Loading...
HomeMy WebLinkAboutReports - 2023.11.16 - 40707 AGENDA ITEM: Acceptance from the U.S. Department of Health and Human Services Health Resources and Services Administration for the 2023 Community Project Funding/Congressionally Directed Spending Facilities and/or Equipment Projects Program DEPARTMENT: Health & Human Services MEETING: Board of Commissioners DATE: Thursday, November 16, 2023 9:30 AM - Click to View Agenda ITEM SUMMARY SHEET COMMITTEE REPORT TO BOARD Resolution #2023-3448 Motion to approve the acceptance of the 2023 Community Project Funding/Congressionally Directed Spending Facilities and/or Equipment Projects grant award from the Department of Health and Human Services Health Resources and Human Services Administration for the period September 30, 2023 through September 29, 2026, in the amount of $1,200,000 and authorize the Chair of Board of Commissioner to execute the grant agreement; further, amend the FY 2024 budget as detailed in the attached Schedule A. ITEM CATEGORY SPONSORED BY Grant Penny Luebs INTRODUCTION AND BACKGROUND The Health Division was awarded funding through the 2023 Community Project Funding/Congressionally Directed Spending Facilities and/or Equipment Projects grant in the amount of $1,200,000 for the period September 30, 2023 through September 29, 2026. The funding will directly support expansion of the Health Division Laboratory facility to meet the growing public health needs of the community. The funding will be used for the expansion of a Health Division Laboratory, equipped with advanced technology to meet the growing public health needs of the community. The implementation of this project will enhance the capacity and capabilities of the Laboratory. Digital-drop-PCR instrumentation – currently used for COVID testing – will be improved to expand the County’s testing capabilities to trace the source of pollutants and monitor water quality at beaches throughout Oakland County. Hologic Panther digital instruments will be utilized to improve public health testing for influenza and hepatitis viruses, STDs and bacterial pathogens. This expansion will increase the capacity of OCHD testing, allowing the Health Division to process more labs for partner organizations and access to quality care. The grant agreement has completed the Grant Review Process in accordance with the Grant Policy Procedures. No county match required. POLICY ANALYSIS acceptance of this grant does not obligate the county to any future commitment and continuation of this program is contingent upon continued future levels of grant funding. BUDGET AMENDMENT REQUIRED: Yes Committee members can contact Michael Andrews, Policy and Fiscal Analysis Supervisor at 248.425.5572 or andrewsmb@oakgov.com, or the department contact persons listed for additional information. CONTACT Leigh-Anne Stafford, Director Health & Human Services ITEM REVIEW TRACKING Aaron Snover, Board of Commissioners Created/Initiated - 11/16/2023 AGENDA DEADLINE: 11/16/2023 9:30 AM ATTACHMENTS 1. PH&S Health_Community Project Funding_Congressional Direct_Sch.A (1) 2. Grant Acceptance Review Sign-Off 3. NoA COMMITTEE TRACKING 2023-11-07 Public Health & Safety - Forward to Finance 2023-11-08 Finance - Recommend to Board 2023-11-16 Full Board - Adopt Motioned by: Commissioner Yolanda Smith Charles Seconded by: Commissioner Philip Weipert Yes: David Woodward, Michael Spisz, Michael Gingell, Penny Luebs, Karen Joliat, Kristen Nelson, Christine Long, Robert Hoffman, Philip Weipert, Gwen Markham, Angela Powell, Marcia Gershenson, Janet Jackson, William Miller III, Yolanda Smith Charles, Brendan Johnson, Ajay Raman (17) No: None (0) Abstain: None (0) Absent: Charles Cavell (1) Passed Oakland County, Michigan HEALTH AND HUMAN SERVICES - COMMUNITY PROJECT FUNDING/CONGRESSIONALLY DIRECTED SPENDING Schedule "A" DETAIL R/E Fund Name Division Name Fund # (FND) Cost Center (CCN) # Account # (RC/SC) Program # (PRG) Grant ID (GRN) # Project ID # (PROJ) Regio n (REG) Budget Fund Affiliat e (BFA) Ledger Account Summary Account Title FY 2024 Amendment FY 2025 Amendment FY 2026 Amendment R Human Service GrantsHealth FND11007 CCN1060201 RC610313 PRG133150 GRN-1004339 610000 Federal Operating Grants $1,200,000 $1,200,000 $1,200,000 Total Revenues $1,200,000 $1,200,000 $1,200,000 E Human Service GrantsHealth FND11007 CCN1060201 SC730373 PRG133150 GRN-1004339 730000 Contracted Services 1,200,000 1,200,000 1,200,000 Total Expenditures $1,200,000 $1,200,000 $1,200,000 GRANT REVIEW SIGN-OFF – Health & Human Services / Health Division GRANT NAME: Community Project Funding/Congressionally Directed Spending FUNDING