration
planning for 1200 LF segment of Kid's Creek through an institutional
campus. Restoration Plan incorporated increased stream sinuosity, step
pools for aeration, and riparian buffer vegetation.
Project Manager, Riparian Restoration, Tittabawassee River, Midland,
Michigan: Directed planning and design of two riverside restoration
projects totaling $7M on former industrial properties located for one mile of the Tittawabassee River across from
downtown Midland. A former fly ash pond site was designed as a 17 acre stormwater wetland treating an 80 acre
urban watershed. An adjacent 12 acre former manufacturing site was designed to incorporate wetland, riparian
revegetation, trails, public art, a pavilion, and a pedestrian bridge.
Project Manager, Green Stormwater Infrastructure, Neighborhood GSI Planning, Detroit Water and
Sewerage Department, Detroit, Michigan: Directed planning to identify Green Stormwater Infrastructure
opportunities for 12 urban neighborhoods. Identified GSI opportunities for urban boulevards, for urban parks, and
267
AECOM Thomas M. Evans
Page 2 of 2
in high vacancy neighborhoods. Prepared planning reports containing conceptual plans, project narratives, runoff
reduction estimates, and cost estimates.
Project Principal, West Creek Confluence Restoration, NEORSD, Cleveland, Ohio: Directed Multidiscipline
team preparing construction plans for $3M urban stream restoration at confluence of West Creek and Cuyahoga
River. Project transformed highly channelized stream into 5 acre floodplain and oxbow habitat.
Project Manager, Upper 40 Steam Restoration, Mayfield Village, Ohio: Directed multidiscipline team for
design to restore floodplain functions to 1500 lineal feet of this channelized tributary of the Chagrin River.
Prepared successful grant application for $540,000. Directed survey, geotech, permitting, modeling, design,
bidding, and construction administration. HEC RAS modeling indicated that the project reduced peak discharges
by 35%.
Project Manager, Foster's Run Riparian Restoration, Mayfield Village, Ohio: Directed design and
construction to daylight 1500 lineal feet of stream and construct 2000 lineal feet of trail in North Chagrin
Reservation of Cleveland Metroparks. Directed extensive HEC RAS modeling to guide design of stream profile,
cross sections, and channel structures. Wrote successful grant for $780,000 in funding. Project design optimizes
meander wavelength within confines of ravine and incorporates cascades and step pools within floor of existing
wooded ravine. Project bids came in well under grant construction budget of $1,125,000.
Project Manager, Orchard Hills Park, Geauga Park District Chardon, Ohio: Directed multidiscipline team in
the design of a new 220 acre, $3 million park on former golf course. Park development includes access road,
parking lot, stormwater wetlands, bioswales, and lighting. Park structures include combined shelter, picnic
shelters, restrooms, and pergolas. Ecological restoration included 2000 LF of stream restoration, 60 acres of
reforestation, and 3.5 acres of meadow restoration. Project won Ohio ASLA award.
Project Manager, Pleasant Valley Park, Lake County Metroparks, Willoughby Hills, Ohio: Directed design of
a new 45 acre park on the Chagrin River. Park development includes ecological restoration of floodplain, a
variety of wetlands, and access road.
Project Manager, Wooster Memorial Park ADA Trails, Wooster, Ohio: Directed grant assistance and design
for 1 mile of ADA trails, boardwalks and ravine overlooks for this 220 acre park. Assisted Friends group to obtain
2 grants totaling $200k to fund the project.
Project Manager, Morgana Bluffs Nature Center and Learning Center, Boys and Girls Clubs of Cleveland,
Ohio: Directed design of a 5 acre urban stormwater wetland and outdoor land lab. Design included storm sewer
system to divert storm flows from combined sewer system, and an innovative zero discharge stormwater wetland
system. Wrote two grants, successfully obtaining $540k to fully fund design and construction of the project.
Project Manager, Steam Mitigation/Restoration, Pleasant Run Golf Course, Indiana DOT, Indianapolis,
Indiana: Directed preparation of construction plans and specification for mitigation/restoration of 6,300 lineal feet
of Pleasant Run located as mitigation for highway impacts. Restoration includes natural channel restoration, and
riparian vegetation restoration. The project carefully balances the needs of stream restoration and golf course
playability.
Project Manager, Oneida Wetland Mitigation Bank, Wisconsin Department of Transportation, Green Bay,
Wisconsin: Directed the preparation of construction plans to construct 41 acres of wetland mitigation within an
80 acre parcel to serve the immediate and future needs of Wisconsin DOT.
268
A_COM
Areas of Expertise
Park and Trail Design
Streetscape Design
Landscape Design
Restoration Design
Master Plan Development
Construction Documentation
Construction Administration
Years of Experience
With AECOM: 9 Years
With Other Organizations: 5 Years
Education
BA/2004/ Kenyon College
MLA/2007/Cornell University
GIS Coursework/Lakeland CC
Registration/Certification
Landscape Architect/NY
Landscape Architect/OH
Landscape Architect/PA
Landscape Architect/DE
CLARB Certified
Christian Lynn, PLA, ASLA
Senior Landscape Architect
Overview
Mr. Lynn is responsible for leading a wide array of Landscape
Architecture project types across the Midwest. He has a diverse array
of experience collaborating across all architectural and engineering
disciplines to develop more integrated design solutions. His work has
a common theme of strategically leveraging infrastructure -oriented
investments to support the creation or enhancement of public space.
Project Specific Experience
Poseyville Riverside Park Planning and Design, Momentum
Midland, Midland, MI: Project Manager for the conceptual planning
and final design for the development of 20-acre park along the
Tittabawassee River in Midland, Michigan. The property is the site of a
former concrete plant and has long been seen as an opportunity for
revitalization to support downtown Midland's strategic plan for
economic development. The plan calls for ecological restoration and
creation of habitat along the river, incorporating trails, boardwalks,
and overlooks to enhance the user engagement.
Holbrook Hollows Park Design, Geauga Park District Bainbridge,
OH. Project Manager for Geauga Park District's development of a
new park in the southwest corner of Geauga County. The park is a
regional asset, offering equal access and recreational resources for a
diverse set of neighbours. The park provides a unique piece of
architecture to support year-round use and offers miles of trails,
some of which provide regional linkages and a direct connection to
the Cleveland Metroparks
Huron Waterfront Park Concept and Feasibility Design, Liberty
Development Inc., Huron, OH: Mr. Lynn served as the Project
Manager for the conceptual redevelopment of a former ConAgra
industrial site near the confluence of the Huron River and Lake Erie.
Working with the developer and the City, AECOM developed site
analysis, and conceptual waterfront and trail alternatives for the
design of a new iconic waterfront park. With construction and
environmental constraints, the scope of work was driven by the need
to understand the feasibility and costs associated with the new park.
Blair Road Property Parking and River Access Improvements, Lake
County Metroparks, Leroy Township, Ohio: Task manager for the
development of a conceptual plan and construction drawings for a
new Lake Metroparks property along the Grand River. Resting in the
269
floodplain, various schemes were developed to understand flood
impact while ultimately providing patron access to the river for fishing
and kayaking. As part of the project, AECOM was also responsible for
executing a flood plain development permit.
DOW Ash Pond Wetland Restoration, Midland, MI: Led the
conceptual, schematic, and final design for the creation of 17 acres of
high -quality wetlands, incorporating public access and amenities
along the Tittabawassee River. The design focused around the
creation of 5 distinct habitat zones within the wetland.
Project Landscape Architect, Boardman River Dam Removal &
Restoration, Visual Impact Simulations, Traverse City, Michigan:
Lead landscape architect for the development of a series of
simulated images that would accurately illustrate the condition of the
Boardman River during and following the removal of an upstream
dam. Renderings were developed that would convey not only the
post -construction condition but also the process, allowing
communities to better assess the impacts and provide valuable
feedback.
Landscape Architect, West Creek Confluence Restoration,
Northeast Ohio Regional Sewer District, Cleveland, Ohio: Assisted
in the design of the $3M design/build stream restoration project to
restore a channelized stream bed, improve bank stabilization, support
ecological habitat and restore 5 acres of estuary floodplain. Primary
role revolved around the technological aspect of the drawing
creation, utilizing Civil 3D software to create alignments, profiles,
cross sections, and TIN surfaces.
270
A_COM
Areas of Expertise
Park and Trail Design
Streetscape Design
Landscape Design
Restoration Design
Master Plan Development
Construction Documentation
Construction Administration
Years of Experience
With AECOM: 6 Years
With Other Organizations: 3 Years
Education
BA/2007/ Georgetown University
MLA/2013/University of Maryland
Registration/Certification
Landscape Architect/MI
Landscape Architect/OH
CLARB Certified
Matt Busa, PLA, ASLA
Landscape Architect
Overview
Mr. Busa is a landscape architect who provides design services for a
variety of project types across the Midwest. He has a diverse array of
experience collaborating across all architectural and engineering
disciplines to develop more integrated design solutions. His work has
a common theme of strategically leveraging infrastructure -oriented
investments to support the creation or enhancement of public space.
Project Specific Experience
Poseyville Riverside Park Planning and Design, Momentum
Midland, Midland, MI: Landscape Architect for the conceptual
planning and final design for the development of 20-acre park along
the Tittabawassee River in Midland, Michigan. The property is the site
of a former concrete plant and has long been seen as an opportunity
for revitalization to support downtown Midland's strategic plan for
economic development. The plan calls for ecological restoration and
creation of habitat along the river, incorporating trails, boardwalks,
and overlooks to enhance the user engagement.
Holbrook Hollows Park Design, Geauga Park District Bainbridge,
OH. Landscape Architect for Geauga Park District's development of a
new park in the southwest corner of Geauga County. The park is a
regional asset, offering equal access and recreational resources for a
diverse set of neighbours. The park provides a unique piece of
architecture to support year-round use and offers miles of trails,
some of which provide regional linkages and a direct connection to
the Cleveland Metroparks
Huron Waterfront Park Concept and Feasibility Design, Liberty
Development Inc., Huron, OH: Landscape Architect for the
conceptual redevelopment of a former ConAgra industrial site near
the confluence of the Huron River and Lake Erie. Working with the
developer and the City, AECOM developed site analysis, and
conceptual waterfront and trail alternatives for the design of a new
iconic waterfront park. With construction and environmental
constraints, the scope of work was driven by the need to understand
the feasibility and costs associated with the new park.
Wooster Memorial Park Trails, Wooster, OH: Provided site design
and landscape architecture services for park expansion project,
including new parking lot, trailhead, ADA trails, boardwalks, overlooks,
picnic area, seating, and signage. The trail layout was designed to
271
meander in and out of mature woodlands and restored prairies,
incorporating a bridge, boardwalks, and overlook points that were
carefully chosen to showcase views of a deep wooded ravine. A
picnic area and bathroom were sited near the trailhead and parking
lot for easy access and maintenance.
FishPass at Union Street Park, Traverse City, MI: Landscape
Architect for this innovative project to enhance fish passage and
connectivity between the Boardman River and Lake Michigan.
FishPass will replace the deteriorating Union Street Dam in downtown
Traverse City, Michigan with an improved barrier featuring a fish -
sorting channel and a nature -like river channel. The project will also
incorporate public access, recreational, and park improvements.
272
AECOM - Park Planning and Design - Select Project Examples
FishPass at Union Street Park
Traverse City, MI
Client
Great Lakes Fisheries
Commission
Services
Landscape Architecture
Architecture
Geotechnical Design
Civil Engineering
Permitting
Survey
AECOM developed the planning and design for the first of
a kind facility capable of selective bi-directional fish
passage and testing multiple fish sorting technologies
and techniques. The rehabilitation of the Union Street
Dam, the lower most barrier on the Boardman River, a
coldwater stream habitat, provided a unique locational
opportunity for Fish Pass.
Key elements of the Fish Pass project include the
prototypical fish sorting channel, nature like bypass
channel, Researcher Building, riparian vegetation
restoration, and aquatic habitat. The project will control
the spread of invasive fish species such as sea lamprey.
The rehabbed dam represents the control structure
Boardman Lake, a 200 acre urban lake, located just
upstream.
Fish Pass is located in a riverside park in downtown
Traverse City. Key Park elements include a pedestrian
bridge, kayak portages, ADA compliant riverfront trail
linkages, fishing access points, and an outdoor education
area.
Design challenges include fitting all the programmatic
elements into compact site with a 20' vertical drop to
water elevation, and surrounded by existing residential and
institutional buildings.
Construction Cost
$8,000,000
Completion Date
Anticipated in 2021
AL
Key Contact
Dan Zielinski, PhD.,PE
Project Manager
dzielinski@usgs.gov
M��,
AECOM is providing a suite of multi -discipline services
including complex hydraulic modeling, structural design,
geotechnical design, permitting, Architecture, electrical
Engineering, and Landscape Architecture
273
AECOM
AECOM - Park Planning and Design - Select Project Examples
Poseyville Riverside Park
Midland, MI
Client Services
Michigan Baseball Foundation Waterfront Parks Planning
Parks & Trail Design
Wetland Restoration
Construction Cost
$4 million
Completion Date
2020 (Anticipated)
Key Contact
Dan Rogers
Michigan Baseball Foundation
(989) 837-6121
AECOM is working with the City and multiple community • Addition of a gateway to Midland from the South
stakeholders to develop restoration plans for two former
industrial properties, totaling nearly 40 acres and one mile • A new recreational amenity adjacent to the city park
of the Tittabawassee River floodplain. . A conveniently located outdoor education resource
Both properties are prone to annual flooding. The city
acquired a 14.5 acre flood prone site, previously a
concrete block plant, with FEMA funding. Conceptual
restoration plans call for this site to include 3000 feet
of floodplain restoration, 3 acres of restored wetlands,
a pedestrian bridge, recreational trails, river overlooks,
a mountain bike skills course and a public art gateway
element.
The adjacent property to the south, a former industrial
ash pond, will be transformed into a stormwater wetland
treating runoff from about 80 acres. The investment in this
site will provide a full ecological restoration, incorporating
nearly 13 acres of diverse wetlands, vernal pools, a
restored riparian edge, and forested uplands. Future plans
call for loop trails, boardwalks, overlooks, and interpretive
signage.
The Restoration Plan will provide additional community
benefits including:
• Restoration and beautification one mile of riverfront
across from downtown Midland
• A pedestrian bridge across the river to link loop trails to
downtown employees.
• AECOM also provided technical support in the
development of cost estimates, and the funding and
phasing strategy.
274
AECOM
AECOM - Park Planning and Design - Select Project Examples
Ash Pond Wetland Restoration
Midland, MI
Client Services
DOW Chemical Engineering
Hydraulic Modeling
Landscape Architecture
Restoration Design
Survey
AECOM's team of engineers, environmental
scientists, and landscape architects led
the wetland restoration associated with
the $3 million dollar remediation of a 25-
acre former industrial ash pond along the
Tittabawassee River.
In an effort to achieve their sustainability goals and support
the community's larger riverfront restoration initiative, the
client requested that the entire 25-acre site be fully restored.
HEC-RAS hydrological modeling determined that the site
would support approximately 15 acres of diverse wetland
habitat. The restoration was designed to incorporate 1700
feet of riparian restoration, upland meadows, vernal pools,
and submergent, emergent, and forested wetlands.
Initially, conceptual master plan drawings and renderings
were developed which included long-term plans to
incorporate over one mile of trails and boardwalks, river
Completion Date Construction Cost
Fall 2016 $3,000,000
overlooks, and interpretive elements. With the approval
of the concept, the team proceeded to develop detailed
construction engineering drawings.
In addition, AECOM provided construction administration
services for the duration of the project. Construction for
Phase 1 was completed in 2016.
L
i
PINIIFGT9FNE�_`u�xna ..,
Ak
xrerAwnw,wraem
Nxwxnmonwm.:um�
275
AECOM
AECOM - Park Planning and Design - Select Project Examples
Orchard Hills Park & Ecological Restoration
Chester Township, Ohio
Client Services Construction Cost Key Contact
Geauga Park District Architecture $3 million Matt McCue, PLA
MEP Engineering Director of Planning& Operations
Landscape Architecture Completion Date 440.279.0813
LEED Design September 2012 mmccue@geaugaparkdistrict.org
The design strategy for Orchard Hills Park established
concentric "zones of use" that organized site layout and
programming while minimizing environmental impacts. The
active use zone was located near the park entrance and
contains major park infrastructure, including the parking
lot, trail head, and lodge. A passive use zone encompasses
remote areas of the site with a focus on conservation.
The landscape architect led a multi -disciplinary effort to
restore the site's hydrology. Streams that had been piped
beneath fairways were daylighted, channelized stream
beds were realigned, and floodplains were re-established.
Bioengineering techniques were used to stabilize stream
banks and slopes with coir logs, erosion mat, and live stakes
until native vegetation could take hold. In areas with severe
erosion and steep topography, step pools were designed to
center the flow, take up grade, and dissipate energy.
The combination shelter and picnic shelters at Orchard
Hills reinforce the park district's established brand and
identity in the county. The buildings utilize stone for the fire
places, board and batten wood siding, and green shingled
roofs to emphasize the park district's brand. The multi-
use Combination Shelter provides seasonal outdoor use
with the fireplace and a 24' x 30' heated enclosed meeting
space for year round use. The Picnic Shelters provide
seasonal use through -out the year with a fire place in winter
months. The picnic shelters are located centrally with close
proximity to the sledding hill, cross country trails, and other
park amenities while still offering unobstructed views.
During initial construction, the park restored 50-acres of
forest and 22-acres of meadow. Over the next 10 years, the
park plans to reforest one former fairway per year.
Park amenities include:
• 3.6-miles of multi -use trails and boardwalks
• indoor/outdoor lodge
• four open-air shelters/warming huts
• waterless restrooms
• trail head kiosk
• fishing piers
• sledding hill
• interpretive signage
276
AECOM
AEOOM Contract#5528; Change Order#1, Please II of M➢II Pond Dam Removal and Restoration Design/Engineedrg Seances October 15, 2019
Attachment 2: Cost estimate for completing the scope of work.
The change order document requested the fee broken down by the following categories.
SOW Description
Preliminary Design Engineering
DEP, Budget Estimating
DEP, Construction Documents Bid Assistance
Contracting Administration
Grant Writing Assistance
Conceptual Park Design
Associated Task
Fee
Task 1- 7
$135,390
Task 2 and 6 (Budget Estimating
Only)
$2795
Task 8 and 9
$41,885
Task 10
$46,240
Task 11
Task 12
$6,480
$26,660
A comprehensive fee for all tasks is provided, along with hourly rates and other costs, on the
following page. Note, the "DEP, Budget Estimating" fee breakout in the table above is
included in the overall fee.
The estimated per meeting cost is $3,000.
277
Fee Proposal (Revision 1): Mill Pond Dam Removal and Restoration
Task
Task 1— Kick -Off Meeting
Regular Conference Calls
Task 2 — 50% DEP and Review
Task 2.1- Geotechnical Investigation and Foundation Design (AECOM)
Task 2.2— Flow Data Collection and Analysis
Task 3 — Facilitate Mtgs with Regulatory Agencies and others (2)
Task 4 — 75% DEP and Review, with renderings
Task 5 — Facilitate and Document Public Meetings (2)
Minimum of 3 Renderings/Models
Task 6 —100% DEP
Task 7 - Presentations of DEP to OCPRC and CTS (3) Meetings
Task 8 - 90% DEP Construction documents, Specifications, and Budget
Task 9 - Finalize DEP for permitting, bidding and procurement
Permit Applications, Bid Documents
Final Presentation Boards for Display (2)
Task 10 - Facilitate Contract Administration
Progress/Site Inspections
Task 11 - Grant Writing
Task 12 - Conceptual Park Design
Hours
Labor Rates
AECOM Fee Based on Previously Provided Rate Sheet
Other Direct Costs:
Geotechnical Investigation
Engineering Staff Other Direct Costs:
Travel
Printing & Reproduction
Other Direct Cost Total
Grand Total Cost
Mill Pond Fee by Task Grou
Task 1-7
Task 8-9
Task 10
Task 11
Task 12
Project director Project Manager
2
18
20
16
16
4
24
6
4
4
4
24
12
154
$180.00
$ 27,720.00 $
$4,368.00
$107, 580.00
$38,485.00
$46,240.00
$6,480.00
$26,660.00
2
18
60
24
16
16
20
Senior
Project
Engineer
2
18
78
24
16
16
18
AECOM Key Staff Hours
Project Geotechnical
Engineer Engineer
2
18
80 40
8
20
30
27
30
20
12
12
24
40
24
60
24
24
20
20
20
358
231
246
$180.00
$135.00
$100.00
64,440.00
$ 31,185.00
$ 24,600.00 $
$3,344.00 $1,698.00
$27,810.00
$3,400.00
$0.00
$0.00
$0.00
$135,390.00
$41,885.00
$46, 240.00
$6,480.00
$26,660.00
Prepared by TRN on September 20, 2019
Land. Arch. Construction Proj. Admin Total Hours
Admin
40
80
4
4
4 4
24 24
16
2
16
20
8
16
208
16 120
100 268 208 78
$135.00 $135.00 $100.00 $90.00
13,500.00 $ 36,180.00 $ 20,800.00 $ 7,020.00
1
$1, 800.00
Fee
8
$
1,190.00
72
$
10,710.00
334
$
45,170.00
10
$
1,260.00
48
$
7,560.00
48
$
7,920.00
0
$
-
48
$
7,920.00
80
$
10,800.00
82
$
10,730.00
24
$
4,320.00
0
$
-
117
$
15,465.00
64
$
8,940.00
68
$
9,040.00
28
$
5,040.00
172
$
25,440.00
208
$
20,800.00
36
$
6,480.00
196
$
26,660.00
225,445.00
$20,000.00
$9,410.00
$1,800
$31,210
$256,655
278
AEOOM Contract #5528; Change Order #1; Phase 11 of Nall Paid Dam Removal and Restoration DesigrVEngirieering Services October 15, 2019
Attachment 3: Comments on the proposed schedule.
The original SAC provided was missing the following tasks from the schedule list:
• Task 1: Kick -Off Meeting
• Task 3: Facilitate at least 3 Meetings with Regulatory Agencies and Others for
Permitting/Planning
• Task 4: 75% Design has been eliminated. This means that the reviews associated with the
deliverable is de scoped, but the design activities still occur under task 2.
• Task 6: 100%DEP
• Task 7: Present final DEP at 3 meetings with OCPRC and CTS
• Task 12: Conceptual Park Design
These tasks will be added to the schedule in the appropriate phases. Additionally, approvals
and tasks falling to the DT rather than AECOM will be highlighted in the project design
schedule —these included Commission Agendas, and CTS and OCPRC votes for approval.
These are critical path tasks but should be considered separate from the tasks for meetings
with OPRC and CTS for presentations/review of plans. Grant writing and applications was a
task included in the initial Design Engineering Phase, it is unclear whether that is meant as a
task for the DT or AECOM. Grant assistance is included in the schedule list now as its own
task, Task 11, under Final DEP, as it is assumed that final grant applications will need DT
approval and finalized plans and figures for final submission.
The AECOM Team proposes to provide a draft schedule as part of the kick-off meeting for
review with the DT. Based on feedback from the DT provided at the kick-off meeting AECOM
will finalize the schedule.
279
AEOOM Contract #5528; Change Order #1; Phase 11 of Nall Paid Dam Removal and Restoration DesigrVEngirieering Services October 15, 2019
Attachment 5: List of assumptions and clarifications to scope of work
To aid in reviewing the proposed fee and associated tasks, AECOM has divided the scope into
12 tasks. The attached scope of work associates Task # with project scope. The scope of
work is acceptable to AECOM with the following clarifications:
1. Rates are provided based on the rate sheet provided as part of the initial contract and
will be increased annually by 3%. Other disciplines may be required as the project
progresses.
2. Due to the length of the contract rates will be increased annually to account for COLA
and other adjustments.
3. Other direct costs and subconsultant costs will be passed through the contract with
no markup.
4. It is assumed that the County will be providing full time construction oversight and
administration including pay application review, grant reimbursement requests, daily
site inspections, and permit compliance.
5. AECOM will provide grant writing support related to technical aspects of the project
and will work with the DT to identify appropriate grants. Grant submittals and financial
tracking will be the responsibility of the County.
280
SEPTEMBER 1, 2021 AGENDA ITEM NO. 15
PLANNING & RESOURCE DEVELOPMENT
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
Melissa Prowse, Supervisor — Planning & Resource Development
Subject: Motion — Grant Acceptance — Michigan Department of Natural Resources Fisheries Habitat Grant
for Mill Pond Dam Removal and Restoration
INTRODUCTION AND HISTORY
Project History: Oakland County Parks and Recreation and Springfield Township share in the joint maintenance
and repair of the Mill Pond Dam as well as the maintenance of the Mill Pond in Springfield Township. This is due
to OCPR and Springfield Township being the majority landowners on either side of the Mill Pond and the dam.
The Mill Pond is part of Springfield Oaks Golf Course (it defines the north boundary of the golf course), and
OCPR also owns Rotary Park on the north side of the dam. Springfield Township owns and operates Mill Pond
Park, to the north and east of the Mill Pond.
Knowing the dam was reaching the end of its useful life and in need of repair, OCPR and the Township partnered
in 2019 to conduct a feasibility study for the dam, contracting with AECOM to produce the plan, including
significant public involvement. The final report indicated that due to the crushed outlet pipe that is not repairable,
the dam would need to be fully replaced, or removed. Replacement of the dam was estimated between $1.2M
- $1.3M. Removal of the dam and restoration of the natural stream channel was estimated at $1.5 - $1.7M.
However, there are multiple grant opportunities associate with removal of the dam, and no grant opportunities
associated with the replacement, therefore removing the dam should be less out-of-pocket expense for OCPR
and the Township than replacing the dam. There are also significant ecological and environmental benefits
associated with removing the dam, such as re -connecting the natural stream channel to the benefit of many
native species including rainbow darter, sunfishes, and state species of concern including mudpuppy and
rainbow mussels. The restoration of the impoundment back to prairie fen habitat will also provide critical habitat
and linkages for species such as the federally threatened eastern Massasauga rattlesnake.
Current Request: In February 2021 staff applied for a grant from the Michigan Department of Natural Resources
Fisheries Habitat Grant Program. We received notification of the grant award ($345,000) in May and received
the attached Project Agreement in July.
STAFF RECOMMENDATION
Staff is recommending the Commission approve the acceptance of the grant of $345,000 from the Michigan
Department of Natural Resources Fisheries Habitat Grant Program for the Mill Pond Dam Removal and
Restoration Project and forward the grant agreement to the Oakland County Board of Commissioners for their
approval.
MOTION
Move to approve the acceptance of the grant of $345,000 from the Michigan Department of Natural
Resources Fisheries Habitat Grant Program for the Mill Pond Dam Removal and Restoration project and
forward the grant agreement to the Oakland County Board of Commissioners for their approval.
281
'0F NATu? Michigan Department of Natural Resources — Fisheries Division/Grants Management
0
o
oN FISHERIES HABITAT GRANT PROGRAM PROJECT AGREEMENT
This information is required by authority of Part 5 of Act 451, P.A. 1994 as amended, to receive funds.
This Agreement is between Oakland County , in the county of Oakland ,
hereafter referred to as the "GRANTEE," and the MICHIGAN DEPARTMENT OF NATURAL RESOURCES, an agency of the State
of Michigan, hereinafter referred to as the "DEPARTMENT." Funds are appropriated from the Michigan Game and Fish Protection
Fund, the Michigan Game and Fish Settlement Fund, and the State of Michigan General Fund to the DEPARTMENT for the Fisheries
Habitat Grant Program (FHGP), through which the DEPARTMENT may issue grants for projects to support a variety of activities to
benefit fisheries, aquatic resources, and the public, including fish habitat conservation, dam removal and repair, and access to
recreation.
