HomeMy WebLinkAboutReports - 2023.12.07 - 40853 AGENDA ITEM: FY2024 BOC Accessible Toilet Rooms Renovation DEPARTMENT: Facilities Planning & Engineering MEETING: Board of Commissioners DATE: Thursday, December 7, 2023 6:00 PM - Click to View Agenda ITEM SUMMARY SHEET COMMITTEE REPORT TO BOARD Resolution #2023-3592 Motion to approve the FY2024 Board of Commissioners Auditorium Building Accessible Toilet Rooms Renovation in the amount of $207,413; further, authorize the transfer of funding for PRJ- 17453 from the Capital Improvement Program/Building Fund (#40100) to the Project Work Order Fund (#40400) as detailed in Schedule A. ITEM CATEGORY SPONSORED BY Budget Amendment Yolanda Smith Charles INTRODUCTION AND BACKGROUND Renovate the existing North Men’s and Women’s toilet rooms at the Courthouse Complex Board of Commissioners Auditorium Building. All Board of Commissioners meetings must be open/accessible to the public per the Open Meetings Act (OMA), the restroom facility at the Board of Commissioners Auditorium should comply with ADA (Americans with Disability Act) standards. In accordance with Purchasing Division policies and procedures, Facilities Planning and Engineering (FP&E) and the Purchasing Division solicited proposals from competitively bid contractors to renovate the existing North Men’s and Women’s toilet rooms at the Courthouse Complex Board of Commissioners Auditorium Building to create accessible all-gender toilet room(s), from annual competitively bid and selected contractors. The total project cost is $207,413, including $112,951 for construction, $26,200 for electrical, $10,000 for miscellaneous owner costs, $600 for signage, $20,224 for professional service fees, and $37,438 for contingencies. Funding in the amount of $207,413 is available for transfer from the FY 2024 Capital Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund (#40400) for the FY2024 Board of Commissioners Auditorium Building Accessible Toilet Rooms Renovation. POLICY ANALYSIS BUDGET AMENDMENT REQUIRED: Yes Committee members can contact Michael Andrews, Policy and Fiscal Analysis Supervisor at 248.425.5572 or andrewsmb@oakgov.com, or the department contact persons listed for additional information. CONTACT Jason Warner, Manager Facilities Planning & Engineering ITEM REVIEW TRACKING Aaron Snover, Board of Commissioners Created/Initiated - 12/7/2023 AGENDA DEADLINE: 12/07/2023 6:00 PM ATTACHMENTS 1. Facilities_FY2024 BOC Accessible Toilet Rms Renovation_Sch.A 2. Facilities_23-082 MR-BOC ADA TR_FY2024 FINAL 3. Facilities_23-082 BOC ADA TR Reno_Project Estimate 2023_1013 FINAL COMMITTEE TRACKING 2023-11-29 Economic Development & Infrastructure - Forward to Finance 2023-11-29 Finance - Recommend to Board 2023-12-07 Full Board - Adopt Motioned by: Commissioner Charles Cavell Seconded by: Commissioner Ajay Raman Yes: David Woodward, Michael Spisz, Michael Gingell, Penny Luebs, Karen Joliat, Kristen Nelson, Christine Long, Robert Hoffman, Philip Weipert, Gwen Markham, Angela Powell, Marcia Gershenson, William Miller III, Yolanda Smith Charles, Charles Cavell, Brendan Johnson, Ajay Raman, Ann Erickson Gault (18) No: None (0) Abstain: None (0) Absent: (0) Passed Oakland County, Michigan FACILITIES MANAGEMENT/FACILITIES MAINTENANCE AND OPERATIONS - FY2024 BOC ACCESSIBLE TOILET ROOMS RENOVATION Schedule "A" DETAIL R/E Fund Name Division Name Fund # (FND)Cost Center (CCN) # Account # (RC/SC) Program # (PRG)Grant ID (GRN) # Project ID # (PROJ) Region (REG) Budget Fund Affiliate (BFA) Ledger Account Summary Account Title FY 2024 Amendment FY 2025 Amendment FY 2026 Amendment E Building Improvement Facilities Engineering Admin FND40100 CCN1040801 SC788001 PRG148020 BFA40400 788001 Transfer Out $207,413.00 $-$- Total Expenditures $207,413.00 $-$- R Project Work Order Facilities Engineering Admin FND40400 CCN1040801 RC695500 PRG148020 PROJ-17453 BFA40100 695500 Transfer In $207,413.00 $-$- Total Revenues $207,413.00 $-$- Project Estimate DESCRIPTION ESTIMATE Estimate Date: 10/13/2023 FPE#: 23-082 WO#: 1146890 FM Project Manager: HENSON-PECIC, JENNIFER Project: BOC Accessible Toilet Rooms Renovation FM-730352 CONSTRUCTION FM-730352-FireSuppression Fire Strobe Material/Labor $10,822.54 FM-730352-EnvironmentalWork Asbestos Abatement- Rightway $5,900.00 FM-730352-EnvironmentalWork Air Quality Monitoring- ETC $2,600.00 FM-730352-PatchandPaint Patch and Paint $3,690.00 FM-730352-Architectural General Contractor- Allied Building Services $75,086.00 FM-730352-Flooring Ceramic Tile, Resilient Flooring and Base $14,852.40 $112,950.94Total:CONSTRUCTION FM-730562 ELECTRICAL FM-730562-ElectricalLighting Electrical- Material and Labor $26,200.00 $26,200.00Total:ELECTRICAL FM-731241 MISCELLANEOUS FM-731241-Miscellaneous Misc Owners Costs $10,000.00 $10,000.00Total:MISCELLANEOUS FM-731752 SIGNAGE FM-731752-Signage Signage Remove and Replace $600.00 $600.00Total:SIGNAGE FM-730359 CONTINGENCY FM-730359-Contingency Construction Contingency- 15%$22,462.64 FM-730359-Contingency Inflation & Market Uncertainty Contingency 10%$14,975.09 $37,437.73Total:CONTINGENCY Others CONSULTANTS FM-731444-EnvironmentalConsultant Environmental Testing- SME $3,000.00 FM-731444-ArchConsultant JFR Architects & Consultants $17,224.00 $20,224.00Total:CONSULTANTS GRAND TOTAL: Subtotal Without Contingency: Contingency: $169,974.94 $37,437.73 $207,412.67 10/13/2023