AGENCY: Michigan Department of Health & Human Services DEPARTMENT CONTACT: Stacey Smith 248-452-2151 STATUS: Acceptance (Greater than $50,000) DATE: 10/12/2023 Please be advised that the captioned grant materials have completed internal grant review. Below are the returned comments. The Board of Commissioners’ liaison committee resolution and grant acceptance package (which should include this sign- off and the grant agreement/contract with related documentation) should be placed on the next agenda(s) of the appropriate Board of Commissioners’ committee(s) for grant acceptance by Board resolution. DEPARTMENT REVIEW Management and Budget: Approved– Sheryl Johnson (10/092023) Human Resources: Approved by Human Resources. No position impact – Heather Mason (10/06/2023) Risk Management: Approved. No County insurance requirements – Robert Erlenbeck (10/09//2023) Corporation Counsel: Approved - Sharon Kessler (10/10/2023) Department of Health and Human Services Health Resources and Services Administration Notice of Award FAIN# CE152780 Federal Award Date: 09/22/2023 Recipient Information 1. Recipient Name OAKLAND, COUNTY OF 1200 N Telegraph Rd Pontiac, MI 48341‐1032 2. Congressional District of Recipient 11 3. Payment System Identifier (ID) 1386004876A4 4. Employer Identification Number (EIN) 386004876 5. Data Universal Numbering System (DUNS) 136200362 6. Recipient's Unique Entity Identifier HZ4EUKDD7AB4 7. Project Director or Principal Investigator Leigh‐Anne Stafford Director Health & Human Services‐APP staffordl@oakgov.com (248)858‐1293 8. Authorized Official David Woodward Board Chair ‐ Commissioner woodwardd@oakgov.com (248)296‐5033 Federal Agency Information 9. Awarding Agency Contact Information Shelia Burks Grants Management Specialist Office of Federal Assistance Management (OFAM) Division of Grants Management Office (DGMO) sburks@hrsa.gov (301) 443‐6452 10. Program Official Contact Information Benjamin Williams Healthcare Systems Bureau (HSB) bwilliams2@hrsa.gov (301) 287‐0241 Federal Award Information 11. Award Number 1 CE1HS52780‐01‐00 12. Unique Federal Award Identification Number (FAIN) CE152780 13. Statutory Authority Consolidated Appropriations Act, 2022, (PL 117‐103) 14. Federal Award Project Title Community Project Funding/Congressionally Directed Spending ‐ Construction 15. Assistance Listing Number 93.493 16. Assistance Listing Program Title Congressional Directives 17. Award Action Type New 18. Is the Award R&D? No Summary Federal Award Financial Information 19. Budget Period Start Date 09/30/2023 ‐ End Date 09/29/2026 20. Total Amount of Federal Funds Obligated by this Action $1,200,000.00 20a. Direct Cost Amount 20b. Indirect Cost Amount 21. Authorized Carryover $0.00 22. Offset $0.00 23. Total Amount of Federal Funds Obligated this budget period $1,200,000.00 24. Total Approved Cost Sharing or Matching, where applicable $0.00 25. Total Federal and Non‐Federal Approved this Budget Period $1,200,000.00 26. Project Period Start Date 09/30/2023 ‐ End Date 09/29/2026 27. Total Amount of the Federal Award including Approved Cost Sharing or Matching this Project Period $1,200,000.00 28. Authorized Treatment of Program Income Addition 29. Grants Management Officer – Signature Tammy Ponton on 09/22/2023 30. Remarks Page 1 A printer version document only.The document may contain some accessibility challenges for the screen reader users.To access same information,a fully 508 compliant accessible HTML version is available on the HRSA Electronic Handbooks.If you need more information,please contact HRSA contact center at 877-464-4772,8 am to 8 pm ET,weekdays. Healthcare Systems Bureau (HSB) Notice of Award Award Number: 1 CE1HS52780‐01‐00 Federal Award Date: 09/22/2023 31. APPROVED BUDGET: (Excludes Direct Assistance) [X]Grant Funds Only [ ]Total project costs including grant funds and all other financial participation a.Salaries and Wages:$0.00 b.Fringe Benefits:$0.00 c.Total Personnel Costs:$0.00 d.Consultant Costs:$0.00 e.Equipment:$0.00 f.Supplies:$0.00 g.Travel:$0.00 h.Construction/Alteration and Renovation:$0.00 i.Other:$0.00 j.Consortium/Contractual Costs:$0.00 k.Trainee Related Expenses:$0.00 l.Trainee Stipends:$0.00 m.Trainee Tuition and Fees:$0.00 n.Trainee Travel:$0.00 o.TOTAL DIRECT COSTS:$1,200,000.00 p.INDIRECT COSTS (Rate: % of S&W/TADC):$0.00 q.TOTAL APPROVED BUDGET:$1,200,000.00 i. Less Non‐Federal Share:$0.00 ii. Federal Share:$1,200,000.00 32. AWARD COMPUTATION FOR FINANCIAL ASSISTANCE: a.Authorized Financial Assistance This Period $1,200,000.00 b.Less Unobligated Balance from Prior Budget Periods i. Additional Authority $0.00 ii. Offset $0.00 c.Unawarded Balance of Current Year's Funds $0.00 d.Less Cumulative Prior Award(s) This Budget Period $0.00 e.AMOUNT OF FINANCIAL ASSISTANCE THIS ACTION $1,200,000.00 33. RECOMMENDED FUTURE SUPPORT: (Subject to the availability of funds and satisfactory progress of project) YEAR TOTAL COSTS Not applicable 34. APPROVED DIRECT ASSISTANCE BUDGET: (In lieu of cash) a. Amount of Direct Assistance $0.00 b. Less Unawarded Balance of Current Year's Funds $0.00 c. Less Cumulative Prior Award(s) This Budget Period $0.00 d. AMOUNT OF DIRECT ASSISTANCE THIS ACTION $0.00 35. FORMER GRANT NUMBER 36. OBJECT CLASS 41.11 37. BHCMIS# 38. THIS AWARD IS BASED ON THE APPLICATION APPROVED BY HRSA FOR THE PROJECT NAMED IN ITEM 14. FEDERAL AWARD PROJECT TITLE AND IS SUBJECT TO THE TERMS AND CONDITIONS INCORPORATED EITHER DIRECTLY OR BY REFERENCE AS: a. The program authorizing statue and program regulation cited in this Notice of Award; b. Conditions on activities and expenditures of funds in certain other applicable statutory requirements, such as those included in appropriations restrictions applicable to HRSA funds; c. 45 CFR Part 75; d. National Policy Requirements and all other requirements described in the HHS Grants Policy Statement; e. Federal Award Performance Goals; and f. The Terms and Conditions cited in this Notice of Award. In the event there are conflicting or otherwise inconsistent policies applicable to the award, the above order of precedence shall prevail. Recipients indicate acceptance of the award, and terms and conditions by obtaining funds from the payment system. 39. ACCOUNTING CLASSIFICATION CODES FY‐CAN CFDA DOCUMENT NUMBER AMT. FIN. ASST.AMT. DIR. ASST.SUB PROGRAM CODE SUB ACCOUNT CODE 23 - 370CONS 93.493 23CE1HS52780 $1,200,000.00 $0.00 N/A 23CE1HS52780 NOTICE OF AWARD (Continuation Sheet)Date Issued: 9/22/2023 8:47:41 AM Award Number: 1 CE1HS52780-01-00 Page 2 HRSA Electronic Handbooks (EHBs) Registration Requirements The Project Director of the grant (listed on this NoA) and the Authorizing Official of the grantee organization are required to register (if not already registered) within HRSA's Electronic Handbooks (EHBs). Registration within HRSA EHBs is required only once for each user for each organization they represent. To complete the registration quickly and efficiently we recommend that you note the 10-digit grant number from box 4b of this NoA. After you have completed the initial registration steps (i.e.,created an individual account and associated it with the correct grantee organization record), be sure to add this grant to your portfolio. This registration in HRSA EHBs is required for submission of noncompeting continuation applications. In addition, you can also use HRSA EHBs to perform other activities such as updating addresses, updating email addresses and submitting certain deliverables electronically. Visit https://grants3.hrsa.gov/2010/WebEPSExternal/Interface/common/accesscontrol/login.aspx to use the system. Additional help is available online and/or from the HRSA Call Center at 877-Go4-HRSA/877-464-4772. Terms and Conditions Failure to comply with the remarks, terms, conditions, or reporting requirements may result in a draw down restriction being placed on your Payment Management System account or denial of future funding. Grant Specific Condition(s) 1. Due Date: Within 120 Days of Budget Start Date The award recipient must consult with the HRSA Project Officer and environmental reviewer to determine if other environmental compliance reviews are required for the proposed project. Additional information will be provided within 120 days of the Project Period Start Date to identify the extent of the information that will be needed for this specific project. This information may include an Environmental Assessment (EA) under NEPA, consultation under Section 106 of the National Historic Preservation Act with the State Historic Preservation Officer (SHPO) / Tribal Historic Preservation Officer (THPO) (and any other consulting parties if identified), a hazardous materials survey, Coastal Zone Consistency Determination, Floodplain Management, Environmental Justice, etc. The documentation must be completed and submitted to HRSA for review and approval. This condition must be approved and lifted from the Notice of Award prior to initiating any physical site preparation, demolition, alteration and renovation, or construction related to the project. Funds may only be drawn down for pre- construction activities, such as the purchase of moveable equipment, completion of architectural and engineering plans, licensing and permitting requirements, State Historic Preservation Office/Tribal Historic Preservation Office consultation, and preparation of the EA or related testing and surveys. 