The purpose of this Agreement is to provide funding in exchange for work to be performed for the project named below. This
Agreement is subject to the terms and conditions specified herein.
Project Title: Mill Pond Dam Removal and Restoration
Project #: FH2O-016
Amount of grant: $345,000 90 % PROJECT TOTAL: $385,000
Amount of match: $40,000 10
Start Date: Date of Execution by DEPARTMENT End Date: October 7, 2022
As a precondition to the effectiveness of the Agreement, the GRANTEE is required to sign the Agreement and return it to the
DEPARTMENT within 60 days of the date the Agreement is issued or the Agreement may be cancelled by the DEPARTMENT.
This Agreement is not effective until the GRANTEE has signed it, returned it, and the DEPARTMENT has signed it. The
Agreement is considered executed when signed by the DEPARTMENT.
The individuals signing below certify by their signatures that they are authorized to sign this Agreement on behalf of their agencies,
and that the parties will fulfill the terms of this Agreement, including any attached appendices, as set forth herein.
GRANTEE
SIGNED
By [Print Name]:
Title:
Organization
Date:
DUNS Number
SIGMA Vendor Number SIGMA Address ID
MICHIGAN DEPARTMENT OF NATURAL RESOURCES
SIGNED
By
Grants Section Manager
Date of Execution by DEPARTMENT
282
CONTACT INFORMATION
This Agreement shall be administered on behalf of the DEPARTMENT by the Grants Management Section within the
Finance and Operations Division. All notices, reports, documents, requests, actions or other communications required
between the DEPARTMENT and the GRANTEE shall be submitted to the primary contact identified below:
GRANTEE CONTACT
Name/Title
Organization
Address
Address
Telephone Number
E-mail Address
DEPARTMENT CONTACT
Fisheries Habitat Grant Program Manager
Name/Title
Grants Management/DNR Finance & Operations
Organization
525 W. Allegan Street, Lansing, MI 48933
Address
P.O Box 30425, Lansing, MI 48909
Address
517-284-7268
Telephone Number
DNR-Grants@michigan.gov
E-mail Address
The DEPARTMENT and GRANTEE may by written notice designate a different primary contact with correlating information to
which subsequent notices, reports, requests, or other communications shall be sent.
2. PROJECT SCOPE
The FHGP application # FH2O-016 (APPENDIX A) is, by this reference, made part of this Agreement. This Agreement,
together with APPENDIX A, constitutes the entire Agreement between the parties.
Costs must be allowable, allocable, reasonable and consistent with the budget identified for completing the project as described
in APPENDIX A, including modifications to APPENDIX A, which must be requested and approved in writing. Only the agreed
upon project costs (including GRANTEE match) incurred during the project period are eligible for grant payment, unless
otherwise approved in writing by the DEPARTMENT.
3. PROJECT PERIOD
The project period is from the date of execution by the DEPARTMENT through the end date identified on page 1 of this
Agreement. The GRANTEE is expected to complete the project within the project period. Requests by the GRANTEE to
extend the project period must be made in writing a minimum of 30 days before the expiration of the project period. Extensions
to the project period are at the discretion of the DEPARTMENT and may be made only by an amendment to this Agreement.
4. GRANTEE DELIVERABLES AND REPORTING REQUIREMENTS
The GRANTEE must complete and submit bi-annual progress reports in accordance with the template and instructions
provided by the DEPARTMENT. This includes, but is not limited to, a narrative report and summary of expenditures on the
project proposed in Appendix A of this Agreement.
YEAR
DATE
REQUIRED INFORMATION
2021
11/12
Summary of accomplishments and expenditures (Template Provided)
2022
4/15
Summary of accomplishments and expenditures (Template Provided)
2022
12/7
Final Report (See Final Report requirements)
Within 45 days of project completion, the GRANTEE must submit final reporting documentation including a reimbursement
request, narrative report, final completion scorecard, and copies of written materials and/or photographs of program recognition
signs in accordance with the template and instructions provided by the DEPARTMENT.
283
5. CHANGES
Any changes to this Agreement requested by GRANTEE must be made in writing to the DEPARTMENT and are subject to
DEPARTMENT approval in its sole discretion. Changes requiring an amendment to this Agreement will be executed by the
DEPARTMENT and the GRANTEE in the same manner as this Agreement.
6. THE GRANTEE WILL:
a) Abide by all applicable local, State, and federal laws, rules, ordinances, and regulations in the performance of this
grant.
b) Obtain all necessary permits before commencement of the project. This Agreement shall not be construed to obligate
the DEPARTMENT or any other agency to issue any permit required for the completion of the project. It is the sole
responsibility of the GRANTEE to determine what permits are required for the project, secure the needed permits
and remain in compliance with such permits. The GRANTEE will retain a copy of all permits in the file and make
them available to the DEPARTMENT upon request.
c) Affirm to have control of the project area through fee -simple title, lease or other recorded interest in the project area,
or have written permission from the owner of the project area to complete project activities.
d) Instruct its contractors and volunteers to take steps to minimize the risk of spreading terrestrial and aquatic invasive
species during this project. Selection of project -appropriate measures should be dependent on the type of work
being conducted and the specific situation, including proper decontamination and disposal.
e) Abide by all State and federal threatened and endangered species regulations when completing project activities.
f) Be solely responsible for the operation and maintenance of the project activities that are the subject of this Agreement
and the actions of any employee or agent of the GRANTEE acting within the scope of their employment or agency.
g) Shall comply with the Employers Engaging in Unfair Labor Practices Act, 1980 PA 278, as amended, MCL 423.321
et seq.
This Agreement shall not be construed to require the DEPARTMENT to operate or maintain or to contribute to the operation
or maintenance of the project improvements and associated project activities that are the subject of this Agreement for the
course of the expected useful life.
7. PURCHASING AND CONTRACTING
The GRANTEE will:
a) Submit design plans, specifications, and/or bid documents for DEPARTMENT approval prior to seeking written
quotes or bids for contracts for purchases or services with a value equal to or greater than $5,000.
b) Provide design plans to the DEPARTMENT for review and approval at the 30%, 60%, and 100% complete stages,
unless waived by the DEPARTMENT in writing.
c) Upon DEPARTMENT approval of design plans, specifications and bid documents, openly advertise and seek
written bids for contracts for purchases or services with a value equal to or greater than $50,000 and accept the
lowest qualified bid as determined by the GRANTEE.
d) Upon DEPARTMENT approval of design plans, specifications and bid documents, solicit three (3) written quotes
for contracts for purchases or services between $5,000 and $50,000 and accept the lowest qualified bid as
determined by the GRANTEE.
The DEPARTMENT reserves the right to deny the use of any consultant, contractor, associate, or other personnel to perform
any portion of the project. The GRANTEE is solely responsible for all contractual activities performed under this Agreement.
Further, the DEPARTMENT will consider the GRANTEE to be the sole point of contact regarding contractual matters,
including payment of any and all charges resulting from the anticipated grant. All subcontractors used by the GRANTEE in
performing the project shall be subject to the provisions of this Agreement and shall be qualified to perform the duties
required.
8. ASSIGNABILITY
The GRANTEE may not assign or transfer any interest in this Agreement without prior written authorization of the DEPARTMENT.
9. NON-DISCRIMINATION
a) The GRANTEE shall comply with the Elliott Larsen Civil Rights Act, 1976 PA 453, as amended, MCL 37.2101 et
seq., the Persons with Disabilities Civil Rights Act, 1976 PA 220, as amended, MCL 37.1101 et seq., and all other
federal, State, and local fair employment practices and equal opportunity laws.
284
b) The GRANTEE agrees not to discriminate against an employee or applicant for employment with respect to hire,
tenure, terms, conditions, or privileges of employment, or a matter directly or indirectly related to employment,
because of religion, race, color, national origin, age, sex, sexual orientation, height, weight, marital status, partisan
considerations, or a disability or genetic information that is unrelated to the person's ability to perform the duties of
a particular job or position. The GRANTEE further agrees that any subcontract shall contain non-discrimination
provisions which are not less stringent than this provision and binding upon any and all subcontractors. A breach of
this covenant shall be regarded as a material breach of this Agreement.
No individual shall be denied access to grant -funded facilities or activities on the basis of religion, race, color, national origin,
age, sex, sexual orientation, height, weight, marital status, partisan considerations, or disability.
10. LIABILITY
The GRANTEE hereby represents that it will defend any suit brought against either party that involves title, ownership, or
specific rights, including appurtenant riparian rights, of any lands controlled by the GRANTEE connected with or affected by
the project.
The GRANTEE is responsible for all claims, demands, judgments, and expenses, including attorney fees, from any and all
loss, damage, or injury to person or property, or death arising under or in any manner related to the Agreement, the activities
authorized by the Agreement or the use and occupancy of the premises, project area or facilities.
11. CONFLICT OF INTEREST
No government employee, or member of the legislative, judicial, or executive branches, or member of the GRANTEE's Board
of Directors, its employees, partner agencies, or their families shall benefit financially from any part of this Agreement.
12. ANTI -LOBBYING
The GRANTEE shall not use any of the grant funds awarded in this Agreement for the purpose of lobbying as defined in the
State of Michigan's lobbying statute, MCL 4.415(2). "Lobbying" means communicating directly with an official of the executive
branch of State government or an official in the legislative branch of State government for the purpose of influencing legislative
or administrative action.
13. DEBARMENT AND SUSPENSION
By signing this Agreement, the GRANTEE certifies to the best of its knowledge and belief that it, its agents, and its
subcontractors:
a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
covered transactions by any federal department or the State.
b) Have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered
against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or
performing a public (federal, State, or local) transaction or contract under a public transaction, as defined in 45 CFR
1185; violation of federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery,
falsification or destruction of records, making false statements, or receiving stolen property.
c) Are not presently indicted or otherwise criminally or civilly charged by a government entity (federal, State, or local)
with commission of any of the offenses enumerated in subsection (2).
d) Have not within a three-year period preceding this Agreement had one or more public transactions (federal, State,
or local) terminated for cause or default.
14. IRAN SANCTIONS ACT
By signing this Agreement, the GRANTEE is certifying that it is not an Iran linked business, and that its contractors are not
Iran linked businesses, as defined in MCL 129.312.
15. AUDIT AND ACCESS TO RECORDS
The DEPARTMENT reserves the right to conduct a programmatic and financial audit of the project and may withhold payment
until the audit is satisfactorily completed. The GRANTEE must maintain all pertinent records and evidence pertaining to this
Agreement, including grant and any required matching funds, in accordance with generally accepted accounting principles and
other procedures specified by the State. The State or any of its duly authorized representatives must have access, upon
285
reasonable notice, to such books, records, documents, and other evidence for the purpose of inspection, audit, and copying.
The GRANTEE will provide proper facilities for such access and inspection. All records must be maintained for a minimum of
seven years after the final payment has been issued to the GRANTEE by the DEPARTMENT.
16. INSURANCE
The GRANTEE shall acquire and maintain insurance which will protect the GRANTEE from claims which may arise out of or
result from the GRANTEE'S operations under this Agreement, whether performed by the GRANTEE, a subcontractor or
anyone directly or indirectly employed by the GRANTEE, or anyone for whose acts may hold them liable. Such insurance
shall be with companies authorized to do business in the State of Michigan in such amounts and against such risks as are
ordinarily carried by similar entities, including but not limited to public liability insurance, worker's compensation insurance or
a program of self-insurance complying with the requirements of Michigan law. The GRANTEE shall provide evidence of such
insurance to the DEPARTMENT at its request.
17. OTHER SOURCES OF FUNDING
The GRANTEE agrees to notify the DEPARTMENT immediately if funding for the same or a substantially similar project is
received and to cease all activity under this Agreement until the difference in scope between projects is identified and agreed
upon by all parties.
The GRANTEE guarantees that any claims for reimbursement made to the DEPARTMENT under this Agreement must not be
financed by any source other than the DEPARTMENT under the terms of this Agreement. If funding is received through any
other source, the GRANTEE agrees to delete from GRANTEE's billings, or to immediately refund to the DEPARTMENT, the
total amount representing such duplication of funding.
18. ADVANCE AND REIMBURSEMENT
The DEPARTMENT will make payment to the GRANTEE as follows:
a) The DEPARTMENT will pay the GRANTEE a total amount not to exceed the amount on page 1 of this Agreement,
in accordance with APPENDIX A. Any cost overruns incurred to complete the project activities called for by this
Agreement shall be the sole responsibility of the GRANTEE.
b) To be eligible for payment, the GRANTEE must submit a complete payment request to the DEPARTMENT on form(s)
provided by the DEPARTMENT and have satisfied all progress reporting requirements due prior to the date of the
payment request.
c) The GRANTEE may request up to fifty percent (50%) of the approved grant amount as an advance prior to incurring
costs. The advance amount requested must be reasonable in relationship to the project's cash flow and necessary
for the success of the project. The entire advance amount must be earned and documented on a reimbursement
request before additional payments will be made to the GRANTEE.
d) The GRANTEE is required to submit documentation of all costs incurred, including the value of match and donations
made to the project. Documentation of expenditures and value of match and donations must meet written
DEPARTMENT requirements as specified in the FHGP Handbook for the year the grant was issued or the most
recent version of the FHGP handbook. The DEPARTMENT reserves the right to request additional information
necessary to substantiate payment.
e) The GRANTEE must submit a reimbursement request within six months of incurring project match or expense. The
reimbursement request must be for a specific identified time period and must contain all grant expenses, match and
donations that have occurred during that time period. Expenses not submitted within the correct time period or older
than six months may be considered ineligible for payment.
f) The GRANTEE is responsible for providing documentation of all matching funds committed to the project. If the
GRANTEE fails to meet the match obligation the DEPARTMENT may withhold or require repayment of grant funds.
g) The GRANTEE must be a registered vendor with the State of Michigan SIGMA Vendor Self Service (VSS) system
to receive payments. The registration website is: htti)s://sigma.michiqan.qov/webapp/PRDVSS2Xl/AltSelfService.
All grant funds will be paid by Electronic Funds Transfer (EFT).
h) Due to the State's year-end closing procedures, an estimate of expenditures from the GRANTEE's last
reimbursement request through September 30 must be submitted to allow the State to complete its accounting for
that fiscal year. Advance notification regarding the due date for the estimate of expenditures will be sent to the
GRANTEE.
286
i) The DEPARTMENT will hold back ten percent (10%) of the approved grant amount until review and approval of
project completion. Final payment of the remaining ten percent (10%) of the approved grant amount will be released
upon DEPARTMENT approval of the GRANTEE's Final Narrative Report, Final Completion Scorecard, Final
Reimbursement Request and satisfactory project completion as determined by the DEPARTMENT.
19. CLOSEOUT
A determination of project completion, which may include a site inspection and an audit, shall be made by the DEPARTMENT
after the GRANTEE has met any match obligations, satisfactorily completed the activities, and provided products and
deliverables described in APPENDIX A.
Upon issuance of final payment from the DEPARTMENT, the GRANTEE releases the DEPARTMENT of all claims against the
DEPARTMENT arising under this Agreement. Unless otherwise provided in this Agreement or by State law, final payment
under this Agreement shall not constitute a waiver of the DEPARTMENT's claims against the GRANTEE. All records must be
maintained for a minimum of seven years after the final payment has been issued to the GRANTEE by the DEPARTMENT.
The GRANTEE shall immediately refund to the DEPARTMENT any payments in excess of the costs allowed by this
Agreement.
20. CANCELLATION
This Agreement may be cancelled by the DEPARTMENT, upon 30 days written notice, due to Executive Order, budgetary
reduction, other lack of funding, upon request by the GRANTEE, or upon mutual Agreement by the DEPARTMENT and
GRANTEE. The DEPARTMENT may honor requests forjust and equitable compensation to the GRANTEE for all satisfactory
and eligible work completed under this Agreement up until 30 days after written notice, upon which time all outstanding reports
and documents are due to the DEPARTMENT and the DEPARTMENT will no longer be liable to pay the GRANTEE for any
further charges to the grant.
21. TERMINATION
Failure by the GRANTEE to comply with any of the provisions of this Agreement shall constitute a material breach of this
Agreement.
Upon breach of the Agreement by the GRANTEE, the DEPARTMENT may, in addition to any other remedy provided by law
a) Terminate this Agreement; and/or
b) Withhold and/or cancel future payments to the GRANTEE on any or all current grant projects until the violation is
resolved to the satisfaction of the DEPARTMENT; and/or
c) Withhold action on all pending and future grant applications submitted by the GRANTEE under the FHGP and/or
d) Require repayment of grant funds already paid to GRANTEE; and/or
e) Require specific performance of the Agreement.
287
APPENDIX A
FISHERIES HABITAT GRANT APPLICATION #FH20-016
(incorporated herein by reference)
288
SEPTEMBER 1, 2021 AGENDA ITEM NO. 16
PLANNING & RESOURCE DEVELOPMENT
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
Melissa Prowse, Supervisor — Planning & Resource Development
Subject: Motion — Approval of License Agreement with Electrify America for JEEP Branded Electric Vehicle
Charging Station at Holly Oaks ORV Park
INTRODUCTION AND HISTORY
Staff were approached by both JEEP and Electrify America about an opportunity to house a solar -powered
electric vehicle charging station at Holly Oaks ORV Park. JEEP has partnered with Electrify America to place
these charging stations at various high -profile off -road locations around the country. The charging station will
be located in the Holly Oaks ORV Park parking lot. Electrify America will cover all costs associated with
installation of the charging station, as well as all maintenance costs. In addition, Electrify America will pay
Oakland County Parks and Recreation $100 per month while the station is at Holly Oaks.
With the Holly Oaks parking lot Phase II construction pending for next year, Electrify America has offered to
provide a temporary unit to be installed this fall (ideally prior to the Detroit 4Fest taking place September 24-
26). They will then, at no expense to OCPRC, replace it with a semi -permanent charging station next year
once the second phase of the parking lot is complete and staff can designate a permanent home for it.
At the time of agenda publication, the agreement was still being reviewed by Corporation Counsel.
The agreement will be e-mailed to Commissioners prior to the Commission meeting. The term of the
license agreement is through December 31, 2023. Staff feel that this is a unique and exciting way to provide
electric vehicle charging at the park while building our relationship with JEEP and aligning nicely with the
direction and discussion of the OCPR Sustainability Committee. Staff will promote and highlight the new
charging station through a press release and social media posts.
STAFF RECOMMENDATION
Staff recommends the Commission approve the license agreement with Electrify America for a solar -powered
vehicle charging station to be located at Holly Oaks ORV Park through December 31, 2023.
MOTION
Move to approve the license agreement with Electrify America for a solar -powered vehicle charging
station to be located at Holly Oaks ORV Park through December 31, 2023.
289
CHARGING STATION SITE LICENSE AGREEMENT
This CHARGING STATION SITE LICENSE AGREEMENT (the "Agreement"), dated as of
, 2020 (the "Effective Date"), between the County of Oakland, by and through its
statutory agent, the Oakland County Parks and Recreation Commission, 2800 Watkins Lake Road,
Waterford, Michigan 48328 ("Licensor") and ELECTRIFY AMERICA, LLC, a Delaware limited liability
company ("Licensee"), whose address is 2003 Edmund Halley Drive, Suite 200, Reston, Virginia 20191
(Licensor and Licensee being each herein referred to as a "Party" and collectively as the "Parties").
RECITALS
A. Licensee wishes to create electric charging stations for electric vehicles throughout the
United States at various locations;
B. Licensor desires to participate in Licensee's network of charging stations for electric
vehicles in the United States;
C. This Agreement sets forth the agreement of the Parties with respect to Licensor's license
to Licensee.
AGREEMENT
1. Basic Provisions.
a. License Premises. The Licensor hereby licenses to Licensee approximately three hundred
and twenty square feet (320 sq), which will result in two (2) electric vehicle ("BV") charging parking spaces
(the "License Premises") at the location depicted on Exhibit "A" attached and incorporated hereto, together
with all related equipment, in order to build two (2) electric vehicle charging stations ("Charging Station")
to charge EVs.
b. Fee. Licensee hereby agrees to pay Licensor a license fee equal to $100 per Charging
Station per month, starting on the Commencement Date (as defined below) and continuing until the
Expiration Date (as defined below) as consideration for the Agreement herein.
C. Term. The term ("Term") of this Agreement shall commence on the Effective Date and
end on December 31, 2023 (as extended from time to time, the "Expiration Date").
d. Commencement. The "Commencement Date" shall mean the date on which the Charging
Station is first operational.
e. Extension. Prior to the Expiration Date, License may request, in writing, an extension of
this Agreement for a period of three (3) years, which request may be granted or denied at the sole discretion
of the Licensor through its Parks and Recreation Executive Officer or his/her successor. In the event this
Agreement is extended, this Agreement shall continue based upon the identical terms and conditions
contained herein.
f. Expansion. Licensee may request, in writing, an expansion of the License Premises to
include up to an additional three hundred and twenty adjacent square feet (320 sf) for two (2) additional
290
charging stations. Licensor through its Parks and Recreation Executive Officer or his/her successor may
grant or deny such request is its sole discretion. Licensor shall permit Licensee to prepare plans and
specifications for such additional space, pull the permits, and upon receipt of permits, build out such
additional spaces with additional Charging Stations, at which time such additional space shall be part of the
License Premises. In the event Licensee exercises such expansion option, the Fee set forth in Section 1(c)
of this Agreement shall be applicable to each additional Charging Station under the expansion per month
for the remainder of the Term.
g. This Agreement covers only the License Premises and the non-exclusive use, in common
with others, of the areas contiguous thereto that are reasonably necessary to provide access to and from the
License Premises and the Charging Station for the purpose of the construction, installation, maintenance,
repair and operation of the Charging Station, by Licensee, together with any ancillary uses permitted herein,
all in accordance with this Agreement.
2. Termination.
a. By Licensee. Licensee shall have the right to terminate this Agreement at any time upon
thirty (30) days prior written notice. In connection with any early termination, the Licensee shall comply
with the Surrender obligations set forth below.
b. By Licensor. This Agreement may be terminated by the Licensor at any time upon ninety
(90) days prior written notice,.
C. Surrender. Promptly following the expiration or termination of this Agreement,
Licensee shall remove the Charging Station from the License Premises and restore the License Premises
to substantially its former condition, including the removal of all utilities (underground and above -ground)
and all solar panels, excluding ordinary wear and tear.
d. No Further Obligations. Upon any termination pursuant to this Section, both parties are
relieved of any further obligations contained in this Agreement, except for those that by their terms or nature
survive or may require performance after termination (e.g., indemnity).
3. Charging Station.
a. Installation. Upon execution of this Agreement, Licensor shall deliver possession of the
License Premises to Licensee, and Licensee shall, at its sole cost and expense, construct the improvements
described in and pursuant to the procedures set forth in Exhibit `B" attached and incorporated hereto. The
design, make, model, and manufacturer of the Licensee charging stations and their number and approximate
locations are specified in Exhibit `B". Licensee, at any time and for any reason during the term of this
Agreement, may elect to upgrade, revise, alter, or swap any Charging Station installed in the Premises with
similar equipment and with not increase in the size of the License Premises.
b. Construction. Licensee is solely responsible for supervising the construction and
installation of the Charging Station, and shall have control over construction, scheduling, and installation
means, methods, techniques, sequences, and procedures, including the coordination of all work. Before
commencing installation of the Charging Station at the License Premises, Licensee shall give a copy of the
anticipated construction schedule and installation plans to Licensor for its approval, which approval shall
not be unreasonably withheld, conditioned or delayed. No work will begin until plans have been approved
by Licensor and all applicable permits and certifications have been obtained. Once approved, and after
Licensee has provided Licensor with all necessary insurance certificates required by this Agreement,
291
Licensee will, at its sole cost and expense, oversee and manage the installation of the Charging Station,
including the hiring and coordination of all vendors and contractors; the installation of electrical equipment,
utility lines, hardware, and software; site preparation, trenching, repaving, and landscaping; and installation
of all Licensee branded signage. Licensor shall allow Licensee and Licensee's agents to stage equipment
in reasonable proximity to the License Premises to facilitate Licensee's construction at the Property;
provided such staging shall not unreasonably interfere with Licensor's use of the Property. Upon prior
written approval of Licensor through its Parks and Recreation Executive Officer or his/her successor,
Licensee shall be permitted to reconfigure the existing parking spaces to meet the needs of Licensee and
Licensee's end users. For the avoidance of doubt, reconfiguring of parking spaces shall include, among
other things, the right to reduce the number of striped parking spaces, if necessary, to promote the efficient
and legal use of the Charing Station.
C. Permits. Licensee will, at its sole cost and expense, obtain from applicable governmental
authorities all licenses, permits, or other approvals required to install the Charging Station, and Licensor
will reasonably cooperate upon request with Licensee's efforts to do so. . Licensor will provide staffing
support to meet with Licensee at the License Premises as needed, and cooperate generally with Licensee
during the planning, permitting, and construction of the Charging Station.
d. No Liens. Licensee will not permit or suffer any mechanic's or materialmen's or
construction liens to attach to the License Premises as a result of the installation of the Charging Station. If
such a lien attaches to the License Premises, Licensee shall remove such lien at Licensee's sole cost and
expense, within twenty (20) days of Licensee receiving written notice thereof from Licensor.
e. Ownership by Licensee. Licensee shall either own or have a valid leasehold interest in the
Charging Station, and as such, as between Licensor and Licensee, the Charging Station shall remain the
sole property of the Licensee at all times, and Licensee shall have the right to remove all or a portion of the
Charging Station at any time during the term of this Agreement, whether or not the Charging Station is
considered a fixture and attached to the License Premises under applicable laws.
f. Char2in2 Station Definition. For purposes of this Agreement, "Charging Station" shall
mean all electrical and mechanical equipment, hardware, and software installed by Licensee, electrical
wiring and/or cabling, equipment infrastructure, Licensee's signage and all supporting equipment,
including without limitation concrete pads, protective bollards, and, if elected to be constructed by
Licensee, a canopy covering the Premises.
g. Security. Licensee and its employees and vendors may perform security assessments and
install (or add additional) reasonable security features at the License Premises, including, without
limitation, lighting, and cameras.
h. Ri2ht to Tow. Licensee retains the right to remove any vehicle from the License Premises
at any time and for any reason at Licensee's sole cost, in accordance with applicable law.
4. Operation and Maintenance. Except as otherwise provided in this Agreement, Licensee will,
at its sole cost and expense, maintain and operate (or cause to be maintained and operated via Licensee's
contractors, agents and/or employees) the Charging Station, including making all necessary maintenance, repairs,
and replacements.
292
Access. Licensee's customers, contractors, agents, and employees shall have free, unrestricted access to
the License Premises while the Park is open. If Licensee needs access to the Park while it is closed, it
will have to contact the Park Supervisor.
5. Right to Relocate. Should Licensor desire to relocate Licensee on the Property, Licensor may do
so as provided in this Section 8. At Licensor's sole cost and expense reimbursable to Licensee, Licensor may
require Licensee to relocate to other premises ("New Premises") within the Property. The New Premises will be
reasonably comparable in location, proximity to the main entrance to the facility, size, visibility, and layout to the
License Premises at Licensor's sole cost and expense, as the License Premises as of the date of Licensor's Notice
(hereinafter defined). Licensor will reimburse Licensee all reasonable costs Licensee incurs to move Licensee's
fixtures and equipment to the New Premises as well as costs incurred to secure new power at the New Premises.
