Loading...
HomeMy WebLinkAboutResolutions - 2024.05.22 - 41201 AGENDA ITEM: Cost Participation Agreement with Road Commission for Oakland County (RCOC) for the County Center Drive East Paving Project DEPARTMENT: Facilities Planning & Engineering MEETING: Board of Commissioners DATE: Friday, June 7, 2024 8:55 PM - Click to View Agenda ITEM SUMMARY SHEET COMMITTEE REPORT TO BOARD Resolution #2024-4116 Motion to approve the County Center Drive East Paving Project (PRJ-17592) in the amount of $2,548,665, and authorizes the Chair of the Board of Commissioners to execute the attached Agreement with the Road Commission for Oakland County; further, the FY2024 budget is amended as detailed in Schedule A. ITEM CATEGORY SPONSORED BY Contract Yolanda Smith Charles INTRODUCTION AND BACKGROUND In accordance with Purchasing Division policies and procedures, Facilities Planning and Engineering (FP&E) and the Road Commission for Oakland County (RCOC) solicited a proposal for asphalt paving, concrete and associated utility work at County Center Drive East from annual competitively bid and selected contractors. The RCOC provided the best value bid. The total project cost is $2,548,665, including $1,920,013 for asphalt paving, concrete, and infrastructure, $50,000 for FM&O Landscape Services, $61,560 for electrical work, $7,359 for signage, as well as $509,733 for contingencies. Funding in the amount of $2,548,665 is available for transfer from the FY2024 Capital Improvement Program/Building Improvement Fund (#40100) to the Project Work Order Fund (#40400) for the County Center Drive East Paving Project. The project includes asphalt paving, concrete and associated utility work. POLICY ANALYSIS The RCOC shall undertake and complete the reconstruction of County Center Drive, between Telegraph Road to East of Hospital Drive. The reconstruction shall consist of 0.47 miles of full depth roadway reconstruction, including storm sewer reconstruction, curb and gutter installation, aggregate base, HMA paving, detention basin, permanent signing, and pavement marking. Affected County offices include the Medical Examiner’s Office, Sheriff’s Office Administration, and the Animal Shelter and Pet Adoption Center. Detour signs will be posted and access will be maintained to the facilities on the north side of the road. The project should take 70 calendar days and be completed no later than September 20, 2024. BUDGET AMENDMENT REQUIRED: Yes Committee members can contact Michael Andrews, Policy and Fiscal Analysis Supervisor at 248.425.5572 or andrewsmb@oakgov.com or the department contact persons listed for additional information. CONTACT Jason Warner, Manager Facilities Planning & Engineering ITEM REVIEW TRACKING Aaron Snover, Board of Commissioners Created/Initiated - 5/22/2024 AGENDA DEADLINE: 06/07/2024 6:00 PM ATTACHMENTS 1. Cost Participation Agreement - County Center Drive Project No. 55541 2. 22-487 Project Estimate 3_19_24 3. Area of Construction - Detour Route 4. County Center Drive East Paving Project_Schedule A-Budget Amendment COMMITTEE TRACKING 2024-05-15 Economic Development & Infrastructure - Forward to Finance 2024-05-15 Finance - Recommend to Board 2024-05-22 Full Board - Adopted Motioned by: Commissioner Penny Luebs Seconded by: Commissioner Robert Hoffman Yes: David Woodward, Michael Spisz, Penny Luebs, Kristen Nelson, Christine Long, Robert Hoffman, Philip Weipert, Gwen Markham, Angela Powell, Marcia Gershenson, Yolanda Smith Charles, Charles Cavell, Brendan Johnson, Ajay Raman, Ann Erickson Gault, Linnie Taylor (16) No: None (0) Abstain: None (0) Absent: Karen Joliat, Michael Gingell (2) Passed 1 COUNTY CENTER DRIVE between COUNTY OF OAKLAND and ROAD COMMISSION FOR OAKLAND COUNTY PROJECT NO. 55541 THIS AGREEMENT (“Agreement’), made and entered into this day of 2024, us made between the Road Commission for Oakland County, a Michigan statutory public body corporate, with administrative offices at 31001 Lahser Road, Beverly Hills, MI 48025, (hereinafter “RCOC”) and the County of Oakland, with offices