2. Due Date: Within 60 Days of Budget Start Date Within 60 days of the Project Period Start Date, submit a revised construction schedule providing more detailed information and project milestones into HRSA’s Electronic Handbook. Provide an overall project schedule, including the number of months for each of the following critical milestones within the three-year budget/project period (36 months): planning, obtain required permits and/or variances, meet Federal environmental and historic preservation requirements, awarding of contracts, alteration/renovation period, and expected project completion date. Describe the current status of the project including any steps that may have been accomplished to date and identify the person or entity accountable for each milestone. Contact the assigned Project Officer for additional information. 3. Due Date: Within 60 Days of Budget Start Date Within 60 days of Project Period Start Date, the award recipient must submit into HRSA's Electronic Handbook a revised SF-424C budget page, revised budget justification and revised equipment list, in accordance with the application guidance. Please move Project Management fees to line 5 of the budget. Please move costs for Signage, Voice and Data lines, and Security System updates to line 9 (Construction). The costs shown on line 7 (Site Work) consist of demolition and construction activities. Please move those costs to line 8 (Demolition) and line 9 (Construction). Please amend the Budget Narrative to indicate the total project costs on line 16 and the amount of grant funding requested on line 17. Please fill line 17 of the SF-424C. The equipment list shows $22,028 in equipment costs while the Budget Justification and SF-424C each show $24,500. Please check and revise all budget documents to ensure that all costs are consistently accounted for. The Contingency costs are more than the allowable amount (5% of the sum of lines 7,8, & 9). Please amend. 4. Due Date: Within 60 Days of Budget Start Date Within 60 days of the Project Period Start Date, the award recipient must submit schematic drawings including floor plan(s) and, if applicable to the project, a site plan that provide clear and complete information on the project into HRSA’s Electronic Handbook to support the requested funding amount for this project. Floor plans/site plans must be drawn to scale including proposed exam rooms, waiting area, etc. Documents must include rough dimensions for major project components. Drawings should clearly identify the project components that are being proposed, as well as distinguishing improved space from unaffected space. Contact the assigned Project Officer for additional information. NOTICE OF AWARD (Continuation Sheet)Date Issued: 9/22/2023 8:47:41 AM Award Number: 1 CE1HS52780-01-00 Page 3 Revised Schematic: Please amend the second-floor plan to indicate the construction activities that will occur at each affected location. Grant Specific Term(s) 1. 45 CFR Part 75 applies to all federal funds associated with the award. Part 75 has been effective since December 26, 2014. All references to prior OMB Circulars for the administrative and audit requirements and the cost principles that govern Federal monies associated with this award are superseded by the Uniform Guidance 2 CFR Part 200 as codified by HHS at 45 CFR Part 75. 2. As required by the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109–282), as amended by section 6202 of Public Law 110–252, recipients must report information for each subaward of $30,000 or more in Federal funds and executive total compensation, as outlined in Appendix A to 2 CFR Part 170. You are required to submit this information to the FFATA Subaward Reporting System (FSRS) at https://www.fsrs.gov/ by the end of the month following the month in which you awarded any subaward. The FFATA reporting requirements apply for the duration of the project period and so include all subsequent award actions to aforementioned HRSA grants and cooperative agreement awards (e.g., Type 2 (competing continuation), Type 5 (non-competing continuation), etc.). Subawards to individuals are exempt from these requirements. For more information, visit: https://www.hrsa.gov/grants/ffata.html. 3. All post-award requests, such as significant budget revisions or a change in scope, must be submitted as a Prior Approval action via the Electronic Handbooks (EHBs) and approved by HRSA prior to implementation. Grantees under “Expanded Authority,” as noted