In the event Licensor elects to exercise the right of relocation, Licensor shall deliver written notice to Licensee
identifying the location of the proposed New Premises at least one hundred twenty (120) days prior to the date that
Licensee is required to relocate to the New Premises ("Licensor's Notice"). Licensee shall have no obligation to
vacate the License Premises until the New Premises is commissioned and fully operational.
6. Signage. Licensee may paint, place, erect, or construct signage, marks, or advertising devices in,
on, or about the License Premises, with prior written approve of Licensor through its Parks and Recreation
Executive Officer or his/her successor. Licensee shall be responsible at its own cost and expense to obtain any
and all permits necessary for the installation of its signs. All signage shall be in accordance with all laws, rules and
ordinances.
7. Licensor Obligations regarding Prooerty/Premises. Licensor shall, at its sole cost and expense,
take all actions necessary to maintain the License Premises in a clean, safe, and orderly condition consistent with
Licensor standards throughout its Parks, including, without limitation, parking lot sweeping, parking lot snow and
ice removal, parking lot repaving and restriping, and maintenance and repair of curbs, gutters and landscaping
features. Licensor shall be liable for any damage caused to the License Premises, including each Charging Station,
which may be caused, directly, by Licensor or its employees. To the extent Licensor has actual knowledge of
vandalism, Licensor shall promptly notify Licensee. For the avoidance of doubt, Licensor shall be under no
obligation to maintain the Charging Station, signage or any other equipment installed by Licensee within the
Premises. However, if Licensor restripes the parking lot, inclusive of the License Premises, Licensor shall restripe
the License Premises in a manner identical to Licensee's striping scheme in effect immediately prior to the
restriping.
8. Utility Availabilitv. Licensee shall be responsible for all electricity costs of the Charging Station.
Licensee shall, at its sole expense, ensure that the Charging Station contains separately -metered electricity with
Licensee as the customer of record for such meter. Licensee may charge its end users for electrical usage if market
conditions permit. Licensor shall cooperate with Licensee to obtain electricity and any other utilities necessary to
operate the Charging Station; provided, however, that Licensor is not required to pay money to satisfy the
requirements of the utility provider or Licensee associated with the provision of such utilities. Neither Licensor
nor Licensee has any responsibility or liability for interruption, curtailment, failure, or defect in the supply or
character of utilities furnished to facilities or equipment located at the License Premises, unless the cause of the
interruption is covered by such party's indemnity provided for in Sections 23 and 24.
9. Taxes. Licensee is solely responsible for personal property taxes imposed on the Charging
Station, and any other equipment installed by it at the Premises.
10. Ownership of Drawings and Other Documents. All documents prepared by or under the
direction of Licensee pursuant to this Agreement, including, without limitation, drawings, plans, and
specifications, including those in electronic format, are solely and exclusively owned by Licensee, and Licensee
293
retains all common law, statutory and other reserved rights, including the copyright. The parties agree between
them that the Licensee has and retains ownership of all of such Licensee's Intellectual Property rights therein, and
Licensor has no right, and shall not obtain any right, in any Licensee Intellectual Property.
As used in this Agreement, "Intellectual Proberty" means all copyrights, patents, trademarks and service
marks, names, logos, designs, domain names, charger station equipment names, all registrations for
copyrights, patents, trademarks and service marks/names, domain names, trade secrets, know-how, and
all unique concepts, information, data and knowledge that is eligible for legal protection under applicable
laws as intellectual property, whether protected through confidentiality, registration or pending registration,
regardless of form, whether disclosed in writing, electronically, orally or through visual means, whether
learned or obtained orally, through observation, through the discharge of responsibilities under this
Agreement, or through analysis of that information, data or knowledge.
II. Publicity. Neither party will use the other parry's name, trademark or logo without such other
party's prior written consent. If mutually agreed in writing, Licensee and Licensor may make general press releases
and statements, hold press conferences, both through traditional and electronic media, including websites created
by Licensee or other third parties, regarding the existence of the Charging Station and the status of the activities
contemplated by this Agreement; provided that all such press releases and statements and press conferences shall
be approved in advance by the Licensor and Licensee. Nothing herein shall be deemed to require Licensor's
consent to Licensee's disclosure of the location of the Charging Station to the general public in any manner,
including via an application to permit electric vehicle owners, users and lessees to locate places to charge their
vehicles. Licensor shall disclose the location of the Charging Station to the general public as part of a standard
Property site map and/or directory.
12. Licensor and Licensee Renresentations and Warrantiel. Each of Licensor and Licensee hereby
represents and warrants to the other as of the Effective Date that: (a) it has all necessary power and authority to
execute, deliver, and perform its obligations hereunder; (b) the execution, delivery, and performance of this
Agreement have been duly authorized by all necessary action and do not violate any of the terms or conditions of
its governing documents, any contract to which it is a party, or any law, rule, regulation, order, judgment, or other
legal or regulatory determination applicable to it; (c) there is no pending or, to its knowledge, threatened litigation
or administrative proceeding that may materially adversely affect its ability to perform this Agreement; (d) it is
duly organized and validly existing under the laws of the jurisdiction of its organization or incorporation and, if
relevant under such laws, in good standing; (e) this Agreement constitutes a legal, valid and binding obligation of
such party, except as the enforceability of this Agreement may be limited by the effect of any applicable
bankruptcy, insolvency, reorganization, moratorium or similar laws affecting creditors' rights generally and by
general principles of equity; and (f) at all times during the Term, it will comply with all federal, state, and local
laws, rules, regulations (including, without limitation, all zoning ordinances and building codes) in performing its
obligations under this Agreement.
13. Licensor Covenants. Licensor covenants that it shall not take any action that would interrupt the
use of the License Premises or the Charging Station. Licensor further represents, warrants and covenants that it
has obtained any and all consents or approvals required in order for Licensor to enter into this Agreement and to
perform its obligations under this Agreement, including, but not limited to, obtaining the consent of any holder of
any lien, easement or encumbrance affecting or pertaining to the Property.
14. Licensee Insurance.
294
a. During the Term of this Agreement, Licensee shall maintain in full force and effect, at its
cost and expense, the following coverages and amounts of insurance:
i. Full replacement cost property Insurance (written on a "special form"
basis) for the Charging Station and all other personal property, machinery, equipment and
trade fixtures owned by Licensee;
ii. Statutory Worker's Compensation Insurance, and Employer's Liability
limits of $1,000,000.00 per accident/per employee;
iii. Commercial General Liability Insurance, written on an occurrence basis,
covering bodily injury (including death), personal injury, and property damage, with
limits of not less than $1,000,000.00 per occurrence, that includes coverage for
contractual liability, independent contractors, premises/operations, products/completed
operations, and cross liabilities/separation of insureds; Licensee shall consider its own
insurance primary, and shall not seek contribution from similar insurance being maintained
by the Licensor.
iv. Automobile Liability with a combined single limit of $1,000,000.00 that
includes coverage for owned, non -owned and hired vehicles; and
V. $5,000,000.00 in excess liability coverage per occurrence, for injuries,
losses, claims for damages to persons or property occurring on the License Premises, and
resulting from the use of the Charging Station, the occupancy of the License Premises
and/or the negligence of Licensee and its agents, contractors, agents, employees or invitees,
which coverage shall sit excess of the scheduled underlying General Liability, and
Automobile Liability and Employer's Liability Insurance policies with exclusions that are
no more broad that those contained in the underlying policies.
b. With respect to Licensee's Commercial General Liability Insurance, Automobile Liability
Insurance and Excess Liability Insurance, include Licensor as an additional insured with respect to liability
arising out of the ownership, maintenance or use of the Charging Station or the Premises.
C. Upon execution of this Agreement, Licensee shall provide Licensor with a certificate of
insurance, evidencing the required coverages. Licensee shall have the right to "self insure" all or any portion
of the foregoing insurance obligations. The right to self -insure is subject to the review of Licensee's
financials and approval of Oakland County Risk Management.
d.
15. Policv lZequirements. The insurance policies required under Sections 18 shall:
a. be issued by insurance companies licensed to do business in the state in which the Property
is located, with a general policyholder's ratings of at least "A-" and a financial rating of at least "Class
VIII," in the most current Best's Insurance Reports available on the Commencement Date; if the Best's
ratings are changed or discontinued, the parties shall agree to a comparable method of rating insurance
companies;
295
b. contain provisions whereby each party's insurers waive all rights of subrogation against
the other party on each of the coverages required herein.
16. Waiver. Anything in this Agreement to the contrary notwithstanding, to the extent covered by any
property insurance maintained (or required to be maintained) hereunder, each party hereby waives every right or
cause of action for any and all loss of, or damage to (whether or not such loss or damage is caused by the fault or
negligence of the other party or anyone for whom said other party may be responsible) the Property, the License
Premises, the Charging Station and/or the personal property of either party, or their respective affiliates,
representatives, agents, officers, directors, managers, members, shareholders, partners, contractors, or employees,
regardless of cause or origin. These waivers and releases shall apply between the parties and they shall also apply
to any claims under or through either party as a result of any asserted right of subrogation.
17. Casualty and Condemnation.
a. Damage. If the License Premises, any portion of the Charging Station or any portion of
the Property that adversely affects the use of the Charging Station is damaged by fire or other casualty, then
either Licensor or Licensee may, within thirty (30) days of the date of such fire or other casualty elect to
terminate the Agreement on written notice to the other party. If Licensee elects to repair its property, it shall
restore, rebuild, or replace those portions of the Charging Station in the License Premises and any other
property damaged as a result of such fire or other casualty to its prior or better condition as necessary, and
all property insurance proceeds of Licensor applicable to the License Premises shall be made available to
Licensee in connection with such repair and restoration. If Licensee elects to terminate the Agreement, it
shall remove all of Licensee's property from the License Premises in accordance with Section 5 of this
Agreement. Any repair and restoration required by Licensee under this Section 22 shall commence within
sixty (60) days of the date Licensee elects to repair and restore the License Premises and shall be completed
no later than 120 days thereafter, if reasonably possible.
b. Condemnation/Takin2. If any portion of the License Premises or Property is condemned
or taken in any manner for a public or quasi -public use that could adversely affect the use of the Charging
Station, then Licensee may elect to terminate this Agreement effective as of the date title to the condemned
portion of the Property is transferred to the condemning authority. If Licensee does not elect to terminate,
the parties will use commercially reasonable efforts to find an alternate location for the Charging Station
elsewhere on the Property. The costs of the relocation of the Charging Station shall be paid by Licensee.
Licensee may file a separate claim to the condemning authority for any relocation award made as a result
of such condemnation; provided, however, in no event shall such claim reduce the Licensor's award related
to the condemnation or taking.
C. Suspension of Term. During any time that the Charging Station or any portion of the
License Premises is under repair or being relocated pursuant to a casualty or condemnation, the Term shall
be temporarily suspended on a day -for -day basis.
18. Licensee's Indemnitv. Licensee shall indemnify and hold harmless Licensor, its directors,
employees, and agents from and against all third party claims, demands, causes of action, liabilities, costs,
damages, losses, penalties, fines, judgments or expenses, including reasonable attorneys' fees and costs of
collection (collectively, "Losses") that arise out of or result from the acts or omissions of Licensee, and it directors,
officers, employees, or agents.t The obligations of Licensee under this Section shall survive the expiration,
cancellation, or termination of this Agreement and Term.
296
19
20. Limitation of Licensor and Licensee LiabilitvX. In no event shall either party be liable (in contract
or in tort, including negligence and strict liability) to such other parry or to such other party's affiliates or their
respective representatives, agents, officers, directors, shareholders, partners or employees for any special, indirect,
punitive or consequential damages relating to this Agreement.
21. Defa . Each of the following shall constitute an "Event of Default" by Licensor or Licensee, as
applicable, under this Agreement:
a. The failure by either Licensee or Licensor to perform or observe any material term or
condition of this Agreement and such failure continues for a period of thirty (30) days after receipt of written
notice thereof, provided however, that if the nature of such default is such that the same cannot be
reasonably cured within said thirty (30) day period, then Licensee or Licensor, as applicable, shall have
such additional time as is reasonably required to cure such failure, provided, Licensee or Licensor
commences to cure such failure within such 30 day period and proceeds to cure such failure with diligence
and continuity; or
b. The appointment of a receiver or trustee to take possession of all or substantially all of the
assets of Licensee or Licensor located at the License Premises if possession is not restored to Licensee or
Licensor, as applicable, within sixty (60) days; or a general assignment by Licensee or Licensor for the
benefit of creditors; or any action or proceeding commenced by or against Licensee or Licensor under any
insolvency or bankruptcy act; or under any other statute or regulation having as its purpose the protection
of creditors and in the case of involuntary actions filed against the Licensee or Licensor the same are not
discharged within 60 days after the date of commencement.
22. Remedies. Licensor and Licensee acknowledge and agree that each party shall have all remedies
available at law or in equity if the other party is in default under the terms of this Agreement. If an Event of Default
has occurred and is continuing beyond any applicable cure period, then Licensor or Licensee, as applicable, in
addition to any other remedies given at law or in equity may (a) bring an action to recover and regain possession
of said License Premises in the manner provided by the laws of eviction of the State where the License Premises
are located then in effect, or (b) seek damages for breach of this Agreement. The provisions of this Section 27 are
subject to the limitations set forth in Section 25.
23. Brokers. In the event Licensor or Licensee utilizes a broker in connection with this transaction,
the party that is responsible for engaging such broker shall indemnify and hold harmless the other party for any
commissions and/or fees due or owing. The payment of any such commission and/or fee shall be the subject of a
separate, independent agreement between such party and the broker.
24. Survival of Covenants. The covenants, representations and agreements of Sections 13, 14, 21,
23, 24, 25, and 29 shall survive the expiration, termination or cancellation of this Agreement, regardless of reason.
25. Notice. Any notice provided or permitted to be given under this Agreement must be in writing
and be served either by (i) deposit in the mail, addressed to the party to be notified, postage prepaid, and registered
or certified, with a return receipt requested, or (ii) deposit with an internationally -recognized overnight delivery
carrier, with notice of delivery to the recipient party. Notice given by registered or certified mail or overnight
297
carrier shall be deemed delivered and effective on the date of delivery shown on the return receipt or proof of
receipt. For purposes of notice the addresses of the parties shall be as follows:
If to Licensee:
Electrify America, LLC
2003 Edmund Halley Drive, Suite 200
Reston, Virginia 20191
Attention: Christina Slayton
With a copy to (which shall not constitute notice):
Electrify America, LLC
2003 Edmund Halley Drive, Suite 200
Reston, Virginia 20191
Attention: Emily Durham, Esq.
If to Licensor:
Oakland County Parks and Recreation
Attn: Executive Officer
2800 Watkins Lake Road
Waterford, MI 48328
Each party may change its address for notice by giving notice thereof to the other party.
26. Assignment. This Agreement is binding on and inures to the benefit of the parties and their
respective heirs, successors, assigns, and personal representatives. Neither party may assign its rights and
obligations in and under this Agreement without first obtaining prior written consent of the other party, which may
be withheld in such party's sole discretion; provided, however, that either party may assign its rights and
obligations in and under the Agreement to an affiliate, subsidiary or successor by merger or acquisition or successor
to all or substantially all of the assets of such party at any time and without consent. Further, Licensor expressly
agrees that Licensee may, at any time and without prior written consent, assign this Agreement in its entirety to
FCA US LLC ("FCA"), upon the assumption of which Electrify America will have no further rights, obligations,
or liabilities except for those obligations which arose prior to the assignment and assumption of this Agreement.
A copy of such assignment and assumption will be provided to Licensor
27. Miscellaneous
a. Force Mai eure. Neither parry is responsible for any delay or failure in performance of any
part of this Agreement to the extent that delay or failure is caused by fire, flood, explosion, war, pandemic,
embargo, government requirement, civil or military authority, act of God, act or omission of carriers or
other similar causes beyond the party's control.
b. Governing Law. This Agreement shall be governed by and interpreted in accordance with
the internal laws of the State in which the License Premises is located without giving effect to conflict of
law rules.
C.
298
d. No Waiver. The failure of a party to insist on strict performance of any provision of the
Agreement does not constitute a waiver of, or estoppel against asserting, the right to require performance
in the future. A waiver or estoppel given in any one instance does not constitute a waiver or estoppel with
respect to a later obligation or breach.
e. No Third Party Beneficiaries. This Agreement does not confer any rights or remedies on
any person other than the parties and their respective successors and permitted assigns, provided that FCA
shall be deemed a third -party beneficiary of this Agreement.
f. Remedies. The rights and remedies provided by this Agreement are cumulative, and the
use of any right or remedy by any party does not preclude or waive its right to use any or all other remedies.
These rights and remedies are given in addition to any other rights a party may have under applicable law,
in equity or otherwise, subject to the provisions of Section 25.
g. Severability. If any term of this Agreement is held by any court of competent jurisdiction
to contravene, or to be invalid under, the laws of any political body having jurisdiction over this subject
matter, that contravention or invalidity shall not invalidate the entire Agreement. Instead, this Agreement
shall be construed as reformed to the extent necessary to render valid the particular provision or provisions
held to be invalid, consistent with the original intent of that provision and the rights and obligations of the
parties shall be construed and enforced accordingly, and this Agreement shall remain in full force and effect
as reformed.
h. Integration; Amendments. It is agreed and understood that this Agreement contains all
agreements, promises and understandings between the parties, and that there are no verbal or oral
agreements, promises or understandings between the parties. Any amendment, modification or other change
to this Agreement shall be ineffective unless made in a writing signed by the parties hereto.
i. Counterpart/Electronic Execution. This Agreement may be executed in any number of
counterparts with the same effect as if all the parties had signed the same document; all counterparts shall
be construed together and shall constitute one and the same instrument. The delivery of an executed
counterpart to this Agreement by electronic means (including via email) shall be as effective as the delivery
of a manually executed counterpart.
Time is of the Essence. Time is of the essence in this Agreement.
In witness whereof, the parties hereto execute this Agreement as of the date first above written.
LICENSOR: LICENSEE:
ELECTRIFY AMERICA, LLC
By: By:
Name: Name: Giovanni Palazzo
Title: Title: President & Chief Executive Officer
299
By:
Name: Gregory A. Crossley
Title: Chief Financial Officer
300
Site Host Agreement
EXHIBIT A
PROPERTY —LICENSES PREMISES
301
Electrify America Oakland County Parks and Recreation License Agreement — Charging Station Location Map
Southern portion of Dixie Ledge Parking Lot
L f `1
°*..MT� H OLLYqrS KI AND
B ARD RE 4'# SNOW O SORT
^V 1 \ .
Charging
Station 3;..
THE — Location
•. TROUBLES
.. .....
.............
. _. .. 4 O A.E r �+ < � • .'� y
E ,
T �\\ \ s r } •9�i
, •P L •,.•' 7 .1 �l
4rL E
......
�•� •CdI g44 •BAD •••.................. fir. -= Y ® -
THE BORDERti.
4 e '
H O L L Y OAKS ORV PARK
Y F A R T w o
302
Site Host Agreement
EXHIBIT B
PREMISES
303
SEPTEMBER 1, 2021 AGENDA ITEM NO. 17
PLANNING AND RESOURCE DEVELOPMENT
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
Melissa Prowse, Supervisor Planning and Resource Development
Sarah Cook-Maylen, Natural Resources Coordinator
Subject: Motion - Approval of Oakland County Stormwater Engineering Design Standards
INTRODUCTION AND HISTORY
Oakland County Parks and Recreation (OCPR) is required by law to manage stormwater runoff from parklands
and prevent pollution to local streams and lakes. The Clean Water Act mandates that discharge of stormwater
from a conveyance system — like a pipe, ditch, or channel - to tributaries of navigable waters must be done
according to a National Pollutant Discharge Elimination System (NPDES) Phase II permit obtained from the US
Environmental Protection Agency and the Michigan Department of Environment, Great Lakes and Energy. The
Oakland County Water Resources Commissioner's Office (WRC) holds the NPDES Phase II permit for
Oakland County properties and OCPR Natural Resources Management staff coordinate with WRC to
implement permit requirements and best management practices, track and monitor required stormwater
infrastructure within the parks, and provide necessary data and information for reporting purposes.
WRC has been working to develop an updated NPDES Phase II permit and as part of that process, developed
new Stormwater Engineering Design Standards in coordination with the Regional Stormwater Standards
Coordination Committee consisting of stormwater experts from Oakland, Macomb, Wayne, and Livingston
Counties. The standards impact water quality, water volume and flood control including, but not limited to,
specific standards for Channel Protection Volume Control (Infiltration), Channel Protection Rate Control
(Extended Detention), and Operations and Maintenance. These standards will apply to development and re-
development projects that are greater than one acre in size and will not require retrofitting of existing
infrastructure or changes to existing parks maintenance practices.
ATTACHMENTS
• Memorandum for Adoption of Oakland County Stormwater Engineering Design Standards for County
Properties
• Oakland County Final Phase II NPDES Permit
• Oakland County Stormwater Engineering Design Standards
STAFF RECOMMENDATION
Staff recommends approval of the Oakland County -wide Stormwater Engineering Design Standards as
submitted by the Water Resources Commissioner's Office and for the Chairperson to sign the attached
Memorandum for Adoption of Oakland County Stormwater Engineering Design Standards for County
Properties.
MOTION
Move to approve the Oakland County -wide Stormwater Engineering Design Standards as submitted
by the Water Resources Commissioner's Office and for the Chairperson to sign the attached
Memorandum for Adoption of Oakland County Stormwater Engineering Design Standards for County
Properties.
304
OAKLAND COUNTY MEMORANDUM
WATER RESOURCES COMMISSIONER
TO: Gary McGillivray, Chairman
Oakland County Parks and Recreation Commission
FROM: Lynne Seymour, P.E., Assistant Chief Engineer
SUBJECT: Adoption of Oakland County Stormwater Engineering Design Standards for
County Properties
DATE: August 3, 2021
The Oakland County Water Resources Commissioner's office has developed the attached
Stormwater Engineering Design Standards in coordination with the Regional Stormwater Standards
Coordination Committee consisting of stormwater experts from Oakland, Macomb, Wayne and
Livingston Counties. This office has facilitated more than 40 committee meetings and continues to
meet regularly to share progress, discuss issues and work toward consistent implementation of
regional stormwater standards that protect our water resources.
Adoption of these standards is necessary to meet federal Municipal Separate Storm Sewer System
(MS4) permit requirements as outlined in Oakland County's current permit for county -owned or -
operated separate stormwater systems. The standards include new stormwater management
requirements for Channel Protection Volume Control (Infiltration), Channel Protection Rate Control
(Extended Detention), Water Quality Control, Operations and Maintenance and Detention and Flood
Control.
The attached stormwater standards are recommended for adoption with implementation on county
Parks' properties commencing on August 31, 2021. These standards will continue to evolve as our
stormwater expert team from our partner counties continue to meet and refine them as necessary.
Any significant changes to these standards will be approved for adoption prior to implementation.
Recommended Action: Approve and adopt the attached Oakland County Stormwater Engineering
Design Standards for all Municipal Separate Storm Sewer Systems on County Parks' properties with
implementation commencing on August 31, 2021.
Approved By:
Gary McGillivray, Chairman Date
Oakland County Parks and Recreation Commission
305
PERMIT NO. M10060089
STATE � o I HIGAN
DEPARTMENT OF ENVIRON REAT LAKES, AND ENERGY
n tR C`LMSpG
AUTHORIZATION TO CHARGE UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq., as
amended; the "Federal Act"); Part 31, Water Resources Protection, of the Natural Resources and Environmental
Protection Act, 1994 PA 451, as amended (NREPA); Part 41, Sewerage Systems, of the NREPA; and Michigan
Executive Order 2019-06,
Oakland County
Water Resources Commissioner's Office
One Public Works Drive, Building 95 West
Waterford, MI 48328
is authorized to discharge from the Municipal Separate Storm Sewer System (MS4)
designated as Oakland CDC MS4
to surface waters of the state of Michigan in accordance with effluent limitations, monitoring requirements, and
other conditions set forth in this permit.
This permit takes effect on January 1, 2021. This permit is based on a complete application submitted on
March 24, 2008, as amended through July 16, 2020.
The provisions of this permit are severable. After notice and opportunity for a hearing, this permit may be
modified, suspended, or revoked in whole or in part during its term in accordance with applicable laws and rules.
On its effective date this permit shall supersede Certificate of Coverage No. MIG610042, issued on
December 16, 2003, which is hereby revoked upon the effective date of this permit.
This permit and the authorization to discharge shall expire at midnight, October 1, 2023. In order to receive
authorization to discharge beyond the date of expiration, the permittee shall submit an application which
contains such information, forms, and fees as are required by the Department of Environment, Great Lakes, and
Energy (Department) by April 4, 2023.
Issued: November 12. 2020.
Oriqinal siqned by Christine Alexander
Christine Alexander, Manager
Permits Section
Water Resources Division
PERMIT NO. M10060089
Page 2 of 34
PERMIT FEE REQUIREMENTS
In accordance with Section 324.3118 of the NREPA, the permittee shall make payment of an annual storm water
fee to the Department for each January 1 the permit is in effect regardless of occurrence of discharge. The
permittee shall submit the fee in response to the Department's annual notice. Payment may be made
electronically via the Department's MiWaters system. The MiWaters website is located at
https://miwaters.deq.state.mi.us. Payment shall be submitted or postmarked by March 15 for notices mailed by
February 1. Payment shall be submitted or postmarked no later than 45 days after receiving the notice for
notices mailed after February 1.
Annual Permit Fee Classification: Municipal Storm Water — County
CONTACT INFORMATION
Unless specified otherwise, all contact with the Department required by this permit shall be made to the Warren
District Office of the Water Resources Division. The Warren District Office is located at 27700 Donald Court,
Warren, MI 48092-2793, Telephone: 586-753-3700, Fax: 586-751-4690.
CONTESTED CASE INFORMATION
Any person who is aggrieved by this permit may file a sworn petition with the Michigan Administrative Hearing
System within the Michigan Department of Licensing and Regulatory Affairs, c/o the Michigan Department of
Environment, Great Lakes, and Energy, setting forth the conditions of the permit which are being challenged and
specifying the grounds for the challenge. The Department of Licensing and Regulatory Affairs may reject any
petition filed more than 60 days after issuance as being untimely.
307
PERMIT NO. M10060089
Page 3 of 34
PART
Section A. Limitations and Monitoring Requirements
1. Authorized Discharges
a. Authorized Outfalls and Points of Discharge
This permit authorizes the discharge of storm water from the permittee's MS4 to the surface waters of
the state via the outfalls and points of discharge identified in the permittee's application and as modified
in accordance with this permit. Such discharges shall be controlled and monitored by the permittee in
accordance with this permit.
Nested MS4 Discharges
This permit authorizes the discharge of storm water to surface waters of the state from a nested MS4
owned or operated by public bodies that include, but are not limited to, public school districts; public
universities; airports; or county, state, or federal agencies. The permittee may request to modify permit
coverage to add or remove a nested MS4 by submitting a request to the Department for approval.
Modifications to the permit coverage may result in a permit modification, after opportunity for public
comment.
C. Discharges Authorized Under Other National Pollutant Discharge Elimination System (NPDES) Permits
This permit does not prohibit the use of an MS4 for other discharges authorized under other NPDES
permits, or equivalent Department approval under the NREPA or the Federal Act.
d. Water Quality Requirements
Discharges from the permittee's MS4 shall not cause or contribute to an exceedance of water quality
standards in the receiving waters. This includes, but is not limited to, the requirement set forth in
R 323.1050 of the Water Quality Standards stating that the receiving waters shall not have any of the
following unnatural physical properties as a result of the discharge, in quantities which are or may
become injurious to any designated use: turbidity, color, oil films, floating solids, foams, settleable
solids, suspended solids, or deposits.