at 1200 N. Telegraph Road, Pontiac, MI 48341 (hereinafter “County”) (collectively referred to as ‘the Parties’), provides as follows: WHEREAS, the road referred to as County Center Drive located in the Oakland County Service Center in Pontiac, Michigan is in poor condition and in need of repair, and WHEREAS, certain roads in the Oakland County Service Center are dedicated roadways and physically maintained by RCOC, and WHEREAS, the County Department of Facilities Management/Facilities Planning & Engineering is satisfied that this Agreement with RCOC is the most cost-effective means of completing the necessary repairs to County Center Drive, NOW, THEREFORE, in consideration of the mutual benefits set forth herein, it is agreed between the Parties: 1. RCOC RESPONSIBILTIES a. The RCOC shall undertake and complete the reconstruction of County Center Drive, between Telegraph Road to East of Hospital Drive. Said reconstruction shall consist of 0.47 miles of full depth roadway reconstruction, including storm sewer reconstruction, curb and gutter installation, aggregate base, HMA paving, detention basin, permanent signing, and pavement marking (“Project”). b. Except for the County’s payment obligation described herein, RCOC shall be solely responsible for providing any materials, equipment, and labor necessary to complete the Project and shall be solely responsible for engaging, overseeing, and reimbursing any person(s) providing any material or labor to or in connection with the Project. c. In connection with the Project, RCOC shall comply with all applicable laws, regulations code and ordinances, and secure any necessary permits or licenses. 2 2. COUNTY RESPONSIBILITIES Upon execution of this Agreement, the RCOC shall invoice the County $___________________ for the Project (“Invoice”). This amount is for 100% of the accepted low bid for the Project. The full amount of Invoice shall be paid by the County to RCOC in available United States Funds within thirty (30) days of the date of the Invoice. Upon completion of the Project, RCOC shall refund the County for any construction costs under the amount of the Invoice, based on the final construction cost, as determined by RCOC. Any final construction costs in excess of the Invoice shall be funded by RCOC. 3. GENERAL TERMS a. This agreement, and/or any subsequent amendments thereto, shall not become effective prior to approving resolutions issued by respective governing Boards of both Parties and as reflected and entered in each Board’s official minutes and filed with the Michigan Secretary of State as required by MCL §124.510. b. Any amendment or changes to this Agreement shall be in writing and approved by the respective governing Board of each Party. c. Each Party shall be responsible for any claims, damages, losses, or liabilities made against that Party by any third party or person. In this regard, if necessary, each Party shall seek its own legal representation and bear the costs associated with such representation, including attorney fees. Neither Party shall have any right under legal principle to be indemnified by the other Party or by any of its employees or agents in connection with any such claims, damages, losses, or liabilities. d. This Agreement does not, and is not intended to, impair, divest, delegate, or contravene any constitutional, statutory, and/or legal right, privilege, power, obligation, duty, or immunity of the Parties. e. The Parties intend and agree that for all purposes under this Agreement, RCOC’s legal status and relationship to the County shall be that of an independent contractor. f. It is the intention of the Parties that this Agreement is not made for the benefit of any third party or person. g. This Agreement shall be construed, interpreted, and governed in accordance with the laws of the State of Michigan. h. This Agreement includes three (3) pages. Except as otherwise expressly stated herein, this Agreement represents the entire agreement and understanding between the Parties. This 3 Agreement supersedes