in the Remarks section of the Notice of Award, have different prior approval requirements. See “Prior-Approval Requirements” in the DHHS Grants Policy Statement: https://www.hhs.gov/sites/default/files/grants/grants/policies-regulations/hhsgps107.pdf. 4. The funds for this award are in a sub-account in the Payment Management System (PMS). This type of account allows recipients to specifically identify the individual grant for which they are drawing funds and will assist HRSA in monitoring the award. Access to the PMS account number is provided to individuals at the organization who have permissions established within PMS. The PMS sub-account code can be found on the HRSA specific section of the NoA (Accounting Classification Codes). Both the PMS account number and sub-account code are needed when requesting grant funds. Please note that for new and competing continuation awards issued after 10/1/2020, the sub-account code will be the document number. You may use your existing PMS username and password to check your organizations’ account access. If you do not have access, complete a PMS Access Form (PMS/FFR Form) found at: https://pmsapp.psc.gov/pms/app/userrequest. If you have any questions about accessing PMS, contact the PMS Liaison Accountant as identified at: http://pms.psc.gov/find-pms-liaison-accountant.html Program Specific Term(s) 1. On September 15, 2010, the United States Department of Justice published revised Americans with Disabilities Act (ADA) regulations in the Federal Register that update and amend some of the provisions in the original 1991 ADA regulations (see http://www.ada.gov/). These changes include revised accessibility standards, called the 2010 Standards for Accessible Design (2010 Standards), which establish minimum criteria for accessibility in design and construction (http://www.ada.gov/2010ADAstandards_index.htm). 2. The award recipient must submit an annual Federal Financial Report with expense date for each consecutive twelve (12) month budget period. This report is submitted through the Payment Management System (PMS). 3. This Notice of Award (NoA) is issued to inform your organization of the awarding of Community Project Funding/Congressionally Directed Spending (CPF/CDS): Construction Projects (HRSA-23-117) funding. This funding is authorized by the FY 2023 Consolidated Appropriations Act (P.L. 117-328) for projects that relate to the construction and renovation (including equipment) of health care and other facilities. This award cannot be transferred to another entity. 4. Each budget has a Federal Percentage Share based upon the award amount and the total allowable costs. Grant funds can only be drawn down from the Payment Management System (PMS) as allowable costs are incurred. Unless otherwise authorized, draw down should be done in the same proportion as the grant is to total project costs in the approved budget. For example, for a project with a total allowable cost of $100,000, and a federal contribution of $75,000, the federal share is 75 percent. If $100 in allowable costs are incurred, then $75 of grant funds would be drawn down from PMS to pay this incurred cost, while the other $25 will be paid by other sources of funds. The draw down percentage may be re-evaluated based on any modifications to the project that have been received from the grantee and approved by HRSA. 5. Equipment includes all moveable equipment that has a useful life of more than one year and a per-unit acquisition cost of $5,000 or more, including information technology systems. Moveable equipment can be readily shifted from place to place without requiring a change in the utilities or structural characteristics of the space. Any equipment purchased with your CDS award must be procured, maintained, tracked, and disposed of in accordance with 45 CFR part 75. 6.Applicants that are NOT required to file a Notice of Federal Interest, still acknowledge with the receipt of the Notice of Award that the Federal NOTICE OF AWARD (Continuation Sheet)Date Issued: 9/22/2023 8:47:41 AM Award Number: 1 CE1HS52780-01-00 Page 4 interest exists in real property and equipment and will be maintained in accordance with 45 CFR Part 75 UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, or 45 CFR Part 75 UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS, as applicable. The recipient shall maintain adequate documentation to track and protect the Federal Interest. For real property, adequate documentation will also include communications between the lessor and the lessee related to protecting such interest, in accordance with the standard award terms and