2. Outfall or Point of Discharge Identified, Constructed, or Installed
After Permit Issuance
a. Outfall or Point of Discharge Within the Permittee's Regulated Area
Authorization from the Department is required to discharge storm water to a surface water of the state
from a permittee owned or operated outfall or point of discharge identified, constructed, or installed after
issuance but during the term of this permit and located within the permittee's regulated area as identified
in the application. For each outfall or point of discharge identified, constructed, or installed after
issuance but during the term of this permit, the permittee shall request authorization to discharge storm
water by providing the following to the Department in a written request:
1) whether the discharge is from an outfall or point of discharge;
2) the outfall or point of discharge identification number assigned by the permittee;
3) the surface water of the state receiving the discharge from the outfall or point of discharge;
4) a certification statement that the outfall or point of discharge is within the permittee's regulated
area as identified in the application;
5) a certification statement that the previously approved Storm Water Management Program (Part
I.A.3. of this permit) includes best management practices (BMPs) to comply with the minimum
requirements of the permit for the outfall or point of discharge; and
308
PERMIT NO. M10060089
Page 4 of 34
PART
Section A. Limitations and Monitoring Requirements
6) a certification statement that the previously approved Storm Water Management Program (Part
I.A.3. of this permit) is being implemented in the regulated area served by the outfall or point of
discharge, including having available an up-to-date storm sewer system map required in Part I.A.3.d.1)
of this permit.
Outfall or Point of Discharge Outside the Permittee's Regulated Area
Authorization from the Department is required to discharge storm water to a surface water of the state
from a permittee owned or operated outfall or point of discharge identified, constructed, or installed after
issuance but during the term of this permit and located outside the permittee's regulated area as
identified in the application (e.g., area served by an expanded MS4 or area previously served by a
combined sewer system that is now separated). For each outfall or point of discharge identified,
constructed, or installed after issuance but during the term of this permit, the permittee shall request
authorization to discharge storm water by providing the following to the Department in a written request:
1) whether the discharge is from an outfall or point of discharge;
2) the outfall or point of discharge identification number assigned by the permittee;
3) the surface water of the state receiving the discharge from the outfall or point of discharge;
4) a map identifying the expanded regulated area served by the permittee's MS4;
5) a certification statement that the previously approved Storm Water Management Program (Part
I.A.3. of this permit) includes BMPs to comply with the minimum requirements of the permit for the outfall
or point of discharge and expanded regulated area; and
6) a certification statement that the previously approved Storm Water Management Program (Part
I.A.3. of this permit) is being implemented in the expanded regulated area served by the outfall or point
of discharge, including having available an up-to-date storm sewer system map as required in Part
I.A.3.d.1) of this permit.
C. Upon review of the request to authorize the discharge from an outfall or point of discharge identified,
constructed, or installed after issuance but during the term of this permit in accordance with Part I.A.2.a.
or Part I.A.2.b. of this permit, the Department may determine that a permit modification is required, after
opportunity for public comment. The Department will notify the permittee if a modification is required.
3. Storm Water Management Program (SWMP)
The permittee submitted a SWMP with its application for an NPDES permit. The SWMP is approved as
submitted. The permittee shall implement the approved SWMP to comply with the minimum requirements
identified in this permit. The SWMP shall cover the regulated area served by, or otherwise contributing to
discharges from, the MS4 owned or operated by the permittee identified in the application. The permittee shall
implement and enforce the SWMP to reduce the discharge of pollutants from the MS4 to the maximum extent
practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the NREPA and
the Federal Act. The approved SWMP is an enforceable part of this permit and any Department approved
modifications made to the SWMP shall also become enforceable parts of this permit.
a. Enforcement Response Procedure (ERP)
The permittee shall implement the ERP for violations of the permittee's ordinances or regulatory
mechanisms identified in the SWMP to the maximum extent practicable. The ERP shall be implemented
to compel compliance with the permittee's ordinances and/or regulatory mechanisms and to deter
continuing violations.
309
PERMIT NO. M10060089
Page 5 of 34
PART
Section A. Limitations and Monitoring Requirements
The permittee shall track and document all enforcement conducted pursuant to the permittee's ERP. At
a minimum, the permittee shall track and document the following: the name of the person responsible
for violating the permittee's ordinance or regulatory mechanism; the date and location of the violation; a
description of the violation; a description of the enforcement response used; a schedule for returning to
compliance; and the date the violation was resolved.
Public Participation/Involvement Program (PPP)
The permittee shall implement the PPP to encourage public participation/involvement in the
implementation and periodic review of the SWMP to the maximum extent practicable. The permittee
shall implement the PPP as part of the SWMP. The permittee has chosen to work collaboratively with
watershed or regional partners to implement the PPP or part of the PPP, therefore each permittee
working collaboratively is responsible for complying with the PPP as described in the SWMP.
The PPP requires implementation of the following minimum requirements:
1) The procedure for making the SWMP available for public inspection and comment, including
complying with local public notice requirements, as appropriate; and
2) The procedure for inviting public participation and involvement in the implementation and
periodic review of the SWMP.
C. Public Education Program (PEP)
The permittee shall implement the PEP as part of the SWMP to the maximum extent practicable. At the
minimum, the PEP shall promote, publicize, and facilitate education for the purpose of encouraging the
public to reduce the discharge of pollutants in storm water runoff. The PEP shall be implemented to
achieve measurable improvements in the public's understanding of storm water pollution and efforts to
reduce the impacts of storm water pollution.
The PEP requires implementation of the following minimum requirements:
1) BMPs to address the following PEP topics:
(a) Promote public responsibility and stewardship in the permittee's watershed.
(b) Inform and educate the public about the connection of the MS4 to area waterbodies and
the potential impacts discharges can have on surface waters of the state.
(c) Educate the public on illicit discharges and promote public reporting on illicit discharges
and improper disposal of materials into the MS4.
(d) Promote preferred cleaning materials and procedures for car, pavement, and power
washing.
(e) Inform and educate the public on proper application and disposal of pesticides,
herbicides, and fertilizers.
(f) Promote proper disposal practices for grass clippings, leaf litter, and animal wastes that
may enter into the MS4.
(g) Identify and promote the availability, location, and requirements of facilities for collection
or disposal of household hazardous wastes, travel trailer sanitary wastes, chemicals,
and motor vehicle fluids.
(h) Inform and educate the public on proper septic system care and maintenance, and how
to recognize system failure.
310
PERMIT NO. M10060089
Page 6 of 34
PART
Section A. Limitations and Monitoring Requirements
(i) Educate the public on, and promote the benefits of, green infrastructure and Low Impact
Development.
(j) Identify and educate commercial, industrial, and institutional entities likely to contribute
pollutants to storm water runoff.
2) The procedure for determining the overall effectiveness of implementation and the process for
modifying the PEP to address ineffective implementation. The Department may determine that a permit
modification is required, after opportunity for public comment, based on modifications to the PEP. The
Department will notify the permittee if a modification is required.
d. Illicit Discharge Elimination Program (IDEP)
The permittee shall implement and enforce the IDEP to detect and eliminate illicit discharges and
connections to the permittee's MS4. The permittee shall implement the IDEP as part of the SWMP to
the maximum extent practicable. The permittee has chosen to work collaboratively with watershed or
regional partners to implement the IDEP or part of the IDEP, therefore each permittee working
collaboratively is responsible for complying with the IDEP as described in the SWMP.
The IDEP requires implementation of the following minimum requirements:
1) An available, up-to-date storm sewer system map identifying the following: the storm sewer
system, location of all outfalls and points of discharge the permittee owns or operates in the regulated
area, and the names and location of all surface waters of the state that receive discharges from the
permittee's MS4. The map shall be retained by the permittee and made available to the Department
upon request. The map shall be maintained and updated as outfalls and points of discharge are
identified, constructed, and installed in accordance with Part I.A.2. of this permit.
2) The plan to detect and eliminate non -storm water discharges to the permittee's MS4, including
illegal dumping/spills. The plan includes the following:
a) A procedure for identifying priority areas for field observations. The permittee shall
conduct field observations in accordance with the procedure identifying the priority
area(s) developed as part of the IDEP.
b) A procedure for conducting field observations, field screening, and source
investigations. The permittee shall conduct a field observation in accordance with the
procedure during dry -weather at least once during the term of the permit. Field
screening and source investigation shall be conducted in accordance with the schedule
in the procedure.
Field observations, field screening, and source investigations shall include the following:
(1) Field Observation — The permittee shall observe the outfall or point of discharge
for the following during dry -weather in accordance with the procedure:
presence/absence of flow, water clarity, color, odor, floatable materials, deposits/stains
on the discharge structure and bank, vegetation condition, structural condition, and
biology (e.g. bacterial sheens, algae, and slimes).
(2) Field Screening — If flow is observed at an outfall or point of discharge, the
permittee shall analyze the flow for the indicator parameters identified in the procedure.
If the source of an illicit discharge is identified during the field observation, field
screening may not be necessary.
311
PERMIT NO. M10060089
Page 7 of 34
PART
Section A. Limitations and Monitoring Requirements
(3) Source Investigation — If the source of the illicit discharge was not identified by
the field screening, the permittee shall conduct an investigation to identify the source in
accordance with the procedure. If the permittee opts to use tracer dyes, the discharge
of the dyes shall be authorized in accordance with Part I.A.6. of this permit.
If the permittee is made aware of non -storm water discharges outside the priority areas,
illegal dumping/spills, or complaints received, the permittee shall conduct field
observations and follow-up field screening and source investigations as appropriate in
accordance with the procedure, including the schedule, in the IDEP. The permittee
shall immediately report any release of any polluting material which occurs to the
surface waters or groundwaters of the state in accordance with Part II.C.7. of this
permit.
c) A procedure for responding to illicit discharges and pursuing enforcement action. The
permittee shall implement the procedure to respond and pursue enforcement action
once the source of the illicit discharge is identified, including the corrective action
required to eliminate the illicit discharge. The permittee shall also implement the
procedure to respond to illegal spills/dumping. For each illicit discharge not eliminated
within 90 days of its discovery, the permittee shall provide, with the next progress report
due, a written certification that the illicit discharge was eliminated or a description of how
the illicit discharge will be eliminated.
3) The employee training program, which includes the following:
a) Training on techniques for identifying illicit discharges and connections, including field
observations, field screening, and source investigations;
b) Training on procedures for reporting, responding to, and eliminating an illicit discharge
or connection and the proper enforcement response; and
c) A schedule and requirement for training at least once during the term of the permit for
existing staff and within the first vear of hire for new staff.
4) The procedure for IDEP evaluation and determining the overall effectiveness of the IDEP.
e. Construction Storm Water Runoff Control Program
The permittee shall implement the construction storm water runoff control program to address areas of
construction activity that disturb one (1) or more acres, including projects less than one (1) acre that are
part of a larger common plan of development or sale. The permittee shall implement the construction
storm water runoff control program as part of the SWMP to the maximum extent practicable.
The construction storm water runoff control program requires implementation of the following minimum
requirements:
1) The procedure to notify the Part 91 Agency, or appropriate staff (if the permittee is a Part 91
Agency), when soil or sediment is discharged to the permittee's MS4 from a construction activity.
2) The procedure to notify the Department when soil, sediment, or other pollutants are discharged
to the permittee's MS4 from a construction activity.
3) The procedure for ensuring that construction activity one (1) acre or greater in total earth
disturbance with the potential to discharge to the permittee's MS4 obtains a Part 91 permit or is
conducted by an approved Authorized Public Agency, as appropriate.
4) The procedure to advise the landowner or recorded easement holder of the State of Michigan
Permit by Rule (R 323.2190 of the Part 21 Rules promulgated pursuant to Part 31 of the NREPA).
312
PERMIT NO. M10060089
Page 8 of 34
PART
Section A. Limitations and Monitoring Requirements
Post -Construction Storm Water Runoff Program
The permittee shall implement and enforce the program to address post -construction storm water runoff
from new development and redevelopment projects that disturb one (1) or more acres, including projects
less than one (1) acre that are part of a larger common plan of development or sale, and that discharge
into the permittee's MS4. The permittee shall implement and enforce the post -construction storm water
control program as part of the SWMP, to the maximum extent practicable and in accordance with the
approved ordinance or regulatory mechanism.
1) On or before March 1, 2021, the permittee shall submit to the Department for approval an in -
effect Post -Construction Storm Water Control regulatory mechanism to achieve the post -construction
storm water runoff performance standards set forth in a) and b) below at the project site (including
projects where the permittee is the project developer). Upon Department approval of the in -effect
regulatory mechanism, the permittee shall implement and enforce the regulatory mechanism requiring
implementation of BMPs by the project developer (including the permittee if the permittee is the project
developer) to achieve the post -construction storm water runoff performance standards at the project site
to the maximum extent practicable.
a) Water Quality Control Performance Standard
Treat the post -development runoff volume generated from a 1.0-inch rainfall event.
BMPs shall be designed on a site -specific basis to achieve a minimum of 80 percent
removal of total suspended solids (TSS) as compared with uncontrolled runoff or a
discharge concentration of TSS not to exceed 80 milligrams per liter (mg/1).
b) Channel Protection Control Performance Standard (CPC)
The CPC shall be implemented to limit the surface runoff rate and volume at the project
site to maintain or restore stable hydrology in receiving waters. An alternative CPC was
approved as part of the SWMP. The alternative CPC requires implementation of the
following at the project site to the maximum extent practicable:
(1) Channel Protection Volume Control (CPVC): Retain onsite the post -
development runoff volume from a 1.3-inch rainfall event, and
(2) Channel Protection Rate Control (CPRC): Provide extended detention for the
post -development runoff volume from a 1.9-inch rainfall event.
On or before April 1, 2022 and on or before April 1 of each vear following, as part of the
approved alternative, the permittee shall submit an annual report to the Department for
the previous calendar year documenting the results of implementing the alternative CPC
within the regulated area. The annual report shall tabulate the following for each
development or redevelopment project subject to the permittee's alternative CPC
(including projects where the permittee is the project developer) and provide an overall
summary for each reporting line:
(1) Change in impervious area, pervious area by cover type, and total area by site.
(2) CPVC volume provided at the site.
(3) Difference between required and provided CPVC volume by site.
(4) Percent of site in each Hydrologic Soil Group (Type A, B, C. D).
(5) Site location in geographic information system (GIS) polygon format.
(6) Site outfalls and points of discharge in GIS point format.
313
PERMIT NO. M10060089
Page 9 of 34
PART
Section A. Limitations and Monitoring Requirements
(7) Site MS4 outfall drainage area in GIS polygon format, including any offsite
drainage that passes through the outfall or points of discharge.
(8) CPRC volume provided at the site.
(9) Difference between required and provided CPRC volume by site.
The Department will provide a written determination to the permittee based on the
review of each progress report. The permittee shall submit available documentation to
support implementation of the alternative CPC, such as approved project plans, upon
request. The permittee may submit information to support implementation of the
alternative CPC in addition to the reporting requirements above as part of the progress
report.
The alternative CPC approval is limited to the permit term. The results from the annual
reports will be evaluated as part of permit reissuance using methods agreed to by the
permittee and the Department, which may result in an updated alternative CPC. A
modification to the alternative CPC during the permit term will result in a permit
modification after opportunity for public comment.
2) The permittee shall implement and enforce the following site -specific requirements as part of
meeting the post -construction storm water runoff performance standards set forth in a) and b), above:
a) The procedure for reviewing the use of infiltration BMPs to achieve the performance
standards in areas of soil or groundwater contamination in a manner that does not
exacerbate existing conditions.
b) The ordinance or regulatory mechanism requiring BMPs to address the associated
pollutants in potential hot spots as part of meeting the performance standards. Hot
spots include areas with the potential for significant pollutant loading including, but not
limited to, the following: gas stations; vehicle maintenance and repair; auto recyclers;
recycling centers and scrap yards; landfills; solid waste facilities; and railroads. Hot
spots also include areas with the potential for contaminating public water supply intakes.
3) All structural and vegetative BMPs installed and implemented to meet the performance
standards shall be operated and maintained in perpetuity by the BMP owner/operator. The permittee
shall implement and enforce the ordinance or regulatory mechanism program to ensure long-term
operation and maintenance of BMPs.
4) The ordinance or regulatory mechanism and procedures for site plan review and approval for
projects that disturb one (1) or more acres, including projects less than one (1) acre that are part of a
larger common plan of development or sale, and discharge to the permittee's MS4, including projects
where the permittee is the developer. The site plan review and approval shall demonstrate compliance
with the performance standards and long-term operation and maintenance requirements of this permit.
g. Pollution Prevention and Good Housekeeping Activities for Municipal Operations
The permittee shall implement the pollution prevention and good housekeeping program with the goal of
preventing or reducing pollutant runoff from municipal facilities and operations that discharge storm
water to surface waters of the state. The permittee shall implement the program as part of the SWMP to
the maximum extent practicable.
314
PERMIT NO. M10060089
Page 10 of 34
PART
Section A. Limitations and Monitoring Requirements
1) Municipal Facility and Structural Storm Water Control Inventory
The permittee shall make available to the Department upon request an up-to-date map or maps of the
facilities and structural storm water controls owned or operated by the permittee with a discharge to
surface waters of the state in the regulated area. In accordance with the procedure for updating and
revising the permittee's facility inventory and map(s), the permittee shall submit to the Department the
type and location for any new facility obtained or constructed during this permit term with a discharge of
storm water to surface waters of the state and the information requested in Part I.A.2. of the permit.
2) Facility -Specific Storm Water Management
The permittee shall implement the facility -specific standard operating procedure (SOP) for each facility
the permittee identified as having the high potential to discharge pollutants to surface waters of the
state. The permittee shall implement the BMPs identified in the procedure to prevent or reduce pollutant
runoff at each facility the permittee identified as having the medium or low potential to discharge
pollutants to surface waters of the state. The permittee shall assess new facilities for the potential to
discharge pollutants to surface waters of the state in accordance with the procedure to determine a
priority level. High -priority facilities shall include permittee-owned or operated fleet maintenance and
storage yards unless a demonstration is submitted and approved by the Department demonstrating how
the permittee's fleet maintenance or storage yard has the low potential to discharge pollutants to surface
waters of the state. The assessment shall be submitted in writing to the Department for approval within
30 days of ownership or operation of the new facility. The permittee shall certify in writing to the
Department that a facility -specific SOP is being implemented within 90 days of ownership or operation of
a new high -priority facility. Within 90 days of ownership or operation, the permittee shall certify in writing
to the Department that BMPs are being implemented in accordance with the procedure developed to
prevent or reduce pollutant runoff at each new medium- or low -priority facility. For new facilities, the
Department may determine that a permit modification is required, after opportunity for public comment.
The Department will notify the permittee if a modification is required. The permittee shall document all
other changes to the facility assessment as part of the progress report and as an update to the
procedure.
The facility -specific SOP shall be kept at the site described in the SOP and made available upon request
by the Department. The facility -specific SOP for each high -priority facility shall include implementation
of the following.
a) Structural and non-structural storm water controls to prevent or reduce the discharge of
pollutants to surface waters of the state.
b) Up-to-date list of significant materials stored on -site that could pollute storm water with a
description of the handling and storage requirements and potential to discharge for each
significant material.
c) Good housekeeping practices including, but not limited to, maintaining a clean and
orderly facility, properly storing and covering materials, and minimizing pollutant sources
to prevent or reduce pollutant runoff.
d) Routine maintenance and inspections of storm water management and control devices
to ensure materials and equipment are clean and orderly and prevent or reduce
pollutant runoff. The written report of the inspection and corrective actions shall be
retained in accordance with Part II.B.5. of this permit.
e) Comprehensive site inspections at least once every six (6) months. The comprehensive
site inspection shall include an inspection of all structural storm water controls and a
review of non-structural storm water controls to prevent or reduce pollutant runoff. A
written report of the inspection and corrective actions shall be retained in accordance
with Part II.B.5. of this permit.
315
PERMIT NO. M10060089
Page 11 of 34
PART
Section A. Limitations and Monitoring Requirements
3) Structural Storm Water Control Operation and Maintenance Activities
a) The permittee shall implement the procedures for inspecting, cleaning, and maintaining
permittee-owned or operated catch basins in the regulated area using the priority level
assigned to each catch basin. The permittee shall document changes to the priority
level for a catch basin as part of the progress report and as an update to the procedure.
The permittee shall also implement the procedure for dewatering and disposal of
materials extracted from the catch basins in accordance with Part 111 (Hazardous
Waste), Part 115 (Solid Waste), and Part 121 (Liquid Industrial Waste) of the NREPA.
b) The permittee shall implement the procedure for inspecting and maintaining permittee-
owned or operated structural storm water controls other than catch basins in the
regulated area. The permittee shall document changes to the procedure as part of the
progress report and as an update to the procedure.
c) The permittee shall implement the procedure requiring that new permittee-owned or
operated facilities or structural storm water controls to address water quantity be
designed and implemented in accordance with the post -construction storm water runoff
performance standards and long-term operation and maintenance requirements in Part
I.A.31. of this permit.
4) Municipal Operations and Maintenance Activities
a) The permittee shall implement the procedure, including the BMPs identified, to prevent
or reduce pollutant runoff from the permittee's operation and maintenance activities
identified in the SWMP. The permittee shall document changes to the assessment of
operation and maintenance activities for the potential to discharge pollutants to surface
waters of the state as part of the progress report and as an update to the procedure.
b) The permittee shall implement the procedure for the street sweeping program for
permittee-owned or operated streets, parking lots, or other impervious infrastructure in
the regulated area using the sweeping methods and assigned priority levels identified in
the procedure. The permittee shall document changes to the priority level for a street,
parking lot, or other impervious infrastructure as part of the progress report and as an
update to the procedure.
The permittee shall also implement the procedure for dewatering and disposal of street
sweeper waste material.
5) Managing Vegetated Properties
The permittee shall implement the procedure requiring the permittee's pesticide applicator to be certified
by the State of Michigan as an applicator in the applicable category, to prevent or reduce pollutant runoff
from vegetated land.
6) Employee Training
The permittee shall implement the employee training program to train employees involved in
implementing pollution prevention and good housekeeping activities. At a minimum, existing staff shall
be trained once during the permit cycle and new hire employees within the first vear of their hire date.
7) Contractor Requirements and Oversight
The permittee shall implement the procedure requiring contractors hired by the permittee to perform
municipal operation and maintenance activities that comply with the permittee's pollution prevention and
good housekeeping program and contractor oversight to ensure compliance.
316
PERMIT NO. M10060089
Page 12 of 34
PART
Section A. Limitations and Monitoring Requirements
4.
a
Total Maximum Daily Load (TMDL) Implementation Plan
The permittee shall implement the TMDL Implementation Plan to reduce the discharge of pollutants from
the permittee's MS4 to make progress in meeting Water Quality Standards. The permittee shall
implement the TMDL Implementation Plan as part of the SWMP.
The following TMDLs are applicable to the discharge from the permittee's MS4:
Name of TMDL
Clinton River
Red Run Drain and Bear Creek
Rouge River
Johnson Creek
Kent Lake
Norton Creek
Strawberry Lake
Pollutant of Concern
E. coli
E. coli
Biota (sediment) and E.coli
Dissolved oxygen
Phosphorus
Dissolved oxygen
Phosphorus
The permittee shall implement the prioritized BMPs included in the TMDL Implementation Plan during
the permit cycle to make progress in achieving the pollutant load reduction requirement in the TMDL.
The permittee shall review, update, and revise the list of BMPs implemented as part of the TMDL
Implementation Plan in accordance with the procedure included in the SWMP. The Department may
determine that a permit modification is required, after opportunity for public comment, based on
modifications to the TMDL Implementation Plan. The Department will notify the permittee if a
modification is required.
The permittee shall implement the monitoring plan included in the TMDL Implementation Plan for
assessing the effectiveness of the BMPs implemented in making progress toward achieving the TMDL
pollutant load reduction. Available monitoring data shall be submitted with each progress report.
SWMP Modifications
SWMP Modifications Requested by the Permittee
Modifications to the previously approved SWMP may be requested by the permittee as follows:
1) Modifications adding BMPs (but not replacing, subtracting, or affecting the level of
implementation of any other BMP) to the previously approved SWMP may be made by the permittee at
any time upon written notification to the Department. Notification shall include a description of the
modification, which may include a description of a new BMP with a corresponding measurable goal.
Upon notification to the Department, the modification is considered an enforceable part of the approved
SWMP.
2) Modifications replacing an ineffective or unfeasible BMP identified in the previously approved
SWMP with an alternative BMP may be requested at any time by written notification to the Department.
The ineffective or unfeasible BMP identified shall not be replaced in the previously approved SWMP
unless the replacement is approved by the Department. Modifications to the previously approved
SWMP may result in a permit modification after opportunity for public comment. Such requests shall
include the following:
a) an analysis of why the BMP is ineffective or unfeasible (including cost -prohibitive);
b) a measurable goal for the replacement BMP; and
c) an analysis of why the replacement BMP is expected to achieve the intent of the BMP to
be replaced.
317
PERMIT NO. M10060089
Page 13 of 34
PART
Section A. Limitations and Monitoring Requirements
3) Modifications subtracting an ineffective or unfeasible BMP identified in the previously approved
SWMP may be requested by written notification to the Department. The identified BMP shall not be
subtracted from the previously approved SWMP unless the subtraction is approved by the Department.
Modifications to the previously approved SWMP may result in a permit modification after opportunity for
public comment. Such requests shall include the following:
a) an analysis of why the BMP is ineffective or unfeasible (including cost prohibitive); and
b) a determination of why the removal of the BMP will not change the permittee's ability to
comply with the permit requirements.
Modifications Required by the Department
The Department may require the permittee to modify the SWMP as needed to:
1) address contributions from the permittee's MS4 discharge that impair receiving water quality;
2) include more stringent requirements necessary to comply with new state or federal statutory or
regulatory requirements; and/or
3) include such other conditions deemed necessary by the Department to comply with the goals
and requirements of the Federal Act or the NREPA, including the requirement to reduce the discharge of
pollutants from the MS4 to the maximum extent practicable.
5. Request for Approval to Use Water Treatment Additives
This permit does not authorize the use of any water treatment additive without prior written approval from the
Department. Such approval is authorized under separate correspondence. Water treatment additives include
any materials that are added to water used at the facility, or to wastewater generated by the facility, to condition
or treat the water. Permittees proposing to use water treatment additives, including a proposed increased
concentration of a previously approved water treatment additive, shall submit a request for approval via the
Department's MiWaters system. The MiWaters website is located at https://miwaters.deq.state.mi.us.
Instructions for submitting such a request may be obtained at http://www.michigan.gov/npdes (near the bottom of
that page, click on one or both of the links located under the Water Treatment Additives banner). Additional
monitoring and reporting may be required as a condition of approval to use the water treatment additive.
A request for approval to use water treatment additives shall include all of the following usage and discharge
information for each water treatment additive proposed to be used:
a. The Safety Data Sheet (SDS);
Ingredient information, including the name of each ingredient, CAS number for each ingredient, and
fractional content by weight for each ingredient;
C. The proposed water treatment additive discharge concentration with supporting calculations;
d. The discharge frequency (i.e., number of hours per day and number of days per year);
e. The outfall(s) and monitoring point(s) from which the water treatment additive is to be discharged;
f. The type of removal treatment, if any, that the water treatment additive receives prior to discharge;
g. The water treatment additive's function (i.e., microbiocide, flocculant, etc.);
h. The SDS shall include a 48-hour LC50 or EC50 for a North American freshwater planktonic crustacean
(either Ceriodaphnia sp., Daphnia sp., or Simocephalus sp.); The results shall be based on the whole
water treatment additive, shall not be results based on a similar product, and shall not be estimated; and
318
PERMIT NO. M10060089
Page 14 of 34
PART
Section A. Limitations and Monitoring Requirements
The SDS shall include the results of a toxicity test for one (1) other North American freshwater aquatic
species (other than a planktonic crustacean) that meets a minimum requirement of R 323.1057(2) of the
Water Quality Standards. The results shall be based on the whole water treatment additive, shall not be
results based on a similar product, and shall not be estimated. Examples of tests that would meet this
requirement include a 96-hour LC50 for rainbow trout, bluegill, or fathead minnow.