all other oral or written understandings between the Parties in any way related to the Project. IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be signed by their duly authorized representatives as of the date above. The signatures warrant that they are authorized to execute this Agreement on behalf of their respective organizations. BOARD OF ROAD COMMISSIONERS FOR THE COUNTY OF OAKLAND, a Public Body Corporate By: Dennis G. Kolar Its: Managing Director COUNTY OF OAKLAND By: Its: Project Estimate DESCRIPTION ESTIMATE Estimate Date: 3/19/2024 FPE#: 22-487 WO#: 1137947 FM Project Manager: BATTISHILL, BRETT Project: Paving County Center Drive East FM-730352 CONSTRUCTION FM-730352-Sitework RCOC-Asphalt, concrete, and infrastructure $1,920,012.58 FM-730352-Sitework FM&O Landscape Services-site restoration $50,000.00 $1,970,012.58Total:CONSTRUCTION FM-730562 ELECTRICAL FM-730562-ElectricalLighting FM&O-relocate three light poles, add new bases $61,560.00 $61,560.00Total:ELECTRICAL FM-731752 SIGNAGE FM-731752-Signage Done Right Signs-remove and re-install $7,359.00 $7,359.00Total:SIGNAGE FM-730359 CONTINGENCY FM-730359-Contingency Owner's Contingency 15%$305,839.74 FM-730359-Contingency Inflationary Contingency 10%$203,893.16 $509,732.90Total:CONTINGENCY GRAND TOTAL: Subtotal Without Contingency: Contingency: $2,038,931.58 $509,732.90 $2,548,664.48 3/19/2024 PO N T I A C L A K E R D CO U N T Y C E N T E R D R I V E W E S T T E L E G R A P H R O A D HO S P I T A L D R CO U R T T O W E R BL V D N O R T H CO U N T Y C E N T E R D R I V E E A S T COURT TOWER BLVD S SPC SPC SPC RCTT T3 RCA CCDE DA CCDE DA CCDE DA CCDE CCDE-D DET-R CCDE-D DET-R CCDE DET-S CCDE DET-S CCDE DET-L CCDE END SHQ-R SHQ-R AS-R AS-S SHQ-L AS-R RC T3 RC T3 RC T3 RC T3 SHQ-L AS-L 210Sft Sft 210Sign, Type B, Temp, Prismatic, Furn TRAFFIC DEVICES THIS SHEET UNIT QTY Sign, Type B, Temp, Prismatic, Oper 159Sft Sft 159Sign, Type B, Temp, Prismatic, Special, Furn Sign, Type B, Temp, Prismatic, Special, Oper ITEM 10EaBarricade, Type III, High Intensity, Double Sided, Lighted, Furn 10EaBarricade, Type III, High Intensity, Double Sided, Lighted, Oper X1 X4 X2 X2 X1 ME-L ME-S ME-R Road Closed for Construction Barricade_RCOC Barricade_RCOC Barricade_RCOC Barricade_RCOC DATE PROJECT NO. SHEET NO. DESIGN PHASE PROJECT NO. 55541 PROJECT NAME: COUNTY CENTER DRIVE PR O J E C T N O . 55 5 4 1 EN G I N E E R . SQ U A D 2 PR O J E C T N A M E : CO U N T Y C E N T E R D R I V E TE L E G R A P H R O A D T O E A S T O F H O S P I T A L D R I V E Know what's below. before you dig.Call R DETOUR ROUTE COUNTY CENTER DRIVETELEGRAPH ROAD TO EAST OF HOSPITAL DRIVE KEY D ET O U R D E T O U R D ET O U R D ET O U R A H E A D E N D D ET O U R R O A D C L O S E D A H E A D County Center Dr E County Center Dr E A n i m a l S h e l t e r A n i m a l S h e l t e r S h e r i ff's H QSheriff's H Q R O A D C L O S E D T O T H R U T RA F F I CRCTT T3 RCA CCDE DA CCDE CCDE-D DET-R CCDE DET-S CCDE DET-L CCDE END SHQ-R SHQ-L AS-S AS-R R O A D C L O S E DRC T3 W20-3-48 W20-2-48 M4-9-30 L M4-9-30 R M4-9-30 T R11-2 R11-4 60"x30" 48"x30" 48"x48" 48"x48" AS-L Ani mal Shelter Med i ca l Exa mi nerME-L Med i ca l Exa mi nerME-R M e d i c a l E x a m i n e rME-S County CtrCountyCtr County Ctr County Ctr Oakland County, Michigan FACILITIES MANAGEMENT/FACILITIES MAINTENANCE AND OPERATIONS - FY2024 COUNTY CENTER DRIVE EAST PAVING PROJECT Schedule "A" DETAIL R/E Fund Name Division Name Fund # (FND)Cost Center (CCN) # Account # (RC/SC) Program # (PRG)Grant ID (GRN) # Project ID # (PROJ) Region (REG) Budget Fund Affiliate (BFA) Ledger Account Summary Account Title FY 2024 Amendment FY 2025 Amendment FY 2026 Amendment E Building Improvement Facilities Engineering Admin FND40100 CCN1040801 SC788001 PRG148020 BFA40400 788001 Transfer Out $(2,548,665.00)$-$- Total Expenditures $(2,548,665.00)$-$- R Project Work Order Facilities Engineering Admin FND40400 CCN1040801 RC695500 PRG148020 PROJ-17592 BFA40100 695500 Transfer In $2,548,665.00 $-$- Total Revenues $2,548,665.00 $-$-