conditions. Such documentation should be available for subsequent review by HRSA. 7. The preferred method for accomplishing construction development is by soliciting for competitive bids and then selecting the lowest responsive and responsible bid (where the contractor has adequately responded to the terms, conditions, and specification of the bid and has the capability to satisfactorily perform the contract). However, some award recipients may wish to accomplish construction using their own work force (force account). The award recipient must justify the use of force account by demonstrating that it would be more cost effective and that qualified personnel are available to accomplish the work. Consultation with the Project Officer is needed to determine if force account labor will be permitted. 8. If a Notice of Federal Interest (NFI) is required, HRSA's Federal interest is subordinate to all pre-existing mortgages or obligations recorded against the property. HRSA's Federal interest is also subordinate to loans and obligations identified in the application as sources of financing for the project. Future modifications and new mortgages and obligations will require prior approval. 9. You will need to submit a pre-award prior approval request to HRSA for review of any costs incurred up to 90 day prior to the Consolidated Appropriations Act, 2023 (P.L. 117-328; enacted December 29, 2022). Please refer to HRSA-23-117 for further guidance. 10. The award recipient does not have expanded authority under this program. Items that require prior approval from the awarding office as indicated in 45 CFR Part 75. HRSA has not waived cost-related or administrative prior approvals for recipients unless specifically stated on this Notice of Award] or 45 CFR Part 75, or the HHS Grants Policy Statement Prior-Approval Requirements, must be submitted in through the Electronic Handbook. Only responses to prior approval requests signed by the GMO and authorized under a Notice of Award are considered valid. award recipients who take action on the basis of responses from other officials do so at their own risk. Such responses will not be considered binding by or upon the HRSA. HRSA requires award recipients to seek prior approval through the Electronic Handbook for: (a) all pre-award costs, (b) rebudgeting of funds between construction and nonconstruction work; (c) rebudgeting of project costs exceeding 25 percent of the total approved budget (inclusive of direct and indirect costs and Federal funds and required matching or cost sharing) for that budget period; (d) changes in project scope, which occurs when the recipient proposes to change (or changes) the objectives, aims, or purposes identified in the approved application, including changing location, changing the approved design under a construction grant, eliminating a primary care delivery site, or making budget changes that cause a project to change substantially from that which was approved. Approval of a prior approval request may be conditioned by new terms and conditions that must be met and lifted from the Notice of Award prior to implementing work. 11 . An award recipient may acquire a variety of commercially available goods or services in connection with a grant-supported project or program. Award recipients may use their own procurement procedures that reflect applicable state and local laws and regulations, as long as those procedures conform to the following applicable U.S. Department of Health and Human Services (HHS) regulations: HHS regulations at 45 Code of Federal Regulations (CFR) 75 UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR HHS AWARDS. States must follow the requirements at Title 45 CFR 75. Generally, States must follow the same policies and procedures they use for procurements from non-Federal funds. Local and Tribal governments must follow the requirements at 45 CFR 75. 12. All program income generated as a result of awarded funds must be used for approved project-related activities. Any program income earned by the recipient must be used under the addition/additive alternative. Additional requirements found at 45 CFR § 75.307. 