6. Tracer Dye Discharges
This permit does not authorize the discharge of tracer dyes without approval from the Department. Requests to
discharge tracer dyes shall be submitted to the Department in accordance with Rule 1097 (R 323.1097 of the
Michigan Administrative Code).
7. Storm Water Program Manager (Facility Contact)
The "Facility Contact' was specified in the application. The permittee may replace the facility contact at any
time, and shall notify the Department in writing within 10 days after replacement (including the name, address
and telephone number of the new facility contact).
a. The facility contact shall be (or a duly authorized representative of this person):
• for a corporation, a principal executive officer of at least the level of vice president; or a designated
representative if the representative is responsible for the overall operation of the facility from which
the discharge originates, as described in the permit application or other NPDES form,
• for a partnership, a general partner,
• for a sole proprietorship, the proprietor, or
• for a municipal, state, or other public facility, either a principal executive officer, the mayor, village
president, city or village manager or other duly authorized employee.
A person is a duly authorized representative only if:
• the authorization is made in writing to the Department by a person described in paragraph a. of this
section; and
• the authorization specifies either an individual or a position having responsibility for the overall
operation of the regulated facility or activity such as the position of plant manager, operator of a well
or a well field, superintendent, position of equivalent responsibility, or an individual or position having
overall responsibility for environmental matters for the facility (a duly authorized representative may
thus be either a named individual or any individual occupying a named position).
Nothing in this section obviates the permittee from properly submitting reports and forms as required by law.
319
PERMIT NO. M10060089
Page 15 of 34
PART
Section B. Program Assessment and Reporting
1. Progress Reports
Progress reports shall be submitted on or before April 1, 2022 and on or before April 1 every two (2) vears
following. The Department may approve alternate dates for progress report submittal if requested and
adequately justified by the permittee. Each progress report shall contain the following information for the entire
period that has elapsed since the last progress report submittal (i.e., the reporting cycle):
a. Compliance Assessment
The permittee shall describe the status of compliance with the approved SWMP identified in Part I.A.3 of
this permit. The permittee shall assess and describe the appropriateness of the BMPs identified in the
SWMP. The report shall describe the progress made towards achieving the identified measurable goals
for each of the BMPs, and specific evaluation criteria as follows:
1) For the PEP, provide a summary of the evaluation of the overall effectiveness of the PEP, using
the evaluation methods described in the PEP.
2) For the IDEP, provide a summary of the evaluation and determination of the overall
effectiveness of the IDEP, using the evaluation methods described in the IDEP. For each illicit
discharge that was not eliminated within 90 days of its discovery the permittee shall provide a written
certification that the illicit discharge was eliminated or a description of how the illicit discharge will be
eliminated.
3) If applicable, the permittee shall submit to the Department any new outfall or point of discharge
information as required in Part I.A.2. of this permit.
4) For the TMDL Implementation Plan, if monitoring data is available in accordance with the
monitoring plan, provide an assessment of progress made toward achieving the TMDL pollutant load
reduction requirement.
Data and Results
The permittee shall provide a summary of all of the information collected and analyzed, including
monitoring data, if any, during the reporting cycle.
C. Upcoming Activities
The permittee shall provide a summary of the BMPs to be implemented during the next reporting cycle.
d. Changes to BMPs and Measurable Goals
The permittee shall describe any changes to BMPs or measurable goals in the approved SWMP. In
accordance with the permit, these changes will be reviewed to determine if a permit modification is
necessary. The Department will notify the permittee if a permit modification is required.
e. Notice of Changes in Nested Jurisdiction Agreements
The permittee shall identify any nested jurisdictions that enter into or terminate permit agreements with
the permittee which were not identified in the SWMP. The permittee may request to modify the permit
coverage to add or remove a nested MS4 by submitting a request to the Department for approval in
accordance with Part I.A.1.b. of this permit. Modifications to the permit coverage may result in a permit
modification, after opportunity for public comment.
Required Signatures
All reports required by this permit, and other information requested by the Department, shall be signed
by either a principal executive officer or ranking elected official, or by a duly authorized representative of
that person in accordance with 40 CFR 122.22(b).
320
PERMIT NO. M10060089 Page 16 of 34
PART II
Part II may include terms and /or conditions not applicable to discharges covered under this permit.
Section A. Definitions
Acute toxic unit (TUA) means 100/LC50 where the LC50 is determined from a whole effluent toxicity (WET) test
which produces a result that is statistically or graphically estimated to be lethal to 50% of the test organisms.
Annual monitoring frequency refers to a calendar year beginning on January 1 and ending on December 31.
When required by this permit, an analytical result, reading, value or observation shall be reported for that period
if a discharge occurs during that period.
Authorized public agency means a state, local, or county agency that is designated pursuant to the provisions
of Section 9110 of Part 91, Soil and Sedimentation Control, of the NREPA, to implement soil erosion and
sedimentation control requirements with regard to construction activities undertaken by that agency.
Best management practices (BMPs) means structural devices or nonstructural practices that are designed to
prevent pollutants from entering into storm water, to direct the flow of storm water, or to treat polluted storm
water.
Bioaccumulative chemical of concern (BCC) means a chemical which, upon entering the surface waters, by
itself or as its toxic transformation product, accumulates in aquatic organisms by a human health
bioaccumulation factor of more than 1000 after considering metabolism and other physiochemical properties that
might enhance or inhibit bioaccumulation. The human health bioaccumulation factor shall be derived according
to R 323.1057(5). Chemicals with half-lives of less than 8 weeks in the water column, sediment, and biota are
not BCCs. The minimum bioaccumulation concentration factor (BAF) information needed to define an organic
chemical as a BCC is either a field -measured BAF or a BAF derived using the biota -sediment accumulation
factor (BSAF) methodology. The minimum BAF information needed to define an inorganic chemical as a BCC,
including an organometal, is either a field -measured BAF or a laboratory -measured bioconcentration factor
(BCF). The BCCs to which these rules apply are identified in Table 5 of R 323.1057 of the Water Quality
Standards.
Biosolids are the solid, semisolid, or liquid residues generated during the treatment of sanitary sewage or
domestic sewage in a treatment works. This includes, but is not limited to, scum or solids removed in primary,
secondary, or advanced wastewater treatment processes and a derivative of the removed scum or solids.
Bulk biosolids means biosolids that are not sold or given away in a bag or other container for application to a
lawn or home garden.
Certificate of Coverage (COC) is a document, issued by the Department, which authorizes a discharge under a
general permit.
Chronic toxic unit (TUB) means 100/MATC or 100/IC25, where the maximum acceptable toxicant concentration
(MATC) and IC25 are expressed as a percent effluent in the test medium.
Class B biosolids refers to material that has met the Class B pathogen reduction requirements or equivalent
treatment by a Process to Significantly Reduce Pathogens (PSRP) in accordance with the Part 24 Rules, Land
Application of Biosolids, promulgated under Part 31 of the NREPA. Processes include aerobic digestion,
composting, anaerobic digestion, lime stabilization and air drying.
Combined sewer system is a sewer system in which storm water runoff is combined with sanitary wastes.
Continuous monitoring refers to sampling/readings that occur at regular and consistent intervals throughout a
24-hour period and at a frequency sufficient to capture data that are representative of the discharge. The
maximum acceptable interval between samples/readings shall be one (1) hour.
321
PERMIT NO. M10060089
Page 17 of 34
PART II
Section A. Definitions
Daily concentration
FOR PARAMETERS OTHER THAN pH, DISSOLVED OXYGEN, TEMPERATURE, AND CONDUCTIVITY —
Daily concentration is the sum of the concentrations of the individual samples of a parameter taken within a
calendar day divided by the number of samples taken within that calendar day. The daily concentration will be
used to determine compliance with any maximum and minimum daily concentration limitations. For guidance
and examples showing how to perform calculations using results below quantification levels, see the document
entitled "Reporting Results Below Quantification," available at https://www.michigan.gov/documents/deq/wrd-
npdes-resu Its-quantification_620791 _7. pdf.
FOR pH, DISSOLVED OXYGEN, TEMPERATURE, AND CONDUCTIVITY — The daily concentration used to
determine compliance with maximum daily pH, temperature, and conductivity limitations is the highest pH,
temperature, and conductivity readings obtained within a calendar day. The daily concentration used to
determine compliance with minimum daily pH and dissolved oxygen limitations is the lowest pH and dissolved
oxygen readings obtained within a calendar day.
Daily loading is the total discharge by weight of a parameter discharged during any calendar day. This value is
calculated by multiplying the daily concentration by the total daily flow and by the appropriate conversion factor.
The daily loading will be used to determine compliance with any maximum daily loading limitations. When
required by the permit, report the maximum calculated daily loading for the month in the "MAXIMUM" column
under "QUANTITY OR LOADING' on the DMRs.
Daily monitoring frequency refers to a 24-hour day. When required by this permit, an analytical result,
reading, value or observation shall be reported for that period if a discharge occurs during that period.
Department means the Michigan Department of Environment, Great Lakes, and Energy.
Detection level means the lowest concentration or amount of the target analyte that can be determined to be
different from zero by a single measurement at a stated level of probability.
Discharge means the addition of any waste, waste effluent, wastewater, pollutant, or any combination thereof to
any surface water of the state.
EC50 means a statistically or graphically estimated concentration that is expected to cause 1 or more specified
effects in 50% of a group of organisms under specified conditions.
Fecal coliform bacteria monthly
FOR WWSLs THAT COLLECT AND STORE WASTEWATER AND ARE AUTHORIZED TO DISCHARGE ONLY
IN THE SPRING AND/OR FALL ON AN INTERMITTENT BASIS — Fecal coliform bacteria monthly is the
geometric mean of all daily concentrations determined during a discharge event. Days on which no daily
concentration is determined shall not be used to determine the calculated monthly value. The calculated
monthly value will be used to determine compliance with the maximum monthly fecal coliform bacteria
limitations. When required by the permit, report the calculated monthly value in the "AVERAGE" column under
"QUALITY OR CONCENTRATION" on the DMR. If the period in which the discharge event occurred was
partially in each of two months, the calculated monthly value shall be reported on the DMR of the month in which
the last day of discharge occurred.
FOR ALL OTHER DISCHARGES — Fecal coliform bacteria monthly is the geometric mean of all daily
concentrations determined during a reporting month. Days on which no daily concentration is determined shall
not be used to determine the calculated monthly value. The calculated monthly value will be used to determine
compliance with the maximum monthly fecal coliform bacteria limitations. When required by the permit, report
the calculated monthly value in the "AVERAGE" column under "QUALITY OR CONCENTRATION" on the DMR.
322
PERMIT NO. M10060089
Page 18 of 34
PART II
Section A. Definitions
Fecal coliform bacteria 7-day
FOR WWSLs THAT COLLECT AND STORE WASTEWATER AND ARE AUTHORIZED TO DISCHARGE ONLY
IN THE SPRING AND/OR FALL ON AN INTERMITTENT BASIS — Fecal coliform bacteria 7-day is the geometric
mean of the daily concentrations determined during any 7 consecutive days of discharge during a discharge
event. If the number of daily concentrations determined during the discharge event is less than 7 days, the
number of actual daily concentrations determined shall be used for the calculation. Days on which no daily
concentration is determined shall not be used to determine the value. The calculated 7-day value will be used to
determine compliance with the maximum 7-day fecal coliform bacteria limitations. When required by the permit,
report the maximum calculated 7-day geometric mean value for the month in the "MAXIMUM" column under
"QUALITY OR CONCENTRATION" on the DMRs. If the 7-day period was partially in each of two months, the
value shall be reported on the DMR of the month in which the last day of discharge occurred.
FOR ALL OTHER DISCHARGES — Fecal coliform bacteria 7-day is the geometric mean of the daily
concentrations determined during any 7 consecutive days in a reporting month. If the number of daily
concentrations determined is less than 7, the actual number of daily concentrations determined shall be used for
the calculation. Days on which no daily concentration is determined shall not be used to determine the value.
The calculated 7-day value will be used to determine compliance with the maximum 7-day fecal coliform bacteria
limitations. When required by the permit, report the maximum calculated 7-day geometric mean for the month in
the "MAXIMUM" column under "QUALITY OR CONCENTRATION" on the DMRs. The first calculation shall be
made on day 7 of the reporting month, and the last calculation shall be made on the last day of the reporting
month.
Flow -proportioned composite sample — See definition of 24-hour composite sample.
General permit means an NPDES permit authorizing a category of similar discharges.
Geometric mean is the average of the logarithmic values of a base 10 data set, converted back to a base 10
number.
Grab sample is a single sample taken at neither a set time nor flow.
IC25 means the toxicant concentration that would cause a 25% reduction in a nonquantal biological
measurement for the test population.
Illicit connection means a physical connection to a municipal separate storm sewer system that primarily
conveys non -storm water discharges other than uncontaminated groundwater into the storm sewer; or a physical
connection not authorized or permitted by the local authority, where a local authority requires authorization or a
permit for physical connections.
Illicit discharge means any discharge to, or seepage into, a municipal separate storm sewer system that is not
composed entirely of storm water or uncontaminated groundwater. Illicit discharges include non -storm water
discharges through pipes or other physical connections; dumping of motor vehicle fluids, household hazardous
wastes, domestic animal wastes, or litter; collection and intentional dumping of grass clippings or leaf litter; or
unauthorized discharges of sewage, industrial waste, restaurant wastes, or any other non -storm water waste
directly into a separate storm sewer.
Individual permit means a site -specific NPDES permit.
Inlet means a catch basin, roof drain, conduit, drain tile, retention pond riser pipe, sump pump, or other point
where storm water or wastewater enters into a closed conveyance system prior to discharge off site or into
waters of the state.
323
PERMIT NO. M10060089
Page 19 of 34
PART II
Section A. Definitions
Interference is a discharge which, alone or in conjunction with a discharge or discharges from other sources,
both: 1) inhibits or disrupts a POTW, its treatment processes or operations, or its sludge processes, use or
disposal; and 2) therefore, is a cause of a violation of any requirement of the POTW's NPDES permit (including
an increase in the magnitude or duration of a violation) or, of the prevention of sewage sludge use or disposal in
compliance with the following statutory provisions and regulations or permits issued thereunder (or more
stringent state or local regulations): Section 405 of the Clean Water Act, the Solid Waste Disposal Act (SWDA)
(including Title ll, more commonly referred to as the Resource Conservation and Recovery Act (RCRA), and
including state regulations contained in any state sludge management plan prepared pursuant to Subtitle D of
the SWDA), the Clean Air Act, the Toxic Substances Control Act, and the Marine Protection, Research and
Sanctuaries Act. [This definition does not apply to sample matrix interference].
Land application means spraying or spreading biosolids or a biosolids derivative onto the land surface,
injecting below the land surface, or incorporating into the soil so that the biosolids or biosolids derivative can
either condition the soil or fertilize crops or vegetation grown in the soil.
LC50 means a statistically or graphically estimated concentration that is expected to be lethal to 50% of a group
of organisms under specified conditions.
Maximum acceptable toxicant concentration (MATC) means the concentration obtained by calculating the
geometric mean of the lower and upper chronic limits from a chronic test. A lower chronic limit is the highest
tested concentration that did not cause the occurrence of a specific adverse effect. An upper chronic limit is the
lowest tested concentration which did cause the occurrence of a specific adverse effect and above which all
tested concentrations caused such an occurrence.
Maximum extent practicable means implementation of best management practices by a public body to comply
with an approved storm water management program as required by a national permit for a municipal separate
storm sewer system, in a manner that is environmentally beneficial, technically feasible, and within the public
body's legal authority.
MBTU/hr means million British Thermal Units per hour.
MGD means million gallons per day.
Monthly concentration is the sum of the daily concentrations determined during a reporting period divided by
the number of daily concentrations determined. The calculated monthly concentration will be used to determine
compliance with any maximum monthly concentration limitations. Days with no discharge shall not be used to
determine the value. When required by the permit, report the calculated monthly concentration in the
"AVERAGE" column under "QUALITY OR CONCENTRATION" on the DMR.
For minimum percent removal requirements, the monthly influent concentration and the monthly effluent
concentration shall be determined. The calculated monthly percent removal, which is equal to 100 times the
quantity [1 minus the quantity (monthly effluent concentration divided by the monthly influent concentration)],
shall be reported in the "MINIMUM" column under "QUALITY OR CONCENTRATION" on the DMRs.
Monthly loading is the sum of the daily loadings of a parameter divided by the number of daily loadings
determined during a reporting period. The calculated monthly loading will be used to determine compliance with
any maximum monthly loading limitations. Days with no discharge shall not be used to determine the value.
When required by the permit, report the calculated monthly loading in the "AVERAGE" column under
"QUANTITY OR LOADING" on the DMR.
Monthly monitoring frequency refers to a calendar month. When required by this permit, an analytical result,
reading, value or observation shall be reported for that period if a discharge occurs during that period.
Municipal separate storm sewer means a conveyance or system of conveyances designed or used for
collecting or conveying storm water which is not a combined sewer and which is not part of a POTW as defined
in the Code of Federal Regulations at 40 CFR 122.2.
324
PERMIT NO. M10060089
Page 20 of 34
PART II
Section A. Definitions
Municipal separate storm sewer system (MS4) means all separate storm sewers that are owned or operated
by the United States, a state, city, village, township, county, district, association, or other public body created by
or pursuant to state law, having jurisdiction over disposal of sewage, industrial wastes, storm water, or other
wastes, including special districts under state law, such as a sewer district, flood control district, or drainage
district, or similar entity, or a designated or approved management agency under Section 208 of the Clean
Water Act that discharges to the waters of the state. This term includes systems similar to separate storm sewer
systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highways
and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as
individual buildings.
National Pretreatment Standards are the regulations promulgated by or to be promulgated by the Federal
Environmental Protection Agency pursuant to Section 307(b) and (c) of the Clean Water Act. The standards
establish nationwide limits for specific industrial categories for discharge to a POTW.
No observed adverse effect level (NOAEL) means the highest tested dose or concentration of a substance
which results in no observed adverse effect in exposed test organisms where higher doses or concentrations
result in an adverse effect.
Noncontact cooling water is water used for cooling which does not come into direct contact with any raw
material, intermediate product, by-product, waste product or finished product.
Nondomestic user is any discharger to a POTW that discharges wastes other than or in addition to water -
carried wastes from toilet, kitchen, laundry, bathing or other facilities used for household purposes.
Nonstructural controls are practices or procedures implemented by employees at a facility to manage storm
water or to prevent contamination of storm water.
NPDES means National Pollutant Discharge Elimination System.
Outfall is the location at which a point source discharge first enters a surface water of the state.
Part 91 agency means an agency that is designated by a county board of commissioners pursuant to the
provisions of Section 9105 of Part 91 of the NREPA; an agency that is designated by a city, village, or township
in accordance with the provisions of Section 9106 of Part 91 of the NREPA; or the Department for soil erosion
and sedimentation control activities under Part 615, Supervisor of Wells; Part 631, Reclamation of Mining Lands;
or Part 632, Nonferrous Metallic Mineral Mining, of the NREPA, pursuant to the provisions of Section 9115 of
Part 91 of the NREPA.
Part 91 permit means a soil erosion and sedimentation control permit issued by a Part 91 agency pursuant to
the provisions of Part 91 of the NREPA.
Partially treated sewage is any sewage, sewage and storm water, or sewage and wastewater, from domestic
or industrial sources that is treated to a level less than that required by the permittee's NPDES permit, or that is
not treated to national secondary treatment standards for wastewater, including discharges to surface waters
from retention treatment facilities.
Point of discharge is the location of a point source discharge where storm water is discharged directly into a
separate storm sewer system.
Point source discharge means a discharge from any discernible, confined, discrete conveyance, including but
not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, or rolling stock.
Changing the surface of land or establishing grading patterns on land will result in a point source discharge
where the runoff from the site is ultimately discharged to waters of the state.
325
PERMIT NO. M10060089
Page 21 of 34
PART II
Section A. Definitions
Polluting material means any material, in solid or liquid form, identified as a polluting material under the Part 5
Rules, Spillage of Oil and Polluting Materials, promulgated under Part 31 of the NREPA (R 324.2001 through
R 324.2009 of the Michigan Administrative Code).
POTW is a publicly owned treatment work.
Predevelopment is the last land use prior to the planned new development or redevelopment.
Pretreatment is reducing the amount of pollutants, eliminating pollutants, or altering the nature of pollutant
properties to a less harmful state prior to discharge into a public sewer. The reduction or alteration can be by
physical, chemical, or biological processes, process changes, or by other means. Dilution is not considered
pretreatment unless expressly authorized by an applicable National Pretreatment Standard for a particular
industrial category.
Public (as used in the MS4 individual permit) means all persons who potentially could affect the authorized
storm water discharges, including, but not limited to, residents, visitors to the area, public employees,
businesses, industries, and construction contractors and developers.
Public body means the United States; the state of Michigan; a city, village, township, county, school district,
public college or university, or single -purpose governmental agency; or any other body which is created by
federal or state statute or law.
Qualified Personnel means an individual who meets qualifications acceptable to the Department and who is
authorized by an Industrial Storm Water Certified Operator to collect the storm water sample.
Qualifying storm event means a storm event causing greater than 0.1 inch of rainfall and occurring at least 72
hours after the previous measurable storm event that also caused greater than 0.1 inch of rainfall. Upon
request, the Department may approve an alternate definition meeting the condition of a qualifying storm event.
Quantification level means the measurement of the concentration of a contaminant obtained by using a
specified laboratory procedure calculated at a specified concentration above the detection level. It is considered
the lowest concentration at which a particular contaminant can be quantitatively measured using a specified
laboratory procedure for monitoring of the contaminant.
Quarterly monitoring frequency refers to a three month period, defined as January through March, April
through June, July through September, and October through December. When required by this permit, an
analytical result, reading, value or observation shall be reported for that period if a discharge occurs during that
period.
Regional Administrator is the Region 5 Administrator, U.S. EPA, located at R-19J, 77 W. Jackson Blvd.,
Chicago, Illinois 60604.
Regulated area means the permittee's urbanized area, where urbanized area is defined as a place and its
adjacent densely -populated territory that together have a minimum population of 50,000 people as defined by
the United States Bureau of the Census and as determined by the latest available decennial census.
Secondary containment structure means a unit, other than the primary container, in which significant
materials are packaged or held, which is required by state or federal law to prevent the escape of significant
materials by gravity into sewers, drains, or otherwise directly or indirectly into any sewer system or to the surface
waters or groundwaters of the state.
Separate storm sewer system means a system of drainage, including, but not limited to, roads, catch basins,
curbs, gutters, parking lots, ditches, conduits, pumping devices, or man-made channels, which is not a combined
sewer where storm water mixes with sanitary wastes, and is not part of a POTW.
326
PERMIT NO. M10060089
Page 22 of 34
PART II
Section A. Definitions
Significant industrial user is a nondomestic user that: 1) is subject to Categorical Pretreatment Standards
under 40 CFR 403.6 and 40 CFR Chapter I, Subchapter N; or 2) discharges an average of 25,000 gallons per
day or more of process wastewater to a POTW (excluding sanitary, noncontact cooling and boiler blowdown
wastewater); contributes a process waste stream which makes up five (5) percent or more of the average dry
weather hydraulic or organic capacity of the POTW treatment plant; or is designated as such by the permittee as
defined in 40 CFR 403.12(a) on the basis that the industrial user has a reasonable potential for adversely
affecting the POTW's treatment plant operation or violating any pretreatment standard or requirement (in
accordance with 40 CFR 403.8(f)(6)).
Significant materials means any material which could degrade or impair water quality, including but not limited
to: raw materials; fuels; solvents, detergents, and plastic pellets; finished materials such as metallic products;
hazardous substances designated under Section 101(14) of the Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA) (see 40 CFR 372.65); any chemical the facility is required to report
pursuant to Section 313 of Emergency Planning and Community Right -to -Know Act (EPCRA); polluting materials
as identified under the Part 5 Rules (R 324.2001 through R 324.2009 of the Michigan Administrative Code);
Hazardous Wastes as defined in Part 111, Hazardous Waste Management, of the NREPA; fertilizers; pesticides;
and waste products such as ashes, slag, and sludge that have the potential to be released with storm water
discharges.
Significant spills and significant leaks means any release of a polluting material reportable under the Part 5
Rules (R 324.2001 through R 324.2009 of the Michigan Administrative Code).
Special -use area means storm water discharges for which the Department has determined that additional
monitoring is needed from: secondary containment structures required by state or federal law; lands on
Michigan's List of Sites of Environmental Contamination pursuant to Part 201, Environmental Remediation, of
the NREPA; and/or areas with other activities that may contribute pollutants to the storm water.
Stoichiometric means the quantity of a reagent calculated to be necessary and sufficient for a given chemical
reaction.
Storm water means storm water runoff, snow melt runoff, surface runoff and drainage, and non -storm water
included under the conditions of this permit.
Storm water discharge point is the location where the point source discharge of storm water is directed to
surface waters of the state or to a separate storm sewer. It includes the location of all point source discharges
where storm water exits the facility, including outfalls which discharge directly to surface waters of the state, and
points of discharge which discharge directly into separate storm sewer systems.
Structural controls are physical features or structures used at a facility to manage or treat storm water.
SWPPP means the Storm Water Pollution Prevention Plan prepared in accordance with this permit.
Tier I value means a value for aquatic life, human health or wildlife calculated under R 323.1057 of the Water
Quality Standards using a tier I toxicity database.
Tier II value means a value for aquatic life, human health or wildlife calculated under R 323.1057 of the Water
Quality Standards using a tier II toxicity database.
Total maximum daily loads (TMDLs) are required by the Clean Water Act for waterbodies that do not meet
water quality standards. TMDLs represent the maximum daily load of a pollutant that a waterbody can assimilate
and meet water quality standards, and an allocation of that load among point sources, nonpoint sources, and a
margin of safety.
Toxicity reduction evaluation (TRE) means a site -specific study conducted in a stepwise process designed to
identify the causative agents of effluent toxicity, isolate the sources of toxicity, evaluate the effectiveness of
toxicity control options, and then confirm the reduction in effluent toxicity.
327
PERMIT NO. M10060089
Page 23 of 34
PART II
Section A. Definitions
Water Quality Standards means the Part 4 Water Quality Standards promulgated pursuant to Part 31 of the
NREPA, being R 323.1041 through R 323.1117 of the Michigan Administrative Code.
Weekly monitoring frequency refers to a calendar week which begins on Sunday and ends on Saturday. For
a calendar week that falls entirely within a single calendar month, then when required by this permit, an
analytical result, reading, value, or observation shall be reported for that week if a discharge occurs during that
week. For a calendar week split across two (2) calendar months, a separate analytical result, reading, value, or
observation shall be reported for each part of that week/month in which a discharge occurs.
WWSL is a wastewater stabilization lagoon.
WWSL discharge event is a discrete occurrence during which effluent is discharged to the surface water up to
10 days of a consecutive 14 day period.
3-portion composite sample is a sample consisting of three equal -volume grab samples collected at equal
intervals over an 8-hour period.
7-day concentration
FOR WWSLs THAT COLLECT AND STORE WASTEWATER AND ARE AUTHORIZED TO DISCHARGE ONLY
IN THE SPRING AND/OR FALL ON AN INTERMITTENT BASIS — The 7-day concentration is the sum of the
daily concentrations determined during any 7 consecutive days of discharge during a WWSL discharge event
divided by the number of daily concentrations determined. If the number of daily concentrations determined
during the WWSL discharge event is less than 7 days, the number of actual daily concentrations determined
shall be used for the calculation. The calculated 7-day concentration will be used to determine compliance with
any maximum 7-day concentration limitations. When required by the permit, report the maximum calculated 7-
day concentration for the WWSL discharge event in the "MAXIMUM" column under "QUALITY OR
CONCENTRATION" on the DMR. If the WWSL discharge event was partially in each of two months, the value
shall be reported on the DMR of the month in which the last day of discharge occurred.
FOR ALL OTHER DISCHARGES — The 7-day concentration is the sum of the daily concentrations determined
during any 7 consecutive days in a reporting month divided by the number of daily concentrations determined. If
the number of daily concentrations determined is less than 7, the actual number of daily concentrations
determined shall be used for the calculation. The calculated 7-day concentration will be used to determine
compliance with any maximum 7-day concentration limitations in the reporting month. When required by the
permit, report the maximum calculated 7-day concentration for the month in the "MAXIMUM" column under
"QUALITY OR CONCENTRATION" on the DMR. The first 7-day calculation shall be made on day 7 of the
reporting month, and the last calculation shall be made on the last day of the reporting month.
328
PERMIT NO. M10060089
Page 24 of 34
PART II
Section A. Definitions
7-day loading
FOR WWSLs THAT COLLECT AND STORE WASTEWATER AND ARE AUTHORIZED TO DISCHARGE ONLY
IN THE SPRING AND/OR FALL ON AN INTERMITTENT BASIS — The 7-day loading is the sum of the daily
loadings determined during any 7 consecutive days of discharge during a WWSL discharge event divided by the
number of daily loadings determined. If the number of daily loadings determined during the WWSL discharge
event is less than 7 days, the number of actual daily loadings determined shall be used for the calculation. The
calculated 7-day loading will be used to determine compliance with any maximum 7-day loading limitations.
When required by the permit, report the maximum calculated 7-day loading for the WWSL discharge event in the
"MAXIMUM" column under "QUANTITY OR LOADING" on the DMR. If the WWSL discharge event was partially
in each of two months, the value shall be reported on the DMR of the month in which the last day of discharge
occurred.
FOR ALL OTHER DISCHARGES — The 7-day loading is the sum of the daily loadings determined during any 7
consecutive days in a reporting month divided by the number of daily loadings determined. If the number of
daily loadings determined is less than 7, the actual number of daily loadings determined shall be used for the
calculation. The calculated 7-day loading will be used to determine compliance with any maximum 7-day
loading limitations in the reporting month. When required by the permit, report the maximum calculated 7-day
loading for the month in the "MAXIMUM" column under "QUANTITY OR LOADING' on the DMR. The first 7-day
calculation shall be made on day 7 of the reporting month, and the last calculation shall be made on the last day
of the reporting month.
24-hour composite sample is a flow -proportioned composite sample consisting of hourly or more frequent
portions that are taken over a 24-hour period and in which the volume of each portion is proportional to the
discharge flow rate at the time that portion is taken. A time -proportioned composite sample may be used upon
approval from the Department if the permittee demonstrates it is representative of the discharge.
329
PERMIT NO. M10060089
Page 25 of 34
PART II
Section B. Monitoring Procedures
1. Representative Samples
Samples and measurements taken as required herein shall be representative of the volume and nature of the
monitored discharge.
2. Test Procedures
Test procedures for the analysis of pollutants shall conform to regulations promulgated pursuant to Section
304(h) of the Clean Water Act (40 CFR Part 136 — Guidelines Establishing Test Procedures for the Analysis of
Pollutants), unless specified otherwise in this permit. Test procedures used shall be sufficiently sensitive to
determine compliance with applicable effluent limitations. Requests to use test procedures not
promulgated under 40 CFR Part 136 for pollutant monitoring required by this permit shall be made in accordance
with the Alternate Test Procedures regulations specified in 40 CFR 136.4. These requests shall be submitted to
the Manager of the Permits Section, Water Resources Division, Michigan Department of Environment, Great
Lakes, and Energy, P.O. Box 30458, Lansing, Michigan, 48909-7958. The permittee may use such procedures
upon approval.
The permittee shall periodically calibrate and perform maintenance procedures on all analytical instrumentation
at intervals to ensure accuracy of measurements. The calibration and maintenance shall be performed as part
of the permittee's laboratory Quality Assurance/Quality Control program.
3. Instrumentation
The permittee shall periodically calibrate and perform maintenance procedures on all monitoring instrumentation
at intervals to ensure accuracy of measurements.
4. Recording Results
For each measurement or sample taken pursuant to the requirements of this permit, the permittee shall record
the following information: 1) the exact place, date, and time of measurement or sampling; 2) the person(s) who
performed the measurement or sample collection; 3) the dates the analyses were performed; 4) the person(s)
who performed the analyses; 5) the analytical techniques or methods used; 6) the date of and person
responsible for equipment calibration; and 7) the results of all required analyses.
5. Records Retention
All records and information resulting from the monitoring activities required by this permit including all records of
analyses performed and calibration and maintenance of instrumentation and recordings from continuous
monitoring instrumentation shall be retained for a minimum of three (3) years, or longer if requested by the
Regional Administrator or the Department.
330
PERMIT NO. M10060089
Page 26 of 34
PART II
Section C. Reporting Requirements
1. Start -Up Notification
If the permittee will not discharge during the first 60 days following the effective date of this permit, the permittee
shall notify the Department within 14 days following the effective date of this permit, and then 60 days prior to
the commencement of the discharge.
2. Submittal Requirements for Self -Monitoring Data
Part 31 of the NREPA (specifically Section 324.3110(7)); and R 323.2155(2) of Part 21, Wastewater Discharge
Permits, promulgated under Part 31 of the NREPA, allow the Department to specify the forms to be utilized for
reporting the required self -monitoring data. Unless instructed on the effluent limitations page to conduct
"Retained Self -Monitoring," the permittee shall submit self -monitoring data via the Department's MiWaters
system.
The permittee shall utilize the information provided on the MiWaters website, located at
https://miwaters.deq.state. mi. us, to access and submit the electronic forms. Both monthly summary and daily
data shall be submitted to the Department no later than the 201h day of the month following each month of the
authorized discharge period(s). The permittee may be allowed to submit the electronic forms after this date if
the Department has granted an extension to the submittal date.
3. Retained Self -Monitoring Requirements
If instructed on the effluent limits page (or otherwise authorized by the Department in accordance with the
provisions of this permit) to conduct retained self -monitoring, the permittee shall maintain a year-to-date log of
retained self -monitoring results and, upon request, provide such log for inspection to the staff of the Department.
Retained self -monitoring results are public information and shall be promptly provided to the public upon
request.
The permittee shall certify, in writing, to the Department, on or before January 10th (April 1 st for animal feeding.
operation facilities) of each vear, that: 1) all retained self -monitoring requirements have been complied with and
a year-to-date log has been maintained; and 2) the application on which this permit is based still accurately
describes the discharge. With this annual certification, the permittee shall submit a summary of the previous
year's monitoring data. The summary shall include maximum values for samples to be reported as daily
maximums and/or monthly maximums and minimum values for any daily minimum samples.
Retained self -monitoring may be denied to a permittee by notification in writing from the Department. In such
cases, the permittee shall submit self -monitoring data in accordance with Part II.C.2., above. Such a denial may
be rescinded by the Department upon written notification to the permittee. Reissuance or modification of this
permit or reissuance or modification of an individual permittee's authorization to discharge shall not affect
previous approval or denial for retained self -monitoring unless the Department provides notification in writing to
the permittee.
4. Additional Monitoring by Permittee
If the permittee monitors any pollutant at the location(s) designated herein more frequently than required by this
permit, using approved analytical methods as specified above, the results of such monitoring shall be included in
the calculation and reporting of the values required in the Discharge Monitoring Report. Such increased
frequency shall also be indicated.
Monitoring required pursuant to Part 41 of the NREPA or Rule 35 of the Mobile Home Park Commission Act,
1987 PA 96, as amended, for assurance of proper facility operation, shall be submitted as required by the
Department.
331
PERMIT NO. M10060089
Page 27 of 34
PART II
Section C. Reporting Requirements
5. Compliance Dates Notification
Within 14 days of every compliance date specified in this permit, the permittee shall submit a written notification
to the Department indicating whether or not the particular requirement was accomplished. If the requirement
was not accomplished, the notification shall include an explanation of the failure to accomplish the requirement,
actions taken or planned by the permittee to correct the situation, and an estimate of when the requirement will
be accomplished. If a written report is required to be submitted by a specified date and the permittee
accomplishes this, a separate written notification is not required.
6. Noncompliance Notification
Compliance with all applicable requirements set forth in the Clean Water Act, Parts 31 and 41 of the NREPA,
and related regulations and rules is required. All instances of noncompliance shall be reported as follows:
a. 24-Hour Reporting
Any noncompliance which may endanger health or the environment (including maximum and/or
minimum daily concentration discharge limitation exceedances) shall be reported, verbally, within 24
hours from the time the permittee becomes aware of the noncompliance. A written submission shall
also be provided within five (5) days.
Other Reporting
The permittee shall report, in writing, all other instances of noncompliance not described in a. above at
the time monitoring reports are submitted; or, in the case of retained self -monitoring, within five (5) days
from the time the permittee becomes aware of the noncompliance.
Written reporting shall include: 1) a description of the discharge and cause of noncompliance; and 2) the period
of noncompliance, including exact dates and times, or, if not yet corrected, the anticipated time the
noncompliance is expected to continue, and the steps taken to reduce, eliminate and prevent recurrence of the
noncomplying discharge.
7. Spill Notification
The permittee shall immediately report any release of any polluting material which occurs to the surface waters
or groundwaters of the state, unless the permittee has determined that the release is not in excess of the
threshold reporting quantities specified in the Part 5 Rules (R 324.2001 through R 324.2009 of the Michigan
Administrative Code), by calling the Department at the number indicated on the second page of this permit (or, if
this is a general permit, on the COC); or, if the notice is provided after regular working hours, call the
Department's 24-hour Pollution Emergency Alerting System telephone number, 1-800-292-4706 (calls from out-
of-state call 1-517-373-7660).
Within ten (10) days of the release, the permittee shall submit to the Department a full written explanation as to
the cause of the release, the discovery of the release, response (clean-up and/or recovery) measures taken, and
preventive measures taken or a schedule for completion of measures to be taken to prevent reoccurrence of
similar releases.
332
PERMIT NO. M10060089
Page 28 of 34
PART II
Section C. Reporting Requirements
8. Upset Noncompliance Notification
If a process "upset" (defined as an exceptional incident in which there is unintentional and temporary
noncompliance with technology -based permit effluent limitations because of factors beyond the reasonable
control of the permittee) has occurred, the permittee who wishes to establish the affirmative defense of upset
shall notify the Department by telephone within 24 hours of becoming aware of such conditions; and within five
(5) days, provide in writing, the following information:
a. that an upset occurred and that the permittee can identify the specific cause(s) of the upset;
that the permitted wastewater treatment facility was, at the time, being properly operated and maintained
(note that an upset does not include noncompliance to the extent caused by operational error,
improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance,
or careless or improper operation); and
C. that the permittee has specified and taken action on all responsible steps to minimize or correct any
adverse impact in the environment resulting from noncompliance with this permit.
No determination made during administrative review of claims that noncompliance was caused by upset, and
before an action for noncompliance, is final administrative action subject to judicial review.
In any enforcement proceedings, the permittee, seeking to establish the occurrence of an upset, has the burden
of proof.
9. Bypass Prohibition and Notification
a. Bypass Prohibition
Bypass is prohibited, and the Department may take an enforcement action, unless:
1) bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;
2) there were no feasible alternatives to the bypass, such as the use of auxiliary treatment
facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime.
This condition is not satisfied if adequate backup equipment should have been installed in the exercise
of reasonable engineering judgment to prevent a bypass; and
3) the permittee submitted notices as required under 9.b. or 9.c. below.
Notice of Anticipated Bypass
If the permittee knows in advance of the need for a bypass, it shall submit prior notice to the
Department, if possible at least ten (10) days before the date of the bypass, and provide information
about the anticipated bypass as required by the Department. The Department may approve an
anticipated bypass, after considering its adverse effects, if it will meet the three (3) conditions listed in
9.a. above.
C. Notice of Unanticipated Bypass
The permittee shall submit notice to the Department of an unanticipated bypass by calling the
Department at the number indicated on the second page of this permit (if the notice is provided after
regular working hours, call: 1-800-292-4706) as soon as possible, but no later than 24 hours from the
time the permittee becomes aware of the circumstances.
333
PERMIT NO. M10060089
Page 29 of 34
PART II
Section C. Reporting Requirements
d. Written Report of Bypass
A written submission shall be provided within five (5) workina days of commencing any bypass to the
Department, and at additional times as directed by the Department. The written submission shall
contain a description of the bypass and its cause; the period of bypass, including exact dates and times,
and if the bypass has not been corrected, the anticipated time it is expected to continue; steps taken or
planned to reduce, eliminate, and prevent reoccurrence of the bypass; and other information as required
by the Department.
e. Bypass Not Exceeding Limitations
The permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded,
but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not
subject to the provisions of 9.a., 9.b., 9.c., and 9.d., above. This provision does not relieve the permittee
of any notification responsibilities under Part II.C.11. of this permit.
Definitions
1) Bypass means the intentional diversion of waste streams from any portion of a treatment facility.
2) Severe property damage means substantial physical damage to property, damage to the
treatment facilities which causes them to become inoperable, or substantial and permanent loss of
natural resources which can reasonably be expected to occur in the absence of a bypass. Severe
property damage does not mean economic loss caused by delays in production.
10. Bioaccumulative Chemicals of Concern (BCC)
Consistent with the requirements of R 323.1098 and R 323.1215 of the Michigan Administrative Code, the
permittee is prohibited from undertaking any action that would result in a lowering of water quality from an
increased loading of a BCC unless an increased use request and antidegradation demonstration have been
submitted and approved by the Department.
11. Notification of Changes in Discharge
The permittee shall notify the Department, in writing, as soon as possible but no later than 10 days of knowing,
or having reason to believe, that any activity or change has occurred or will occur which would result in the
discharge of: 1) detectable levels of chemicals on the current Michigan Critical Materials Register, priority
pollutants or hazardous substances set forth in 40 CFR 122.21, Appendix D, or the Pollutants of Initial Focus in
the Great Lakes Water Quality Initiative specified in 40 CFR 132.6, Table 6, which were not acknowledged in the
application or listed in the application at less than detectable levels; 2) detectable levels of any other chemical
not listed in the application or listed at less than detection, for which the application specifically requested
information; or 3) any chemical at levels greater than five times the average level reported in the complete
application (see the first page of this permit, for the date(s) the complete application was submitted). Any other
monitoring results obtained as a requirement of this permit shall be reported in accordance with the compliance
schedules.
334
PERMIT NO. M10060089
Page 30 of 34
PART II
Section C. Reporting Requirements
12. Changes in Facility Operations
Any anticipated action or activity, including but not limited to facility expansion, production increases, or process
modification, which will result in new or increased loadings of pollutants to the receiving waters must be reported
to the Department by a) submission of an increased use request (application) and all information required under
R 323.1098 (Antidegradation) of the Water Quality Standards or b) by notice if the following conditions are met:
1) the action or activity will not result in a change in the types of wastewater discharged or result in a greater
quantity of wastewater than currently authorized by this permit; 2) the action or activity will not result in violations
of the effluent limitations specified in this permit; 3) the action or activity is not prohibited by the requirements of
Part II.C.10.; and 4) the action or activity will not require notification pursuant to Part II.C.11. Following such
notice, the permit or, if applicable, the facility's COC may be modified according to applicable laws and rules to
specify and limit any pollutant not previously limited.
13. Transfer of Ownership or Control
In the event of any change in control or ownership of facilities from which the authorized discharge emanates,
the permittee shall submit to the Department 30 days prior to the actual transfer of ownership or control a written
agreement between the current permittee and the new permittee containing: 1) the legal name and address of
the new owner; 2) a specific date for the effective transfer of permit responsibility, coverage and liability; and 3) a
certification of the continuity of or any changes in operations, wastewater discharge, or wastewater treatment.
If the new permittee is proposing changes in operations, wastewater discharge, or wastewater treatment, the
Department may propose modification of this permit in accordance with applicable laws and rules.
14. Operations and Maintenance Manual
For wastewater treatment facilities that serve the public (and are thus subject to Part 41 of the NREPA), Section
4104 of Part 41 and associated Rule 2957 of the Michigan Administrative Code allow the Department to require
an Operations and Maintenance (O&M) Manual from the facility. An up-to-date copy of the O&M Manual shall
be kept at the facility and shall be provided to the Department upon request. The Department may review the
O&M Manual in whole or in part at its discretion and require modifications to it if portions are determined to be
inadequate.
At a minimum, the O&M Manual shall include the following information: permit standards; descriptions and
operation information for all equipment; staffing information; laboratory requirements; record keeping
requirements; a maintenance plan for equipment; an emergency operating plan; safety program information; and
copies of all pertinent forms, as -built plans, and manufacturer's manuals.
Certification of the existence and accuracy of the O&M Manual shall be submitted to the Department at least
sixtv days prior to start-up of a new wastewater treatment facility. Recertification shall be submitted sixty days
prior to start-up of any substantial improvements or modifications made to an existing wastewater treatment
facility.
335
PERMIT NO. M10060089
Page 31 of 34
PART II
Section C. Reporting Requirements
15. Signatory Requirements
All applications, reports, or information submitted to the Department in accordance with the conditions of this
permit and that require a signature shall be signed and certified as described in the Clean Water Act and the
NREPA.
The Clean Water Act provides that any person who knowingly makes any false statement, representation, or
certification in any record or other document submitted or required to be maintained under this permit, including
monitoring reports or reports of compliance or noncompliance, shall, upon conviction, be punished by a fine of
not more than $10,000 per violation, or by imprisonment for not more than 6 months per violation, or by both.
The NREPA (Section 3115(2)) provides that a person who at the time of the violation knew or should have
known that he or she discharged a substance contrary to this part, or contrary to a permit, COC, or order issued
or rule promulgated under this part, or who intentionally makes a false statement, representation, or certification
in an application for or form pertaining to a permit or COC or in a notice or report required by the terms and
conditions of an issued permit or COC, or who intentionally renders inaccurate a monitoring device or record
required to be maintained by the Department, is guilty of a felony and shall be fined not less than $2,500.00 or
more than $25,000.00 for each violation. The court may impose an additional fine of not more than $25,000.00
for each day during which the unlawful discharge occurred. If the conviction is for a violation committed after a
first conviction of the person under this subsection, the court shall impose a fine of not less than $25,000.00 per
day and not more than $50,000.00 per day of violation. Upon conviction, in addition to a fine, the court in its
discretion may sentence the defendant to imprisonment for not more than 2 years or impose probation upon a
person for a violation of this part. With the exception of the issuance of criminal complaints, issuance of
warrants, and the holding of an arraignment, the circuit court for the county in which the violation occurred has
exclusive jurisdiction. However, the person shall not be subject to the penalties of this subsection if the
discharge of the effluent is in conformance with and obedient to a rule, order, permit, or COC of the Department.
In addition to a fine, the attorney general may file a civil suit in a court of competent jurisdiction to recover the full
value of the injuries done to the natural resources of the state and the costs of surveillance and enforcement by
the state resulting from the violation.
16. Electronic Reporting
Upon notice by the Department that electronic reporting tools are available for specific reports or notifications,
the permittee shall submit electronically all such reports or notifications as required by this permit, on forms
provided by the Department.
336
PERMIT NO. M10060089
Page 32 of 34
PART II
Section D. Management Responsibilities
1. Duty to Comply
All discharges authorized herein shall be consistent with the terms and conditions of this permit. The discharge
of any pollutant identified in this permit, more frequently than, or at a level in excess of, that authorized, shall
constitute a violation of the permit.
It is the duty of the permittee to comply with all the terms and conditions of this permit. Any noncompliance with
the Effluent Limitations, Special Conditions, or terms of this permit constitutes a violation of the NREPA and/or
the Clean Water Act and constitutes grounds for enforcement action; for permit or Certificate of Coverage (COC)
termination, revocation and reissuance, or modification; or denial of an application for permit or COC renewal.
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the conditions of this permit.
2. Operator Certification
The permittee shall have the waste treatment facilities under direct supervision of an operator certified at the
appropriate level for the facility certification by the Department, as required by Sections 3110 and 4104 of the
NREPA. Permittees authorized to discharge storm water shall have the storm water treatment and/or control
measures under direct supervision of a storm water operator certified by the Department, as required by Section
3110 of the NREPA.
3. Facilities Operation
The permittee shall, at all times, properly operate and maintain all treatment or control facilities or systems
installed or used by the permittee to achieve compliance with the terms and conditions of this permit. Proper
operation and maintenance includes adequate laboratory controls and appropriate quality assurance
procedures.
4. Power Failures
In order to maintain compliance with the effluent limitations of this permit and prevent unauthorized discharges,
the permittee shall either:
a. provide an alternative power source sufficient to operate facilities utilized by the permittee to maintain
compliance with the effluent limitations and conditions of this permit; or
upon the reduction, loss, or failure of one or more of the primary sources of power to facilities utilized by
the permittee to maintain compliance with the effluent limitations and conditions of this permit, the
permittee shall halt, reduce or otherwise control production and/or all discharge in order to maintain
compliance with the effluent limitations and conditions of this permit.
5. Adverse Impact
The permittee shall take all reasonable steps to minimize or prevent any adverse impact to the surface waters or
groundwaters of the state resulting from noncompliance with any effluent limitation specified in this permit
including, but not limited to, such accelerated or additional monitoring as necessary to determine the nature and
impact of the discharge in noncompliance.
337
PERMIT NO. M10060089
Page 33 of 34
PART II
Section D. Management Responsibilities
6. Containment Facilities
The permittee shall provide facilities for containment of any accidental losses of polluting materials in
accordance with the requirements of the Part 5 Rules (R 324.2001 through R 324.2009 of the Michigan
Administrative Code). For a POTW, these facilities shall be approved under Part 41 of the NREPA.
7. Waste Treatment Residues
Residuals (i.e. solids, sludges, biosolids, filter backwash, scrubber water, ash, grit, or other pollutants or wastes)
removed from or resulting from treatment or control of wastewaters, including those that are generated during
treatment or left over after treatment or control has ceased, shall be disposed of in an environmentally
compatible manner and according to applicable laws and rules. These laws may include, but are not limited to,
the NREPA, Part 31 for protection of water resources, Part 55 for air pollution control, Part 111 for hazardous
waste management, Part 115 for solid waste management, Part 121 for liquid industrial wastes, Part 301 for
protection of inland lakes and streams, and Part 303 for wetlands protection. Such disposal shall not result in
any unlawful pollution of the air, surface waters or groundwaters of the state.
8. Right of Entry
The permittee shall allow the Department, any agent appointed by the Department, or the Regional
Administrator, upon the presentation of credentials and, for animal feeding operation facilities, following
appropriate biosecurity protocols:
a. to enter upon the permittee's premises where an effluent source is located or any place in which records
are required to be kept under the terms and conditions of this permit; and
at reasonable times to have access to and copy any records required to be kept under the terms and
conditions of this permit; to inspect process facilities, treatment works, monitoring methods and
equipment regulated or required under this permit; and to sample any discharge of pollutants.
9. Availability of Reports
Except for data determined to be confidential under Section 308 of the Clean Water Act and Rule 2128 (R
323.2128 of the Michigan Administrative Code), all reports prepared in accordance with the terms of this permit,
shall be available for public inspection at the offices of the Department and the Regional Administrator. As
required by the Clean Water Act, effluent data shall not be considered confidential. Knowingly making any false
statement on any such report may result in the imposition of criminal penalties as provided for in Section 309 of
the Clean Water Act and Sections 3112, 3115, 4106 and 4110 of the NREPA.
10. Duty to Provide Information
The permittee shall furnish to the Department, within a reasonable time, any information which the Department
may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit
or the facility's COC, or to determine compliance with this permit. The permittee shall also furnish to the
Department, upon request, copies of records required to be kept by this permit.
Where the permittee becomes aware that it failed to submit any relevant facts in a permit application, or
submitted incorrect information in a permit application or in any report to the Department, it shall promptly submit
such facts or information.
338
PERMIT NO. M10060089
Page 34 of 34
PART II
Section E. Activities Not Authorized by This Permit
1. Discharge to the Groundwaters
This permit does not authorize any discharge to the groundwaters. Such discharge may be authorized by a
groundwater discharge permit issued pursuant to the NREPA.
2. POTW Construction
This permit does not authorize or approve the construction or modification of any physical structures or facilities
at a POTW. Approval for the construction or modification of any physical structures or facilities at a POTW shall
be by permit issued under Part 41 of the NREPA.
3. Civil and Criminal Liability
Except as provided in permit conditions on "Bypass" (Part II.C.9. pursuant to 40 CFR 122.41(m)), nothing in this
permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance, whether or
not such noncompliance is due to factors beyond the permittee's control, such as accidents, equipment
breakdowns, or labor disputes.
4. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee
from any responsibilities, liabilities, or penalties to which the permittee may be subject under Section 311 of the
Clean Water Act except as are exempted by federal regulations.
5. State Laws
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee
from any responsibilities, liabilities, or penalties established pursuant to any applicable state law or regulation
under authority preserved by Section 510 of the Clean Water Act.
6. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property, or any
exclusive privileges, nor does it authorize violation of any federal, state or local laws or regulations, nor does it
obviate the necessity of obtaining such permits, including any other Department of Environment, Great Lakes,
and Energy permits, or approvals from other units of government as may be required by law.
339
_I-WWRC
WATER RESOURCES COMMISSIONER
Jim Nash
OAKLAN D COUNTY
WATER RESOURCES COMMISSIONER
Stormwater Engineering Design Standards
Requirements, Rules, and Design Criteria for
Stormwater Management
April 27, 2021
340
Section I - Oakland County Stormwater Standards
The Environmental Protection Agency (EPA) through the Michigan Department of Environment, Great
Lakes, and Energy (EGLE) requires the County of Oakland and other regulated entities to comply with
the National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Separate Storm Sewer
System (MS4) permit requirements. The purpose of these standards is to address Post -Construction
Stormwater Runoff Controls required under this permit.
These standards are a result of ongoing regional collaboration between Oakland, Wayne, Macomb and
Livingston Counties with the following overall objectives:
1. Provide a comprehensive framework for
managing stormwater that addresses
surface water quality, channel and
infrastructure protection, localized flood
control and long-term operations and
maintenance.
2. Incorporate design standards that control
both the quantity and quality of
stormwater runoff.
3. Require volume reducing Low Impact
Development (LID) design measures, or
Best Management Practices (BMPs), such
as infiltration, preservation of natural
areas, enhanced vegetation and reduced
imperviousness to control runoff volume
to the Maximum Extent Practicable (MEP).
4. Strengthen the protection of natural
features.
5. Protect public health, safety and welfare.
6. Promote economic development using
straightforward and uniform drainage
standards for site development
throughout Oakland County, as well as
across Southeast Michigan.
7. Provide guidelines and additional
resources for the selection of effective
structural and vegetative stormwater
BMPs for development sites.