13. Although this NoA approves funds for the project(s) identified in the submitted application, HRSA may take action to withdraw the approval and funds for the project(s) if subsequent events lead HRSA to conclude that a project as originally proposed is ineligible or cannot be completed. Subsequent events could include, but are not limited to, non-compliance with the implementation of the project (such as excessive drawdown, improper procurement, conflicts of interests, etc.), significant changes to the location or physical scope of the project without prior approval, or the identification of previously undocumented environmental or historic preservation issues that lead the HRSA to conclude that the proposed project cannot be carried out consistent with the eligibility and program requirements. If this occurs, please contact the assigned Project Officer to discuss. Standard Term(s) 1. Your organization is required to have the necessary policies, procedures, and financial controls in place to ensure that your organization complies with all legal requirements and restrictions applicable to the receipt of federal funding, per HRSA Standard Terms (unless otherwise specified on your Notice of Award), and Legislative Mandates. The effectiveness of these policies, procedures, and controls is NOTICE OF AWARD (Continuation Sheet)Date Issued: 9/22/2023 8:47:41 AM Award Number: 1 CE1HS52780-01-00 Page 5 subject to audit. Reporting Requirement(s) 1. Due Date: Annually (Budget Period) Beginning: Budget Start Date Ending: Budget End Date, due 90 days after end of reporting period. The recipient must submit, within 90 days after budget period end date, an annual Federal Financial Report (FFR). The report should reflect cumulative reporting within the project period of the document number. All FFRs must be submitted through the Payment Management System (PMS). Technical questions regarding the FFR, including system access should be directed to the PMS Help Desk by submitting a ticket through the self-service web portal (PMS Self-Service Web Portal), or calling 877-614-5533. 2. Due Date: Within 90 Days of Project End Date Within 90 days of project completion, the award recipient must submit into HRSA's Electronic Handbook a final SF-424C budget page, budget justification, and equipment list (if applicable), for the completed project. 3. Due Date: Within 90 Days of Project End Date Within 90 days of project completion, the award recipient must scan and upload photographs, with brief descriptions, of the project prior to initiating work, during renovation/construction, and of the completed project, including exterior shots (front, rear of building), major rooms and examples of grant provided major equipment items, into the EHB for the approved project. 4. Due Date: Within 90 Days of Project End Date Within 90 days of project completion, the award recipient will submit documentation for the approved project certifying that the project have been completed in accordance with the previously provided certified documents and in accordance with all mandatory requirements imposed on+D3 federally-assisted projects by specific laws enacted by Congress, Presidential Executive Orders, or Departmental Policy, as well as all applicable program standards, State codes, and local codes and ordinances. 5. Due Date: Semi-Annually (Budget Period) Beginning: Budget Start Date Ending: Budget End Date, due 30 days after end of reporting period. The award recipient will submit a semi-annual Progress Report for the approved project(s) into the HRSA Electronic Handbook (EHB) approximately every six months until the project is completed. 6. Due Date: Within 90 Days of Project End Date The award recipient must submit within 90 days after the project end date the SF-428 (Tangible Personal Property Report) with the SF-428B (Final Report Attachment) and if applicable the SF-428S (Supplemental Sheet). These documents must be completed using the Electronic Handbooks (EHBs). The award recipient is required to report federally-owned property, acquired equipment with an acquisition cost of $5,000 or more for which HRSA has reserved the right to transfer title, and residual unused supplies with total aggregate fair market value exceeding $5,000. Records for equipment acquired with Federal funds shall be retained for three years after final disposal. Failure to comply with these reporting requirements will result in deferral or additional restrictions of future funding decisions. Contacts NoA Email Address(es): Name Role Email Leigh-Anne Stafford Point of Contact staffordl@oakgov.com Leigh-Anne Stafford Program Director staffordl@oakgov.com David Woodward Authorizing Official woodwardd@oakgov.com Note: NoA emailed to these address(es) All submissions in response to conditions and reporting requirements (with the exception of the FFR) must be submitted via EHBs. Submissions for Federal Financial Reports (FFR) must be completed in the Payment Management System (https://pms.psc.gov/). NOTICE OF AWARD (Continuation Sheet)Date Issued: 9/22/2023 8:47:41 AM Award Number: 1 CE1HS52780-01-00 Page 6