8. Enhance the sustainability of stormwater
management practices in Oakland County
including performance, longevity, safety,
maintenance, community acceptance, and
environmental benefits.
9. Establish a framework to increase the
likelihood of long-term operation and
maintenance of the stormwater
management practices.
10. Use the most currently published, relevant
rainfall statistics.
11. Promote a consistent design process by
using a set of simple equations to
determine runoff rates, detention
volumes, water quality treatment and
infiltration requirements.
341
The Oakland County Water Resources Commissioner's (OCWRC) office will apply these standards within
its legal authority and jurisdiction as outlined in the following regulations:
1. The Subdivision Control Act, Act 288 of the Public Acts of Michigan of 1967, as amended.
2. The Michigan Drain Code, Public Act 40 of 1956, as amended.
3. The Mobile Home Commission Act, Act 96 of the Public Acts of Michigan of 1987, as amended.
4. Part 31, MS4 General Permit, Water Resources Protection, Natural Resources and Environmental
Protection Act, 1994 PA 451, as amended. Oakland County's MS4 permit covers regulated county
stormwater systems under the jurisdiction of the OCWRC office (direct discharges to County
Drains), the Oakland County Parks and Recreation Commission and the County of Oakland. The
Road Commission for Oakland County should be contacted for applicable standards within their
stormwater jurisdiction.
5. EGLE Wastewater Discharge Permit, Rule 323.2161a, Post -Construction Requirements.
To promote consistent regional site development stormwater practices, communities and other entities
responsible for the management of stormwater systems and MS4 permit compliance are encouraged to
adopt these standards. Additionally, communities that operate combined sewer systems and are party
to CSO permit compliance are also encouraged to adopt these standards. Local municipalities may elect
more restrictive standards and when conflicting standards arise, the more stringent requirements govern.
These standards establish minimum requirements for the design, construction and maintenance of
stormwater systems for subdivisions, site condominiums, commercial, industrial and other development
and redevelopment projects.
All construction activity within the OCWRC's
stormwater permitting authority will be reviewed by
the OCWRC's Permitting Department to determine if
the activity is regulated. The OCWRC's office will use
the following applicability criteria to assist in making
this determination and to clarify which stormwater
standards apply to the proposed construction
activity.
342
These standards shall apply to development and redevelopment projects with construction activity
greater than or equal to 1 acre, or part of a common plan of development or sale resulting in a
development or redevelopment activity greater than or equal to 1 acre in size. Including without
limitation, clearing, grading, excavating, construction and paving, that results in an earth change or
disturbance in the existing cover or topography of land, including any external demolition, modification,
or alteration of a site or the footprint of a building.
Common exemptions to these stormwater standards include the following:
1. Resurfacing of an asphalt, concrete, or
similar surface (i.e., 'mill and fill') that
does not expose the aggregate or
subgrade or result in replacement of
the onsite drainage system.
2. The practices of clearing, plowing, and
tilling soil and harvesting for the
purpose of crop production.
3. The project does not meet the
development or redevelopment criteria
in this standard.
4. The development or redevelopment
project construction activity is less than
1.0 acre.
5. The development or redevelopment
project is for one single family detached
dwelling that is not part of a common
plan of development.
6. The development or redevelopment
project is for emergency maintenance
and work performed to protect public
health and safety.
7. The development or redevelopment
project discharges solely to a RCOC
stormwater system or right-of-way.
Contact the RCOC permit staff at the
Road Commission for Oakland County
Official Website (rcocweb.orR) for
RCOC-specific stormwater
requirements.
8. Other exemptions listed herein or
approved by the OCWRC office.
To protect all water resources under OCWRC stormwater
jurisdiction, OCWRC requires applicable standards to be
implemented for development and redevelopment
projects located both inside and outside the Regulated
MS4 Area.
Similarly, to protect all water resources under OCWRC
stormwater jurisdiction, OCWRC requires applicable
standards to be implemented for development and
redevelopment projects regardless of whether they
discharge stormwater to a MS4 or not.
343
The OCWRC office continues to collaborate with the George W. Kuhn Combined Sewer District
communities in adopting Post -Construction stormwater standards to meet its Combined Sewer System
NPDES permit requirements. Many of these communities have both separate and combined systems;
the goal is to adopt similar Post -Construction standards that meet local and regional needs for both
types of systems. Currently, the standards outlined herein are encouraged to be used in the GWK
combined district; collaboration continues with a goal of adoption of these standards in both MS4 and
combined sewer communities.
These standards supersede all previous versions and revisions, and updates will be available on the
OCWRC's website (www.oakeov.com/water) including registration information to receive revisions and
updates to these standards as they become available. These standards are intended to be a living
document and updated as necessary to reflect ongoing changes to climate and regulatory conditions.
Before submitting a site plan for stormwater permitting, check the OCWRC website above for the most
recent version of the standards.
Channel Protection Volume Control (CPVC) is necessary to protect natural watercourses from increased
erosion and sedimentation as a result of increased imperviousness and runoff volume as development
occurs. CPVC also promotes groundwater recharge, stabilizes flow rates and baseflow in our natural
watercourses, and addresses water quality control criteria (Total Suspended Solids).
CPVC shall be implemented to the Maximum Extent Practicable (MEP). The required Channel Protection
Volume (VcP-R) is the post -development site runoff volume from a 1.3-inch rainfall event.
The following CPVC implementation process is summarized
in Appendix A (Channel Protection Flowchart).
1. Implement land use practices that limit the increase in
runoff volume, such as LID practices including (but not
limited to) a design emphasis on naturalized areas (i.e.,
meadow or wooded areas vs. turf grass), reduced
impervious coverage, etc.
2. Calculate the required Channel Protection Volume
using the following equation:
VCP_R = 4,719xCxA
where:
C is the post -development runoff coefficient
A is the contributing area in acres
VcP-R is the required CPVC volume in cubic feet
(Eq. 1)
344
3. Provide adequate infiltration and/or storage/reuse BMPs, to the MEP, to provide the calculated
CPVC volume. This may include (but is not limited to) bioretention, rain gardens, bio-swales,
pervious pavement, cisterns, green roofs, and infiltration trenches. For water reuse BMPs (i.e.,
cisterns), water demand (such as gray water or irrigation water) must be established and
documented to show adequate drawdown times.
a. When the measured in -situ infiltration rate is above 0.5 in/hr., supplemental measures, such
as subsoil amendments and/or a perforated underdrain system, are not required.
b. When the measured in -situ infiltration rate is between 0.24 in/hr. and 0.5 in/hr., soils are
marginally suitable for infiltration BMPs, and supplemental measures are required.
Supplemental measures may include subsoil amendment, or an underdrain located at the top
of the storage bed layer to maximize infiltration.
c. When the measured in -situ infiltration rate is less than 0.24 in/hr., infiltration is deemed
impractical, and the use of this BMP is therefore waived. When infiltration is waived, other
volume -reducing LID practices must be implemented to the MEP.
d. Infiltration BMPs shall completely dewater in less than 72 hours, consisting of 24-hour
dewatering for the surface volume, and 48-hour dewatering of the void space (soil storage)
volume. Water storage/reuse BMPs shall also be designed to fully dewater within 72 hours.
4. Pretreatment is required for all BMPs to remove fine
sediment, trash, and debris to preserve the longevity
and function of the BMPs.
a. Common methods of BMP pretreatment include
mechanical separators, sediment forebays,
vegetated filter strips, vegetated swales,
constructed filters, and curb cuts with sediment
traps.
5. To incentivize and encourage stormwater infiltration on
all sites, the provided Channel Protection Volume, (Vcp-P) can be subtracted from the required 100-
year detention volume, V100o (see equations in Part G below). Upon subtracting the provided
Channel Protection Volume from the required 100-year detention volume, the resulting volume
cannot be less than the Extended Detention Volume (VED, see Part E below).
For underground infiltration BMPs that are not easily accessible for inspection and maintenance,
such as underground detention system infiltration, this Channel Protection Volume is generally not
credited and will be evaluated on a case -by -case basis by the OCWRC's office.
Infiltration BMPs are prohibited in areas containing contaminated soils/groundwater, wellhead
protection areas, high seasonal groundwater (less than 2 feet from the bottom of the stone
storage layer of the infiltration BMP to the seasonally high groundwater table) and in areas with
hotspot activities and setback restrictions (foundations, property lines, drinking wells, septic fields,
pavement, etc.) as defined in the standards. When any of the above adverse conditions are
demonstrated, other volume -reducing LID practices must be implemented to the MEP.
345
Channel Protection Rate Control (CPRC) is necessary to protect natural watercourses from increased
erosion and sedimentation as a result of increased imperviousness and runoff rates as development
occurs. Channel protection rate control is based on a 2-year / 24-hour storm. The CPRC shall be
implemented to the MEP as outlined below.
1. Extended Detention is required for the site's post -development runoff volume from a 1.9-inch
rainfall event. This Extended Detention Volume (VEo) shall be dewatered in not less than 48 hours.
2. Calculate the required Extended Detention Volume using the following equation:
VED = 6,897 x C x A (Eq. 2)
where:
C is the post -development runoff coefficient
A is the contributing area in acres
VEo is the required Extended Detention Volume in cubic feet
3. The Extended Detention requirement effectively maintains the 2-year pre -settlement peak flow
rates, to the MEP, for new developments and reduces the existing 2-year peak flow rates for
redevelopments.
346
Water Quality Control (WQC) focuses on limiting the concentration of Total Suspended Solids (TSS) in
post -development runoff to either of the following water quality standards: 80 mg/L, or 80% TSS
reduction. WQC shall be implemented to the MEP as outlined below.
WQC can be achieved one of several ways:
1. Infiltration (i.e., runoff volume -reducing) or water reuse BMPs that achieve the required Channel
Protection Volume (VCP-R, see Part D) meet the TSS requirements for only areas tributary to an
infiltration BMP. If any areas on a site plan bypass infiltration BMPs, those areas must receive
alternative TSS treatment (see below for other options).
2. Mechanical separators designed for the required TSS removal at a peak flow rate (QwQ) generated
by a 1-year peak flow as calculated below:
QwQ = C x I1x A (Eq. 3)
where:
C is the post -development runoff coefficient
_ 30.2
11 (TC + 9.17)0.81
(Eq. 4)
T, = Time of Concentration (minutes)
maximum peak intensity (11-Max) = 2.0 inches/hour for smaller sites with time of
concentration equal to or less than 15 minutes
minimum peak intensity (11-Mia) =1.0 inches/hour for larger sites with a time of
concentration equal to or greater than 1 hour
A is the contributing area in acres
QwQ is the peak flow rate for mechanical separator design in cfs
3. Sediment forebay(s), when combined with downstream Extended Detention. Forebays shall be
designed with a volume equal to 15% of the Water Quality Volume (0.15 x VwQ) and capture heavy
sediment at inlet pipe locations where access is provided to accommodate sediment removal
equipment. The required sediment forebay volume, VF, is calculated below:
VF = 0.15VwQ = 545 x C x A (Eq. 5)
where:
C is the post -development runoff coefficient
A is the contributing area in acres
VwQ is the required Water Quality volume in cubic feet
347
4. The following treatment trains are effective at meeting the OCWRC water quality requirements:
a. Bioretention BMPs (infiltration), discharging to a conventional detention basin (wet or dry)
b. Mechanical separator(s), discharging to a conventional detention basin (wet or dry)
c. Sediment forebay(s), discharging to a conventional detention basin (wet or dry)
Conventional detention basins include hydraulic controls for both VEo and V100D
Detention and flood control is a critical component in stormwater design as it helps to prevent excess
peak flows and reduces the likelihood of flooding downstream of a development site. The regional
collaboration has resulted in the following Detention and Flood Control standards.
Detention and Flood Control shall be implemented to manage the
100-year peak runoff rate for developed sites as outlined below. The
allowable 100-year post -development peak flow rate (Q1ooP) shall be
approved by the OCWRC office on a case -by -case basis and will be
calculated one of two ways:
1. Using the Variable Release Rate (see equations below)
2. County -determined peak flow rate based on a documented
County Drain flow capacity or other known downstream
capacity limitations (flow rate provided in cfs/acre)
Prior to commencing with site plan design, contact the OCWRC Permitting Department to confirm
which of the above methods is more restrictive and will apply to your site. The chosen method to
determine the 100-year post -development peak flow rate can have a significant impact on required
detention pond volume.
The Variable Release Rate and corresponding post -development peak flow rate are calculated as
follows:
QVRR = 1.1055 — 0.2061n(A) (Eq. 6)
where:
QVRR is the allowable release rate in cfs/acre
A is the contributing area in acres
The variable release rate (cfs/acre) is capped at 1.0 cfs/acre for developments 2
acres or less. For all developments equal to or greater than 100 acres, the
variable release rate is 0.15 cfs/acre.
Q100P - QVRR x A (Eq. 7)
where:
QiooP is the allowable 100-year post -development peak flow rate in cfs
348
A is the contributing area in acres
If downstream capacity is insufficient for the proposed development, the developer can make
improvements that may include construction of additional off -site conveyance capacity, improvements
to the existing drain, acquisition of easements from downstream property owners, etc. The developer is
responsible for securing all necessary easement(s) from downstream property owners and is responsible
for all improvement costs.
All stormwater discharges from the proposed development site shall outlet within the watershed where
flows originated, unless approval is obtained from the OCWRC's office. Offsite runoff shall bypass the
proposed site's stormwater system. If this cannot be achieved, detailed hydrologic and hydraulic
calculations shall be provided to the OCWRC office to demonstrate no adverse impacts downstream for
the 10-year and 100-year storms.
When calculating the required detention volume, all on -site contributing drainage areas shall be used in
the calculation. Volume stored within the forebay and extended detention area may be applied towards
the required detention volume. Please refer to Appendix B for typical detention basin profiles and
stormwater design calculations.
The required 100-year detention volume (MOOD) is calculated as follows:
1. Calculate the total 100-year runoff volume (V100R) under post -development conditions:
V10oR = 18,985 x C x A (Eq. 8)
where:
C is the post -development runoff coefficient
A is the contributing area in acres
V10oR is the post -development 100-year runoff volume in cubic feet
2. Calculate the 100-year peak inflow rate, QioolN, into the detention basin; this is the post -
development peak instantaneous flow prior to (upstream of) the detention basin:
Q1001N = C x I100 x A
83.3
I100 _ — (TC + 9.17)0.81
where:
Q100IN is the 100-year post -development peak inflow rate in cfs
C is the post -development runoff coefficient
A is the contributing area in acres
Iloo is the 100-year peak rainfall intensity in inches/hour
(Eq. 9)
Tc is the Time of Concentration for the development site in minutes
(Eq. 10)
349
3. Calculate the Storage Curve Factor for the 100-year detention volume (R):
R = [0.206 — 0.151n Q1001N
100P(Eq.11)
where:
Q100IN is the 100-year post -development peak inflow rate in cfs
QlooP is the 100-year post -development peak flow rate in cfs
R is the Storage Curve Factor (dimensionless)
4. Finally, calculate the 100-year detention basin size, identifying any credits to the detention basin
volume to reflect the provided Channel Protection Volume (VcP-P))
V100D = w100R x R) — VcP—P
where:
V100D is the required 100-yr detention volume in
cubic feet
V10oR is the 100-year runoff volume in cubic feet
R is the Storage Curve Factor (dimensionless)
VcP_P is the provided CVPC volume in cubic feet
KEY RULE: V100D> VED
Check to verify the adjusted 100-year detention basin volume is equal to or
greater than the Extended Detention Volume (VED). Under no
circumstances shall the adjusted detention basin volume be less than VED.
(Eq. 12)
350
Long-term Operations and Maintenance (O&M) Plans are required for County Stormwater Systems and
Non -County Stormwater Systems and are summarized below. To facilitate routine inspections, all O&M
requirements and documents listed below shall be incorporated into the plan set on dedicated O&M -
specific plan sheets. When O&M responsibilities or requirements are modified or updated, the
respective O&M Plan sheet(s) shall be updated accordingly.
Countv Stormwater Systems
The following MS4 Permit O&M requirements apply to all regulated County Stormwater Systems owned,
operated and maintained by the OCWRC's office, the Oakland County Parks and Recreation Commission
and the County of Oakland, hereafter referred to as County Departments:
1. Prior to the start of any development or redevelopment activity meeting the criteria defined in
Part C: Applicability, the County Department shall obtain a Drain Permit from the OCWRC's
Permitting Department. Coordination with the OCWRC's Permitting Department is recommended
at the conceptual stage of development projects to ensure that permit requirements are clearly
identified early in the planning process.
2. To ensure consistent perpetual O&M of the site's stormwater system and to enhance water quality
protection, prior to Drain Permit issuance, the
OCWRC's Permitting Department shall review
and approve the County Department's site -
specific Stormwater Management O&M Plan
with the following requirements:
a. Purpose of the plan.
b. Drainage area description and details.
c. Description of the stormwater system and
its individual components.
d. Specific short-term, intermediate and
long-term maintenance tasks.
e. Inspection and maintenance tasks, frequencies and responsibilities.
f. Employee and contractor training requirements and responsibilities.
g. Approved construction drawings including stormwater calculations, details, elevations and a
location map, etc.
h. Approved O&M Plan sheet(s) to facilitate routine O&M inspections.
i. County Departments shall submit an Annual Stormwater Svstem O&M Summarv, for their
stormwater systems, to the OCWRC's Environmental Department for County MS4 permit
reporting. Individual County Departments are responsible for completing all O&M tasks and
for maintaining detailed O&M tracking records for their stormwater systems.
351
Non -County Stormwater Svstems
The following MS4 Permit O&M requirements apply to all regulated Non -County Stormwater Systems
owned, operated and maintained by others, which directly connect to a Countv Stormwater Svstem:
1. Prior to the start of any development activity meeting the site applicability criteria defined in Part
C: Applicability, a Drain Permit shall be obtained from the OCWRC's Permitting Department.
Coordination with the OCWRC's Permitting Department is recommended at the conceptual stage
of development projects to ensure that permit requirements are clearly identified early in the
planning process.
2. To ensure consistent perpetual O&M of the site's stormwater system and to enhance water quality
protection, prior to Drain Permit issuance, the OCWRC's Permitting Department shall review and
approve the site -specific Stormwater Management O&M Agreement between the community and
property owner. A fullv executed Stormwater Management O&M Agreement is required prior to
issuance of the Drain Permit. This agreement shall consist of the following requirements which will
be incorporated into the O&M Plan sheet(s):
a. Legal Description: A legal description and reduced copy map to identify the land parcel(s)
affected by this Agreement. This map shall be prepared for each site and must include a
reference to a Subdivision Plat, parcel survey, or Condominium Master Deed, and a map to
illustrate the affected parcel(s).
b. Stormwater Svstem Description and Map: A
location map of the entire stormwater system.
This map must be prepared for each site and the
scale of the map shall show necessary detail.
c. Stormwater O&M Plan Sheet(s): The site -specific
Stormwater O&M Plan shall include the
following requirements:
• Description of the stormwater system, drainage area, and its individual components.
• Specific short-term, intermediate and long-term maintenance tasks.
• Inspection and maintenance tasks, frequencies and responsibilities (matrix/table).
• Employee and contractor O&M training requirements, certifications, and responsibilities.
• BMP Details
• Property owners are responsible for completing all O&M tasks and maintaining O&M
records for their stormwater systems. Property Owners shall submit an Annual
Stormwater Svstem O&M Summary to OCWRC's Permitting Department for tracking only.
The community is responsible for enforcement of the O&M requirements as outlined in
the Stormwater Management O&M Agreement and their MS4 permit.
352
d. Memorandum of Stormwater Management Operations and Maintenance Agreement: This
O&M Memorandum acknowledges a perpetual requirement of stormwater system operations
and maintenance, which is recorded with the Register of Deeds to put any future property
owners, or interest holders, on notice of the Stormwater System and the Stormwater O&M
Plan. This O&M Memorandum references the required Stormwater Management O&M
Agreement, which resides with the local community to ensure consistency and periodic
updates as necessary. A copy of the recorded document shall be submitted to OCWRC prior to
closure of the Drain Permit.
Appendix C — Stormwater Management O&M Agreement is an approved "example" agreement,
however, the OCWRC office recognizes that community -specific O&M agreements, ordinances and
programs may also be proposed and submitted to OCWRC for approval. When developing alternative
O&M programs for consideration, the community should reference EGLE's Post -Construction
Stormwater Runoff Controls Program Compliance Assistance Document (available on EGLE's website)
and their MS4 permit.
353
Collecting data on site runoff characteristics is critical for OCWRC and the local review jurisdiction (if
applicable) to meet ongoing EGLE permit requirements. This will be accomplished with a Land Use
Summary Table, which must be included on the O&M Plan Sheet of each submitted site plan (see table
below). Additionally, GIS-based site data (in the form of a shapefile) will be required as a condition of
site plan approval. GIS data will be limited to key stormwater components that will require future
inspection and maintenance.
Land Use Summary
must be included on the O&M Plan Sheet for all site plans
Existing Proposed
Characteristic Conditions Conditions
Total Development Area (ac)
Impervious Area (ac)
Total Pervious Area (ac)
Pervious Area Breakdown by Cover Tvpe
Meadow/fallow/natural areas (non -cultivated) x.xx acres
x.xx acres
Predominant NRCS Soil Type (A, B, C, or D)
Q
� v
�
Improved areas (turf grass, landscape, row crops) x.xx acres
x.xx acres
>
J
Predominant NRCS Soil Type (A, B, C, or D)
Wooded Areas I x.xx acres x.xx acres
Predominant NRCS Soil Type (A, B, C, or D)
CPVC Volume Calculated (cubic feet)
CPVC Volume Provided (cubic feet)
CPRC Volume Provided (cubic feet)
The Professional Engineer who signs and seals this site plan certifies that the values in this table reflect the
CCWRC stormwater calculations required for this development and that geotechnical investigations were
performed that provide conclusive documentation that demonstrates whether infiltration (i.e., CPVC
Volume Control) is practicable.
Notes:
• The Professional Engineer Certification Statement (see above) must be included with the Land Use Summary Table.
• Areas to be shown to the nearest 0.01 acre
• 'Predominant'soil type shall the soil type with the largest percentage coverage over the designated land use (e.g.,
70% Soil Type B and 30% Soil Type C shall be listed in the table as 'Soil Type B")
• USDA soil types cannot be used to determine site suitability for infiltration and meeting the CPVC volume standard;
direct infiltration testing will be required to determine site suitability for infiltration
• If CPVC requirement is waived, enter ZERO for the 'CPVC Volume Provided'
• When more than one soil type exists in one area, assign the predominant soil type for that area
• Use NRCS/USDA Online Soil Survey Map to determine soil type (A, B, C, or D):
httns://websoilsurvev.sc. eaov. usda. aov/Apo/HomePaae. htm
354
In addition to the Land Use Summary table, the applicant must include the following stormwater system
information in the submittal:
1. Project name
2. Project location
3. City / Township / Village name
4. Applicant name and contact information
5. Engineer and owner names, including contact information
6. Description of work and other relevant information
7. Stormwater Design Narrative (separate document), consisting of the following minimum
components:
a. Summary of the proposed stormwater management system
b. Geotechnical investigations (e.g., soil borings, infiltration tests, and/or an Environmental Site
Assessment)
NOTE: the stormwater review cannot be approved without the submittal of in -situ soil
characteristics and/or evidence of existing soil
contamination; this information is necessary to
determine whether the Channel Protection Volume
Control standard will be required.
c. All stormwater calculations, including a list of all
assumptions, site characteristics, and other information
to support the calculations.
d. If mechanical separators are to be used, include all
vendor certifications for unit sizing and TSS removal
efficiencies.
e. Figures/schematics of the stormwater management system, including clear references to
existing wetlands, floodplains, woodlands or other protected natural features.
f. Outlet hydraulic calculations, including (if requested by the OCWRC) calculations and
certifications for the hydraulic capacity of the receiving system.
g. Operations & Maintenance (O&M) Plan for all proposed stormwater components (collection
system, water quality treatment, infiltration, extended detention, and flood control) shall be
included on the O&M Plan sheet(s).
8. Construction plans developed in accordance with OCWRC requirements
9. Executed Stormwater Management O&M Agreement
10. Recorded Memorandum of Stormwater Management O&M Agreement
355
A final component of the site plan review process is the submittal of a GIS shapefile containing, at a
minimum, the layers listed below, which consist of points and polygons that reflect the key components
of the stormwater system. This information will be provided only after the technical review is
completed. The GIS shapefile must reflect the final approved design and include the following layers
(use the layer naming conventions listed below for ease of storing and tracking the GIS data):
1. Development Site —Area (ac), GIS area polygon (DSA-1, DSA-X)
a. This area should reflect the entire area for which the stormwater system is designed
2. Site Discharge Point(s), GIS points (D-1, D-2, etc.)
a. These points should reflect the location of each site discharge point; this is typically the
point of connection to a County Drain, city storm sewer, or other drainage feature
downstream of the detention basin discharge structure
3. Dry Detention Basins, GIS area (ac) polygons (DBASIN-1, etc.)
a. The polygon should reflect the detention basin footprint up to and including the berm and
any associated maintenance buffer
4. Wet Detention Basins, GIS area (ac) polygons (WBASIN-1,
etc.)
a. The polygon should reflect the detention basin
footprint up to and including the berm and any
associated maintenance buffer
5. Retention Basins (no outlet), GIS area (ac) polygons
(RBASIN-1, etc.)
a. The polygon should reflect the detention basin
footprint up to and including the berm and any
associated maintenance buffer
6. Sediment Forebays, GIS area (ac) polygons (Forebay-1,
etc.)
a. The polygon should reflect the detention basin footprint up to and including the berm and
any associated maintenance buffer
7. Mechanical Separators, GIS points (MS-1, etc.)
a. The points can be placed at a maintenance access point for each structure. If multiple
mechanical separator units are proposed, create a point for each unit.
8. Bioretention — GIS area (ac), GIS polygons (BR-1, etc.)
a. The polygon should reflect the bioretention footprint including any maintenance or safety
buffers
9. Bioswales — GIS area (ac), GIS polygons (BS-1, etc.)
10. Porous Pavement —GIS area (ac), GIS polygons (PP-1, etc.)
11. Cisterns/Rain Barrels, GIS points (RB-1, etc.)
356
SEPTEMBER 1, 2021
AGENDA ITEM NO. 18
ADMINISTRATION
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
James Dunleavy, Chief of Park Operations & Maintenance — N. District
Subject: Motion — To approve Temporary Liquor License for the Oakland County Fair Board for the Fall
Michigan Antique Festival
INTRODUCTION AND HISTORY
The Michigan Antique Festival is planned for October 8-10, 2021, Staff and the Oakland County Fair board are excited to
have this event back at Springfield Oaks after needing to cancel in 2020 because of the pandemic. Per the Oakland
County Parks and Recreation rules and regulations, The Oakland County Fair Board is requesting to sell alcohol at
Springfield Oaks County Park during the Fall Michigan Antique Festival.
STAFF RECOMMENDATION
Staff recommends the Commission approve the temporary liquor license for Fair Board to sell alcohol at the Fall Michigan
Antique Festival, to be held at Springfield Oaks County Park October 8-10, 2021.
ATTACHMENTS
1. Request letter from The Oakland County Fair Board.
MOTION
Move to approve the temporary liquor license for The Oakland County Fair Board to sell alcohol at the
Fall Michigan Antique Festival, to be held at Springfield Oaks County Park October 8-10, 2021.
357
�r �, ice OAKLA
ak-
Oakland County Fair
12451 Andersonville Rd., PC) Box 365
Davisburg, MI 48350
Phone: (248)634-8830 Fax: (248) 634-4237
2019.2020
Board of Directors
August 5, 2021
President
Dear Chairman McGillvaray and Commissioners:
Loren Hotchkiss
The Oakland County Fair Board is requesting permission from the Oakland County Parks and
Recreation Commission to obtain a temporary liquor license for one events to be held at -
Terri Bumett
Springfield Oaks County Park in 2021. This event is the Michigan Antique Festival October 8-10.
Sale times for the Antique Festival would be Friday and Saturday 11 am- 7pm and 12- 5 pm on
Deborah Kayga
Sunday.
Treasurer
We are excited to have such events back at Springfield Oaks County Park after needing to
Chelsie Marshall
cancel them for the pandemic. As these events return we hope it will bring several thousand
people to the grounds and the surrounding area businesses, as they re-establish themselves as
Di;ectois
annual events here in Davisburg.
Jennifer Angus
Lori Bosetb
The sale of craft beer would tie into the local feel and artisan nature of this event. These sales
MaryAnn Floyed
would be a fundraiser for the fair. The commission has previously approved similar
Kelly Fuller
alcohol sales to benefit our fair.
Debbi Gallo
Ryan Hart
The Oakland County Fair Board, as in the past, would meet all the insurance and other
Ted Kenyon
requirements set forth by the commission. We will uphold the high standard of the Oakland
Melanie Peterson
County Parks.
Fay Preston
Please feel free to call or email me with any questions.
Galen Ressler
Ken Roberts
Thank you,
Chris Sardo
Ashley Saunders
Jackie Scramlin
L.C. Scramlin
General Manager
General Manager
L C Scramlin
Fair Mission
The Oakland County d-H Fair
Associations' mission is to provide a
public educalianal Shaw ase of our
youth through hands -an experience
wilh exhibits, demonstrations, and
presenlations as young people
develop life skills in a
family almosphere.
358
SEPTEMBER 1, 2021
AGENDA ITEM NO. 19
ADMINISTRATION
To: Chairman McGillivray and Commission Members
From: Susan M. Wells, Interim Executive Officer
James Dunleavy, Chief of Park Operations & Maintenance — N. District
Subject: Motion — To approve Temporary Liquor License for DRAW — Clarkston State Bank Back Roads
Half Marathon
INTRODUCTION AND HISTORY
Staff is very excited to be working with the promoter of the Clarkston State Bank Back Roads Half Marathon. This will the
9tn year for this annual event. The race starts and ends at Independence Oaks County Park. We have recently received
a request for DRAW (Disaster Relief At Work, Inc.) to serve Alcohol at the Clarkston State Bank Back Road Half Marathon
in support of their Disaster Relief At Work Program, for November 14, 2021, DRAW is a 501(c) (3) dedicated to providing
relief services to communities hit by natural disasters. Per the Oakland County Parks and Recreation rules and
regulations, DRAW is requesting to sell alcohol at Independence Oaks County Park during the Clarkston State Bank Back
Roads Half Marathon.
STAFF RECOMMENDATION
Staff recommends the Commission approve the temporary liquor license for DRAW (Disaster Relief At Work, Inc.) to sell
alcohol at the Back Roads Half Marathon, to be held at Independence Oaks County Park November 14, 2021.
ATTACHMENTS
1. Request letter from DRAW.
MOTION
Move to approve the temporary liquor license for DRAW to sell alcohol at the Clarkston State Bank
Back Roads Half Marathon, to be held at Independence Oaks County Park November 14, 2021.
359
DISASTER RELIEF AT
WORK
www.drawbuckets.org
i nfo(a).d rawb u ckets. ora.
1556 N. Telegraph Drive
Pontiac, MI 48340
EIN:45-49000831
Dear Members of the Oakland County Parks and Recreation Commission:
We are requesting permission for the sale of alcohol at Indendence Oaks on November 14,
2021 for the Clarkston State Bank Back Roads Half Marathon. We will be obtaining a liquor
license through the Michigan Department of Licensing and Regulatory Affairs Liquor Control
Commission (MLCC).
DRAW (Disaster Relief At Work, Inc.) is a 501(c)(3) nonprofit (45-4900831) dedicated to
providing relief services to communities hit by natural disasters. DRAW was started with a
singular premise in mind: A natural disaster is one of very few times in the human experience
where a person or family goes from everyday life to rock bottom instantly. Since our inception in
2012, DRAW has responded to 10 major disasters per year, on average.
Please let me know if you have questions regarding this request. Thanks so much for your time
and consideration. I can be reached at 864 569 6249 or greg@drawbuckets.org.
Sincerely,
Greg Martin
Director
DRAW
360
1. Upcoming OCPR Commission Meeting and OCPRC Executive Committee Meeting Dates:
At this point, the next OCPR Commission meeting will be Wednesday. October 6. 2021 at 2:00 p.m.
at the Parks and Recreation Administration Buildinq, 2800 Watkins Lake Rd, Waterford, MI 48328.
The next OCPRC Executive Committee meeting is scheduled on Monday. September 13, 2021 at
1:00 p.m. This will be a teleconference meeting.
2. OCPR Upcoming Events: See Attached List
3. Communications and Marketing: Attached to this report is a Communications and
Marketing and Marketing Media Report on Oakland County Parks and Recreation from
Desiree Stanfield, Supervisor — Marketing and Communications.
4. 2022 Annual Vehicle Permits: The 2022 Annual vehicle permits will go on sale Monday, September 27th. This
includes the free vehicle permit given to seniors, veterans and individuals with a permanent disability who live in
Oakland County.
5. OCPR/HCMA News: Oakland County Parks will be participating with HCMA on their program focusing on
swimming lessons for youth. We will have someone on the planning committee to represent OC Parks.
6. OCPR Grant Program Schedule: Staff has updated the schedule for the rollout of the OCPR Trailways and
Park Improvements Grant Programs. After reviewing the programs with Oakland County Economic
Development staff, OCPR staff are going to re -work the applications and process to streamline and simplify
based on other county -run grant programs. The application materials and grant guidance will now come to the
Commission for their approval in October. An updated timeline is below.
• April 2021: OCPRC review and discuss Millage Initiatives Funding Policy, grant program criteria and
process, provide feedback for staff
• May 2021: OCPRC approve Millage Initiatives Funding Policy, grant program criteria and process
• July - September: Develop digital application process with Oakland County IT
• September: On -board Project Advisor — Community Outreach & Grant Management
• September - October: Initial Community Outreach —set up a grant web page with basic information, send
informational "head's up" e-mail to CVTs
• October 1, 2021: Beginning of FY2022 budget year
• October 6, 2021: OCPRC review and approve grant application materials
• October 18, 2021: Launch web page with grant -related materials and application information and links
• November 1, 2021: Open Laserfiche application
• Week of November 15, 2021: Hold virtual meeting for potential grantees to review grant programs and
answer questions
• January 14, 2021: Grant applications due into Laserfiche by 5:00 p.m.
• Grant applications reviewed by staff — January 17 — March 4, 2022
• Review and award recommendations made to AMT — March 8-15, 2022
• AMT recommends awards to Parks Commission — April 2022
• OCPRC Approval and Execution — May 2022
• Grant agreements sent out — May/June 2022 — Grant period: June 1 — May 31
361
Active Adults
September 15 Fireside Chat -Waterford Oaks Lookout Lodge (Virtual Option)
Groveland Oaks
September 3-5 Labor Day -(Not) Workin' for the Weekend
September 17-18 Haunted Hallows I
September 24-25 Haunted Hallows 11
Nature/Interuretive Programs
Fieldtrips & Birthday Parties
September 11 Quinn's 4' Birthday Party — Red Oaks Nature Center
September 11 Ben's 7`h Birthday Party — Wint Nature Center
September 25 Joey & Tommy's Birthday — Red Oaks Nature Center
Homeschool Series
September 9 Nature Neighbors — Red Oaks Nature Center
September 14 Nature Neighbors — Wint Nature Center
Public Interpretive Programs
September 10
Morning Munchkins — Red Oaks Nature Center
September 10
Trail Hikes by Appointment — Wint Nature Center
September 11
Trail Hikes by Appointment — Wint Nature Center
September 12
Grandparents Day — Wint Nature Center
September 17
Trails Hikes by Appointment — Red Oaks Nature Center
September 18
Trails Hikes by Appointment — Red Oaks Nature Center
September 24
Nature Fit: Bat Walk — Red Oaks Nature Center
September 26
Magnificent Magical Monarchs Red Oaks Nature Center
I:Z19i
September 15 Ferndale — Red Oaks Nature Center
September 18 Farmington Farmers Market — Red Oaks Nature Center
Virtual Series & Self Led
September 18 Rock Out - Wint Nature Center
Mobile Recreation
September 2
Stage (2): Arts Beats & Eats Downtown Royal Oak
September 3
Bus: Wedding Shuttle Royal Park Hotel
September 4
Carnival Package: OCPRC - Groveland Campground
September 5
Carnival Package & Festival Package: OCPRC - Addison Oaks Campground
September 5
Axe Throwing, Festival & Carnival: Franklin Hills Labor Day Event Country Club
September 9
Stage: Oak Park P and R David Shephard Park
September 10
Stage: Royal Oak Farmers Market
September 10
Mini-Fest.: Paint Creek Ctr Arts & Apples Rochester Municipal
September 10
Bus (2) Wedding Shuttle Addison Oaks
September 11
Stage: Holly DDA Holly Days
September 11
Mini-Fest.: Paint Creek Ctr Arts & Apples Rochester Municipal
September 11
Climbing Tower: OCPRC - Waterford Market Food Truck Rally
September 11
Festival Package: Waterford P & R Big Wheels Town Hall
362
September 11
Festival Package: Gerling, Melissa Block Party Lot Adjacent
September 12
Mini-Fest.: Paint Creek Ctr Arts & Apples Rochester Municipal
September 16
Stage: Oakland Community Health Network Annual Recovery Celebration
September 16
Bus: MR -PA Field Trip
September 16
Axe Throwing, Archery, & Carnival Games Older Person Comm Oktoberfest
September 17
Archery: West Bloomfield Event Marshbank Park
September 17
Festival Package: South Lyon Movies in McHattie Park
September 18
Stage: Golling Buick GM Car Show Golling Buick
September 18
Stage: Lincoln Park DDA Celebration
September 18
Carnival Package: OCPRC — Campground Groveland
September 18
Festival Package: Oakland Twp P & R Goodison Good Tyme Bear Creek Nature Park
September 18
Stage: Wixom DDA Block Party Pontiac trail and old Wixom
September 19
Climbing Tower: Ferndale Police Open House
September 24
Stage: Notre Dame Prep Football
September 24
Stage: Royal Oak Farmers Market
September 24
Bleachers: South Lyon Area Pumpkin Fest.
September 25
Stage: Brandon Twp Parks and Rec. Septemberfest
September 25
Carnival Package: OCPRC - Campground Groveland
September 25
Obstacle Course: Orion Twp P & R Fall Festival Camp Agawam
September 25
Climbing Tower: MILFORD P & R Fall Picnic Central Park
September 25
Climbing Tower, Stage, Tents, & Light Towers: Oakland County Brooksie Way
September 26
Carnival Games: Springfield Twp P&R Oaks on the Road, Bugs Life
September 29
Bus: OAKLAND Community Health Network Lansing Trip
September 29
Bus: Oxford Twp P & R Senior Trip
Oakland Countv Farmer's Market
September 4
Yoga at the Market
September 4
Tai Chi at the Market
September 8
Gleaners Community Food Bank Mobile Pantry
September 16
Yoga at the Market
September 19
Community Garage Sale
September 22
Gleaners Community Food Bank Mobile Pantry
Special Events
September 17
Recreation Revealed -Red Oaks
September 18
Haunted Hallows-Groveland Oaks
September 24
Recreation Revealed -Waterford Oaks
September 25
Haunted Hallows-Groveland Oaks
September 26
Oaks on the Road -Springfield Township
September 26
Brooksie Way -Rochester Hills
Springfield Oaks
Wednesdays
Ellis Barn Tours
September 3-5
Ellis Barn Wedding
September 3-5
Activity Center Wedding
September 9
Ferndale Service Club Outing
September 10
ASBE Outing
September 10-12
Ellis Barn Wedding
September 10-11
Activity Center Wedding
September 12
Golf Outing
363
September 12
Carousel Hall Wedding
September 14
Grand Hall Dog Practice (every Tuesday beginning 9/14)
September 15
Grand Hall Mighty Mutts
September 17-18
Holly Cross Country Meet (run by Fair)
September 24-26
Ellis Barn Wedding
September 24-26
Activity Center Wedding
September 24-25
Dog Show
September 27
Flint Metro Girls Tournament
September 27,29
Pickleball
Volunteer Opportunities
September 17-18 Haunted Hallows I
September 24-25 Haunted Hallows II
Archery n, Independence Oaks
September 7 Beginner & Intermediate Archery Classes
September 14 Beginner & Intermediate Archery Classes
September 19 Scout Field Trip
Wed, Thurs & Fri Open Archery
364
Communications • • Marketing 0MAKLAND
SEPTEMBER REPORT 2021 COUNTY PARKS
GreatDarks for Great People
The following is an update provided by Desiree Stanfield,
Supervisor - Marketing and Communications: 14
E-marketing Messages
4
n
r
4
News Releases
• Make the most of summer with Oakland County Parks and
Recreation, July 29
Design Initiatives:
• Designed two interpretive signs for Normandy Oaks Park
• Revised park maps for Lyon Oaks Wayfinding system upgrades
• Designed content for the following projects/events: Oakland
Uncorked 2021 at the Oakland County Farmers Market; Parks
Employee Survey flyers; Annual Vehicle Permit 2022 collateral;
OCFM Arts & Crafts Show; and OCFM Food Truck Rally.
Advertising:
• MetroParent Pulse digital edition about fall camping, July 26.
The e-newsletter is delivered to 22,000+ MPP subscribers.
• EdibleWOW ad for about fall flowers, produce at the Oakland
County Farmers Market, July 22. The magazine distributes
12,000 copies to its networks in Southeast MIchigan.
• Ad for Michigan Gardener magazine about fall flowers,
produce at the Oakland County Farmers Market. The
magazine reaches 70,000+ garden enthusiasts throughout
Southeast Michigan.
• Michigan RV & Campgrounds: Full page, two 1/4-page and
leaderboard ad for Groveland Oaks and Addison Oaks
campgrounds. The 2022 directory is the official publication
of the Michigan Association of Recreation Vehicles and
Campgrounds. 100,000 copies distributed annually at RV
shows and Michigan Welcome Centers, and including targeted
marketing to 25,000 consumers directly interested in the RV
and camping industry.
r
L
OF +
Wrote and distributed 33 e-marketing messages. The topics
highlighted items for the nature centers, hiring initiatives, farmers
market, campgrounds and summer programs. These e-marketing
messages were delivered to 222,384 recipients as follows:
• Raise your own black swallowtail caterpillar - 8,303 recipients
• TrailBlazer program heads to Orion Oaks - 8,032
• Join us for lunchtime yoga - 5,890
• Springfield Oaks is hiring - 4,516
• Use a solar telescope to look at the sun - 8,235
• Carol Bacak-Egbo to host Trailside Chat - 6,077
• Springfield Oaks is hiring - 4,517
• Join us for Family Market Day! - 9,418
• Get your steps in during TrailBlazer program - 6,118
• Newsbreak - July 23, 2021 - 623
• Family Market Day is TOMORROW! - 9,414
• Interested in archaeology? - 6,138
• Ever heard of a toadbug? - 9,642
• Join a free, virtual cooking class - 5,456
• See what nature -based technology is all about - 6,860
• Learn about habitats at Catalpa Oaks - 6,129
• Know any disappearing towns? - 6,080
• Free lifeguard assessment available - 9,372
• Register for Morning Munchkins - 6,864
• Create your own school supplies - 7,843
• Design a masterpiece - 9,633
• Free lifeguard assessment available - 9,368
• Time for yoga and tai chi - 5,768
• Ready to walk? - 6,163
• Rediscover our rural roots - 6,136
• We're inspecting insects - 6,401
• Operational changes at our campgrounds - 1,888
• Newsbreak - Aug. 6, 2021 - 623
• Operational changes at our campgrounds - 6,812
• Enjoy summer on the trails - 7,952
• Free food distribution Wednesday - 8,281
• Register for the Puddle Jumpers program - 9,629
• We're celebrating grandparents! - 8,203
HOLLY OAKS
• ,,tv � '7 0
Primary Facebook OCFM Facebook Holly Oaks Twitter Instagram
Follows Follows Facebook Follows Followers Followers
26,580 12,966 10,859 6,947 2,994
0
00
Social Media:
July was National Park and Recreation Month! Each week on Facebook and Twitter, we posted videos featuring Oakland County Parks
and Recreation staff. The first week was all about Groveland Oaks, the second week featured Orion Oaks Dog Park, the third week
highlighted the Recreation Programs and Services team, and the last week was focused on staff at all of the facilities that make up Red
Oaks County Park. We wanted to showcase the passion that the OCPR team has for parks! Throughout the month, we also asked our
social media audience to share their memories from our parks. In between promoting this special month, we also featured all of the
programs taking place at the parks, promoted the Oakland County Fair throughout the entire 10 days, and recognized national holidays
such as National Hammock Day and National Waterpark Day.
❑awmwi Bounty Park&arld Wred#Ian ...
PIIIJICAH-11 ki}• 19 lily 31 al is}¢ PM •�
7WDd 's t* td51; of NdtWnai Pprk i)na FlWOI;h4n Norm Guk our
pinkS pr47d51c ovidoor 0d%*r1kurs5 throu�hp4lf th{•en ire- y r. DL.W
Oakland County Parilis and Recreation temp is dedcatmd fo proy ding
all residents qualityfecreatiorn P*eriencesthat encotrage heallhyr
W&L5tyle�c, 9upporl economic proWerRy4 promote the ikro%Ctlon of
AAkurdt rft0L.M *nd li!rth8eh4o 11ho "lily 01 IXf 1hrWgh.Xd
ltoaklardcounty. lbdayr we're hiokghting mcd Uaks Nature Ccr*hcr,
tie# {fake roil Caurs..- See mare
Oakland County Farmers Market
z Oakland County Parks and Zecreafion
P..bli Avd by Amon& Sable 9 117 10 Aa �••
A few highlights from day jf of the Oakland Canty Fair' loin us
now through July 18 at Springfield Daks County Pak Details.
hltp lktakfair.prrd{,
The fair is featuring_
lid Mister Grab - Hermit Crab Races
# d t3411000 ArtiSt Show
iq,b High plve perforrndnces
a Stilt Walker
Radng Prigs
Miracle of Birth Barn
W Butterfly Exhibit
s Fair food
Big Rock Amusements carnival
�* Livestock
arld more! You won't want to miss it!
The Oakland County Farmers Market Facebook page has been focused on spreading the word about the vendors who are at the market
and the events that are happening such as Yoga at the Market, the Family Market Day, Gleaners Community Food Bank distribution
days and the Gleaners' Cooking Matters program. We also highlighted different vendors throughout National Farmers Market Week, to
remind patrons of the hard work that goes into being a business at the farmers market and why farmers markets are an important part
of communities.
w � �
366
Holly Oaks ORV Park
The Holly Oaks ORV Park Facebook page kept all park patrons updated after the rain we received in July, which created some issues at
the park, causing some areas to be closed. Once they were reopened, posts were published to let park users know.
Holly Oaks.ORV Park ...
Publishea tyAmanda Sable * -.truly 29 at3:50 PM $
Check INsouk! Thank you For your pallencewlith the severe storms
that ranraged southeastern W h{gan last Saturday. We experienced
severe wajhautr. that washed away roads, trails and hillsides. Staff
worked diligently to repair routes for safe teal irthrough the park and
there Is plenty of newobstaoes mother Nature created For us all to
ptay on. we are stlU pumprrg ar16 Cryiii'bg out the &am Tub Ring Track
and that will remain dosed ror this weekend. All ether areas are npen-
Be careful of the water depths and washouts_
Advertising
Hilly Oaks ORV ftrk ...
NoEhAd b}'.Mardi SablA9- Aupp� i 5it 2!53 PM -QP
All arras aF the park we men -- even The fiakhkub ring track) Our skaFr
warped bawd tQ cart the track A-er all the raIP, lQ hope you enjoy
It Learn about tickels, ho^ toles and mane at our w*bslte,.
hitps;?f3it1YJ'2Q DlSP?.
Make a
Reservation
For relaxation -
Make plans now for a camping trip
to one of Oakland County Parks
and Recreation's campgrounds
Campers enjoy a popular Campground
Recreation Program featuring activities,
"is
Addison Oaks Campground
-near Rochester. MI
Groveland Oaks Campground
Poq -near Holly, MI
L-ted u-s frm HUIHJ 0010 ORV Pork
©Call 246-858-1400
for reservations
Michigan Gardener Magazine
2022 MARVAC Camper Directory 367
Print and Digital Media Exposure:
WCRZ-FM USA Au¢ 6 9:21 am
Michigan Patch.com Nikki Gaskins Patch Staff USA Au¢ 10 1:50 om 10 MI Beaches That are Closed or Have Contamination Advisories
Free Document Shredding Event For Oakland County Residents Pontiac Lake - Pontiac Recreation Area - Closed Crooked Lake -
residents can take advantage of free document shredding on Monday, Independence Oaks County Park - Closed Lake Callis - Lake Callis
Aug. 16 at Catalpa Oaks County Park from 9-11 a.m. If you can't make Davison -
that
FOX 2 Detroit News Amber Ainsworth USA Au¢_ 10 10:37 am
Things to do this weekend in Southeast Michigan
featured? Email me at amber.ainsworth@fox.com. Michigan Taco Fest
Springfield Oaks County Park in Davisburg Friday, Aug. 13 from 4-9
p.m.
Deadline Detroit USA Ana 8 10:12 om
10 Michigan Beaches Are Closed or Under Bacteria Contamination
Warnings
to high bacteria levels due to wildlife. Crooked Lake, Independence
Oaks County Park - Closed since July 27 due to high bacteria levels
Oakland County Moms USA Au¢ 8 7:51 om
Calendar
troy community center events troy events troy family aquatic center
events troy historic village events troy stage nature center events
The Oakland Press Kathv Blake USA Au¢ 6 3:52 vm
Oakland County community calendar Aug. 8 and beyond
a different Oakland County Park each week during the TrailBlazer
Summer Walking Series, 7-8 p.m. Aug. 10 at Independence Oaks County
Park.
Detroit Free Press USA Au¢ 6 3:50 Dm
10 Michigan beaches closed due to high levels of bacteria
Youth Pontiac Lake: Pontiac Recreation Area Crooked Lake:
Independence Oaks County Park Kent Lake: Kensington Metropark,
Maple beach Lake
The Oakland Press Stevhen Frve USA Aug 6 3:33 om
Hot days ahead: Relief found at the Red Oaks Waterpark
Scenes from the Red Oaks Waterpark in Madison Heights, where
hundreds go each day to beat the heat. Scenes from the Red Oaks
Waterpark in
CBS Detroit Sara Powers USA Aug 6 12:12 vm
10 Beaches In Michigan Closed Due To High Bacteria Levels
Lake - Pontiac Recreation Area (Oakland County) Crooked Lake -
Independence Oaks County Park (Oakland County) Lake Callis - Lake
Callis (
Neighborhood SEEN USA Au¢ 5 6:16 vm
8 Things to Do in Metro Detroit This August
Taco Fest, presented by Canterbury Village Events and happening at
Springfield Oaks County Park. Enjoy three straight days of 30+ taco
Radio.com Marisa Jenkins USA Aug 5 10:21 am
10 Michigan beaches closed due to high levels of e. coli bacteria
- Pontiac Recreation Area - Oakland County • Crooked Lake -
Independence Oaks County Park - Oakland County • Lake Callis - Lake
Callis -
Oakland Countv Times USA Au¢ 4 6:55 vm
Rare White Monarch Graces Orion Oaks Park (video) • Oakland
County Times
had not heard of any. Those who are enjoying the details of nature are
reminded to stay on the trails, as that are of the park is a known
Crain's Detroit Business USA Au¢ 4 1:15 vm
Restaurant Roundup: Milford House closes I Taco Fest returns I D'Luxe
cookies debut
in Davisburg If you like tacos, you'll want to head to Springfield Oaks
County Park in Davisburg next weekend. The second annual Taco Fest,
Florida Patch.com Release Desk USA Tu128 10:53 am
Orange County Regional History Center Blog: Making Waves At Wet `N
Wild
manager Eric Reickel built at Waterford Oaks, Mich., for Oakland
County Parks and Recreation. Logistics for Millay's new water park
quickly
Sherman Publications Wendi Reardon USA Tul 28 9:03 am
A Look Back for July 28, 2021
way for Independence Township residents to celebrate than to visit
Independence Oaks County Park right off Sashabaw Road. `A love affair
Oakland Countv Moms USA Tul 2712:00 am
Haunted Houses Metro Detroit 2021
have no announcements to reopen September 2019 - Oakland County
Parks / Addison Oaks County Park won't be hosting Boo Bash haunted
camping
Oakland Countv Times USA Tul 25 11:02 om
Oakland County Fair Sees Crowds Return, Celebrates 50 Year
Anniversary . Oakland County Times
been a real Celebration. For 50 years the Fair has been here on
Springfield Oaks County Park- and we've been giving out things in 50's
from
Auburn Hills Chamber of Commerce USA Tul 22 11:59 vm
Oakland University professor conducting pollinator surveys in Oakland
County parks
County and are supported by Oakland Township Parks and Recreation
as well as Oakland County Parks. These research efforts involve Oakland
Detroit Legal News USA Tul 22 6:13 am
Oakland County offers COVID-19 vaccine at popular destinations
of residents ages 16 years and older. They include: • Oakland County
Farmers Market in Waterford on July 24. Orchard Lake Fine Art Show
368
Model D David Sands USA Jul 21 11:26 vm
The DNR turns 100 this year. Here's how it's shaped Southeast Michigan's
natural areas.
play a critical role in keeping the state park system on stable footing.
Holly Oaks ORV Park in Holly. "We've been falling behind and know
Detroit Free Press (Premium) Christina Hall USA Jul 21 10:48 am
Genesee County woman wins $1 million prize in MI Shot To Win
COVID-19 vaccine lottery
at upcoming community events and destinations, such as the Oakland
County Farmers Market in Waterford and the Best Western Premier
Hotel in
Sherman Publications Matt Mackinder USA Jul 21 10:37 am
Upper Bushman Lake earns designation from county
. Among them is Upper Bushman Lake, a 32-acre lake in Independence
Oaks County Park that has once again received a catch -and -release -for -
all
Detroit Leal News USA Jul 21 6:44 am
Family and Senior Market Days promote healthy eating in Oakland
County
will include a variety of activities for families and seniors, including Tai
Chi, Oakland County Parks inflatables, raffles, and prizes. The
Auburn Hills Chamber of Commerce USA Jul 20 11:59 vm
Pontiac Community Foundation Hosts Open Streets Program
for our partners at Molina Healthcare, Oakland County Parks, Sheriff
PAL Oakland County, Pontiac Youth and Recreation, and The City of
Oakland Countv Times USA Jul 17 11:36 vm
Places to EXPLORE in Oakland County . Oakland County Times
Train Mural Lyon Township Lyon Township Library Madison Heights
Red Oaks Nature Center Novi Lakeshore Park Oak Park Victoria Park
Trivsavvv Laura Sternbere USA Jul 17 6:41 am
Guide to Metro Detroit Beaches and Parks
of M-24 (Lapeer Road). 10 of 17 Leonard: Addison Oaks County Park
Michigan.org
369